    SR.NO DESCRIPTION UOM QTY. RATES AM

    8. WATERPROOFING WORK

    8.1 Designing, providing and installing average 110mm thick proprietary terrace

    waterproofing consisting of brickbat coba in cement mortar mix in ratio of 1:5 (1

    cement : 5 sand) with approved waterproofing compound at the rate as specified by

    approved manufacturer to terrace, chajjas etc. including applying to cleaned, grouted

    concrete base surface, proprietary chemical water proofing system consisting of

    polymer modified acrylic base composite coating (of one part or two part

    component) as approved by the PM and as recommended by the approved

    manufacturer of waterproofing coating, and laying brick bat to required slope; outlet

    and rain water pipes grouted (minimum thickness 75mm), further finished with

    China mosaic in pattern and size as approved by EIC, joints grouted with

    waterproof jointing compound of approved colour and pattern all complete as per

    specifications as detailed and as approved by the EIC;

    Sq m 28463

    system to be carried over parapet wall about 300mm high from finish floor level.

    testing by ponding water about 200 mm high for 72 hrs. protecting till handover,

    testing for heat insulation etc. all complete as per specifications or equivalent as

    approved by the EIC; contractor to provide guarantee for 10 years on Rs.100/-

    stamp paper in approved proforma. ( Main Terrace)

    8.2 Designing, providing and laying proprietary chemical water proofing system

    consisting of polymer modified acrylic base composite coating (of one part or two

    part component) as approved by the EIC and as recommended by the approved

    manufacturer of waterproofing coating, sandwiched fibre mesh and protective

    screed. The work shall include cleaning of surface, grouting porous surfaces

    including making V grooves at junctions, cracks etc. Further including horizontal

    surface protected with 20mm screed in 1:4 mortar (1 cement : 4 sand) and vertical

    surface (wall) plastered with cement, sand mortar in ratio 1:4 (1 cement : 4 sand),

    finished in ready to receive Architectural finish, in correct line, level and plumb,

    curing, grouting, testing, etc. all complete to entire satisfaction of the PM, contractor

    to provide guarantee for 10 years Rs.100/- stamp paper in approved proforma. (To

    Toilets, Balconies etc.)

    Sq m 173837

    8.3 Providing and filling Brick bat (40-60 mm) with cement mortar mixed in ratio 1:3:6

    (1 cement : 3 sand : 6 brick bats) including mixing of water proofing compound 4 %

    by weight of cement to sunk portions of toilets, kitchen projection, terraces etc.

    complete to the entire satisfaction of the EIC. Toilet / Sunk portion shall be tested by

    ponding water for 72 hrs.

    Cu m 16181

    8.4 Designing, providing, installing Membrane waterproofing system below RCC

    foundation / raft and on outside of RCC retaining walls. System should follow

    progressive lifts of RCC retaining wall and should create 100% water tight and

    chemical barrier around the structure. All complete to approval of EIC and system

    shall be guaranteed for 10 years on Rs.100/- stamp paper. System recommended andspecified are as under. (Basement)

    Sq m 134935

    Below RCC Raft

    - Clean the PCC concrete surface with brush. Remove sharp protrusion on the

    blinding layer by chipping and local repairs and apply one coat of solvent based

    bitumen primer on entire PCC surface by brush. If PCC top surface is wet/moist, the

    same shall be made dry by Hot air blow at site.

    - Laying 2mm thick non-reinforced PVC membrane sheet of approved make. The

    size of Membrane shall be large enough to minimize the number of joints. Adjacent

    sheet shall be laid in similar manner with overlap of at least 150mm. The overlap

    joint shall be cleaned with approved primer and sealed as per manufacturer's

    specification, sealing corners and drains etc.

    - Laying of geo-textile mat of 120 gsm shall be laid over Membrane with an overlap

    of 75 mm spot stuck with neoprene base bonding adhesive.

    Protective layer of 30mm thick IPS 1:2:4 (1 cement : 2 sand : 4 aggregates) with

    adding waterproofing compound 4% by weight of cement shall be laid over the geo-

    textile. The treated surface should be cured for seven days.

    Outside Retaining Wall

  • 7/29/2019 WPROOFING Falcon View

    2/11

    - System shall consist of preparation of surfaces including V grooves at junctions

    and joints, pressure grouting the same and curing.

    - Applying approved crystalline waterproofing compound one / two coat at

    specified intervals and as recommended by manufacturer and allowed to cure.

    - Walls plastering and finished smooth with about 15 mm thick with cement sand

    mortar 1:4 (1 cement : 4 sand) using 2% of waterproofing compound by weight of

    cement.- Floors to have average 30 mm thick IPS to gradient 1:2:4 (1 cement : 2 sand : 4

    aggregate) with waterproofing compound 2% be weight of cement including

    required wattas, rounding of corners; junctions with walls and floor finished smooth

    Tank shall be tested by filling the water and maintaining it for 72 hrs. leakage.

    Contractor shall provide 10 year guarantee for waterproofing on Rs.100/- stamp

    paper in a approved proforma.

    8.6 Providing and applying membrane waterproofing to Landscape area through

    approved agencies consisting of

    Sq m 20303

    - Cementious based chemical waterproofing coating (two / three coats) systemincluding preparation of surfaces to receive approved chemicals, curing

    - Light weight concrete of density 450 kg/cum and of minimum 75 mm thickness

    at draining point and rest area sloped to drain water as detailed in drawing.

    - Perforated Mel drain system. Mel Drain matrix soil filter cum drainage system

    from M/s WR Meadows Inc. USA. or.J drain Inc. USA or equivalent approved.

    - 3.2 mm thick APP Polymer modified polyester reinforced.

    - Membrane protected by 30 mm thick water proof screed in CM mix ratio (1:4)

    spread over entire landscape area and finished to receive Architectural finish. Walls

    plastered with 12 mm thick CM 1:4. Work to include adding Polypropylene

    Fibermesh fibers with Microban to mortar in proportion recommended by the

    manufacturer with use of approved products and work carried out as per approved

    shop drawings, instructions and specifications of the manufacturer of product. Alsoinclude required preparation of the surface, etc. testing by pounding water for 72

    hours and giving guarantee for 10 years on Rs.100/- Stamp paper in approved

    proforma.

    8.7 Providing and applying membrane waterproofing to basement projection area

    through approved agencies consisting of

    Sq m 67714

    - Cementious based chemical waterproofing coating (two / three coats) system

    including preparation of surfaces to receive approved chemicals, curing

    - Light weight concrete of density 450 kg/cum (for non traffic area) and of

    minimum 75 mm thickness at draining point and rest area sloped to drain water as

    detailed in drawing.

    - Sloped shall be developed with required density mix to suite type traffic

    expected.- 3.2 mm thick APP Polymer modified polyester reinforced.

    - Protective screed of 30 mm thick water proof screed in CM mix ratio (1:4) spread

    over entire terrace area and finished to receive Architectural finish. Walls plastered

    with 12 mm thick CM 1:4. Work to include adding Polypropylene Fibermesh fibers

    with Microban to mortar in proportion recommended by the manufacturer with use

    of approved products and work carried out as per approved shop drawings,

    instructions and specifications of the manufacturer of product. Also include required

    preparation of the surface, etc. testing by pounding water for 72 hours and giving

    guarantee for 10 years on Rs.100/- Stamp paper in approved proforma.

    TOTAL OF WATERPROOFING WORK

  • 7/29/2019 WPROOFING Falcon View

    3/11

    8. WATERPROOFING WORK

    8.1 Designing, providing and installing average 110mmthick proprietary terrace waterproofing consisting of

    brickbat coba in cement mortar mix in ratio of 1:5 (1

    cement : 5 sand) with approved waterproofing

    compound at the rate as specified by approvedmanufacturer to terrace, chajjas etc. including

    applying to cleaned, grouted concrete base surface,

    proprietary chemical water proofing system

    consisting of polymer modified acrylic base

    composite coating (of one part or two part

    component) as approved by the PM and as

    recommended by the approved manufacturer of

    waterproofing coating, and laying brick bat to

    required slope; outlet and rain water pipes grouted

    (minimum thickness 75mm), further finished with

    China mosaic in pattern and size as approved by

    EIC, joints grouted with waterproof jointingcompound of approved colour and pattern all

    complete as per specifications as detailed and as

    a roved b the EIC

    Sq m 28463

    system to be carried over parapet wall about

    300mm high from finish floor level. testing by

    ponding water about 200 mm high for 72 hrs.

    protecting till handover, testing for heat insulation

    etc. all complete as per specifications or equivalent

    as approved by the EIC; contractor to provide

    guarantee for 10 years on Rs.100/- stamp paper in

    a roved roforma. Main Terrace

  • 7/29/2019 WPROOFING Falcon View

    4/11

    8.2 Designing, providing and laying proprietary

    chemical water proofing system consisting of

    polymer modified acrylic base composite coating

    (of one part or two part component) as approved

    by the EIC and as recommended by the approvedmanufacturer of waterproofing coating,

    sandwiched fibre mesh and protective screed. The

    work shall include cleaning of surface, grouting

    porous surfaces including making V grooves at

    junctions, cracks etc. Further including horizontal

    surface protected with 20mm screeding in 1:4

    mortar (1 cement : 4 sand) and vertical surface

    (wall) plastered with cement, sand mortar in ratio

    1:4 (1 cement : 4 sand), finished in ready to

    receive Architectural finish, in correct line, level

    and plumb, curing, grouting, testing, etc. all

    complete to entire satisfaction of the PM,

    contractor to provide guarantee for 10 years

    Rs.100/- stamp paper in approved proforma. (To

    Toilets, Balconies etc.)

    Sq m 173837

    8.3 Providing and filling Brick bat (40-60 mm) withcement mortar mixed in ratio 1:3:6 (1 cement : 3

    sand : 6 brick bats) including mixing of water

    proofing compound 4 % by weight of cement to

    sunk portions of toilets, kitchen projection, terracesetc. complete to the entire satisfaction of the EIC.

    Toilet / Sunk portion shall be tested by ponding

    water for 72 hrs.

    Cu m 16181

    8.4 Designing, providing, installing Membrane

    waterproofing system below RCC foundation / raft

    and on outside of RCC retaining walls. System

    should follow progressive lifts of RCC retaining

    wall and should create 100% water tight and

    chemical barrier around the structure. All

    complete to approval of EIC and system shall beguaranteed for 10 years on Rs.100/- stamp paper.

    System recommended and specified are as under.

    (Basement)

    Sq m 134935

    Below RCC Raft

  • 7/29/2019 WPROOFING Falcon View

    5/11

    - Clean the PCC concrete surface with brush.

    Remove sharp protrusion on the blinding layer by

    chipping and local repairs and apply one coat of

    solvent based bitumen primer on entire PCC

    surface by brush. If PCC top surface is wet/moist,

    the same shall be made dry by Hot air blow at site.

    - Laying 2mm thick non-reinforced PVC membrane

    sheet of approved make. The size of Membrane

    shall be large enough to minimize the number of

    joints. Adjacent sheet shall be laid in similar

    manner with overlap of at least 150mm. The

    overlap joint shall be cleaned with approved primer

    and sealed as per manufacturer's specification,

    sealing corners and drains etc.- Laying of geo-textile mat of 120 gsm shall be laid

    over Membrane with an overlap of 75 mm spot

    stuck with neoprene base bonding adhesive.

    - Protective layer of 30mm thick IPS 1:2:4 (1

    cement : 2 sand : 4 aggregates) with adding

    waterproofing compound 4% by weight of cement

    shall be laid over the geo-textile. The treated

    surface should be cured for seven days.

    Outside Retaining Wall

    - The surface of retaining shall be cleaned, make

    free from dust, remove any sharp protrusion before

    applying treatment. A bonding adhesive of

    approved make to be applied on the both sides of

    Membrane as well as on surface of retaining wall.

    Allow adhesive to dry until it is tacky then coated

    with 2mm thick non-reinforced PVC membrane ofapproved make. Adjacent sheet shall be adhere in

    similar manner with overlap of at least 150mm. The

    overlap joint shall be cleaned with approved primer

    and sealed as per manufacturer's specification.

    Membrane is covered upto 300 mm height above

    G.L and stuck the membrane into a groove cut into

    the concrete surface and seals the groove with a

    suitable bitumastic or li uid sealant.- A protective layer of 7.5mm thick HDPE protection

    board of approved make shall be adhered over

    Membrane with approved bonding adhesive.

    8.5 Designing, providing and installing proprietarycrystalline waterproofing system to inside surfaces

    of the water retaining structures

    Sq m ate Only

    - System shall consist of preparation of surfaces

    including V grooves at junctions and joints,

    pressure grouting the same and curing.

  • 7/29/2019 WPROOFING Falcon View

    6/11

    - Applying approved crystalline waterproofing

    compound one / two coat at specified intervals and

    as recommended by manufacturer and allowed to

    cure.

    - Walls plastering and finished smooth with about

    15 mm thick with cement sand mortar 1:4 (1cement : 4 sand) using 2% of waterproofing

    compound by weight of cement.

    - Floors to have average 30 mm thick IPS to

    gradient 1:2:4 (1 cement : 2 sand : 4 aggregate)

    with waterproofing compound 2% be weight of

    cement including required wattas, rounding of

    corners; junctions with walls and floor finished

    smooth and cured.Tank shall be tested by filling the water and

    maintaining it for 72 hrs. leakage. Contractor shall

    provide 10 year guarantee for waterproofing on

    Rs.100/- stamp paper in a approved proforma.

    8.6 Providing and applying membrane waterproofing toLandscape area through approved agencies

    consisting of

    Sq m 20303

    - Cementious based chemical waterproofing

    coating (two / three coats) system including

    preparation of surfaces to receive approved

    chemicals, curing

    - Light weight concrete of density 450 kg/cum and

    of minimum 75 mm thickness at draining point and

    rest area sloped to drain water as detailed in

    drawing.

    - Perforated Mel drain system. Mel Drain matrixsoil filter cum drainage system from M/s WR

    Meadows Inc. USA. or.J drain Inc. USA or

    equivalent approved.

    - 3.2 mm thick APP Polymer modified polyester

    reinforced.

    - Membrane protected by 30 mm thick water proof

    screed in CM mix ratio (1:4) spread over entire

    landscape area and finished to receive

    Architectural finish. Walls plastered with 12 mm

    thick CM 1:4. Work to include adding Polypropylene

    Fibermesh fibers with Microban to mortar in

    proportion recommended by the manufacturer withuse of approved products and work carried out as

    per approved shop drawings, instructions and

    specifications of the manufacturer of product. Also

    include required preparation of the surface, etc.

    testing by pounding water for 72 hours and giving

    guarantee for 10 years on Rs.100/- Stamp paper in

    approved proforma.

  • 7/29/2019 WPROOFING Falcon View

    7/11

    8.7 Providing and applying membrane waterproofing tobasement projection area through approved

    agencies consisting of

    Sq m 67714

    - Cementious based chemical waterproofing

    coating (two / three coats) system includingpreparation of surfaces to receive approved

    chemicals, curing

    - Light weight concrete of density 450 kg/cum (for

    non traffic area) and of minimum 75 mm thickness

    at draining point and rest area sloped to drain water

    as detailed in drawing.

    - Sloped shall be developed with required density

    mix to suite type traffic expected.

    - 3.2 mm thick APP Polymer modified polyester

    reinforced.

    - Protective screed of 30 mm thick water proof

    screed in CM mix ratio (1:4) spread over entire

    terrace area and finished to receive Architectural

    finish. Walls plastered with 12 mm thick CM 1:4.

    Work to include adding Polypropylene Fibermesh

    fibers with Microban to mortar in proportion

    recommended by the manufacturer with use of

    approved products and work carried out as per

    approved shop drawings, instructions and

    specifications of the manufacturer of product. Also

    include required preparation of the surface, etc.

    testing by pounding water for 72 hours and giving

    guarantee for 10 years on Rs.100/- Stamp paper in

    a roved roforma.

    TOTAL OF WATERPROOFING WORK

  • 7/29/2019 WPROOFING Falcon View

    8/11

    8. WATERPROOFING WORK

    8 Designing, providing and installing average 110mm thick

    proprietary terrace waterproofing consisting of brickbat coba

    in cement mortar mix in ratio of 1:5 (1 cement : 5 sand) with

    approved waterproofing compound at the rate as specified by

    approved manufacturer to terrace, chajjas etc. includingapplying to cleaned, grouted concrete base surface,

    proprietary chemical water proofing system consisting of

    polymer modified acrylic base composite coating (of one part

    or two part component) as approved by the PM and as

    recommended by the approved manufacturer of waterproofing

    coating, and laying brick bat to required slope; outlet and rain

    water pipes grouted (minimum thickness 75mm), further

    finished with China mosaic in pattern and size as approved by

    EIC, joints grouted with waterproof jointing compound of

    approved colour and pattern all complete as per specifications

    as detailed and as approved by the EIC;

    Sq m 28463

    system to be carried over parapet wall about 300mm high

    from finish floor level. testing by ponding water about 200 mm

    high for 72 hrs. protecting till handover, testing for heat

    insulation etc. all complete as per specifications or equivalent

    as approved by the EIC; contractor to provide guarantee for

    10 years on Rs.100/- stamp paper in approved proforma. (

    Main Terrace)

    8 Designing, providing and laying proprietary chemical water

    proofing system consisting of polymer modified acrylic base

    composite coating (of one part or two part component) as

    approved by the EIC and as recommended by the approved

    manufacturer of waterproofing coating, sandwiched fibremesh and protective screed. The work shall include cleaning

    of surface, grouting porous surfaces including making V

    grooves at junctions, cracks etc. Further including horizontal

    surface protected with 20mm screeding in 1:4 mortar (1

    cement : 4 sand) and vertical surface (wall) plastered with

    cement, sand mortar in ratio 1:4 (1 cement : 4 sand), finished

    in ready to receive Architectural finish, in correct line, level

    and plumb, curing, grouting, testing, etc. all complete to entire

    satisfaction of the PM, contractor to provide guarantee for 10

    years Rs.100/- stamp paper in approved proforma. (To

    Toilets Balconies etc.

    Sq m 173837

    8 Providing and filling Brick bat (40-60 mm) with cement mortar

    mixed in ratio 1:3:6 (1 cement : 3 sand : 6 brick bats)

    including mixing of water proofing compound 4 % by weight of

    cement to sunk portions of toilets, kitchen projection, terraces

    etc. complete to the entire satisfaction of the EIC. Toilet /

    Sunk portion shall be tested by ponding water for 72 hrs.

    Cu m 16181

  • 7/29/2019 WPROOFING Falcon View

    9/11

    8 Designing, providing, installing Membrane waterproofing

    system below RCC foundation / raft and on outside of RCC

    retaining walls. System should follow progressive lifts of RCC

    retaining wall and should create 100% water tight and

    chemical barrier around the structure. All complete toapproval of EIC and system shall be guaranteed for 10 years

    on Rs.100/- stamp paper. System recommended and

    s ecified are as under. Basement

    Sq m 134935

    Below RCC Raft

    - Clean the PCC concrete surface with brush. Remove sharp

    protrusion on the blinding layer by chipping and local repairs

    and apply one coat of solvent based bitumen primer on entire

    PCC surface by brush. If PCC top surface is wet/moist, the

    same shall be made dry by Hot air blow at site.

    - Laying 2mm thick non-reinforced PVC membrane sheet of

    approved make. The size of Membrane shall be large enoughto minimize the number of joints. Adjacent sheet shall be laid

    in similar manner with overlap of at least 150mm. The overlap

    joint shall be cleaned with approved primer and sealed as per

    manufacturer's specification, sealing corners and drains etc.

    - Laying of geo-textile mat of 120 gsm shall be laid over

    Membrane with an overlap of 75 mm spot stuck with

    neoprene base bonding adhesive.

    - Protective layer of 30mm thick IPS 1:2:4 (1 cement : 2 sand

    : 4 aggregates) with adding waterproofing compound 4% by

    weight of cement shall be laid over the geo-textile. The

    treated surface should be cured for seven days.

    Outside Retaining Wall

    - The surface of retaining shall be cleaned, make free from

    dust, remove any sharp protrusion before applying treatment.

    A bonding adhesive of approved make to be applied on the

    both sides of Membrane as well as on surface of retaining

    wall. Allow adhesive to dry until it is tacky then coated with

    2mm thick non-reinforced PVC membrane of approved make.

    Adjacent sheet shall be adhere in similar manner with overlap

    of at least 150mm. The overlap joint shall be cleaned with

    approved primer and sealed as per manufacturer's

    specification. Membrane is covered upto 300 mm height

    above G.L and stuck the membrane into a groove cut into the

    concrete surface and seals the groove with a suitablebitumastic or li uid sealant.- A protective layer of 7.5mm thick HDPE protection board of

    approved make shall be adhered over Membrane with

    approved bonding adhesive.

  • 7/29/2019 WPROOFING Falcon View

    10/11

    9 Designing, providing and installing proprietary crystalline

    waterproofing system to inside surfaces of the water retaining

    structures

    Sq m Rate Only

    - System shall consist of preparation of surfaces including V

    grooves at junctions and joints, pressure grouting the same

    and curing.- Applying approved crystalline waterproofing compound one

    / two coat at specified intervals and as recommended by

    manufacturer and allowed to cure.

    - Walls plastering and finished smooth with about 15 mm

    thick with cement sand mortar 1:4 (1 cement : 4 sand) using

    2% of waterproofing compound by weight of cement.

    - Floors to have average 30 mm thick IPS to gradient 1:2:4 (1

    cement : 2 sand : 4 aggregate) with waterproofing compound

    2% be weight of cement including required wattas, rounding

    of corners; junctions with walls and floor finished smooth and

    cured.

    Tank shall be tested by filling the water and maintaining it for

    72 hrs. leakage. Contractor shall provide 10 year guarantee

    for waterproofing on Rs.100/- stamp paper in a approved

    proforma.

    9 Providing and applying membrane waterproofing to

    Landscape area through approved agencies consisting of

    Sq m 20303

    - Cementious based chemical waterproofing coating (two /

    three coats) system including preparation of surfaces to

    receive approved chemicals, curing

    - Light weight concrete of density 450 kg/cum and of

    minimum 75 mm thickness at draining point and rest area

    sloped to drain water as detailed in drawing.

    - Perforated Mel drain system. Mel Drain matrix soil filtercum drainage system from M/s WR Meadows Inc. USA. or.J

    drain Inc. USA or equivalent approved.

    - 3.2 mm thick APP Polymer modified polyester reinforced.

    - Membrane protected by 30 mm thick water proof screed in

    CM mix ratio (1:4) spread over entire landscape area and

    finished to receive Architectural finish. Walls plastered with 12

    mm thick CM 1:4. Work to include adding Polypropylene

    Fibermesh fibers with Microban to mortar in proportion

    recommended by the manufacturer with use of approved

    products and work carried out as per approved shop

    drawings, instructions and specifications of the manufacturer

    of product. Also include required preparation of the surface,etc. testing by pounding water for 72 hours and giving

    guarantee for 10 years on Rs.100/- Stamp paper in approved

    roforma.

    9 Providing and applying membrane waterproofing to basement

    projection area through approved agencies consisting of

    Sq m 67714

  • 7/29/2019 WPROOFING Falcon View

    11/11

    - Cementious based chemical waterproofing coating (two /

    three coats) system including preparation of surfaces to

    receive approved chemicals, curing

    - Light weight concrete of density 450 kg/cum (for non traffic

    area) and of minimum 75 mm thickness at draining point and

    rest area sloped to drain water as detailed in drawing.

    - Sloped shall be developed with required density mix to

    suite type traffic expected.

    - 3.2 mm thick APP Polymer modified polyester reinforced.

    - Protective screed of 30 mm thick water proof screed in CM

    mix ratio (1:4) spread over entire terrace area and finished to

    receive Architectural f inish. Walls plastered with 12 mm thick

    CM 1:4. Work to include adding Polypropylene Fibermesh

    fibers with Microban to mortar in proportion recommended by

    the manufacturer with use of approved products and work

    carried out as per approved shop drawings, instructions and

    specifications of the manufacturer of product. Also include

    required preparation of the surface, etc. testing by pounding

    water for 72 hours and giving guarantee for 10 years on

    Rs.100/- Stamp paper in approved proforma.

    TOTAL OF WATERPROOFING WORK