Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan Revision of Updated Procurement Plan, August 2017 2. Date of General Procurement Notice: October 10, 2016 3. Period covered by this procurement plan: 18 months II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Category Prior Review Threshold US$ Comments 1. Goods and >= US$2 million All 2. Works >= US$ 10 million All 3. (Non-Consultant Services) >= US$2 million All 2. Prequalification. _Not applicable. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: At sub-national levels (Commune/Sangkat and Community), provisions of the Project Implementation Manual (PIM) dated March 30, 2016 which has been agreed by the Bank will apply. The PIM provides for processes and procedures for procurement at sub-national levels. 4. Reference to (if any) Project Operational/Procurement Manual: the Project Implementation Manual (PIM) dated March 30, 2016 has been agreed by the Bank. 5. Summary of the Procurement Packages 1 2 3 4 5 6 7 Ref. No. Description Estimated Cost US$ million Packages Domest ic Prefere nce (yes/no) Review by Bank (Prior / Post) Comments LASE D/NC DDS/ W/NC B/05/1 7 Upgrade Earth Road to Late-Rite Roads (106.96Km) 1.5 1 No Post NCB Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Upload: others

Post on 16-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: World Bank Documentdocuments.worldbank.org/curated/en/... · II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review

Procurement Plan

I. General

1. Bank’s approval Date of the procurement Plan Revision of Updated Procurement Plan, August 2017

2. Date of General Procurement Notice: October 10, 20163. Period covered by this procurement plan: 18 months

II. Goods and Works and non-consulting services.

1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement:

Procurement Category Prior Review ThresholdUS$

Comments

1. Goods and >= US$2 million All2. Works >= US$ 10 million All3. (Non-Consultant Services) >= US$2 million All

2. Prequalification. _Not applicable.

3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: At sub-national levels (Commune/Sangkat and Community), provisions of the Project Implementation Manual (PIM) dated March 30, 2016 which has been agreed by the Bank will apply. The PIM provides for processes and procedures for procurement at sub-national levels.

4. Reference to (if any) Project Operational/Procurement Manual: the Project Implementation Manual (PIM) dated March 30, 2016 has been agreed by the Bank.

5. Summary of the Procurement Packages

1 2 3 4 5 6 7

Ref. No.

Description EstimatedCostUS$

million

Packages Domestic

Preference

(yes/no)

Reviewby Bank

(Prior / Post)

Comments

LASED/NCDDS/W/NCB/05/17

Upgrade Earth Road to Late-Rite Roads (106.96Km)

1.5 1 No Post NCB

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: World Bank Documentdocuments.worldbank.org/curated/en/... · II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review

LASED/NCDDS/W/NCB/03/17

Construction of Late-Rite Roads = 29km

1.3 1 No Post NCB

LASED/NCDDS/W/NCB/02/17

Land Preparation Agriculture-Bulldozing, Leveling. Total:2,355.50Ha

2.4 1 No Post NCB

LASED/NCDDS/W/NCB/06/17

Construction of 11 small dams.

1.1 1 No Post NCB

LASED/NCDDS/W/NCB/04/17

Construction of earth roads (130Km)

2.86 1 No Post NCB

LASED/NCDDS/G/NCB/12/17

Household Start-Up Packages for Daung 700 HH (Solar lamp, Tent plastic, mat, blanket, water jar, water filter)

0.12 1 No Post NCB

LASED/NCDDS/G/NCB/03/16

Office equipment (computers & Photocopy Machines)

0.18 1 No Post NCB

III. Selection of Consultants

1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants:

2. Selection Method Prior Review Threshold Comment1. Competitive Methods (Firms) >= US$1,000,0002. Individual >= US$ 300,000

2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise

Page 3: World Bank Documentdocuments.worldbank.org/curated/en/... · II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review

entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines.

4. Consultancy Assignments with Selection Methods

1 2 3 4 5 6

Ref. No. Description of Assignment

Estimated CostUS$ million

Packages Reviewby Bank(Prior / Post)

Comments

LASED/NCDDS/F/35/17

Consulting firm for Irrigation Design (8 sites)

0.12 1 Post CQS

LASED/NCDDS/IC/30/17

Baseline Survey in year 2017 (Local Firm)

0.07 1 Post CQS

LASED/NCDDS/IC/31/18

Impact Survey for 2nd year of the project/Mid-term review (Local Firm)

0.05 1 Post CQS

LASED/NCDDS/IC/32/21

Final Impact Survey

0.12 1 Post CQS

Page 4: World Bank Documentdocuments.worldbank.org/curated/en/... · II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review

Page 1

PROCUREMENT

PLANCambodia : KH-Land Allocation for Social and Economic Development Project II

General Information

Country: Cambodia Bank’s Approval Date of the Original Procurement Plan: 2016-08-18

Revised Plan Date(s): (comma delineated, leave blank if none)2019-12-18

Project ID: P150631 GPN Date: 2016-10-10

Project Name: KH-Land Allocation for Social and Economic Development Project II

Loan / Credit No: IDA / 58070

Executing Agency(ies): National Committee for Sub-National Democratic Development Secretariat

WORKS

Activity Reference No.

/ DescriptionLoan / Credit

No.Component Review Type Method

Market

Approach

Procurement

Process

Prequalificatio

n (Y/N)

Estimated

Amount

(US$)

Actual

Amount

(US$)

Process

Status

Draft Pre-

qualification

Documents

Prequalification

Evaluation Report

Draft Bidding

Document /

Justification

Specific Procurement

Notice / Invitation

Bidding Documents

as Issued

Proposal Submission

/ Opening / Minutes

Bid Evaluation

Report and

Recommendation for

Award

Signed Contract Contract Completion

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

COMMUNE NO 07/17 /

Water well (Afredes) for

Thmey 19 Units

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope63,333.33 62,890.00 Signed 2017-06-06 2017-08-01 2018-08-01

COMMUNE NO 08/17 /

Water well (Afredes) for

Chambak 6 Units

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope20,000.00 9,900.00 Signed 2017-06-06 2017-08-01 2018-08-01

COMMUNE NO 10/17 /

House for Nurses &

Teachers Ceramic tile

floor (W=9.2m, L=16.2m,

H=6.82m, 4 bed room, 4

rooms's W.C & 4 places

of kitchend) for Tipo 1

QTY 1 Unit

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope35,000.00 34,750.00 Signed 2017-07-06 2017-08-31 2018-08-31

COMMUNE NO 11/17 /

House for Nurses &

Teachers Ceramic tile

floor (W=9.2m, L=16.2m,

H=6.82m, 4 bed room, 4

rooms's W.C & 4 places

of kitchend) for Tipo 2

QTY 1 Unit

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope35,000.00 34,750.00 Signed 2017-07-06 2017-08-31 2018-08-31

COMMUNE NO 12/17 /

House for Nurses &

Teachers Ceramic tile

floor (W=9.2m, L=16.2m,

H=6.82m, 4 bed room, 4

rooms's W.C & 4 places

of kitchend) for

Choamkravien QTY 1

Unit

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope35,000.00 34,400.00 Signed 2017-07-06 2017-08-31 2018-08-31

COMMUNE NO 13/17 /

House for Nurses &

Teachers (8mx 20m

x4Rooms, each room

equipped with internal

kitchen & bathroom) for

Chambak QTY 1 Unit

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope35,000.00 32,400.00 Signed 2017-07-06 2017-08-31 2018-08-31

COMMUNE NO 14/17 /

House for Nurses &

Teachers Ceramic tile

floor (W=9.2m, L=16.2m,

H=6.82m, 4 bed room, 4

rooms's W.C & 4 places

of kitchend) for Sambok

QTY 1 Unit

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope35,000.00 31,500.00 Signed 2017-07-06 2017-08-31 2018-08-31

COMMUNE NO 15/17 /

House for Nurses &

Teachers Ceramic tile

floor (W=9.2m, L=16.2m,

H=6.82m, 4 bed room, 4

rooms's W.C & 4 places

of kitchend) for

Changkrang QTY 1 Unit

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope35,000.00 34,850.00 Signed 2017-07-06 2017-08-31 2018-08-31

COMMUNE NO 16/17 /

House for Nurses &

Teachers Ceramic tile

floor (W=9.2m, L=16.2m,

H=6.82m, 4 bed room, 4

rooms's W.C & 4 places

of kitchend) for Thmey

QTY 1 Unit

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope35,000.00 34,700.00 Signed 2017-07-06 2017-08-31 2018-08-31

COMMUNE NO 17/17 /

House for Nurses &

Teachers Ceramic tile

floor (W=9.2m, L=16.2m,

H=6.82m, 4 bed room, 4

rooms's W.C & 4 places

of kitchend) for Dar QTY

1 Unit

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope35,000.00 30,400.00 Signed 2017-07-06 2017-08-31 2018-08-31

COMMUNE NO 18/17 /

House for Nurses &

Teachers Ceramic tile

floor (W=9.2m, L=16.2m,

H=6.82m, 4 bed room, 4

rooms's W.C & 4 places

of kitchend) for Ksach Sar

QTY 1 Unit

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope35,000.00 34,886.00 Signed 2017-07-06 2017-08-31 2018-08-31

COMMUNE NO 19/17 /

House for Nurses &

Teachers Ceramic tile

floor (W=9.2m, L=16.2m,

H=6.82m, 4 bed room, 4

rooms's W.C & 4 places

of kitchend) for Sambok

Kriel QTY 1 Unit

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope35,000.00 34,720.00 Signed 2017-07-06 2017-08-31 2018-08-31

COMMUNE NO 20/17 /

House for Nurses &

Teachers Ceramic tile

floor (W=9.2m, L=16.2m,

H=6.82m, 4 bed room, 4

rooms's W.C & 4 places

of kitchend) for Peam

QTY 1 Unit

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope35,000.00 34,869.00 Signed 2017-07-06 2017-08-31 2018-08-31

COMMUNE NO 21/17 /

House for Nurses &

Teachers (8mx 20m

x4Rooms, each room

equipped with internal

kitchen & bathroom) for

Chhean Loeung QTY 1

Unit

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope35,000.00 34,800.00 Signed 2017-07-06 2017-08-31 2018-08-31

COMMUNE NO 22/17 /

House for Nurses &

Teachers Ceramic tile

floor (W=9.2m, L=16.2m,

H=6.82m, 4 bed room, 4

rooms's W.C & 4 places

of kitchend) for Raksmey

Samaki QTY 1 Unit

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope35,000.00 33,942.00 Signed 2017-07-06 2017-08-31 2018-08-31

COMMUNE NO 23/17 /

Construction of

Community Centre

Ceramic tile floor

(W=7.2m, L=17.2m,

H=6.62m, Warehouse, 2

rooms's W.C) for Dar (1).

Total: 1 Unit

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope29,000.00 28,900.00 Signed 2017-06-06 2017-08-01 2018-07-31

COMMUNE NO 24/17 /

Construction of

Community Centre

Ceramic tile floor

(W=7.2m, L=17.2m,

H=6.62m, Warehouse, 2

rooms's W.C) for Thmey

(1). Total: 1 Unit

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope29,000.00 28,950.00 Signed 2017-06-06 2017-08-01 2018-07-31

COMMUNE NO 25/17 /

Construction of

Community Centre

Ceramic tile floor

(W=7.2m, L=17.2m,

H=6.62m, Warehouse, 2

rooms's W.C) for Chambak

(1). Total: 1 Unit

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope29,000.00 27,400.00 Signed 2017-06-06 2017-08-01 2018-07-31

Page 5: World Bank Documentdocuments.worldbank.org/curated/en/... · II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review

Page 2

COMMUNE NO 26/17 /

Construction of

Community Centre

Ceramic tile floor

(W=7.2m, L=17.2m,

H=6.62m, Warehouse, 2

rooms's W.C) for

Choamkravien (1). Total: 1

Unit

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope29,000.00 28,800.00 Signed 2017-06-06 2017-08-01 2018-07-31

COMMUNE NO 27/17 /

Construction of

Community Centre

Ceramic tile floor

(W=7.2m, L=17.2m,

H=6.62m, Warehouse, 2

rooms's W.C) for Tipo 2

(1). Total: 1 Unit

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope29,000.00 25,400.00 Signed 2017-06-06 2017-08-01 2018-08-01

COMMUNE NO 29/17 /

Construction of

Community Centre

Ceramic tile floor

(W=7.2m, L=17.2m,

H=6.62m, Warehouse, 2

rooms's W.C) for Peam

(1). Total: 1 Unit

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope29,000.00 26,400.00 Signed 2017-06-06 2017-08-01 2018-08-01

COMMUNE NO 30/17 /

Construction of

Community Centre

Ceramic tile floor

(W=7.2m, L=17.2m,

H=6.62m, Warehouse, 2

rooms's W.C) for Chean

Loeung (1). Total: 1 Unit

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope29,000.00 28,850.00 Signed 2017-06-06 2017-08-01 2018-08-31

COMMUNE NO 31/17 /

Construction of

Community Centre

Ceramic tile floor

(W=7.2m, L=17.2m,

H=6.62m, Warehouse, 2

rooms's W.C) for Ksach

Sor (1). Total: 1 Unit

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope29,000.00 28,780.00 Signed 2017-06-06 2017-08-01 2018-08-01

COMMUNE NO 32/17 /

Construction of

Community Centre

Ceramic tile floor

(W=7.2m, L=17.2m,

H=6.62m, Warehouse, 2

rooms's W.C) for Chum

Kreal (1). Total: 1 Unit

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope29,000.00 26,300.00 Signed 2017-06-06 2017-08-01 2018-08-01

COMMUNE NO 33/17 /

Construction of

Community Centre

Ceramic tile floor

(W=7.2m, L=17.2m,

H=6.62m, Warehouse, 2

rooms's W.C) for Prey

Thom (1). Total: 1 Unit

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope29,000.00 27,565.00 Signed 2017-06-06 2017-08-01 2018-08-01

LASED/NCDDS/W/NCB/02/

17 / Land Preparation

Agriculture-Buldozing,

Leveling:LOT1:

S.Kriel(100),

Ksa.Sar(126.50),Peam(116.5

0), Chh.loeung(103),

Ra.Samaki(200), TP1(276),

TP2 (226.50), S.bok(100),

Ch.Krang(59), Dar(97),

Thmey(174)&Chambak(277)

. LOT2:Daung (500).Grand

Total:2,355.50Ha

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

BidsOpen - National

Single Stage -

One Envelope2,355,500.00 1,913,405.75 Signed 2017-02-01 2017-02-06 2017-03-20 2017-04-19 2017-05-24 2017-11-20

LASED/NCDDS/W/NCB/07/

17 / Construction of

Primary Schools (5Rooms,

4WCs, 1Well, 1Flag Pole)

Incl. 250chairs connected

with tables, 5Tables &

5Chairs and Whiteboards

for: Tipo1, Chambak,

Sambok, Raksmey Samaki

(KSP), Ksach Sar (KCH),

Choamkravien and Daung

(2units) Total:8Units

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

BidsOpen - National

Single Stage -

One Envelope711,111.11 693,314.40 Signed 2017-09-15 2017-09-20 2017-11-01 2017-12-01 2018-01-05 2018-07-04

LASED/NCDDS/W/SP/01/17

/ "Upgrade Earth Road to

Late-Rite Roads

(W4.5mxT0.15m): Main

Road, KPT

Tipo 1 and 2 = 11km. "

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope158,888.89 127,836.37 Signed 2017-12-20 2018-02-14 2018-08-13

COMMUNE/KPT/W/37/18

/ Upgrade Earth Road to

Late-Rite Roads

(W4.5mxT0.15m):, Tipo 1

(AR3=0.95km,

ART=0.71km, AR2=1.26km,

AR4=1,35) Total= 4.27km.

(Package1)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope61,677.78 0.00

Pending

Implementa

tion

2018-08-06 2018-10-01 2019-03-30

LASED/NCDDS/W/NCB/05/

17 / Upgrade Earth Road

to Late-Rite

Roads(W4.5mxT0.15m):LOT

1: Tipo1(9.47km), Tipo2

(10.53km) and Main Road

(11km). Total 31km. LOT

2: S.Kriel(19km),

K.Sar(10.80km),

Peam(11.44km),

Chh.Loeung(13.72km) &

Ra.Samaki(21km). Total:

75.96km. Grand Total

106.96Km

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

BidsOpen - National

Single Stage -

One Envelope1,544,977.78 0.00 Canceled 2017-09-01 2017-09-06 2017-10-18 2017-11-17 2017-12-22 2018-06-20

LASED/NCDDS/W/NCB/03/

17 / Construction of Lot

1. Late-Rite Roads

(W5xT0.15xE0.5m) =

22km. Lot 2. Earth Roads

(W5xT0.15xE0.5m) for

Daung = 29km

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

BidsOpen - National

Single Stage -

One Envelope1,342,000.00 0.00

Pending

Implementa

tion

2019-01-01 2019-01-06 2019-02-17 2019-03-19 2019-04-23 2019-10-20

LASED/NCDDS/W/SP/09/17

/ Build board

Construction, Installation

and Renew Banner (New

bill board 3 sites at KSP,

KPT and KCH) and

Renews banner for

existing bill board 9 sites.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope116,666.67 107,060.85 Signed 2018-04-07 2018-06-02 2018-11-29

COMMUNE/KRT/W/54/18

/ Construction of Health

Posts (3 rooms, fense

400m, gate 1, well1, WC

2rooms, pipe culvert 1,

incinerator 1, 200m of

laterite road). 1 Unit for

Da, KRT

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope36,666.67 34,900.00 Signed 2018-03-06 2018-05-01 2018-10-28

COMMUNE/KRT/W/55/18

/ Construction of Health

Posts (3 rooms, fense

400m, gate 1, well1, WC

2rooms, pipe culvert 1,

incinerator 1, 200m of

laterite road). 1 Unit

for Thmey, KRT.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope36,666.67 36,200.00 Signed 2018-03-06 2018-05-01 2018-10-28

LASED/NCDDS/W/NCB/08/

17 / Construction of

Health Posts (3 rooms,

fense 400m, gate 1, well1,

WC 2rooms, pipe culvert

1, incinerator 1, 200m of

laterite road). Da (1

Unit), Thmey (1 Unit)

Ksach Sar (1 Unit),

Chhean Loeung (1 Unit)

and Daung (1 Unit). Total

5 Units.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope183,333.33 0.00 Canceled 2017-02-06 2017-04-03 2018-04-03

Page 6: World Bank Documentdocuments.worldbank.org/curated/en/... · II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review

Page 3

LASED/NCDDS/W/NCB/01/

17 / 1) Concrete Poles in

Agriculture & Residential

Lands (0.12 x 0.12 x

0.75m) = (5000 Poles), 2)

Concrete Poles in Forestry

& in SLC Sites

(0.3x0.3x0.4x1.5m) (150

Poles) and 3) Concrete

Poles in Stream and

Canal (0.2x0.2x1.5m) for

Daung (200 Poles).

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope160,555.56 0.00 Canceled 2017-10-07 2017-12-02 2018-05-31

LASED/NCDDS/W/NCB/09/

18 / Upgrade Earth Road

to Late-Rite

Road(W4.5mxT0.15m):LOT1

:KPT,Tipo=15

lines=15.73km,LOT2: KCH

A) KrangLvea =22 Lines

25.14km),B)Peam =17

Lines(11.44km),C)Chhean

Loeung=10 Lines

(9.57km)=46.15km &

LOT3:

KSP,RaksmeySamaki=5

Lines= 16.25km.

GrandTotal=78.13Km.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

BidsOpen - National

Single Stage -

One Envelope1,128,544.44 946,643.43 Signed 2018-08-22 2018-08-27 2018-10-08 2018-11-07 2018-12-12 2019-12-12

COMMUNE/KCH/W/42/18

/ Upgrade Earth Road to

Late-Rite Roads

(W4.5mxT0.15m): Sambok

Kriel, Krang Lvea

Commune, KCH =

(URR/5lines = 4.66km).

(Package 2).

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope67,311.11 0.00

Pending

Implementa

tion

2018-05-23 2018-07-18 2019-01-14

COMMUNE/KCH/W/46/18

/ Upgrade Earth Road to

Late-Rite Roads

(W4.5mxT0.15m): Chhean

Loeung Commune, KCH =

(URR/12lines) = 4.15km.

(Package 1).

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope59,944.44 0.00

Pending

Implementa

tion

2018-05-09 2018-07-04 2018-12-31

COMMUNE/KCH/W/56/18

/ Construction of Health

Posts (3 rooms, fense

400m, gate 1, well1, WC

2rooms, pipe culvert 1,

incinerator 1, 200m of

laterite road). 1 Unit

for Ksach Sar, KCH.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope36,666.67 29,967.00 Signed 2018-04-22 2018-06-17 2018-12-14

COMMUNE/KCH/W/57/18

/ Construction of Health

Posts (3 rooms, fense

400m, gate 1, well1, WC

2rooms, pipe culvert 1,

incinerator 1, 200m of

laterite road). 1 Unit for

Chhean Loeung, KCH.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope36,666.67 0.00

Pending

Implementa

tion

2018-04-22 2018-06-17 2018-12-14

COMMUNE/KCH/W/59/18

/ Ploughing (2 Times) for

Peam Commune (116.5Ha),

Samaki Meanchey District,

Kg. Chhnang

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope12,944.44 0.00

Pending

Implementa

tion

2018-05-23 2018-07-18 2019-01-14

COMMUNE/KCH/W/60/18

/ Ploughing (2 Times) for

Chheanloeurng Commune

(103Ha), Samaki

Meanchey District, Kg.

Chhnang.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope11,444.44 0.00

Pending

Implementa

tion

2018-05-23 2018-07-18 2019-01-14

COMMUNE/KSP/W/49/18

/ Upgrade Earth Road to

Late-Rite Roads

(W4.5mxT0.15m): Raksmey

Samaki, KSP =

(Up1=3.40km, Up2=0.30

km, Up3=0.15 km,

Up4=0.30 km, Up5=0.30

km, and Up6=0.30km) =

4.75km. (Package 1)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope68,611.11 67,345.00 Signed 2018-04-14 2018-06-09 2018-12-06

COMMUNE/KPT/W/53/18

/ Construction of Health

Posts (3 rooms, fense

400m, gate 1, well1, WC

2rooms, pipe culvert 1,

incinerator 1, 200m of

laterite road). 1 Unit for

Daung, KPT.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope36,666.67 0.00

Pending

Implementa

tion

2018-11-20 2019-01-15 2019-07-14

COMMUNE NO 05/17 /

Water well (Afredes) for

Daung (Site I) : Total: 18

Units

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope54,000.00 0.00

Pending

Implementa

tion

2018-09-19 2018-11-14 2019-05-13

COMMUNE/KSP/W/61/18

/ Ploughing (2 Times) for

Reaksmey Samaki

Commune (200Ha), Oral

District, Kg. Speu.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope22,222.22 21,600.00 Signed 2018-05-23 2018-07-18 2019-01-14

COMMUNE/KPT/W/62/18

/ Ploughing (2 Times)

Tipo 1 = 354.44Ha &

Tipo 2 =226.5Ha, Total =

580.94Ha for Tipo

Commune, Suntuk

District, Kg. Thom.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope64,548.89 46,075.20 Signed 2018-05-23 2018-07-18 2019-01-14

COMMUNE/KRT/W/67/18

/ Ploughing (2 Times) for

Thmey Commune (174Ha),

Chetr Borey, Kratie.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope19,333.33 0.00

Pending

Implementa

tion

2018-05-23 2018-07-18 2019-01-14

COMMUNE/KRT/W/68/18

/ Ploughing (2 Times) for

Chambak Commune

(277Ha), Prek Prasab,

Kratie.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope30,777.78 0.00

Pending

Implementa

tion

2018-05-23 2018-07-18 2019-01-14

COMMUNE/KPT/W/63/18

/ Ploughing (2 Times) for

Daung Commune (500Ha),

Suntuk District, Kg.

Thom.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope55,555.56 0.00

Pending

Implementa

tion

2019-02-06 2019-04-03 2019-09-30

COMMUNITY/KCH/W/45/1

8 / Planting in

Agriculture Land (Sowing

Seed or Planting Seedling

cover crop) for community

in Sambok Kriel (100Ha),

KCH.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

2,777.78 0.00 Canceled 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27

COMMUNITY/KCH/W/46/1

8 / Planting in

Agriculture Land (Sowing

Seed or Planting Seedling

cover crop) for community

in Ksach Sar (126.50Ha),

KCH.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

3,513.89 0.00 Canceled 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27

COMMUNITY/KCH/W/47/1

8 / Planting in

Agriculture Land (Sowing

Seed or Planting Seedling

cover crop) for community

in Peam (116.50Ha), KCH.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

3,236.11 0.00 Canceled 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27

COMMUNITY/KCH/W/48/1

8 / Planting in

Agriculture Land (Sowing

Seed or Planting Seedling

cover crop) for community

in Chheanloeung (103Ha),

KCH.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

2,861.11 0.00 Canceled 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27

COMMUNITY/KSP/W/49/18

/ Planting in Agriculture

Land (Sowing Seed or

Planting Seedling cover

crop) for community in

Raksmey Samaki (200Ha),

KSP.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

5,555.56 0.00 Canceled 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27

Page 7: World Bank Documentdocuments.worldbank.org/curated/en/... · II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review

Page 4

COMMUNITY/KPT/W/42/18

/ Planting in Agriculture

Land (Sowing Seed or

Planting Seedling cover

crop) for community in

Tipo 1, KPT (354.44Ha)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

9,845.56 0.00 Canceled 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27

COMMUNITY/KPT/W/43/18

/ Planting in Agriculture

Land (Sowing Seed or

Planting Seedling cover

crop) for community in

Tipo 2 , KPT (226.50Ha)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

6,291.67 0.00 Canceled 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27

COMMUNITY/KRT/W/50/18

/ Planting in Agriculture

Land (Sowing Seed or

Planting Seedling cover

crop) for community in

Sambok, KRT

(100Ha+120Ha=220Ha).

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

6,111.11 0.00 Canceled 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27

COMMUNITY/KRT/W/51/18

/ Planting in Agriculture

Land (Sowing Seed or

Planting Seedling cover

crop) for community in

Changkrang, KRT

(59Ha+80Ha=139Ha)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

3,861.11 0.00 Canceled 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27

COMMUNITY/KRT/W/52/18

/ Planting in Agriculture

Land (Sowing Seed or

Planting Seedling cover

crop) for community in

Dar, KRT (97Ha)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

2,694.44 0.00 Canceled 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27

COMMUNITY/KRT/W/53/18

/ Planting in Agriculture

Land (Sowing Seed or

Planting Seedling cover

crop) for community in

Thmey, KRT (174Ha)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

4,833.33 0.00 Canceled 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27

COMMUNITY/KRT/W/54/18

/ Planting in Agriculture

Land (Sowing Seed or

Planting Seedling cover

crop) for community in

Chambak, KRT (277Ha)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

7,694.44 0.00 Canceled 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27

COMMUNITY/KPT/W/44/18

/ Planting in Agriculture

Land (Sowing Seed or

Planting Seedling cover

crop) for community in

Daung, KPT (500Ha)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

13,888.89 0.00 Canceled 2019-05-08 2019-05-13 2019-06-24 2019-07-24 2019-08-28 2020-02-24

COMMUNE NO 06/17 /

Water well (Afredes) for

Daung (Site II): Total: 17

Units

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope51,000.00 0.00

Pending

Implementa

tion

2019-01-20 2019-03-17 2019-09-13

COMMUNE/KPT/W/34/18

/ Concrete Poles in

Agriculture Lands (0.12 x

0.12 x 0.75m) = (3600

Poles) for Daung, KPT.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope72,000.00 28,800.00 Signed 2019-01-20 2019-03-17 2019-09-13

COMMUNE/KPT/W/35-

36/18 / Concrete Poles in

Residential Lands (0.12 x

0.12 x 0.75m= 1400 Poles)

and Concrete Poles in

Forestry (0.3x0.3x0.4x1.5m

= 150 Poles) and Concrete

Poles in Stream and

Canal (0.2x0.2x1.5m = 200

Poles) for Daung, KPT.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope44,600.00 21,300.00 Signed 2018-09-22 2018-11-17 2019-05-16

COMMUNITY/KPT/W/39/18

/ Instalation Concrete

Poles in Agriculture

Lands (0.12 x 0.12 x

0.75m) = (3600 Poles) for

Daung, KPT.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

18,000.00 0.00

Pending

Implementa

tion

2019-01-15 2019-01-20 2019-03-03 2019-04-02 2019-05-07 2019-11-03

COMMUNE NO 09/17 /

House for Nurses &

Teachers Ceramic tile

floor (W=9.2m, L=16.2m,

H=6.82m, 4 bed room, 4

rooms's W.C & 4 places

of kitchend) for Daung

QTY 1 Unit

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope35,000.00 0.00

Pending

Implementa

tion

2018-12-19 2019-02-13 2019-08-12

COMMUNE NO 28/17 /

Construction of

Community Centre

Ceramic tile floor

(W=7.2m, L=17.2m,

H=6.62m, Warehouse, 2

rooms's W.C) for Daung

(1). Total: 1 Unit

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope29,000.00 0.00

Pending

Implementa

tion

2019-01-02 2019-02-27 2019-08-26

COMMUNE NO 01/17 /

Repair Earth Roads for

Sambok (6.6km). Total:

6.6Km

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope22,000.00 21,614.12 Signed 2018-05-29 2018-07-24 2019-07-24

COMMUNE NO 02/17 /

Repair Earth Roads for

Changkrang (6.6km) Total:

6.6Km

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope22,000.00 21,576.00 Signed 2018-05-29 2018-07-24 2019-07-24

COMMUNE NO 03/17 /

Repair Earth Roads for

Thmey (4km). Total: 4Km

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope13,333.33 9,934.00 Signed 2018-05-29 2018-07-24 2019-07-24

COMMUNE NO 04/17 /

Repair Earth Roads for

Dar (7.8km). Total: 7.8

Km

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope26,000.00 25,497.00 Signed 2018-05-29 2018-07-24 2019-07-24

COMMUNE/KRT/W/64/18

/ Ploughing (2 Times) for

Sambok Commune

(100Ha+120Ha=220Ha),

Chetr Borey, Kratie.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope24,444.44 0.00

Pending

Implementa

tion

2018-05-23 2018-07-18 2019-01-14

COMMUNE/KRT/W/65/18

/ Ploughing (2 Times) for

Changkrang Commune

(59Ha+80Ha=139Ha),

Chetr Borey, Kratie.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope15,444.44 0.00

Pending

Implementa

tion

2018-05-23 2018-07-18 2019-01-14

COMMUNE/KRT/W/66/18

/ Ploughing (2 Times) for

Dar Commune (97Ha),

Chetr Borey, Kratie.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope10,777.78 0.00

Pending

Implementa

tion

2018-05-23 2018-07-18 2019-01-14

COMMUNITY/KCH/W/07A/

18 / 1) Concrete Poles in

Agriculture & Residential

Lands (0.12x0.12x0.75m) =

(700 Poles) and 2)

Concrete Poles in Forestry

& in SLC Sites (0.3x 0.3x

0.4x 1.5m) for Sambok

Kriel (20 Poles).

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

18,900.00 0.00

Pending

Implementa

tion

2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27

COMMUNITY/KCH/W/08A/

18 / Concrete Poles in

Agriculture & Residential

Lands (0.12x0.12x0.75m)

for Ksach Sar (400 Poles).

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

10,000.00 0.00

Pending

Implementa

tion

2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27

Page 8: World Bank Documentdocuments.worldbank.org/curated/en/... · II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review

Page 5

COMMUNITY/KCH/W/09A/

18 / 1) Concrete Poles in

Agriculture & Residential

Lands (0.12x0.12x0.75m) =

(400 Poles) and Concrete

Poles in Forestry & in

SLC Sites

(0.3x0.3x0.4x1.5m) for

Peam (30 Poles).

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

12,100.00 0.00

Pending

Implementa

tion

2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27

COMMUNITY/KCH/W/34A/

18 / Construction of Pipe

Culverts (H1xL6m) for

Sambok Kriel: 10 Units.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

25,000.00 0.00

Pending

Implementa

tion

2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27

COMMUNITY/KCH/W/35A/

18 / Construction of Pipe

Culverts (H1xL6m) for

Ksach Sar: 15 Units

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

37,500.00 0.00

Pending

Implementa

tion

2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27

COMMUNITY/KCH/W/36A/

18 / Construction of Pipe

Culverts (H1xL6m) for

Peam: 5 Units

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

12,500.00 0.00

Pending

Implementa

tion

2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27

COMMUNITY/KCH/W/37A/

18 / Construction of Pipe

Culverts (H1xL6m) for

Chhean Loeun: 10 Units.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

25,000.00 0.00

Pending

Implementa

tion

2018-06-06 2018-06-11 2018-07-23 2018-08-22 2018-09-26 2019-03-25

COMMUNITY/KSP/W/10A/

18 / 1) Concrete Poles in

Forestry & in SLC Sites

(0.3x0.3x0.4x1.5m) (20

Poles) and 2) Concrete

Poles in Stream and

Canal (0.2x0.2x1.5m) for

Raksmey Samaki (26

Poles).

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

2,570.00 0.00

Pending

Implementa

tion

2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2018-12-27

COMMUNITY NO 10/18

/ 1) Concrete Poles in

Forestry & in SLC Sites

(0.3x0.3x0.4x1.5m) (20

Poles) and 2) Concrete

Poles in Stream and

Canal (0.2x0.2x1.5m) for

Raksmey Samaki (26

Poles)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope2,570.00 0.00 Canceled 2018-06-06 2018-08-01 2019-08-01

COMMUNITY/KSP/W/38A/

18 / Construction of Pipe

Culverts (H1xL6m) for

Raksmey Samaki: 15

Units

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

37,500.00 0.00

Pending

Implementa

tion

2018-06-15 2018-06-20 2018-08-01 2018-08-31 2018-10-05 2019-01-03

COMMUNITY NO 38/18

/ Construction of Pipe

Culverts (H1xL6m) for

Raksmey Samaki: 15

Units

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope37,500.00 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28

COMMUNITY NO 17/18

/ Planting Grass of Earth

Roads (W5xT0.15xE0.5m)

for Tipo 1 (15Km)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope18,750.00 0.00 Canceled 2018-03-06 2018-05-01 2018-10-28

COMMUNITY/KPT/W/17A/

18 / Planting Grass of

Earth Roads

(W5xT0.15xE0.5m) for

Tipo 1 (15Km)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

18,750.00 0.00

Pending

Implementa

tion

2019-03-15 2019-03-20 2019-05-01 2019-05-31 2019-07-05 2019-10-03

COMMUNITY NO 18/18

/ Planting Grass of Earth

Roads (W5xT0.15xE0.5m)

for Tipo 2 (12Km)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope15,000.00 0.00 Canceled 2018-03-06 2018-05-01 2018-10-28

COMMUNITY/KPT/W/18A/

18 / Planting Grass of

Earth Roads

(W5xT0.15xE0.5m) for

Tipo 2 (12Km)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

15,000.00 0.00

Pending

Implementa

tion

2019-03-15 2019-03-20 2019-05-01 2019-05-31 2019-07-05 2019-10-03

COMMUNITY NO 32/18

/ Construction of Pipe

Culverts (H1xL6m) for

Tipo 1 (10), Kg. Thom: 11

Units.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope27,500.00 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28

COMMUNITY/KPT/W/32A/

18 / Construction of Pipe

Culverts (H1xL6m) for

Tipo 1 (10), Kg. Thom: 11

Units.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

27,500.00 0.00

Pending

Implementa

tion

2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27

COMMUNITY/KPT/W/33A/

18 / Construction of Pipe

Culverts (H1xL6m) for

Tipo 2 (10), Kg. Thom.

Total: 11 Units.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

27,500.00 0.00

Pending

Implementa

tion

2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27

COMMUNITY NO 01/18

/ Concrete Poles and

Installation in Agriculture

& Residential Lands

(0.12x0.12x0.75m) for

Sambok, Kratie (708

Poles).

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope17,700.00 0.00 Canceled 2018-06-06 2018-08-01 2019-08-01

COMMUNITY/KRT/W/01A/

18 / Concrete Poles and

Installation in Agriculture

& Residential Lands

(0.12x0.12x0.75m) for

Sambok, Kratie (708

Poles).

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

17,700.00 0.00

Pending

Implementa

tion

2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27

COMMUNITY NO 02/18

/ Concrete Poles in

Agriculture & Residential

Lands (0.12x0.12x0.75m)

for Changkrang (700

Poles).

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope17,500.00 0.00 Canceled 2018-06-06 2018-08-01 2019-08-01

COMMUNITY/KRT/W/02A/

18 / Concrete Poles in

Agriculture & Residential

Lands (0.12x0.12x0.75m)

for Changkrang (700

Poles).

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

17,500.00 0.00

Pending

Implementa

tion

2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27

COMMUNITY NO 05/18

/ Concrete Poles in

Agriculture & Residential

Lands (0.12x0.12x0.75m) =

(250 Poles) and Concrete

Poles in Forestry & in

SLC Sites

(0.3x0.3x0.4x1.5m) for

Thmey (10 Poles)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope6,950.00 0.00 Canceled 2018-06-06 2018-08-01 2019-08-01

COMMUNITY/KRT/W/05A/

18 / Concrete Poles in

Agriculture & Residential

Lands (0.12x0.12x0.75m) =

(250 Poles) and Concrete

Poles in Forestry & in

SLC Sites

(0.3x0.3x0.4x1.5m) for

Thmey (10 Poles)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

6,950.00 0.00

Pending

Implementa

tion

2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27

COMMUNITY NO 06/18

/ Concrete Poles in

Agriculture & Residential

Lands (0.12x0.12x0.75m)

for Chambak (270 Poles).

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope6,750.00 0.00 Canceled 2018-06-06 2018-08-01 2019-08-01

COMMUNITY/KRT/W/06A/

18 / Concrete Poles in

Agriculture & Residential

Lands (0.12x0.12x0.75m)

for Chambak (270 Poles).

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

6,750.00 0.00

Pending

Implementa

tion

2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27

Page 9: World Bank Documentdocuments.worldbank.org/curated/en/... · II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review

Page 6

COMMUNITY NO 07/18

/ 1) Concrete Poles in

Agriculture & Residential

Lands (0.12x0.12x0.75m) =

(700 Poles) and 2)

Concrete Poles in Forestry

& in SLC Sites (0.3x 0.3x

0.4x 1.5m) for Sambok

Kriel (20 Poles)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope18,900.00 0.00 Canceled 2018-06-06 2018-08-01 2019-08-01

COMMUNITY NO 08/18

/ Concrete Poles in

Agriculture & Residential

Lands (0.12x0.12x0.75m)

for Ksach Sar (400 Poles).

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope10,000.00 0.00 Canceled 2018-06-06 2018-08-01 2019-08-01

COMMUNITY NO 09/18

/ 1) Concrete Poles in

Agriculture & Residential

Lands (0.12x0.12x0.75m) =

(400 Poles) and Concrete

Poles in Forestry & in

SLC Sites

(0.3x0.3x0.4x1.5m) for

Peam (30 Poles).

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope12,100.00 0.00 Canceled 2018-06-06 2018-08-01 2019-08-01

COMMUNITY/KRT/W/13A/

18 / Planting Grass of

Earth Roads

(W5xT0.15xE0.5m). for

Sambok (6km).

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

7,500.00 0.00

Pending

Implementa

tion

2019-01-08 2019-01-13 2019-02-24 2019-03-26 2019-04-30 2019-07-29

COMMUNITY NO 13/18

/ Planting Grass of Earth

Roads (W5xT0.15xE0.5m).

for Sambok (6km).

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope7,500.00 0.00 Canceled 2018-03-06 2018-05-01 2018-10-28

COMMUNITY NO 14/18

/ Planting Grass of Earth

Roads (W5xT0.15xE0.5m)

for Changkrang (6km).

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope7,500.00 0.00 Canceled 2018-03-06 2018-05-01 2018-10-28

COMMUNITY/KRT/W/15A/

18 / Planting Grass of

Earth Roads

(W5xT0.15xE0.5m) for Da

(8km).

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

10,000.00 0.00

Pending

Implementa

tion

2019-01-08 2019-01-13 2019-02-24 2019-03-26 2019-04-30 2019-07-29

COMMUNITY/KRT/W/19A/

18 / Construction of Box

Culverts (2x3x6m) for

Sambok (1 Unit)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

16,000.00 0.00

Pending

Implementa

tion

2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2018-12-27

COMMUNITY/KRT/W/20A/

18 / Construction of Box

Culverts (2x3x6m) for

Changkrang (1 Unit)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

16,000.00 0.00

Pending

Implementa

tion

2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2018-12-27

COMMUNITY/KRT/W/21A/

18 / Construction of Box

Culverts (2x3x6m) for Dar

(1 Unit)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

16,000.00 0.00

Pending

Implementa

tion

2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2018-12-27

COMMUNITY/KRT/W/22A/

18 / Construction of Box

Culverts (2x3x6m) for

Thmey (2 Units)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

32,000.00 0.00

Pending

Implementa

tion

2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2018-12-27

COMMUNITY/KRT/W/23A/

18 / Construction of Box

Culverts (2x3x6m) for

Chambak. Phase 1 (2

Units)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

32,000.00 0.00

Pending

Implementa

tion

2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2018-12-27

COMMUNITY/KRT/W/24A/

18 / Construction of Box

Culverts (2x3x6m) for

Chambak. Phase 2 (2

Units)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

32,000.00 0.00

Pending

Implementa

tion

2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2018-12-27

COMMUNITY/KRT/W/25A/

18 / Construction of Box

Culverts (2x3x6m) for

Chambak. Phase 3 (2

Units)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

32,000.00 0.00

Pending

Implementa

tion

2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2018-12-27

COMMUNITY/KRT/W/26A/

18 / Construction of Pipe

Culverts (H1xL6m) for

Sambok, Kratie: 8 Units

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

20,000.00 0.00

Pending

Implementa

tion

2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2018-12-27

COMMUNITY/KRT/W/27A/

18 / Construction of Pipe

Culverts (H1xL6m) for

Changkrang, Kratie: 8

Units

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

20,000.00 0.00

Pending

Implementa

tion

2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2018-12-27

COMMUNITY/KRT/W/28A/

18 / Construction of Pipe

Culverts (H1xL6m) for

Dar, Kratie: 6 Units

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

15,000.00 0.00

Pending

Implementa

tion

2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2018-12-27

COMMUNITY/KRT/W/29A/

18 / Construction of Pipe

Culverts (H1xL6m) for

Thmey, Kratie: 7 Units

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

17,500.00 0.00

Pending

Implementa

tion

2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2018-12-27

COMMUNITY/KRT/W/30A/

18 / Construction of Pipe

Culverts (H1xL6m) for

Chambak, Kratie: 4 Units

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

10,000.00 0.00

Pending

Implementa

tion

2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2018-12-27

COMMUNITY/KTM/W/11A/

18 / Concrete Poles in

Stream and Canal

(0.2x0.2x1.5m) for

Chaomkravien (350 Poles).

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

15,750.00 0.00

Pending

Implementa

tion

2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27

COMMUNITY/KTM/W/16A/

18 / Planting Grass of

Earth Roads

(W5xT0.15xE0.5m) for

Choamkravien (5Km)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

6,250.00 0.00

Pending

Implementa

tion

2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2018-12-27

COMMUNITY/KTM/W/31A/

18 / Construction of Pipe

Culverts (H1xL6m) for

Choamkravien, Kg. Cham:

8 Units

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

20,000.00 0.00

Pending

Implementa

tion

2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2018-12-27

COMMUNE/KCH/W/58/18

/ Ploughing (2 Times) for

Sambok Kriel (100Ha) and

for Ksach Sar (126.50Ha),

Total 226.50 Ha,

Kranglovea Commune,

Samaki Meanchey District,

Kg. Chhnang.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope25,166.67 0.00

Pending

Implementa

tion

2018-05-23 2018-07-18 2019-01-14

COMMUNITY/KPT/W/41/18

/ Instalation Concrete

Poles in in Residential

Lands (0.12 x 0.12 x

0.75m = 1400 Poles) and

Concrete Poles in Forestry

(0.3x0.3x0.4x1.5m = 150

Poles) and Concrete Poles

in Stream and Canal

(0.2x0.2x1.5m = 200 Poles)

for Daung, KPT.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

9,900.00 0.00

Pending

Implementa

tion

2018-09-17 2018-09-22 2018-11-03 2018-12-03 2019-01-07 2019-07-06

COMMUNE/KPT/W/38/18

/ Upgrade Earth Road to

Late-Rite Roads

(W4.5mxT0.15m): Tipo 1

(AR6=1.30km, AR=14km,

AR16=0.85km, AR18=0.46,

and AA1= 1.42) Total=

5.2km. (Package2)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope75,111.11 0.00 Canceled 2018-08-06 2018-10-01 2019-03-30

Page 10: World Bank Documentdocuments.worldbank.org/curated/en/... · II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review

Page 7

COMMUNE/KPT/W/39/18

/ Upgrade Earth Road to

Late-Rite Roads

(W4.5mxT0.15m): Tipo 2

(AR01=1.10km,

AR02=1.20km,

AR03=1.20km,

AR04=1.13km,

ARAR05=1.25km)=

Total:5.88km (Package 1)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope84,933.33 0.00 Canceled 2018-07-07 2018-09-01 2019-02-28

COMMUNE/KPT/W/40/18

/ Upgrade Earth Road to

Late-Rite Roads

(W4.5mxT0.15m): Tipo 2

(AR06=1.10km,

AR07=1.15km,

AR08=1.00km,

AR09=0.60km,

AR10=0.80km)=

Total:4.65km (Package 2)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope67,166.67 0.00 Canceled 2018-07-07 2018-09-01 2019-02-28

COMMUNE/KCH/W/41/18

/ Upgrade Earth Road to

Late-Rite Roads

(W4.5mxT0.15m): Sambok

Kriel = (URR/7lines =

5.34km). (Package 1)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope77,133.33 0.00 Canceled 2018-04-07 2018-06-02 2018-11-29

COMMUNE/KCH/W/43/18

/ Upgrade Earth Road to

Late-Rite Roads

(W4.5mxT0.15m): Ksach

Sar = (URR/2lines &

UAR/6lines = 4.8km).

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope69,333.33 0.00 Canceled 2018-04-07 2018-06-02 2018-11-29

COMMUNE/KCH/W/44/18

/ Upgrade Earth Road to

Late-Rite Roads

(W4.5mxT0.15m): Peam =

(URR/9lines) = 5.67km.

(Package 1)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope81,900.00 0.00 Canceled 2018-04-07 2018-06-02 2018-11-29

COMMUNE/KCH/W/45/18

/ Upgrade Earth Road to

Late-Rite Roads

(W4.5mxT0.15m): Peam =

(URR/5lines &

UAR/3lines). Total =

5.77km. (Package 2)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope83,344.44 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28

COMMUNE/KCH/W/47/18

/ Upgrade Earth Road to

Late-Rite Roads

(W4.5mxT0.15m):Chhean

Loeung = (UAR/4lines).

Total = 4.40km. (Package

2)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope63,555.56 0.00 Canceled 2018-07-07 2018-09-01 2019-02-28

COMMUNE/KCH/W/48/18

/ Upgrade Earth Road to

Late-Rite Roads

(W4.5mxT0.15m):Chhean

Loeung = (UAR/6lines).

Total = 5.17km. (Package

3)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope74,677.78 0.00 Canceled 2018-07-07 2018-09-01 2019-02-28

COMMUNE/KSP/W/50/18

/ Upgrade Earth Road to

Late-Rite Roads

(W4.5mxT0.15m): Raksmey

Samaki, KSP = (Up7=3.50

km, and Up9=1.75km) =

5.25km. (Package 2)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope75,833.33 0.00 Canceled 2018-02-06 2018-04-03 2018-09-30

COMMUNE/KSP/W/51/18

/ Upgrade Earth Road to

Late-Rite Roads

(W4.5mxT0.15m): Raksmey

Samaki, KSP = (Up8=1.65

km, and Up10=3.50km) =

5.15km. (Package 3)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope74,388.89 0.00 Canceled 2018-02-06 2018-04-03 2018-09-30

COMMUNE/KSP/W/52/18

/ Upgrade Earth Road to

Late-Rite Roads

(W4.5mxT0.15m): Raksmey

Samaki, KSP - Main =

(Up11=5.85km) = 5.85km.

(Package 4)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope84,500.00 0.00 Canceled 2018-03-06 2018-05-01 2018-10-28

LASED/NCDDS/W/SP/02/18

/ "Upgrade Earth Road to

Late-Rite Roads

(W4.5mxT0.15m): Main

Road KCH

Sambokreal = 9km and

Khsach Sor = 6km. (Total

= 15km)"

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope216,666.67 0.00 Canceled 2018-08-06 2018-10-01 2019-03-30

COMMUNITY NO 33/18

/ Construction of Pipe

Culverts (H1xL6m) for

Tipo 2 (10), Kg. Thom.

Total: 11 Units

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope27,500.00 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28

COMMUNITY NO 15/18

/ Planting Grass of Earth

Roads (W5xT0.15xE0.5m)

for Da (8km).

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope10,000.00 0.00 Canceled 2018-03-06 2018-05-01 2018-10-28

COMMUNITY NO 19/18

/ Construction of Box

Culverts (2x3x6m) for

Sambok (1)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope16,000.00 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28

COMMUNITY NO 20/18

/ Construction of Box

Culverts (2x3x6m) for

Changkrang (1 Unit)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope16,000.00 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28

COMMUNITY NO 21/18

/ Construction of Box

Culverts (2x3x6m) for Dar

(1 Unit)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope16,000.00 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28

COMMUNITY NO 22/18

/ Construction of Box

Culverts (2x3x6m) for

Thmey (2 Units)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope32,000.00 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28

COMMUNITY NO 23/18

/ Construction of Box

Culverts (2x3x6m) for

Chambak. Phase 1 (2

Units)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope32,000.00 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28

COMMUNITY NO 24/18

/ Construction of Box

Culverts (2x3x6m) for

Chambak. Phase 2 (2

Units)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope32,000.00 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28

COMMUNITY NO 25/18

/ Construction of Box

Culverts (2x3x6m) for

Chambak. Phase 3 (2

Units)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope32,000.00 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28

COMMUNITY NO 26/18

/ Construction of Pipe

Culverts (H1xL6m) for

Sambok, Kratie: 8 Units

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope20,000.00 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28

COMMUNITY NO 27/18

/ Construction of Pipe

Culverts (H1xL6m) for

Changkrang, Kratie: 8

Units

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope20,000.00 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28

COMMUNITY NO 28/18

/ Construction of Pipe

Culverts (H1xL6m) for

Dar, Kratie: 6 Units

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope15,000.00 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28

Page 11: World Bank Documentdocuments.worldbank.org/curated/en/... · II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review

Page 8

COMMUNITY NO 29/18

/ Construction of Pipe

Culverts (H1xL6m) for

Thmey, Kratie: 7 Units

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope17,500.00 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28

COMMUNITY NO 30/18

/ Construction of Pipe

Culverts (H1xL6m) for

Chambak, Kratie: 4 Units

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope10,000.00 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28

COMMUNITY NO 31/18

/ Construction of Pipe

Culverts (H1xL6m) for

Choamkravien, Kg. Cham:

8 Units

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope20,000.00 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28

COMMUNITY NO 16/18

/ Planting Grass of Earth

Roads (W5xT0.15xE0.5m)

for Choamkravien (5Km)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope6,250.00 0.00 Canceled 2018-08-06 2018-10-01 2019-03-30

COMMUNITY NO 11/18

/ Concrete Poles in

Stream and Canal

(0.2x0.2x1.5m) for

Chaomkravien (350 Poles).

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope15,750.00 0.00 Canceled 2018-06-06 2018-08-01 2019-08-01

COMMUNITY NO 34/18

/ Construction of Pipe

Culverts (H1xL6m) for

Sambok Kriel: 10 Units

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope25,000.00 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28

COMMUNITY NO 35/18

/ Construction of Pipe

Culverts (H1xL6m) for

Ksach Sar: 15 Units

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope37,500.00 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28

COMMUNITY NO 36/18

/ Construction of Pipe

Culverts (H1xL6m) for

Peam: 5 Units

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope12,500.00 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28

COMMUNITY NO 37/18

/ Construction of Pipe

Culverts (H1xL6m) for

Chhean Loeun: 10 Units

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope25,000.00 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28

COMMUNITY/KRT/W/14A/

18 / Planting Grass of

Earth Roads

(W5xT0.15xE0.5m) for

Changkrang, KRT (6km).

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Community

Driven

Development

Open - National

7,500.00 0.00

Pending

Implementa

tion

2019-01-08 2019-01-13 2019-02-24 2019-03-26 2019-04-30 2019-07-29

COMMUNE/TKM/W/69/19

/ Construction of

community market (size

5m x 6m roof zine and

concrete basement) in

Choamkravien, TKM.

Toatl: 1 Unit

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope15,000.00 0.00

Pending

Implementa

tion

2019-03-06 2019-05-01 2019-10-28

COMMUNE/KCH/W/70/19

/ Construction of

community market (size

5m x 6m roof zine and

concrete basement) in

Peam, KCH. Total: 1 Unit

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope15,000.00 0.00

Pending

Implementa

tion

2019-03-06 2019-05-01 2019-10-28

COMMUNE/KPT/W/71/19

/ Construction of

community market (size

5m x 6m roof zine and

concrete basement) in

Tipo, KPT. Total: 1 Unit

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope15,000.00 0.00

Pending

Implementa

tion

2019-03-06 2019-05-01 2019-10-28

COMMUNE/KRT/W/72/19

/ Construction of

community market (size

5m x 6m roof zine and

concrete basement) in Dar,

KRT. Total: 1 Unit

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope15,000.00 0.00

Pending

Implementa

tion

2019-03-06 2019-05-01 2019-10-28

COMMUNE/KRT/W/73/19

/ Repair Existing Earth

Road in SAMBOK (A006

(AT001)=0.70km,

A004b=0.48km,

A010=1.26km,

A001b=1.55km,

S007=1.940km,

A007=0.780km,

A024=1.015km,

A034=1.300km) in KRT-

Total=9.03Km

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope30,099.97 0.00

Pending

Implementa

tion

2019-03-15 2019-05-10 2019-11-06

COMMUNE/KRT/W/74/19

/ Repair Existing Earth

Road in CHANGKRANG

(La Or village=4.10km,

S029=0.650km,

A013b=1.13km,

A15b=1.10km) in KRT-

Total=6.98Km

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope23,266.64 0.00

Pending

Implementa

tion

2019-03-16 2019-05-11 2019-11-07

COMMUNE/KRT/W/75/19

/ Repair Existing Earth

Road in DAR

(S004=1.32km,

A007=1.00km,

S012=0.40km) - in KRT.

Total=2.72Km

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope9,066.66 0.00

Pending

Implementa

tion

2019-03-25 2019-05-20 2019-11-16

COMMUNE/KRT/W/76/19

/ Repair Existing Earth

Road in THMEI

(A002a=1.07km,

A012a=1.39km, S006A =

0.467 KM, A006a=1.703,

S004a=0.467km, Boeung

Svay Chrum road=3.50km)

- in KRT. Total= 8.59Km

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope28,633.30 0.00

Pending

Implementa

tion

2019-03-25 2019-05-20 2019-11-16

LASED/NCDDS/W/NCB/04/

17 / Construction Earth

Roads(W5xT0.15xE0.5m):L

OT1:Sambok(14.975),Ch.kra

ng(6),Dar(8),Thmey(10),

Chambak(29.091),Choamkr

avien-

TKM(5),TP1(15),TP2(12).To

tal:100.410km.LOT2:S.Kriel

(14),

Ks.Sar(14),Peam(14),Chh.Lo

eung(7),Ra.Samaki(7).Total:

29.590km.GrandTotal:130K

m

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

BidsOpen - National

Single Stage -

One Envelope2,860,000.00 2,404,574.45 Signed 2019-02-20 2019-02-25 2019-04-08 2019-05-08 2019-06-12 2019-12-09

LASED/NCDDS/W/NCB/10/

19 / Construction of

Community Rain Water

Storage at Thmey 1 line

(L:600m, TW:5m, Laterite

Layer, 1 Double Box

Culvert with lifting Gates)

and Chambak 1 line

(L:160m, TW:5m,Laterite

Layer, 1 Double Box

Culvert with Lifting

Gates) in KRT. Total: 2

lines.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

BidsOpen - National

Single Stage -

One Envelope294,776.67 0.00

Pending

Implementa

tion

2019-02-15 2019-02-20 2019-04-03 2019-05-03 2019-06-07 2019-12-04

LASED/NCDDS/W/NCB/11/

19 / Construction of

Community Natural Live

Stream Storage at Tipo

Commune 1 line (L:600m,

TW:5m, Laterite Layer,

Double Box Culvert with

lifting Gates, and One

line of Spillway structure

of 45 m) in KPT. Total: 1

line

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

BidsOpen - National

Single Stage -

One Envelope322,493.33 0.00

Pending

Implementa

tion

2019-02-20 2019-02-25 2019-04-08 2019-05-08 2019-06-12 2019-12-09

LASED/NCDDS/W/NCB/12/

19 / Construction of

Community Natural Live

Stream Storage 1 line:

Dyke (L:200m, TW:5m,

Laterite Layer, Double

Box Culvert with lifting

Gates, One line of

Spillway structure of 45m)

at Prey Thom, KSP,

Total: 1 line

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

BidsOpen - National

Single Stage -

One Envelope338,888.89 0.00

Pending

Implementa

tion

2019-06-30 2019-07-05 2019-08-16 2019-09-15 2019-10-20 2020-04-17

Page 12: World Bank Documentdocuments.worldbank.org/curated/en/... · II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review

Page 9

LASED/NCDDS/W/NCB/13/

19 / Construction of

Community Rain Water

Storage at 1)Ksach Sar 1

line(L:200m, TW:5m), 2)

Kiri Aphivath 1 line

(L:150m,TW:5m), 3)

Sambok Kreal 1 line

(Dyke L:80m, TW:5m) and

4) Pond at Sok Senchey

(80mx50m) in KCH. Total:

3 lines & 1 Pond.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

BidsOpen - National

Single Stage -

One Envelope416,222.22 0.00

Pending

Implementa

tion

2019-06-20 2019-06-25 2019-08-06 2019-09-05 2019-10-10 2020-04-07

LASED/NCDDS/W/NCB/06/

17 / Small Dam(W4xSite

Slop1:2, average

embankment, length

depends on each site,1spill

way 20m,water double

gates (2x2m=4m):Lot

1:S.bok(1),Ch.krang(1),

Thmey(1),Chambak(1),TP1(

1),TP2(1)&Daung(1).Lot

2:Sb.Kriel(1),Ks.Sar(1),Pea

m(1) and

R.Samaki(1).Total: 11Unit

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

BidsOpen - National

Single Stage -

One Envelope980,000.00 0.00 Canceled 2018-09-03 2018-09-08 2018-10-20 2018-11-19 2018-12-24 2019-06-22

COMMUNITY/KRT/W/55/19

/ Planting Grass of Earth

Roads (W5xT0.15xE0.5m).

for SAMBOK, (9.03km)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post Direct Selection Direct

11,287.50 0.00

Pending

Implementa

tion

2019-06-17 2019-06-22 2019-07-27 2020-01-23

COMMUNITY/KRT/W/56/19

/ Planting Grass of Earth

Roads (W5xT0.15xE0.5m)

for CHANGKRANG

(6.98km)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post Direct Selection Direct

8,725.00 0.00

Pending

Implementa

tion

2019-03-20 2019-03-25 2019-04-29 2019-10-26

COMMUNITY/KRT/W/57/19

/ Planting Grass of Earth

Roads (W5xT0.15xE0.5m)

for DAR (2.72km)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post Direct Selection Direct

3,400.00 0.00

Pending

Implementa

tion

2019-06-20 2019-06-25 2019-07-30 2020-01-26

COMMUNITY/KRT/W/58/19

/ Planting Grass of Earth

Roads (W5xT0.15xE0.5m)

for THMEI (8.59km)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post Direct Selection Direct

10,737.50 0.00

Pending

Implementa

tion

2019-06-20 2019-06-25 2019-07-30 2020-01-26

COMMUNITY/KRT/W/59/19

/ Repair health post in

CHAMBAK which was

built during LASED I

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post Direct Selection Direct

3,000.00 0.00

Pending

Implementa

tion

2019-03-20 2019-03-25 2019-04-29 2019-10-26

COMMUNITY/KRT/W/60/19

/ Fence for health post in

CHAMBAK 300m

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post Direct Selection Direct

3,000.00 0.00

Pending

Implementa

tion

2019-03-15 2019-03-20 2019-04-24 2019-10-21

GOODS

Activity Reference No.

/ DescriptionLoan / Credit

No.Component Review Type Method

Market

Approach

Procurement

Process

Prequalificatio

n (Y/N)

Estimated

Amount

(US$)

Actual

Amount

(US$)

Process

Status

Draft Pre-

qualification

Documents

Prequalification

Evaluation Report

Draft Bidding

Document /

Justification

Specific Procurement

Notice / Invitation

Bidding Documents

as Issued

Proposal Submission

/ Opening / Minutes

Bid Evaluation

Report and

Recommendation for

Award

Signed Contract Contract Completion

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

LASED/NCDDS/G/NCB/07/

16 /

OfficeFurniture:Nat.+3New

Provi:(30MeetChr,

28Desks, 58Chr,

4MeetTab,

2Filingcabi,3SlidingCabi,6Fi

lingCabi). 3Distr:(15Des,

45Chr, 3SlidingCabi,

3FilingCabi, 3MeetTab)

5NewHP:(10Des,10Char,5Sl

idingCabi,5FilingCabi+4Dra

w, 5Connected

3Cha,10Bed,5WaterFilter)

IDA / 58070Component 2: Project

ManagementPost

Request for

QuotationsOpen - National

Single Stage -

One Envelope40,110.00 37,270.50 Signed 2017-02-06 2017-04-03 2018-04-03

LASED/NCDDS/G/SP/10/17

/ GPS Mapping+Licenses:

NCDDS 2, GSSLC 4,

GDA 5, (KCH,KSP,TBM)

3, Total GPS:14 units.

Concrete Test Hammer for

3 new provinces 3 & for

NCDDS 1. Dynamic Cone

Penetrometer(DCP) for

new provinces 3 and

NCDDS 1. Topography

Survey for new provinces

3 &NCDDS 1.

IDA / 58070

Sub-Component 1.1: Social

Land Concession

Investment Planning and

Prioritization

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope44,311.11 42,260.00 Signed 2017-02-06 2017-04-03 2017-09-30

LASED/NCDDS/G/NCB/01/

16 / Vehicles : 9 Pickup

Trucks for National Level

and Sub-National.

IDA / 58070

Sub-component 1.3:

Agriculture and

Livelihood Development

PostRequest for

BidsOpen - National

Single Stage -

One Envelope270,000.00 243,531.00 Signed 2016-11-14 2016-11-19 2016-12-31 2017-01-30 2017-03-06 2017-09-02

LASED/NCDDS/G/SP/06/16

/ Software (GIS,

Accounting) for NCDDS,

GSSLC & GDA

IDA / 58070Component 2: Project

ManagementPost

Request for

QuotationsOpen - National

Single Stage -

One Envelope24,200.00 15,760.00 Signed 2016-11-26 2017-01-21 2018-01-21

LASED/NCDDS/G/NCB/02/

16 / Motorcycles: for

Province(KSP: 10, KCH:

10, TBK: 10), for District:

(SMC: 5, OR: 5, PBL:5),

for Communes: (CL:1,

PM:1, RSMSK:1, DG:1,

KLV:1), for NCDDS: 3

Units, GSSLC: 3 Units,

GDA: 7 Units. Total 63

Units

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

BidsOpen - National

Single Stage -

One Envelope115,500.00 100,170.00 Signed 2016-12-31 2017-01-05 2017-02-16 2017-03-18 2017-04-22 2018-04-22

LASED/NCDDS/G/NCB/03/

16 / Computer&Photocopy

Machine: Lot 1: Nat.:

37Laptops,3LaserJet

Printers, 4Scaners. Provi.:

49Laptops, 5LaserJet

Printer & 5Scaner.

Distr.:14Laptops, 7LaserJet

Printers.Lot 2: Nat.:

3Photocopy, 4LCD

Projector+Screen,

Provi.:5Photocopy & 5LCD

Projector+Screen

IDA / 58070Component 2: Project

ManagementPost

Request for

BidsOpen - National

Single Stage -

One Envelope177,460.00 191,151.40 Signed 2016-11-30 2016-12-05 2017-01-16 2017-02-15 2017-03-22 2018-03-22

LASED/NCDDS/G/SP/08/16

/ Soil Testing Kits (16

kits)

IDA / 58070

Sub-Component 1.1: Social

Land Concession

Investment Planning and

Prioritization

PostRequest for

QuotationsLimited

Single Stage -

One Envelope2,720.00 0.00 Canceled 2017-02-06 2017-04-03 2017-10-03

LASED/NCDDS/G/SP/01A/1

7 / 1 Pickup Trucks for

National Level.

IDA / 58070

Sub-component 1.3:

Agriculture and

Livelihood Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope30,000.00 27,000.00 Signed 2017-10-06 2017-12-01 2018-04-03

LASED/NCDDS/G/SP/05/16

/ Building new networking

data center for LASED-

NCDDS (1 server

machine, fiber optic cable,

and network accessory)

and Internet Service

Provider

IDA / 58070Component 2: Project

ManagementPost

Request for

QuotationsOpen - National

Single Stage -

One Envelope36,000.00 0.00 Canceled 2016-12-06 2017-01-31 2018-01-31

LASED/NCDDS/G/NCB/03A

/18 / Laptop for National

and Sub-National Level (4

for GDH, 2 for GDA and

27 for NCDDS and 5

Provinces) and 1 Desktop

for (Large Monitor) for

GDH. Total: 34 units

IDA / 58070Component 2: Project

ManagementPost

Request for

QuotationsOpen - National

Single Stage -

One Envelope54,400.00 55,220.00 Signed 2018-03-06 2018-05-01 2018-07-30

LASED/NCDDS/G/SP/04/16

/ Camera Equipment. A)

National level: 1)

Professional Camera (3

units) and Professional

Video Camera (3 units)

for LASED-GSSLC

Communication, LASED-

NCDDS & GDA. B)

Provincial: 1) Camera (5

units); 2) Aircon (6 units).

IDA / 58070

Sub-Component 1.1: Social

Land Concession

Investment Planning and

Prioritization

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope32,000.00 16,900.00 Signed 2018-04-07 2018-06-02 2018-08-31

Page 13: World Bank Documentdocuments.worldbank.org/curated/en/... · II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review

Page 10

LASED/NCDDS/G/SP/05A/1

6 / Building new

networking data center for

LASED-NCDDS (1 server,

Back up Storage 4TB,

UPS, Other Software

license, Internet service 4

years) and Android Tablet

(50 Tablets)

IDA / 58070Component 2: Project

ManagementPost

Request for

QuotationsOpen - National

Single Stage -

One Envelope48,650.00 46,840.80 Signed 2018-05-06 2018-07-01 2018-09-29

LASED/NCDDS/G/SP/09/17

/ 1). Mobile loud speaker

(Loud Speaker, Stand,

Transmitter and Receiver)

for LASED GSSLC,

NCDDS and GDA. Toal: 3

sets. 2). Loud Speaker (

Loud Speaker, Microphone,

Ampli, Battery and

Electrical line) for 12 SLC

Community Toal: 14 sets.

IDA / 58070

Sub-component 1.3:

Agriculture and

Livelihood Development

PostRequest for

QuotationsLimited

Single Stage -

One Envelope11,500.00 11,950.00 Signed 2018-04-07 2018-06-02 2018-11-29

LASED/NCDDS/G/NCB/11/

17 / Agriculture Start-Up

Packages for Daung 700

HH (Agri kits 8 items,

rice 200kg/HH, vegetable

seeds 6 items, plants 5

items)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

BidsOpen - National

Single Stage -

One Envelope280,000.00 206,229.76 Signed 2018-06-01 2018-06-06 2018-07-18 2018-08-17 2018-09-21 2019-09-21

LASED/NCDDS/G/NCB/12/

17 / Household Start-Up

Packages for Daung 700

HH (Solar lamp, Tent

plastic, mat, blanket,

water jar, water filter)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

BidsOpen - National

Single Stage -

One Envelope116,666.67 0.00

Pending

Implementa

tion

2018-07-02 2018-07-07 2018-08-18 2018-09-17 2018-10-22 2019-04-20

LASED/NCDDS/G/NCB/13/

17 / Shelter Construction

Materials (40 Zincs/HH)

for Daung 700HH

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

BidsOpen - National

Single Stage -

One Envelope217,777.78 223,080.00 Signed 2018-05-01 2018-05-06 2018-06-17 2018-07-17 2018-08-21 2019-02-17

COMMUNE/KCH/G/03A/18

/ Supply Cover Crops (

Mug bean = 20kgs/Ha and

Cashew = 210

Seedlings/Ha) for Peam

Commune (116.5Ha),

Samaki Meanchey District,

Kg. Chhnang.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope19,416.67 0.00

Pending

Implementa

tion

2018-05-23 2018-07-18 2018-10-16

COMMUNE/KCH/G/04A/18

/ Supply Cover Crops (

Mug bean = 20kgs/Ha and

Cashew = 210

Seedlings/Ha) for

Chheanloeurng Commune

(103Ha), Samaki

Meanchey District, Kg.

Chhnang.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope17,166.67 0.00

Pending

Implementa

tion

2018-05-23 2018-07-18 2018-10-16

COMMUNE/KSP/G/05-

06A/18 / Supply Cover

Crops ( Mug bean =

20kgs/Ha and Cashew =

210 Seedlings/Ha) for

Reaksmey Samaki

Commune (200Ha), Oral

District, Kg. Speu.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope33,333.33 33,120.00 Signed 2018-05-23 2018-07-18 2019-01-14

COMMUNE/KPT/G/07-

11A/18 / Supply Cover

Crops ( Mug bean =

20kgs/Ha and Cashew =

210 Seedlings/Ha) Tipo 1

= 354.44Ha & Tipo 2

=226.5Ha, Total =

580.94Ha for Tipo

Commune, Suntuk

District, Kg. Thom.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope96,823.33 923,804.64 Signed 2018-05-23 2018-07-18 2019-01-14

COMMUNE/KRT/G/12A/18

/ Supply Cover Crops (

Mug bean = 20kgs/Ha and

Cashew = 210

Seedlings/Ha) for Sambok

Commune

(100Ha+120Ha=220Ha),

Chetr Borey, Kratie.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope36,666.67 0.00

Pending

Implementa

tion

2018-05-23 2018-07-18 2019-01-14

COMMUNE/KRT/G/15-

16A/18 / Supply Cover

Crops ( Mug bean =

20kgs/Ha and Cashew =

210 Seedlings/Ha) for

Thmey Commune (174Ha),

Chetr Borey, Kratie.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope29,000.00 28,779.60 Signed 2018-05-23 2018-07-18 2019-01-14

COMMUNE/KRT/G/17-

19A/18 / Supply Cover

Crops ( Mug bean =

20kgs/Ha and Cashew=

210 Seedlings/Ha) for

Chambak Commune

(277Ha), Prek Prasab,

Kratie.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope46,166.67 0.00

Pending

Implementa

tion

2018-05-23 2018-07-18 2019-01-14

COMMUNE/KPT/G/20-

24A/18 / Supply Cover

Crops ( Mug bean =

20kgs/Ha and Cashew=

210 Seedlings/Ha) for

Daung Commune (500Ha),

Suntuk District, Kg.

Thom.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope83,333.33 0.00

Pending

Implementa

tion

2019-02-06 2019-04-03 2019-09-30

COMMUNE/KCH/G/01-

02A/18 / Supply Cover

Crops ( Mug bean =

20kgs/Ha and Cashew =

210 Seedlings/Ha) for

Sambok Kriel (100Ha)and

for Ksach Sar (126.50Ha),

Total 226.50 Ha,

Kranglovea Commune,

Samaki Meanchey District,

Kg. Chhnang

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope37,750.00 0.00

Pending

Implementa

tion

2018-05-23 2018-07-18 2018-10-16

COMMUNE/G/02/18 /

Planting in Agriculture

Land (Ploughing and

Seedling for Cover Crop)

for Ksach Sar (126.50Ha),

Kranglovea Commune,

Samaki Meanchey District,

Kg. Chhnang

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope35,138.89 0.00 Canceled 2018-01-06 2018-03-03 2018-08-30

COMMUNE/G/23/18 /

Planting in Agriculture

Land (Ploughing and

Seedling for Cover Crop)

for Daung Commune,

Prasad Balang, Kg. Thom.

PHASE 4 (100Ha) of

500Ha

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope27,777.78 0.00 Canceled 2018-01-06 2018-03-03 2018-08-30

COMMUNE/KRT/G/13A/18

/ Supply Cover Crops (

Mug bean = 20kgs/Ha and

Cashew= 210

Seedlings/Ha) for

Changkrang Commune

(59Ha+80Ha=139Ha),

Chetr Borey, Kratie

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope23,166.67 0.00

Pending

Implementa

tion

2018-05-23 2018-07-18 2019-01-14

COMMUNE/KRT/G/14A/18

/ Supply Cover Crops (

Mug bean = 20kgs/Ha and

Cashew = 210

Seedlings/Ha) for Dar

Commune (97Ha), Chetr

Borey, Kratie.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope16,166.67 15,729.52 Signed 2018-05-23 2018-07-18 2019-01-14

LASED/NCDDS/G/UN/01/19

/ Vehicles (SUV) for GDH,

NCDDS & GDA, total = 3

units

IDA / 58070

Sub-component 1.3:

Agriculture and

Livelihood Development

PostUN Agencies

(Direct)Direct

108,000.00 0.00

Pending

Implementa

tion

2019-02-01 2019-02-06 2019-03-13 2019-09-09

LASED/NCDDS/G/SP/11/19

/ Solar Panel for teacher

and nurse house, total =

9 sets

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope14,400.00 14,193.00 Signed 2019-03-06 2019-05-01 2019-10-28

Page 14: World Bank Documentdocuments.worldbank.org/curated/en/... · II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review

Page 11

LASED/NCDDS/G/SP/12/19

/ DGPS for KRT and

KPT, total = 2 units

GPS for GDH (2 units),

GDA (4 units) , and 5

units for KCH, KRT,

KPT, KSP and TKM), toal

= 11 units

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope61,000.00 0.00

Pending

Implementa

tion

2019-03-20 2019-05-15 2019-11-11

LASED/NCDDS/G/SP/13/19

/ Tape Recorder (3 units

for NCDDS, GDH, and

GDA and 5 units for 5

provinces), total = 8 units

IDA / 58070

Sub-Component 1.1: Social

Land Concession

Investment Planning and

Prioritization

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope3,200.00 3,160.00 Signed 2019-03-25 2019-05-20 2019-11-16

LASED/NCDDS/G/SP/14/1

9 / Agriculture Materials:L

ot 1: Soil Auger (ឧបករណ៌ខួងដី) for GDA, Total = 2 units

Lot 2: Hatchery Machine (

ម៉ាស៊ីនភ្ញាស់ពងមាន់) (2 unitsfor Sambok, 2 units for C

hangkrang, 2 units of Cha

mkravien, 2 units for Tipo

, 2 units for Rasmey Sam

aki) Total = 10 units

IDA / 58070

Sub-component 1.3:

Agriculture and

Livelihood Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope14,277.78 0.00

Pending

Implementa

tion

2019-04-15 2019-06-10 2019-12-07

COMMUNE/KSP/G/20/19

/ Water tank with

supporter and tube

(Rasmey Samaki, KSP),

Total = 3 units

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope10,500.00 0.00

Pending

Implementa

tion

2019-03-06 2019-05-01 2019-07-30

COMMUNE/KPT/G/21/19

/ Water tank for health

post in Dong SLC, KPT,

total = 1 units

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope2,000.00 0.00

Pending

Implementa

tion

2019-04-15 2019-06-10 2019-09-08

NON CONSULTING SERVICES

Activity Reference No.

/ DescriptionLoan / Credit

No.Component Review Type Method

Market

Approach

Procurement

Process

Prequalificatio

n (Y/N)

Estimated

Amount

(US$)

Actual

Amount

(US$)

Process

Status

Draft Pre-

qualification

Documents

Prequalification

Evaluation Report

Draft Bidding

Document /

Justification

Specific Procurement

Notice / Invitation

Bidding Documents

as Issued

Proposal Submission

/ Opening / Minutes

Bid Evaluation

Report and

Recommendation for

Award

Signed Contract Contract Completion

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

LASED/NCDDS/IC/35/17 /

Insurance (Group Personal

Accident and Health

Insurance and Vehicle

Insurance (Third Party

Liability Driver and

Passenger)

IDA / 58070Component 2: Project

ManagementPost

Request for

BidsOpen - National

Single Stage -

One Envelope108,900.00 0.00

Pending

Implementa

tion

2017-03-01 2017-03-06 2017-04-17 2017-05-17 2017-06-21 2021-12-31

CONSULTING FIRMSActivity Reference No.

/ DescriptionLoan / Credit

No.Component Review Type Method

Market

Approach

Contract Type Estimated

Amount (US$)

Actual

Amount

(US$)

Process

StatusTerms of Reference

Expression of

Interest Notice

Short List and

Draft Request for

Proposals

Request for

Proposals as Issued

Opening of

Technical Proposals

/ Minutes

Evaluation of

Technical Proposal

Combined

Evaluation Report

and Draft

Negotiated Contract

Signed Contract Contract Completion

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

LASED/NCDDS/IC/30/17 /

Baseline Survey in year

2017 (Local Firm)

IDA / 58070

Sub-Component 1.1: Social

Land Concession

Investment Planning and

Prioritization

Post

Consultant

Qualification

Selection

Open - National

70,000.00 69,998.05 Signed 2017-01-31 2017-02-21 2017-04-06 2017-05-06 2017-06-10 2018-06-10

LASED/NCDDS/F/35/17 /

Consulting firm for

Irrigation Design (8 sites)

IDA / 58070

Sub-Component 1.1: Social

Land Concession

Investment Planning and

Prioritization

Post

Consultant

Qualification

Selection

Open - National

120,000.00 119,997.50 Signed 2017-09-15 2017-10-06 2017-11-19 2017-12-19 2018-01-23 2018-06-12

LASED/NCDDS/IC/31/18 /

Impact Survey for 2nd

year of the project/Mid-

term review (Local Firm)

IDA / 58070

Sub-Component 1.1: Social

Land Concession

Investment Planning and

Prioritization

Post

Consultant

Qualification

Selection

Open - National

50,000.00 0.00Pending

Implementation2018-07-10 2018-07-31 2018-09-13 2018-10-13 2018-11-17 2019-11-17

LASED/NCDDS/IC/32/21 /

Final Impact Survey

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Consultant

Qualification

Selection

Open -

International

90,000.00 0.00Pending

Implementation2021-07-13 2021-08-03 2021-09-16 2021-10-16 2021-11-20 2022-07-12

LASED/NCDDS/IC/34/17 /

Service Provider for

Implementation

Community Development

Fund (for 5 years)

IDA / 58070

Sub-component 1.3:

Agriculture and

Livelihood Development

PostQuality Based

Selection

Open -

International

514,100.00 589,967.25 Signed 2018-06-01 2018-06-22 2018-08-05 2018-09-02 2018-10-02 2018-11-01 2018-12-06 2023-04-30

INDIVIDUAL CONSULTANTSActivity Reference No.

/ DescriptionLoan / Credit

No.Component Review Type Method

Market

Approach

Contract Type Estimated

Amount (US$)

Actual

Amount

(US$)

Process

StatusTerms of Reference

Invitation to

Identified/Selected

Consultant

Draft Negotiated

ContractSigned Contract Contract Completion

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

LASED/NCDDS/IC/10/17 /

Admin and Finance

Assistant at NCDDS

IDA / 58070Component 2: Project

ManagementPost

Individual

Consultant

Selection

Open

56,470.59 35,209.47 Signed 2017-01-01 2017-02-19 2017-03-12 2017-04-16 2021-12-31

LASED/NCDDS/IC/11/17 /

Admin and Finance

Assistant at GDA-MAFF

IDA / 58070Component 2: Project

ManagementPost

Individual

Consultant

Selection

Open

56,470.59 35,209.37 Signed 2017-01-01 2017-02-19 2017-03-12 2017-04-16 2021-12-31

LASED/NCDDS/IC/12/17 /

Admin and Finance

Assistant at GSSLC

IDA / 58070Component 2: Project

ManagementPost

Individual

Consultant

Selection

Open

56,470.59 34,126.12 Terminated 2017-01-01 2017-02-19 2017-03-12 2017-04-16 2021-12-31

LASED/NCDDS/IC/04/16 /

Project Finance Consultant

at GSSLC & GDA

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Prior

Individual

Consultant

Selection

Open

148,235.29 0.00 Canceled 2016-09-01 2016-10-20 2016-11-10 2016-12-15 2021-08-31

LASED/NCDDS/IC/01/16 /

National Operation and

M&E Advisor at NCDDS

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Prior

Individual

Consultant

Selection

Open

148,235.29 0.00 Canceled 2016-08-16 2016-10-04 2016-10-25 2016-11-29 2021-08-31

LASED/NCDDS/IC/05/16 /

National Infrastructure

Advisor at GSSLC

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Prior

Individual

Consultant

Selection

Open

118,588.24 0.00 Canceled 2016-09-01 2016-10-20 2016-11-10 2016-12-15 2020-11-30

LASED/NCDDS/IC/06/16 /

National Operation and

M&E Advisor at GSSLC

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Prior

Individual

Consultant

Selection

Open

148,235.29 0.00 Canceled 2016-09-01 2016-10-20 2016-11-10 2016-12-15 2021-08-31

LASED/NCDDS/IC/07/16 /

National Agriculture &

Rural Development

Advisor at GDA - MAFF

IDA / 58070

Sub-component 1.3:

Agriculture and

Livelihood Development

Prior

Individual

Consultant

Selection

Open

148,235.29 0.00 Canceled 2016-09-01 2016-10-20 2016-11-10 2016-12-15 2021-08-31

LASED/NCDDS/IC/08/16 /

National Communication

& Strategy Advisor at

NCDDS

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Prior

Individual

Consultant

Selection

Open

118,588.24 0.00 Canceled 2016-12-01 2017-01-19 2017-02-09 2017-03-16 2020-11-30

LASED/NCDDS/IC/13/17 /

One Provincial GIS,

Safeguard and

Environemental Advisor at

LASED Kratie

IDA / 58070

Sub-Component 1.1: Social

Land Concession

Investment Planning and

Prioritization

Post

Individual

Consultant

Selection

Open

101,647.06 56,587.00 Signed 2016-12-31 2017-02-18 2017-03-11 2017-04-15 2021-04-15

LASED/NCDDS/IC/14/17 /

One Provincial GIS,

Safeguard and

Environemental Advisor

for LASED Kg. Thom and

Thbong Khmum

IDA / 58070

Sub-Component 1.1: Social

Land Concession

Investment Planning and

Prioritization

Post

Individual

Consultant

Selection

Open

101,647.06 75,689.25 Signed 2016-12-31 2017-02-18 2017-03-11 2017-04-15 2021-04-15

LASED/NCDDS/IC/15/17 /

One Provincial GIS,

Safeguard and

Environmental Advisor for

LASED Kampong Speu

and Kampong Chhnang.

IDA / 58070

Sub-Component 1.1: Social

Land Concession

Investment Planning and

Prioritization

Post

Individual

Consultant

Selection

Open

101,647.06 72,085.00 Signed 2016-12-31 2017-02-18 2017-03-11 2017-04-15 2021-04-15

LASED/NCDDS/IC/16/17 /

Provincial Operation

Advisor for LASED

Kratie.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Individual

Consultant

Selection

Open

109,411.76 64,876.50 Signed 2016-12-31 2017-02-18 2017-03-11 2017-04-15 2021-12-31

Page 15: World Bank Documentdocuments.worldbank.org/curated/en/... · II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review

Page 12

LASED/NCDDS/IC/17/17 /

Provincial Operation

Advisor for LASED Tbong

Khmum.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Individual

Consultant

Selection

Open

109,411.76 54,064.00 Terminated 2016-12-31 2017-02-18 2017-03-11 2017-04-15 2021-12-31

LASED/NCDDS/IC/18/17 /

Provincial Operation

Advisor for LASED Kg.

Thom.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Individual

Consultant

Selection

Open

109,411.76 58,749.00 Signed 2016-12-31 2017-02-18 2017-03-11 2017-04-15 2021-12-31

LASED/NCDDS/IC/19/17 /

Provincial Operation

Advisor for LASED Kg.

Speu.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Individual

Consultant

Selection

Open

109,411.76 58,668.00 Terminated 2016-12-31 2017-02-18 2017-03-11 2017-04-15 2021-12-31

LASED/NCDDS/IC/20/17 /

Provincial Operation

Advisor for LASED Kg.

Chhnang.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Individual

Consultant

Selection

Open

109,411.76 64,876.50 Signed 2016-12-31 2017-02-18 2017-03-11 2017-04-15 2021-12-31

LASED/NCDDS/IC/21/16 /

Provincial Finance

Consultant for LASED

Kratie.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Individual

Consultant

Selection

Open

109,411.76 52,262.00 Terminated 2016-11-30 2017-01-18 2017-02-08 2017-03-15 2021-12-31

LASED/NCDDS/IC/22/16 /

Provincial Finance

Consultant for LASED

Thbong Khmum.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Individual

Consultant

Selection

Open

109,411.76 64,876.50 Terminated 2016-11-30 2017-01-18 2017-02-08 2017-03-15 2021-12-31

LASED/NCDDS/IC/23/16 /

Provincial Finance

Consultant for LASED Kg.

Thom.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Individual

Consultant

Selection

Open

109,411.76 37,845.00 Terminated 2016-11-30 2017-01-18 2017-02-08 2017-03-15 2021-12-31

LASED/NCDDS/IC/24/16 /

Provincial Finance

Consultant for LASED Kg.

Speu.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Individual

Consultant

Selection

Open

109,411.76 46,855.00 Terminated 2016-11-30 2017-01-18 2017-02-08 2017-03-15 2021-12-31

LASED/NCDDS/IC/25/16 /

Provincial Finance

Consultant for LASED Kg.

Chhnang.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Individual

Consultant

Selection

Open

109,411.76 46,855.00 Terminated 2016-11-30 2017-01-18 2017-02-08 2017-03-15 2021-12-31

LASED/NCDDS/IC/01A/16

/ Senior Sub-National

Project Management

Advisor at NCDDS

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Individual

Consultant

Selection

Open

155,294.12 134,747.00 Signed 2016-11-30 2017-01-18 2017-02-08 2017-03-15 2021-12-31

LASED/NCDDS/IC/05A/16

/ Senior National

Infrastructure Advisor at

GSSLC

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Individual

Consultant

Selection

Open

118,588.24 113,262.00 Signed 2016-11-30 2017-01-18 2017-02-08 2017-03-15 2021-03-15

LASED/NCDDS/IC/06A/16

/ Senior National

Operation and M&E

Advisor at GSSLC

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Individual

Consultant

Selection

Open

176,470.59 154,680.00 Terminated 2016-11-30 2017-01-18 2017-02-08 2017-03-15 2021-12-31

LASED/NCDDS/IC/07A/16

/ Senior National

Agriculture & Rural

Development Advisor at

GDA - MAFF

IDA / 58070

Sub-component 1.3:

Agriculture and

Livelihood Development

Post

Individual

Consultant

Selection

Open

148,235.29 106,605.00 Signed 2016-11-30 2017-01-18 2017-02-08 2017-03-15 2021-12-31

LASED/NCDDS/IC/08A/16

/ National Communication

& Strategy Advisor at

NCDDS

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Individual

Consultant

Selection

Open

118,588.24 105,626.91 Signed 2016-11-30 2017-01-18 2017-02-08 2017-03-15 2021-03-15

LASED/NCDDS/IC/26/16 /

Provincial Infrastructure

Engineer at LASED

Kratie

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Individual

Consultant

Selection

Open

87,529.41 64,876.50 Signed 2016-11-30 2017-01-18 2017-02-08 2017-03-15 2021-03-15

LASED/NCDDS/IC/27/16 /

Provincial Infrastructure

Engineer for LASED Kg.

Thom and Thbong

Khmum

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Individual

Consultant

Selection

Open

87,529.41 64,876.50 Signed 2016-11-30 2017-01-18 2017-02-08 2017-03-15 2021-03-15

LASED/NCDDS/IC/28/16 /

Provincial Infrastructure

Engineer for LASED

Kampong Speu and

Kampong Chhnang.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Individual

Consultant

Selection

Open

87,529.41 66,679.00 Signed 2016-11-30 2017-01-18 2017-02-08 2017-03-15 2021-03-15

LASED/NCDDS/IC/29/17 /

International Short-Term

Consultant for Internal

Review and Report

(1month x 6times)

IDA / 58070

Sub-Component 1.1: Social

Land Concession

Investment Planning and

Prioritization

Post

Individual

Consultant

Selection

Open

100,000.00 83,720.93 Signed 2017-03-31 2017-05-19 2017-06-09 2017-07-14 2018-01-10

LASED/NCDDS/IC/33/21 /

National Consultant for

Preparing Project

Completion Report.

IDA / 58070

Sub-Component 1.1: Social

Land Concession

Investment Planning and

Prioritization

Post

Individual

Consultant

Selection

Open

65,000.00 0.00Pending

Implementation2020-12-31 2021-02-18 2021-03-11 2021-04-15 2021-12-31

LASED/NCDDS/IC/37/17 /

Community Development

and Agriculture Facilitator

for Sambok, KRT

IDA / 58070

Sub-component 1.3:

Agriculture and

Livelihood Development

Post

Individual

Consultant

Selection

Open

48,000.00 27,748.65 Signed 2017-02-28 2017-04-18 2017-05-09 2017-06-13 2021-12-31

LASED/NCDDS/IC/38/17 /

Community Development

and Agriculture Facilitator

for ChangKrang, KRT

IDA / 58070

Sub-component 1.3:

Agriculture and

Livelihood Development

Post

Individual

Consultant

Selection

Open

48,000.00 21,473.38 Signed 2017-02-28 2017-04-18 2017-05-09 2017-06-13 2021-12-31

LASED/NCDDS/IC/39/17 /

Community Development

and Agriculture Facilitator

for Da, KRT

IDA / 58070

Sub-component 1.3:

Agriculture and

Livelihood Development

Post

Individual

Consultant

Selection

Open

48,000.00 34,688.25 Signed 2017-02-28 2017-04-18 2017-05-09 2017-06-13 2021-12-31

LASED/NCDDS/IC/40/17 /

Community Development

and Agriculture Facilitator

for Thmey, KRT

IDA / 58070

Sub-component 1.3:

Agriculture and

Livelihood Development

Post

Individual

Consultant

Selection

Open

48,000.00 21,473.38 Signed 2017-02-28 2017-04-18 2017-05-09 2017-06-13 2021-12-31

LASED/NCDDS/IC/41/17 /

Community Development

and Agriculture Facilitator

for Chambak, KRT

IDA / 58070

Sub-component 1.3:

Agriculture and

Livelihood Development

Post

Individual

Consultant

Selection

Open

48,000.00 16,076.32 Signed 2017-02-28 2017-04-18 2017-05-09 2017-06-13 2021-12-31

LASED/NCDDS/IC/42/17 /

Community Development

and Agriculture Facilitator

for Choamkravien, TKM

IDA / 58070

Sub-component 1.3:

Agriculture and

Livelihood Development

Post

Individual

Consultant

Selection

Open

48,000.00 29,346.23 Signed 2017-02-28 2017-04-18 2017-05-09 2017-06-13 2021-12-31

LASED/NCDDS/IC/43/17 /

Community Development

and Agriculture Facilitator

for Tipo, KPT

IDA / 58070

Sub-component 1.3:

Agriculture and

Livelihood Development

Post

Individual

Consultant

Selection

Open

48,000.00 31,329.12 Signed 2017-02-28 2017-04-18 2017-05-09 2017-06-13 2021-12-31

LASED/NCDDS/IC/44/17 /

Community Development

and Agriculture Facilitator

for Dong, KPT

IDA / 58070

Sub-component 1.3:

Agriculture and

Livelihood Development

Post

Individual

Consultant

Selection

Open

48,000.00 38,205.00 Signed 2017-02-28 2017-04-18 2017-05-09 2017-06-13 2021-12-31

LASED/NCDDS/IC/45/17 /

Community Development

and Agriculture Facilitator

for Kraing Lavea, KCH

IDA / 58070

Sub-component 1.3:

Agriculture and

Livelihood Development

Post

Individual

Consultant

Selection

Open

48,000.00 30,434.00 Signed 2017-02-28 2017-04-18 2017-05-09 2017-06-13 2021-12-31

LASED/NCDDS/IC/46/17 /

Community Development

and Agriculture Facilitator

for Chheanloeung, KCH

IDA / 58070

Sub-component 1.3:

Agriculture and

Livelihood Development

Post

Individual

Consultant

Selection

Open

48,000.00 29,091.32 Signed 2017-02-28 2017-04-18 2017-05-09 2017-06-13 2021-12-31

LASED/NCDDS/IC/47/17 /

Community Development

and Agriculture Facilitator

for Peam, KCH

IDA / 58070

Sub-component 1.3:

Agriculture and

Livelihood Development

Post

Individual

Consultant

Selection

Open

48,000.00 31,329.12 Terminated 2017-02-28 2017-04-18 2017-05-09 2017-06-13 2021-12-31

Page 16: World Bank Documentdocuments.worldbank.org/curated/en/... · II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review

Page 13

LASED/NCDDS/IC/48/17 /

Community Development

and Agriculture Facilitator

for Raksmeysamaki, Oral,

KSP

IDA / 58070

Sub-component 1.3:

Agriculture and

Livelihood Development

Post

Individual

Consultant

Selection

Open

48,000.00 26,853.53 Signed 2017-02-28 2017-04-18 2017-05-09 2017-06-13 2021-12-31

LASED/NCDDS/IC/09/16 /

Procurement and Contract

Management Assistant at

NCDDS

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Prior

Individual

Consultant

Selection

Open

104,470.59 0.00 Canceled 2016-08-22 2016-10-10 2016-10-31 2016-12-05 2021-07-31

LASED/NCDDS/IC/02/16 /

National Procurement and

Contract Management

Advisor at NCDDS

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Prior

Individual

Consultant

Selection

Open

158,117.65 0.00 Canceled 2016-08-22 2016-10-10 2016-10-31 2016-12-05 2020-07-31

LASED/NCDDS/IC/03/16 /

Project Finance Consultant

at NCDDS

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Prior

Individual

Consultant

Selection

Open

148,235.29 0.00 Canceled 2016-09-01 2016-10-20 2016-11-10 2016-12-15 2021-08-31

LASED-NCDDS-IC-02A-16

/ Senior National

Procurement and Contract

Management Advisor at

NCDDS

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Individual

Consultant

Selection

Open

158,117.65 158,258.00 Signed 2016-08-31 2016-10-19 2016-11-09 2016-12-14 2020-12-13

LASED-NCDDS-IC-03A-16

/ Senior National Project

Financial Management

Consultant at NCDDS,

GSSLC and GDA

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Individual

Consultant

Selection

Open

176,470.59 70,400.00 Signed 2016-09-11 2016-12-07 2016-12-28 2017-02-01 2021-12-31

LASED-NCDDS-IC-09A-16

/ Procurement and

Contract Management

Assistant at NCDDS

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Individual

Consultant

Selection

Open

104,470.59 66,375.00 Signed 2016-09-01 2016-10-20 2016-11-10 2016-12-15 2021-12-31

LASED/NCDDS/IC/36A/17

/ One Consultant for

Develop and Upgrade of

Management Information

System (MIS) for District

IDA / 58070Component 2: Project

ManagementPost

Individual

Consultant

Selection

Open

86,000.00 82,950.00 Signed 2017-08-28 2017-10-16 2017-11-06 2017-12-11 2019-02-04

LASED/NCDDS/IC/36/17 /

One Consultant for

Develop and Upgrade of

Management Information

System (MIS) for District

IDA / 58070Component 2: Project

ManagementPost

Individual

Consultant

Selection

Open

40,000.00 0.00 Canceled 2017-05-31 2017-07-19 2017-08-09 2017-09-13 2019-05-13

LASED/NCDDS/IC/50/17 /

One Consultant for

Annual Progress Survey

IDA / 58070

Sub-Component 1.1: Social

Land Concession

Investment Planning and

Prioritization

Post

Individual

Consultant

Selection

Open

23,760.00 63,300.00 Signed 2017-11-01 2017-12-20 2018-01-10 2018-02-14 2021-12-31

LASED/NCDDS/IC/49/17 /

IT Adviser

IDA / 58070Component 2: Project

ManagementPost

Individual

Consultant

Selection

Open

112,941.18 108,335.29 Signed 2018-01-01 2018-02-19 2018-03-12 2018-04-16 2021-12-31

LASED/NCDDS/IC/51/18 /

One National Consultant

for PIM revision of

LASEDII (Lumpsum

Contract external short

term consultant out put

base)

IDA / 58070

Sub-Component 1.1: Social

Land Concession

Investment Planning and

Prioritization

Post

Individual

Consultant

Selection

Open

16,000.00 0.00Pending

Implementation2018-11-01 2018-12-20 2019-01-10 2019-02-14 2019-08-13

LASED/NCDDS/IC/52/18 /

One National Consultant

for Small scale Solar-

irrigation system study in

2 sites in Dar and Choam

krovien (Lumpsum

Contract external short

term consultant out put

base for study (2 sites)

for LASED II.

IDA / 58070

Sub-Component 1.1: Social

Land Concession

Investment Planning and

Prioritization

Post

Individual

Consultant

Selection

Open

30,000.00 0.00Pending

Implementation2018-09-03 2018-10-22 2018-11-12 2018-12-17 2019-06-15

LASED/NCDDS/IC/53/18 /

One National Consultant

for Socio Economic

baseline survey (Lumpsum

Contract external short

term consultant out put

base for LASED II

IDA / 58070

Sub-Component 1.1: Social

Land Concession

Investment Planning and

Prioritization

Post

Individual

Consultant

Selection

Open

20,000.00 0.00Pending

Implementation2018-08-01 2018-09-19 2018-10-10 2018-11-14 2019-05-13

LASED/NCDDS/IC/54/18 /

One National Consultant

for Effectiveness

application of safeguard

assessment (Lumpsum

Contract short term

consultant out put base)

for LASED II

IDA / 58070

Sub-Component 1.1: Social

Land Concession

Investment Planning and

Prioritization

Post

Individual

Consultant

Selection

Open

25,000.00 0.00Pending

Implementation2018-10-01 2018-11-19 2018-12-10 2019-01-14 2019-07-13

LASED/NCDDS/IC/55/18 /

M&E and Training

Assistant (MTA)

IDA / 58070Component 2: Project

ManagementPost

Individual

Consultant

Selection

Open

33,882.35 0.00Under

Implementation2018-08-06 2018-09-24 2018-10-15 2018-11-19 2021-11-18

LASED/NCDDS/IC/25A/18

/ Provincial Finance

Consultant for LASED Kg.

Chhnang. (New)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Individual

Consultant

Selection

Open

96,411.76 0.00Under

Implementation2018-08-24 2018-10-12 2018-11-02 2018-12-07 2021-12-31

LASED/NCDDS/IC/56/19 /

Senior Agronomist and

Value Chain Adviser for

GDA

IDA / 58070

Sub-component 1.3:

Agriculture and

Livelihood Development

Post

Individual

Consultant

Selection

Open

94,823.53 92,510.29 Signed 2019-02-15 2019-04-05 2019-04-26 2019-05-31 2021-12-31

LASED/NCDDS/IC/57/19 /

Consultant for

Measurement the

awareness and

understanding of LRs and

project team on the

LASED II and SLC.

IDA / 58070

Sub-Component 1.1: Social

Land Concession

Investment Planning and

Prioritization

Post

Individual

Consultant

Selection

Open

20,000.00 0.00Pending

Implementation2019-04-19 2019-06-07 2019-06-28 2019-08-02 2020-01-31

LASED/NCDDS/F/36/19 /

Contract with NGOs to

form and strengthen the

community forestry

conservation in project

target sites.

IDA / 58070

Sub-component 1.3:

Agriculture and

Livelihood Development

Post Direct Selection Direct

40,000.00 0.00Pending

Implementation2019-05-01 2019-05-11 2019-07-15 2021-12-31

LASED/NCDDS/IC/17A/19

/ Provincial Operation

Advisor for LASED

Thbong Khmum.

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Individual

Consultant

Selection

Open

54,705.88 0.00Pending

Implementation2019-03-15 2019-05-03 2019-05-24 2019-06-28 2021-12-31

LASED/NCDDS/IC/23A/19

/ Provincial Finance

Consultant for LASED Kg.

Thom. (New)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Individual

Consultant

Selection

Open

56,529.41 0.00Pending

Implementation2019-03-25 2019-05-13 2019-06-03 2019-07-08 2021-12-31

LASED/NCDDS/IC/06B/19

/ New Senior National

Operation and M&E

Advisor at GDH

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Individual

Consultant

Selection

Open

91,176.50 90,485.29 Terminated 2019-04-01 2019-05-20 2019-06-10 2019-07-15 2021-12-31

LASED/NCDDS/IC/59/19 /

National Short-Term

Consultant for Social Risk

Management Framework

Development for LASED

III Preparation

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post Direct Selection Direct

13,500.00 0.00Under

Implementation2019-08-29 2019-09-08 2019-11-12 2020-02-10

LASED/NCDDS/IC/60/19 /

National Short-Term

Consultant for

Environmental Risk

Management Framework

Development for LASED

III Preparation

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post Direct Selection Direct

13,500.00 0.00Under

Implementation2019-08-29 2019-09-08 2019-11-12 2019-11-21

LASED/NCDDS/IC/61/19 /

National Monitoring and

Evaluation Consultant for

LASED II at NCDDS

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post Direct Selection Direct

78,400.00 0.00Under

Implementation2019-08-29 2019-09-08 2019-11-12 2021-12-31

Page 17: World Bank Documentdocuments.worldbank.org/curated/en/... · II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review

Page 14

LASED/GDH/IC/62/19 /

National Monitoring and

Evaluation Consultant for

LASED II at GDH

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post Direct Selection Direct

78,400.00 0.00Under

Implementation2019-08-29 2019-09-08 2019-11-12 2021-12-31

LASED/NCDDS/IC/58/19 /

International Short-Term

Consultant for

Environmental

Management

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post Direct Selection Direct

18,750.00 0.00Under

Implementation2019-09-26 2019-10-06 2019-12-10 2020-01-04

LASED/NCDDS/IC/47A/19

/ Community Development

and Agriculture Facilitator

for Peam, KCH (New)

IDA / 58070

Sub-component 1.3:

Agriculture and

Livelihood Development

Post

Individual

Consultant

Selection

Open

22,400.00 0.00Pending

Implementation2019-09-26 2019-11-14 2019-12-05 2020-01-09 2021-12-31

KH-NCDDS-135175-CS-

CDS / International Short

Term Consultant for

Social Risk Management

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post Direct Selection Direct

30,000.00 0.00Under

Implementation2019-09-26 2019-10-06 2019-12-10 2020-01-19

LASED/NCDDS/IC/21A/19

/ Provincial Finance

Consultant for LASED

Kratie (New)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Individual

Consultant

Selection

Open

45,588.00 0.00Pending

Implementation2019-11-01 2019-12-20 2020-01-10 2020-02-14 2021-12-31

LASED/NCDDS/IC/22A/19

/ Provincial Finance

Consultant for LASED

Tbong Khmum (New)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Individual

Consultant

Selection

Open

45,588.00 0.00Pending

Implementation2019-11-01 2019-12-20 2020-01-10 2020-02-14 2021-12-31

LASED/NCDDS/IC/24A/19

/ Provincial Finance

Consultant for LASED Kg.

Speu. (New)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Individual

Consultant

Selection

Open

45,588.00 0.00Pending

Implementation2019-11-01 2019-12-20 2020-01-10 2020-02-14 2021-12-31

LASED/GDH/IC/12A/19 /

Admin and Finace

Assistant at GDH (New)

IDA / 58070Component 2: Project

ManagementPost

Individual

Consultant

Selection

Open

23,529.00 0.00Pending

Implementation2019-11-01 2019-12-20 2020-01-10 2020-02-14 2021-12-31

LASED/GDH/IC/63/19 /

Short-term consultant to

produce Orthophoto for

Land Activities in Daung

Site, KPT

IDA / 58070

Sub-Component 1.1: Social

Land Concession

Investment Planning and

Prioritization

Post

Individual

Consultant

Selection

Open

7,600.00 0.00Pending

Implementation2019-11-05 2019-12-24 2020-01-14 2020-02-18 2020-08-16

LASED/GDH/IC/64/19 /

Short-term Consultant to

Update, Revised PIM /

COM for LASED III,

Including ICLT chapter.

IDA / 58070

Sub-Component 1.1: Social

Land Concession

Investment Planning and

Prioritization

Post

Individual

Consultant

Selection

Open

30,000.00 0.00Pending

Implementation2019-11-15 2020-01-03 2020-01-24 2020-02-28 2020-08-26

LASED/NCDDS/IC/19A/19

/ Provincial Operation

Advisor for LASED Kg.

Speu (New).

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post

Individual

Consultant

Selection

Open

41,941.18 0.00Pending

Implementation2019-11-20 2020-01-08 2020-01-29 2020-03-04 2021-12-31

LASED/GDH/IC/65/19 /

Project Management

Support Consultant at

GDH

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post Direct Selection Direct

26,470.59 0.00Under

Implementation2019-11-14 2019-11-24 2020-01-28 2021-01-27

LASED/NCDDS/IC/66/19 /

International Short-Term

Consultant for Support

the formulation of an

Agricultural Service

Strategy for LASED III

(21 days)

IDA / 58070

Sub-component 1.2: Land

Preparation and

Infrastructure

Development

Post Direct Selection Direct

18,442.00 0.00Pending

Implementation2019-12-20 2019-12-30 2020-03-04 2020-03-29