Procurement Plan
I. General
1. Bank’s approval Date of the procurement Plan Revision of Updated Procurement Plan, August 2017
2. Date of General Procurement Notice: October 10, 20163. Period covered by this procurement plan: 18 months
II. Goods and Works and non-consulting services.
1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement:
Procurement Category Prior Review ThresholdUS$
Comments
1. Goods and >= US$2 million All2. Works >= US$ 10 million All3. (Non-Consultant Services) >= US$2 million All
2. Prequalification. _Not applicable.
3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: At sub-national levels (Commune/Sangkat and Community), provisions of the Project Implementation Manual (PIM) dated March 30, 2016 which has been agreed by the Bank will apply. The PIM provides for processes and procedures for procurement at sub-national levels.
4. Reference to (if any) Project Operational/Procurement Manual: the Project Implementation Manual (PIM) dated March 30, 2016 has been agreed by the Bank.
5. Summary of the Procurement Packages
1 2 3 4 5 6 7
Ref. No.
Description EstimatedCostUS$
million
Packages Domestic
Preference
(yes/no)
Reviewby Bank
(Prior / Post)
Comments
LASED/NCDDS/W/NCB/05/17
Upgrade Earth Road to Late-Rite Roads (106.96Km)
1.5 1 No Post NCB
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
LASED/NCDDS/W/NCB/03/17
Construction of Late-Rite Roads = 29km
1.3 1 No Post NCB
LASED/NCDDS/W/NCB/02/17
Land Preparation Agriculture-Bulldozing, Leveling. Total:2,355.50Ha
2.4 1 No Post NCB
LASED/NCDDS/W/NCB/06/17
Construction of 11 small dams.
1.1 1 No Post NCB
LASED/NCDDS/W/NCB/04/17
Construction of earth roads (130Km)
2.86 1 No Post NCB
LASED/NCDDS/G/NCB/12/17
Household Start-Up Packages for Daung 700 HH (Solar lamp, Tent plastic, mat, blanket, water jar, water filter)
0.12 1 No Post NCB
LASED/NCDDS/G/NCB/03/16
Office equipment (computers & Photocopy Machines)
0.18 1 No Post NCB
III. Selection of Consultants
1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants:
2. Selection Method Prior Review Threshold Comment1. Competitive Methods (Firms) >= US$1,000,0002. Individual >= US$ 300,000
2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise
entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines.
4. Consultancy Assignments with Selection Methods
1 2 3 4 5 6
Ref. No. Description of Assignment
Estimated CostUS$ million
Packages Reviewby Bank(Prior / Post)
Comments
LASED/NCDDS/F/35/17
Consulting firm for Irrigation Design (8 sites)
0.12 1 Post CQS
LASED/NCDDS/IC/30/17
Baseline Survey in year 2017 (Local Firm)
0.07 1 Post CQS
LASED/NCDDS/IC/31/18
Impact Survey for 2nd year of the project/Mid-term review (Local Firm)
0.05 1 Post CQS
LASED/NCDDS/IC/32/21
Final Impact Survey
0.12 1 Post CQS
Page 1
PROCUREMENT
PLANCambodia : KH-Land Allocation for Social and Economic Development Project II
General Information
Country: Cambodia Bank’s Approval Date of the Original Procurement Plan: 2016-08-18
Revised Plan Date(s): (comma delineated, leave blank if none)2019-12-18
Project ID: P150631 GPN Date: 2016-10-10
Project Name: KH-Land Allocation for Social and Economic Development Project II
Loan / Credit No: IDA / 58070
Executing Agency(ies): National Committee for Sub-National Democratic Development Secretariat
WORKS
Activity Reference No.
/ DescriptionLoan / Credit
No.Component Review Type Method
Market
Approach
Procurement
Process
Prequalificatio
n (Y/N)
Estimated
Amount
(US$)
Actual
Amount
(US$)
Process
Status
Draft Pre-
qualification
Documents
Prequalification
Evaluation Report
Draft Bidding
Document /
Justification
Specific Procurement
Notice / Invitation
Bidding Documents
as Issued
Proposal Submission
/ Opening / Minutes
Bid Evaluation
Report and
Recommendation for
Award
Signed Contract Contract Completion
Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual
COMMUNE NO 07/17 /
Water well (Afredes) for
Thmey 19 Units
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope63,333.33 62,890.00 Signed 2017-06-06 2017-08-01 2018-08-01
COMMUNE NO 08/17 /
Water well (Afredes) for
Chambak 6 Units
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope20,000.00 9,900.00 Signed 2017-06-06 2017-08-01 2018-08-01
COMMUNE NO 10/17 /
House for Nurses &
Teachers Ceramic tile
floor (W=9.2m, L=16.2m,
H=6.82m, 4 bed room, 4
rooms's W.C & 4 places
of kitchend) for Tipo 1
QTY 1 Unit
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope35,000.00 34,750.00 Signed 2017-07-06 2017-08-31 2018-08-31
COMMUNE NO 11/17 /
House for Nurses &
Teachers Ceramic tile
floor (W=9.2m, L=16.2m,
H=6.82m, 4 bed room, 4
rooms's W.C & 4 places
of kitchend) for Tipo 2
QTY 1 Unit
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope35,000.00 34,750.00 Signed 2017-07-06 2017-08-31 2018-08-31
COMMUNE NO 12/17 /
House for Nurses &
Teachers Ceramic tile
floor (W=9.2m, L=16.2m,
H=6.82m, 4 bed room, 4
rooms's W.C & 4 places
of kitchend) for
Choamkravien QTY 1
Unit
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope35,000.00 34,400.00 Signed 2017-07-06 2017-08-31 2018-08-31
COMMUNE NO 13/17 /
House for Nurses &
Teachers (8mx 20m
x4Rooms, each room
equipped with internal
kitchen & bathroom) for
Chambak QTY 1 Unit
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope35,000.00 32,400.00 Signed 2017-07-06 2017-08-31 2018-08-31
COMMUNE NO 14/17 /
House for Nurses &
Teachers Ceramic tile
floor (W=9.2m, L=16.2m,
H=6.82m, 4 bed room, 4
rooms's W.C & 4 places
of kitchend) for Sambok
QTY 1 Unit
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope35,000.00 31,500.00 Signed 2017-07-06 2017-08-31 2018-08-31
COMMUNE NO 15/17 /
House for Nurses &
Teachers Ceramic tile
floor (W=9.2m, L=16.2m,
H=6.82m, 4 bed room, 4
rooms's W.C & 4 places
of kitchend) for
Changkrang QTY 1 Unit
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope35,000.00 34,850.00 Signed 2017-07-06 2017-08-31 2018-08-31
COMMUNE NO 16/17 /
House for Nurses &
Teachers Ceramic tile
floor (W=9.2m, L=16.2m,
H=6.82m, 4 bed room, 4
rooms's W.C & 4 places
of kitchend) for Thmey
QTY 1 Unit
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope35,000.00 34,700.00 Signed 2017-07-06 2017-08-31 2018-08-31
COMMUNE NO 17/17 /
House for Nurses &
Teachers Ceramic tile
floor (W=9.2m, L=16.2m,
H=6.82m, 4 bed room, 4
rooms's W.C & 4 places
of kitchend) for Dar QTY
1 Unit
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope35,000.00 30,400.00 Signed 2017-07-06 2017-08-31 2018-08-31
COMMUNE NO 18/17 /
House for Nurses &
Teachers Ceramic tile
floor (W=9.2m, L=16.2m,
H=6.82m, 4 bed room, 4
rooms's W.C & 4 places
of kitchend) for Ksach Sar
QTY 1 Unit
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope35,000.00 34,886.00 Signed 2017-07-06 2017-08-31 2018-08-31
COMMUNE NO 19/17 /
House for Nurses &
Teachers Ceramic tile
floor (W=9.2m, L=16.2m,
H=6.82m, 4 bed room, 4
rooms's W.C & 4 places
of kitchend) for Sambok
Kriel QTY 1 Unit
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope35,000.00 34,720.00 Signed 2017-07-06 2017-08-31 2018-08-31
COMMUNE NO 20/17 /
House for Nurses &
Teachers Ceramic tile
floor (W=9.2m, L=16.2m,
H=6.82m, 4 bed room, 4
rooms's W.C & 4 places
of kitchend) for Peam
QTY 1 Unit
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope35,000.00 34,869.00 Signed 2017-07-06 2017-08-31 2018-08-31
COMMUNE NO 21/17 /
House for Nurses &
Teachers (8mx 20m
x4Rooms, each room
equipped with internal
kitchen & bathroom) for
Chhean Loeung QTY 1
Unit
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope35,000.00 34,800.00 Signed 2017-07-06 2017-08-31 2018-08-31
COMMUNE NO 22/17 /
House for Nurses &
Teachers Ceramic tile
floor (W=9.2m, L=16.2m,
H=6.82m, 4 bed room, 4
rooms's W.C & 4 places
of kitchend) for Raksmey
Samaki QTY 1 Unit
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope35,000.00 33,942.00 Signed 2017-07-06 2017-08-31 2018-08-31
COMMUNE NO 23/17 /
Construction of
Community Centre
Ceramic tile floor
(W=7.2m, L=17.2m,
H=6.62m, Warehouse, 2
rooms's W.C) for Dar (1).
Total: 1 Unit
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope29,000.00 28,900.00 Signed 2017-06-06 2017-08-01 2018-07-31
COMMUNE NO 24/17 /
Construction of
Community Centre
Ceramic tile floor
(W=7.2m, L=17.2m,
H=6.62m, Warehouse, 2
rooms's W.C) for Thmey
(1). Total: 1 Unit
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope29,000.00 28,950.00 Signed 2017-06-06 2017-08-01 2018-07-31
COMMUNE NO 25/17 /
Construction of
Community Centre
Ceramic tile floor
(W=7.2m, L=17.2m,
H=6.62m, Warehouse, 2
rooms's W.C) for Chambak
(1). Total: 1 Unit
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope29,000.00 27,400.00 Signed 2017-06-06 2017-08-01 2018-07-31
Page 2
COMMUNE NO 26/17 /
Construction of
Community Centre
Ceramic tile floor
(W=7.2m, L=17.2m,
H=6.62m, Warehouse, 2
rooms's W.C) for
Choamkravien (1). Total: 1
Unit
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope29,000.00 28,800.00 Signed 2017-06-06 2017-08-01 2018-07-31
COMMUNE NO 27/17 /
Construction of
Community Centre
Ceramic tile floor
(W=7.2m, L=17.2m,
H=6.62m, Warehouse, 2
rooms's W.C) for Tipo 2
(1). Total: 1 Unit
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope29,000.00 25,400.00 Signed 2017-06-06 2017-08-01 2018-08-01
COMMUNE NO 29/17 /
Construction of
Community Centre
Ceramic tile floor
(W=7.2m, L=17.2m,
H=6.62m, Warehouse, 2
rooms's W.C) for Peam
(1). Total: 1 Unit
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope29,000.00 26,400.00 Signed 2017-06-06 2017-08-01 2018-08-01
COMMUNE NO 30/17 /
Construction of
Community Centre
Ceramic tile floor
(W=7.2m, L=17.2m,
H=6.62m, Warehouse, 2
rooms's W.C) for Chean
Loeung (1). Total: 1 Unit
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope29,000.00 28,850.00 Signed 2017-06-06 2017-08-01 2018-08-31
COMMUNE NO 31/17 /
Construction of
Community Centre
Ceramic tile floor
(W=7.2m, L=17.2m,
H=6.62m, Warehouse, 2
rooms's W.C) for Ksach
Sor (1). Total: 1 Unit
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope29,000.00 28,780.00 Signed 2017-06-06 2017-08-01 2018-08-01
COMMUNE NO 32/17 /
Construction of
Community Centre
Ceramic tile floor
(W=7.2m, L=17.2m,
H=6.62m, Warehouse, 2
rooms's W.C) for Chum
Kreal (1). Total: 1 Unit
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope29,000.00 26,300.00 Signed 2017-06-06 2017-08-01 2018-08-01
COMMUNE NO 33/17 /
Construction of
Community Centre
Ceramic tile floor
(W=7.2m, L=17.2m,
H=6.62m, Warehouse, 2
rooms's W.C) for Prey
Thom (1). Total: 1 Unit
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope29,000.00 27,565.00 Signed 2017-06-06 2017-08-01 2018-08-01
LASED/NCDDS/W/NCB/02/
17 / Land Preparation
Agriculture-Buldozing,
Leveling:LOT1:
S.Kriel(100),
Ksa.Sar(126.50),Peam(116.5
0), Chh.loeung(103),
Ra.Samaki(200), TP1(276),
TP2 (226.50), S.bok(100),
Ch.Krang(59), Dar(97),
Thmey(174)&Chambak(277)
. LOT2:Daung (500).Grand
Total:2,355.50Ha
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
BidsOpen - National
Single Stage -
One Envelope2,355,500.00 1,913,405.75 Signed 2017-02-01 2017-02-06 2017-03-20 2017-04-19 2017-05-24 2017-11-20
LASED/NCDDS/W/NCB/07/
17 / Construction of
Primary Schools (5Rooms,
4WCs, 1Well, 1Flag Pole)
Incl. 250chairs connected
with tables, 5Tables &
5Chairs and Whiteboards
for: Tipo1, Chambak,
Sambok, Raksmey Samaki
(KSP), Ksach Sar (KCH),
Choamkravien and Daung
(2units) Total:8Units
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
BidsOpen - National
Single Stage -
One Envelope711,111.11 693,314.40 Signed 2017-09-15 2017-09-20 2017-11-01 2017-12-01 2018-01-05 2018-07-04
LASED/NCDDS/W/SP/01/17
/ "Upgrade Earth Road to
Late-Rite Roads
(W4.5mxT0.15m): Main
Road, KPT
Tipo 1 and 2 = 11km. "
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope158,888.89 127,836.37 Signed 2017-12-20 2018-02-14 2018-08-13
COMMUNE/KPT/W/37/18
/ Upgrade Earth Road to
Late-Rite Roads
(W4.5mxT0.15m):, Tipo 1
(AR3=0.95km,
ART=0.71km, AR2=1.26km,
AR4=1,35) Total= 4.27km.
(Package1)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope61,677.78 0.00
Pending
Implementa
tion
2018-08-06 2018-10-01 2019-03-30
LASED/NCDDS/W/NCB/05/
17 / Upgrade Earth Road
to Late-Rite
Roads(W4.5mxT0.15m):LOT
1: Tipo1(9.47km), Tipo2
(10.53km) and Main Road
(11km). Total 31km. LOT
2: S.Kriel(19km),
K.Sar(10.80km),
Peam(11.44km),
Chh.Loeung(13.72km) &
Ra.Samaki(21km). Total:
75.96km. Grand Total
106.96Km
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
BidsOpen - National
Single Stage -
One Envelope1,544,977.78 0.00 Canceled 2017-09-01 2017-09-06 2017-10-18 2017-11-17 2017-12-22 2018-06-20
LASED/NCDDS/W/NCB/03/
17 / Construction of Lot
1. Late-Rite Roads
(W5xT0.15xE0.5m) =
22km. Lot 2. Earth Roads
(W5xT0.15xE0.5m) for
Daung = 29km
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
BidsOpen - National
Single Stage -
One Envelope1,342,000.00 0.00
Pending
Implementa
tion
2019-01-01 2019-01-06 2019-02-17 2019-03-19 2019-04-23 2019-10-20
LASED/NCDDS/W/SP/09/17
/ Build board
Construction, Installation
and Renew Banner (New
bill board 3 sites at KSP,
KPT and KCH) and
Renews banner for
existing bill board 9 sites.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope116,666.67 107,060.85 Signed 2018-04-07 2018-06-02 2018-11-29
COMMUNE/KRT/W/54/18
/ Construction of Health
Posts (3 rooms, fense
400m, gate 1, well1, WC
2rooms, pipe culvert 1,
incinerator 1, 200m of
laterite road). 1 Unit for
Da, KRT
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope36,666.67 34,900.00 Signed 2018-03-06 2018-05-01 2018-10-28
COMMUNE/KRT/W/55/18
/ Construction of Health
Posts (3 rooms, fense
400m, gate 1, well1, WC
2rooms, pipe culvert 1,
incinerator 1, 200m of
laterite road). 1 Unit
for Thmey, KRT.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope36,666.67 36,200.00 Signed 2018-03-06 2018-05-01 2018-10-28
LASED/NCDDS/W/NCB/08/
17 / Construction of
Health Posts (3 rooms,
fense 400m, gate 1, well1,
WC 2rooms, pipe culvert
1, incinerator 1, 200m of
laterite road). Da (1
Unit), Thmey (1 Unit)
Ksach Sar (1 Unit),
Chhean Loeung (1 Unit)
and Daung (1 Unit). Total
5 Units.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope183,333.33 0.00 Canceled 2017-02-06 2017-04-03 2018-04-03
Page 3
LASED/NCDDS/W/NCB/01/
17 / 1) Concrete Poles in
Agriculture & Residential
Lands (0.12 x 0.12 x
0.75m) = (5000 Poles), 2)
Concrete Poles in Forestry
& in SLC Sites
(0.3x0.3x0.4x1.5m) (150
Poles) and 3) Concrete
Poles in Stream and
Canal (0.2x0.2x1.5m) for
Daung (200 Poles).
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope160,555.56 0.00 Canceled 2017-10-07 2017-12-02 2018-05-31
LASED/NCDDS/W/NCB/09/
18 / Upgrade Earth Road
to Late-Rite
Road(W4.5mxT0.15m):LOT1
:KPT,Tipo=15
lines=15.73km,LOT2: KCH
A) KrangLvea =22 Lines
25.14km),B)Peam =17
Lines(11.44km),C)Chhean
Loeung=10 Lines
(9.57km)=46.15km &
LOT3:
KSP,RaksmeySamaki=5
Lines= 16.25km.
GrandTotal=78.13Km.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
BidsOpen - National
Single Stage -
One Envelope1,128,544.44 946,643.43 Signed 2018-08-22 2018-08-27 2018-10-08 2018-11-07 2018-12-12 2019-12-12
COMMUNE/KCH/W/42/18
/ Upgrade Earth Road to
Late-Rite Roads
(W4.5mxT0.15m): Sambok
Kriel, Krang Lvea
Commune, KCH =
(URR/5lines = 4.66km).
(Package 2).
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope67,311.11 0.00
Pending
Implementa
tion
2018-05-23 2018-07-18 2019-01-14
COMMUNE/KCH/W/46/18
/ Upgrade Earth Road to
Late-Rite Roads
(W4.5mxT0.15m): Chhean
Loeung Commune, KCH =
(URR/12lines) = 4.15km.
(Package 1).
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope59,944.44 0.00
Pending
Implementa
tion
2018-05-09 2018-07-04 2018-12-31
COMMUNE/KCH/W/56/18
/ Construction of Health
Posts (3 rooms, fense
400m, gate 1, well1, WC
2rooms, pipe culvert 1,
incinerator 1, 200m of
laterite road). 1 Unit
for Ksach Sar, KCH.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope36,666.67 29,967.00 Signed 2018-04-22 2018-06-17 2018-12-14
COMMUNE/KCH/W/57/18
/ Construction of Health
Posts (3 rooms, fense
400m, gate 1, well1, WC
2rooms, pipe culvert 1,
incinerator 1, 200m of
laterite road). 1 Unit for
Chhean Loeung, KCH.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope36,666.67 0.00
Pending
Implementa
tion
2018-04-22 2018-06-17 2018-12-14
COMMUNE/KCH/W/59/18
/ Ploughing (2 Times) for
Peam Commune (116.5Ha),
Samaki Meanchey District,
Kg. Chhnang
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope12,944.44 0.00
Pending
Implementa
tion
2018-05-23 2018-07-18 2019-01-14
COMMUNE/KCH/W/60/18
/ Ploughing (2 Times) for
Chheanloeurng Commune
(103Ha), Samaki
Meanchey District, Kg.
Chhnang.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope11,444.44 0.00
Pending
Implementa
tion
2018-05-23 2018-07-18 2019-01-14
COMMUNE/KSP/W/49/18
/ Upgrade Earth Road to
Late-Rite Roads
(W4.5mxT0.15m): Raksmey
Samaki, KSP =
(Up1=3.40km, Up2=0.30
km, Up3=0.15 km,
Up4=0.30 km, Up5=0.30
km, and Up6=0.30km) =
4.75km. (Package 1)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope68,611.11 67,345.00 Signed 2018-04-14 2018-06-09 2018-12-06
COMMUNE/KPT/W/53/18
/ Construction of Health
Posts (3 rooms, fense
400m, gate 1, well1, WC
2rooms, pipe culvert 1,
incinerator 1, 200m of
laterite road). 1 Unit for
Daung, KPT.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope36,666.67 0.00
Pending
Implementa
tion
2018-11-20 2019-01-15 2019-07-14
COMMUNE NO 05/17 /
Water well (Afredes) for
Daung (Site I) : Total: 18
Units
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope54,000.00 0.00
Pending
Implementa
tion
2018-09-19 2018-11-14 2019-05-13
COMMUNE/KSP/W/61/18
/ Ploughing (2 Times) for
Reaksmey Samaki
Commune (200Ha), Oral
District, Kg. Speu.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope22,222.22 21,600.00 Signed 2018-05-23 2018-07-18 2019-01-14
COMMUNE/KPT/W/62/18
/ Ploughing (2 Times)
Tipo 1 = 354.44Ha &
Tipo 2 =226.5Ha, Total =
580.94Ha for Tipo
Commune, Suntuk
District, Kg. Thom.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope64,548.89 46,075.20 Signed 2018-05-23 2018-07-18 2019-01-14
COMMUNE/KRT/W/67/18
/ Ploughing (2 Times) for
Thmey Commune (174Ha),
Chetr Borey, Kratie.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope19,333.33 0.00
Pending
Implementa
tion
2018-05-23 2018-07-18 2019-01-14
COMMUNE/KRT/W/68/18
/ Ploughing (2 Times) for
Chambak Commune
(277Ha), Prek Prasab,
Kratie.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope30,777.78 0.00
Pending
Implementa
tion
2018-05-23 2018-07-18 2019-01-14
COMMUNE/KPT/W/63/18
/ Ploughing (2 Times) for
Daung Commune (500Ha),
Suntuk District, Kg.
Thom.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope55,555.56 0.00
Pending
Implementa
tion
2019-02-06 2019-04-03 2019-09-30
COMMUNITY/KCH/W/45/1
8 / Planting in
Agriculture Land (Sowing
Seed or Planting Seedling
cover crop) for community
in Sambok Kriel (100Ha),
KCH.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
2,777.78 0.00 Canceled 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27
COMMUNITY/KCH/W/46/1
8 / Planting in
Agriculture Land (Sowing
Seed or Planting Seedling
cover crop) for community
in Ksach Sar (126.50Ha),
KCH.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
3,513.89 0.00 Canceled 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27
COMMUNITY/KCH/W/47/1
8 / Planting in
Agriculture Land (Sowing
Seed or Planting Seedling
cover crop) for community
in Peam (116.50Ha), KCH.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
3,236.11 0.00 Canceled 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27
COMMUNITY/KCH/W/48/1
8 / Planting in
Agriculture Land (Sowing
Seed or Planting Seedling
cover crop) for community
in Chheanloeung (103Ha),
KCH.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
2,861.11 0.00 Canceled 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27
COMMUNITY/KSP/W/49/18
/ Planting in Agriculture
Land (Sowing Seed or
Planting Seedling cover
crop) for community in
Raksmey Samaki (200Ha),
KSP.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
5,555.56 0.00 Canceled 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27
Page 4
COMMUNITY/KPT/W/42/18
/ Planting in Agriculture
Land (Sowing Seed or
Planting Seedling cover
crop) for community in
Tipo 1, KPT (354.44Ha)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
9,845.56 0.00 Canceled 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27
COMMUNITY/KPT/W/43/18
/ Planting in Agriculture
Land (Sowing Seed or
Planting Seedling cover
crop) for community in
Tipo 2 , KPT (226.50Ha)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
6,291.67 0.00 Canceled 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27
COMMUNITY/KRT/W/50/18
/ Planting in Agriculture
Land (Sowing Seed or
Planting Seedling cover
crop) for community in
Sambok, KRT
(100Ha+120Ha=220Ha).
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
6,111.11 0.00 Canceled 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27
COMMUNITY/KRT/W/51/18
/ Planting in Agriculture
Land (Sowing Seed or
Planting Seedling cover
crop) for community in
Changkrang, KRT
(59Ha+80Ha=139Ha)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
3,861.11 0.00 Canceled 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27
COMMUNITY/KRT/W/52/18
/ Planting in Agriculture
Land (Sowing Seed or
Planting Seedling cover
crop) for community in
Dar, KRT (97Ha)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
2,694.44 0.00 Canceled 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27
COMMUNITY/KRT/W/53/18
/ Planting in Agriculture
Land (Sowing Seed or
Planting Seedling cover
crop) for community in
Thmey, KRT (174Ha)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
4,833.33 0.00 Canceled 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27
COMMUNITY/KRT/W/54/18
/ Planting in Agriculture
Land (Sowing Seed or
Planting Seedling cover
crop) for community in
Chambak, KRT (277Ha)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
7,694.44 0.00 Canceled 2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27
COMMUNITY/KPT/W/44/18
/ Planting in Agriculture
Land (Sowing Seed or
Planting Seedling cover
crop) for community in
Daung, KPT (500Ha)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
13,888.89 0.00 Canceled 2019-05-08 2019-05-13 2019-06-24 2019-07-24 2019-08-28 2020-02-24
COMMUNE NO 06/17 /
Water well (Afredes) for
Daung (Site II): Total: 17
Units
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope51,000.00 0.00
Pending
Implementa
tion
2019-01-20 2019-03-17 2019-09-13
COMMUNE/KPT/W/34/18
/ Concrete Poles in
Agriculture Lands (0.12 x
0.12 x 0.75m) = (3600
Poles) for Daung, KPT.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope72,000.00 28,800.00 Signed 2019-01-20 2019-03-17 2019-09-13
COMMUNE/KPT/W/35-
36/18 / Concrete Poles in
Residential Lands (0.12 x
0.12 x 0.75m= 1400 Poles)
and Concrete Poles in
Forestry (0.3x0.3x0.4x1.5m
= 150 Poles) and Concrete
Poles in Stream and
Canal (0.2x0.2x1.5m = 200
Poles) for Daung, KPT.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope44,600.00 21,300.00 Signed 2018-09-22 2018-11-17 2019-05-16
COMMUNITY/KPT/W/39/18
/ Instalation Concrete
Poles in Agriculture
Lands (0.12 x 0.12 x
0.75m) = (3600 Poles) for
Daung, KPT.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
18,000.00 0.00
Pending
Implementa
tion
2019-01-15 2019-01-20 2019-03-03 2019-04-02 2019-05-07 2019-11-03
COMMUNE NO 09/17 /
House for Nurses &
Teachers Ceramic tile
floor (W=9.2m, L=16.2m,
H=6.82m, 4 bed room, 4
rooms's W.C & 4 places
of kitchend) for Daung
QTY 1 Unit
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope35,000.00 0.00
Pending
Implementa
tion
2018-12-19 2019-02-13 2019-08-12
COMMUNE NO 28/17 /
Construction of
Community Centre
Ceramic tile floor
(W=7.2m, L=17.2m,
H=6.62m, Warehouse, 2
rooms's W.C) for Daung
(1). Total: 1 Unit
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope29,000.00 0.00
Pending
Implementa
tion
2019-01-02 2019-02-27 2019-08-26
COMMUNE NO 01/17 /
Repair Earth Roads for
Sambok (6.6km). Total:
6.6Km
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope22,000.00 21,614.12 Signed 2018-05-29 2018-07-24 2019-07-24
COMMUNE NO 02/17 /
Repair Earth Roads for
Changkrang (6.6km) Total:
6.6Km
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope22,000.00 21,576.00 Signed 2018-05-29 2018-07-24 2019-07-24
COMMUNE NO 03/17 /
Repair Earth Roads for
Thmey (4km). Total: 4Km
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope13,333.33 9,934.00 Signed 2018-05-29 2018-07-24 2019-07-24
COMMUNE NO 04/17 /
Repair Earth Roads for
Dar (7.8km). Total: 7.8
Km
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope26,000.00 25,497.00 Signed 2018-05-29 2018-07-24 2019-07-24
COMMUNE/KRT/W/64/18
/ Ploughing (2 Times) for
Sambok Commune
(100Ha+120Ha=220Ha),
Chetr Borey, Kratie.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope24,444.44 0.00
Pending
Implementa
tion
2018-05-23 2018-07-18 2019-01-14
COMMUNE/KRT/W/65/18
/ Ploughing (2 Times) for
Changkrang Commune
(59Ha+80Ha=139Ha),
Chetr Borey, Kratie.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope15,444.44 0.00
Pending
Implementa
tion
2018-05-23 2018-07-18 2019-01-14
COMMUNE/KRT/W/66/18
/ Ploughing (2 Times) for
Dar Commune (97Ha),
Chetr Borey, Kratie.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope10,777.78 0.00
Pending
Implementa
tion
2018-05-23 2018-07-18 2019-01-14
COMMUNITY/KCH/W/07A/
18 / 1) Concrete Poles in
Agriculture & Residential
Lands (0.12x0.12x0.75m) =
(700 Poles) and 2)
Concrete Poles in Forestry
& in SLC Sites (0.3x 0.3x
0.4x 1.5m) for Sambok
Kriel (20 Poles).
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
18,900.00 0.00
Pending
Implementa
tion
2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27
COMMUNITY/KCH/W/08A/
18 / Concrete Poles in
Agriculture & Residential
Lands (0.12x0.12x0.75m)
for Ksach Sar (400 Poles).
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
10,000.00 0.00
Pending
Implementa
tion
2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27
Page 5
COMMUNITY/KCH/W/09A/
18 / 1) Concrete Poles in
Agriculture & Residential
Lands (0.12x0.12x0.75m) =
(400 Poles) and Concrete
Poles in Forestry & in
SLC Sites
(0.3x0.3x0.4x1.5m) for
Peam (30 Poles).
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
12,100.00 0.00
Pending
Implementa
tion
2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27
COMMUNITY/KCH/W/34A/
18 / Construction of Pipe
Culverts (H1xL6m) for
Sambok Kriel: 10 Units.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
25,000.00 0.00
Pending
Implementa
tion
2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27
COMMUNITY/KCH/W/35A/
18 / Construction of Pipe
Culverts (H1xL6m) for
Ksach Sar: 15 Units
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
37,500.00 0.00
Pending
Implementa
tion
2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27
COMMUNITY/KCH/W/36A/
18 / Construction of Pipe
Culverts (H1xL6m) for
Peam: 5 Units
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
12,500.00 0.00
Pending
Implementa
tion
2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27
COMMUNITY/KCH/W/37A/
18 / Construction of Pipe
Culverts (H1xL6m) for
Chhean Loeun: 10 Units.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
25,000.00 0.00
Pending
Implementa
tion
2018-06-06 2018-06-11 2018-07-23 2018-08-22 2018-09-26 2019-03-25
COMMUNITY/KSP/W/10A/
18 / 1) Concrete Poles in
Forestry & in SLC Sites
(0.3x0.3x0.4x1.5m) (20
Poles) and 2) Concrete
Poles in Stream and
Canal (0.2x0.2x1.5m) for
Raksmey Samaki (26
Poles).
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
2,570.00 0.00
Pending
Implementa
tion
2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2018-12-27
COMMUNITY NO 10/18
/ 1) Concrete Poles in
Forestry & in SLC Sites
(0.3x0.3x0.4x1.5m) (20
Poles) and 2) Concrete
Poles in Stream and
Canal (0.2x0.2x1.5m) for
Raksmey Samaki (26
Poles)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope2,570.00 0.00 Canceled 2018-06-06 2018-08-01 2019-08-01
COMMUNITY/KSP/W/38A/
18 / Construction of Pipe
Culverts (H1xL6m) for
Raksmey Samaki: 15
Units
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
37,500.00 0.00
Pending
Implementa
tion
2018-06-15 2018-06-20 2018-08-01 2018-08-31 2018-10-05 2019-01-03
COMMUNITY NO 38/18
/ Construction of Pipe
Culverts (H1xL6m) for
Raksmey Samaki: 15
Units
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope37,500.00 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28
COMMUNITY NO 17/18
/ Planting Grass of Earth
Roads (W5xT0.15xE0.5m)
for Tipo 1 (15Km)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope18,750.00 0.00 Canceled 2018-03-06 2018-05-01 2018-10-28
COMMUNITY/KPT/W/17A/
18 / Planting Grass of
Earth Roads
(W5xT0.15xE0.5m) for
Tipo 1 (15Km)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
18,750.00 0.00
Pending
Implementa
tion
2019-03-15 2019-03-20 2019-05-01 2019-05-31 2019-07-05 2019-10-03
COMMUNITY NO 18/18
/ Planting Grass of Earth
Roads (W5xT0.15xE0.5m)
for Tipo 2 (12Km)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope15,000.00 0.00 Canceled 2018-03-06 2018-05-01 2018-10-28
COMMUNITY/KPT/W/18A/
18 / Planting Grass of
Earth Roads
(W5xT0.15xE0.5m) for
Tipo 2 (12Km)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
15,000.00 0.00
Pending
Implementa
tion
2019-03-15 2019-03-20 2019-05-01 2019-05-31 2019-07-05 2019-10-03
COMMUNITY NO 32/18
/ Construction of Pipe
Culverts (H1xL6m) for
Tipo 1 (10), Kg. Thom: 11
Units.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope27,500.00 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28
COMMUNITY/KPT/W/32A/
18 / Construction of Pipe
Culverts (H1xL6m) for
Tipo 1 (10), Kg. Thom: 11
Units.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
27,500.00 0.00
Pending
Implementa
tion
2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27
COMMUNITY/KPT/W/33A/
18 / Construction of Pipe
Culverts (H1xL6m) for
Tipo 2 (10), Kg. Thom.
Total: 11 Units.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
27,500.00 0.00
Pending
Implementa
tion
2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27
COMMUNITY NO 01/18
/ Concrete Poles and
Installation in Agriculture
& Residential Lands
(0.12x0.12x0.75m) for
Sambok, Kratie (708
Poles).
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope17,700.00 0.00 Canceled 2018-06-06 2018-08-01 2019-08-01
COMMUNITY/KRT/W/01A/
18 / Concrete Poles and
Installation in Agriculture
& Residential Lands
(0.12x0.12x0.75m) for
Sambok, Kratie (708
Poles).
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
17,700.00 0.00
Pending
Implementa
tion
2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27
COMMUNITY NO 02/18
/ Concrete Poles in
Agriculture & Residential
Lands (0.12x0.12x0.75m)
for Changkrang (700
Poles).
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope17,500.00 0.00 Canceled 2018-06-06 2018-08-01 2019-08-01
COMMUNITY/KRT/W/02A/
18 / Concrete Poles in
Agriculture & Residential
Lands (0.12x0.12x0.75m)
for Changkrang (700
Poles).
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
17,500.00 0.00
Pending
Implementa
tion
2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27
COMMUNITY NO 05/18
/ Concrete Poles in
Agriculture & Residential
Lands (0.12x0.12x0.75m) =
(250 Poles) and Concrete
Poles in Forestry & in
SLC Sites
(0.3x0.3x0.4x1.5m) for
Thmey (10 Poles)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope6,950.00 0.00 Canceled 2018-06-06 2018-08-01 2019-08-01
COMMUNITY/KRT/W/05A/
18 / Concrete Poles in
Agriculture & Residential
Lands (0.12x0.12x0.75m) =
(250 Poles) and Concrete
Poles in Forestry & in
SLC Sites
(0.3x0.3x0.4x1.5m) for
Thmey (10 Poles)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
6,950.00 0.00
Pending
Implementa
tion
2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27
COMMUNITY NO 06/18
/ Concrete Poles in
Agriculture & Residential
Lands (0.12x0.12x0.75m)
for Chambak (270 Poles).
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope6,750.00 0.00 Canceled 2018-06-06 2018-08-01 2019-08-01
COMMUNITY/KRT/W/06A/
18 / Concrete Poles in
Agriculture & Residential
Lands (0.12x0.12x0.75m)
for Chambak (270 Poles).
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
6,750.00 0.00
Pending
Implementa
tion
2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27
Page 6
COMMUNITY NO 07/18
/ 1) Concrete Poles in
Agriculture & Residential
Lands (0.12x0.12x0.75m) =
(700 Poles) and 2)
Concrete Poles in Forestry
& in SLC Sites (0.3x 0.3x
0.4x 1.5m) for Sambok
Kriel (20 Poles)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope18,900.00 0.00 Canceled 2018-06-06 2018-08-01 2019-08-01
COMMUNITY NO 08/18
/ Concrete Poles in
Agriculture & Residential
Lands (0.12x0.12x0.75m)
for Ksach Sar (400 Poles).
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope10,000.00 0.00 Canceled 2018-06-06 2018-08-01 2019-08-01
COMMUNITY NO 09/18
/ 1) Concrete Poles in
Agriculture & Residential
Lands (0.12x0.12x0.75m) =
(400 Poles) and Concrete
Poles in Forestry & in
SLC Sites
(0.3x0.3x0.4x1.5m) for
Peam (30 Poles).
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope12,100.00 0.00 Canceled 2018-06-06 2018-08-01 2019-08-01
COMMUNITY/KRT/W/13A/
18 / Planting Grass of
Earth Roads
(W5xT0.15xE0.5m). for
Sambok (6km).
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
7,500.00 0.00
Pending
Implementa
tion
2019-01-08 2019-01-13 2019-02-24 2019-03-26 2019-04-30 2019-07-29
COMMUNITY NO 13/18
/ Planting Grass of Earth
Roads (W5xT0.15xE0.5m).
for Sambok (6km).
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope7,500.00 0.00 Canceled 2018-03-06 2018-05-01 2018-10-28
COMMUNITY NO 14/18
/ Planting Grass of Earth
Roads (W5xT0.15xE0.5m)
for Changkrang (6km).
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope7,500.00 0.00 Canceled 2018-03-06 2018-05-01 2018-10-28
COMMUNITY/KRT/W/15A/
18 / Planting Grass of
Earth Roads
(W5xT0.15xE0.5m) for Da
(8km).
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
10,000.00 0.00
Pending
Implementa
tion
2019-01-08 2019-01-13 2019-02-24 2019-03-26 2019-04-30 2019-07-29
COMMUNITY/KRT/W/19A/
18 / Construction of Box
Culverts (2x3x6m) for
Sambok (1 Unit)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
16,000.00 0.00
Pending
Implementa
tion
2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2018-12-27
COMMUNITY/KRT/W/20A/
18 / Construction of Box
Culverts (2x3x6m) for
Changkrang (1 Unit)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
16,000.00 0.00
Pending
Implementa
tion
2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2018-12-27
COMMUNITY/KRT/W/21A/
18 / Construction of Box
Culverts (2x3x6m) for Dar
(1 Unit)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
16,000.00 0.00
Pending
Implementa
tion
2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2018-12-27
COMMUNITY/KRT/W/22A/
18 / Construction of Box
Culverts (2x3x6m) for
Thmey (2 Units)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
32,000.00 0.00
Pending
Implementa
tion
2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2018-12-27
COMMUNITY/KRT/W/23A/
18 / Construction of Box
Culverts (2x3x6m) for
Chambak. Phase 1 (2
Units)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
32,000.00 0.00
Pending
Implementa
tion
2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2018-12-27
COMMUNITY/KRT/W/24A/
18 / Construction of Box
Culverts (2x3x6m) for
Chambak. Phase 2 (2
Units)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
32,000.00 0.00
Pending
Implementa
tion
2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2018-12-27
COMMUNITY/KRT/W/25A/
18 / Construction of Box
Culverts (2x3x6m) for
Chambak. Phase 3 (2
Units)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
32,000.00 0.00
Pending
Implementa
tion
2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2018-12-27
COMMUNITY/KRT/W/26A/
18 / Construction of Pipe
Culverts (H1xL6m) for
Sambok, Kratie: 8 Units
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
20,000.00 0.00
Pending
Implementa
tion
2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2018-12-27
COMMUNITY/KRT/W/27A/
18 / Construction of Pipe
Culverts (H1xL6m) for
Changkrang, Kratie: 8
Units
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
20,000.00 0.00
Pending
Implementa
tion
2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2018-12-27
COMMUNITY/KRT/W/28A/
18 / Construction of Pipe
Culverts (H1xL6m) for
Dar, Kratie: 6 Units
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
15,000.00 0.00
Pending
Implementa
tion
2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2018-12-27
COMMUNITY/KRT/W/29A/
18 / Construction of Pipe
Culverts (H1xL6m) for
Thmey, Kratie: 7 Units
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
17,500.00 0.00
Pending
Implementa
tion
2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2018-12-27
COMMUNITY/KRT/W/30A/
18 / Construction of Pipe
Culverts (H1xL6m) for
Chambak, Kratie: 4 Units
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
10,000.00 0.00
Pending
Implementa
tion
2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2018-12-27
COMMUNITY/KTM/W/11A/
18 / Concrete Poles in
Stream and Canal
(0.2x0.2x1.5m) for
Chaomkravien (350 Poles).
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
15,750.00 0.00
Pending
Implementa
tion
2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2019-03-27
COMMUNITY/KTM/W/16A/
18 / Planting Grass of
Earth Roads
(W5xT0.15xE0.5m) for
Choamkravien (5Km)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
6,250.00 0.00
Pending
Implementa
tion
2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2018-12-27
COMMUNITY/KTM/W/31A/
18 / Construction of Pipe
Culverts (H1xL6m) for
Choamkravien, Kg. Cham:
8 Units
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
20,000.00 0.00
Pending
Implementa
tion
2018-06-08 2018-06-13 2018-07-25 2018-08-24 2018-09-28 2018-12-27
COMMUNE/KCH/W/58/18
/ Ploughing (2 Times) for
Sambok Kriel (100Ha) and
for Ksach Sar (126.50Ha),
Total 226.50 Ha,
Kranglovea Commune,
Samaki Meanchey District,
Kg. Chhnang.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope25,166.67 0.00
Pending
Implementa
tion
2018-05-23 2018-07-18 2019-01-14
COMMUNITY/KPT/W/41/18
/ Instalation Concrete
Poles in in Residential
Lands (0.12 x 0.12 x
0.75m = 1400 Poles) and
Concrete Poles in Forestry
(0.3x0.3x0.4x1.5m = 150
Poles) and Concrete Poles
in Stream and Canal
(0.2x0.2x1.5m = 200 Poles)
for Daung, KPT.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
9,900.00 0.00
Pending
Implementa
tion
2018-09-17 2018-09-22 2018-11-03 2018-12-03 2019-01-07 2019-07-06
COMMUNE/KPT/W/38/18
/ Upgrade Earth Road to
Late-Rite Roads
(W4.5mxT0.15m): Tipo 1
(AR6=1.30km, AR=14km,
AR16=0.85km, AR18=0.46,
and AA1= 1.42) Total=
5.2km. (Package2)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope75,111.11 0.00 Canceled 2018-08-06 2018-10-01 2019-03-30
Page 7
COMMUNE/KPT/W/39/18
/ Upgrade Earth Road to
Late-Rite Roads
(W4.5mxT0.15m): Tipo 2
(AR01=1.10km,
AR02=1.20km,
AR03=1.20km,
AR04=1.13km,
ARAR05=1.25km)=
Total:5.88km (Package 1)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope84,933.33 0.00 Canceled 2018-07-07 2018-09-01 2019-02-28
COMMUNE/KPT/W/40/18
/ Upgrade Earth Road to
Late-Rite Roads
(W4.5mxT0.15m): Tipo 2
(AR06=1.10km,
AR07=1.15km,
AR08=1.00km,
AR09=0.60km,
AR10=0.80km)=
Total:4.65km (Package 2)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope67,166.67 0.00 Canceled 2018-07-07 2018-09-01 2019-02-28
COMMUNE/KCH/W/41/18
/ Upgrade Earth Road to
Late-Rite Roads
(W4.5mxT0.15m): Sambok
Kriel = (URR/7lines =
5.34km). (Package 1)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope77,133.33 0.00 Canceled 2018-04-07 2018-06-02 2018-11-29
COMMUNE/KCH/W/43/18
/ Upgrade Earth Road to
Late-Rite Roads
(W4.5mxT0.15m): Ksach
Sar = (URR/2lines &
UAR/6lines = 4.8km).
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope69,333.33 0.00 Canceled 2018-04-07 2018-06-02 2018-11-29
COMMUNE/KCH/W/44/18
/ Upgrade Earth Road to
Late-Rite Roads
(W4.5mxT0.15m): Peam =
(URR/9lines) = 5.67km.
(Package 1)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope81,900.00 0.00 Canceled 2018-04-07 2018-06-02 2018-11-29
COMMUNE/KCH/W/45/18
/ Upgrade Earth Road to
Late-Rite Roads
(W4.5mxT0.15m): Peam =
(URR/5lines &
UAR/3lines). Total =
5.77km. (Package 2)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope83,344.44 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28
COMMUNE/KCH/W/47/18
/ Upgrade Earth Road to
Late-Rite Roads
(W4.5mxT0.15m):Chhean
Loeung = (UAR/4lines).
Total = 4.40km. (Package
2)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope63,555.56 0.00 Canceled 2018-07-07 2018-09-01 2019-02-28
COMMUNE/KCH/W/48/18
/ Upgrade Earth Road to
Late-Rite Roads
(W4.5mxT0.15m):Chhean
Loeung = (UAR/6lines).
Total = 5.17km. (Package
3)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope74,677.78 0.00 Canceled 2018-07-07 2018-09-01 2019-02-28
COMMUNE/KSP/W/50/18
/ Upgrade Earth Road to
Late-Rite Roads
(W4.5mxT0.15m): Raksmey
Samaki, KSP = (Up7=3.50
km, and Up9=1.75km) =
5.25km. (Package 2)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope75,833.33 0.00 Canceled 2018-02-06 2018-04-03 2018-09-30
COMMUNE/KSP/W/51/18
/ Upgrade Earth Road to
Late-Rite Roads
(W4.5mxT0.15m): Raksmey
Samaki, KSP = (Up8=1.65
km, and Up10=3.50km) =
5.15km. (Package 3)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope74,388.89 0.00 Canceled 2018-02-06 2018-04-03 2018-09-30
COMMUNE/KSP/W/52/18
/ Upgrade Earth Road to
Late-Rite Roads
(W4.5mxT0.15m): Raksmey
Samaki, KSP - Main =
(Up11=5.85km) = 5.85km.
(Package 4)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope84,500.00 0.00 Canceled 2018-03-06 2018-05-01 2018-10-28
LASED/NCDDS/W/SP/02/18
/ "Upgrade Earth Road to
Late-Rite Roads
(W4.5mxT0.15m): Main
Road KCH
Sambokreal = 9km and
Khsach Sor = 6km. (Total
= 15km)"
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope216,666.67 0.00 Canceled 2018-08-06 2018-10-01 2019-03-30
COMMUNITY NO 33/18
/ Construction of Pipe
Culverts (H1xL6m) for
Tipo 2 (10), Kg. Thom.
Total: 11 Units
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope27,500.00 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28
COMMUNITY NO 15/18
/ Planting Grass of Earth
Roads (W5xT0.15xE0.5m)
for Da (8km).
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope10,000.00 0.00 Canceled 2018-03-06 2018-05-01 2018-10-28
COMMUNITY NO 19/18
/ Construction of Box
Culverts (2x3x6m) for
Sambok (1)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope16,000.00 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28
COMMUNITY NO 20/18
/ Construction of Box
Culverts (2x3x6m) for
Changkrang (1 Unit)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope16,000.00 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28
COMMUNITY NO 21/18
/ Construction of Box
Culverts (2x3x6m) for Dar
(1 Unit)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope16,000.00 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28
COMMUNITY NO 22/18
/ Construction of Box
Culverts (2x3x6m) for
Thmey (2 Units)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope32,000.00 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28
COMMUNITY NO 23/18
/ Construction of Box
Culverts (2x3x6m) for
Chambak. Phase 1 (2
Units)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope32,000.00 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28
COMMUNITY NO 24/18
/ Construction of Box
Culverts (2x3x6m) for
Chambak. Phase 2 (2
Units)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope32,000.00 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28
COMMUNITY NO 25/18
/ Construction of Box
Culverts (2x3x6m) for
Chambak. Phase 3 (2
Units)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope32,000.00 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28
COMMUNITY NO 26/18
/ Construction of Pipe
Culverts (H1xL6m) for
Sambok, Kratie: 8 Units
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope20,000.00 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28
COMMUNITY NO 27/18
/ Construction of Pipe
Culverts (H1xL6m) for
Changkrang, Kratie: 8
Units
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope20,000.00 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28
COMMUNITY NO 28/18
/ Construction of Pipe
Culverts (H1xL6m) for
Dar, Kratie: 6 Units
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope15,000.00 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28
Page 8
COMMUNITY NO 29/18
/ Construction of Pipe
Culverts (H1xL6m) for
Thmey, Kratie: 7 Units
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope17,500.00 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28
COMMUNITY NO 30/18
/ Construction of Pipe
Culverts (H1xL6m) for
Chambak, Kratie: 4 Units
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope10,000.00 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28
COMMUNITY NO 31/18
/ Construction of Pipe
Culverts (H1xL6m) for
Choamkravien, Kg. Cham:
8 Units
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope20,000.00 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28
COMMUNITY NO 16/18
/ Planting Grass of Earth
Roads (W5xT0.15xE0.5m)
for Choamkravien (5Km)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope6,250.00 0.00 Canceled 2018-08-06 2018-10-01 2019-03-30
COMMUNITY NO 11/18
/ Concrete Poles in
Stream and Canal
(0.2x0.2x1.5m) for
Chaomkravien (350 Poles).
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope15,750.00 0.00 Canceled 2018-06-06 2018-08-01 2019-08-01
COMMUNITY NO 34/18
/ Construction of Pipe
Culverts (H1xL6m) for
Sambok Kriel: 10 Units
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope25,000.00 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28
COMMUNITY NO 35/18
/ Construction of Pipe
Culverts (H1xL6m) for
Ksach Sar: 15 Units
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope37,500.00 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28
COMMUNITY NO 36/18
/ Construction of Pipe
Culverts (H1xL6m) for
Peam: 5 Units
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope12,500.00 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28
COMMUNITY NO 37/18
/ Construction of Pipe
Culverts (H1xL6m) for
Chhean Loeun: 10 Units
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope25,000.00 0.00 Canceled 2018-06-06 2018-08-01 2019-01-28
COMMUNITY/KRT/W/14A/
18 / Planting Grass of
Earth Roads
(W5xT0.15xE0.5m) for
Changkrang, KRT (6km).
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Community
Driven
Development
Open - National
7,500.00 0.00
Pending
Implementa
tion
2019-01-08 2019-01-13 2019-02-24 2019-03-26 2019-04-30 2019-07-29
COMMUNE/TKM/W/69/19
/ Construction of
community market (size
5m x 6m roof zine and
concrete basement) in
Choamkravien, TKM.
Toatl: 1 Unit
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope15,000.00 0.00
Pending
Implementa
tion
2019-03-06 2019-05-01 2019-10-28
COMMUNE/KCH/W/70/19
/ Construction of
community market (size
5m x 6m roof zine and
concrete basement) in
Peam, KCH. Total: 1 Unit
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope15,000.00 0.00
Pending
Implementa
tion
2019-03-06 2019-05-01 2019-10-28
COMMUNE/KPT/W/71/19
/ Construction of
community market (size
5m x 6m roof zine and
concrete basement) in
Tipo, KPT. Total: 1 Unit
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope15,000.00 0.00
Pending
Implementa
tion
2019-03-06 2019-05-01 2019-10-28
COMMUNE/KRT/W/72/19
/ Construction of
community market (size
5m x 6m roof zine and
concrete basement) in Dar,
KRT. Total: 1 Unit
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope15,000.00 0.00
Pending
Implementa
tion
2019-03-06 2019-05-01 2019-10-28
COMMUNE/KRT/W/73/19
/ Repair Existing Earth
Road in SAMBOK (A006
(AT001)=0.70km,
A004b=0.48km,
A010=1.26km,
A001b=1.55km,
S007=1.940km,
A007=0.780km,
A024=1.015km,
A034=1.300km) in KRT-
Total=9.03Km
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope30,099.97 0.00
Pending
Implementa
tion
2019-03-15 2019-05-10 2019-11-06
COMMUNE/KRT/W/74/19
/ Repair Existing Earth
Road in CHANGKRANG
(La Or village=4.10km,
S029=0.650km,
A013b=1.13km,
A15b=1.10km) in KRT-
Total=6.98Km
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope23,266.64 0.00
Pending
Implementa
tion
2019-03-16 2019-05-11 2019-11-07
COMMUNE/KRT/W/75/19
/ Repair Existing Earth
Road in DAR
(S004=1.32km,
A007=1.00km,
S012=0.40km) - in KRT.
Total=2.72Km
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope9,066.66 0.00
Pending
Implementa
tion
2019-03-25 2019-05-20 2019-11-16
COMMUNE/KRT/W/76/19
/ Repair Existing Earth
Road in THMEI
(A002a=1.07km,
A012a=1.39km, S006A =
0.467 KM, A006a=1.703,
S004a=0.467km, Boeung
Svay Chrum road=3.50km)
- in KRT. Total= 8.59Km
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope28,633.30 0.00
Pending
Implementa
tion
2019-03-25 2019-05-20 2019-11-16
LASED/NCDDS/W/NCB/04/
17 / Construction Earth
Roads(W5xT0.15xE0.5m):L
OT1:Sambok(14.975),Ch.kra
ng(6),Dar(8),Thmey(10),
Chambak(29.091),Choamkr
avien-
TKM(5),TP1(15),TP2(12).To
tal:100.410km.LOT2:S.Kriel
(14),
Ks.Sar(14),Peam(14),Chh.Lo
eung(7),Ra.Samaki(7).Total:
29.590km.GrandTotal:130K
m
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
BidsOpen - National
Single Stage -
One Envelope2,860,000.00 2,404,574.45 Signed 2019-02-20 2019-02-25 2019-04-08 2019-05-08 2019-06-12 2019-12-09
LASED/NCDDS/W/NCB/10/
19 / Construction of
Community Rain Water
Storage at Thmey 1 line
(L:600m, TW:5m, Laterite
Layer, 1 Double Box
Culvert with lifting Gates)
and Chambak 1 line
(L:160m, TW:5m,Laterite
Layer, 1 Double Box
Culvert with Lifting
Gates) in KRT. Total: 2
lines.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
BidsOpen - National
Single Stage -
One Envelope294,776.67 0.00
Pending
Implementa
tion
2019-02-15 2019-02-20 2019-04-03 2019-05-03 2019-06-07 2019-12-04
LASED/NCDDS/W/NCB/11/
19 / Construction of
Community Natural Live
Stream Storage at Tipo
Commune 1 line (L:600m,
TW:5m, Laterite Layer,
Double Box Culvert with
lifting Gates, and One
line of Spillway structure
of 45 m) in KPT. Total: 1
line
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
BidsOpen - National
Single Stage -
One Envelope322,493.33 0.00
Pending
Implementa
tion
2019-02-20 2019-02-25 2019-04-08 2019-05-08 2019-06-12 2019-12-09
LASED/NCDDS/W/NCB/12/
19 / Construction of
Community Natural Live
Stream Storage 1 line:
Dyke (L:200m, TW:5m,
Laterite Layer, Double
Box Culvert with lifting
Gates, One line of
Spillway structure of 45m)
at Prey Thom, KSP,
Total: 1 line
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
BidsOpen - National
Single Stage -
One Envelope338,888.89 0.00
Pending
Implementa
tion
2019-06-30 2019-07-05 2019-08-16 2019-09-15 2019-10-20 2020-04-17
Page 9
LASED/NCDDS/W/NCB/13/
19 / Construction of
Community Rain Water
Storage at 1)Ksach Sar 1
line(L:200m, TW:5m), 2)
Kiri Aphivath 1 line
(L:150m,TW:5m), 3)
Sambok Kreal 1 line
(Dyke L:80m, TW:5m) and
4) Pond at Sok Senchey
(80mx50m) in KCH. Total:
3 lines & 1 Pond.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
BidsOpen - National
Single Stage -
One Envelope416,222.22 0.00
Pending
Implementa
tion
2019-06-20 2019-06-25 2019-08-06 2019-09-05 2019-10-10 2020-04-07
LASED/NCDDS/W/NCB/06/
17 / Small Dam(W4xSite
Slop1:2, average
embankment, length
depends on each site,1spill
way 20m,water double
gates (2x2m=4m):Lot
1:S.bok(1),Ch.krang(1),
Thmey(1),Chambak(1),TP1(
1),TP2(1)&Daung(1).Lot
2:Sb.Kriel(1),Ks.Sar(1),Pea
m(1) and
R.Samaki(1).Total: 11Unit
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
BidsOpen - National
Single Stage -
One Envelope980,000.00 0.00 Canceled 2018-09-03 2018-09-08 2018-10-20 2018-11-19 2018-12-24 2019-06-22
COMMUNITY/KRT/W/55/19
/ Planting Grass of Earth
Roads (W5xT0.15xE0.5m).
for SAMBOK, (9.03km)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post Direct Selection Direct
11,287.50 0.00
Pending
Implementa
tion
2019-06-17 2019-06-22 2019-07-27 2020-01-23
COMMUNITY/KRT/W/56/19
/ Planting Grass of Earth
Roads (W5xT0.15xE0.5m)
for CHANGKRANG
(6.98km)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post Direct Selection Direct
8,725.00 0.00
Pending
Implementa
tion
2019-03-20 2019-03-25 2019-04-29 2019-10-26
COMMUNITY/KRT/W/57/19
/ Planting Grass of Earth
Roads (W5xT0.15xE0.5m)
for DAR (2.72km)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post Direct Selection Direct
3,400.00 0.00
Pending
Implementa
tion
2019-06-20 2019-06-25 2019-07-30 2020-01-26
COMMUNITY/KRT/W/58/19
/ Planting Grass of Earth
Roads (W5xT0.15xE0.5m)
for THMEI (8.59km)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post Direct Selection Direct
10,737.50 0.00
Pending
Implementa
tion
2019-06-20 2019-06-25 2019-07-30 2020-01-26
COMMUNITY/KRT/W/59/19
/ Repair health post in
CHAMBAK which was
built during LASED I
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post Direct Selection Direct
3,000.00 0.00
Pending
Implementa
tion
2019-03-20 2019-03-25 2019-04-29 2019-10-26
COMMUNITY/KRT/W/60/19
/ Fence for health post in
CHAMBAK 300m
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post Direct Selection Direct
3,000.00 0.00
Pending
Implementa
tion
2019-03-15 2019-03-20 2019-04-24 2019-10-21
GOODS
Activity Reference No.
/ DescriptionLoan / Credit
No.Component Review Type Method
Market
Approach
Procurement
Process
Prequalificatio
n (Y/N)
Estimated
Amount
(US$)
Actual
Amount
(US$)
Process
Status
Draft Pre-
qualification
Documents
Prequalification
Evaluation Report
Draft Bidding
Document /
Justification
Specific Procurement
Notice / Invitation
Bidding Documents
as Issued
Proposal Submission
/ Opening / Minutes
Bid Evaluation
Report and
Recommendation for
Award
Signed Contract Contract Completion
Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual
LASED/NCDDS/G/NCB/07/
16 /
OfficeFurniture:Nat.+3New
Provi:(30MeetChr,
28Desks, 58Chr,
4MeetTab,
2Filingcabi,3SlidingCabi,6Fi
lingCabi). 3Distr:(15Des,
45Chr, 3SlidingCabi,
3FilingCabi, 3MeetTab)
5NewHP:(10Des,10Char,5Sl
idingCabi,5FilingCabi+4Dra
w, 5Connected
3Cha,10Bed,5WaterFilter)
IDA / 58070Component 2: Project
ManagementPost
Request for
QuotationsOpen - National
Single Stage -
One Envelope40,110.00 37,270.50 Signed 2017-02-06 2017-04-03 2018-04-03
LASED/NCDDS/G/SP/10/17
/ GPS Mapping+Licenses:
NCDDS 2, GSSLC 4,
GDA 5, (KCH,KSP,TBM)
3, Total GPS:14 units.
Concrete Test Hammer for
3 new provinces 3 & for
NCDDS 1. Dynamic Cone
Penetrometer(DCP) for
new provinces 3 and
NCDDS 1. Topography
Survey for new provinces
3 &NCDDS 1.
IDA / 58070
Sub-Component 1.1: Social
Land Concession
Investment Planning and
Prioritization
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope44,311.11 42,260.00 Signed 2017-02-06 2017-04-03 2017-09-30
LASED/NCDDS/G/NCB/01/
16 / Vehicles : 9 Pickup
Trucks for National Level
and Sub-National.
IDA / 58070
Sub-component 1.3:
Agriculture and
Livelihood Development
PostRequest for
BidsOpen - National
Single Stage -
One Envelope270,000.00 243,531.00 Signed 2016-11-14 2016-11-19 2016-12-31 2017-01-30 2017-03-06 2017-09-02
LASED/NCDDS/G/SP/06/16
/ Software (GIS,
Accounting) for NCDDS,
GSSLC & GDA
IDA / 58070Component 2: Project
ManagementPost
Request for
QuotationsOpen - National
Single Stage -
One Envelope24,200.00 15,760.00 Signed 2016-11-26 2017-01-21 2018-01-21
LASED/NCDDS/G/NCB/02/
16 / Motorcycles: for
Province(KSP: 10, KCH:
10, TBK: 10), for District:
(SMC: 5, OR: 5, PBL:5),
for Communes: (CL:1,
PM:1, RSMSK:1, DG:1,
KLV:1), for NCDDS: 3
Units, GSSLC: 3 Units,
GDA: 7 Units. Total 63
Units
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
BidsOpen - National
Single Stage -
One Envelope115,500.00 100,170.00 Signed 2016-12-31 2017-01-05 2017-02-16 2017-03-18 2017-04-22 2018-04-22
LASED/NCDDS/G/NCB/03/
16 / Computer&Photocopy
Machine: Lot 1: Nat.:
37Laptops,3LaserJet
Printers, 4Scaners. Provi.:
49Laptops, 5LaserJet
Printer & 5Scaner.
Distr.:14Laptops, 7LaserJet
Printers.Lot 2: Nat.:
3Photocopy, 4LCD
Projector+Screen,
Provi.:5Photocopy & 5LCD
Projector+Screen
IDA / 58070Component 2: Project
ManagementPost
Request for
BidsOpen - National
Single Stage -
One Envelope177,460.00 191,151.40 Signed 2016-11-30 2016-12-05 2017-01-16 2017-02-15 2017-03-22 2018-03-22
LASED/NCDDS/G/SP/08/16
/ Soil Testing Kits (16
kits)
IDA / 58070
Sub-Component 1.1: Social
Land Concession
Investment Planning and
Prioritization
PostRequest for
QuotationsLimited
Single Stage -
One Envelope2,720.00 0.00 Canceled 2017-02-06 2017-04-03 2017-10-03
LASED/NCDDS/G/SP/01A/1
7 / 1 Pickup Trucks for
National Level.
IDA / 58070
Sub-component 1.3:
Agriculture and
Livelihood Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope30,000.00 27,000.00 Signed 2017-10-06 2017-12-01 2018-04-03
LASED/NCDDS/G/SP/05/16
/ Building new networking
data center for LASED-
NCDDS (1 server
machine, fiber optic cable,
and network accessory)
and Internet Service
Provider
IDA / 58070Component 2: Project
ManagementPost
Request for
QuotationsOpen - National
Single Stage -
One Envelope36,000.00 0.00 Canceled 2016-12-06 2017-01-31 2018-01-31
LASED/NCDDS/G/NCB/03A
/18 / Laptop for National
and Sub-National Level (4
for GDH, 2 for GDA and
27 for NCDDS and 5
Provinces) and 1 Desktop
for (Large Monitor) for
GDH. Total: 34 units
IDA / 58070Component 2: Project
ManagementPost
Request for
QuotationsOpen - National
Single Stage -
One Envelope54,400.00 55,220.00 Signed 2018-03-06 2018-05-01 2018-07-30
LASED/NCDDS/G/SP/04/16
/ Camera Equipment. A)
National level: 1)
Professional Camera (3
units) and Professional
Video Camera (3 units)
for LASED-GSSLC
Communication, LASED-
NCDDS & GDA. B)
Provincial: 1) Camera (5
units); 2) Aircon (6 units).
IDA / 58070
Sub-Component 1.1: Social
Land Concession
Investment Planning and
Prioritization
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope32,000.00 16,900.00 Signed 2018-04-07 2018-06-02 2018-08-31
Page 10
LASED/NCDDS/G/SP/05A/1
6 / Building new
networking data center for
LASED-NCDDS (1 server,
Back up Storage 4TB,
UPS, Other Software
license, Internet service 4
years) and Android Tablet
(50 Tablets)
IDA / 58070Component 2: Project
ManagementPost
Request for
QuotationsOpen - National
Single Stage -
One Envelope48,650.00 46,840.80 Signed 2018-05-06 2018-07-01 2018-09-29
LASED/NCDDS/G/SP/09/17
/ 1). Mobile loud speaker
(Loud Speaker, Stand,
Transmitter and Receiver)
for LASED GSSLC,
NCDDS and GDA. Toal: 3
sets. 2). Loud Speaker (
Loud Speaker, Microphone,
Ampli, Battery and
Electrical line) for 12 SLC
Community Toal: 14 sets.
IDA / 58070
Sub-component 1.3:
Agriculture and
Livelihood Development
PostRequest for
QuotationsLimited
Single Stage -
One Envelope11,500.00 11,950.00 Signed 2018-04-07 2018-06-02 2018-11-29
LASED/NCDDS/G/NCB/11/
17 / Agriculture Start-Up
Packages for Daung 700
HH (Agri kits 8 items,
rice 200kg/HH, vegetable
seeds 6 items, plants 5
items)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
BidsOpen - National
Single Stage -
One Envelope280,000.00 206,229.76 Signed 2018-06-01 2018-06-06 2018-07-18 2018-08-17 2018-09-21 2019-09-21
LASED/NCDDS/G/NCB/12/
17 / Household Start-Up
Packages for Daung 700
HH (Solar lamp, Tent
plastic, mat, blanket,
water jar, water filter)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
BidsOpen - National
Single Stage -
One Envelope116,666.67 0.00
Pending
Implementa
tion
2018-07-02 2018-07-07 2018-08-18 2018-09-17 2018-10-22 2019-04-20
LASED/NCDDS/G/NCB/13/
17 / Shelter Construction
Materials (40 Zincs/HH)
for Daung 700HH
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
BidsOpen - National
Single Stage -
One Envelope217,777.78 223,080.00 Signed 2018-05-01 2018-05-06 2018-06-17 2018-07-17 2018-08-21 2019-02-17
COMMUNE/KCH/G/03A/18
/ Supply Cover Crops (
Mug bean = 20kgs/Ha and
Cashew = 210
Seedlings/Ha) for Peam
Commune (116.5Ha),
Samaki Meanchey District,
Kg. Chhnang.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope19,416.67 0.00
Pending
Implementa
tion
2018-05-23 2018-07-18 2018-10-16
COMMUNE/KCH/G/04A/18
/ Supply Cover Crops (
Mug bean = 20kgs/Ha and
Cashew = 210
Seedlings/Ha) for
Chheanloeurng Commune
(103Ha), Samaki
Meanchey District, Kg.
Chhnang.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope17,166.67 0.00
Pending
Implementa
tion
2018-05-23 2018-07-18 2018-10-16
COMMUNE/KSP/G/05-
06A/18 / Supply Cover
Crops ( Mug bean =
20kgs/Ha and Cashew =
210 Seedlings/Ha) for
Reaksmey Samaki
Commune (200Ha), Oral
District, Kg. Speu.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope33,333.33 33,120.00 Signed 2018-05-23 2018-07-18 2019-01-14
COMMUNE/KPT/G/07-
11A/18 / Supply Cover
Crops ( Mug bean =
20kgs/Ha and Cashew =
210 Seedlings/Ha) Tipo 1
= 354.44Ha & Tipo 2
=226.5Ha, Total =
580.94Ha for Tipo
Commune, Suntuk
District, Kg. Thom.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope96,823.33 923,804.64 Signed 2018-05-23 2018-07-18 2019-01-14
COMMUNE/KRT/G/12A/18
/ Supply Cover Crops (
Mug bean = 20kgs/Ha and
Cashew = 210
Seedlings/Ha) for Sambok
Commune
(100Ha+120Ha=220Ha),
Chetr Borey, Kratie.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope36,666.67 0.00
Pending
Implementa
tion
2018-05-23 2018-07-18 2019-01-14
COMMUNE/KRT/G/15-
16A/18 / Supply Cover
Crops ( Mug bean =
20kgs/Ha and Cashew =
210 Seedlings/Ha) for
Thmey Commune (174Ha),
Chetr Borey, Kratie.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope29,000.00 28,779.60 Signed 2018-05-23 2018-07-18 2019-01-14
COMMUNE/KRT/G/17-
19A/18 / Supply Cover
Crops ( Mug bean =
20kgs/Ha and Cashew=
210 Seedlings/Ha) for
Chambak Commune
(277Ha), Prek Prasab,
Kratie.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope46,166.67 0.00
Pending
Implementa
tion
2018-05-23 2018-07-18 2019-01-14
COMMUNE/KPT/G/20-
24A/18 / Supply Cover
Crops ( Mug bean =
20kgs/Ha and Cashew=
210 Seedlings/Ha) for
Daung Commune (500Ha),
Suntuk District, Kg.
Thom.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope83,333.33 0.00
Pending
Implementa
tion
2019-02-06 2019-04-03 2019-09-30
COMMUNE/KCH/G/01-
02A/18 / Supply Cover
Crops ( Mug bean =
20kgs/Ha and Cashew =
210 Seedlings/Ha) for
Sambok Kriel (100Ha)and
for Ksach Sar (126.50Ha),
Total 226.50 Ha,
Kranglovea Commune,
Samaki Meanchey District,
Kg. Chhnang
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope37,750.00 0.00
Pending
Implementa
tion
2018-05-23 2018-07-18 2018-10-16
COMMUNE/G/02/18 /
Planting in Agriculture
Land (Ploughing and
Seedling for Cover Crop)
for Ksach Sar (126.50Ha),
Kranglovea Commune,
Samaki Meanchey District,
Kg. Chhnang
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope35,138.89 0.00 Canceled 2018-01-06 2018-03-03 2018-08-30
COMMUNE/G/23/18 /
Planting in Agriculture
Land (Ploughing and
Seedling for Cover Crop)
for Daung Commune,
Prasad Balang, Kg. Thom.
PHASE 4 (100Ha) of
500Ha
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope27,777.78 0.00 Canceled 2018-01-06 2018-03-03 2018-08-30
COMMUNE/KRT/G/13A/18
/ Supply Cover Crops (
Mug bean = 20kgs/Ha and
Cashew= 210
Seedlings/Ha) for
Changkrang Commune
(59Ha+80Ha=139Ha),
Chetr Borey, Kratie
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope23,166.67 0.00
Pending
Implementa
tion
2018-05-23 2018-07-18 2019-01-14
COMMUNE/KRT/G/14A/18
/ Supply Cover Crops (
Mug bean = 20kgs/Ha and
Cashew = 210
Seedlings/Ha) for Dar
Commune (97Ha), Chetr
Borey, Kratie.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope16,166.67 15,729.52 Signed 2018-05-23 2018-07-18 2019-01-14
LASED/NCDDS/G/UN/01/19
/ Vehicles (SUV) for GDH,
NCDDS & GDA, total = 3
units
IDA / 58070
Sub-component 1.3:
Agriculture and
Livelihood Development
PostUN Agencies
(Direct)Direct
108,000.00 0.00
Pending
Implementa
tion
2019-02-01 2019-02-06 2019-03-13 2019-09-09
LASED/NCDDS/G/SP/11/19
/ Solar Panel for teacher
and nurse house, total =
9 sets
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope14,400.00 14,193.00 Signed 2019-03-06 2019-05-01 2019-10-28
Page 11
LASED/NCDDS/G/SP/12/19
/ DGPS for KRT and
KPT, total = 2 units
GPS for GDH (2 units),
GDA (4 units) , and 5
units for KCH, KRT,
KPT, KSP and TKM), toal
= 11 units
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope61,000.00 0.00
Pending
Implementa
tion
2019-03-20 2019-05-15 2019-11-11
LASED/NCDDS/G/SP/13/19
/ Tape Recorder (3 units
for NCDDS, GDH, and
GDA and 5 units for 5
provinces), total = 8 units
IDA / 58070
Sub-Component 1.1: Social
Land Concession
Investment Planning and
Prioritization
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope3,200.00 3,160.00 Signed 2019-03-25 2019-05-20 2019-11-16
LASED/NCDDS/G/SP/14/1
9 / Agriculture Materials:L
ot 1: Soil Auger (ឧបករណ៌ខួងដី) for GDA, Total = 2 units
Lot 2: Hatchery Machine (
ម៉ាស៊ីនភ្ញាស់ពងមាន់) (2 unitsfor Sambok, 2 units for C
hangkrang, 2 units of Cha
mkravien, 2 units for Tipo
, 2 units for Rasmey Sam
aki) Total = 10 units
IDA / 58070
Sub-component 1.3:
Agriculture and
Livelihood Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope14,277.78 0.00
Pending
Implementa
tion
2019-04-15 2019-06-10 2019-12-07
COMMUNE/KSP/G/20/19
/ Water tank with
supporter and tube
(Rasmey Samaki, KSP),
Total = 3 units
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope10,500.00 0.00
Pending
Implementa
tion
2019-03-06 2019-05-01 2019-07-30
COMMUNE/KPT/G/21/19
/ Water tank for health
post in Dong SLC, KPT,
total = 1 units
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
PostRequest for
QuotationsOpen - National
Single Stage -
One Envelope2,000.00 0.00
Pending
Implementa
tion
2019-04-15 2019-06-10 2019-09-08
NON CONSULTING SERVICES
Activity Reference No.
/ DescriptionLoan / Credit
No.Component Review Type Method
Market
Approach
Procurement
Process
Prequalificatio
n (Y/N)
Estimated
Amount
(US$)
Actual
Amount
(US$)
Process
Status
Draft Pre-
qualification
Documents
Prequalification
Evaluation Report
Draft Bidding
Document /
Justification
Specific Procurement
Notice / Invitation
Bidding Documents
as Issued
Proposal Submission
/ Opening / Minutes
Bid Evaluation
Report and
Recommendation for
Award
Signed Contract Contract Completion
Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual
LASED/NCDDS/IC/35/17 /
Insurance (Group Personal
Accident and Health
Insurance and Vehicle
Insurance (Third Party
Liability Driver and
Passenger)
IDA / 58070Component 2: Project
ManagementPost
Request for
BidsOpen - National
Single Stage -
One Envelope108,900.00 0.00
Pending
Implementa
tion
2017-03-01 2017-03-06 2017-04-17 2017-05-17 2017-06-21 2021-12-31
CONSULTING FIRMSActivity Reference No.
/ DescriptionLoan / Credit
No.Component Review Type Method
Market
Approach
Contract Type Estimated
Amount (US$)
Actual
Amount
(US$)
Process
StatusTerms of Reference
Expression of
Interest Notice
Short List and
Draft Request for
Proposals
Request for
Proposals as Issued
Opening of
Technical Proposals
/ Minutes
Evaluation of
Technical Proposal
Combined
Evaluation Report
and Draft
Negotiated Contract
Signed Contract Contract Completion
Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual
LASED/NCDDS/IC/30/17 /
Baseline Survey in year
2017 (Local Firm)
IDA / 58070
Sub-Component 1.1: Social
Land Concession
Investment Planning and
Prioritization
Post
Consultant
Qualification
Selection
Open - National
70,000.00 69,998.05 Signed 2017-01-31 2017-02-21 2017-04-06 2017-05-06 2017-06-10 2018-06-10
LASED/NCDDS/F/35/17 /
Consulting firm for
Irrigation Design (8 sites)
IDA / 58070
Sub-Component 1.1: Social
Land Concession
Investment Planning and
Prioritization
Post
Consultant
Qualification
Selection
Open - National
120,000.00 119,997.50 Signed 2017-09-15 2017-10-06 2017-11-19 2017-12-19 2018-01-23 2018-06-12
LASED/NCDDS/IC/31/18 /
Impact Survey for 2nd
year of the project/Mid-
term review (Local Firm)
IDA / 58070
Sub-Component 1.1: Social
Land Concession
Investment Planning and
Prioritization
Post
Consultant
Qualification
Selection
Open - National
50,000.00 0.00Pending
Implementation2018-07-10 2018-07-31 2018-09-13 2018-10-13 2018-11-17 2019-11-17
LASED/NCDDS/IC/32/21 /
Final Impact Survey
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Consultant
Qualification
Selection
Open -
International
90,000.00 0.00Pending
Implementation2021-07-13 2021-08-03 2021-09-16 2021-10-16 2021-11-20 2022-07-12
LASED/NCDDS/IC/34/17 /
Service Provider for
Implementation
Community Development
Fund (for 5 years)
IDA / 58070
Sub-component 1.3:
Agriculture and
Livelihood Development
PostQuality Based
Selection
Open -
International
514,100.00 589,967.25 Signed 2018-06-01 2018-06-22 2018-08-05 2018-09-02 2018-10-02 2018-11-01 2018-12-06 2023-04-30
INDIVIDUAL CONSULTANTSActivity Reference No.
/ DescriptionLoan / Credit
No.Component Review Type Method
Market
Approach
Contract Type Estimated
Amount (US$)
Actual
Amount
(US$)
Process
StatusTerms of Reference
Invitation to
Identified/Selected
Consultant
Draft Negotiated
ContractSigned Contract Contract Completion
Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual
LASED/NCDDS/IC/10/17 /
Admin and Finance
Assistant at NCDDS
IDA / 58070Component 2: Project
ManagementPost
Individual
Consultant
Selection
Open
56,470.59 35,209.47 Signed 2017-01-01 2017-02-19 2017-03-12 2017-04-16 2021-12-31
LASED/NCDDS/IC/11/17 /
Admin and Finance
Assistant at GDA-MAFF
IDA / 58070Component 2: Project
ManagementPost
Individual
Consultant
Selection
Open
56,470.59 35,209.37 Signed 2017-01-01 2017-02-19 2017-03-12 2017-04-16 2021-12-31
LASED/NCDDS/IC/12/17 /
Admin and Finance
Assistant at GSSLC
IDA / 58070Component 2: Project
ManagementPost
Individual
Consultant
Selection
Open
56,470.59 34,126.12 Terminated 2017-01-01 2017-02-19 2017-03-12 2017-04-16 2021-12-31
LASED/NCDDS/IC/04/16 /
Project Finance Consultant
at GSSLC & GDA
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Prior
Individual
Consultant
Selection
Open
148,235.29 0.00 Canceled 2016-09-01 2016-10-20 2016-11-10 2016-12-15 2021-08-31
LASED/NCDDS/IC/01/16 /
National Operation and
M&E Advisor at NCDDS
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Prior
Individual
Consultant
Selection
Open
148,235.29 0.00 Canceled 2016-08-16 2016-10-04 2016-10-25 2016-11-29 2021-08-31
LASED/NCDDS/IC/05/16 /
National Infrastructure
Advisor at GSSLC
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Prior
Individual
Consultant
Selection
Open
118,588.24 0.00 Canceled 2016-09-01 2016-10-20 2016-11-10 2016-12-15 2020-11-30
LASED/NCDDS/IC/06/16 /
National Operation and
M&E Advisor at GSSLC
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Prior
Individual
Consultant
Selection
Open
148,235.29 0.00 Canceled 2016-09-01 2016-10-20 2016-11-10 2016-12-15 2021-08-31
LASED/NCDDS/IC/07/16 /
National Agriculture &
Rural Development
Advisor at GDA - MAFF
IDA / 58070
Sub-component 1.3:
Agriculture and
Livelihood Development
Prior
Individual
Consultant
Selection
Open
148,235.29 0.00 Canceled 2016-09-01 2016-10-20 2016-11-10 2016-12-15 2021-08-31
LASED/NCDDS/IC/08/16 /
National Communication
& Strategy Advisor at
NCDDS
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Prior
Individual
Consultant
Selection
Open
118,588.24 0.00 Canceled 2016-12-01 2017-01-19 2017-02-09 2017-03-16 2020-11-30
LASED/NCDDS/IC/13/17 /
One Provincial GIS,
Safeguard and
Environemental Advisor at
LASED Kratie
IDA / 58070
Sub-Component 1.1: Social
Land Concession
Investment Planning and
Prioritization
Post
Individual
Consultant
Selection
Open
101,647.06 56,587.00 Signed 2016-12-31 2017-02-18 2017-03-11 2017-04-15 2021-04-15
LASED/NCDDS/IC/14/17 /
One Provincial GIS,
Safeguard and
Environemental Advisor
for LASED Kg. Thom and
Thbong Khmum
IDA / 58070
Sub-Component 1.1: Social
Land Concession
Investment Planning and
Prioritization
Post
Individual
Consultant
Selection
Open
101,647.06 75,689.25 Signed 2016-12-31 2017-02-18 2017-03-11 2017-04-15 2021-04-15
LASED/NCDDS/IC/15/17 /
One Provincial GIS,
Safeguard and
Environmental Advisor for
LASED Kampong Speu
and Kampong Chhnang.
IDA / 58070
Sub-Component 1.1: Social
Land Concession
Investment Planning and
Prioritization
Post
Individual
Consultant
Selection
Open
101,647.06 72,085.00 Signed 2016-12-31 2017-02-18 2017-03-11 2017-04-15 2021-04-15
LASED/NCDDS/IC/16/17 /
Provincial Operation
Advisor for LASED
Kratie.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Individual
Consultant
Selection
Open
109,411.76 64,876.50 Signed 2016-12-31 2017-02-18 2017-03-11 2017-04-15 2021-12-31
Page 12
LASED/NCDDS/IC/17/17 /
Provincial Operation
Advisor for LASED Tbong
Khmum.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Individual
Consultant
Selection
Open
109,411.76 54,064.00 Terminated 2016-12-31 2017-02-18 2017-03-11 2017-04-15 2021-12-31
LASED/NCDDS/IC/18/17 /
Provincial Operation
Advisor for LASED Kg.
Thom.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Individual
Consultant
Selection
Open
109,411.76 58,749.00 Signed 2016-12-31 2017-02-18 2017-03-11 2017-04-15 2021-12-31
LASED/NCDDS/IC/19/17 /
Provincial Operation
Advisor for LASED Kg.
Speu.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Individual
Consultant
Selection
Open
109,411.76 58,668.00 Terminated 2016-12-31 2017-02-18 2017-03-11 2017-04-15 2021-12-31
LASED/NCDDS/IC/20/17 /
Provincial Operation
Advisor for LASED Kg.
Chhnang.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Individual
Consultant
Selection
Open
109,411.76 64,876.50 Signed 2016-12-31 2017-02-18 2017-03-11 2017-04-15 2021-12-31
LASED/NCDDS/IC/21/16 /
Provincial Finance
Consultant for LASED
Kratie.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Individual
Consultant
Selection
Open
109,411.76 52,262.00 Terminated 2016-11-30 2017-01-18 2017-02-08 2017-03-15 2021-12-31
LASED/NCDDS/IC/22/16 /
Provincial Finance
Consultant for LASED
Thbong Khmum.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Individual
Consultant
Selection
Open
109,411.76 64,876.50 Terminated 2016-11-30 2017-01-18 2017-02-08 2017-03-15 2021-12-31
LASED/NCDDS/IC/23/16 /
Provincial Finance
Consultant for LASED Kg.
Thom.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Individual
Consultant
Selection
Open
109,411.76 37,845.00 Terminated 2016-11-30 2017-01-18 2017-02-08 2017-03-15 2021-12-31
LASED/NCDDS/IC/24/16 /
Provincial Finance
Consultant for LASED Kg.
Speu.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Individual
Consultant
Selection
Open
109,411.76 46,855.00 Terminated 2016-11-30 2017-01-18 2017-02-08 2017-03-15 2021-12-31
LASED/NCDDS/IC/25/16 /
Provincial Finance
Consultant for LASED Kg.
Chhnang.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Individual
Consultant
Selection
Open
109,411.76 46,855.00 Terminated 2016-11-30 2017-01-18 2017-02-08 2017-03-15 2021-12-31
LASED/NCDDS/IC/01A/16
/ Senior Sub-National
Project Management
Advisor at NCDDS
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Individual
Consultant
Selection
Open
155,294.12 134,747.00 Signed 2016-11-30 2017-01-18 2017-02-08 2017-03-15 2021-12-31
LASED/NCDDS/IC/05A/16
/ Senior National
Infrastructure Advisor at
GSSLC
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Individual
Consultant
Selection
Open
118,588.24 113,262.00 Signed 2016-11-30 2017-01-18 2017-02-08 2017-03-15 2021-03-15
LASED/NCDDS/IC/06A/16
/ Senior National
Operation and M&E
Advisor at GSSLC
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Individual
Consultant
Selection
Open
176,470.59 154,680.00 Terminated 2016-11-30 2017-01-18 2017-02-08 2017-03-15 2021-12-31
LASED/NCDDS/IC/07A/16
/ Senior National
Agriculture & Rural
Development Advisor at
GDA - MAFF
IDA / 58070
Sub-component 1.3:
Agriculture and
Livelihood Development
Post
Individual
Consultant
Selection
Open
148,235.29 106,605.00 Signed 2016-11-30 2017-01-18 2017-02-08 2017-03-15 2021-12-31
LASED/NCDDS/IC/08A/16
/ National Communication
& Strategy Advisor at
NCDDS
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Individual
Consultant
Selection
Open
118,588.24 105,626.91 Signed 2016-11-30 2017-01-18 2017-02-08 2017-03-15 2021-03-15
LASED/NCDDS/IC/26/16 /
Provincial Infrastructure
Engineer at LASED
Kratie
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Individual
Consultant
Selection
Open
87,529.41 64,876.50 Signed 2016-11-30 2017-01-18 2017-02-08 2017-03-15 2021-03-15
LASED/NCDDS/IC/27/16 /
Provincial Infrastructure
Engineer for LASED Kg.
Thom and Thbong
Khmum
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Individual
Consultant
Selection
Open
87,529.41 64,876.50 Signed 2016-11-30 2017-01-18 2017-02-08 2017-03-15 2021-03-15
LASED/NCDDS/IC/28/16 /
Provincial Infrastructure
Engineer for LASED
Kampong Speu and
Kampong Chhnang.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Individual
Consultant
Selection
Open
87,529.41 66,679.00 Signed 2016-11-30 2017-01-18 2017-02-08 2017-03-15 2021-03-15
LASED/NCDDS/IC/29/17 /
International Short-Term
Consultant for Internal
Review and Report
(1month x 6times)
IDA / 58070
Sub-Component 1.1: Social
Land Concession
Investment Planning and
Prioritization
Post
Individual
Consultant
Selection
Open
100,000.00 83,720.93 Signed 2017-03-31 2017-05-19 2017-06-09 2017-07-14 2018-01-10
LASED/NCDDS/IC/33/21 /
National Consultant for
Preparing Project
Completion Report.
IDA / 58070
Sub-Component 1.1: Social
Land Concession
Investment Planning and
Prioritization
Post
Individual
Consultant
Selection
Open
65,000.00 0.00Pending
Implementation2020-12-31 2021-02-18 2021-03-11 2021-04-15 2021-12-31
LASED/NCDDS/IC/37/17 /
Community Development
and Agriculture Facilitator
for Sambok, KRT
IDA / 58070
Sub-component 1.3:
Agriculture and
Livelihood Development
Post
Individual
Consultant
Selection
Open
48,000.00 27,748.65 Signed 2017-02-28 2017-04-18 2017-05-09 2017-06-13 2021-12-31
LASED/NCDDS/IC/38/17 /
Community Development
and Agriculture Facilitator
for ChangKrang, KRT
IDA / 58070
Sub-component 1.3:
Agriculture and
Livelihood Development
Post
Individual
Consultant
Selection
Open
48,000.00 21,473.38 Signed 2017-02-28 2017-04-18 2017-05-09 2017-06-13 2021-12-31
LASED/NCDDS/IC/39/17 /
Community Development
and Agriculture Facilitator
for Da, KRT
IDA / 58070
Sub-component 1.3:
Agriculture and
Livelihood Development
Post
Individual
Consultant
Selection
Open
48,000.00 34,688.25 Signed 2017-02-28 2017-04-18 2017-05-09 2017-06-13 2021-12-31
LASED/NCDDS/IC/40/17 /
Community Development
and Agriculture Facilitator
for Thmey, KRT
IDA / 58070
Sub-component 1.3:
Agriculture and
Livelihood Development
Post
Individual
Consultant
Selection
Open
48,000.00 21,473.38 Signed 2017-02-28 2017-04-18 2017-05-09 2017-06-13 2021-12-31
LASED/NCDDS/IC/41/17 /
Community Development
and Agriculture Facilitator
for Chambak, KRT
IDA / 58070
Sub-component 1.3:
Agriculture and
Livelihood Development
Post
Individual
Consultant
Selection
Open
48,000.00 16,076.32 Signed 2017-02-28 2017-04-18 2017-05-09 2017-06-13 2021-12-31
LASED/NCDDS/IC/42/17 /
Community Development
and Agriculture Facilitator
for Choamkravien, TKM
IDA / 58070
Sub-component 1.3:
Agriculture and
Livelihood Development
Post
Individual
Consultant
Selection
Open
48,000.00 29,346.23 Signed 2017-02-28 2017-04-18 2017-05-09 2017-06-13 2021-12-31
LASED/NCDDS/IC/43/17 /
Community Development
and Agriculture Facilitator
for Tipo, KPT
IDA / 58070
Sub-component 1.3:
Agriculture and
Livelihood Development
Post
Individual
Consultant
Selection
Open
48,000.00 31,329.12 Signed 2017-02-28 2017-04-18 2017-05-09 2017-06-13 2021-12-31
LASED/NCDDS/IC/44/17 /
Community Development
and Agriculture Facilitator
for Dong, KPT
IDA / 58070
Sub-component 1.3:
Agriculture and
Livelihood Development
Post
Individual
Consultant
Selection
Open
48,000.00 38,205.00 Signed 2017-02-28 2017-04-18 2017-05-09 2017-06-13 2021-12-31
LASED/NCDDS/IC/45/17 /
Community Development
and Agriculture Facilitator
for Kraing Lavea, KCH
IDA / 58070
Sub-component 1.3:
Agriculture and
Livelihood Development
Post
Individual
Consultant
Selection
Open
48,000.00 30,434.00 Signed 2017-02-28 2017-04-18 2017-05-09 2017-06-13 2021-12-31
LASED/NCDDS/IC/46/17 /
Community Development
and Agriculture Facilitator
for Chheanloeung, KCH
IDA / 58070
Sub-component 1.3:
Agriculture and
Livelihood Development
Post
Individual
Consultant
Selection
Open
48,000.00 29,091.32 Signed 2017-02-28 2017-04-18 2017-05-09 2017-06-13 2021-12-31
LASED/NCDDS/IC/47/17 /
Community Development
and Agriculture Facilitator
for Peam, KCH
IDA / 58070
Sub-component 1.3:
Agriculture and
Livelihood Development
Post
Individual
Consultant
Selection
Open
48,000.00 31,329.12 Terminated 2017-02-28 2017-04-18 2017-05-09 2017-06-13 2021-12-31
Page 13
LASED/NCDDS/IC/48/17 /
Community Development
and Agriculture Facilitator
for Raksmeysamaki, Oral,
KSP
IDA / 58070
Sub-component 1.3:
Agriculture and
Livelihood Development
Post
Individual
Consultant
Selection
Open
48,000.00 26,853.53 Signed 2017-02-28 2017-04-18 2017-05-09 2017-06-13 2021-12-31
LASED/NCDDS/IC/09/16 /
Procurement and Contract
Management Assistant at
NCDDS
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Prior
Individual
Consultant
Selection
Open
104,470.59 0.00 Canceled 2016-08-22 2016-10-10 2016-10-31 2016-12-05 2021-07-31
LASED/NCDDS/IC/02/16 /
National Procurement and
Contract Management
Advisor at NCDDS
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Prior
Individual
Consultant
Selection
Open
158,117.65 0.00 Canceled 2016-08-22 2016-10-10 2016-10-31 2016-12-05 2020-07-31
LASED/NCDDS/IC/03/16 /
Project Finance Consultant
at NCDDS
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Prior
Individual
Consultant
Selection
Open
148,235.29 0.00 Canceled 2016-09-01 2016-10-20 2016-11-10 2016-12-15 2021-08-31
LASED-NCDDS-IC-02A-16
/ Senior National
Procurement and Contract
Management Advisor at
NCDDS
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Individual
Consultant
Selection
Open
158,117.65 158,258.00 Signed 2016-08-31 2016-10-19 2016-11-09 2016-12-14 2020-12-13
LASED-NCDDS-IC-03A-16
/ Senior National Project
Financial Management
Consultant at NCDDS,
GSSLC and GDA
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Individual
Consultant
Selection
Open
176,470.59 70,400.00 Signed 2016-09-11 2016-12-07 2016-12-28 2017-02-01 2021-12-31
LASED-NCDDS-IC-09A-16
/ Procurement and
Contract Management
Assistant at NCDDS
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Individual
Consultant
Selection
Open
104,470.59 66,375.00 Signed 2016-09-01 2016-10-20 2016-11-10 2016-12-15 2021-12-31
LASED/NCDDS/IC/36A/17
/ One Consultant for
Develop and Upgrade of
Management Information
System (MIS) for District
IDA / 58070Component 2: Project
ManagementPost
Individual
Consultant
Selection
Open
86,000.00 82,950.00 Signed 2017-08-28 2017-10-16 2017-11-06 2017-12-11 2019-02-04
LASED/NCDDS/IC/36/17 /
One Consultant for
Develop and Upgrade of
Management Information
System (MIS) for District
IDA / 58070Component 2: Project
ManagementPost
Individual
Consultant
Selection
Open
40,000.00 0.00 Canceled 2017-05-31 2017-07-19 2017-08-09 2017-09-13 2019-05-13
LASED/NCDDS/IC/50/17 /
One Consultant for
Annual Progress Survey
IDA / 58070
Sub-Component 1.1: Social
Land Concession
Investment Planning and
Prioritization
Post
Individual
Consultant
Selection
Open
23,760.00 63,300.00 Signed 2017-11-01 2017-12-20 2018-01-10 2018-02-14 2021-12-31
LASED/NCDDS/IC/49/17 /
IT Adviser
IDA / 58070Component 2: Project
ManagementPost
Individual
Consultant
Selection
Open
112,941.18 108,335.29 Signed 2018-01-01 2018-02-19 2018-03-12 2018-04-16 2021-12-31
LASED/NCDDS/IC/51/18 /
One National Consultant
for PIM revision of
LASEDII (Lumpsum
Contract external short
term consultant out put
base)
IDA / 58070
Sub-Component 1.1: Social
Land Concession
Investment Planning and
Prioritization
Post
Individual
Consultant
Selection
Open
16,000.00 0.00Pending
Implementation2018-11-01 2018-12-20 2019-01-10 2019-02-14 2019-08-13
LASED/NCDDS/IC/52/18 /
One National Consultant
for Small scale Solar-
irrigation system study in
2 sites in Dar and Choam
krovien (Lumpsum
Contract external short
term consultant out put
base for study (2 sites)
for LASED II.
IDA / 58070
Sub-Component 1.1: Social
Land Concession
Investment Planning and
Prioritization
Post
Individual
Consultant
Selection
Open
30,000.00 0.00Pending
Implementation2018-09-03 2018-10-22 2018-11-12 2018-12-17 2019-06-15
LASED/NCDDS/IC/53/18 /
One National Consultant
for Socio Economic
baseline survey (Lumpsum
Contract external short
term consultant out put
base for LASED II
IDA / 58070
Sub-Component 1.1: Social
Land Concession
Investment Planning and
Prioritization
Post
Individual
Consultant
Selection
Open
20,000.00 0.00Pending
Implementation2018-08-01 2018-09-19 2018-10-10 2018-11-14 2019-05-13
LASED/NCDDS/IC/54/18 /
One National Consultant
for Effectiveness
application of safeguard
assessment (Lumpsum
Contract short term
consultant out put base)
for LASED II
IDA / 58070
Sub-Component 1.1: Social
Land Concession
Investment Planning and
Prioritization
Post
Individual
Consultant
Selection
Open
25,000.00 0.00Pending
Implementation2018-10-01 2018-11-19 2018-12-10 2019-01-14 2019-07-13
LASED/NCDDS/IC/55/18 /
M&E and Training
Assistant (MTA)
IDA / 58070Component 2: Project
ManagementPost
Individual
Consultant
Selection
Open
33,882.35 0.00Under
Implementation2018-08-06 2018-09-24 2018-10-15 2018-11-19 2021-11-18
LASED/NCDDS/IC/25A/18
/ Provincial Finance
Consultant for LASED Kg.
Chhnang. (New)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Individual
Consultant
Selection
Open
96,411.76 0.00Under
Implementation2018-08-24 2018-10-12 2018-11-02 2018-12-07 2021-12-31
LASED/NCDDS/IC/56/19 /
Senior Agronomist and
Value Chain Adviser for
GDA
IDA / 58070
Sub-component 1.3:
Agriculture and
Livelihood Development
Post
Individual
Consultant
Selection
Open
94,823.53 92,510.29 Signed 2019-02-15 2019-04-05 2019-04-26 2019-05-31 2021-12-31
LASED/NCDDS/IC/57/19 /
Consultant for
Measurement the
awareness and
understanding of LRs and
project team on the
LASED II and SLC.
IDA / 58070
Sub-Component 1.1: Social
Land Concession
Investment Planning and
Prioritization
Post
Individual
Consultant
Selection
Open
20,000.00 0.00Pending
Implementation2019-04-19 2019-06-07 2019-06-28 2019-08-02 2020-01-31
LASED/NCDDS/F/36/19 /
Contract with NGOs to
form and strengthen the
community forestry
conservation in project
target sites.
IDA / 58070
Sub-component 1.3:
Agriculture and
Livelihood Development
Post Direct Selection Direct
40,000.00 0.00Pending
Implementation2019-05-01 2019-05-11 2019-07-15 2021-12-31
LASED/NCDDS/IC/17A/19
/ Provincial Operation
Advisor for LASED
Thbong Khmum.
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Individual
Consultant
Selection
Open
54,705.88 0.00Pending
Implementation2019-03-15 2019-05-03 2019-05-24 2019-06-28 2021-12-31
LASED/NCDDS/IC/23A/19
/ Provincial Finance
Consultant for LASED Kg.
Thom. (New)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Individual
Consultant
Selection
Open
56,529.41 0.00Pending
Implementation2019-03-25 2019-05-13 2019-06-03 2019-07-08 2021-12-31
LASED/NCDDS/IC/06B/19
/ New Senior National
Operation and M&E
Advisor at GDH
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Individual
Consultant
Selection
Open
91,176.50 90,485.29 Terminated 2019-04-01 2019-05-20 2019-06-10 2019-07-15 2021-12-31
LASED/NCDDS/IC/59/19 /
National Short-Term
Consultant for Social Risk
Management Framework
Development for LASED
III Preparation
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post Direct Selection Direct
13,500.00 0.00Under
Implementation2019-08-29 2019-09-08 2019-11-12 2020-02-10
LASED/NCDDS/IC/60/19 /
National Short-Term
Consultant for
Environmental Risk
Management Framework
Development for LASED
III Preparation
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post Direct Selection Direct
13,500.00 0.00Under
Implementation2019-08-29 2019-09-08 2019-11-12 2019-11-21
LASED/NCDDS/IC/61/19 /
National Monitoring and
Evaluation Consultant for
LASED II at NCDDS
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post Direct Selection Direct
78,400.00 0.00Under
Implementation2019-08-29 2019-09-08 2019-11-12 2021-12-31
Page 14
LASED/GDH/IC/62/19 /
National Monitoring and
Evaluation Consultant for
LASED II at GDH
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post Direct Selection Direct
78,400.00 0.00Under
Implementation2019-08-29 2019-09-08 2019-11-12 2021-12-31
LASED/NCDDS/IC/58/19 /
International Short-Term
Consultant for
Environmental
Management
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post Direct Selection Direct
18,750.00 0.00Under
Implementation2019-09-26 2019-10-06 2019-12-10 2020-01-04
LASED/NCDDS/IC/47A/19
/ Community Development
and Agriculture Facilitator
for Peam, KCH (New)
IDA / 58070
Sub-component 1.3:
Agriculture and
Livelihood Development
Post
Individual
Consultant
Selection
Open
22,400.00 0.00Pending
Implementation2019-09-26 2019-11-14 2019-12-05 2020-01-09 2021-12-31
KH-NCDDS-135175-CS-
CDS / International Short
Term Consultant for
Social Risk Management
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post Direct Selection Direct
30,000.00 0.00Under
Implementation2019-09-26 2019-10-06 2019-12-10 2020-01-19
LASED/NCDDS/IC/21A/19
/ Provincial Finance
Consultant for LASED
Kratie (New)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Individual
Consultant
Selection
Open
45,588.00 0.00Pending
Implementation2019-11-01 2019-12-20 2020-01-10 2020-02-14 2021-12-31
LASED/NCDDS/IC/22A/19
/ Provincial Finance
Consultant for LASED
Tbong Khmum (New)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Individual
Consultant
Selection
Open
45,588.00 0.00Pending
Implementation2019-11-01 2019-12-20 2020-01-10 2020-02-14 2021-12-31
LASED/NCDDS/IC/24A/19
/ Provincial Finance
Consultant for LASED Kg.
Speu. (New)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Individual
Consultant
Selection
Open
45,588.00 0.00Pending
Implementation2019-11-01 2019-12-20 2020-01-10 2020-02-14 2021-12-31
LASED/GDH/IC/12A/19 /
Admin and Finace
Assistant at GDH (New)
IDA / 58070Component 2: Project
ManagementPost
Individual
Consultant
Selection
Open
23,529.00 0.00Pending
Implementation2019-11-01 2019-12-20 2020-01-10 2020-02-14 2021-12-31
LASED/GDH/IC/63/19 /
Short-term consultant to
produce Orthophoto for
Land Activities in Daung
Site, KPT
IDA / 58070
Sub-Component 1.1: Social
Land Concession
Investment Planning and
Prioritization
Post
Individual
Consultant
Selection
Open
7,600.00 0.00Pending
Implementation2019-11-05 2019-12-24 2020-01-14 2020-02-18 2020-08-16
LASED/GDH/IC/64/19 /
Short-term Consultant to
Update, Revised PIM /
COM for LASED III,
Including ICLT chapter.
IDA / 58070
Sub-Component 1.1: Social
Land Concession
Investment Planning and
Prioritization
Post
Individual
Consultant
Selection
Open
30,000.00 0.00Pending
Implementation2019-11-15 2020-01-03 2020-01-24 2020-02-28 2020-08-26
LASED/NCDDS/IC/19A/19
/ Provincial Operation
Advisor for LASED Kg.
Speu (New).
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post
Individual
Consultant
Selection
Open
41,941.18 0.00Pending
Implementation2019-11-20 2020-01-08 2020-01-29 2020-03-04 2021-12-31
LASED/GDH/IC/65/19 /
Project Management
Support Consultant at
GDH
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post Direct Selection Direct
26,470.59 0.00Under
Implementation2019-11-14 2019-11-24 2020-01-28 2021-01-27
LASED/NCDDS/IC/66/19 /
International Short-Term
Consultant for Support
the formulation of an
Agricultural Service
Strategy for LASED III
(21 days)
IDA / 58070
Sub-component 1.2: Land
Preparation and
Infrastructure
Development
Post Direct Selection Direct
18,442.00 0.00Pending
Implementation2019-12-20 2019-12-30 2020-03-04 2020-03-29