world bank document€¦ · this fiscal year (dli 2.1: diploma in primary education (dped) training...
TRANSCRIPT
![Page 1: World Bank Document€¦ · this fiscal year (DLI 2.1: Diploma in Primary Education (DPEd) Training Plan and DLI 3.1: Teacher Recruitment Plan). As reported in the JCM, out of the](https://reader034.vdocuments.us/reader034/viewer/2022050214/5f6093f6829baa7ae2254792/html5/thumbnails/1.jpg)
The World Bank Implementation Status & Results ReportQuality Learning for All Program (P162619)
5/20/2019 Page 1 of 22
Quality Learning for All Program (P162619)
SOUTH ASIA | Bangladesh | Education Global Practice | Requesting Unit: SACBD | Responsible Unit: GED06IBRD/IDA | Program-for-Results Financing | FY 2018 | Team Leader(s): Saurav Dev Bhatta, Syed Rashed Al-Zayed
Seq No: 2 | ARCHIVED on 20-May-2019 | ISR36287 | Created by: Saurav Dev Bhatta on 11-Mar-2019 | Modified by: Saurav Dev Bhatta on 08-May-2019
Program Development Objectives
Program Development Objective (from Program Appraisal Document)The objective of the Program is to improve the quality of and enhance equitable access to education from pre-primary to grade 5.
Overall Ratings
Name Previous Rating Current Rating
Progress towards achievement of PDO Satisfactory Satisfactory
Overall Implementation Progress (IP) Satisfactory Satisfactory
Implementation Status and Key Decisions 01. A Memorandum of Understanding (MoU) between the Ministry of Primary and Mass Education (MoPME) and the Independent Verification Agency (IVA) was signed on September 16, 2018 fulfilling the effectiveness condition for the Program. Accordingly, the program became effective on September 20, 2018. 02. In the JCM of February 4, 2019, the Bank and the DPC concluded that two of the four Year 0 DLI targets have been met (DLI 1.1: Action Plan for Curriculum and DLI 5.1: Approval of Infrastructure Guideline), and the remaining two Year 0 DLI targets are on track to be achieved by the end this fiscal year (DLI 2.1: Diploma in Primary Education (DPEd) Training Plan and DLI 3.1: Teacher Recruitment Plan).As reported in the JCM, out of the six Year 1 DLIs, DPE updated the consortium that 4 DLIs are on track to be met by June 2019 and the remaining 2 are on track to be achieved by the first quarter of FY 2020.
Data on Financial Performance
Disbursements (by loan)
Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed
P162619 IDA-62110 Effective USD 700.00 700.00 0.00 169.55 504.81 25%
Key Dates (by loan)
Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date
P162619 IDA-62110 Effective 14-Jun-2018 28-Jun-2018 20-Sep-2018 30-Jun-2023 30-Jun-2023
Program Action Plan
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
![Page 2: World Bank Document€¦ · this fiscal year (DLI 2.1: Diploma in Primary Education (DPEd) Training Plan and DLI 3.1: Teacher Recruitment Plan). As reported in the JCM, out of the](https://reader034.vdocuments.us/reader034/viewer/2022050214/5f6093f6829baa7ae2254792/html5/thumbnails/2.jpg)
The World Bank Implementation Status & Results ReportQuality Learning for All Program (P162619)
5/20/2019 Page 2 of 22
Action Description 1.MoUs/ agreements/ contracts signed between DPE/MoPME and associate agencies supporting PEDP 4
Source DLI# Responsibility Timing Timing Value Status
Other MoPME/DPE Due Date 31-Dec-2018 In Progress
Completion Measurement
Signed approved document
Comments MoU with IVA is signed. MoU with CPHE and LGED are in draft. Expected to be signed by April 30, 2019 once the negotiation is completed.
Action Description 2.MoPME has followed the GoB recruitment guidelines in all recruitments initiated since July 2018
Source DLI# Responsibility Timing Timing Value Status
Technical DPE Recurrent Yearly In Progress
Completion Measurement
Annual progress report on implementation of agreed recruitment guideline.
Comments
Action Description 3.Web-based SLIP/UPEP funds management module added to the existing funds management system
Source DLI# Responsibility Timing Timing Value Status
DPE/MoPME Due Date 30-Jun-2019 Not Yet Due
Completion Measurement
Comments
Action Description 4.Capacity building plan for field offices to support institutional strengthening prepared and implemented
Source DLI# Responsibility Timing Timing Value Status
Technical DPE Recurrent Yearly In Progress
Completion Measurement
DPE reports. DPE will update details in the document for JARM in June 2019.
Comments
Action Description 5.BBS or any suitable entity commissioned to conduct Education Household Survey 2021
Source DLI# Responsibility Timing Timing Value Status
![Page 3: World Bank Document€¦ · this fiscal year (DLI 2.1: Diploma in Primary Education (DPEd) Training Plan and DLI 3.1: Teacher Recruitment Plan). As reported in the JCM, out of the](https://reader034.vdocuments.us/reader034/viewer/2022050214/5f6093f6829baa7ae2254792/html5/thumbnails/3.jpg)
The World Bank Implementation Status & Results ReportQuality Learning for All Program (P162619)
5/20/2019 Page 3 of 22
DPE/BBS Due Date 30-Jun-2021 Not Yet Due
Completion Measurement
Comments
Action Description6.Preparation of Annual Procurement Plan (APP) for the Program by each Implementing Agency of the Program coordinated, consolidated and monitored by DPE
Source DLI# Responsibility Timing Timing Value Status
Technical DPE/IAs Recurrent Yearly Completed
Completion Measurement
APP and Procurement implementation progress report
Comments
Action Description 7.Model bidding documents for procurement of goods and works are updated.
Source DLI# Responsibility Timing Timing Value Status
Fiduciary Systems All Implementing Agencies Recurrent Yearly In Progress
Completion Measurement
Procurement implementation progress report shows continuous use of agreed PEDP3 model bidding documents for NCB procurement until the model document is updated with CPTU approval
Comments PEDP4 is following standard tender documents for goods and works through e-GP system
Action Description 8.Annual Fiduciary Reviews (AFR) conducted and disseminated
Source DLI# Responsibility Timing Timing Value Status
Fiduciary Systems DPE Recurrent Yearly Not Yet Due
Completion Measurement
-
Comments 1st and 2nd Quarter has been approved
Action Description 9.(i) Timely disbursement of quarterly fund release
Source DLI# Responsibility Timing Timing Value Status
Fiduciary Systems DPE Recurrent Quarterly In Progress
![Page 4: World Bank Document€¦ · this fiscal year (DLI 2.1: Diploma in Primary Education (DPEd) Training Plan and DLI 3.1: Teacher Recruitment Plan). As reported in the JCM, out of the](https://reader034.vdocuments.us/reader034/viewer/2022050214/5f6093f6829baa7ae2254792/html5/thumbnails/4.jpg)
The World Bank Implementation Status & Results ReportQuality Learning for All Program (P162619)
5/20/2019 Page 4 of 22
Completion Measurement
Allotment letter from MoF showing quarterly releases of funds by the first month of each next quarter
Comments 1st and 2nd Quarter advance has been approved
Action Description 9. (ii)Monitoring of advances ensured
Source DLI# Responsibility Timing Timing Value Status
Fiduciary Systems DPE Recurrent Monthly In Progress
Completion Measurement
ADP review meeting minutes showing status of advances
Comments
Action Description10.Conduct Tripartite (MoPME/DPE, CAO/MOF, and OCAG) quarterly audit review meeting to monitor the progress in resolving audit observations.
Source DLI# Responsibility Timing Timing Value Status
MoPME and DPE Recurrent Quarterly Not Yet Due
Completion Measurement
Comments
Action Description 11.Institutionalizing internal audit units at DPE for conducting internal audit.
Source DLI# Responsibility Timing Timing Value Status
DPE Due Date 30-Jun-2020 Not Yet Due
Completion Measurement
Comments
Action Description12.Grievance Redress System (GRS) improved and made (i) more accessible to potential users; (ii) proactive in sharing information; (iii) functional in terms of recording and reporting
Source DLI# Responsibility Timing Timing Value Status
Fiduciary Systems DPE and MoPME Recurrent Semi-Annually In Progress
Completion Measurement
Bi-annual progress report on grievance redress system and e-GP prepared and shared by MoPME with DPs
![Page 5: World Bank Document€¦ · this fiscal year (DLI 2.1: Diploma in Primary Education (DPEd) Training Plan and DLI 3.1: Teacher Recruitment Plan). As reported in the JCM, out of the](https://reader034.vdocuments.us/reader034/viewer/2022050214/5f6093f6829baa7ae2254792/html5/thumbnails/5.jpg)
The World Bank Implementation Status & Results ReportQuality Learning for All Program (P162619)
5/20/2019 Page 5 of 22
Comments Bi- annual progress reports are prepared according to the format provided by DPC
Action Description 13.The harmonized SMF and EMF developed under PEDP 3 are updated, adopted, and operationalized
Source DLI# Responsibility Timing Timing Value Status
Environmental and Social Systems DPE Due Date 31-Dec-2018 In Progress
Completion Measurement
Updated version of the SMF and EMF have been adopted; and implementation status included in DPE annual progress report
Comments EMF has been approved and uploaded to DPE website. Draft SMF has been shared with all DPs for review.
Action Description 14.WASH Block maintenance manual adopted by DPE and hygiene promotion manual is developed by DPHE
Source DLI# Responsibility Timing Timing Value Status
Environmental and Social Systems DPE/DPHE Due Date 31-Dec-2018 In Progress
Completion Measurement
Circulate adopted/endorsed WASH Block maintenance manual and hygiene promotion manual (drafted by DPHE) to schools
Comments The draft WASH block maintenance manual and hygiene promotion manual had been drafted by DPHE and shared with DPE
Action Description15.Water quality test requirement included in the MOU signed between DPE and DPHE with sufficient budget allocated annually
Source DLI# Responsibility Timing Timing Value Status
DPE/DPHE Recurrent Yearly Not Yet Due
Completion Measurement
Comments
Action Description16.Safeguard focal person/specialist is assigned at DPE to strengthen the coordination of environmental and social safeguard
Source DLI# Responsibility Timing Timing Value Status
Environmental and Social Systems DPE Due Date 31-Dec-2018 Completed
Completion Measurement
MoPME letter confirming that the focal person/specialist has been assigned with ToR.
![Page 6: World Bank Document€¦ · this fiscal year (DLI 2.1: Diploma in Primary Education (DPEd) Training Plan and DLI 3.1: Teacher Recruitment Plan). As reported in the JCM, out of the](https://reader034.vdocuments.us/reader034/viewer/2022050214/5f6093f6829baa7ae2254792/html5/thumbnails/6.jpg)
The World Bank Implementation Status & Results ReportQuality Learning for All Program (P162619)
5/20/2019 Page 6 of 22
Comments
Action Description 17. Necessary devices will be supplied on a need basis to Children with Special Education Need and Disability
Source DLI# Responsibility Timing Timing Value Status
DPE Recurrent Yearly Not Yet Due
Completion Measurement
Comments
Risks
Systematic Operations Risk-rating Tool
Risk Category Rating at Approval Previous Rating Current Rating
Political and Governance -- Substantial Substantial
Macroeconomic -- Moderate Moderate
Sector Strategies and Policies -- Substantial Substantial
Technical Design of Project or Program -- Substantial Substantial Institutional Capacity for Implementation and Sustainability -- Substantial Substantial
Fiduciary -- High High
Environment and Social -- Moderate Moderate
Stakeholders -- Substantial Substantial
Other -- -- --
Overall -- Substantial Substantial
Results
PDO Indicators by Objectives / Outcomes
Improve quality of educationIN00679507►Percentage of grade 3 students achieving grade-level competencies in Bangla (Text, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value All: 65%Boys: 62%
All: 65%Boys: 62%
All: 74%Boys: 73%
All: 74%Boys: 74%
![Page 7: World Bank Document€¦ · this fiscal year (DLI 2.1: Diploma in Primary Education (DPEd) Training Plan and DLI 3.1: Teacher Recruitment Plan). As reported in the JCM, out of the](https://reader034.vdocuments.us/reader034/viewer/2022050214/5f6093f6829baa7ae2254792/html5/thumbnails/7.jpg)
The World Bank Implementation Status & Results ReportQuality Learning for All Program (P162619)
5/20/2019 Page 7 of 22
Girls 66% Girls 66% Girls 76% Girls 74%
Date 31-Dec-2016 31-Dec-2016 28-Dec-2017 30-Jun-2023
CommentsIN00679509►Percentage of grade 3 students achieving grade-level competencies in mathematics (Text, Custom)
Baseline Actual (Previous) Actual (Current) End Target
ValueAll: 39%Boys: 37%Girls 40%
All: 39%Boys: 37%Girls 40%
All: 41%Boys: 42%Girls 41%
All: 45%Boys: 45%Girls 45%
Date 31-Dec-2016 31-Dec-2016 28-Dec-2017 30-Jun-2023
CommentsIN00679511►Percentage of GPSs that meet at least three of four school-level quality indicators (Percentage, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value 32.80 32.80 32.80 55.00
Date 31-Dec-2016 31-Dec-2016 31-Dec-2016 30-Jun-2023
Comments
Enhance equitable access to educationIN00679508►Primary cycle completion rate (Percentage, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value 80.90 80.90 80.90 90.00
Date 31-Dec-2016 31-Dec-2016 31-Dec-2016 30-Jun-2023
CommentsIN00679510►Percentage of out-of-school children ages 8–14 (Percentage, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value 11.00 11.00 11.00 6.00
Date 31-Dec-2016 31-Dec-2016 31-Dec-2016 30-Jun-2023
Comments
Intermediate Results Indicators by Results Areas
QualityIN00679512
![Page 8: World Bank Document€¦ · this fiscal year (DLI 2.1: Diploma in Primary Education (DPEd) Training Plan and DLI 3.1: Teacher Recruitment Plan). As reported in the JCM, out of the](https://reader034.vdocuments.us/reader034/viewer/2022050214/5f6093f6829baa7ae2254792/html5/thumbnails/8.jpg)
The World Bank Implementation Status & Results ReportQuality Learning for All Program (P162619)
5/20/2019 Page 8 of 22
►Percentage of double shift schools converted to single shift (Percentage, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 0.00 0.00 25.00
Date 31-Dec-2016 31-Dec-2016 31-Dec-2016 30-Jun-2023
CommentsIN00679515►Percentage of schools with approved supplementary reading materials (SRMs) in grades 1–3 classrooms (Percentage, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 0.00 0.00 99.00
Date 31-Dec-2016 31-Dec-2016 31-Dec-2016 30-Jun-2023
CommentsIN00679518►Percentage of schools that meet the STR standard of 40:1 (Percentage, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value 37.00 37.00 37.00 50.00
Date 31-Dec-2016 31-Dec-2016 31-Dec-2016 30-Jun-2023
CommentsIN00679521►Teachers recruited or trained (Number, Corporate)
Baseline Actual (Previous) Actual (Current) End Target
Value 11,312.00 11,312.00 11,312.00 50,000.00
Date 31-Dec-2016 31-Dec-2016 31-Dec-2016 30-Jun-2023
CommentsIN00679524
Number of teachers recruited (Number, Corporate Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 11,312.00 11,312.00 11,312.00 50,000.00
Date 31-Dec-2016 31-Dec-2016 31-Dec-2016 30-Jun-2023
IN00679526
Teachers recruited or trained - Female (RMS requirement) (Number, Corporate Supplement)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 0.00 0.00 25,000.00
IN00679527
Number of teachers trained (Number, Corporate Breakdown)
![Page 9: World Bank Document€¦ · this fiscal year (DLI 2.1: Diploma in Primary Education (DPEd) Training Plan and DLI 3.1: Teacher Recruitment Plan). As reported in the JCM, out of the](https://reader034.vdocuments.us/reader034/viewer/2022050214/5f6093f6829baa7ae2254792/html5/thumbnails/9.jpg)
The World Bank Implementation Status & Results ReportQuality Learning for All Program (P162619)
5/20/2019 Page 9 of 22
Baseline Actual (Previous) Actual (Current) End Target
Value 11,312.00 11,312.00 11,312.00 50,000.00
Date 31-Dec-2016 31-Dec-2016 31-Dec-2016 30-Jun-2023IN00679528►Percentage of PECE items which are competency based (Percentage, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value 65.00 65.00 80.00 100.00
Date 31-Dec-2016 31-Dec-2016 31-Dec-2017 30-Jun-2023
CommentsIN00679529►PECE pass rate of OOSC enrolled in learning centers (Percentage, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value 72.00 72.00 72.00 80.00
Date 31-Dec-2016 31-Dec-2016 31-Dec-2016 30-Jun-2023
Comments
Equitable access and participationIN00679513►Total OOSC (new) enrolled in learning centers (Number, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value 100,000.00 100,000.00 100,000.00 1,000,000.00
Date 31-Dec-2016 31-Dec-2016 31-Dec-2016 30-Jun-2023
CommentsIN00679516►Difference in grade 5 survival rate between boys and girls (Percentage, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value 6.80 6.80 6.80 5.80
Date 31-Dec-2016 31-Dec-2016 31-Dec-2016 30-Jun-2023
Comments Unit of Measure is Percentage point
IN00679519►Decrease in difference in NER between disadvantaged areas (urban slums and CHT) and the rest of the country (Percentage, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 0.00 0.00 10.00
Date 31-Dec-2016 31-Dec-2016 31-Dec-2016 30-Jun-2023
![Page 10: World Bank Document€¦ · this fiscal year (DLI 2.1: Diploma in Primary Education (DPEd) Training Plan and DLI 3.1: Teacher Recruitment Plan). As reported in the JCM, out of the](https://reader034.vdocuments.us/reader034/viewer/2022050214/5f6093f6829baa7ae2254792/html5/thumbnails/10.jpg)
The World Bank Implementation Status & Results ReportQuality Learning for All Program (P162619)
5/20/2019 Page 10 of 22
Comments Unit of Measure is percentage point
IN00679522►Students benefiting from direct interventions to enhance learning (Number, Corporate)
Baseline Actual (Previous) Actual (Current) End Target
Value 18,190,000.00 18,190,000.00 18,190,000.00 18,106,000.00
Date 31-Dec-2016 31-Dec-2016 31-Dec-2016 30-Jun-2023
CommentsIN00679525
Students benefiting from direct interventions to enhance learning - Female (Number, Corporate Supplement)
Baseline Actual (Previous) Actual (Current) End Target
Value 18,190,000.00 18,190,000.00 18,190,000.00 18,106,000.00
Management, governance and financingIN00679514►Number of primary schools that annually receive SLIP funds based on number of students (Number, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 0.00 0.00 55,000.00
Date 31-Dec-2016 31-Dec-2016 31-Dec-2016 30-Jun-2023
CommentsIN00679517►Percentage of schools (all school types) which display key school data in a public area of the school (Percentage, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 0.00 0.00 80.00
Date 31-Dec-2016 31-Dec-2016 31-Dec-2016 30-Jun-2023
CommentsIN00679520►Percentage of schools that produce annual social audit report on time (Percentage, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value 80.00 80.00 80.00 100.00
Date 31-Dec-2016 31-Dec-2016 31-Dec-2016 30-Jun-2023
CommentsIN00679523►Approved contracts in DPE processed through e-GP. (Percentage, Custom)
Baseline Actual (Previous) Actual (Current) End Target
![Page 11: World Bank Document€¦ · this fiscal year (DLI 2.1: Diploma in Primary Education (DPEd) Training Plan and DLI 3.1: Teacher Recruitment Plan). As reported in the JCM, out of the](https://reader034.vdocuments.us/reader034/viewer/2022050214/5f6093f6829baa7ae2254792/html5/thumbnails/11.jpg)
The World Bank Implementation Status & Results ReportQuality Learning for All Program (P162619)
5/20/2019 Page 11 of 22
Value 0.00 0.00 0.00 80.00
Date 31-Dec-2016 31-Dec-2016 31-Dec-2016 30-Jun-2023
Comments
Disbursement Linked IndicatorsDLI_IND_TABLE
►DLI 1 Curriculum revision and textbook development (Output, 85,000,000.00, 0%)
Baseline Actual (Previous) Actual (Current) Year 5
Value Not Applicable Not Applicable Not Applicable Cumulative of all DLRs
Date -- 10-Sep-2018 10-Sep-2018 --
Comments
DLI 1.1 Action plan for curriculum revision, and textbook and teaching learning materials development has been approved by MoPME (Output, 21,250,000.00, 0%)Unit of Measure: Yes/NoIndicator Type:
Baseline Actual (Previous) Actual (Current) Year 5
Value No No Yes --
Date -- 10-Sep-2018 05-Dec-2018 --
Comments
DLI 1.2 Pre-primary education (PPE) and grades 1-5 curriculum has been revised (Output, 21,250,000.00, 0%)
Unit of Measure: Yes/NoIndicator Type:
Baseline Actual (Previous) Actual (Current) Year 5
Value No No No --
Date -- 10-Sep-2018 10-Sep-2018 --
Comments
DLI 1.3 Grades 1-2 textbooks and teaching learning materials have been developed as per revised curriculum (Output, 21,250,000.00, 0%)Unit of Measure: Yes/NoIndicator Type:
Baseline Actual (Previous) Actual (Current) Year 5
Value No No No --
![Page 12: World Bank Document€¦ · this fiscal year (DLI 2.1: Diploma in Primary Education (DPEd) Training Plan and DLI 3.1: Teacher Recruitment Plan). As reported in the JCM, out of the](https://reader034.vdocuments.us/reader034/viewer/2022050214/5f6093f6829baa7ae2254792/html5/thumbnails/12.jpg)
The World Bank Implementation Status & Results ReportQuality Learning for All Program (P162619)
5/20/2019 Page 12 of 22
Date -- 10-Sep-2018 10-Sep-2018 --
Comments
DLI 1.4 PPE and grades 3-5 textbooks and teaching learning materials have been developed as per revised curriculum (Output, 21,250,000.00, 0%)Unit of Measure: Yes/NoIndicator Type:
Baseline Actual (Previous) Actual (Current) Year 5
Value No No No --
Date -- 10-Sep-2018 10-Sep-2018 --
Comments
►DLI 2 Assistant teacher recruitment and deployment (Output, 80,000,000.00, 0%)
Baseline Actual (Previous) Actual (Current) Year 5
Value Not Applicable Not Applicable Not Applicable Cumulative of all DLRs
Date -- 10-Sep-2018 10-Sep-2018 --
Comments
DLI 2.1 Recruitment plan for assistant teachers has been prepared and approved by MoPME (Output, 26,670,000.00, 0%)
Unit of Measure: Yes/NoIndicator Type:
Baseline Actual (Previous) Actual (Current) Year 5
Value No No No --
Date -- 10-Sep-2018 04-Feb-2019 --
Comments
DLI 2.2 75% of the end of program target has been achieved as per assistant teacher recruitment plan (Output, 26,670,000.00, 0%)Unit of Measure: Yes/NoIndicator Type:
Baseline Actual (Previous) Actual (Current) Year 5
Value No No No --
Date -- 10-Sep-2018 10-Sep-2018 --
Comments
![Page 13: World Bank Document€¦ · this fiscal year (DLI 2.1: Diploma in Primary Education (DPEd) Training Plan and DLI 3.1: Teacher Recruitment Plan). As reported in the JCM, out of the](https://reader034.vdocuments.us/reader034/viewer/2022050214/5f6093f6829baa7ae2254792/html5/thumbnails/13.jpg)
The World Bank Implementation Status & Results ReportQuality Learning for All Program (P162619)
5/20/2019 Page 13 of 22
DLI 2.3 At least 50% of GPS have a student teacher ratio of 40:1 or less (Output, 26,670,000.00, 0%)
Unit of Measure: Yes/NoIndicator Type:
Baseline Actual (Previous) Actual (Current) Year 5
Value No No No Yes
Date -- 10-Sep-2018 10-Sep-2018 --
Comments
►DLI 3 Teacher education and continuous professional development (CPD) (Output, 80,000,000.00, 0%)
Baseline Actual (Previous) Actual (Current) Year 5
Value Not Applicable Not Applicable Not Applicable Cumulative of all DLRs
Date -- 10-Sep-2018 10-Sep-2018 --
Comments
DLI 3.1 Diploma in Primary Education (DPEd) training plan has been approved by MoPME (Output, 13,330,000.00, 0%)
Unit of Measure: Yes/NoIndicator Type:
Baseline Actual (Previous) Actual (Current) Year 5
Value No No No --
Date -- 10-Sep-2018 04-Feb-2019 --
Comments
DLI 3.2 CPD framework and plan have been developed and approved by MoPME (Output, 13,330,000.00, 0%)
Unit of Measure: Yes/NoIndicator Type:
Baseline Actual (Previous) Actual (Current) Year 5
Value No No No --
Date -- 10-Sep-2018 10-Sep-2018 --
Comments
DLI 3.3 Revised DPEd curriculum has been approved by MoPME (Output, 13,330,000.00, 0%)
Unit of Measure: Yes/NoIndicator Type:
![Page 14: World Bank Document€¦ · this fiscal year (DLI 2.1: Diploma in Primary Education (DPEd) Training Plan and DLI 3.1: Teacher Recruitment Plan). As reported in the JCM, out of the](https://reader034.vdocuments.us/reader034/viewer/2022050214/5f6093f6829baa7ae2254792/html5/thumbnails/14.jpg)
The World Bank Implementation Status & Results ReportQuality Learning for All Program (P162619)
5/20/2019 Page 14 of 22
Baseline Actual (Previous) Actual (Current) Year 5
Value No No No --
Date -- 10-Sep-2018 10-Sep-2018 --
Comments
DLI 3.4 CPD training has been started as per approved plan (Output, 13,330,000.00, 0%)
Unit of Measure: Yes/NoIndicator Type:
Baseline Actual (Previous) Actual (Current) Year 5
Value No No No --
Date -- 10-Sep-2018 10-Sep-2018 --
Comments
DLI 3.5 DPEd has been implemented according to the plan with 50% of the teachers without DPEd/C-in-Ed trained (Output, 13,330,000.00, 0%)Unit of Measure: Yes/NoIndicator Type:
Baseline Actual (Previous) Actual (Current) Year 5
Value No No No --
Date -- 10-Sep-2018 10-Sep-2018 --
Comments
DLI 3.6 CPD training has been conducted as per approved plan (Output, 13,330,000.00, 0%)
Unit of Measure: Yes/NoIndicator Type:
Baseline Actual (Previous) Actual (Current) Year 5
Value No No No --
Date -- 10-Sep-2018 10-Sep-2018 --
Comments
►DLI 4 Examinations and assessments (Output, 100,000,000.00, 0%)
Baseline Actual (Previous) Actual (Current) Year 5
Value Not Applicable Not Applicable Not Applicable Cumulative of all DLRs
![Page 15: World Bank Document€¦ · this fiscal year (DLI 2.1: Diploma in Primary Education (DPEd) Training Plan and DLI 3.1: Teacher Recruitment Plan). As reported in the JCM, out of the](https://reader034.vdocuments.us/reader034/viewer/2022050214/5f6093f6829baa7ae2254792/html5/thumbnails/15.jpg)
The World Bank Implementation Status & Results ReportQuality Learning for All Program (P162619)
5/20/2019 Page 15 of 22
Date -- 10-Sep-2018 10-Sep-2018 --
Comments
DLI 4.1 National Student Assessment (NSA) 2021 has been conducted (Output, 50,000,000.00, 0%)
Unit of Measure: Yes/NoIndicator Type:
Baseline Actual (Previous) Actual (Current) Year 5
Value No No No --
Date -- 10-Sep-2018 10-Sep-2018 --
Comments
DLI 4.2 Proportion of grade 3 students achieving minimum competency in Bangla and Math in NSA 2021 has increased by at least 10% each compared to to the percentage in NSA 2017 (Output, 50,000,000.00, 0%)Unit of Measure: Yes/NoIndicator Type:
Baseline Actual (Previous) Actual (Current) Year 5
Value No No No Yes
Date -- 10-Sep-2018 10-Sep-2018 --
Comments
►DLI 5 Need-based infrastructure development (Output, 175,000,000.00, 0%)
Baseline Actual (Previous) Actual (Current) Year 5
Value Not Applicable Not Applicable Not Applicable Cumulative of all DLRs
Date -- 10-Sep-2018 10-Sep-2018 --
Comments
DLI 5.1 Infrastructure plan and infrastructure planning guideline (IPG) have been updated and approved by MoPME (Output, 58,330,000.00, 0%)Unit of Measure: Yes/NoIndicator Type:
Baseline Actual (Previous) Actual (Current) Year 5
Value No No Yes --
Date -- 10-Sep-2018 29-Nov-2018 --
Comments
![Page 16: World Bank Document€¦ · this fiscal year (DLI 2.1: Diploma in Primary Education (DPEd) Training Plan and DLI 3.1: Teacher Recruitment Plan). As reported in the JCM, out of the](https://reader034.vdocuments.us/reader034/viewer/2022050214/5f6093f6829baa7ae2254792/html5/thumbnails/16.jpg)
The World Bank Implementation Status & Results ReportQuality Learning for All Program (P162619)
5/20/2019 Page 16 of 22
DLI 5.2 At least 75 % of planned need-based infrastructure development works (additional classrooms, gender segregated WASH blocks, drinking water source) have been completed according to the IPG and as per (Output, 58,330,000.00, 0%)Unit of Measure: Yes/NoIndicator Type:
Baseline Actual (Previous) Actual (Current) Year 5
Value No No No --
Date -- 10-Sep-2018 10-Sep-2018 --
Comments
DLI 5.3 Single shift schools has increased by 10 percentage points compared to program baseline (Output, 58,340,000.00, 0%)Unit of Measure: Yes/NoIndicator Type:
Baseline Actual (Previous) Actual (Current) Year 5
Value No No No Yes
Date -- 10-Sep-2018 10-Sep-2018 --
Comments
►DLI 6 Educational opportunities for out of school children (OOSC) (Output, 120,000,000.00, 0%)
Baseline Actual (Previous) Actual (Current) Year 5
Value Not Applicable Not Applicable Not Applicable Cumulative of All DLRs
Date -- 10-Sep-2018 10-Sep-2018 --
Comments
DLI 6.1 OOSC enrolled in learning centers (LCs) under PEDP3 are back to school or LCs (Output, 10,000,000.00, 0%)
Unit of Measure: Yes/NoIndicator Type:
Baseline Actual (Previous) Actual (Current) Year 5
Value No No No --
Date -- 10-Sep-2018 10-Sep-2018 --
Comments
DLI 6.2 At least 250,000 new OOSC have enrolled in learning centers through ISAs (Output, 10,000,000.00, 0%)
Unit of Measure: Number (Thousand)Indicator Type:
![Page 17: World Bank Document€¦ · this fiscal year (DLI 2.1: Diploma in Primary Education (DPEd) Training Plan and DLI 3.1: Teacher Recruitment Plan). As reported in the JCM, out of the](https://reader034.vdocuments.us/reader034/viewer/2022050214/5f6093f6829baa7ae2254792/html5/thumbnails/17.jpg)
The World Bank Implementation Status & Results ReportQuality Learning for All Program (P162619)
5/20/2019 Page 17 of 22
Baseline Actual (Previous) Actual (Current) Year 5
Value 0.00 0.00 0.00 --
Date -- 10-Sep-2018 10-Sep-2018 --
Comments
DLI 6.3 At least 250,000 new OOSC have enrolled in learning centers through ISAs (Output, 10,000,000.00, 0%)
Unit of Measure: Number (Thousand)Indicator Type:
Baseline Actual (Previous) Actual (Current) Year 5
Value 0.00 0.00 0.00 --
Date -- 10-Sep-2018 10-Sep-2018 --
Comments
DLI 6.4 At least 60% of children in LCs since Year 2 remain enrolled in the LCs (Output, 10,000,000.00, 0%)
Unit of Measure: PercentageIndicator Type:
Baseline Actual (Previous) Actual (Current) Year 5
Value 0.00 0.00 0.00 --
Date -- 10-Sep-2018 10-Sep-2018 --
Comments
DLI 6.5 National survival rate to grade 5 has increased by 2 percentage points for both boys and girls (Output, 10,000,000.00, 0%)Unit of Measure: PercentageIndicator Type:
Baseline Actual (Previous) Actual (Current) Year 5
Value 0.00 0.00 0.00 --
Date -- 10-Sep-2018 10-Sep-2018 --
Comments
DLI 6.6 650,000 OOSC (cumulative from year 2) are back to school or learning centers (Output, 10,000,000.00, 0%)
Unit of Measure: Number (Thousand)Indicator Type:
Baseline Actual (Previous) Actual (Current) Year 5
![Page 18: World Bank Document€¦ · this fiscal year (DLI 2.1: Diploma in Primary Education (DPEd) Training Plan and DLI 3.1: Teacher Recruitment Plan). As reported in the JCM, out of the](https://reader034.vdocuments.us/reader034/viewer/2022050214/5f6093f6829baa7ae2254792/html5/thumbnails/18.jpg)
The World Bank Implementation Status & Results ReportQuality Learning for All Program (P162619)
5/20/2019 Page 18 of 22
Value 0.00 0.00 0.00 650.00
Date -- 10-Sep-2018 10-Sep-2018 --
Comments
►DLI 7 Fiduciary system and budget (Output, 40,000,000.00, 0%)
Baseline Actual (Previous) Actual (Current) Year 5
Value Not Applicable Not Applicable Not Applicable Cumulative of all DLRs
Date -- 10-Sep-2018 10-Sep-2018 --
Comments
DLI 7.1 Fiduciary system has been updated (Output, 8,000,000.00, 0%)
Unit of Measure: Yes/NoIndicator Type:
Baseline Actual (Previous) Actual (Current) Year 5
Value No No No --
Date -- 10-Sep-2018 10-Sep-2018 --
Comments
DLI 7.2 Internal audit unit/cell (IAU) has been established at DPE and adequately staffed (Output, 8,000,000.00, 0%)
Unit of Measure: Yes/NoIndicator Type:
Baseline Actual (Previous) Actual (Current) Year 5
Value No No No --
Date -- 10-Sep-2018 10-Sep-2018 --
Comments
DLI 7.3 85% of the original approved cumulative annual budget of years 1-2 has been utilized (Output, 8,000,000.00, 0%)
Unit of Measure: PercentageIndicator Type:
Baseline Actual (Previous) Actual (Current) Year 5
Value 70.00 0.00 0.00 --
Date -- 10-Sep-2018 10-Sep-2018 --
![Page 19: World Bank Document€¦ · this fiscal year (DLI 2.1: Diploma in Primary Education (DPEd) Training Plan and DLI 3.1: Teacher Recruitment Plan). As reported in the JCM, out of the](https://reader034.vdocuments.us/reader034/viewer/2022050214/5f6093f6829baa7ae2254792/html5/thumbnails/19.jpg)
The World Bank Implementation Status & Results ReportQuality Learning for All Program (P162619)
5/20/2019 Page 19 of 22
Comments
DLI 7.4 iBAS++ has been rolled out in 90% of all DDOs and 80% of approved number of eligible contracts in DPE have been processed through e-GP (Output, 8,000,000.00, 0%)Unit of Measure: Yes/NoIndicator Type:
Baseline Actual (Previous) Actual (Current) Year 5
Value No No No --
Date -- 10-Sep-2018 10-Sep-2018 --
Comments
DLI 7.5 Further enhanced functions for audit resolution (Output, 8,000,000.00, 0%)
Unit of Measure: Yes/NoIndicator Type:
Baseline Actual (Previous) Actual (Current) Year 5
Value No No No Yes
Date -- 10-Sep-2018 10-Sep-2018 --
Comments
►DLI 8 Data system, monitoring and accountability (Output, 40,000,000.00, 0%)
Baseline Actual (Previous) Actual (Current) Year 5
Value Not Applicable Not Applicable Not Applicable Cumulative of All DLRs
Date -- 10-Sep-2018 10-Sep-2018 --
Comments
DLI 8.1 Roadmap for a comprehensive MIS has been developed and approved by MoPME (Output, 10,000,000.00, 0%)
Unit of Measure: Yes/NoIndicator Type:
Baseline Actual (Previous) Actual (Current) Year 5
Value No No No --
Date -- 10-Sep-2018 10-Sep-2018 --
Comments
DLI 8.2 Integrated web-based MIS has been established (Output, 10,000,000.00, 0%)
![Page 20: World Bank Document€¦ · this fiscal year (DLI 2.1: Diploma in Primary Education (DPEd) Training Plan and DLI 3.1: Teacher Recruitment Plan). As reported in the JCM, out of the](https://reader034.vdocuments.us/reader034/viewer/2022050214/5f6093f6829baa7ae2254792/html5/thumbnails/20.jpg)
The World Bank Implementation Status & Results ReportQuality Learning for All Program (P162619)
5/20/2019 Page 20 of 22
Unit of Measure: Yes/NoIndicator Type:
Baseline Actual (Previous) Actual (Current) Year 5
Value No No No --
Date -- 10-Sep-2018 10-Sep-2018 --
Comments
DLI 8.3 70% of GPSs display key school data, as specified by DPE, in public areas in the schools (Output, 10,000,000.00, 0%)Unit of Measure: PercentageIndicator Type:
Baseline Actual (Previous) Actual (Current) Year 5
Value 0.00 0.00 0.00 --
Date -- 10-Sep-2018 10-Sep-2018 --
Comments
DLI 8.4 Integrated web based MIS has become fully operational (Output, 10,000,000.00, 0%)
Unit of Measure: Yes/NoIndicator Type:
Baseline Actual (Previous) Actual (Current) Year 5
Value No No No --
Date -- 10-Sep-2018 10-Sep-2018 --
Comments
►DLI 9 Institutional strengthening (Output, 40,000,000.00, 0%)
Baseline Actual (Previous) Actual (Current) Year 5
Value Not Applicable Not Applicable Not Applicable Cumulative of all DLRs
Date -- 10-Sep-2018 10-Sep-2018 --
Comments
DLI 9.1 ISP under updated ODCBG has been developed and approved by MoPME (Output, 6,660,000.00, 0%)
Unit of Measure: Yes/NoIndicator Type:
Baseline Actual (Previous) Actual (Current) Year 5
![Page 21: World Bank Document€¦ · this fiscal year (DLI 2.1: Diploma in Primary Education (DPEd) Training Plan and DLI 3.1: Teacher Recruitment Plan). As reported in the JCM, out of the](https://reader034.vdocuments.us/reader034/viewer/2022050214/5f6093f6829baa7ae2254792/html5/thumbnails/21.jpg)
The World Bank Implementation Status & Results ReportQuality Learning for All Program (P162619)
5/20/2019 Page 21 of 22
Value No No No --
Date -- 10-Sep-2018 10-Sep-2018 --
Comments
DLI 9.2 SLIP and UPEP guidelines have been updated (Output, 6,660,000.00, 0%)
Unit of Measure: Yes/NoIndicator Type:
Baseline Actual (Previous) Actual (Current) Year 5
Value No No No --
Date -- 10-Sep-2018 10-Sep-2018 --
Comments
DLI 9.3 UPEP has been implemented in 50 upazilas according to updated guidelines (Output, 6,670,000.00, 0%)
Unit of Measure: Yes/NoIndicator Type:
Baseline Actual (Previous) Actual (Current) Year 5
Value No No No --
Date -- 10-Sep-2018 10-Sep-2018 --
Comments
DLI 9.4 ISP implementation under ODCBG has been initiated (Output, 6,670,000.00, 0%)
Unit of Measure: Yes/NoIndicator Type:
Baseline Actual (Previous) Actual (Current) Year 5
Value No No No --
Date -- 10-Sep-2018 10-Sep-2018 --
Comments
DLI 9.5 85% of GPSs have received SLIP funds and utilized them as per the updated SLIP guidelines (Output, 6,670,000.00, 0%)Unit of Measure: Yes/NoIndicator Type:
Baseline Actual (Previous) Actual (Current) Year 5
Value No No No --
![Page 22: World Bank Document€¦ · this fiscal year (DLI 2.1: Diploma in Primary Education (DPEd) Training Plan and DLI 3.1: Teacher Recruitment Plan). As reported in the JCM, out of the](https://reader034.vdocuments.us/reader034/viewer/2022050214/5f6093f6829baa7ae2254792/html5/thumbnails/22.jpg)
The World Bank Implementation Status & Results ReportQuality Learning for All Program (P162619)
5/20/2019 Page 22 of 22
Date -- 10-Sep-2018 10-Sep-2018 --
Comments
DLI 9.6 ISP under updated ODCBG has been implemented (Output, 6,670,000.00, 0%)
Unit of Measure: Yes/NoIndicator Type:
Baseline Actual (Previous) Actual (Current) Year 5
Value No No No --
Date -- 10-Sep-2018 10-Sep-2018 --
Comments