workshop on implementation of twinning project / baku, 6-7 november 2008 this project is funded by...
TRANSCRIPT
1
Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008
This project is funded by European Union
This project is implemented by ECO
Implementation of Twinning & TAIEX Operations in Azerbaijan
Les Grandes Etapes de Mise en Oeuvre
Unité de Gestion du P3AMaroc
LE JUMELAGE INSTITUTIONNEL
2
Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008
This project is funded by European Union
This project is implemented by ECO
Implementation of Twinning & TAIEX Operations in Azerbaijan
Plan
Jumelage, grandes étapes
Identification/formulation d’un projet
Approbation de la fiche de projet
Appel à propositions
Évaluation des propositions
Préparation du contrat de jumelage
Signature du contrat
Mise en œuvre du projet
3
Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008
This project is funded by European Union
This project is implemented by ECO
Implementation of Twinning & TAIEX Operations in Azerbaijan
Jumelage, grandes étapes
Etape Résultat de l’étape
Identification/formulation Fiche de projet approuvée
Appel à Propositions Propositions des EMs
Évaluation des propositions Choix de l’EM
Préparation du contrat de jumelage Contrat signé
Mise en œuvre du projet Résultats du projet réalisés
Clôture du projet Projet évalué, soldé et clôturé
4
Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008
This project is funded by European Union
This project is implemented by ECO
Implementation of Twinning & TAIEX Operations in Azerbaijan
Jumelage, grandes étapes
Etape Résultat de l’étape
Identification/formulation Fiche de projet approuvéeAppel à Propositions Propositions des EMs
Évaluation des propositions Choix de l’EM
Préparation du contrat de jumelage Contrat signé
Mise en œuvre du projet Résultats du projet réalisés
Clôture du projet Projet évalué, soldé et clôturé
5
Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008
This project is funded by European Union
This project is implemented by ECO
Implementation of Twinning & TAIEX Operations in Azerbaijan
Identification/formulation d’un projet de jumelage
Assistance fournie à l’Administration bénéficiaire dans l’identification/formulation d’un projet.
La CE met à disposition des experts spécialisés dans le domaine• Préparation (par le bénéficiaire, l’UGP et la DCE) des TdR de la mission (domaine traité, profil des
experts, volume de la prestation)• Appel d’offres lancé par la DCE (contrat cadre)• Evaluation des offres (bénéficiaire, UGP et la DCE)• Signature du contrat (DCE et le prestataire)
6
Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008
This project is funded by European Union
This project is implemented by ECO
Implementation of Twinning & TAIEX Operations in Azerbaijan
Identification/formulation d’un projet de jumelage
1ère Phase de la mission : Identification/formulation d’un projet
– Briefing – Réunion de démarrage– Lancement de la mission
• Rencontres avec les partenaires• Réunions de suivi• Préparation de la fiche
– Draft de la fiche de projet– Debriefing– Accord du bénéficiaire sur la fiche de projet
7
Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008
This project is funded by European Union
This project is implemented by ECO
Implementation of Twinning & TAIEX Operations in Azerbaijan
Identification/formulation d’un projet de jumelage
Commentaires de la CE sur la fiche de projet
– Envoi par la DCE de la fiche de projet à la CE pour commentaires• La fiche a eu l’accord du bénéficiaire
– Commentaires de la CE sur la fiche de projet• Consultation des DG thématiques
– Planification de la 2ème phase de la mission (UGP, bénéficiaire et experts)• Intégration des commentaires par les experts
8
Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008
This project is funded by European Union
This project is implemented by ECO
Implementation of Twinning & TAIEX Operations in Azerbaijan
Identification/formulation d’un projet de jumelage
2ème Phase de la mission : Prise en compte des commentaires de la CE
– Réunion de briefing :• Discutions des commentaires (Bénéficiaire, experts, DCE et UGP)
– Prise en compte– Finalisation de la fiche de projet– Accord du bénéficiaire– Approbation finale de la fiche par CE
9
Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008
This project is funded by European Union
This project is implemented by ECO
Implementation of Twinning & TAIEX Operations in Azerbaijan
Jumelage, grandes étapes
Etape Résultat de l’étape
Identification/formulation Fiche de projet approuvée
Appel à Propositions Propositions des EMsÉvaluation des propositions Choix de l’EM
Préparation du contrat de jumelage Contrat signé
Mise en œuvre du projet Résultats du projet réalisés
Clôture du projet Projet évalué, soldé et clôturé
10
Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008
This project is funded by European Union
This project is implemented by ECO
Implementation of Twinning & TAIEX Operations in Azerbaijan
Appel à propositions
Publication de l’avis d’AàP
11 jours
Une semaine
21 jours
Da
te l
imit
e d
e
so
um
iss
ion
de
s
pro
po
sit
ion
s
11
Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008
This project is funded by European Union
This project is implemented by ECO
Implementation of Twinning & TAIEX Operations in Azerbaijan
Avis d’appel à propositions
• Publication d’un avis d’appel à propositions dans le site web de la CE
• L’avis comporte les informations suivantes :– Référence du projet (programme, bénéficiaire, financement)– Nature des activités– Budget du projet– Calendrier prévisionnel
1. Date limite de soumission
2. Dates de demandes de clarification
3. Date de réponses
4. Date de la réunion de sélection
5. Date indicative de notification de l’attributaire
6. Date de démarrage du projet
7. Date de signature du contrat de jumelage
12
Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008
This project is funded by European Union
This project is implemented by ECO
Implementation of Twinning & TAIEX Operations in Azerbaijan
Soumission des propositions
– Répondre clairement à la fiche de projet avec un degré avancé de préparation. (Manifestations d’intérêt ne sont considérées comme éligibles).
– Une seule proposition par EM• À titre individuel (partenaire principal)• Dans le cadre d’un consortium
– Répondre selon format standard (annexe C2)
– Pertinence du système de l’EM pour le bénéficiaire
– Description de la stratégie suggérée pour la mise en œuvre du projet
– Proposition inclut les CV des CP, CRJ et ECT
Les propositions doivent arriver à l’UGP avant la date limite indiquée dans l’avis d’AàP
13
Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008
This project is funded by European Union
This project is implemented by ECO
Implementation of Twinning & TAIEX Operations in Azerbaijan
Jumelage, grandes étapes
Etape Résultat de l’étape
Identification/formulation Fiche de projet approuvée
Appel à Propositions Propositions des EMs
Évaluation des propositions Choix de l’EMPréparation du contrat de jumelage Contrat signé
Mise en œuvre du projet Résultats du projet réalisés
Clôture du projet Projet évalué, soldé et clôturé
14
Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008
This project is funded by European Union
This project is implemented by ECO
Implementation of Twinning & TAIEX Operations in Azerbaijan
Évaluation/choix de l’EM partenaire
Notification du choix de l’EM
Constitution d’un Comité d’évaluation
Évaluation administrative
Réunions de sélection
Évaluation technique
15
Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008
This project is funded by European Union
This project is implemented by ECO
Implementation of Twinning & TAIEX Operations in Azerbaijan
Comité d’évaluationÉvaluation
administrativeRéunions de
sélectionÉvaluation technique
Évaluation/choix de l’EM partenaire
16
Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008
This project is funded by European Union
This project is implemented by ECO
Implementation of Twinning & TAIEX Operations in Azerbaijan
Comité d’évaluationÉvaluation
administrativeRéunions de
sélectionÉvaluation technique
Évaluation/choix de l’EM partenaire
17
Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008
This project is funded by European Union
This project is implemented by ECO
Implementation of Twinning & TAIEX Operations in Azerbaijan
Comité d’évaluationÉvaluation
administrativeRéunions de
sélectionÉvaluation technique
Évaluation/choix de l’EM partenaire
18
Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008
This project is funded by European Union
This project is implemented by ECO
Implementation of Twinning & TAIEX Operations in Azerbaijan
Comité d’évaluationÉvaluation
administrativeRéunions de
sélectionÉvaluation technique
Évaluation/choix de l’EM partenaire
19
Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008
This project is funded by European Union
This project is implemented by ECO
Implementation of Twinning & TAIEX Operations in Azerbaijan
Jumelage, grandes étapes
Etape Résultat de l’étape
Identification/formulation Fiche de projet approuvée
Appel à Propositions Propositions des EMs
Évaluation des propositions Choix de l’EM
Préparation du contrat de jumelage Contrat signéMise en œuvre du projet Résultats du projet réalisés
Clôture du projet Projet évalué, soldé et clôturé
20
Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008
This project is funded by European Union
This project is implemented by ECO
Implementation of Twinning & TAIEX Operations in Azerbaijan
Elaboration du contrat de jumelage
Lorsque le PB a choisi un partenaire, il incombe aux deux administrations partenaires (EM + PB) d’élaborer sous leur entière responsabilité le plan de travail détaillé avec un budget correspondant.
Ces éléments constitueront, avec les autres annexes définies dans le Manuel, le contrat de jumelage.
Le succès d’un projet dépend souvent largement de la qualité et de l’appropriation par les partenaires du contrat de jumelage
21
Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008
This project is funded by European Union
This project is implemented by ECO
Implementation of Twinning & TAIEX Operations in Azerbaijan
En pratique…
• Les partenaires de l’EM organisent des visites au Maroc pour faciliter la préparation conjointe du contrat
• L’UGP
veille au respect des règles et procédures assure le suivi des missions organisées par les EM
22
Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008
This project is funded by European Union
This project is implemented by ECO
Implementation of Twinning & TAIEX Operations in Azerbaijan
Structure du contrat de jumelage
• Conditions particulières (document principal)• Annexe A1: plan de travail (description de l’action)• Annexe A2: conditions générales applicables aux contrats de subvention dans le cadre des actions
extérieures de la Communauté européenne• Annexe A3: budget de l’action (y compris la part cofinancée par le bénéficiaire final de l’action) • Annexe A4: procédures de passation de marchés • Annexe A5: demande type de paiement et fiche signalétique financière • Annexe A6: rapport de vérification des dépenses • Annexe A7: dispositions financières particulières • Annexe A8: mandats (en cas de constitution d’un consortium d’États membres).
23
Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008
This project is funded by European Union
This project is implemented by ECO
Implementation of Twinning & TAIEX Operations in Azerbaijan
Processus d’élaboration du contrat de jumelage
3 mois
Préparationdu CJ
Avis motivé de l’UGP/DCE/CE
Contrôle de la version modifiée
Finalisationdu CJ
Signature
4 semaines
Prise en comptede l’avis motivé
4 semainesX Y
Objectif : 3 mois + X + Y = 6 mois max
No
tific
atio
n d
u c
ho
ix
de
l’E
M p
ar
l’UG
P
So
um
issi
on
à l’
UG
P d
u 1
er D
raft
So
um
issi
on
à l’
UG
P d
e la
ve
rsio
n m
od
ifié
e
Ap
pro
ba
tion
du
CJ
24
Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008
This project is funded by European Union
This project is implemented by ECO
Implementation of Twinning & TAIEX Operations in Azerbaijan
Le plan de travail
Reflète une stratégie claire, assortie d’indicateurs mesurables pour parvenir aux résultats obligatoires
Spécifie en détail les prestations et les contributions qui seront apportées
Explique clairement « qui fait quoi »
25
Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008
This project is funded by European Union
This project is implemented by ECO
Implementation of Twinning & TAIEX Operations in Azerbaijan
Le plan de travail
• Doit être conforme à la fiche de projet au niveau des résultats à atteindre et du budget total
• Doit préciser les activités liées aux résultats obligatoires– Quoi? – – Quand ?– – Combien de temps? –– Quelles ressources EM? –– Quelles ressources PB?- – Quelles conditions préalables? – Quels indicateurs de réalisation?
• Clarifie les ressources administratives du PB, les questions de langue, du profil de l’assistant du CRJ et de son recrutement, le calendrier général du projet
26
Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008
This project is funded by European Union
This project is implemented by ECO
Implementation of Twinning & TAIEX Operations in Azerbaijan
Délais, durée du contrat de jumelage
Etablissement initial du CRJ
Durée du plan de travail Clôture du projet (Rapport final et certificat d’audit)
X Durée du plan de travail
Durée légale du contrat = Durée du plan de travail + X + YX + Y = 3 mois
Y
27
Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008
This project is funded by European Union
This project is implemented by ECO
Implementation of Twinning & TAIEX Operations in Azerbaijan
Le budget Coûts éligibles
Liste non exhaustive
- Frais encourus lors de la préparation du contrat de jumelage- Plafonds en fonction du budget de jumelage (6 voyages pour <1M€ et 9 voyages pour >1M€)- conditions : seuls le CP et le CRJ sont éligibles. Durée de Préparation ne dépassant pas 6 mois
- CRJ (salaire pays origine, indemnités journalières, logement, assurance, voyages )
- Assistant CRJ (recruté en externe)
- Visites CP et ECT EM (honoraires, coûts de gestion et voyages)
- Formations, Visites d’études de fonctionnaires de l’administration bénéficiaire (voyages et indemnités journalières)
- Frais d’interprétariat/traduction/documentation
- Petit équipement (max 5000€)
- Frais d’audits
- Réserve pour couvrir les variations dans les prix
28
Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008
This project is funded by European Union
This project is implemented by ECO
Implementation of Twinning & TAIEX Operations in Azerbaijan
Signature du contrat et notification
L’UGP notifie la signature du contrat aux partenaires = début de la période légale
29
Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008
This project is funded by European Union
This project is implemented by ECO
Implementation of Twinning & TAIEX Operations in Azerbaijan
Jumelage, grandes étapes
Etape Résultat de l’étape
Identification/formulation Fiche de projet approuvée
Appel à Propositions Propositions des EMs
Évaluation des propositions Choix de l’EM
Préparation du contrat de jumelage Contrat signé
Mise en œuvre du projet Résultats du projet réalisésClôture du projet Projet évalué, soldé et clôturé
30
Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008
This project is funded by European Union
This project is implemented by ECO
Implementation of Twinning & TAIEX Operations in Azerbaijan
Mise en oeuvre
En Bref
• Gestion par les CPs– Gestion financière et la logistique nécessaire à la mise en œuvre
• Suivi– Réalisation des résultats obligatoires– Réunions de coordination– Rapports trimestriels, rapport final– Evaluation par l’UGP et la DCE– Comité de pilotage
• Evaluation– Experts indépendants mandatés par la CE
• Modifications au contrat• Clôture
31
Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008
This project is funded by European Union
This project is implemented by ECO
Implementation of Twinning & TAIEX Operations in Azerbaijan
Modifications au contrat
Principes
• Modifications demandées doivent être justifiées• Examen par l’UGP • Respect de la règle de l’égalité de traitement entre soumissionnaires.• Non rétroactivité • Respect du montant maximal de la subvention prévue dans le contrat.
Procédures- l’avenant- la lettre d’avenant (ordre administratif)
32
Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008
This project is funded by European Union
This project is implemented by ECO
Implementation of Twinning & TAIEX Operations in Azerbaijan
Modifications au contrat
1. Avenants :
• Signatures : par les signataires du contrat de jumelage. • Délais: d’une partie à l’autre min 30 jours avant la date à laquelle l’avenant devrait entrer en
vigueur.• Approbation : signature, endossement et notification par l’UGP
2. Lettres d’avenant (ordres administratifs)
• Signatures : CPs de manière autonome et conjointe. Notification à l’UGP avec copie à la DCE.• Délais : Toute modification doit être notifiée préalablement à sa mise en œuvre
33
Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008
This project is funded by European Union
This project is implemented by ECO
Implementation of Twinning & TAIEX Operations in Azerbaijan
Les grandes étapes du jumelage
Identification/formulation du projet de jumelage 4 à 6 mois
Appel à propositions 2 mois
Évaluation 1 mois
Préparation et signature du contrat de jumelage 6 à 8 mois
Mise en œuvre du projet Jusqu’à 36 mois
34
Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008
This project is funded by European Union
This project is implemented by ECO
Implementation of Twinning & TAIEX Operations in Azerbaijan
Conclusion
Utilité du jumelage
• à améliorer la législation (rapprochement à l’acquis communautaire)
• à mettre en place/renforcer les compétence du bénéficiaire
• à accroître les capacités de planification dans les secteurs concernés
35
Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008
This project is funded by European Union
This project is implemented by ECO
Implementation of Twinning & TAIEX Operations in Azerbaijan
Conclusion
Avantages
• Gain de temps et d’expérience
• Evolution plus rapide des pratiques
• Accroissement de la motivation et de la confiance de l’administration bénéficiaire
36
Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008
This project is funded by European Union
This project is implemented by ECO
Implementation of Twinning & TAIEX Operations in Azerbaijan
Conclusion
Conseils
• Bonne préparation du projet• Choix du partenaire• Respect des obligations de chaque acteur pendant tout le projet• Durabilité des résultats
Mais surtout
• Etablissement de relations de travail conviviales;
• Confrontation des idées et des points de vue;
• Suppression des barrières culturelles, processus d’apprentissage mutuel dans un esprit de parrainage
37
Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008
This project is funded by European Union
This project is implemented by ECO
Implementation of Twinning & TAIEX Operations in Azerbaijan
Enseignements tirés
• Un jumelage ne peut apporter de solution à tous les problèmes auxquels est confrontée une administration
• Importance du climat de confiance ; nécessité d’une totale transparence entre les deux parties
Conclusion
38
Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008
This project is funded by European Union
This project is implemented by ECO
Implementation of Twinning & TAIEX Operations in Azerbaijan
Conclusion
Expérience acquise
Identification/formulation d’une fiche de projet
- Une bonne analyse préalable de la thématique à aborder
- Ne pas être trop ambitieux
- Besoins clairement définis et fiche correctement élaborée
39
Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008
This project is funded by European Union
This project is implemented by ECO
Implementation of Twinning & TAIEX Operations in Azerbaijan
Expérience acquise
Sélection du partenaire de jumelage
- Bonne corrélation entre les qualifications de l’équipe d’experts proposés et les besoins du projet
- Souplesse et adaptation
Conclusion
40
Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008
This project is funded by European Union
This project is implemented by ECO
Implementation of Twinning & TAIEX Operations in Azerbaijan
Expérience acquise
Élaboration du contrat de jumelage
- Responsabilité des acteurs très claire
- Résultats durables, réalistes et mesurables
- Le budget clair et réaliste
- Le projet doit bénéficier de l’approbation de l’autorité politique à l’échelon le plus élevé
Conclusion
41
Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008
This project is funded by European Union
This project is implemented by ECO
Implementation of Twinning & TAIEX Operations in Azerbaijan
Expérience acquise
Mise en œuvre du projet
- Bien préparer l’accueil de du CRJ
- Bonne communication sur le projet (séminaire de lancement, …)
- Organiser des réunions régulières avec les différents acteurs du projet
- Etre flexible: ne pas hésiter à changer ou adapter des activités et actions si cela est nécessaire pour assurer le succès du projet
Conclusion
42
Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008Workshop on implementation of Twinning Project / Workshop on implementation of Twinning Project / BakBakuu,, 6-76-7 November November 20082008
This project is funded by European Union
This project is implemented by ECO
Implementation of Twinning & TAIEX Operations in Azerbaijan
Pour plus d’informations, consultez le Manuel de référence pour les projet de « jumelage »
• Il définit les principes fondamentaux régissant les jumelages institutionnels• Il établit l’ensemble des procédures permettant la gestion opérationnelle et financière des
jumelages par les acteurs impliqués
• Disponible sur les sites de :
L’UGP• http://www.maec.gov.ma/paaa
La DCE :• http://www.delmar.ec.europa.eu
Merci de votre attention, …