wiring regulations design and verification of electrical installations

112

Upload: ryan-malone

Post on 27-Oct-2015

156 views

Category:

Documents


14 download

TRANSCRIPT

Page 1: Wiring Regulations Design and Verification of Electrical Installations
Page 2: Wiring Regulations Design and Verification of Electrical Installations

IEE Wiring Regulations

Design and Verification of Electrical Installations

Page 3: Wiring Regulations Design and Verification of Electrical Installations

By the same author

Electric Wiring Domestic

Electrical Installation Work

PAT: Portable Appliance Testing

Wiring Regulations: Inspection, Testing andCertification

Wiring Regulations: Explained and Illustrated

Wiring Systems and Fault Finding for InstallationElectricians

Page 4: Wiring Regulations Design and Verification of Electrical Installations

IEE Wiring RegulationsDesign and Verification ofElectrical Installations

Fourth Edition

Brian Scaddan IEng, MIIE (elec)

OXFORD AUCKLAND BOSTON JOHANNESBURG MELBOURNE NEW DELHI

Page 5: Wiring Regulations Design and Verification of Electrical Installations

NewnesAn imprint of Butterworth-HeinemannLinacre House, Jordan Hill, Oxford OX2 8DP225 Wildwood Avenue, Woburn, MA 01801-2041A division of Reed Educational and Professional Publishing Ltd

A member of the Reed Elsevier plc group

First published 1995Reprinted 1996, 1999Second edition 1999Third edition 2001Fourth edition 2002

© Brian Scaddan 1998, 1999, 2001, 2002

All rights reserved. No part of this publication may be reproduced inany material form (including photocopying or storing in any medium byelectronic means and whether or not transiently or incidentally to someother use of this publication) without the written permission of thecopyright holder except in accordance with the provisions of the Copyright,Designs and Patents Act 1988 or under the terms of a licence issued by theCopyright Licensing Agency Ltd, 90 Tottenham Court Road, London,England W1P 9HE. Applications for the copyright holder’s writtenpermission to reproduce any part of this publication should be addressedto the publishers

British Library Cataloguing in Publication DataA catalogue record for this book is available from the British Library

ISBN 0 7506 5470 8

Printed on acid free paperComposition by Genesis Typesetting, Laser Quay, Rochester, KentPrinted and bound in Great Britain by Biddles. Guildford and King’s Lynn

Page 6: Wiring Regulations Design and Verification of Electrical Installations

CONTENTS

1 Design 7

2 Inspection and Testing 61

3 Special Locations 88

4 Sample Questions and Answers 91

Appendix A: BS7671 2001 The Changes 106

Index 111

5

Page 7: Wiring Regulations Design and Verification of Electrical Installations

1DESIGN

Any design to the 16th Edition of the IEE Wiring RegulationsBS 7671 must be primarily concerned with the safety of persons,property and livestock. All other considerations such as operation,maintenance, aesthetics, etc., while forming an essential part of thedesign, should never compromise the safety of the installation.

The selection of appropriate systems and associated equipmentand accessories is an integral part of the design procedure, and assuch cannot be addressed in isolation. For example, the choice ofa particular type of protective device may have a considerableeffect on the calculation of cable size, or shock risk or the integrityof conductor insulation under fault conditions.

Perhaps the most difficult installations to design are those involv-ing additions and/or alterations to existing systems, especiallywhere no original details are available, and those where there isa change of usage or a refurbishment of a premises, together with arequirement to utilize as much of the existing wiring system aspossible.

So, let us investigate those parts of the Wiring Regulations thatneed to be considered in the early stages of the design procedure.

7

Page 8: Wiring Regulations Design and Verification of Electrical Installations

Design

8

Assessment of general characteristicsRegardless of whether the installation is a whole one, an addition,or an alteration, there will always be certain design criteria to beconsidered before calculations are carried out. Part 3 of the 16thEdition, ‘Assessment of General Characteristics’, indicates fourmain headings under which these considerations should beaddressed. These are:

1 Purpose, supplies and structure2 External influences3 Compatibility4 Maintainability.

Let us look at these headings in a little more detail.

Purpose, supplies and structure� For a new design, will the installation be suitable for its

intended purpose?� For a change of usage, is the installation being used for its

intended purpose?� If not, can it be used safely and effectively for any other purpose?� Has the maximum demand been evaluated?� Can diversity be taken into account?� Are the supply and earthing characteristics suitable?� Are the methods for protection for safety appropriate?� If standby or safety supplies are used, are they reliable?� Are the installation circuits arranged to avoid danger and

facilitate safe operation?

External influencesAppendix 5 of the IEE Regulations classifies external influenceswhich may affect an installation. This classification is divided intothree sections, the environment (A), how that environment is

Page 9: Wiring Regulations Design and Verification of Electrical Installations

Design

utilized (B) and construction of buildings (C). The nature of anyinfluence within each section is also represented by a number. Thefollowing gives examples of the classification:

Environment Utilization Building

Water Capability MaterialsAD6 Waves BA3 Handicapped CA1 Non-combustible

With external influences included on drawings and in specifica-tions, installations and materials used can be designedaccordingly.

CompatibilityIt is of great importance to ensure that damage to, or mal-operationof equipment cannot be caused by harmful effects generated byother equipment even under normal working conditions. Forexample, MIMS cable should not be used in conjunction withdischarge lighting, as the insulation can break down whensubjected to the high starting voltages; the operation of RCDs maybe impaired by the magnetic fields of other equipment; computers,PLCs, etc., may be affected by normal earth leakage currents fromother circuits.

MaintainabilityAll installations require maintaining, some more than others, anddue account of the frequency and quality of maintenance must betaken at the design stage. It is usually the industrial installationsthat are mostly affected by the need for regular maintenance, andconsultation with those responsible for the work is essential inorder to ensure that all testing, maintenance and repair can beeffectively and safely carried out. The following example may

9

Page 10: Wiring Regulations Design and Verification of Electrical Installations

Design

serve to illustrate an approach to consideration of design criteriawith regards to a change of usage.

EXAMPLE 1A vacant two-storey light industrial workshop, 12 years old, is tobe taken over and used as a Scout/Guide HQ. New showerfacilities are to be provided. The supply is three-phase 400/230 Vand the earthing system is TN–S.

The existing electrical installation on both floors comprises steeltrunking at a height of 2.5 m around all perimeter walls, with steelconduit, to all socket outlets and switches (metal-clad), tonumerous isolators and switch-fuses once used to control singleand three-phase machinery, and to the lighting, fluorescentluminaires suspended by chains from the ceilings. The groundfloor is to be used as the main activity area and part of the top floorat one end is to be converted to house separate male and femaletoilet and shower facilities accommodating two 8 kW/230 Vshower units in each area.

If the electrical installation has been tested and inspected andshown to be safe:

1 Outline the design criteria, having regard for the new usage, for(a) The existing wiring system, and(b) The wiring to the new showers.

2 What would be the total assumed current demand of the showerunits?

Suggested approach/solution 1(a) Existing system

Purpose, supplies and structureClearly the purpose for which the installation was intended haschanged, however, the new usage is unlikely, in all but a fewinstances, to have a detrimental effect on the existing system. Itwill certainly be under-loaded, nevertheless this does not precludethe need to assess the maximum demand.

10

Page 11: Wiring Regulations Design and Verification of Electrical Installations

Design

The supply and earthing arrangements will be satisfactory, butthere may be a need to alter the arrangement of the installation, inorder to rebalance the load across the phases now that machineryis no longer present.

External influencesThe new shower area will probably have a classification AD3 or 4and will be subject to Section 601, IEE Regulations. Hence allmetal conduit and trunking should be removed together with anysocket outlets. The trunking could be replaced with PVC,alternatively it could be boxed in using insulating material andscrew-on lids to enable access. Suspended fluorescent fittingsshould be replaced with the enclosed variety, with control switchespreferably located outside the area.

The activities in the ground-floor area will almost certainlyinvolve various ball games giving it a classification of AG2(medium impact). Conduit drops are probably suitable, but oldisolators and switch-fuses should be removed, and luminairesfixed to the ceiling and caged, or be replaced with suitably cagedspotlights on side walls at high level.

As the whole building utilization can now be classified BA2(children), it is probably wise to provide supplementary protectionagainst direct contact by installing 30 mA RCDs on all accessiblecircuits.

CompatibilityUnlikely to be any compatibility problems with the new usage.

MaintainabilityMainly periodic test and inspection with some maintenance oflighting, hence suitable access equipment should be available,together with spare lamps and tubes. Lamp disposal facilitiesshould be considered.

11

Page 12: Wiring Regulations Design and Verification of Electrical Installations

Design

(b) New shower area (BS7691 Section 601)

Purpose, supplies and structureAs this is a new addition, the installation will be designed to fulfil allthe requirements for which it is intended. The supply and earthingsystem should be suitable, but a measurement of the PSCC and Ze

should be taken. The loading of the showers will have beenaccounted for during the assessment of maximum demand.

In the unlikely event of original design and installation detailsbeing available, it may be possible to utilize the existing trunkingwithout exceeding space factors or de-rating cables due to theapplication of grouping factors. However, it is more probable thata re-evaluation of the trunking installation would need to beundertaken, or alternatively, install a completely separate system.Whichever the method adopted, a sub-main supplying a four-waydistribution board located outside the area would be appropriate,the final circuits to each shower being run via individual controlswitches also outside, and thence to the units using a PVC conduitsystem. Protection against indirect contact would be by earthedequipotential bonding and automatic disconnection, by CBsbacked up by RCDs.

External influencesThese have already been addressed in 1(a) above.

CompatibilityThere will be no incompatibility between any equipment in thisarea.

MaintainabilityAfforded by the individual switches and/or CBs allowing isolationto maintain or repair/replace defective units.

Suggested approach/solution 2Design current Ib for each unit = 8000/230 = 35 A applyingdiversity:

12

Page 13: Wiring Regulations Design and Verification of Electrical Installations

Design

1st unit 100% of 35 = 352nd unit 100% of 35 = 353rd unit 25% of 35 = 8.754th unit 25% of 35 = 8.75

Total assumed current demand = 87.5 A

As an answer to a C&G 2400 examination question, thissuggested approach is more comprehensive than time constraintswould allow, and hence an abbreviated form is acceptable. Thesolutions to the questions in Chapter 3 of this book illustrate suchshortened answers.

Protection for safetyPart 4 of the 16th Edition details the methods and applications ofprotection for safety, and consideration of these details must bemade as part of the design procedure. Areas that the designerneeds to address are: protection against shock, thermal effects,overcurrent and undervoltage, and the requirements for isolationand switching. Let us now deal, in broad terms, with each ofthese areas.

Protection against shockThere are two ways that persons or livestock may be exposed tothe effects of electric shock, these are (a) by touching live parts ofelectrical equipment, ‘Direct Contact’ or (b) by touching exposed-conductive-parts of electrical equipment or systems, which havebeen made live by a fault, ‘Indirect Contact’. Chart 1 indicates thecommon methods of protecting against either of these situations.

Barriers and enclosuresOne method used to protect against direct contact is to place liveparts in enclosures and/or behind barriers. In order to ensure thatsuch protection will be satisfactory, the enclosures/barriers must

13

Page 14: Wiring Regulations Design and Verification of Electrical Installations

Design

Chart 1 Common methods of protection against shock

Protection by Protection against Applications and comments

SELV(separatedextra lowvoltage)

Direct andIndirect contact

Used for circuits in environmentssuch as bathrooms, swimmingpools, restrictive conductivelocations, agricultural andhorticultural situations, and for25 V hand lamps in dampsituations on construction sites.Also useful for circuits in schools,or college laboratories.

Insulation oflive parts

Direct contact This is simply ‘basic insulation’.

Barriers andenclosures

Direct contact Except where otherwise specified,such as swimming pools, hot airsaunas, etc., placing LIVE PARTSbehind barriers or in enclosures toat least IP2X is the norm. Twoexceptions to this are:

1 Accessible horizontal topsurfaces of, for example,distribution boards or consumerunits, where the protection mustbe to at least IP4X, and

2 Where a larger opening thanIP2X is necessary, e.g. entry tolampholders where replacementof lamps is needed.

Access past a barrier or into anenclosure should only be possibleby the use of a tool, or after thesupply has been disconnected, orif there is an intermediate barrierto at least IP2X. This does notapply to ceiling roses or ceilingswitches with screw-on lids.

14

Page 15: Wiring Regulations Design and Verification of Electrical Installations

Design

Chart 1 Continued

Protection by Protection against Applications and comments

Obstacles Direct contact Restricted to areas only accessibleto skilled persons, e.g. sub-stationswith open fronted busbarchambers, etc.

Placing outof reach

Direct contact Restricted to areas only accessibleto skilled persons, e.g. sub-stationswith open fronted busbarchambers, etc. Overhead travellingcranes or overhead lines.

RCDs(residualcurrentdevices)

Direct contact These may only be used assupplementary protection againstdirect contact, and must have anoperating current of 30 mA or less,and an operating time of 40 ms orless at a residual current of5 × I�n.

Indirect contact Used when the loop impedancerequirements for EEBADS cannotbe met or for protecting S/Ocircuits supplying portableequipment used outdoors.

Preferred method of earth faultprotection for TT systems.

EEBADS(earthedequipotentialbonding andautomaticdisconnectionof supply)

Indirect contact The most common method in use.Relies on the co-ordination of thecharacteristics of the earthing,impedance of circuits, andoperation of protective devicessuch that no danger is caused byearth faults occurring anywhere inthe installation.

15

Page 16: Wiring Regulations Design and Verification of Electrical Installations

Design

conform to BS EN 60529, commonly referred to as the IP code.This details the amount of protection an enclosure can offer to theingress of mechanical objects, foreign solid bodies and moisture.Table 1 shows part of the IP code. The X in a code simplymeans that protection is not specified, for example, in the codeIP2X, only the protection against mechanical objects is specified,not moisture.

16

Chart 1 Continued

Protection by Protection against Applications and comments

Class IIequipment

Indirect contact Sometimes referred to asdouble insulated equipment andmarked with the BS symbol �� .

Supplying such equipment via aclass II ‘All insulated’installation incorporating S/Osmay NOT be used as the solemeans of protection againstIndirect Contact.

Non-conductinglocation

Indirect contact Rarely used – only for veryspecial installations under strictsupervision.

Earth-freelocalequipotentialbonding

Indirect contact Rarely used – only for veryspecial installations under strictsupervision.

Electricalseparation

Indirect contact Rarely used – only for veryspecial installations under strictsupervision.

Page 17: Wiring Regulations Design and Verification of Electrical Installations

Design

Table 1

First numeral Mechanical protection

0 No protection of persons against contact with liveor moving parts inside the enclosure. No protectionof equipment against ingress of solid foreign bodies.

1 Protection against accidental or inadvertent contactwith live or moving parts inside the enclosure by alarge surface of the human body, for example, ahand, not for protection against deliberate access tosuch parts. Protection against ingress of large solidforeign bodies.

2 Protection against contact with live or moving partsinside the enclosure by fingers. Protection againstingress of medium-sized solid foreign bodies.

3 Protection against contact with live or moving partsinside the enclosure by tools, wires or such objectsof thickness greater than 2.5 mm. Protection againstingress of small foreign bodies.

4 Protection against contact with live or moving partsinside the enclosure by tools, wires or such objectsof thickness greater than 1 mm. Protection againstingress of small foreign bodies.

5 Complete protection against contact with live ormoving parts inside the enclosures. Protectionagainst harmful deposits of dust. The ingress of dustis not totally prevented, but dust cannot enter in anamount sufficient to interfere with satisfactoryoperation of the equipment enclosed.

6 Complete protection against contact with live ormoving parts inside the enclosures. Protectionagainst ingress of dust.

17

Page 18: Wiring Regulations Design and Verification of Electrical Installations

Design

Table 1 Continued

Second numeral Liquid protection

0 No protection.

1 Protection against drops of condensed water. Dropsof condensed water falling on the enclosure shallhave no effect.

2 Protection against drops of liquid. Drops of fallingliquid shall have no harmful effect when theenclosure is tilted at any angle up to 15° from thevertical.

3 Protection against rain. Water falling in rain at anangle equal to or smaller than 60° with respect tothe vertical shall have no harmful effect.

4 Protection against splashing. Liquid splashed fromany direction shall have no harmful effect.

5 Protection against water jets. Water projected by anozzle from any direction under stated conditionsshall have no harmful effect.

6 Protection against conditions on ships’ decks (deckwith watertight equipment). Water from heavy seasshall not enter the enclosures under prescribedconditions.

7 Protection against immersion in water. It must notbe possible for water to enter the enclosure understated conditions of pressure and time.

8 Protection against indefinite immersion in waterunder specified pressure. It must not be possible forwater to enter the enclosure.

18

Page 19: Wiring Regulations Design and Verification of Electrical Installations

Design

Earthed equipotential bonding and automaticdisconnection of supply (EEBADS)As Chart 1 indicates, EEBADS is the most common method ofproviding protection against electric shock through IndirectContact, and hence it is important to expand on this topic.

There are two basic ways of receiving an electric shock byIndirect Contact:

1 Via parts of the body and the general mass of earth (typicallyhands and feet) Figure 1 and

2 Via parts of the body and simultaneously accessible Exposedand Extraneous conductive parts (typically hand to hand)Figure 2.

Clearly, the conditions shown in Figures 1 and 2 would provide noprotection, as the installation is not earthed. However, if it can beensured that protective devices operate fast enough by providinglow impedance paths for earth fault currents, and that mainequipotential bonding is carried out, then the magnitude andduration of earth faults will be reduced to such a level as not tocause danger.

19

Figure 1

Page 20: Wiring Regulations Design and Verification of Electrical Installations

Design

Experience has shown that it is reasonable to allow earth faultsto persist on circuits feeding fixed or stationary equipment, fordurations up to 5 s, and up to 0.4 s on circuits feeding socket outletsintended to supply portable appliances. These times are furtherreduced to 0.2 s, in agricultural and horticultural situations and onconstruction sites. The nominal voltage to earth (Uo) in all thesecases being 230 V to 277 V.

The connection of main equipotential bonding conductors hasthe effect of creating a zone in which, under earth fault conditions,all exposed and extraneous conductive parts rise to a substantiallyequal potential. There may be differences in potential betweensimultaneously accessible conductive parts, but provided thedesign and installation is correct, the level of shock voltage willnot be harmful.

Figure 3 shows the earth fault system which provides protectionagainst indirect contact.

The low impedance path for fault currents, the earth fault looppath, comprises that part of the system external to the installation,i.e. the impedance of the supply transformer, distributor and

20

Figure 2

Page 21: Wiring Regulations Design and Verification of Electrical Installations

Supplytransformer

Consumer unit

Is

Is

Earthingconductor

Exposedconductive part

Fault

IsP

N

E

Is

Equipment

P

N

IsIs CPC

Main equipotentialbonding to gas, water, etc.

Link forTN–C–S E

Is

General mass of earth or othermetallic return path

Extraneousconductive parts

Us Us

G W

Design

service cables Ze, and the resistance of the phase conductor R1,and CPC R2, of the circuit concerned.

The total value of loop impedance Zs is therefore the sum ofthese values:

Zs = Ze + (R1 + R2) �

Provided that this value of Zs does not exceed the maximumvalue given for the protective device in question in Tables 41B1,41B2 or 41D of the Regulations, the protection will operate withinthe prescribed time limits.

It must be noted that the actual value of (R1 + R2) is determinedfrom:

Tabulated value of (R1 + R2) × Circuit length × Multiplier

1000

Note: The multiplier corrects the resistance at 20°C to the value atconductor operating temperature.

External loop impedance ZeThe designer obviously has some measure of control over thevalues of R1 and R2, but the value of Ze can present a problem

21

Figure 3

Page 22: Wiring Regulations Design and Verification of Electrical Installations

Design

when the premises, and hence the installation within it, are atdrawing board stage. Clearly Ze cannot be measured, and althougha test made in an adjacent installation would give some indicationof a likely value, the only recourse would either be to requestsupply network details from the supply authority and calculate thevalue of Ze, or use the maximum likely values quoted by theelectricity boards, which are:

TT system 21 �TN–S system 0.8 �TNC–S system 0.35 �

These values are pessimistically high and may cause difficultyin even beginning a design calculation. For example, calculatingthe size of conductors (considering shock risk) for, say, a sub-maincable protected by a 160 A, BS88 fuse and supplied via a TNC–Ssystem, would present great difficulties, as the maximum value ofZs (Table 41D(b)) for such a fuse is 0.27 � and the quoted likelyvalue of Ze is 0.35 �. In this case the supply authority would needto be consulted.

Supplementary equipotential bondingThis still remains a contentious issue even though the Regulationsare quite clear on the matter.

Supplementary bonding is only required under the followingconditions:

1 When the requirements for loop impedance and associateddisconnection times cannot be met (RCDs may be installed as analternative), and

2 The exposed and/or extraneous conductive parts are simultane-ously accessible, or

3 The location is an area of increased risk such as detailed in Part6 of the Regulations, and other areas such as industrial kitchens,laundry rooms, etc.

22

Page 23: Wiring Regulations Design and Verification of Electrical Installations

Design

Other equipotential bondingThere are occasions when a distribution board houses circuits withsignificantly different disconnection times. In the event of an earthfault occurring on equipment supplied by the circuit with thelonger time, a fault voltage could appear on the exposedconductive parts of equipment supplied by the circuit with theshorter time.

This situation can be resolved by connecting a local equipoten-tial bonding conductor from the earth terminal of the distributionboard to the same extraneous conductive parts that have beenbonded at the intake position. Perhaps the better method ofovercoming the problem is to design all the circuits for the lowerdisconnection time of 0.4 s.

Protection against thermal effectsThe provision of such protection requires, in the main, a common-sense approach. Basically, ensure that electrical equipment thatgenerates heat is so placed as to avoid harmful effects onsurrounding combustible material. Terminate or join all liveconductors in approved enclosures, and where electrical equip-ment contains in excess of 25 litres of flammable liquid, makeprovision to prevent the spread of such liquid, for example, aretaining wall round an oil-filled transformer.

In order to protect against burns from equipment not subject toa British Standard limiting temperature, conform to the require-ments of Table 42A, IEE Regulations.

Precautions where there is a particular risk of fire(IEE Regs Chapter 48)This chapter outlines details of locations and situations where theremay be a particular risk of fire. These would include locationswhere combustible materials are stored or could collect and wherea risk of ignition exists. This section does not include locationswhere there is a risk of explosion.

23

Page 24: Wiring Regulations Design and Verification of Electrical Installations

Design

Protection against overcurrentThe term overcurrent may be sub-divided into:

1 Overload current, and2 Fault current.

The latter being further sub-divided to:

(a) Short-circuit current (between live conductors), and(b) Earth fault current (between phase and earth)Overloads are overcurrents occurring in healthy circuits and causedby, for example, motor starting, inrush currents, motor stalling,connection of more loads to a circuit than it is designed for, etc.

Fault currents, on the other hand, typically occur when there ismechanical damage to circuits and/or accessories causing insula-tion failure or breakdown leading to ‘bridging’ of conductors. Theimpedance of such a ‘bridge’ is assumed to be negligible.

Clearly, significant overcurrents should not be allowed to persistfor any length of time, as damage will occur to conductors andinsulation.

Chart 2 indicates some of the common types of protective device.

Protection against overloadProtective devices used for this purpose have to be selected toconform with the following requirements:

1 The nominal setting of the device In must be greater than orequal to the design current Ib.

In � Ib

2 The current carrying capacity of the conductors, Iz must be lessthan or equal to the nominal setting of the device In.

Iz � In

3 The current causing operation of the device I2 must be less thanor equal to 1.45 times the current carrying capacity of theconductors Iz.

I2 ≤ 1.45 × Iz

24

Page 25: Wiring Regulations Design and Verification of Electrical Installations

Design

Chart 2 Commonly used protective devices

Device Application Comments

Semi-enclosedre-wireablefuse BS3036

Mainly domesticconsumer units

Gradually being replaced by othertypes of protection. Its high fusingfactor results in lower cable currentcarrying capacity or, conversely,larger cable sizes.

Does not offer good short-circuitcurrent protection.

Ranges from 5 A to 200 A.

HRC fuselinks BS88Parts 2 and 6

Mainlycommercial andindustrial use

Give excellent short-circuit currentprotection. Does not cause cablede-rating. ‘M’ types used for motorprotection. Ranges from 2 A to1200 A.

HRC fuselinks BS1361

House serviceand consumerunit fuses

Not popular for use in consumerunits, however, gives goodshort-circuit current protection, anddoes not result in cable de-rating.

Ranges from 5 A to 100 A.

MCBs(miniaturecircuitbreakers)BS3871, nowsuperseded byBS EN 60898CBs

Domesticconsumer unitscommercial/industrialdistributionboards.

Very popular due to ease ofoperation. Some varieties havelocking-off facilities.

Range from 1 A to 63 A single andthree phase. Old types 1, 2, 3 and 4now replaced by types B, C and Dwith breaking capacities from 3 kA to25 kA.

MCCBs(moulded casecircuitbreakers) BSEN 609472

Industrialsituations wherehigh current andbreakingcapacities arerequired

Breaking capacity, 22 kA to 50 kA inranges 16 A to 1200 A. 2, 3 and 4pole types available.

25

Page 26: Wiring Regulations Design and Verification of Electrical Installations

Design

For fuses to BS88 and BS1361, and MCBs or CBs, compliance with(2) above automatically gives compliance with (3). For fuses toBS3036 (re-wireable) compliance with (3) is achieved if thenominal setting of the device In is less than or equal to 0.725 × Iz.

In ≤ 0.725 × Iz

This is due to the fact that a re-wireable fuse has a fusing factorof 2, and 1.45/2 = 0.725.

Overload devices should be located at points in a circuitwhere there is a reduction in conductor size or anywhere alongthe length of a conductor, providing there are no branch circuits.The Regulations indicate circumstances under which overloadprotection may be omitted, one such example is when thecharacteristics of the load are not likely to cause an overload,hence there is no need to provide protection at a ceiling rose forthe pendant drop.

Protection against fault current

Short-circuit currentWhen a ‘bridge’ of negligible impedance occurs between liveconductors (remember, a neutral conductor is a live conductor) theshort-circuit current that could flow is known as the ‘prospectiveshort circuit current’ (PSCC), and any device installed to protectagainst such a current must be able to break the PSCC at the point atwhich it is installed without the scattering of hot particles or damageto surrounding materials and equipment. It is clearly importanttherefore to select protective devices that can meet thisrequirement.

It is perhaps wise to look in a little more detail at this topic. Figure4 shows PSCC over one half-cycle, t1 is the time taken to reach ‘cut-off’ when the current is interrupted, and t2 the total time taken fromstart of fault to extinguishing of the arc.

During the ‘pre-arcing’ time t1, electrical energy of considerableproportions is passing through the protective device into theconductors. This is known as the ‘pre-arcing let-through’ energyand is given by If

2t1, where If is the short-circuit current at ‘cut-off’.

26

Page 27: Wiring Regulations Design and Verification of Electrical Installations

Short-circuit current (amperes)

Time (seconds)t1 t2

Prospectiveshort-circuit current

Cut-off point

Fault current

RMSvalue

Pre-arcing time Arc being extinguished

P

N

Load

Energy let-through = I t2f

If

Fault

If

Protection

Design

27

Figure 4

Figure 5

Page 28: Wiring Regulations Design and Verification of Electrical Installations

Design

The total amount of energy let through into the conductors is givenby If

2t2 in Figure 5.For faults up to 5 s duration, the amount of heat and mechanical

energy that a conductor can withstand is given by k2s2, where k isa factor dependent on the conductor and insulation materials(tabulated in the Regulations), and s is the conductor csa. Providedthe energy let-through by the protective device does not exceed theenergy withstand of the conductor, no damage will occur. Hence,the limiting situation is when If

2t = k2s2. If we now transpose thisformula for t, we get t = k2s2/If

2, which is the maximumdisconnection time (t in seconds).

When an installation is being designed, the PSCC at eachrelevant point in the installation has to be determined, unless thebreaking capacity of the lowest rated fuse in the system is greaterthan the PSCC at the intake position. For supplies up to 100 A thesupply authorities quote a value of PSCC at the point at whichthe service cable is joined to the distributor cable, of 16 kA. Thisvalue will decrease significantly over only a short length of servicecable.

Earth fault currentWe have already discussed this topic with regards to shock risk,and although the protective device may operate fast enough toprevent shock, it has to be ascertained that the duration of the fault,however small, is such that no damage to conductors or insulationwill result. This may be verified in two ways:

1 If the protective conductor conforms to the requirements ofTable 54G (IEE Regulations), or if

2 The csa of the protective conductor is not less than thatcalculated by use of the formula

s =���I2t

k

which is another rearrangement of the formula I2t = k2s2.

28

Page 29: Wiring Regulations Design and Verification of Electrical Installations

Design

For flat, twin and three-core cables the formula method ofverification will be necessary, as the circuit protective conductor(CPC) incorporated in such cables is always smaller than theassociated phase conductor. It is often desirable when choosing aCPC size to use the calculation, as invariably, the result leads tosmaller CPCs and hence greater economy. This topic will beexpanded further in the section ‘Design calculations’.

29

Chart 3 I f2 t characteristics: 2–800 A fuse links. Discrimination is

achieved if the total I f2 t of the minor fuse does not exceed the

pre-arcing I f2 t of the major fuse

Rating (A) I f2 t pre-arcing I f

2 t total at 415 V

2 0.9 1.74 4 126 16 59

10 56 17016 190 58020 310 81025 630 1 70032 1 200 2 80040 2 000 6 00050 3 600 11 00063 6 500 14 00080 13 000 36 000

100 24 000 66 000125 34 000 120 000160 80 000 260 000200 140 000 400 000250 230 000 560 000315 360 000 920 000350 550 000 1 300 000400 800 000 2 300 000450 700 000 1 400 000500 900 000 1 800 000630 2 200 000 4 500 000700 2 500 000 5 000 000800 4 300 000 10 000 000

Page 30: Wiring Regulations Design and Verification of Electrical Installations

Design

DiscriminationIt is clearly important that, in the event of an overcurrent, theprotection associated with the circuit in question should operate,and not other devices upstream. It is not enough to simply assumethat a device one size lower will automatically discriminate with onea size higher. All depends on the ‘let-through’ energy of the devices.If the total ‘let-through’ energy of the lower rated device does notexceed the pre-arcing ‘let-through’ energy of the higher rateddevice, then discrimination is achieved. Chart 3 shows the ‘let-through’ values for a range of BS88 fuse links, and illustrates thefact that devices of consecutive ratings do not necessarilydiscriminate. For example, a 6 A fuse will not discriminate with a10 A fuse.

30

Protection against undervoltageIn the event of a loss of, or significant drop in voltage, protectionshould be available to prevent either damage or danger when thesupply is restored. This situation is most commonly encountered inmotor circuits, and in this case the protection is provided by thecontactor coil via the control circuit. If there is likely to be damageor danger due to undervoltage, standby supplies could be installedand in the case of computer systems, uninterruptible powersupplies (UPS).

Protection against overvoltage(IEE Regs Chapter 44)This chapter deals with the requirements of an electrical installa-tion to withstand overvoltages caused by lightning or switchingsurges. It is unlikely that installations in the UK will be affected bythe requirements of this section as the number of thunderstormdays per year is not likely to exceed 25.

Isolation and switchingLet us first be clear about the difference between isolators andswitches. An isolator is, by definition, ‘A mechanical switchingdevice which provides the function of cutting off, for reasons of

Page 31: Wiring Regulations Design and Verification of Electrical Installations

Design

safety, the supply to all or parts of an installation, from everysource. Whereas a switch is a mechanical switching device whichis capable of making, carrying and breaking normal load current,and some overcurrents. It may not break short-circuit currents.’

So, a switch may be used for isolation, but not vice versa.Basically an isolator is operated after all loads are switched off, inorder to prevent energization while work is being carried out.Isolators are off-load devices, switches are on-load devices. Chart4 indicates some of the common devices.

31

Chart 4 Common types of isolators and switches

Device Application Comments

Isolator ordisconnector

Performs the functionof isolation

Not designed to be operatedon load. Isolation can also beachieved by the removal offuses, pulling plugs, etc.

Functionalswitch

Any situation wherea load needs to befrequently operated,i.e. light switches,switches on socketoutlets, etc.

A functional switch could beused as a means of isolation,i.e. a one-way light switchprovides isolation for lampreplacement provided theswitch is under the control ofthe person changing the lamp.

Switch-fuse At the origin of aninstallation orcontrolling sub-mainsor final circuits

These can perform thefunction of isolation whilehousing the circuit protectivedevices.

Fuse-switch As for switch-fuse Mainly used for highercurrent ratings and have theirfuses as part of the movingswitch blades.

Switchdisconnector

Main switch onconsumer units anddistribution fuseboards

These are ON LOAD devicesbut can still perform thefunction of isolation.

Page 32: Wiring Regulations Design and Verification of Electrical Installations

Design

Design calculationsBasically, all designs follow the same procedure:

1 Assessment of general characteristics2 Determination of design current Ib

3 Selection of protective device having nominal rating or setting In

4 Selection of appropriate correction factors5 Calculation of tabulated conductor current It

6 Selection of suitable conductor size7 Calculation of voltage drop8 Evaluation of shock risk9 Evaluation of thermal risks to conductors.

Let us now consider these steps in greater detail. We have alreadydealt with ‘assessment of general characteristics’, and clearly oneresult of such assessment will be the determination of the type anddisposition of the installation circuits. Chart 5 gives details ofcommon wiring systems and cable types. Having made the choiceof system and cable type, the next stage is to determine the designcurrent.

Design current IbThis is defined as ‘the magnitude of the current to be carried by acircuit in normal service’, and is either determined directly frommanufacturers’ details or calculated using the following formulae:

Single phase:

Ib =P

Vor

P

V × Eff% × PF

Three phase:

Ib =P

√3 × VL

orP

√3 × VL × Eff% × PF

where: P = power in wattsV = phase to neutral voltage in voltsVL = phase to phase voltage in voltsEFF% = efficiencyPF = power factor.

32

Page 33: Wiring Regulations Design and Verification of Electrical Installations

Design

Chart 5 Common wiring systems and cable types

System/cable type Applications Comments

1 Flat twin andthree-core cablewith CPC; PVCsheathed, PVCinsulated, copperconductors

Domestic andcommercial fixedwiring

Used clipped direct to surfaceor buried in plaster eitherdirectly, or encased in ovalconduit or top-hat section,also used in conjunction withPVC mini-trunking.

2 PVC mini-trunking

Domestic andcommercial fixedwiring

Used with (1) above forneatness when surface wiringis required.

3 PVC conduit withsingle-core PVCinsulated copperconductors

Commercial andlight industrial

Easy to install high impact,vermin proof, self-extinguishing, good incorrosive situations. Whenused with ‘all insulated’accessories, provides a degreeof protection against indirectcontact on the system.

4 PVC trunking:square,rectangular,skirting, dado,cornice, angledbench. Withsingle-core PVCinsulated copperconductors

Domestic,commercial andlight industrial

When used with all insulatedaccessories provides a degreeof protection against indirectcontact on the system. Someforms come pre-wired withcopper busbars and socketoutlets. Segregatedcompartment type good forhousing different bandcircuits.

5 Steel conduit andtrunking withsingle-core PVCinsulated copperconductors

Light and heavyindustry, areassubject tovandalism

Black enamelled conduit andpainted trunking used in non-corrosive, dry environments.Galvanized finish good formoist/damp or corrosivesituations. May be used asCPC, though separate one ispreferred.

33

Page 34: Wiring Regulations Design and Verification of Electrical Installations

Design

Chart 5 Continued

System/cable type Applications Comments

6 Busbar trunking Light and heavyindustry, risingmains in tallbuildings

Overhead plug-in typeideal for areas wheremachinery may need to bemoved. Arranged in a ringsystem with sectionswitches providesflexibility where regularmaintenance is required.

7 Mineral insulatedcopper sheathed(MICS) cable exposedto touch or PVCcovered. Clippeddirect to a surface orperforated tray or intrunking or ducts

All industrialareas, especiallychemical works,boiler houses,petrol fillingstations, etc.,where harshconditions existsuch asextremes ofheat, moisture,corrosion, etc.,also used forfire alarmcircuits

Very durable, long-lasting,can take considerableimpact before failing.Conductor current carryingcapacity greater than samein other cables. May be runwith circuits of differentcategories in un-segregatedtrunking. Cable referencesystem as follows:CC – Bare copper sheathedMI cableV – PVC coveredM – Low smoke and fume(LSF) material coveredL – Light duty (500 V)H – Heavy duty (750 V)Hence a two-core 2.5 mm2

light duty MI cable withPVC oversheath would beshown: CCV 2L 2.5.

8 F.P. 200. PVCsheathed aluminiumscreened silicon-rubber insulated,copper conductors.Clipped direct tosurface or onperforated tray or runin trunking or ducts

Fire alarm andemergencylighting circuits

Specially designed towithstand fire. May be runwith circuits of differentcategories in non-segregated trunking.

34

Page 35: Wiring Regulations Design and Verification of Electrical Installations

Design

DiversityThe application of diversity to an installation permits, by assumingthat not all loads will be energized at the same time, a reduction inmain or sub-main cable sizes. The IEE Regulations guidance notesor On-Site Guide tabulate diversity in the form of percentages offull load for various circuits in a range of installations. However itis for the designer to make a careful judgement as to the exact levelof diversity to be applied.

Nominal rating or setting of protection InWe have seen earlier that the first requirement for In is that itshould be greater than or equal to Ib. We can select for thiscondition from IEE Regulations Tables 41B1, 41B2 or 41D. Fortypes and sizes outside the scope of these tables, details from themanufacturer will need to be sought.

35

Chart 5 Continued

System/cable type Applications Comments

9 Steel wire armoured.PVC insulated PVCsheathed with copperconductors, clippeddirect to a surface oron cable tray or inducts or underground

Industrial areas,constructionsites,undergroundsupplies, etc.

Combines a certain amountof flexibility withmechanical strength anddurability.

10 As above butinsulation is XLPE.Cross (X) linked (L)poly (P) ethylene (E)

For use in hightemperatureareas

As above.

11 HOFR sheathedcables (heat, oil,flame retardant)

All areas wherethere is a risk ofdamage by heat,oil or flame

These are usually flexiblecords.

Page 36: Wiring Regulations Design and Verification of Electrical Installations

Design

Correction factorsThere are several conditions which may have an adverse effect onconductors and insulation, and in order to protect against this,correction factors (CFs) are applied. These are:

Ca Factor for ambient temperature (From IEE RegulationsTables 4C1 or 4C2)

Cg Factor for groups of cables (From IEE RegulationsTable 4B)

Cf Factor if BS 3036 re-wireablefuse is used

(Factor is 0.725)

Ci Factor if cable is surroundedby thermally insulating material

(IEE Regulations Table 52A)

Application of correction factorsThe factors are applied as divisors to the setting of the protectionIn, the resulting value should be less than or equal to the tabulatedcurrent carrying capacity It of the conductor to be chosen.

It is unlikely that all of the adverse conditions would prevail atthe same time along the whole length of the cable run and henceonly the relevant factors would be applied. Unconsidered applica-tion of correction factors can result in unrealistically largeconductor sizes. Item 6.4, Appendix 4, IEE Regulations refers tothis situation, so consider the following:

1 If the cable in Figure 6 ran for the whole of its length, groupedwith others of the same size in a high ambient temperature, andwas totally surrounded with thermal insulation, it would seemlogical to apply all the CFs, as they all affect the whole cablerun. Certainly the factors for the BS3036 fuse, grouping andthermal insulation should be used. However, it is doubtful if theambient temperature will have any effect on the cable, as thethermal insulation, if it is efficient, will prevent heat reachingthe cable. Hence apply Cg, Cf and Ci .

36

Page 37: Wiring Regulations Design and Verification of Electrical Installations

Design

2 In Figure 7(a) the cable first runs grouped, then leaves thegroup and runs in high ambient temperature, and finally isenclosed in thermal insulation. We therefore have threedifferent conditions, each affecting the cable in different areas.The BS3036 fuse affects the whole cable run and therefore Cf

37

Figure 6

Figure 7

Page 38: Wiring Regulations Design and Verification of Electrical Installations

Design

must be used, but there is no need to apply all of the remainingfactors as the worst one will automatically compensate for theothers. The relevant factors are shown in Figure 7(b) and applyonly if Cf = 0.725 and Ci = 0.5. If protection was not byBS3036 fuse, then apply only Ci = 0.5.

3 In Figure 8 a combination of cases 1 and 2 is considered. Theeffect of grouping and ambient temperature is 0.7 × 0.97 = 0.679.The factor for thermal insulation is still worse than thiscombination, and therefore Ci is the only one to be used.

Tabulated conductor current carrying capacity It

It �In

Ca × Cg × Cf × Ci

Remember, only the relevant factors are to be used!As we have seen when discussing overload protection, the

Regulations permit the omission of such protection in certaincircumstances (473–01–04), in these circumstances, In is replacedby Ib and the formula becomes:

It �Ib

Ca × Cg × Ci

38

Figure 8

Page 39: Wiring Regulations Design and Verification of Electrical Installations

Design

Selection of suitable conductor sizeDuring the early stages of the design, the external influences willhave been considered, and a method of circuit installation chosen.Appendix 4, IEE Regulations Table 4A1 gives examples ofinstallation methods, and it is important to select the appropriatemethod in the current rating tables. For example, from IEERegulations Table 4D2A the tabulated current ratings It forreference method 3 are less than those for method 1. Havingselected the correct cable rating table and relevant referencemethod, the conductor size is determined to correspond with It �the corrected value of In or Ib as is the case.

Voltage dropIn many instances this may well be the most onerous condition toaffect cables sizes. The Regulations require that the voltage at theterminals of fixed equipment should be greater than the lower limitpermitted by the British Standard for that equipment, or in theabsence of a British Standard, that the safe functioning of theequipment should not be impaired. These requirements arefulfilled if the voltage drop between the origin of the installationand the equipment does not exceed 4% of the supply voltage. Thismeans a permitted drop of 9.2 V for a single-phase 230 V supplyand 16 V for a 400 V three-phase supply.

Accompanying the cable current rating tables are tabulatedvalues of voltage drop based on the milli-volts (mV) dropped forevery ampere of design current (A), for every metre of conductorlength (m), i.e.

Volt drop = mV/A/m

or fully translated with Ib for A and L (length in metres):

Volt drop =mV × Ib × length voltss

1000

For conductor sizes in excess of 16 mm2 the impedance valuesof volt drop (columns headed z) should be used. The columns

39

Page 40: Wiring Regulations Design and Verification of Electrical Installations

Design

headed r and x indicate the resistive and reactive components ofthe impedance values.

Evaluation of shock riskThis topic has been discussed earlier, suffice to say that thecalculated value of loop impedance should not exceed thetabulated value quoted for the protective device in question.

Evaluation of thermal constraintsAs we know, the ‘let-through’ energy of a protective device underfault conditions can be considerable and it is therefore necessary toensure that the CPC is large enough either by satisfying therequirements of IEE Regulations Table 54G or by comparing itssize with the minimum derived from the formula:

s =���I2t

k

where: s = minimum csa of the CPCI = fault currentt = disconnection time in secondsk = factor taken from IEE Regulations Tables 54B to 54F

The following examples illustrate how this design procedure is putinto practice.

EXAMPLE 2A consumer has asked to have installed a new 9 kW/230 V showerunit in a domestic premises. The existing eight-way consumer unithouses BS3871 MCBs and supplies two ring final circuits, onecooker circuit, one immersion heater circuit and two lightingcircuits, leaving two spare ways. The earthing system is TN–C–Swith a measured value of Ze of 0.18 ohms, and the length of therun from consumer unit to shower is approximately 28 m. The

40

Page 41: Wiring Regulations Design and Verification of Electrical Installations

Design

installation reference method is method 1, and the ambienttemperature will not exceed 30°C. If flat twin cable with CPC is tobe used, calculate the minimum cable size.

1 Assessment of general characteristicsIn this case, the major concern is the maximum demand. It will needto be ascertained whether or not the increased load can beaccommodated by the consumer unit and the supplier’s equipment.

2 Design current Ib (based on rated values)

Ib =P

V=

9000

230= 39 A

3 Choice and setting of protectionThe type of MCB most commonly found in domestic installationsover 10 years old is a Type 2, and the nearest European standardto this is a Type B. So from IEE Regulations Table 41B2, theprotection would be a 40 A Type B MCB with a correspondingmaximum value of loop impedance Ze of 1.2 �.

4 Tabulated conductor current carrying capacity ItAs a shower is unlikely to cause an overload, Ib may be usedinstead of In.

It �Ib

Ca × Cg × Cf × Ci

but as there are no correction factors,

It � Ib It � 39

41

Page 42: Wiring Regulations Design and Verification of Electrical Installations

Design

5 Selection of conductor sizeAs the cable is to be PVC Twin with CPC, the conductor size willbe selected from IEE Regulations Table 4D2A column 6. Hence It

will be 46 A and the conductor size 6.0 mm2.

6 Voltage dropFrom IEE Regulations Table 4D2B column 3, the mV drop is7.3, so:

Volt drop =mV × Ib × L

1000

=7.3 × 39 × 28

1000= 7.96 V (acceptable)

7 Evaluation for shock riskThe phase conductor of the circuit has been calculated as 6.0 mm2,and a twin cable of this size has a 2.5 mm2 CPC. So, using thetabulated values of R1 and R2 given in tabulated values of resistanceat the end of this book, 28 m of cable would have a resistance underoperating conditions of:

28 × (3.08 + 7.41) × 1.2

1000= 0.35 �

(1.2 = multiplier for 70°C conductor operating temperature) and asZe is 0.18 �, then:

Zs = Ze + R1 + R2

= 0.18 + 0.35

= 0.53 �

Which is clearly less than the maximum value of 1.2 �.

42

Page 43: Wiring Regulations Design and Verification of Electrical Installations

Design

8 Evaluation of thermal constraintsFault current I is found from:

I =Uoc

Zs

Where: Uoc = open circuit voltage at supply transformerZs = calculated value of loop impedance

I =240

0.53= 453 A

t for 450 A from IEE Regulations curves, Figure 3.4 for a 40 A CB isless than 0.1 sec. k from IEE Regulations Table 54C is 115.

s =���I2t

k=

√4532 × 0.1

115= 1.24 mm2

Which means that the 2.5 mm2 CPC is perfectly adequate. It doesnot mean that a 1.24 mm2 CPC could be used.

Hence, provided the extra demand can be accommodated, thenew shower can be wired in 6.0 mm2 flat twin cable with a2.5 mm2 CPC and protected by a 40 A Type B CB.

EXAMPLE 3Four industrial single-phase fan assisted process heaters are to beinstalled adjacent to each other in a factory. Each one is rated at50 A/230 V. The furthest heater is some 32 m from a distributionboard, housing BS88 fuses, located at the intake position. It hasbeen decided to supply the heaters with PVC singles in steeltrunking (reference method 3), and part of the run will be throughan area where the ambient temperature may reach 35°C. Theearthing system is TN–S with a measured Ze of 0.3 �. There isspare capacity in the distribution board, and the maximum demandwill not be exceeded. Calculate the minimum size of liveconductors and CPC.

Calculations will be based on the furthest heater. Also, only onecommon CPC need be used (IEE Regulations 543–01–02(1)).

43

Page 44: Wiring Regulations Design and Verification of Electrical Installations

50 A50 A50 A50 A

Dis

trib

utio

nbo

ard

32 m

Singles in trunking

Heaters

35°CBS88

Ze = 0.3 �

Design

Design current IbIb = 50 A

Type and setting of protection InIn � Ib so, from IEE Regulations Table 41D, a BS 88 50 A fusewould be used with a corresponding value of Zs of 1.09 �.

Correction factorsAs the circuits will be grouped and, for part of the run, in a highambient temperature, both Ca and Cg will need to be used.

Ca for 35°C 0.94 (Table 4C1)Cg for four circuits 0.65 (Table 4B1)

Tabulated current carrying capacity ItAs the heaters are fan assisted, they are susceptible to overload,hence In is used.

It �In

Ca × Cg

�50

0.94 × 0.65

� 82 A

44

Page 45: Wiring Regulations Design and Verification of Electrical Installations

Design

Selection of conductor sizeFrom IEE Regulations Table 4D1A column 4, It = 101 A, and theconductor size is 25.00 mm2.

Voltage dropFrom IEE Regulations Table 4D1B, the mV drop for 25.0 mm2 is1.8 mV.

Volt drop =1.8 × 50 × 32

1000= 2.88 V (acceptable)

Evaluation of shock riskIn this case, as the conductors are singles, a CPC size has to bechosen either from IEE Regulations Table 54G, or by calculation.The former method will produce a size of 16 mm2, whereascalculation tends to produce considerably smaller sizes. Thecalculation involves the rearrangement of the formula:

Zs = Ze + (R1 + R2) × L × 1.2

1000

to find the maximum value of R2 and selecting a CPC size to suit.The value of Zs used will be the tabulated maximum which in thiscase is 1.09 �. The rearranged formula is:

R2 = � (Zs – Ze) × 1000

L × 1.2 � – R1

= � (1.09 – 0.3) × 1000

32 × 1.2 � – 0.727

= 19.84 m�

45

Page 46: Wiring Regulations Design and Verification of Electrical Installations

Design

The nearest value to this maximum is 18.1 m� giving a CPC sizeof 1.0 mm2. This will satisfy the shock risk requirements, but wewill still have to know the actual value of Zs, so:

Zs = 0.3 + (0.727 + 18.1) × 1.2 × 32

1000

= 1.0 �

Evaluation of thermal constraints

Fault current I =Uoc

Zs

=240

1= 240 A

t from 50 A BS88 curve = 3 sk = 115 (IEE Regulations Table 54C)

s =���I2t

k

=√2402 × 3

115

= 3.6 mm2

Hence, our 1.0 mm2 CPC is too small to satisfy the thermalconstraints, and hence a 4.0 mm2 CPC would have to be used. Sothe heaters would be supplied using 25 mm2 live conductors, a4.0 mm CPC and 50 A BS88 protection.

EXAMPLE 4Part of the lighting installation in a new warehouse is to comprisea sub-main supply to a three-phase lighting distribution board fromwhich nine single-phase final circuits are to be fed. The sub-main,protected by BS88 fuses, is to be four-core PVC SWA cable and is

46

Page 47: Wiring Regulations Design and Verification of Electrical Installations

TN–C

–S

BS88

Dis

trib

utio

nbo

ard

Four-core PVC SWA

230/400 V MCB Type C

9 circuits

Z = 0.3e �

14 300 W�

22 m 45 m

Design

22 m long. The armouring will provide the function of the CPC.The distribution board will house BS EN 60898 Type C CBs, andeach final circuit is to supply fourteen 300 W discharge luminaires.The longest run is 45 m, and the wiring system will be singles intrunking, the first few metres of which will house all nine finalcircuits. The earthing system is TN-C-S and the value of Ze

calculated to be 0.2 �. The ambient temperature will not exceed30°C.

Determine all relevant cable/conductor sizes

Design current of each final circuit IbAs each row comprises fourteen 300 W/230 V discharge fittings:

Ib =14 × 300 × 1.8

230

(The 1.8 is the multiplier fordischarge lamps)

= 32.8 A

As the nine circuits will be balanced over three phases, each phasewill feed three rows of fittings.

Ib per phase = 3 × 32.8 = 98.4 A

47

Page 48: Wiring Regulations Design and Verification of Electrical Installations

Design

Sub-main design current IbSub-main Ib per phase = 98.4 A

Nominal rating of protection InIn � Ib so, from IEE Regulations Table 41D the protection will be100 A with a maximum loop impedance Zs of 0.44 �.

Correction factorsNot applicable.

Tabulated current carrying capacity ItDischarge units do cause short duration overloads at start-up, so itis perhaps best to use In rather than Ib.

It � In

� 100 A

Cable selectionFrom IEE Regulations Table 4D4A column 3, It = 102 A, givinga cable size of 25 mm2.

Voltage dropFrom IEE Regulations Table 4D4B column 4, the mV drop is 1.5.

Volt drop =1.5 × 98.4 × 22

1000= 3.23 V (acceptable)

This is the three-phase drop, the single phase being:

3.23

√3= 1.87 V

48

Page 49: Wiring Regulations Design and Verification of Electrical Installations

Design

Evaluation of shock riskCable manufacturer’s information shows that the resistance of thearmouring on a 25 mm2 four-core cable is 2.1 m�/m. Hence,R1 = 0.727 m�, and R2 = 2.1 m�.

Zs = 0.2 + (0.727 + 2.1) × 22 × 1.2

1000= 0.274 �

Clearly ok, as Zs maximum is 0.44 �.

Thermal constraints

I =UOC

Zs

=240

0.274= 875 A

t = 0.6 (from BS88 curve for 100 A)

k = 51 (IEE Regulations Table 54D)

s =√8752 × 0.6

51= 13.3 mm2

Manufacturer’s information gives the gross csa of 25 mm2 four-core SWA cable as 76 mm2. Hence the armouring provides a goodCPC.

If we had chosen to use IEE Regulations Table 54G to determinethe minimum size it would have resulted in:

s =16 × k1

k2

=16 × 115

51= 36 mm2

which still results in a smaller size than will exist.

Final circuits design current IbIb = 32.8 A (calculated previously)

49

Page 50: Wiring Regulations Design and Verification of Electrical Installations

Design

Setting of protection InFrom IEE Regulations Table 41B2 (h) In � Ib = 40 A with acorresponding value for Zs of 0.6 �.

Correction factorsOnly grouping needs to be considered:

Cg for nine circuits = 0.5 (IEE Regulations Table 4B1)

Tabulated current carrying capacity It

It �In

Cg

�40

0.5� 80 A

Cable selectionFrom IEE Regulations Table 4D1A It � 80 A = 101 A andconductor size will be 16 mm2.

Voltage dropThe assumption that the whole of the design current of 32.8 A willflow in the circuit would be incorrect, as the last section will onlydraw:

32.8

14= 2.34 A

the section previous to that 4.68 A, the one before that 7.02 A and soon, the total volt drop being the sum of all the individual volt drops.However, this is a lengthy process and for simplicity the volt drop inthis case will be based on 32.8 A over the whole length.

From IEE Regulations Table 4D1B column 3, the mV drop fora 25 mm2 conductor is 2.8 mV.

Volt drop =1.8 × 32.8 × 45

1000= 2.6 V

50

Page 51: Wiring Regulations Design and Verification of Electrical Installations

Design

Add this to the sub-main single-phase drop, and the total will be:

1.87 + 2.6 = 4.47 V (acceptable)

Shock risk constraints

Zs = Zc + (R1 + R2) × L × 1.2

1000

In this case Ze will be the Zs value for the sub-main.Rearranging as before, to establish a minimum CPC size, we get:

R2 = � (Zs – Ze) × 1000

length × 1.2 � – R2 (for 25 mm2)

=(0.6 – 0.262) × 1000

45 × 1.2– 0.727

= 5.53 m�

Therefore, the nearest value below this gives a size of 4.0 mm2:

Actual Zs = 0.262 + (0.727 + 4.61)

1000× 45 × 1.2

= 0.55 � (less than the maximum of 0.75 �)

Thermal constraints

I =UOC

Zs

=240

0.55= 436 A

t from Type C CB curve for 32 A = is less than 0.1 sk = 115 (IEE Regulations Table 54C)

s =√4362 × 0.1

115= 1.19 mm

Hence our 4.0 mm2 CPC is adequate.

51

Page 52: Wiring Regulations Design and Verification of Electrical Installations

Design

So, the calculated cable design details are as follows:

Sub-main protection 100 A BS88 fusesSub-main cable 25 mm2 four-core SWA with armour

as the CPC

Final circuit protection 32 A Type C, BS EN 60898 MCBFinal circuit cable 25 mm2 singles with 4.0 mm2 CPC

Condult and trunking sizesPart of the design procedure is to select the correct size of conduitor trunking. The basic requirement is that the space factor is notexceeded and in the case of conduit, that cables can be easilydrawn in without damage.

For conduit, the requirement is that the space occupied byconductors should not exceed 40% of the internal conduit area. Fortrunking, the figure is 45%. The IEE Regulations Guidance Notes/On-Site-Guide give a series of tables which enable the designer toselect appropriate sizes by the application of conductor/conduit/trunking terms. This is best illustrated by the followingexamples.

EXAMPLE 5What size straight 2.5 m long conduit would be needed toaccommodate ten 2.5 mm2 and 5 1.5 mm2 stranded conductors?

Tabulated cable term for 1.5 mm2 stranded = 31Tabulated cable term for 2.5 mm2 stranded = 43

31 × 5 = 15543 × 10 = 430

Total = 585

The corresponding conduit term must be equal to or greater thanthe total cable term. Hence the nearest conduit term to 585 is 800which gives a conduit size of 25 mm2.

52

Page 53: Wiring Regulations Design and Verification of Electrical Installations

Design

EXAMPLE 6How many 4.0 mm2 stranded conductors may be installed in astraight 3 m run of 25 mm conduit?

Tabulated conduit term for 25 mm2 = 800Tabulated cable term for 4.0 mm2 = 58

Number of cables =800

58= 13.79

Hence thirteen 4.0 mm conductors may be installed.

EXAMPLE 7What size conduit 6 m long and incorporating two bends would beneeded to house eight 6.0 mm2 conductors?

Tabulated cable term for 6.0 mm2 = 58Overall cable term = 58 × 8 = 464

Nearest conduit term above this is 600, giving 32 mm2 conduit.

EXAMPLE 8What size trunking would be needed to accommodate twenty-eight10 mm2 conductors?

Tabulated cable term for 10 mm2 36.3Overall cable term 36.3 × 28 = 1016.4

Nearest trunking term above this is 1037, giving 50 mm × 50 mmtrunking.

EXAMPLE 9What size of trunking would be required to house the followingconductors:

20–1.5 mm2 stranded35–2.5 mm2 stranded28–4.0 mm2 stranded

53

Page 54: Wiring Regulations Design and Verification of Electrical Installations

Design

Tabulated cable term for 1.5 mm2 = 8.1Tabulated cable term for 2.5 mm2 = 11.4Tabulated cable term for 4.0 mm2 = 15.2

Hence 8.1 × 20 = 16211.4 × 35 = 39915.2 × 28 = 425.6

Total = 986.6

The nearest trunking term is 993 giving 100 mm × 225 mm trunking,but it is more likely that the more common 50 mm × 250 mmwould be chosen.

NoteIt is often desirable to make allowance for future additions totrunking systems, but care must be taken to ensure that extracircuits do not cause a change of grouping factor which could thende-rate the existing conductors below their original designedsize.

DrawingsHaving designed the installation it will be necessary to record thedesign details either in the form of a schedule for smallinstallations or on drawings for the more complex installation.These drawings may be of the block, interconnection, layout, etc.,type. The following figures indicate some typical drawings.

Note the details of the design calculations shown on Figure 11,all of which is essential information for the testing and inspectionprocedure.

With the larger types of installation, an alphanumeric system isvery useful for cross reference between block diagrams and floorplans showing architectural symbols. Figure 12 shows such asystem.

Distribution board 3 (DB3) under the stairs would haveappeared on a diagram such as Figure 10, with its final circuitsindicated. The floor plan shows which circuits are fed from DB3,and the number and phase colour of the protection. For example,

54

Page 55: Wiring Regulations Design and Verification of Electrical Installations

Lighting DBL2

Lighting DBL1

TP&NBS 88 fuses

TP&NBS 88 fuses

32 A

Isolator

32 A

IsolatorLighting DB

L3

TP&NBS 88 fuses

32 A

Isolator

DBA

TP&NBS 88 fuses

63 A

Isolator

DBB

TP&NBS 88 fuses

63 A

Isolator Section DBL

TP&NBS 88 fuses

100 ATP&N

FS

32 ATP&N

FS

Boilerhouse

63 ATP&N

FS

63 ATP&N

FS

100 ATP&N

FS

CompressorSection DBL

TP&NBS 88 fuses

200 ATP&N

FS

20 ASP&N

FS

Firealarm

Busbar 1

Busbar 2

Busbar 3

Busbar 4

630 ATP&N

FS

Busbar chamberMain switchgear

DBFS

distribution boardfuse switch

BB

SF

SFBBSF

DB

DB

DB

RYBNBYBN

RYBN

R

NB

NY

N

HLPHLPHLP

M M M

M MMM

M

M

MMM

TP&Nswitch-fuse

Overheadtap-offbusbartrunking(ring main)feedingsingle- andthree-phasemotors

Heating,lightingand powerfinalsubcircuitsbalancedoverthreephasesMain

switch-fuseor circuitbreaker

Busbarchamber

TP&Nswitch-fuse

Busbarchamber Distribution

boards

Sub-maincables(usually PVCarmoured)

Design

55

Figure 9Layout of industrialinstallation

Figure 10Distribution system,block type

Page 56: Wiring Regulations Design and Verification of Electrical Installations

DB 2C DB 2D

M

26m

26m

DB 1C

23m

DB 1D

M

23m

CCAMDVDELIPFC

38281.62 V0.166.03 kA

6952

6750

CCAMDVDELIPFC

550.7 V0.24.09 kA

10.7510.75

88

CCAMDVDELIPFC

14.514.50.83 V0.194.39 kA

11.7511.75

5.55.5

CCAMDVDELIPFC

69.5521.43 V0.156.32 kA

6750

3829

8

DB GBM

12

3C 23 mm XLPE/SWA/PVC2

4C 35 mm XLPE/SWA/PVC2

4C 16 mm XLPE/SWA/PVC2

4C 16 mm XLPE/SWA/PVC2

3C 4 mm PVC/SWA/PVC2

2

CCAMDVDELIPFC

5401.92 V0.174.8 kA

2925

3835

To GA

30 m

4C 25 mm XLPE/SWA/PVC2

624 mTelephoneexchange panel

3C 4 mmPVC/SWA/PVC

2

DB GCM

Essential

DB COM

CCAMDOngenerator

R150.29067

Y152.791.271

B145.18768

CCAMDVDELIPFC

4.44.40.5 V0.213.7 kA

6.56.5

4.34.3

To GA

2

4C 70 mm XLPE/SWA/PVC1

2

C 35 mm PVC/SWA/PVC2

4C 16 mm XLPE/SWA/PVC2

30 m

3C 16 mm PVC/SWA/PVC2

3 m

CCAMDVDELIPFC

12A6A0.5 V0.0938.5 kA

Design

56

Figure 11 Distribution system, interconnection type

CC = Circuit currentAMD = Assumed maximum demandVD = Volt dropELI = Earth loop impedancePFC = Prospective fault or short-circuit current

Page 57: Wiring Regulations Design and Verification of Electrical Installations

Design

57

Figure 12 Example floor plan

Page 58: Wiring Regulations Design and Verification of Electrical Installations

Design

58

Figure 13 Isometric drawing for garage/workshop

1 Three-phase supply to ramp: 20 mm2 conduit2 Single-phase supply to double sockets: 20 mm2 conduit. Also 3, 5, 6, 9,

11, 134 Single-phase supply to light switch in store: 20 mm2 conduit7 Single-phase supply to light switch in compressor: 20 mm2 conduit8 Three-phase supply to compressor: 20 mm2 conduit

10 Single-phase supply to heater in WC: 20 mm2 conduit12 Single-phase supply to light switch in WC: 20 mm2 conduit14 Single-phase supply to light switch in office: 20 mm2 conduit15 Main intake position16 Single-phase supplies to switches for workshop lights: 20 mm2 conduit17 50 mm × 50 mm steel trunking18 Supplies to fluorescent fittings: 20 mm2 conduit

Page 59: Wiring Regulations Design and Verification of Electrical Installations

B3

Y3

R3

Workshop

3

B42

B42RYB11

R4

Store

R5

2

R5

2Compressor room

2Y5 Y5

R4 Office

2 Y52 2

R4R4

Y4

W/C

RYB2RYB2

Design

the fluorescent lighting in the main entrance hall is fed from fuseor MCB 1 on the red phase of DB3, and is therefore marked DB3/R1. Similarly, the water heater circuit in the female toilets is fedfrom fuse or MCB 2 on the yellow phase, i.e. DB3/Y2.

Figures 13, 14, and 15 illustrate a simple but complete schemefor a small garage/workshop. Figure 13 is an isometric drawing ofthe garage and the installation, from which direct measurementsfor materials may be taken. Figure 14 is the associated floor plan,which cross-references with the DB schedule and interconnectiondetails shown on Figure 15.

59

Figure 14 Floor plan for garage/workshop

Page 60: Wiring Regulations Design and Verification of Electrical Installations

R1 3 10 A

Y1

B1

R2

Y2

B2

R3

Y3

B3

R4

Y4

B4

R5

Y5

B5

R6

Y6

B6

3

3

3

3

3

2

2

2

2

2

2

2

2

10 A

10 A

30 A

30 A

30 A

10 A

10 A

10 A

10 A

15 A

30 A

30 A

30 A

Three-phasesupply to

ramp

Three-phasesupply to

compressor

WS lighting 4

WS lighting 2

WS lighting 3

Office, WC, storeand compressor

room lighting

WC, water heater

SOs 2 and 3,radial

SOs 5 and 6,radial

SOs 9, 11 and 13,radial

TN–S

I

Zp

c

= 3 kA

= 0.4 �

100 A DB with main switchprotection by MCB

M

10 A

10 A

Isolator3 1.5 mm singles + 1 mm CPC� 2 2

3 10 mm singles + 1.5 mm CPC� 2 2

M

28 A

30 A

Isolator

2 1.5 mm singles + 1 mm CPC� 2 23 125 W 2000 mmdoubles

2 1.5 mm singles + 1 mm CPC� 2 23 125 W 2000 mmdoubles

2 1.5 mm singles + 1 mm CPC� 2 2

2 1.5 mm singles + 1 mm CPC� 2 2

3 125 W 2000 mmdoubles

3 125 W 2000 mm and8doubles

�80 W 1200 mm�

2 2.5 mm singles + 1 mm CPC� 2 2

Fused spur box

2 6.0 mm singles + 1.5 mm CPC� 2 2 2 2

2 6.0 mm singles + 1.5 mm CPC� 2 2

2 6.0 mm singles + 1.5 mm CPC� 2 2

2

2

2

2 2

Type

Design

60

Figure 15 Details of connection diagram for garage/workshop

Page 61: Wiring Regulations Design and Verification of Electrical Installations

2INSPECTION AND

TESTING

This is the subject of Part 7 of the IEE Regulations, and opens withthe statement to the effect that it must be verified that allinstallations, before being put into service, comply with theRegulations, i.e. BS 7671. The author interprets the comment‘before being put into service by the user’ as before being handedover to the user, not, before the supply is connected. Clearly asupply is needed to conduct some of the tests.

The opening statement also indicates that verification ofcompliance be carried out during the erection of the installationand after it has been completed. In any event, certain criteria mustbe observed.

1 The test procedure must not endanger persons, livestock orproperty.

2 Before any inspection and testing can even start, the personcarrying out the verification must be in possession of all therelevant information and documentation. In fact the installationwill fail to comply without such information (IEE Regulations712–01–03 xvii). How, for example, can a verifier accept thatthe correct size conductors have been installed, without designdetails (IEE Regulations 712–01–03 iv)?

61

Page 62: Wiring Regulations Design and Verification of Electrical Installations

Inspection and testing

So, let us start, as they say, at the beginning. Armed with theresults of the Assessment of General Characteristics, the designer’sdetails, drawings, charts, etc., together with test instruments, theverification process may proceed.

InspectionUsually referred to as a visual inspection, this part of the procedureis carried out against a check list as detailed in the IEE Regulations,section 712 (Appendix 6), and in the Guidance Notes 3 forinspection and testing. Much of the initial inspection will involveaccess to enclosures housing live parts, hence, those parts of theinstallation being tested should be isolated from the supply.

Naturally, any defects found must be rectified before instrumenttests are performed.

TestingThis involves the use of test equipment and there are severalimportant points to be made in this respect.

1 Electronic instruments must conform to BS4743 and electricalinstruments to BS5458.

2 The Electricity at Work Regulations 1989 state an absoluterequirement in Regulation 4(4), that test equipment be main-tained in good condition. Hence it is important to ensure thatregular calibration is carried out.

3 Test leads should have shrouded/recessed ends and/or when oneend is a probe, it should be insulated to within 2 mm of the tipand have finger guards.

4 Test lamps should be of the approved type.

Selection of test equipmentAs has been mentioned, instruments must comply with the relevantBritish Standard, and provided they are purchased from estab-lished bona fide instrument manufacturers, this does not present a

62

Page 63: Wiring Regulations Design and Verification of Electrical Installations

Inspection and testing

problem. There is a range of instruments needed to carry out all thestandard installation tests, and some manufacturers produceequipment with dual functions, indeed there are now singleinstruments capable of performing all the fundamental tests.

Chart 6 indicates the basic tests and the instruments required.

Approved test lamps and indicatorsSearch your tool boxes: find, with little difficulty one wouldsuspect, your ‘neon screwdriver’ or ‘testascope’; locate a verydeep pond; and drop it in!

63

Chart 6

Test Range Type of instrument

1 Continuity of ringfinal conductors

0.05 to 0.8 � Low resistanceohmmeter

2 Continuity ofprotectiveconductors

2 to 0.005 �or less

Low resistanceohmmeter

3 Earth electroderesistance

Any value overabout 3 to 4 �

Special ohmmeter

4 Insulationresistance

Infinity to lessthan 1 m�

High resistanceohmmeter

5 Polarity None Ohmmeter, bell, etc.

6 Earth fault loopimpedance

0 to 2000 � Special ohmmeter

7 Operation of RCD 5 to 500 mA Special instrument

8 Prospective short-circuit current

2 A to 20 kA Special instrument

Page 64: Wiring Regulations Design and Verification of Electrical Installations

Opaque cover

Lamp

Insulated lead

Resistor

Spring

Fuse

Outercasing totally

insulated

2 mmexposed tip

Inspection and testing

Imagine actually allowing electric current at low voltage (50 to1000 V ac) to pass through one’s body in order to activate a testlamp! It only takes around 10 to 15 mA to cause severe electricshock, and 50 mA (1/20th of an ampere) to kill.

Apart from the fact that such a device will register any voltagefrom about 5 V upwards, the safety of the user depends entirely onthe integrity of the current limiting resistor in the unit. Anelectrician received a considerable shock when using such aninstrument after his apprentice had dropped it in a sink of water,simply wiped it dry and replaced it in the tool box. The water hadseeped into the device and shorted out the resistor.

An approved test lamp should be of similar construction to thatshown in Figure 16.

64

Figure 16 Approved test lamp

Page 65: Wiring Regulations Design and Verification of Electrical Installations

Inspection and testing

The following procedure is recommended when using approvedtest lamps to check that live parts have been made dead:

1 Check that the test lamp is in good condition and the leadsare undamaged. (This should be done regardless of the purposeof use.)

2 Establish that the lamp is sound by probing onto a known supply.This is best achieved by using a proving unit. This is simply apocket-sized device which electronically produces 230 V dc.

3 Carry out the test to verify the circuit is dead.4 Return to the proving unit and check the lamp again.

It has long been the practice when using a test lamp to probebetween phase and earth for an indication of a live supply on thephase terminal. However, this can now present a problem whereRCDs exist in the circuit, as of course the test is applying adeliberate phase-to-earth fault.

Some test lamps have LED indicators, and the internal circuitryof such test lamps limits the current to earth to a level below thatat which the RCD will operate. The same limiting effect applies tomultimeters. However, it is always best to check that the testingdevice will have no effect on RCDs.

Calibration, zeroing and care of instrumentsPrecise calibration of instruments is usually well outside theprovince of the electrician, and would normally be carried out bythe manufacturer or local service representative. A check,however, can be made by the user to determine whether calibrationis necessary by comparing readings with an instrument known tobe accurate, or by measurement of known values of voltage,resistance, etc. However, as we have already seen, regularcalibration is a legal requirement.

It may be the case that readings are incorrect simply because theinstrument is not zeroed before use, or because the internal batteryneeds replacing. Most modern instruments have battery conditionindication, and of course this should never be ignored.

65

Page 66: Wiring Regulations Design and Verification of Electrical Installations

Inspection and testing

Always adjust any selection switches to the off position aftertesting. Too many instrument fuses are blown when, for example,a multimeter is inadvertently left on the ohms range and then usedto check for mains voltage.

The following set procedure may seem rather basic but shouldensure trouble-free testing:

1 Check test leads for obvious defects.2 Zero the instrument.3 Select the correct range for the values anticipated. If in doubt,

choose the highest range and gradually drop down.4 Make a record of the test results.5 When a no reading is expected and occurs (or, in the case of

insulation resistance, an infinite reading), make a quick check onthe test leads just to ensure that they are not open circuited.

6 Return switches/selectors to the off position.7 Replace instrument and leads in carrying case.

The testsThe IEE Regulations indicate a preferred sequence of tests andstate that if, due to a defect, compliance cannot be achieved, thedefect should be rectified and the test sequence started from thebeginning. The tests for ‘Site applied insulation’, ‘Protection byseparation’, and ‘Insulation of non-conducting floors and walls’ allrequire specialist high voltage equipment and in consequence willnot be discussed here. The sequence of tests for an initialinspection and test is as follows:

1 Continuity of protective conductors2 Continuity of ring final circuit conductors3 Insulation resistance4 Protection against direct contact by barriers or enclosures5 Polarity6 Earth electrode resistance7 Earth fault loop impedance8 Prospective fault current.9 Functional testing.

66

Page 67: Wiring Regulations Design and Verification of Electrical Installations

Inspection and testing

One other test not included in Part 7 of the IEE Regulations butwhich nevertheless has to be carried out, is external earth faultloop impedance.

Continuity of protective conductorsThese include the CPCs of radial circuits, main and supplementarybonding conductors. Two methods are available, either can be usedfor CPCs, but bonding can only be tested by the second.

Method 1At the distribution board, join together the phase conductor and itsassociated CPC. Using a low resistance ohmmeter, test betweenphase and CPC at all the outlets in the circuit. The reading at thefarthest point will be (R1 + R2) for that circuit. Record this value,as after correction for temperature, it may be compared with thedesigner’s value (more about this later).

Method 2Connect one test instrument lead to the main earthing terminal, anda long test lead to the earth connection at all the outlets in the circuit.Record the value after deducting the lead resistance. An idea of thelength of conductor is valuable, as the resistance can be calculatedand compared with the test reading. Table 2 gives resistance valuesalready calculated for a range of lengths and sizes.

It should be noted that these tests are applicable only to ‘allinsulated’ systems, as installations using conduit, trunking, MICCand SWA cables will produce spurious values due to the probableparallel paths in existence. This is an example of when testingneeds to be carried out during the erection process before finalconnections and bonding are in place.

If conduit, trunking or SWA is used as the CPC, then theverifier has the option of first inspecting the CPC along itslength for soundness then conducting the long-lead resistancetest. If the inspector is not happy with the result, he would carry

67

Page 68: Wiring Regulations Design and Verification of Electrical Installations

Inspection and testing

out a high current test using a proprietary instrument thatdelivers a test current of 1.5 times the design current up to 25 Aat a voltage of 50 V.

Continuity of ring final circuit conductorsThe requirement of this test is that each conductor of the ring iscontinuous. It is, however, not sufficient to simply connect anohmmeter, a bell, etc., to the ends of each conductor and obtain areading or a sound.

So what is wrong with this procedure? A problem arises if aninterconnection exists between sockets on the ring, and there is abreak in the ring beyond that interconnection. From Figure 17 it willbe seen that a simple resistance or bell test will indicate continuityvia the interconnection. However, owing to the break, sockets 4 to11 are supplied by the spur from socket 12 – not a healthy situation.So how can one test to identify interconnections?

There are at present three methods of conducting such a test.Two are based on the principle that resistance changes with achange in length or csa; the other relies on the fact that theresistance measured across any diameter of a circular loop ofconductor is the same. Let us now consider the first two.

68

Table 2 Resistance (�) of copper conductors at 20°C

csa(mm2)

Length (metres)

5 10 15 20 25 30 35 40 45 50

1.0 0.09 0.18 0.27 0.36 0.45 0.54 0.63 0.72 0.82 0.901.5 0.06 0.12 0.18 0.24 0.30 0.36 0.42 0.48 0.55 0.612.5 0.04 0.07 0.11 0.15 0.19 0.22 0.26 0.30 0.33 0.374.0 0.023 0.05 0.07 0.09 0.12 0.14 0.16 0.18 0.21 0.236.0 0.02 0.03 0.05 0.06 0.08 0.09 0.11 0.13 0.14 0.16

10.0 0.01 0.02 0.03 0.04 0.05 0.06 0.07 0.08 0.09 0.1016.0 0.006 0.01 0.02 0.023 0.03 0.034 0.04 0.05 0.051 0.0625.0 0.004 0.007 0.01 0.015 0.02 0.022 0.026 0.03 0.033 0.0435.0 0.003 0.005 0.008 0.01 0.013 0.016 0.019 0.02 0.024 0.03

Page 69: Wiring Regulations Design and Verification of Electrical Installations

X Y Z

R1

�R2

X YZ

Inspection and testing

Method 1If we were to take a length of conductor XYZ and measure theresistance between its ends (Figure 18), then double it over at Y,join X and Z, and measure the resistance between XZ and Y(Figure 19), we would find that the value was approximately aquarter of the original. This is because the length of the conductoris halved and hence so is the resistance, and the csa is doubled andso the resistance is halved again.

69

Figure 17 Ring circuit with interconnection

Figure 18

Figure 19

Page 70: Wiring Regulations Design and Verification of Electrical Installations

A B C

R1

X Y Z

R1

Inspection and testing

In order to apply this principle to a ring final circuit, it isnecessary to know the position of the socket nearest the mid-pointof the ring. The test procedure is then as follows for each of theconductors of the ring:

1 Measure the resistance of the ring conductor under test betweenits ends before completing the ring in the fuse board. Record thisvalue, say R1.

2 Complete the ring.3 Using long test leads, measure between the completed ends and

the corresponding terminal at the socket nearest the mid-point ofthe ring. Record this value, say R2. (The completed endscorrespond to point XZ in Figure 19, and the mid-point to Y.)

4 Measure the resistance of the test leads, say R3, and subtract thisvalue from R2, i.e. R2 – R3 = R4 say.

5 A comparison between R1 and R4 should reveal, if the ring ishealthy, that R4 is approximately a quarter of R1.

Method 2The second method tests two ring circuit conductors at once, andis based on the following.

Take two conductors XYZ and ABC and measure theirresistances (Figure 20). Then double them both over, join the endsXZ and AC and the mid-points YB, and measure the resistancebetween XZ and AC (Figure 21). This value should be a quarter ofthat for XYZ plus a quarter of that for ABC.

If both conductors are of the same length and csa, the resultantvalue would be half that for either of the original resistances.

70

Figure 20

Page 71: Wiring Regulations Design and Verification of Electrical Installations

X Y A

R2

Z C

B

R R2 1� ½

Inspection and testing

Applied to a ring final circuit, the test procedure is asfollows:

1 Measure the resistance of both phase and neutral conductorsbefore completion of the ring. They should both be the samevalue, say R1.

2 Complete the ring for both conductors, and bridge togetherphase and neutral at the mid-point socket (this corresponds topoint YB in Figure 21). Now measure between the completedphase and neutral ends in the fuse board (points XZ and AC inFigure 21). Record this value, say R2.

3 R2 should be, for a healthy ring, approximately half of R1 foreither phase or neutral conductor. When testing the continuity ofa CPC which is a different size from either phase or neutral, theresulting value R2 should be a quarter of R1 for phase or neutralplus a quarter of R1 for the CPC.

Method 3The third method is based on the measurement of resistance atany point across the diameter of a circular loop of conductor(Figure 22).

As long as the measurement is made across the diameter of thering, all values will be the same. The loop of conductor is formedby crossing over and joining the ends of the ring circuit conductorsat the fuse board. The test is conducted as follows:

71

Figure 21

Page 72: Wiring Regulations Design and Verification of Electrical Installations

R �

N1CPC CPC

N2P1 P2

�N1

CPC CPC

N2P1 P2

Inspection and testing

1 Identify both ‘legs’ of the ring.2 Join one phase and one neutral conductor of opposite legs of the

ring.3 Obtain a resistance reading between the other phase and neutral

(Figure 23). (A record of this value is important.)4 Join these last two conductors (Figure 24).5 Measure the resistance value between P and N at each socket on

the ring. All values should be the same, approximately a quarterof the reading in (3) above.

72

Figure 22

Figure 23 Figure 24

Page 73: Wiring Regulations Design and Verification of Electrical Installations

C B A F E D

D E F A B C

0.1 0.3 0.2 0.2 0.30.5

0.3 0.2 0.5 0.3 0.10.2

Phaseloop0.4 0.4

Neutralloop

P1 N2

P2 N1

Inspection and testing

The test is now repeated but the neutral conductors are replaced bythe CPCs. If the cable is twin with CPC, the CPC size will be smallerthan the phase conductor, and although the readings at each socketwill be substantially the same, there will be a slight increase invalues towards the centre of the ring, decreasing back towards thestart. The highest reading represents R1 + R2 for the ring.

The basic principle of this method is that the resistancemeasured between any two points, equidistant around a closedloop of conductor, will be the same.

Such a loop is formed by the phase and neutral conductors of aring final circuit (Figure 25).

Let the resistance of conductors be as shown.R measured between P and N on socket A will be:

0.2 + 0.5 + 0.2 + 0.3 + 0.4 + 0.1 + 0.3

2=

2

2= 1 �

R measured between P and N at socket B will be:

0.3 + 0.2 + 0.5 + 0.2 + 0.3 + 0.4 + 0.1

2=

2

2= 1 �

Hence all sockets on the ring will give a reading of 1 � betweenP and N.

73

Figure 25

Page 74: Wiring Regulations Design and Verification of Electrical Installations

C B A F E D

D E F A B C

Phaseloop

Neutralloop Interconnection

N2 P2

N2 P1

Inspection and testing

If there were a break in the ring in, say, the neutral conductor, allmeasurements would have been 2 �, incorrectly indicating to thetester that the ring was continuous. Hence step 3 in the testprocedure which at least indicates that there is a continuous P–Nloop, even if an interconnection exists. Figure 26 shows a healthyring with interconnection.

Here is an example that shows the slight difference betweenmeasurements on the phase/CPC test. Consider a 30 m ring finalcircuit wired in 2.5 mm2 with a 1.5 mm2 CPC. Figure 27 illustratesthis arrangement when cross-connected for test purposes.

74

Figure 26 Healthy ring with interconnection. Sockets A, B and F will giveidentical readings. C, E and D will not.

Figure 27

Page 75: Wiring Regulations Design and Verification of Electrical Installations

40 Vto

50 VLamp

Supply

Live parts

Joints

Enclosure

Inspection and testing

From the resistance tables, 1.5 mm2 conductor is seen to have aresistance of 12.1 m�/m, and 2.5 mm2, 7.27 m�/m. This gives theresistance from X to A as 15 × 12.1/1000 = 0.1815 � and from Xto B as 15 × 7.27/1000 = 0.109 �. The same values apply from Yto A and Y to B.

So measuring across X and Y we have 2 × 0.1815 = 0.363 inparallel with 2 × 0.109 = 0.218/(0.37 + 0.218) product over sum =0.137 �.

Measuring across A and B (the mid-point) gives 0.1815 + 0.109= 0.29, in parallel with the same value, i.e. 0.29, which gives0.29/2 = 0.145 �.

While there is a difference (0.008 �) the amount is too small tosuggest any faults on the ring.

Protection against direct contact by barriers orenclosuresIf an enclosure/barrier is used to house or obscure live parts, andis not a factory-built assembly, it must be ascertained whether ornot it complies with the requirements of the IP codes IP2X,IPXXB or IP4X. For IP2X and IPXXB, the test is made using the

75

Figure 28

Page 76: Wiring Regulations Design and Verification of Electrical Installations

Inspection and testing

British Standard Finger, which is connected in series with a lampand a supply of not less than 40 V and not more than 50 V. The testfinger is pushed into or behind the enclosure/barrier and the lampshould not light (Figure 28).

The test for IP4X is made with a 1.0 mm diameter wire with itsend bent at right angles. The wire should not enter the enclosure.

Insulation resistanceAn insulation resistance tester, which is a high resistanceohmmeter, is used for this test. The test voltages and minimumM� values are as follows:

ELV circuits(SELV and PELV)

LV circuitsup to 500 V

LV circuitsabove 500 V

V M V M V M250 0.25 500 0.5 1000 1

Clearly with voltages of these levels, there are certain precautionsto be taken prior to the test being carried out. Persons should bewarned, and sensitive electronic equipment disconnected orunplugged. A common example of this is the dimmer switch. Also,as many accessories have indicator lamps, and items of equipmentsuch as fluorescent fittings have capacitors fitted, these should bedisconnected as they will give rise to false readings.

The test procedure is as follows:

Poles to earth (Figure 29)

1 Isolate supply2 Ensure that all protective devices are in place and all switches

are closed3 Link all poles of the supply together (where appropriate)4 Test between the linked poles and earth.

76

Page 77: Wiring Regulations Design and Verification of Electrical Installations

Inspection and testing

Between poles (Figure 30)

1 As previous test2 As previous test3 Remove all lamps, equipment, etc.4 Test between poles.

Test results on disconnected equipment should conform to therelevant British Standard for that equipment. In the absence of aBritish Standard, the minimum value is 0.5 m�.

77

Figure 29

Figure 30

Page 78: Wiring Regulations Design and Verification of Electrical Installations

Inspection and testing

For small installations, the tests are performed on the wholesystem, whereas for larger complex types, the installation may besub-divided into sections and tests performed on each section. Thereason for this is that as conductor insulation and the circuits theysupply are all in parallel, a test on the whole of a large installationwould produce pessimistically low readings even though no faultsexist.

Although for standard 400 V/230 V installations the minimumvalue of insulation resistance is 0.5 m�, a reading of less than2 m� should give rise to some concern. Circuits should be testedindividually to locate the source of such a low reading. If this testreveals all circuits to be above 2 M�, this is satisfactory.

PolarityIt is required that all fuses and single-pole devices such as single-pole MCBs and switches are connected in the phase conductoronly. It is further required that the centre contact of Edison screwlamp holders be connected to the phase conductor and that socketoutlets and similar accessories are correctly connected.

Ring final circuitsIf method 3 for testing ring circuit conductor continuity wasperformed, then any cross polarity would have shown itself andbeen rectified. Hence no further test is necessary. However, ifmethod 1 or 2 were used, and the mid-point socket was correct,reversals elsewhere in the ring would not be detected and thereforetwo tests are needed.

1 Link completed phase and CPC loops together at the fuse boardand test between P and E at each socket. A nil reading willindicate a reversed polarity (Figure 31).

2 Repeat as in 1, but with P and N linked.

Radial circuitsFor radial circuits, the test method 1 for continuity of protectiveconductors will have already proved correct polarity. It justremains to check the integrity of the neutral conductor for socket

78

Page 79: Wiring Regulations Design and Verification of Electrical Installations

Inspection and testing

outlet circuits, and that switch wires and neutrals are not mixed atlighting points. This is done by linking P and N at the fuse boardand testing between P and N at each outlet and between N andswitch wire at each lighting point.

Also for lighting circuits, to test for switches in phaseconductors, etc., link P and E at the fuse board and test as shownin Figure 32.

79

Figure 31

Figure 32 Polarity test on lighting circuit

Page 80: Wiring Regulations Design and Verification of Electrical Installations

Inspection and testing

Earth fault loop impedance

External loop impedance ZeThis is carried out by connecting an earth fault loop impedancetester between the phase conductor and the main earthing terminalat the intake position with the main bonding conductors discon-nected. This ensures that parallel resistance paths will not affectthe reading. Great care must be taken when conducting this test, asthe installation has to be energized and probes and/or clips are usedto make contact, also the installation is not earthed for the durationof the test. When the test is completed reconnect the bonding.

Total loop impedance ZsThis has to be measured in order to ensure that protective deviceswill operate in the specified time under fault conditions. As thevalue of (R1 + R2) for a particular circuit will have already beenestablished, Zs may be found by simply adding the (R1 + R2) value toZe. Alternatively, it may be measured directly at the extremity of aparticular circuit. Whichever method is used, the value obtained willneed to be corrected for ambient and conductor operating tem-peratures before a comparison is made with the tabulated values ofZs in the Regulations.

In practice, it would be unusual to take temperature measure-ments on site an in consequence a ‘rule of thumb’ method isadopted. This simply requires that measured values of loop imped-ance do not exceed 3⁄4 of tabulated values.

Note: All main equipotential and supplementary bending must bein place during this test.

80

Earth electrode resistanceIf we were to place an electrode in the earth and measure theresistance between the electrode and points at increasingly largerdistances from it, we would notice that the resistance increasedwith distance until a point was reached (usually around 2.5 m)beyond which no increase in resistance was noticed (Figure 33).

It is a requirement of the Regulations that for a TT system,exposed conductive parts be connected via protective conductors

Page 81: Wiring Regulations Design and Verification of Electrical Installations

Inspection and testing

81

to an earth electrode, and that the protection is by either an RCDor an overcurrent device, the RCD being preferred. Conditional onthis is the requirement that the product of the sum of theresistances of the earth electrode and protective conductors, andthe operating current of the protective device, shall not exceed50 V, i.e. Ra × Ia � 50 V (Ra is the sum of the resistances of theearth electrode and the protective conductors connecting it to theexposed conductive part).

Clearly then, there is a need to measure the resistance of theearth electrode. This may be done in either of two ways.

Figure 33 Resistance area of electrode

Page 82: Wiring Regulations Design and Verification of Electrical Installations

A

V

R

Supply

R V= I

Resistance

SupplyA

A

3m 3m

Mid-way

Electrodeunder test

Auxiliaryelectrode

Testelectrode

Inspection and testing

1 Based on the principle of the potential divider (Figure 34), anearth resistance tester is used together with test and auxiliaryelectrodes spaced as shown in Figure 35. This spacing ensuresthat resistance areas do not overlap.

The method of test is as follows:

1 Place the current electrode (C2) away from the electrodeunder test, approximately 10 times its length, i.e. 30 m for a3 m rod.

82

Figure 34

Figure 35

R = V/I

Page 83: Wiring Regulations Design and Verification of Electrical Installations

Inspection and testing

2 Place the potential electrode mid-way.3 Connect test instrument as shown.4 Record resistance value.5 Move the potential electrode approximately 3 m either side

of the mid position, and record these two readings.6 Take an average of these three readings (this is the earth

electrode resistance).7 Determine the maximum deviation or difference of this

average from the three readings.8 Express this deviation as a percentage of the average

reading.9 Multiply this percentage deviation by 1.2.

10 Provided this value does not exceed a figure of 5 per cent thenthe accuracy of the measurement is considered acceptable.

Three readings obtained from an earth electrode resistance testwere 181 �, 185 � and 179 �. What is the value of the electroderesistance and is the accuracy of the measurement acceptable?

Average value =181 + 185 + 179

3= 181.67 �

Maximum deviation = 185 – 181.67 = 3.33

Expressed as a percentage of the average =3.33 × 100

181.67

= 1.83%

Measurement accuracy = 1.83% × 1.2

= 2.2% (which is acceptable)

For TT systems the result of this test will indicate complianceif the product of the electrode resistance and the operatingcurrent of the overcurrent device does not exceed 50 V.

2 On TT systems protected by an RCD, a loop impedance tester isused, and effectively measures Ze which is taken as the earthelectrode resistance.

83

Page 84: Wiring Regulations Design and Verification of Electrical Installations

Inspection and testing

Functional testing

Prospective short-circuit currentA PSCC tester, usually incorporated with a loop impedance tester,is used for this. When testing at the intake position, probes and/orclips will be needed and hence great care needs to be taken whenconnecting to live terminals, etc. Measurements are taken betweenP and N.

Residual current devicesOnly the basic type of RCD will be considered here. Clearly, suchdevices must operate to their specification, an RCD tester willestablish this. As with loop impedance testing, care must be takenwhen conducting this test as an intentional earth fault is created inthe installation.

It is important to know why an RCD has been installed as thishas direct effect on the tests performed. The tests are as follows:

1 With the tester set to the RCD rating, half the rated trippingcurrent is passed through the device. It should not trip.

2 With full rated tripping current passed through the device, itshould trip within 200 ms.

3 All RCDs have a test button which should be operated to ensurethe integrity of the tripping mechanism. It does not check anypart of the earthing arrangements. As part of the visualinspection, it should be verified that a notice, indicating that thedevice should be tested via the test button quarterly, is on oradjacent to the RCD.

There seems to be a popular misconception regarding the ratingsand uses of RCD’s in that they are the panacea for all electrical illsand the only useful rating is 30 mA!!

Firstly, RCD’s are not fail safe devices, they are electro-mechanical in operation and can malfunction. Secondly, generalpurpose RCD’s are manufactured in ratings from 5 mA to 100 mAand have many uses. Let us first deal with RCD’s rated at 30 mA

84

Page 85: Wiring Regulations Design and Verification of Electrical Installations

Inspection and testing

or less. The accepted lethal level of shock current is 50 mA andhence RCD’s rated at 30 mA or less would be appropriate for usewhere shock is an increased risk. BS7671 indicates that RCD’s of30 mA or less should be used in the following situations:

1 To protect circuits supplying hand held equipment outside theequipotential zone.

2 To protect all socket outlet circuits in a TT system installation.3 To protect all socket outlets in a caravan park.4 To provide supplementary protection against Direct contact.5 For fixed current using equipment in bathrooms.

In all these cases and apart from conducting the tests alreadymentioned, it is required that the RCD be injected with a currentfive times its operating current and the tripping time should notexceed 40 ms.

Where loop impedence values cannot be met, RCD’s of anappropriate rating can be installed. Their rating can be determinedfrom

I n = 50/Zs

Where I n is the rated operating current of the device50 is the touch voltageZs is the measured loop impedence

RCD’s can also be used for:

1 Discrimination e.g. a 100 mA device to protect the wholeinstallation and a 30 mA for the sockets.

2 Protection against fire use, say, a 500 mA device.

Tests on assembliesThese are carried out on a switchgear, interlock, controlgear, etc.,to ensure that they are mounted and installed according to theRequirements of the 16th Edition.

85

Page 86: Wiring Regulations Design and Verification of Electrical Installations

Inspection and testing

Periodic inspection and testingAfter an installation has had an initial verification and been putinto service, there is a requirement for regular periodic verificationto take place. In some cases where for example a Local Authorityis involved, the interval between tests is mandatory. In other casesthe interval is only a recommendation. For example the recom-mended time between tests on domestic installations is 10 yearswhereas places of public entertainment have a mandatory intervalof one year.

Clearly, periodic tests may prove difficult, as premises are usuallyoccupied and in full service and hence careful planning and con-sultation are needed in order to minimize any disruption. A thoroughvisual inspection should be undertaken first as this will indicate tothe experienced inspector the depth to which he or she need go withthe instrument tests, and an even more rigorous investigation maybe required if drawings/design data are not available.

The visual inspection will need to take into account such itemsas safety, wear and tear, corrosion, signs of overloading,mechanical damage, etc. In many instances, a sample of itemsinspected may be taken, for example a minimum of 10 per cent ofswitching devices may be taken. If, however, the sample indicatesconsiderable deterioration then all items must be inspected.

The test sequence where relevant is as follows:

1 Continuity of protective conductors and bonding. (In this case,unless the supply can be isolated these conductors must not bedisconnected.)

2 Polarity3 Earth fault loop impedance4 Insulation resistance5 Operation of switching and isolating devices6 Operation of RCDs7 Continuity of ring circuit conductors8 Earth electrode resistance9 Operation of MCBs

10 Separation of circuits11 Non-conducting floors and walls.

86

Page 87: Wiring Regulations Design and Verification of Electrical Installations

Inspection and testing

As with visual inspection, sample tests may be made, usually 10per cent, with the proviso that this is increased in the event offaults being found. In the light of previous comments regardingsampling, it is clear that periodic verification is subjective, varyingfrom installation to installation. It is also more dangerous anddifficult and hence requires the inspector to have considerableexperience. Accurate and coherent records must be made andgiven to the person/s ordering the work. Such records/reports mustindicate any departures from or non-compliances with theRegulations, any restrictions in the testing procedure, anydangerous situations, etc., if the installation was erected accordingto an earlier edition of the Regulations, it should be tested as far aspossible to the requirements of the 16th Edition, and a note madeto this effect on the test report.

It should be noted that if an installation is effectively supervisedin normal use, then Periodic Inspection and Testing can bereplaced by regular maintenance by skilled persons. This wouldonly apply to, say, factory installations where there are permanentmaintenance staff.

87

Page 88: Wiring Regulations Design and Verification of Electrical Installations

3SPECIAL LOCATIONS

In this chapter we will deal with locations that require specialconsideration and in particular, bathrooms, construction sites andagricultural/horticultural situations.

Section 601: Locations containing a bath or showerThis section deals with common locations containing baths,showers and cabinets containing a shower and/or bath. It does notapply to specialist locations. The main feature of this section is thedivision of the location into zones (0, 1, 2 and 3) in the same wayas Section 602 for swimming pools.

Section 602: Swimming poolsThe general requirements are similar to those for bathrooms. In thecase of swimming pools the zones are zone A, B & C where ZoneA is in the pools itself, Zone B extends 2.0 m beyond Zone A and2.5 m above it, and Zone C extends a further 1.5 m beyond Zone B.Where they are permitted socket outlets must be of the industrialtype to BS EN 60309-2.

Section 603: Hot air saunasThe room housing a hot air sauna is divided into temperature zonesA, B, C & D in which only equipment suitable for the temperaturemay be installed.

All equipment should be IP24 rated.

88

Page 89: Wiring Regulations Design and Verification of Electrical Installations

Special locations

Section 604: Construction site installationsThis section does not apply to offices, cloakrooms, meeting rooms,canteens etc.

Clearly a construction site is a hazardous area, and a locationwhere many hand held portable tools are used. Consequentlyspecial precautions must be taken.

� 50 V or 25 V SELV would be required for supplying portablehand lamps in damp or confined locations.

� 110 V single or three phase centre tap earth would be needed forgeneral portable lamps or tools. This is the reduced voltagesystem already mentioned in Chapter 3.

� 230 V is only permitted for fixed floodlighting� 400 V for fixed and moveable equipment above 3.75 kW.� Disconnection times are reduced for all voltages above 120 V to

earth, the 220 V–277 V range is halved from 0.4 s to 0.2 s, andthe associated loop impedance values are also reduced.

� Disconnection times for reduced voltage (110 V cte) systems are5 s (IEE Regs 471-15-06)

� Touch voltage has also been reduced from 50 V to 25 V.

Section 605: Agricultural and horticultural locationsThis section does not apply to farm houses and dwellings for humanhabitation. The general requirements are very similar to construc-tion sites except for the voltages. Disconnection times are reducedto 0.2 s. Protection against indirect contact may be achieved byEEBADS. 500 mA RCD’s are permitted for protection against fire.Electrical equipment in normal use should be to IP44.

Section 606: Restrictive conductive locationsThese are locations which are conductive and where freedom ofmovement is difficult. Such a location would be, for example, aventilation shaft where an operative may need to enter to work on,say, a fan. Any hand held tools taken into a location must only besupplied by a SELV supply.

89

Page 90: Wiring Regulations Design and Verification of Electrical Installations

Special locations

Section 607: Installations having high protectiveconductor currentsThese are typically installation in large commercial offices etcwhere IT equipment is extensively used. No special precautionsare needed where leakage currents do not exceed 3.5 mA. Thissection outlines the requirements when currents exceed 3.5 mA or10 mA in respect of types of socket outlet and sizes and number ofprotective conductors and how they should be connected.

Section 608: CaravansGenerally speaking, the electrical contractor will have little inputto the installation in a caravan as they are pre-wired at constructionstage. If, however, re-wiring is needed this section details thewiring systems permitted, the types and positions of inlets andnotices to be displayed.

Section 609: Caravan parksGenerally this section deals with the site supplies to the individualcaravan pitches and outlines the type of wiring system (overheador underground) to be used and the type of socket outlet (BSEN60309-2) permitted.

Section 611: Highway supplies and street locatedequipmentThis section deals with lamp-posts, illuminated road signs etc.Generally such locations are treated as ordinary installations butwith extra details regarding identification of supply cables andtemporary supplies.

90

Page 91: Wiring Regulations Design and Verification of Electrical Installations

4SAMPLE QUESTIONS

AND ANSWERS

In this chapter we will look at typical C&G 2400 examinationquestions and give suggested solutions (pages 81 to 89) expectedby the examiners. Clearly, in many instances there is not alwaysone correct answer, and the examiner will have a range ofalternatives from which to award marks. Owing to the timeconstraints, approximately 18 minutes per question, the candidateis not expected to, and nor can he or she, write an essay in answerto descriptive questions. All that is required are reasonedstatements which indicate a knowledge and understanding of thesubject matter, and if time allows, specific reference to relevantparts of the 16th Edition, although this is not essential unless askedfor. It is not sufficient to simply quote Regulation numbers or Partsin answer to a question. In fact no marks are awarded for suchanswers.

EXAMPLE 11A factory manufacturing chemical products is situated close to thesupply transformer feeding an industrial estate. The earthingsystem is TNC–S with a measured loop impedance of 0.015 � andPSCC of 16 kA. It is required to increase the level of lighting byinstalling 26 400 W/230 V high-bay discharge luminaires. Theexisting wiring system is a mixture of PVC/SWA cables and

91

Page 92: Wiring Regulations Design and Verification of Electrical Installations

Sample questions and answers

galvanized trunking and conduit. There is no spare capacity in anyof the existing distribution fuse boards.

Outline the design considerations for the new lighting, withregards to:

1 Maximum demand and diversity2 Maintainability3 External influences4 Wiring system5 Control and protective devices.

EXAMPLE 12A consumer is having major alterations to their premises, one partof which is to convert an existing kitchen extension to a potteryroom housing a 9 kW/230 V fan-assisted kiln and it is proposed toutilize the existing cooker circuit to supply it. The cabling is6.0 mm2 twin with 2.5 mm2 CPC, clipped direct throughout its25 m run and protected by a 32 A BS3871 Type 2 MCB and thereare no adverse conditions prevailing. The external value of loopimpedance has been measured as 0.3 �. Show by calculation whatchanges, if any, are required to enable the existing system to beused.

EXAMPLE 13You are to provide the temporary electrical installation for aconstruction site on which the site huts and offices together withthe main supply point are on the opposite side of the access roadto the building under construction. The services required aresupplies for:

1 The site huts and offices2 High level fixed floodlighting around the site perimeter3 Portable tools

(a) Indicate a suitable method of running supplies from the sitehut area to the construction area. What type of sockets andcable couplers should be used?

92

Page 93: Wiring Regulations Design and Verification of Electrical Installations

Sample questions and answers

(b) State the voltages and disconnection times for 1, 2 and 3above.

(c) If one of the circuits for the portable tools is protected by a15 A Type B MCB, what is the maximum value of the loopimpedance Zs for that circuit?

EXAMPLE 14Part of a farm complex supplied by a TT system is to be convertedfor use as a poultry incubation area. The existing wiring is some30 years old and incorporates a voltage operated earth leakagecircuit breaker. Outline the design criteria to be considered withregards to:

1 The wiring system2 Protection against shock3 Protection against thermal effects.

EXAMPLE 15A single-phase sub-main circuit to a distribution board housingBS88 fuses is wired in 6.0 mm2 SWA XLPE cable.

A radial lighting circuit wired in 1.5 mm2 PVC copper cablewith a 1.5 mm2 CPC and protected by a 10 A fuse is fed from theboard. The length of the lighting circuit is 40 m.

The measured values of Zs at the distribution board is 2.1 �, andthe ambient temperature at the time of measurement was 20°C.

(a) What would be the minimum gross size of the sub-main cablearmouring if it is to be used as the CPC?

(b) Calculate the value of Zs at the extremity of the lighting circuit.Is this value acceptable?

EXAMPLE 16During a periodic test and inspection of the installation in abutcher’s shop, it is revealed that the circuit supplying anelectrically operated compressor does not meet the maximum earthfault loop impedance requirements. The circuit is protected by a

93

Page 94: Wiring Regulations Design and Verification of Electrical Installations

8 m

2 m

3 m2 m

7 m3 m10 m

5 m

Zs = 0.28�

Sample questions and answers

16 A Type C MCB, and the unit is situated 1 m from a steel sink.Explain how, under certain conditions, this situation may beresolved by the use of supplementary bonding. Support youranswer with calculation.

EXAMPLE 17A 2.5 mm2 ring final circuit 60 m long is wired in singles in PVCconduit, the CPC is 1.5 mm2. A ring circuit continuity test isperformed involving measurements at each socket.

1 What is the purpose of this test?2 Explain a method of identifying the opposite ‘legs’ of the ring.3 What would be the reading between P and E at the socket

nearest the mid-point of the ring?4 What is the significance of this mid-point reading?

EXAMPLE 18

1 Give three examples for the use of an RCD, indicating residualoperating currents, and operating times.

2 How often should a consumer operate an RCD via its testbutton. What does this test achieve.

3 Give one example for the use of a time delayed RCD.

EXAMPLE 19The diagram shows a ring final circuit wired in flat twin with CPCcable (2.5 mm2 + 1.5 mm2). The protection is by 32 A Type B

94

Page 95: Wiring Regulations Design and Verification of Electrical Installations

Sample questions and answers

MCB. If a test for continuity was performed at 15°C using themeasurement at each socket method, calculate:

1 The reading at each socket between P and N.2 The value of (R1 + R2).3 The value of Zs for comparison with the tabulated maximum

value. Is this value acceptable?

(2.5 mm2 copper has a resistance of 7.41 m�/m, 1.5 mm2 is12.1 m�/m and the value of Ze is measured as 0.28 �.)

EXAMPLE 20A small three-storey commercial office complex is due to have aperiodic test and inspection. Outline the major steps you wouldtake regarding:

1 Disturbance to office routine.2 Meeting the requirements of the Electricity at Work Regulations

1989.3 Measuring the continuity of main bonding conductors.4 Reporting defects and issuing certificates.

EXAMPLE 21

1 Give two reasons, when conducting an insulation resistance teston a large complex installation, for breaking it down intosmaller sections. What precautions should be taken beforecommencing the tests?

2 The test results for each section of such an installation are50 M�, 20 M�, 100 M� and 4 M�. Show by calculation theexpected overall insulation resistance at the intake position.

EXAMPLE 22

1 A wiring system employing the use of singles in steel trunkingis to be installed. Outline the main design and installationconsiderations with regards to this installation.

95

Page 96: Wiring Regulations Design and Verification of Electrical Installations

Sample questions and answers

2 The trunking at one point will accommodate the followingsingle stranded conductors:

28 1.5 mm2

20 2.5 mm2

12 6.0 mm2

10 10.0 mm2

Determine the minimum size of trunking to be used.

Suggested solutions

EXAMPLE 11

1 Determine the new maximum demand by calculating theincrease in load and adding to the existing maximum demand.Check that suppliers’ equipment and main switchgear/busbars,etc., can accommodate the extra load.

Increase in load =power × 1.8 (for discharge lamps)

240

=26 × 400 × 1.8

230

= 81.4 A

No diversity would be allowed as it is likely that the lamps willbe on all the time.

2 Luminaires need to be accessible for cleaning, repair, lampreplacement, etc.� Access equipment should be available� Spare lamps, chokes, etc., should be kept� Luminaires supplied via plug and socket arrangement to facili-

tate easy removal, and without losing supply to the other lamps3 As chemicals are being produced the atmosphere could be

corrosive, and there may be a fire risk, external influencesclassification would be AF2 and BE2.

96

Page 97: Wiring Regulations Design and Verification of Electrical Installations

Sample questions and answers

4 If valid documentation exists it is possible for a decision to bemade to use at least in part, the existing trunking system. If not,and this is most likely, a new system should be installed usingeither singles in galvanized steel trunking and conduit, or PVCsheathed material insulated cable, or PVC sheathed SWA cable,with circuits spread over three phases. Protect against indirectcontact by EEBADS.

5 Control by switch operating a three-phase 80 A contactorfeeding a three-phase distribution board housing BS88 fuses tocater for the high PSCC at the intake. Contactor and DB mustalso be able to handle the PSCC.

EXAMPLE 12

Kiln design current =P

V

=9000

230

= 39 A

MCB setting In, such that In � Ib = 40A

No correction factors hence It � 40 A

It = 46 A

Cable size = 6.0 mm2

Volt drop =mV × Ib × L

1000

=7.3 × 37.5 × 25

1000

= 6.8 V ok.

97

Page 98: Wiring Regulations Design and Verification of Electrical Installations

Sample questions and answers

Shock risk Zs = Ze + (R1 + R2)

= 0.3 + (3.08 + 7.41) × 25 × 1.2

1000

= 0.615 �, ok, as Zs maximum

Thermal constraints I =UOC

Zs

=240

0.615

= 390 A

k = 115

S =���I2t

k

= 0.415 mm2

So the 2.5 mm2 CPC is ok. The only change to the existinginstallation would be to uprate the 32 A MCB to 40 A.

EXAMPLE 13

(a) PVC sheathed SWA cable supported over the access road on acatenary wire at a minimum height of 5.8 m. Cable couplersand sockets should be to BS4343 (BS EN 60309–2).

(b) Site huts and offices Fixed floodlights Portable tools230 V 0.4 s & 5 s 230 V 0.2 s 110 V CTE 5 s

98

Page 99: Wiring Regulations Design and Verification of Electrical Installations

Sample questions and answers

(c) From Table 471A, IEE Regulations, Zs = 0.73 or, calculatefrom:

Zs = UOC

Ia

Ia for a 15 A Type B MCB from Figure 7 in IEE Regulationcurves = 75 A

So Zs =55

75= 0.73 �

EXAMPLE 14

1 It is unlikely that the existing wiring will meet the newrequirements, and due to its age it would be best to replacewith a new all insulated system, for example, singles in PVCconduit out of reach of livestock and supplied by a manufacturerwho specifies resistance to the onerous conditions found onfarms.

2 Remove the voltage-operated ELCB. These are not permitted.Socket outlets, except those used for equipment essential for thewelfare of livestock, should be protected by an RCD rated at30 mA or less and which will operate within 40 ms at a residualcurrent of 150 mA.

Protection against indirect would be by EEBADS withsupplementary equipotential bonding. Disconnection time for230 V supplies is reduced to 0.2 s.

3 Protection against fire may be achieved by using an RCD ratedup to 500 mA, except where equipment essential to the welfareof livestock is involved.

Incubation and subsequent hatching involves the use of infra-red lamps to maintain a stable temperature. The enclosures ofsuch lamps may become hot and hence must be located inpositions that will not cause fire or burns.

99

Page 100: Wiring Regulations Design and Verification of Electrical Installations

Sample questions and answers

EXAMPLE 15

(a) Referring to Table 54G:

Sp =k1.S

k2(Sp is the csa of the protective conductor)

As XLPE is thermosetting:

k1 = 143 and k2 = 46

Sp =143 × 6

46

= 18.6 mm2

(b) Sub-main Zs = 2.1 �.

Final circuit (R1 + R2) =(12.1 + 12.1) × 40 × 1.2

1000

= 1.16 �

So total Zs = 2.1 + 1.16

= 3.26 �

Ok, as Zs maximum for a 10 A BS88 fuse for fixed equipment is7.74 �.

EXAMPLE 16Provided that the value of loop impedance allows a fast enoughdisconnection time to protect against thermal effects, thencompliance with the Regulations may be achieved by connecting asupplementary bonding conductor between the exposed conductive

100

Page 101: Wiring Regulations Design and Verification of Electrical Installations

30 m 30 m

CPC Mid-point

15 m 15 m

15 mm CPC2 2.5 mm phase2

Sample questions and answers

parts of the compressor and the sink. The resistance of such aconductor must be less than or equal to:

50

Ia

, Ia, the current causing operation of the protectionwithin 5 s, is 160 A for a Type C MCB.

So, R �50

160

= 0.313 �

EXAMPLE 17

1 To identify breaks in the ring and/or interconnections across thering.

2 Test with a low reading ohmmeter between each P, N and E legand the corresponding terminal at the nearest socket. A lowvalue indicates the short leg, a high value, the long leg.

3 Reading at mid-point =30 m of 2.5 mm2 + 30 m of 1.5 mm2

2

=30 × 0.00741 + 30 × 0.0121

2

= 0.293 �

4 This value is (R1 + R2) for the ring.

101

Page 102: Wiring Regulations Design and Verification of Electrical Installations

Sample questions and answers

EXAMPLE 18

1 (a) When the loop impedance value for an overcurrent devicecannot be met. The product of the residual operating currentof the device and the loop impedance should not exceed50 V. The device should trip within 200 ms at the ratedresidual current.

(b) If supplementary protection against direct current isrequired. RCD should be rated at 30 mA or less, and tripwithin 40 ms at a residual operating current of 150 mA.

(c) In agricultural situations, for protection against fire. TheRCD should not be rated above 500 mA, and used forcircuits other than those essential for the welfare oflivestock. The tripping time would be within 200 ms at arated residual current.

2 The RCD should be tested quarterly via the test button. Thisonly checks the operating mechanism not any earthingarrangements.

3 On a TT system where the whole installation is protected by,say, a 100 mA device and the sockets by a 30 mA device. A timedelay on the 100 mA RCD will give discrimination with the30 mA RCD.

EXAMPLE 19

1 The ring is 40 m long, so the P to N reading at each socketwould be:

2 × 40 × 7.41

100 × 4= 0.148 �.

2 The mid-point R1 + R2 is 20 m of 2.5 mm + 20 m of 1.5 mm inparallel:

=20 × (7.41 + 12.1)

1000 × 2

= 0.195 �.

102

Page 103: Wiring Regulations Design and Verification of Electrical Installations

Sample questions and answers

3 (R1 + R2) corrected for 15°C = 0.195 × 1.02= 0.199 �

Correction for operating temperature = 0.199 × 1.2= 0.239 �

so, Zs = 0.28 + 0.239= 0.52 �

This is ok as tabulated maximum value is 1.5 �.

EXAMPLE 20

1 Careful planning and consultation will be required before anywork commences. It may be the case that access to the premisesis better suited to a weekend, or evenings when no staff arepresent. If this is not possible, then the installation should betested in small sections, all the tests required in each sectionbeing done at that time.

Clearly, in the modern office, computers play a major role,and unless UPS are present, advice should be sought beforeisolating any supplies.

2 The inspector is a duty holder and as such must take allprecautions to safeguard himself and others. Visual inspectioncan involve entry into enclosures housing live parts, and unlessit is completely impracticable, supplies must be isolated andlocked off. Testing on or near live equipment is prohibitedunless it is unreasonable for it to be dead, for example, loopimpedance and RCD tests. All test equipment must be suitablefor the use intended and should be in a safe condition. All testresults must be recorded.

3 It is usual for both ends of the bonding conductor to bedisconnected for test purposes. Unless all supplies to thecomplete installation can be isolated, bonding conductors mustnot be disconnected.

4 All test results must be entered on to a schedule and a report givento the person ordering the work. The report should include detailsof the extent of the work, any dangerous situations prevailing,restrictions to the inspection and test, and serious defects.

103

Page 104: Wiring Regulations Design and Verification of Electrical Installations

Sample questions and answers

Any certificate issued should indicate and explain departuresfrom the 16th Edition especially those due to installationsconstructed before the current Regulations.

EXAMPLE 21

1 Large installations may have circuits in parallel which can resultin pessimistically low values of insulation resistance eventhough there are no defects. Dividing the installation intosmaller sections will overcome these low readings.

Subdivision of the installation, especially on periodic inspec-tions, will enable minimum disruption of work processes.

All persons must be informed that the test is to take place, allsupplies isolated from the part of the installation in question, allelectronic devices, capacitors, neon indicators, etc., should bedisconnected, and ensure that no electrical connection existsbetween any live conductor and earth.

2 The overall value will be the sum of the individual insulationresistances in parallel, hence:

1

R=

1

R1

+ 1

R2

+ 1

R3

+ 1

R4

=1

50+

1

20+

1

100+

1

4

= 0.02 + 0.05 + 0.01 + 0.25

= 0.33

R =1

0.33= 3

EXAMPLE 22

1 The design should embrace grouping of circuits, space factor iftrunking sizes are outside the scope of tabulated sizes, and exter-nal influences which may affect the choice of trunking finish.

104

Page 105: Wiring Regulations Design and Verification of Electrical Installations

Sample questions and answers

With regards to the installation, supports must be at thecorrect spacing, joints should be bridged with an earth strap, andwhere trunking passes through walls, ceilings, etc., it should beexternally and internally sealed to the level of the fire resistancerequired for the building construction.

2 Using the tabulated conductor and trunking terms, we have:

28 × 8.1 = 226.820 × 11.4 = 22812 × 22.9 = 274.810 × 36.3 = 363

Total 1092.6

Hence trunking size is 75 × 37.5 mm2.

105

Table 3 Resistance of copper conductors at 20°C

Conductor csa (mm2) Resistance (m�/m)

1.0 18.11.5 12.12.5 7.414.0 4.616.0 3.08

10.0 1.8316.0 1.1525.0 0.72735.0 0.524

Page 106: Wiring Regulations Design and Verification of Electrical Installations

BS 7671 2001THE CHANGES

The new BS 7671 2001 contains many small editorial andRegulation number alterations; some substantial revisions andamendments; two new chapters and associated regulations; threenew sections and the inclusion of the revised section 601 forbathrooms.

The bulk of the original BS 7671 1992 remains unaffected andthe changes will not significantly effect the work of the electricaloperative. The feel and look (apart from the colour) of the newedition is unchanged and the extent of additions, amendments andre-written regulations etc., are indicated by vertical lines in themargins of each page.

So, as the story teller says, let us begin at the beginning!

Part 1: Scope, object and fundamental principalsThe whole of the original Part 1 has been re-written, rearrangedetc. and three new sections 131, 132 and 133 added. These outlinethe general requirements for Design (131), Selection of electricalequipment (132) and Erection and Inspection and Testing ofinstallations (133).

Part 2: DefinitionsThere are only six significant changes to the list of definitions, twoare deletions (earth leakage and hazardous live part), one (residual

106

Page 107: Wiring Regulations Design and Verification of Electrical Installations

BS 7671 2001 The changes

current) is re-written and three are new (mobile & offshoreinstallations, leakage current and protective conductorcurrent).

Protective conductor current replaces Earth leakage current andis defined as Electric current which flows in a protectiveconductor under normal operating conditions. This is clearly nota fault current and is typical of the current flowing in the cpc’s ofIT equipment installations.

Leakage current on the other hand flows, under normaloperating conditions, in an unwanted conductive path e.g.pipework which is not intended as cpc.

Part 3: Assessment of general characteristicsThis part remains unchanged with the exception of Regulation331-01-01 Compatibility, where there are some small editorialchanges and the addition of Power factor, Undervoltage andUnbalanced loads to the list of harmful effects.

Part 4: Protection for safetyThis part contains by far the most amendments and additions andinclude:

(i) A change in test current requirements for residualcurrent devices.

(ii) Changes to Loop impedance tables.(iii) Change of pvc to Thermoplastic and the addition of

Thermosetting to rubber cables.(iv) A new chapter on Overvoltage.(v) New regulations regarding conductors in parallel.(vi) A new chapter regarding Protective measures as a

function of external influences.

(i) 412-06-02 (ii): When a residual current device is used assupplementary protection against Direct Contact it shouldhave a rating I�n not exceeding 30 mA and should operate in

107

Page 108: Wiring Regulations Design and Verification of Electrical Installations

BS 7671 2001 The changes

40 ms at a residual current of 5 × I�n not 150 mA (except for30 mA devices).

(ii) In tables 41B2, 41C and 471 (also 604B2 and 605B2) allreference to miniature circuit breakers to BS 3871 types 1, 2and 3 has been removed and RCBO’s to BS EN 61009included.

(iii) In table 43A and elsewhere in BS7671, pvc has been replacedby Thermoplastic (pvc) and rubber is now shown asThermosetting (rubber).

(iv) New Chapter 44 Protection against Overvoltage. Thisoutlines the requirements for protecting electrical installationsagainst overvoltages due to switching surges or from anatmospheric origin (lightning!!). Tables 44A and 44B giveexamples of equipment that withstand voltages and thecategories of equipment. It is unlikely that this chapter will beof any real significance in the UK, as most equipment used isto a relevant British Standard, and the number of thunder-storm days anywhere are unlikely to exceed 25 per year.

(v) New Regulations 473-01-06, 07 & 08 and 473-07-05incorporate and add to the old regulations regarding con-ductors in parallel.

(vi) New Chapter 48 Choice of protective measures as a functionof External Influences. This chapter deals with protectionwhere there is a risk of fire due to the nature of processed orstored materials (482-02), and in locations with combustibleconstructional materials (482-03).

Part 5: Selection and erectionThere are few significant changes in this part, most are editorial orre-written sentences.

514-10-01 Voltage warning notices should now read 230 V not250 V.

Part 6: Special installations or locationsThe changes in this part are mainly editorial with a fewadditions.

108

Page 109: Wiring Regulations Design and Verification of Electrical Installations

BS 7671 2001 The changes

Section 601: Bathrooms etcThe old AMD 3 has been incorporated with one or two minoramendments.

Section 604: Construction sites etc.There are three new regulations 604-01-02 and 03 which givegreater detail of the scope of this section and 604-10-03 whichindicates the requirements for the selection of flexible cables i.e.Low temperature 300/500 V thermoplastic cable for reducedvoltage systems and HO7 RN-F 400/750 V rated cables for230/400 V systems.

Section 607: High protective conductor currentinstallationsWhilst this section has been completely re-written the content isgenerally unchanged. Where the protective conductor current islikely to exceed 10 mA, the requirement for two separateprotective conductor terminals in BS EN 60309-2 plugs has beendeleted but where high integrity protective conductors andconnections are required accessories must have two earthingterminals.

RCD’s, should not operate at expected protective conductorcurrents.

Section 611: Highway power supplies etc.Once again this section is generally unchanged with only one newregulation 611-05-02 which requires a degree of protection for allelectrical equipment of IP33.

Regulation 611-02 has been added to with the requirements thataccess doors less than 2.5 m above the ground be locked orsecured by the use of a key or tool.

Regulation 611-02-02 also requires the use of a tool to removebarriers or enclosures to gain access to light sources of luminaireslocated less than 2.8 m above the ground.

109

Page 110: Wiring Regulations Design and Verification of Electrical Installations

BS 7671 2001 The changes

Regulation 611-04-03 has been added to, and includes the needfor colour coded marker tape or cable tiles to be used with powersupply cables.

Part 7: Inspection and testingNot a great deal of change here, just 2 new regulations and somemodifications.

It is now required that for an initial verification, everyinstallation be inspected and tested during and on completion.

New regulation 713-12-01 requires that the Prospective shortcircuit current and Prospective earth fault current at the originand at other relevant points be ascertained by measurement,calculation or other method.

New regulation 732-01-02 concerns Periodic Inspection andTesting and suggests that this may be replaced by an adequateregime of monitoring and maintenance provided this is carriedout by skilled persons, and that the installation is under effectivesupervision.

Both Electrical Installation Certificates and Periodic TestReports must be accompanied by a schedule of test results and aninspection schedule.

New regulation 742-01-02 requires every circuit to be identifiedon a schedule of test results.

AppendicesAppendix 1 and 2 have been updated with regards to new andamended standards and revised and new legislation.

Appendix 3, Time/Current graphs, have had all reference to BS3871 mcb’s deleted and RCBO’s to BS EN61009 added.

Appendix 4 Current ratings etc. has Table 4A changed to 4A1and another table, 4A2 added, which lists all the appropriatecurrent rating tables.

Appendix 6 now includes samples of inspection and testschedules.

110

Page 111: Wiring Regulations Design and Verification of Electrical Installations

INDEX

Alphanumeric system, 52, 57Amendment No 2, 100Approved test lamps, 61

Barriers and enclosures, 11, 12 British Standard Finger, 73BS EN 60529, 14

Cable types, 31Calibration, 63Characteristics of overload devices, 22Class II Equipment, 14Compatibility, 7Conductor energy withstand, 24Conductor size, 30, 40Conduit capacities, 50Connection diagram, 53Continuity of protective conductors,

65Continuity of ring final conductors, 19Correction factors, 29, 34

Design, 5Design Calculations, 29, 38Design current Ib, 30Direct Contact, 11, 12, 13Disconnection times, 18, 20Disconnector, 29Discrimination, 27Distribution diagram, 53, 54Diversity, 30Drawings, 52

Earth electrode resistance, 64, 79Earth fault current, 21, 26Earth fault loop impedance, 64, 78Earth fault loop path, 18Earth free bonding, 14EEBADs, 14, 17Electrical separation, 14Exposed conductive parts, 11Extraneous conductive parts, 17External influences, 6External loop impedance, 19

Fault current, 21Functional switch, 29Functional tests, 82Fuse-switch, 29

Indirect contact, 11, 12, 13, 17Inspection, 60Inspection and testing, 59Insulation of live parts, 12Insulation resistance, 74IP codes, 15Isolation and switching, 28Isolator, 28

Layout drawings, 52Let through energy, 24, 38

Main equipotential bonding, 18Maintainability, 9

111

Page 112: Wiring Regulations Design and Verification of Electrical Installations

Index

Non-conducting location, 14

Obstacles, 13Operation of RCDs, 83Other bonding, 21Overcurrent, 21

Periodic test and inspection, 83Placing out of reach, 13Polarity, 64, 76Prospective short circuit current, 83Protection against fault current, 24Protection against overcurrent, 21Protection against overload, 22Protection against shock, 11Protection against thermal effects, 21Protection against undervoltage, 28Protection by barriers, 64, 73Protection for safety, 11Protection rating Is, 29, 33Protective conductor size, 26Protective devices, 23Proving unit, 63Purpose supplies and structure, 6, 4

RCDs, 13, 63, 82Resistance of copper conductors, 100

SELV, 12Shock risk, 30, 38Short circuit current, 21, 24Supplementary bonding, 20Switch disconnector, 29Switch fuse, 29System:

TT; TN-S; TNC-S, 20Tabulated conductor current Is, 29, 36Test equipment, 60Testing, 60Tests on assemblies, 82Thermal risk to conductors, 30, 38Trunking capacities, 50

Voltage drop, 30, 37

Wiring systems, 31

112