Toro Energy Limited Toro Energy Limited Wiluna Uranium Project June 2010 Toro Energy is an Australian resource company with a multi project Toro Energy is an Australian resource company with a multi project company with a multi-project uranium portfolio and the aim of achieving sustainable medium-term company with a multi-project uranium portfolio and the aim of achieving sustainable medium-term achieving sustainable medium term production at its flagship Wiluna Uranium Project in Western achieving sustainable medium term production at its flagship Wiluna Uranium Project in Western Australia… Australia…

Upload: others

Post on 01-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Wiluna Uranium Project - Toro Energy06+22+… · Wiluna Uranium Project Product Transport • One to two 60t road trains a month (800 (800t – 1 200 UOC )1,200t UOC per annum) •

Toro Energy LimitedToro Energy Limited

Wiluna Uranium ProjectJune 2010

Toro Energy is an Australian resource company with a multi project Toro Energy is an Australian resource company with a multi project company with a multi-project uranium portfolio and the aim of achieving sustainable medium-term

company with a multi-project uranium portfolio and the aim of achieving sustainable medium-term achieving sustainable medium term production at its flagship Wiluna Uranium Project in Western

achieving sustainable medium term production at its flagship Wiluna Uranium Project in Western Australia…Australia…

Page 2: Wiluna Uranium Project - Toro Energy06+22+… · Wiluna Uranium Project Product Transport • One to two 60t road trains a month (800 (800t – 1 200 UOC )1,200t UOC per annum) •

Disclaimer

This presentation has been prepared by Toro Energy Limited (“Toro”). The information contained in this presentation is a professional opinion only and is given in good faith. Certain information in this document has been derived from third parties and though Toro has no reason to believe that it is not accurate, reliable or complete it has not been independently audited or verified by Torocomplete, it has not been independently audited or verified by Toro.

Any forward-looking statements included in this document involve subjective judgement and analysis and are subject to uncertainties, risks and contingencies, many of which are outside the control of, and maybe unknown to, Toro. In particular, they speak only as of the date of this document, they assume the success of Toro’s strategies, and they are subject to significant regulatory, business, competitive and economic uncertainties and risks. Actual future events may vary materially from the forward looking statements and the assumptions on which the forward looking statements are based. Recipients of this document (“Recipients”) are cautioned to not place undue reliance on such forward-looking statementsplace undue reliance on such forward-looking statements.

Toro makes no representation or warranty as to the accuracy, reliability or completeness of information in this document and does not take responsibility for updating any information or correcting any error or omission which may become apparent after this document has been issued.

To the extent permitted by law, Toro and its officers, employees, related bodies corporate and agents (“Agents”) disclaim all liability, direct, indirect or consequential (and whether or not arising out of the negligence, default or lack of care of Toro and/or any of its Agents) for any loss or damage suffered by a Recipient or other ( g g g , y g ) y g y ppersons arising out of, or in connection with, any use or reliance on this presentation or information.

All amounts in A$ unless stated otherwise.

C t t P St t tCompetent Persons Statements:The information in this report that relates to Mineral Resources is based on information compiled by Mr Daniel Guibal who is a Fellow of the Australasian Institute of Mining and Metallurgy (AusIMM). Mr Guibal is a fulltime employee of SRK Consulting and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity he is undertaking to qualify as a Competent Persons as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Guibal consents to the inclusion in this release of the matters based on his information in the form and context in which it appears.information in the form and context in which it appears.

Information in this presentation relating to exploration results of the Napperby Project and Lake Mackay is based on information compiled by Dr David Rawlings BSc (Hons) who is a Member of the Australasian Institute of Mining and Metallurgy. Dr Rawlings is a full-time employee of the Company. Dr Rawlings has sufficient experience, which is relevant to the style of mineralisation and type of deposit under consideration and to the activity, which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ Dr Rawlings consents to the inclusion in this release of the matters based on his information in the form and context in which it appears

2

Ore Reserves . Dr Rawlings consents to the inclusion in this release of the matters based on his information in the form and context in which it appears.

Page 3: Wiluna Uranium Project - Toro Energy06+22+… · Wiluna Uranium Project Product Transport • One to two 60t road trains a month (800 (800t – 1 200 UOC )1,200t UOC per annum) •

Corporate Snapshot

Capital structureExchanges ASX:        TOE

Shareholder profile

Share Price (June 2010) A$0.08Options (unlisted) 21.69m

Shares 964.95mFully Diluted Market Cap A$77 2m

Oz Minerals 42.5%

Minorities57 5%Fully Diluted Market Cap A$77.2m

Cash (at March 31 2010) A$59.2mDebt NilEnterprise Value A$18.0m

57.5%

12 Month High / Low A$0.26 / $0.08

Brief Corporate HistoryListed on ASX  March 2006E t d i t O ti A t N b l 2007

12 Month Share Price Graph

Entered into Option Agreement on Napperby early 2007Completed merger with Nova Energy late 2007Completed Wiluna PFS in 2008Rights Issue late 2008Completed Wiluna Optimisation September 2009Share placement  to OZL and Institutions in Sept/Oct 2009Share Purchase Plan Oct/Nov 2009

3

Toro’s strategy is to become a significant sustainable uranium producer.

Page 4: Wiluna Uranium Project - Toro Energy06+22+… · Wiluna Uranium Project Product Transport • One to two 60t road trains a month (800 (800t – 1 200 UOC )1,200t UOC per annum) •

Key Assets

NamibianJoint Venture

4

Page 5: Wiluna Uranium Project - Toro Energy06+22+… · Wiluna Uranium Project Product Transport • One to two 60t road trains a month (800 (800t – 1 200 UOC )1,200t UOC per annum) •

Toro Energy Strategy

“To become a significant sustainable uranium mining company focusing on developing a top tier exploration and company focusing on developing a top tier exploration and

production profile in the global uranium mining sector.”Toro’s strategy encompasses both qualitative and quantitative

“Significant”

production of greater than 2.2mlb (1,000t) U3O8 pa by 2015

and quantitative targets

production of greater than 5.5mlb (2,500t) U3O8 pa by 2020

“Sustainable”

a JORC Resource greater than 100mlb (45,000t) U3O8 by 2011

a JORC Resource greater than 220mlb (100,000t) U3O8 by 2015g ( ) 3 8 y

Note: quantitative targets are aspirations for the company and do not constitute specific projections

5

Page 6: Wiluna Uranium Project - Toro Energy06+22+… · Wiluna Uranium Project Product Transport • One to two 60t road trains a month (800 (800t – 1 200 UOC )1,200t UOC per annum) •

Uranium Market

6

Page 7: Wiluna Uranium Project - Toro Energy06+22+… · Wiluna Uranium Project Product Transport • One to two 60t road trains a month (800 (800t – 1 200 UOC )1,200t UOC per annum) •

Uranium Market

Demand Demand • Ongoing long term contracting by utilities

• New power station construction still increasing (57)

• New reactors in Western countries now being planned and supported

• Short term softer demand – discretionary

• Uncertainty over China’s future purchasing methodology

Supply • Kazakhstan now largest global producer – ARMZ also

exerting controlexerting control

• Locking up of future potential production sources by utilities and majors

• New projects and discoveries time to development

7

• New projects and discoveries – time to development –reality creeping into costs – need for supportive pricing

Source: Ux Consulting

Page 8: Wiluna Uranium Project - Toro Energy06+22+… · Wiluna Uranium Project Product Transport • One to two 60t road trains a month (800 (800t – 1 200 UOC )1,200t UOC per annum) •

Uranium Market

8 Source: Ux Consulting

Page 9: Wiluna Uranium Project - Toro Energy06+22+… · Wiluna Uranium Project Product Transport • One to two 60t road trains a month (800 (800t – 1 200 UOC )1,200t UOC per annum) •

Australia : New Production

16000

Available New Production Per YearPerhaps something poorly appreciated by h ff h ili i i

10000

12000

14000

O8

(ton

nes)

AVAILABLE

MAJOR

the offshore utilities is the relatively small amount of uranium resource that is available.

2000

4000

6000

8000

Pro

duce

d U

3O MAJOR

ALLOCATEDMost material is either fully committed or in the hands of the major companies.

0

2000

Y

p

Toro holds a significant portion of this ‘available’ production.

Year

2,500

3,000

nnes

)

Toro

1,000

1,500

2,000

uced

U3O

8 (t

on

Remaining Available Production

9

0

500

Pro

du

Source: Public announcements and Toro estimates.

New production excluding Majors

Page 10: Wiluna Uranium Project - Toro Energy06+22+… · Wiluna Uranium Project Product Transport • One to two 60t road trains a month (800 (800t – 1 200 UOC )1,200t UOC per annum) •

Wiluna Uranium ProjectWestern AustraliaWestern Australia

10

Page 11: Wiluna Uranium Project - Toro Energy06+22+… · Wiluna Uranium Project Product Transport • One to two 60t road trains a month (800 (800t – 1 200 UOC )1,200t UOC per annum) •

Wiluna Uranium Project

11

Page 12: Wiluna Uranium Project - Toro Energy06+22+… · Wiluna Uranium Project Product Transport • One to two 60t road trains a month (800 (800t – 1 200 UOC )1,200t UOC per annum) •

Wiluna Uranium Project

Project Overviewj• Mining - Calcrete / sand / clay hosted carnotite mineralisation – shallow (~10m deep) open pit strip

type mining – progressive rehabilitation – hyper-saline groundwater

P i b d d• Processing – two options being considered:

• Alkaline heap leach with direct precipitation

• Agitated (tank) leach with direct precipitation • Agitated (tank) leach with direct precipitation

• Production is approximately 1,200t UOC (1,000 tpa U3O8 equivalent)

• Transport – road/rail shipment with export via ports of Port Adelaide and/or DarwinTransport road/rail shipment with export via ports of Port Adelaide and/or Darwin

• Waste Material and Tailings – either run-of-mine material washed and returned to pit (heap leach) or tailings storage beside and within mined out pits and covered (agitated leach)

• Estimated disturbance footprint is approximately 1,200 ha

• Water use – up to 2.5 GLpa

12

Page 13: Wiluna Uranium Project - Toro Energy06+22+… · Wiluna Uranium Project Product Transport • One to two 60t road trains a month (800 (800t – 1 200 UOC )1,200t UOC per annum) •

Wiluna Uranium Project

Total 25m lbs U3O8 [20.2mt @ 548ppm]#

Lake Way 12.6Mlb U3O8 resource#

• 10.5Mt @ 543ppm

near surface calcrete-style depositCentipede 11.8Mlb U3O8 resource#

• 9.7Mt @ 554ppm

90% of currently defined resource now in Indicatedcategory# Approx

Mineralisation type Calcrete / clay hosted carnotite

Within delta, generally below water table

R i i if di i i

12km

Resource estimate using uniform conditioning at 200ppm cut off

Lake Way all assay data

Centipede mainly gamma data

13

Centipede mainly gamma data

100% Toro owned project # Refer Competent Persons Statements on Page 2 and category of resources on Page 14

Page 14: Wiluna Uranium Project - Toro Energy06+22+… · Wiluna Uranium Project Product Transport • One to two 60t road trains a month (800 (800t – 1 200 UOC )1,200t UOC per annum) •

Upgraded Resource

…31% increase in TOTAL …with slight increase in resource grade

…with slight increase in contained metal

Resource Grade* Contained U3O8#

As at June 2009 Category Mt ppm % U3O8 tonnes Mlbs

Centipede Measured 0.3 588 0.059 176 0.4p

Indicated 7.7 619 0.062 4,754 10.5

Inferred 1.7 251 0.025 424 0.9

TOTAL 9.7 554 0.055 5,355 11.8

Lake Way Inferred 10.5 543 0.054 5,718 12.6

TOTAL 10.5 543 0.054 5,718 12.6

TOTAL WILUNA PROJECT 20.2 548 0.055 11,072 24.4

*200ppm cut‐off# Refer Competent Persons Statements, Page 2

14

…grade increase significantly improves project economics

Page 15: Wiluna Uranium Project - Toro Energy06+22+… · Wiluna Uranium Project Product Transport • One to two 60t road trains a month (800 (800t – 1 200 UOC )1,200t UOC per annum) •

Wiluna Uranium Project

Mining• Selective mining up to 2.0 Mtpa ore

• Intensive grade control• Intensive grade control

• Strip ratio approx 3.8 : 1

• Progressive rehabilitation

• Ore is within shallow hypersaline water table

15

Page 16: Wiluna Uranium Project - Toro Energy06+22+… · Wiluna Uranium Project Product Transport • One to two 60t road trains a month (800 (800t – 1 200 UOC )1,200t UOC per annum) •

Wiluna Uranium Project

Processing – Option 1Processing Option 1Alkaline heap leach• On / off pads at a central location

• Direct precipitation from pregnant liquor

• Processing ~1.6Mtpa

• Average head grade 653ppm U3O8

• Recovery 70%

• Production 700tpa U3O8 equivalentp 3 8 q

• Make up water 700MLpa

• Installed power capacity ~5MW

• Spent heaps washed and returned• Spent heaps washed and returnedto the mine void

• Project life up to 14 years

16

Page 17: Wiluna Uranium Project - Toro Energy06+22+… · Wiluna Uranium Project Product Transport • One to two 60t road trains a month (800 (800t – 1 200 UOC )1,200t UOC per annum) •

Wiluna Uranium Project

P i O i 2Processing – Option 2Alkaline agitated leach• Direct precipitation of uranium from Direct precipitation of uranium from

pregnant liquor

• Processing 1.3 to 2.0Mtpa

• Average head grade 668ppm U O• Average head grade 668ppm U3O8

• Recovery 86%

• Production 700 to 1,000tpa U3O8 e i alentequivalent

• Leaching at elevated temperature (<1000C)

M k 2 500ML• Make up water 2,500MLpa

• Installed power capacity ~12 MW

• Project life up to 14 years

17

Page 18: Wiluna Uranium Project - Toro Energy06+22+… · Wiluna Uranium Project Product Transport • One to two 60t road trains a month (800 (800t – 1 200 UOC )1,200t UOC per annum) •

Wiluna Uranium Project

Product Transport• One to two 60t road trains a month

(800 1 200 UOC )(800t – 1,200t UOC per annum)

• Specialised transport, spill kits, secure stop overs

Hi hl l t d b th C lth G t (ASNO)• Highly regulated by the Commonwealth Government (ASNO)

• Containerisation and transport in place for many years in NT and SA

• Requires container port, Class 7 ships

• Potential export ports Darwin or Port Adelaidep p

• Darwin, Port Adelaide have existing secure facilities

• Collaboration with other WA producers on logistics solution

18

p g

Page 19: Wiluna Uranium Project - Toro Energy06+22+… · Wiluna Uranium Project Product Transport • One to two 60t road trains a month (800 (800t – 1 200 UOC )1,200t UOC per annum) •

Wiluna Uranium Project

2006 2007 2008 2009 2010 2011 2012 2013

Previous Environmental Work Current Environmental WorkPrevious Environmental Work• Environmental baseline

• Radiological baseline

• Air quality modelling

• Green house gas emissions

• Meteorological data collection• Weather station since 2007

• Heritage surveys (2006, 2007 & 2009)

• Resource drilling

Meteorological data collection

• Environmental baseline• Subterranean fauna, Fauna & Short Range Endemics, Flora &

Vegetation, Soils

A i l Sg

• Metallurgical testing

• Tailings characterisation

• Ground water testing

• Aerial Surveys• Radiological baseline, Aerial photographic record, Lidar

survey – 0.2m contours

• WaterH d l H d l W t t• Ground water testing

• Market monitoring

• Prefeasibility and Optimisation Studies

• Hydrology, Hydrogeology, Water management

• Materials characterisation• Minerals characterisation, Chemical modelling /laboratory

testing

19

• Radiation Management, Rehabilitation and Closure,

• ERMP, EPBC submissions

Page 20: Wiluna Uranium Project - Toro Energy06+22+… · Wiluna Uranium Project Product Transport • One to two 60t road trains a month (800 (800t – 1 200 UOC )1,200t UOC per annum) •

Wiluna Uranium Project

2006 2007 2008 2009 2010 2011 2012 2013

Previous Indigenous Relations Work Current Indigenous Relations Workg g

• Wiluna and Tarlpa claimant groups

• Consultation directly with groups and • Toro providing information on radiation and

environmental management including funding of • Consultation directly with groups and through Central Desert Native Title Services (CDNTS) as representative body

• Protocols established for heritage survey

environmental management including funding of independent advice and visits to uranium operations by claimant group representatives

• Development of Heritage Management PlanProtocols established for heritage survey work to clear exploration drilling areas

• Toro has proposed to CDNTS process for negotiating mining agreement

p g gincluding cultural mapping of entire project site

• Development of training and employment program initially with trial pit and g g g genvironmental studies

• Negotiate mining agreement

20

Page 21: Wiluna Uranium Project - Toro Energy06+22+… · Wiluna Uranium Project Product Transport • One to two 60t road trains a month (800 (800t – 1 200 UOC )1,200t UOC per annum) •

Wiluna Project Milestones

Wiluna Resource Upgradepg

Wiluna Optimisation Study

Trial pit approved by WA Govt

Mining proposal submitted to WA Govt for heap leach trial Mining proposal submitted to WA Govt for heap leach trial

Full Project Approvals - now underway – level of assessment at ERMP

Bankable Feasibility Study – under preparation – management in place

Financing – BFS & Approvals funded – Options under review for construction

advancing toward a project development decision

21

…advancing toward a project development decision

Page 22: Wiluna Uranium Project - Toro Energy06+22+… · Wiluna Uranium Project Product Transport • One to two 60t road trains a month (800 (800t – 1 200 UOC )1,200t UOC per annum) •

Wiluna Uranium Project

P j t Ti t bl2009 2010 2011 2012 2013

Optimisation

Project Timetable

Project referral

Environmental Impact Assessment

Metallurgical Trials

Decision to Proceed with BFS

Bankable Feasibility Study (“BFS”)

Indigenous Engagement

Native Title Agreement

Off‐take Agreements

Decision to Proceed with Construct

D i d CDesign and Construct

Commissioning & Production

22

Target for first production - 2013 Completed

Page 23: Wiluna Uranium Project - Toro Energy06+22+… · Wiluna Uranium Project Product Transport • One to two 60t road trains a month (800 (800t – 1 200 UOC )1,200t UOC per annum) •

Project Pipeline & ExplorationProject Pipeline & Exploration

- A$4.5m in 2010 on NT and WA projects

- Namibian projects farm in

- Project and consolidation opportunities

Page 24: Wiluna Uranium Project - Toro Energy06+22+… · Wiluna Uranium Project Product Transport • One to two 60t road trains a month (800 (800t – 1 200 UOC )1,200t UOC per annum) •

Central Australia Exploration Tenement SnapshotTenement Snapshot

24

Page 25: Wiluna Uranium Project - Toro Energy06+22+… · Wiluna Uranium Project Product Transport • One to two 60t road trains a month (800 (800t – 1 200 UOC )1,200t UOC per annum) •

Lake Mackay Project (WA)

Uranium in Tertiary reduced sands and clays

• Hole LP0029 - 6m @ 216ppm U3O8 (assays) OR 4 5m @ 365ppm U3O8 (gamma)#

25

Hole LP0029 - 6m @ 216ppm U3O8 (assays) OR 4.5m @ 365ppm U3O8 (gamma)#

• Hole LP0031 - 2m @ 646ppm U3O8 (assays) OR 3m @ 175ppm U3O8 (gamma)#

# Refer to the Toro ASX release “Uranium Discovery at Lake MacKay” dated 28/10/2009 for complete list of drill hole results

Page 26: Wiluna Uranium Project - Toro Energy06+22+… · Wiluna Uranium Project Product Transport • One to two 60t road trains a month (800 (800t – 1 200 UOC )1,200t UOC per annum) •

Namibia

Namibia Uranium ProspectNAMIBIA [TOE: currently 90%]

Plans Toro in JV with Deep Yellow (DYL to earn 65%) Covers three EPLs Total acreage: 1326km2

Toro to retain 25% interest Namibian BEE Company 10%*

Targets Palaeochannel calcrete; Rossing-style bedrock Possible extensions of Langer Heinrich palaeo-valley

BudgetBudget A$3.5 million spend over 2.5 years

26* Sixzone Investments Limited (Black Economic Empowerment)

Page 27: Wiluna Uranium Project - Toro Energy06+22+… · Wiluna Uranium Project Product Transport • One to two 60t road trains a month (800 (800t – 1 200 UOC )1,200t UOC per annum) •

Birrindudu JV with Cameco (NT)

4850

00 m

E

4900

00 m

E

4950

00 m

E

5000

00 m

E

4800

00 m

E

4600

00 m

E

4650

00 m

E

4700

00 m

E

4750

00 m

E

4550

00 m

E

4400

00 m

E

4450

00 m

E

4500

00 m

E

4250

00 m

E

4300

00 m

E

4350

00 m

E

7940000 mN

4100

00 m

E

4150

00 m

E

4200

00 m

E

7945000 mN

7950000 mN

7920000 mN

7925000 mN

7930000 mN

7935000 mN

7915000 mNBirrindudu Group

c 1650

GORDON DOW NS

Brown'sBrown'sBrown'sBrown'sBrown'sBrown'sBrown'sBrown'sBrown'sRange Range Range Range Range Range Range Range Range

E 8003554E 8003554E 8003554E 8003554E 8003554E 8003554E 8003554E 8003554E 8003554E 8003553E 8003553E 8003553E 8003553E 8003553E 8003553E 8003553E 8003553E 8003553

7895000 mN

7900000 mN

7905000 mN

7910000 mN

Killi Killi Beds

Brow ns RangeMetamorphics

c. 2500

c. 1650

E 8003556E 8003556E 8003556E 8003556E 8003556E 8003556E 8003556E 8003556E 8003556

E 8003558E 8003558E 8003558E 8003558E 8003558E 8003558E 8003558E 8003558E 8003558

E 8003559E 8003559E 8003559E 8003559E 8003559E 8003559E 8003559E 8003559E 8003559 DomeDomeDomeDomeDomeDomeDomeDomeDome-REE-REE-REE-REE-REE-REE-REE-REE-REE

Mount Mansbridge 1Mount Mansbridge 1Mount Mansbridge 1Mount Mansbridge 1Mount Mansbridge 1Mount Mansbridge 1Mount Mansbridge 1Mount Mansbridge 1Mount Mansbridge 1E 8003555E 8003555E 8003555E 8003555E 8003555E 8003555E 8003555E 8003555E 8003555

E 8003557E 8003557E 8003557E 8003557E 8003557E 8003557E 8003557E 8003557E 8003557

7885000 mN

7870000 mN

7875000 mN

7880000 mN

7890000 mN c. 1855 Ma

Birrindudu

STURT CREEKLEW IS CREEK

E 8003560E 8003560E 8003560E 8003560E 8003560E 8003560E 8003560E 8003560E 8003560

Mt. Junction-U (Cu)Mt. Junction-U (Cu)Mt. Junction-U (Cu)Mt. Junction-U (Cu)Mt. Junction-U (Cu)Mt. Junction-U (Cu)Mt. Junction-U (Cu)Mt. Junction-U (Cu)Mt. Junction-U (Cu)Don-U, Au (REE)Don-U, Au (REE)Don-U, Au (REE)Don-U, Au (REE)Don-U, Au (REE)Don-U, Au (REE)Don-U, Au (REE)Don-U, Au (REE)Don-U, Au (REE)

Mount Mansbridge 1Mount Mansbridge 1Mount Mansbridge 1Mount Mansbridge 1Mount Mansbridge 1Mount Mansbridge 1Mount Mansbridge 1Mount Mansbridge 1Mount Mansbridge 1-U (Au, Xen)-U (Au, Xen)-U (Au, Xen)-U (Au, Xen)-U (Au, Xen)-U (Au, Xen)-U (Au, Xen)-U (Au, Xen)-U (Au, Xen)

Mount Mansbridge 2-UMount Mansbridge 2-UMount Mansbridge 2-UMount Mansbridge 2-UMount Mansbridge 2-UMount Mansbridge 2-UMount Mansbridge 2-UMount Mansbridge 2-UMount Mansbridge 2-U

Oracle UO l UO l UOracle UO l UOracle UO l UO l UO l UJaimani-UJaimani-UJaimani-UJaimani-UJaimani-UJaimani-UJaimani-UJaimani-UJaimani-U

7860000 mN

7850000 mN

7855000 mN

7865000 mN

Killi Killi Bedsc. 1855

BirrinduduGroup

c. 1650

Redclif fe Pound Groupc. 800 Ma

Slatey CreekGranite

c. 1790 Ma

W hite's BeachW hite's BeachW hite's BeachW hite's BeachW hite's BeachWhite's BeachWhite's BeachWhite's BeachW hite's Beach-REE (P, U)-REE (P, U)-REE (P, U)-REE (P, U)-REE (P, U)-REE (P, U)-REE (P, U)-REE (P, U)-REE (P, U)

Oracle-UOracle-UOracle-UOracle-UOracle-UOracle-UOracle-UOracle-UOracle-U

E 8003561E 8003561E 8003561E 8003561E 8003561E 8003561E 8003561E 8003561E 8003561

• Over $1m of airborne geophysics completed by Cameco

7845000 mN

7825000 mN

7830000 mN

7835000 mN

7840000 mN

KOOKABURRA-Au

LARRANGANNI BLUFF-Au

Birrindudu 2-UBirrindudu 2-UBirrindudu 2-UBirrindudu 2-UBirrindudu 2-UBirrindudu 2-UBirrindudu 2-UBirrindudu 2-UBirrindudu 2-U• Multiple unconformity uranium targets

• Toro $1m farm-in for 51%

27

7815000 mN

7820000 mN

Killi Killi Hills-UKilli Killi Hills-UKilli Killi Hills-UKilli Killi Hills-UKilli Killi Hills-UKilli Killi Hills-UKilli Killi Hills-UKilli Killi Hills-UKilli Killi Hills-U

Page 28: Wiluna Uranium Project - Toro Energy06+22+… · Wiluna Uranium Project Product Transport • One to two 60t road trains a month (800 (800t – 1 200 UOC )1,200t UOC per annum) •

Outlook

Wiluna Uranium Project• Approvals, Bankable Feasibility Study, Indigenous engagement, product marketing underway

Exploration initiativesExploration initiatives• Lake Mackay – new uranium discovery in greenfields project• Namibia – leveraging on-ground expertise through Deep Yellow• Birrindudu – new uranium exploration provinceBirrindudu new uranium exploration province

Continuing evaluation of corporate and project opportunities

Long term uranium demand fundamentals remain strong, driven by: • improved utilisation / operational life extensions / construction pipeline• delayed supply / new production / current soft pricing

28

Page 29: Wiluna Uranium Project - Toro Energy06+22+… · Wiluna Uranium Project Product Transport • One to two 60t road trains a month (800 (800t – 1 200 UOC )1,200t UOC per annum) •

Greg HallManaging Director

T E Li it dToro Energy Limited3 Boskenna AvenueNORWOODSouth Australia 5067South Australia 5067

Telephone: +61 8 8132 5600Facsimile: +61 8 8362 6655

Email: [email protected]: www.toroenergy.com.au