ARPS CONFERENCE 14-17 OCTOBER 2012

Vanessa Guthrie

TORO ENERGY LIMITED

Wiluna Uranium Project: the WA environmental

approval process

Page 2: TORO ENERGY LIMITED Wiluna Uranium Project: the WA ...10+15+… · …if the ALP come to government and there's a project that's been approved - and when I say been approved I mean

2

Disclaimer

This presentation has been prepared by Toro Energy Limited (“Toro”). The information contained in this presentation is a professional opinion only and is given in good faith. Certain information in this document has been derived from third parties and though Toro has no reason to believe that it is not accurate, reliable or complete, it has not been independently audited or verified by Toro.

Any forward-looking statements included in this document involve subjective judgement and analysis and are subject to uncertainties, risks and contingencies, many of which are outside the control of, and maybe unknown to, Toro. In particular, they speak only as of the date of this document, they assume the success of Toro’s strategies, and they are subject to significant regulatory, business, competitive and economic uncertainties and risks. Actual future events may vary materially from the forward looking statements and the assumptions on which the forward looking statements are based. Recipients of this document (“Recipients”) are cautioned to not place undue reliance on such forward-looking statements.

Toro makes no representation or warranty as to the accuracy, reliability or completeness of information in this document and does not take responsibility for updating any information or correcting any error or omission which may become apparent after this document has been issued.

To the extent permitted by law, Toro and its officers, employees, related bodies corporate and agents (“Agents”) disclaim all liability, direct, indirect or consequential (and whether or not arising out of the negligence, default or lack of care of Toro and/or any of its Agents) for any loss or damage suffered by a Recipient or other persons arising out of, or in connection with, any use or reliance on this presentation or information. All amounts in A$ unless stated otherwise.

Page 3: TORO ENERGY LIMITED Wiluna Uranium Project: the WA ...10+15+… · …if the ALP come to government and there's a project that's been approved - and when I say been approved I mean

Agenda

Toro Energy as a company

Wiluna Project Overview

Approvals

Community and Indigenous Relationships

3

Page 4: TORO ENERGY LIMITED Wiluna Uranium Project: the WA ...10+15+… · …if the ALP come to government and there's a project that's been approved - and when I say been approved I mean

Capital Structure • 1042m shares on issue (ASX)

• 37m options on issue (unlisted)

• ~A$0.083 Share Price (11 October)

• ~A$86.5m Market Capitalisation

• ~A$12.8m cash (30 June)

• ~A$73.7m Enterprise Value (EV/lb A$1.21/lb)

4

100% Wiluna Uranium Project (WA) • 54mlb U3O8 resource* • EPA positive recommendation • Government decisions Q4 2012

100% Theseus Uranium Project (WA) • Greenfield discovery in new area • 22 – 44mlbs U3O8 Exploration Target Range* • Maiden Resource Q4 2012 & potential ISR

operation

WA and NT are Australian States and Territories that allow uranium mining and enclose Toro’s project and exploration

footprint.

Toro’s Australian Tenement Footprint

Perth

Adelaide

Theseus

Wiluna

NT

WA

* See resources statement page 26, and Exploration Target Range statement page 27

Corporate Overview

0.00

0.02

0.04

0.06

0.08

0.10

0.12

$'A

UD

12 Month Share Price Graph

0

10

Mill

ion

s

Page 5: TORO ENERGY LIMITED Wiluna Uranium Project: the WA ...10+15+… · …if the ALP come to government and there's a project that's been approved - and when I say been approved I mean

5

Wiluna Project Overview

• 960 km NE of Perth, semi arid environment

• Shallow open pit mining (<10m), strip 3.8:1, mining to a 250ppm U3O8 cut-off

• Processing 1.3 mtpa to a 500ppm U3O8 cut-off results in 720ppm head grade

• Alkaline tank leach with direct precipitation

• In-pit tailings storage, progressive rehabilitation, similar to sand mining operation

Parameter November 2011 Economics*

Deposits Centipede, Lake Way

Processing Plant 1.3mtpa

Head grade ~720ppm

Recovery Ramping to 85%

C1 Cash Cost US$33/lb

Capital Cost A$280m

Product (per annum) 820t U3O8 (1.8mlb)

Mining Duration 14 years

* First 10 years of production

Page 6: TORO ENERGY LIMITED Wiluna Uranium Project: the WA ...10+15+… · …if the ALP come to government and there's a project that's been approved - and when I say been approved I mean

Wiluna Uranium Project

Calcrete deposits, discovered in 1970s, owned by

Toro since 2007

25 Mlbs U3O8 resource approval at State level,

awaiting Federal decision – Lake Way and

Centipede deposits

54 Mlbs regional resources including Millipede,

Dawson/Hinkler and Nowthanna

Up to 14 year life of mine, regional resources

increase to 20+ years dependent on future

approvals

Next Australian producer – one of few new

projects in world capable of production in 2014-15

6

Page 7: TORO ENERGY LIMITED Wiluna Uranium Project: the WA ...10+15+… · …if the ALP come to government and there's a project that's been approved - and when I say been approved I mean

Environmental Approvals

Page 8: TORO ENERGY LIMITED Wiluna Uranium Project: the WA ...10+15+… · …if the ALP come to government and there's a project that's been approved - and when I say been approved I mean

Approvals Timeline

8

Page 9: TORO ENERGY LIMITED Wiluna Uranium Project: the WA ...10+15+… · …if the ALP come to government and there's a project that's been approved - and when I say been approved I mean

Key Environmental Factors

Factors identified by WA EPA for detailed assessment:

• Groundwater

• Tailings and Mine Closure

• Flora and Vegetation

– Tecticornia, groundwater dependent vegetation

• Subterranean Fauna

– Stygofauna

• Transport

• Radiation

• Heritage

9

Page 10: TORO ENERGY LIMITED Wiluna Uranium Project: the WA ...10+15+… · …if the ALP come to government and there's a project that's been approved - and when I say been approved I mean

Groundwater Drawdown

10

• 0.5m contour for maximum drawdown is worst-case scenario impact zone

• <10% Stygofauna species collected from within mining footprint

• <8% of any PEC impacted

• Past borefield operation at West Creek demonstrates Stygofauna resilience

• Project proposed abstraction at West Creek within historic operations

• Minimal local Tecticornia associations impacted by mining footprint

• No Priority or listed species impacted

Page 11: TORO ENERGY LIMITED Wiluna Uranium Project: the WA ...10+15+… · …if the ALP come to government and there's a project that's been approved - and when I say been approved I mean

11

Mining Plan and Rehabilitation

• Mining for 5 years at Centipede followed by Lake

Way

• De-watering of pits for process water

• Progressive mining, tailings and rehabilitation

• In-pit tailings disposal only into Centipede pits –

below natural ground surface in lined pits

• Disposal sub-aerially in progressive cells – no

decant recovery

• Tailings integrity modelled for 10,000 years

• Mining footprint returned as close as possible to

natural land surface level

• No standing landforms remain post closure

Page 12: TORO ENERGY LIMITED Wiluna Uranium Project: the WA ...10+15+… · …if the ALP come to government and there's a project that's been approved - and when I say been approved I mean

Proposed Transport Route

• Wiluna-Adelaide via national highway system

• 5 conventional ship containers per month (2 double trailers, 1 single)

• Up to 36 truck movements per year

• 2 drivers per truck, 2 trucks in convoy, limited stops, re-fuelling points only

• Shipment from Port Adelaide and/or Darwin – both ports with long experience of uranium handling and certified handling facilities

12

Page 13: TORO ENERGY LIMITED Wiluna Uranium Project: the WA ...10+15+… · …if the ALP come to government and there's a project that's been approved - and when I say been approved I mean

EPA Recommendation

13

“WA Opposition Leader Mark McGowan said if he won the 2013 election, any [uranium] mines that were approved before that time would remain operational...”

AAP Report January 24, 2012

EPA recommends approval for Toro’s Wiluna Uranium

Project in WA to proceed

Paul Vogel

Chair - EPA

Page 14: TORO ENERGY LIMITED Wiluna Uranium Project: the WA ...10+15+… · …if the ALP come to government and there's a project that's been approved - and when I say been approved I mean

Ministerial Approval

14

WA Opposition spokesman Bill Johnston said: “…if the ALP come to government and there's a project that's been approved - and when I say been approved I mean by state approvals - it can proceed.”

ABC Radio, 11 October 2012

“The Liberal-National Government is committed to ensuring that uranium mining in WA will be subject to strict security provisions and world’s best practice safety and environmental standards.”

Minister Marmion, Media Statement 10 October 2012

Page 15: TORO ENERGY LIMITED Wiluna Uranium Project: the WA ...10+15+… · …if the ALP come to government and there's a project that's been approved - and when I say been approved I mean

Community and Indigenous Relationships

Page 16: TORO ENERGY LIMITED Wiluna Uranium Project: the WA ...10+15+… · …if the ALP come to government and there's a project that's been approved - and when I say been approved I mean

Community

• Industry collaboration on regional consultation programme since 2008

• Information days in Wiluna, Kalgoorlie, Menzies and Leonora for ERMP

• Wiluna Shire (Local Government) adopted policy of support for uranium mining

• Wiluna population ~ 650 – more than half indigenous

• Contracts already provided to local and regional businesses

• Indigenous employees engaged during technical site works

16

Page 17: TORO ENERGY LIMITED Wiluna Uranium Project: the WA ...10+15+… · …if the ALP come to government and there's a project that's been approved - and when I say been approved I mean

Indigenous relationships

• Regular attendance by Toro at claimant meetings in Wiluna to provide Project updates

• Traditional Owner site visits

- Beverley Mine (SA)

- Doral Mineral Sands Mine (WA)

- Wiluna Project

• Independent advice on radiation and environmental issues

• Project configuration including infrastructure is basis for mining agreement

• Exclusion zones identified to protect cultural heritage

- Loss of access to ore

- Increased operating costs

• Mining agreement negotiation underway

17

Page 18: TORO ENERGY LIMITED Wiluna Uranium Project: the WA ...10+15+… · …if the ALP come to government and there's a project that's been approved - and when I say been approved I mean

Indigenous Concerns

• Cultural Heritage Management

• Bush Tucker

• Radiation & Environmental Monitoring

• Environmental Management

• Land Rehabilitation

18

Page 19: TORO ENERGY LIMITED Wiluna Uranium Project: the WA ...10+15+… · …if the ALP come to government and there's a project that's been approved - and when I say been approved I mean

Traditional Owner’s view

19

“… for the first time, a mining company has come to

talk to the mob about their concerns. This is good

and the old men are happy that Toro will keep away

from their sites.

There is a long way to go, but at least the men who

are responsible for that area have been able to sit

down and talk about that country on behalf of all

the Wiluna mob and be listened to and be involved

in decisions about that country. This hasn’t

happened before.”

Spokesman for Senior Lawmen

Darren Farmer

Page 20: TORO ENERGY LIMITED Wiluna Uranium Project: the WA ...10+15+… · …if the ALP come to government and there's a project that's been approved - and when I say been approved I mean

Anti-Nuclear Activism

20

Page 21: TORO ENERGY LIMITED Wiluna Uranium Project: the WA ...10+15+… · …if the ALP come to government and there's a project that's been approved - and when I say been approved I mean

21

Conclusions

• Start Early – Relationships take time to develop

– Expect to explain more than once

– Expect turnover

• Plan for extensions of time – Expect public and government will take more time

– Patient, open and honest approach

– Open to feedback

– No shortcuts!

• Meticulous and comprehensive assessment

– Sound science to back up position

– Provide more data not less

– Expect to explain radiation management frequently

– No shortcuts!

Page 22: TORO ENERGY LIMITED Wiluna Uranium Project: the WA ...10+15+… · …if the ALP come to government and there's a project that's been approved - and when I say been approved I mean

Thank You

Toro’s aim is to become Australia’s next uranium

producer focusing on developing a top tier

exploration and production profile in the global uranium

mining sector.

Page 23: TORO ENERGY LIMITED Wiluna Uranium Project: the WA ...10+15+… · …if the ALP come to government and there's a project that's been approved - and when I say been approved I mean

Toro Energy Limited

Vanessa Guthrie Executive General Manager Wiluna Project

Toro Energy Limited Level 2 35 Ventnor Avenue West Perth Western Australia 6005

Telephone: +61 8 9214 2100 Facsimile: +61 8 9226 2958 Email: [email protected] Website: www.toroenergy.com.au

23

Page 24: TORO ENERGY LIMITED Wiluna Uranium Project: the WA ...10+15+… · …if the ALP come to government and there's a project that's been approved - and when I say been approved I mean

The information in this report that relates to Mineral Resources is based on information compiled by Dr Katrin Karner of Toro Energy Limited, Mr Robin Simpson and Mr Daniel Guibal of SRK Consulting (Australasia) Pty Ltd. Daniel Guibal takes overall responsibility for the Resource Estimate, and Dr Karner takes responsibility for the integrity of the drilling and bulk density results. Dr Karner, Mr Simpson and Mr Guibal are Members of the Australasian Institute of Mining and Metallurgy (AusIMM), and have sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity they are undertaking to qualify as Competent Persons as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code 2004)’. The Competent Persons consent to the inclusion in this release of the matters based on the information in the form and context in which it appears.

Information in this report relating to Exploration results is based on information compiled by Mr Mark McGeough who is a Fellow of the Australasian Institute of Mining and Metallurgy. Mr McGeough is a full-time employee of Toro, and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr McGeough consents to the inclusion in this release of the matters based on his information in the form and context in which it appears.

Information in this report relating to Deconvolved Gamma Results, is based on information compiled by Mr David Wilson BSc MSc who is a Member of the Australasian Institute of Mining and Metallurgy. Mr Wilson is a full-time employee of 3D Exploration Ltd, a consultant to Toro and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Wilson consents to the inclusion in this release of the matters based on his information in the form and context in which it appears.

24

Competent Persons Statements