H-1
SHEET NO.WILSON RD SHELTER FLOOR PLAN
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICNSITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
F6TPF
-48V
DC
RA
CK
NO
KIA
7705
RA
CK
FDO
TFI
BE
RR
AC
K
-48VDC BATTERY PLANT
WILSON RD – SHELTER FLOOR PLAN
GENERATOR ROOM
WILSON RD:
A. FUSE PANEL WITHAPPROPRIATELY SIZED FUSES
B1. NOKIA MPR-9500 RADIO SHELFB2. FUTURE NOKIA MPR-9500
RADIO SHELFC. NOKIA 7705 SAR-18 ROUTERD. TELCO SYSTEMS ACCESS60
CHANNEL BANKE. DPS TELECOM LINE
PROTECTOR 48 SPDF. NETGUARDIAN RTUG. 4-WIRE EM JACKFIELDH. DIN RAIL WITH GIGABIT
ETHERNET, 4WEM SPDI. RELOCATED NOKIA NFM-P
FROM DISTRICT 6 RTMCJ. NOKIA 7750 SR-a8
A
B1
G
H
9500 MPT-HLC
9500 MPT-HLC
9500-MPT
9500 MPT-HLC
9500 MPT-HLC
9500-MPT
XMDA 1 XMDA 2 XMDA 3 CSM A CSM BXMDA 4 MDA 1 MDA 2 MDA 3 MDA 4 MDA 5 MDA 6 MDA 7 MDA 8 MDA 9 MDA 10 MDA 11 MDA 12
7705 SAR-18
o I
IoONOFF
IoONOFF
Batt A
Batt B
Fan
Batt A
Batt B
Critical
MajorMinor
BIT S1
BIT S2
AlarmModule
ExternalAlarms
ACO
Alarms
Fan FilterRelease
FanModule
Stat
Pwr
Act
CS
M-2
Com
pact Flash#1C
ompact Flash#2
Mgm
t PortC
onsoleU
SB
2D C
LEI
Stat
Pwr
Act
CS
M-2
Com
pact Flash#1C
ompact Flash#2
Mgm
t PortC
onsoleU
SB
2D C
LEI
Lnk1
ActLnk
2Act
Lnk3
ActLnk
4Act
Lnk5
ActLnk
6Act
78
LnkAct
LnkAct
A8-E
TH
Pwr
Stat
A12-S
DI
Stat
Pwr
Act
Port
Ports 4-6
Ports 1-3
Ports 10-12
Ports 7-9
Lnk1
ActLnk
2Act
Lnk3
ActLnk
4Act
Lnk5
ActLnk
6Act
78
LnkAct
LnkAct
A8-E
TH
Pwr
Stat
Lnk1
ActLnk
2Act
Lnk3
ActLnk
4Act
Lnk5
ActLnk
6Act
78
LnkAct
LnkAct
A8-E
TH
Pwr
Stat
Port1
Call
Port2
Call
Port3
Call
Port4
Call
Port5
Call
Port6
Call
A6-E
&M
Pwr
Stat
A8-1GB-SFP
Stat
Pwr
12
34
76
58
LnkAct
LnkAct
LnkAct
LnkAct
LnkAct
LnkAct
LnkAct
LnkAct
-48V/24V
A8-P
MC
Pwr
Stat
MW
3
LnkAct
MW
4
LnkAct
5
LnkAct
6
LnkAct
7
LnkAct
8
LnkAct
LnkM
W1
ActLnk
MW
2Act
-48V/24V
B2
C
D
F
DPS TELECOM LINE PROTECTOR 48E
NOKIA 7750 SR-a8
RELOCATEDNOKIA NFM-P
I
J
WILSON RD – 7705 RACK
NOTES:
1. 7705 SAR-18 INSTALLED AND IN OPERATION.
2. CUT-OVER NOKIA NFM-P AND 7750 SR-A8 IN ACCORDANCE WITHEQUIPMENT INSTALLATION CUT-OVER SEQUENCING PLAN, SHEETS A-5AND A-6; AND SITE SPECIFIC 7705 CONFIGURATION PARAMETERS.
EQUIPMENT TO BE INSTALLED
FUTURE INSTALLATION
EXISTING FDOT EQUIPMENT
LEGEND:
Attachment 1 8
Microwave RadioDVM6-45
Milton DOT
A
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
AM23
28-T1 TDMMultiplex A
EasternResearch
DACC
(20) T1 to Chipley
01.03.02
01.02.05
P12 Access 60Channel Bank
Nokia 7705
(7) T1 to Milton DOT
T1 Aggregation
Site Equipment
H-2
SHEET NO.PENSACOLA NETWORK DIAGRAMS
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICNSITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
F6TPF
Microwave RadioDVM6-45
Milton DOT
A
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
AM23
28-T1 TDMMultiplex A
BPS 2000
(1) DS3
EasternResearch
DACC
(23) T1 to Tallahassee
FHP
01.03.04
01.02.07
P12 Access 60Channel Bank
CAC Wide Bank 28
Nortel Passsport 15000
DS3 ATM Interface
Gig E 1000 Base SX
Nortel ASN Router
TLANNetPro
Nortel BayStack 106 12-Port 10BaseT Hub
Site Equipment
PENSACOLA – AS-BUILT
PENSACOLA – PROPOSED
NOTES:
1. INSTALL NOKIA 7705 SAR-18, SEE SHEET H-3.
2. CUT-OVER DS-1S AND SITE EQUIPMENT IN ACCORDANCE WITH EQUIPMENT INSTALLATION AND CUT-OVER SEQUENCING PLAN, SHEETS A-5, A-6, AND SITE SPECIFIC 7705 CONFIGURATION PARAMETERS.
NOTE 1
GPSNOTE 2
EQUIPMENT TO BE INSTALLED
EQUIPMENT TO BE REMOVED
EXISTING FDOT EQUIPMENT
LEGEND:
Attachment 1 9
7705 Rack
NR-4-48 VDC
DistributionRack
+
-48 Volt D
CBatteryPlant
Fiber Rack
NR-2DVM6-45XLMicrowaveTerminal
Radio Rack
WoodenDesk
Passport15k
Rack
Unk-1For 47 MHzRepeater
Unk-2ForestryRadio
NR-6Channel Bank
Rack
NR-5Network &
DACC Rack
NOTES:
1. INSTALL NOKIA 7705 SAR-18, -48VDC FUSE PANEL, DSX-1 PANEL, AND SPDS IN NEW 19-INCH EQUIPMENT RACK.
2. CONNECT DS-1s FROM NEW 7705 DSX-1 PANEL TO DVM6-45 DSX-1 PANEL LOCATED IN CHANNEL BANK RACK.
3. INSTALL APPROPRIATELY SIZED -48VDC A/B BREAKERS, AND WIRE TO FUSE PANEL IN 7705 RACK. THE BREAKERS SHALL BE THE SAME STYLE AS SHOWN ON FIGURE 1 SHEET E-1.
4. AFTER FINAL CUT-OVER, REMOVE THE EQUIPMENT IN THE PASSPORT 15K RACK AND THE 23-IN RACK, AND RELOCATE THE 7705 RACK IN ITS PLACE. THE DPS TELECOM NETGUARDIAN 832A SHALL BE DELIVERED TO THE FDOT.
5. INSTALL GPS ANTENNA, COAX TRANSMISSION LINE THROUGH WAVEGUIDE ENTRY PORT.
DS-1 CABLE
-48VDC CABLES
ENTRY PORT
GPS ANTENNA
SPD
NOTE 4
NOTE 1
NOTE 2
NOTE 3
PENSACOLA 7705 RACK:
A. FUSE PANEL WITH APPROPRIATELY SIZED FUSES
B. FUTURE NOKIA MPR-9500 RADIO SHELF
C. NOKIA 7705 SAR-18 ROUTER
D. DSX JACKFIELD – 32 CKTSE. DIN RAIL WITH T-1 SPDS –
28 CKTSF. 19 INCH RELAY RACK
A
B
C
F
9500 MPT-HLC
9500 MPT-HLC
9500-MPT
XMDA 1 XMDA 2 XMDA 3 CSM A CSM BXMDA 4 MDA 1 MDA 2 MDA 3 MDA 4 MDA 5 MDA 6 MDA 7 MDA 8 MDA 9 MDA 10 MDA 11 MDA 12
7705 SAR-18
o I
IoONOFF
IoONOFF
Batt A
Batt B
Stat
Pwr
Act
CS
M-2
Com
pact Flash#1C
ompact Flash#2
Mgm
t PortC
onsoleU
SB
2D C
LEI
Stat
Pwr
Act
CS
M-2
Com
pact Flash#1C
ompact Flash#2
Mgm
t PortC
onsoleU
SB
2D C
LEI
Fan
Batt A
Batt B
Critical
MajorMinor
BIT S1
BIT S2
AlarmModule
ExternalAlarms
ACO
Alarms
7705 DSX-1 PANEL D
E
H-3
SHEET NO.PENSACOLA SHELTER FLOOR PLAN
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICNSITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
F6TPF
PENSACOLA – SHELTER FLOOR PLANPENSACOLA – 7705 RACK
EQUIPMENT TO BE INSTALLED
EQUIPMENT TO BE REMOVED
FUTURE INSTALLATION
EXISTING FDOT EQUIPMENT
LEGEND:
Attachment 1 10
H-4
SHEET NO.CHIPLEY AS-BUILT NETWORK DIAGRAM
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICNSITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
F6TPF
Microwave RadioDVM6-45
Microwave RadioDVM6-45
Caryville Marianna FHP
M121
M122
M123
M124
M125
M126
M127
BM23
M121
M122
M123
M124
M125
M126
M127
AM23
28-T1 TDMMultiplex C
28-T1 TDMMultiplex B
BPS 2000
Nortel BayStack 106 12-Port 10BaseT Hub
B1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
A1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
(1) DS3(1) DS3
CAC Wide Bank 28
EasternResearch
DACC
(23) T1 to Pensacola(23) T1 to Lake City
P12 Access 60Channel Bank
CAC Wide Bank 28
Nortel Passsport 15000
DS3 ATM Interface
Gig E 1000 Base SX
Nortel ASN Router
01.03.02
01.02.05
01.04.03
SITEEQUIPMENT
CHIPLEY – AS-BUILT
EQUIPMENT TO BE REMOVED
EXISTING FDOT EQUIPMENT
LEGEND:
Attachment 1 11
H-5
SHEET NO.CHIPLEY PROPOSED NETWORK DIAGRAM
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICNSITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
F6TPF
Microwave RadioDVM6-45
Microwave RadioDVM6-45
Caryville Marianna FHP
B
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
BM23
A
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
AM23
28-T1 TDMMultiplex A
28-T1 TDMMultiplex B
01.03.02
01.02.05
01.04.03
EasternResearch
DACC
(20) T1 to Pensacola
(20) T1 to Tallahassee FHP
P12
(7) T1 to Caryville
Access 60Channel Bank
Nokia 7705
T1 Aggregation
Site Equipment
(7) T1 to Marianna
CHIPLEY – PROPOSED
NOTES:
1. INSTALL NOKIA 7705 SAR-18, SEE SHEET H-6.
2. CUT-OVER DS-1S AND SITE EQUIPMENT IN ACCORDANCE WITH EQUIPMENT INSTALLATION AND CUT-OVER SEQUENCING PLAN, SHEETS A-5, A-6, AND SITE SPECIFIC 7705 CONFIGURATION PARAMETERS.
NOTE 1
GPSNOTE 2
EQUIPMENT TO BE INSTALLED
EXISTING FDOT EQUIPMENT
LEGEND:
Attachment 1 12
7705 Rack
H-6
SHEET NO.CHIPLEY SHELTER FLOOR PLAN
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICNSITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
F6TPF
Woo
den
Shel
fw
/Dra
wer
MAS Call Box Base Station Rack (FR1)
-48 VDCPower
Distribution Rack
Channel Bank Rack (FR6)
ASN / DACCRack (FR5)
DVM6-45MW TerminalRack (FR2)
DVM6-45MW TerminalRack (FR3)
FDOT 47 MHzGE MASTRIIBase Station
Passport 15000Rack (FR4)
NOTE 1
DS-1 CABLE
GPS COAXIAL
FLOOR ENTRY PORT
SPD
GPS ANTENNA
TRANSMISSIONLINE BRIDGE
NOTE 2
CHIPLEY – 7705 RACKCHIPLEY – SHELTER FLOOR PLAN
NOTES:
1. INSTALL NOKIA 7705 SAR-18, -48VDC FUSE PANEL, DSX-1 PANELS, AND SPDS IN NEW 19-INCH EQUIPMENT RACK.
2. CONNECT DS-1s FROM NEW 7705 DSX-1 PANEL TO DVM6-45 DSX-1 PANEL LOCATED IN CHANNEL BANK RACK.
3. INSTALL APPROPRIATELY SIZED -48VDC A/B BREAKERS, AND WIRE TO FUSE PANEL IN 7705 RACK. THE BREAKERS SHALL BE THE SAME STYLE AS SHOWN ON FIGURE 1 SHEET E-1.
4. AFTER FINAL CUT-OVER, REMOVE THE EQUIPMENT IN THE PASSPORT 15K RACK AND THE 23-IN RACK, AND RELOCATE THE 7705 RACK IN ITS PLACE. THE DPS TELECOM NETGUARDIAN 832A SHALL BE DELIVERED TO THE FDOT.
5. INSTALL GPS ANTENNA, COAX TRANSMISSION LINE THROUGH FLOOR ENTRY PORT.
A
B
C
D
F
E
9500 MPT-HLC
9500 MPT-HLC
9500-MPT
9500 MPT-HLC
9500 MPT-HLC
9500-MPT
B
XMDA 1 XMDA 2 XMDA 3 CSM A CSM BXMDA 4 MDA 1 MDA 2 MDA 3 MDA 4 MDA 5 MDA 6 MDA 7 MDA 8 MDA 9 MDA 10 MDA 11 MDA 12
7705 SAR-18
o I
IoONOFF
IoONOFF
Batt A
Batt B
Stat
Pwr
Act
CS
M-2
Com
pact Flash#1C
ompact Flash#2
Mgm
t PortC
onsoleU
SB
2D C
LEI
Stat
Pwr
Act
CS
M-2
Com
pact Flash#1C
ompact Flash#2
Mgm
t PortC
onsoleU
SB
2D C
LEI
Fan
Batt A
Batt B
Critical
MajorMinor
BIT S1
BIT S2
AlarmModule
ExternalAlarms
ACO
Alarms
7705 DSX-1 PANEL
7705 DSX-1 PANEL
D
E
CHIPLEY - 7705 RACKA. FUSE PANEL WITH
APPROPRIATELY SIZED FUSES
B. FUTURE NOKIA MPR-9500 RADIO SHELF
C. NOKIA 7705 SAR-18 ROUTER
D. DSX JACKFIELD – 32 CKTSE. DIN RAIL WITH T-1 SPDS –
28 CKTSF. 19 INCH RELAY RACK
NOTE 4
NOTE 3
EQUIPMENT TO BE INSTALLED
EQUIPMENT TO BE REMOVED
FUTURE INSTALLATION
EXISTING FDOT EQUIPMENT
LEGEND:
Attachment 1 13
Microwave RadioDVM6-45
Microwave RadioDVM6-45
Quincy FHP Monticello DOT
B
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
BM23
A
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
AM23
28-T1 TDMMultiplex A
28-T1 TDMMultiplex B
(1) DS3(1) DS3
CAC Wide Bank 28
EasternResearch
DACC
(23) T1 to Chipley(23) T1 to Lake City
01.03.04
01.02.07
P12 Access 60Channel Bank
CAC Wide Bank 28
Nortel Passsport 15000
01.05.03
DS3 ATM Interface
Gig E 1000 Base SX
Nortel ASN Router
Nortel ERS 8606
SITEEQUIPMENT
H-7
SHEET NO.TALLAHASSEE AS-BUILT NETWORK DIAGRAM
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICNSITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
F6TPF
TALLAHASSEE – AS-BUILT
EQUIPMENT TO BE REMOVED
EXISTING FDOT EQUIPMENT
LEGEND:
Attachment 1 14
H-8
SHEET NO.TALLAHASSEE PROPOSED NETWORK DIAGRAM
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICNSITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
F6TPF
Microwave RadioDVM6-45
Microwave RadioDVM6-45
Quincy Monticello
B
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
BM23
A
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
CM23
28-T1 TDMMultiplex C
28-T1 TDMMultiplex B
EasternResearch
DACC
(20) T1 to Chipley (20) T1 to Lake City
01.02.07
P12
(7) T1 to Quincy
Access 60Channel Bank
Nokia 7705
01.05.0301.03.04
T1 Aggregation Site Equipment
(7) T1 to Monticello
Nortel ERS 8606
TALLAHASSEE – PROPOSED
NOTES:
1. INSTALL NOKIA 7705 SAR-18, SEE SHEET H-9.
2. CUT-OVER DS-1S AND SITE EQUIPMENT IN ACCORDANCE WITH EQUIPMENT INSTALLATION AND CUT-OVER SEQUENCING PLAN, SHEETS A-5, A-6, AND SITE SPECIFIC 7705 CONFIGURATION PARAMETERS.
NOTE 1
NOTE 2
GPS
EQUIPMENT TO BE INSTALLED
EXISTING FDOT EQUIPMENT
LEGEND:
Attachment 1 15
H-9
SHEET NO.TALLAHASSEE SHELTER FLOOR PLAN
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICNSITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
F6TPF
FDOT 47 MHzGE MASTR II Base Station
ChannelBankRackBR4
DVM6-45Terminal
Radio RackBR6
DVM6-45Terminal
Radio RackBR5
MACBS
DACSForestry
VHF Radio
Tabl
e
-48 Volt DCBatteryPlant
+
Workstation DeskCPU
&UPS
CPU&
UPS
ASN/DACC Rack
-48 VDCDistribution
Rack
Passport15000
Rack (FR4)
ITS WAN Rack
7705 RACK
DS-1 CABLE
-48VDC CABLES
GPS ANTENNA
TRANSMISSIONLINE BRIDGE
FLOOR ENTRY PORT
SPD
NOTE 1
NOTE 2
NOTE 3
TALLAHASSEE 7705 RACK:
A. FUSE PANEL WITH APPROPRIATELY SIZED FUSES
B. FUTURE NOKIA MPR-9500 RADIO SHELF
C. NOKIA 7705 SAR-18 ROUTER
D. DSX JACKFIELD – 32 CKTSE. DIN RAIL WITH T-1 SPDS –
28 CKTSF. 19 INCH RELAY RACK
A
B
C
D
F
E
9500 MPT-HLC
9500 MPT-HLC
9500-MPT
9500 MPT-HLC
9500 MPT-HLC
9500-MPT
B
XMDA 1 XMDA 2 XMDA 3 CSM A CSM BXMDA 4 MDA 1 MDA 2 MDA 3 MDA 4 MDA 5 MDA 6 MDA 7 MDA 8 MDA 9 MDA 10 MDA 11 MDA 12
7705 SAR-18
o I
IoONOFF
IoONOFF
Batt A
Batt B
Stat
Pwr
Act
CS
M-2
Com
pact Flash#1C
ompact Flash#2
Mgm
t PortC
onsoleU
SB
2D C
LEI
Stat
Pwr
Act
CS
M-2
Com
pact Flash#1C
ompact Flash#2
Mgm
t PortC
onsoleU
SB
2D C
LEI
Fan
Batt A
Batt B
Critical
MajorMinor
BIT S1
BIT S2
AlarmModule
ExternalAlarms
ACO
Alarms
7705 DSX-1 PANEL
7705 DSX-1 PANEL
D
E
TALLAHASSEE - 7705 RACK
GPS COAXIAL
TALLAHASSEE – SHELTER FLOOR PLAN
EQUIPMENT TO BE INSTALLED
EQUIPMENT TO BE REMOVED
FUTURE INSTALLATION
EXISTING FDOT EQUIPMENT
LEGEND:
NOTES:
1. INSTALL NOKIA 7705 SAR-18, -48VDC FUSE PANEL, DSX-1 PANELS, AND SPDS IN NEW 19-INCH EQUIPMENT RACK.
2. CONNECT DS-1s FROM NEW 7705 DSX-1 PANEL TO DVM6-45 DSX-1 PANEL LOCATED IN CHANNEL BANK RACK.
3. INSTALL APPROPRIATELY SIZED -48VDC A/B BREAKERS, AND WIRE TO FUSE PANEL IN 7705 RACK. THE BREAKERS SHALL BE THE SAME STYLE AS SHOWN ON FIGURE 2 SHEET E-1.
4. AFTER FINAL CUT-OVER, REMOVE THE EQUIPMENT IN THE PASSPORT 15K RACK AND THE 23-IN RACK. THE DPS TELECOM NETGUARDIAN 832A SHALL BE DELIVERED TO THE FDOT.
5. INSTALL GPS ANTENNA, COAX TRANSMISSION LINE THROUGH FLOOR ENTRY PORT.
NOTE 4
Attachment 1 16
H-10
SHEET NO.LAKE CITY AS-BUILT NETWORK DIAGRAM
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICNSITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
F6TPF
Microwave RadioDVM6-45
(027)
Microwave RadioDVM6-45
(029)
SR 136 Sanderson
B
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
BM23
A
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
CM23
28-T1 TDMMultiplex C
28-T1 TDMMultiplex B
BPS 2000
(1) DS3(1) DS3
CAC Wide Bank 28
EasternResearch
DACC
(23) T1 to Tallahassee
FHP
(23) T1 to Jacksonville
FHP
01.03.04
01.02.07
P12
Microwave RadioDVM6-45
(027)
US 41
A
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
AM23
28-T1 TDMMultiplex A
(23) T1 to Wildwood
CAC Wide Bank 28
Access 60Channel Bank
CAC Wide Bank 28
Nortel Passsport 15000
01.05.03
DS3 ATM Interface
Gig E 1000 Base SX
Nortel ASN Router
TLANNetPro
Nortel BayStack 106 12-Port 10BaseT Hub
01.05.04
SITEEQUIPMENT
(1) DS3
LAKE CITY – AS-BUILTEQUIPMENT TO BE REMOVED
EXISTING FDOT EQUIPMENT
LEGEND:
Attachment 1 17
H-11
SHEET NO.LAKE CITY PROPOSED NETWORK DIAGRAM
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICNSITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
F6TPF
Microwave RadioDVM6-45
(027)
Microwave RadioDVM6-45
(029)
SR 136 Sanderson
B
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
BM23
A
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
CM23
28-T1 TDMMultiplex C
28-T1 TDMMultiplex B
EasternResearch
DACC
(20) T1 to Tallahassee
FHP
(20) T1 to Jacksonville FHP
01.02.07
P12
Microwave RadioDVM6-45
(027)
US 41
A
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
AM23
28-T1 TDMMultiplex A
(20) T1 to Wildwood
(7) T1 to US 41(7) T1 to SR 136
(7) T1 to Sanderson
Access 60Channel Bank
Nokia 7705
01.05.03
01.03.04
01.05.04
T1 Aggregation
SITEEQUIPMENT
LAKE CITY – PROPOSED
NOTES:
1. INSTALL NOKIA 7705 SAR-18, SEE SHEET H-12.
2. CUT-OVER DS-1S AND SITE EQUIPMENT IN ACCORDANCE WITH EQUIPMENT INSTALLATION AND CUT-OVER SEQUENCING PLAN, SHEETS A-5, A-6, AND SITE SPECIFIC 7705 CONFIGURATION PARAMETERS.
NOTE 1
NOTE 2
GPS
EQUIPMENT TO BE INSTALLED
EXISTING FDOT EQUIPMENT
LEGEND:
Attachment 1 18
H-12
SHEET NO.LAKE CITY SHELTER FLOOR PLAN
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICNSITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
F6TPF
-48VDCBatteryPlant
-
+
HON DeskModel P3262
DVM6-45Microwave
Rack
15K Rack-48VDC
DistributionRack
MAS + RWISCall Box
Base Station Rack
47 MHzEricsson Base
TDM/Channel Bank
Rack/DACCS
Bookcase
Network Management
Rack
DVM6-45Microwave
Rack
DVM6-45Microwave
Rack
ITS WAN8606
7705 Rack
GPS ANTENNA
SPD
ENTRY PORT
DS-1 CABLE
NOTE 2
NOTE 2
GPS COAXIAL
-48VDC CABLES
NOTE 3
NOTE 1
NOTE 4
LAKE CITY 7705 RACK:
A. FUSE PANEL WITH APPROPRIATELY SIZED FUSES
B. FUTURE NOKIA MPR-9500 RADIO SHELF
C. NOKIA 7705 SAR-18 ROUTERD. DSX JACKFIELD – 32 CKTSE. DIN RAIL WITH T-1 SPDS –
28 CKTSF. 19 INCH RELAY RACK
A
B
C
D
F
E
9500 MPT-HLC
9500 MPT-HLC
9500-MPT
9500 MPT-HLC
9500 MPT-HLC
9500-MPT
B
XMDA 1 XMDA 2 XMDA 3 CSM A CSM BXMDA 4 MDA 1 MDA 2 MDA 3 MDA 4 MDA 5 MDA 6 MDA 7 MDA 8 MDA 9 MDA 10 MDA 11 MDA 12
7705 SAR-18
o I
IoONOFF
IoONOFF
Batt A
Batt B
Stat
Pwr
Act
CS
M-2
Com
pact Flash#1C
ompact Flash#2
Mgm
t PortC
onsoleU
SB
2D C
LEI
Stat
Pwr
Act
CS
M-2
Com
pact Flash#1C
ompact Flash#2
Mgm
t PortC
onsoleU
SB
2D C
LEI
Fan
Batt A
Batt B
Critical
MajorMinor
BIT S1
BIT S2
AlarmModule
ExternalAlarms
ACO
Alarms
7705 DSX-1 PANEL
7705 DSX-1 PANEL
D
E
9500 MPT-HLC
9500 MPT-HLC
9500-MPT
7705 DSX-1 PANEL
B
D
E
LAKE CITY – SHELTER FLOOR PLAN
LAKE CITY – 7705 RACK
NOTES:
1. INSTALL NOKIA 7705 SAR-18, -48VDC FUSE PANEL, DSX-1 PANELS, AND SPDS IN NEW 19-INCH EQUIPMENT RACK.
2. CONNECT DS-1s FROM NEW 7705 DSX-1 PANEL TO DVM6-45 DSX-1 PANEL LOCATED IN CHANNEL BANK RACK.
3. INSTALL APPROPRIATELY SIZED -48VDC A/B BREAKERS, AND WIRE TO FUSE PANEL IN 7705 RACK. THE BREAKERS SHALL BE THE SAME STYLE AS SHOWN ON FIGURE 2 SHEET E-1.
4. AFTER FINAL CUT-OVER, REMOVE THE EQUIPMENT IN THE PASSPORT 15K RACK AND THE 23-IN RACK, AND RELOCATE THE 7705 RACK IN ITS PLACE. THE DPS TELECOM NETGUARDIAN 832A SHALL BE DELIVERED TO THE FDOT.
5. INSTALL GPS ANTENNA, COAX TRANSMISSION LINE THROUGH WAVEGUIDE ENTRY PORT.
EQUIPMENT TO BE INSTALLED
EQUIPMENT TO BE REMOVED
FUTURE INSTALLATION
EXISTING FDOT EQUIPMENT
LEGEND:
Attachment 1 19
H-13
SHEET NO.WILDWOOD AS-BUILT NETWORK DIAGRAM
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICNSITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
F6TPF
Microwave RadioDVM6-45
Microwave RadioDVM6-45
Ocala DOT Saint Catherine
B
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
BM23
A
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
AM23
28-T1 TDMMultiplex A
28-T1 TDMMultiplex B
Microwave RadioConstellation
Wildwood FTE
A
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
CM23
28-T1 TDMMultiplex C
BPS 2000
(1) DS3(1) DS3
CAC Wide Bank 28
EasternResearch
DACC
(23) T1 to Lake City (23) T1 to Tampa Maintenance
01.03.04
01.02.07
P12
(5) T1 to Stuart Maintenance
CAC Wide Bank 28
Access 60Channel Bank
CAC Wide Bank 28
Nortel Passsport 15000
01.05.03
DS3 ATM Interface
Gig E 1000 Base SX
Nortel ASN Router
TLANNetPro
Nortel BayStack 106 12-Port 10BaseT Hub
01.05.04
SITEEQUIPMENT
(1) DS3
Larus Clock
WILDWOOD – AS-BUILT
EQUIPMENT TO BE REMOVED
EXISTING FDOT EQUIPMENT
LEGEND:
Attachment 1 20
Microwave RadioDVM6-45
Microwave RadioDVM6-45
Ocala DOT Saint Catherine
B
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
BM23
A
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
AM23
28-T1 TDMMultiplex A
28-T1 TDMMultiplex B
Microwave RadioConstellation
Wildwood FTE
A
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
CM23
28-T1 TDMMultiplex C
EasternResearch
DACC
(20) T1 to Lake City(20) T1 to Tampa
Maintenance
P12
(26) T1 to Wildwood Turnpike
(7) T1 to Ocala (7) T1 to Saint Catherine
Access 60Channel Bank
Nokia 7705
T1 Aggregation
SITEEQUIPMENT
Larus Clock
H-14
SHEET NO.WILDWOOD PROPOSED NETWORK DIAGRAM
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICNSITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
F6TPF
WILDWOOD – PROPOSED
NOTES:
1. INSTALL NOKIA 7705 SAR-18, SEE SHEET H-15.
2. CUT-OVER DS-1S AND SITE EQUIPMENT IN ACCORDANCE WITH EQUIPMENT INSTALLATION AND CUT-OVER SEQUENCING PLAN, SHEETS A-5, A-6, AND SITE SPECIFIC 7705 CONFIGURATION PARAMETERS.
NOTE 1 NOTE 2
GPS
EQUIPMENT TO BE INSTALLED
EXISTING FDOT EQUIPMENT
LEGEND:
Attachment 1 21
H-15
SHEET NO.WILDWOOD SHELTER FLOOR PLAN
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICNSITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
F6TPF
7705 Rack
-48VDCBatteryPlant
-
+
DVM6-45 MWTerminal Rack
(Q1)
DVM6-45 MWTerminal Rack
(Q2)
Channel Bank and DACC
Rack
DVM6-45 RackMAS Call Box Base Station
Rack
Passport 15kRack
-48 VDCDistribution
Rack
GPS ANTENNA
SPD
ENTRY PORT
DS-1 CABLE
NOTE 2
NOTE 2
NOTE 2
NOTE 3
NOTE 1
NOTE 4
WILDWOOD 7705 RACK:
A. FUSE PANEL WITH APPROPRIATELY SIZED FUSES
B. FUTURE NOKIA MPR-9500 RADIO SHELF
C. NOKIA 7705 SAR-18 ROUTERD. DSX JACKFIELD – 32 CKTSE. DIN RAIL WITH T-1 SPDS –
28 CKTSF. 19 INCH RELAY RACK
A
B
C
D
F
E
9500 MPT-HLC
9500 MPT-HLC
9500-MPT
9500 MPT-HLC
9500 MPT-HLC
9500-MPT
B
XMDA 1 XMDA 2 XMDA 3 CSM A CSM BXMDA 4 MDA 1 MDA 2 MDA 3 MDA 4 MDA 5 MDA 6 MDA 7 MDA 8 MDA 9 MDA 10 MDA 11 MDA 12
7705 SAR-18
o I
IoONOFF
IoONOFF
Batt A
Batt B
Stat
Pwr
Act
CS
M-2
Com
pact Flash#1C
ompact Flash#2
Mgm
t PortC
onsoleU
SB
2D C
LEI
Stat
Pwr
Act
CS
M-2
Com
pact Flash#1C
ompact Flash#2
Mgm
t PortC
onsoleU
SB
2D C
LEI
Fan
Batt A
Batt B
Critical
MajorMinor
BIT S1
BIT S2
AlarmModule
ExternalAlarms
ACO
Alarms
7705 DSX-1 PANEL
7705 DSX-1 PANEL
D
E
9500 MPT-HLC
9500 MPT-HLC
9500-MPT
7705 DSX-1 PANEL
B
D
E
WILDWOOD – SHELTER FLOOR PLAN
WILDWOOD – 7705 RACK
NOTES:
1. INSTALL NOKIA 7705 SAR-18, -48VDC FUSE PANEL, DSX-1 PANELS, AND SPDS IN NEW 19-INCH EQUIPMENT RACK.
2. CONNECT DS-1s FROM NEW 7705 DSX-1 PANEL TO DVM6-45 DSX-1 PANELS LOCATED IN EACH DVM6-45 RACK.
3. INSTALL APPROPRIATELY SIZED -48VDC A/B BREAKERS, AND WIRE TO FUSE PANEL IN 7705 RACK. THE BREAKERS SHALL BE THE SAME STYLE AS SHOWN ON FIGURE 2 SHEET E-1.
4. AFTER FINAL CUT-OVER, REMOVE THE EQUIPMENT IN THE PASSPORT 15K RACK AND THE 23-IN RACK, AND RELOCATE THE 7705 RACK IN ITS PLACE. THE DPS TELECOM NETGUARDIAN 832A SHALL BE DELIVERED TO THE FDOT.
5. INSTALL GPS ANTENNA, COAX TRANSMISSION LINE THROUGH WAVEGUIDE ENTRY PORT.
EQUIPMENT TO BE INSTALLED
EQUIPMENT TO BE REMOVED
FUTURE INSTALLATION
EXISTING FDOT EQUIPMENT
LEGEND:
Attachment 1 22
H-16
SHEET NO.TAMPA MAINTENANCE AS-BUILT NETWORK
DIAGRAM
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICNSITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
F6TPF
Microwave RadioDVM6-45
Microwave RadioDVM6-45
Temple Terrace Ruskin
B
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
BM23
A
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
AM23
28-T1 TDMMultiplex A
28-T1 TDMMultiplex B
Microwave RadioDVM10-8T
Tampa DOT/FHP
C
M121
M122
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
CM23
28-T1 TDMMultiplex C
BPS 2000
(1) DS3(1) DS3
CAC Wide Bank 28
EasternResearch
DACC
(23) T1 to Wildwood
(23) T1 to Jacaranda
Access 60Channel Bank
CAC Wide Bank 28
Nortel Passsport 15000
DS3 ATM Interface
Gig E 1000 Base SX
Nortel ASN Router
TLANNetPro
Nortel BayStack 106 12-Port 10BaseT Hub
SITEEQUIPMENT
Telco Systems T-Metro TM-100
TAMPA MAINTENANCE – AS-BUILT
EQUIPMENT TO BE REMOVED
EXISTING FDOT EQUIPMENT
LEGEND:
Attachment 1 23
H-17
SHEET NO.TAMPA MAINTENANCE PROPOSED NETWORK
DIAGRAM
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICNSITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
F6TPF
Microwave RadioDVM6-45
Microwave RadioDVM6-45
Temple Terrace Ruskin
B
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
BM23
A
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
AM23
28-T1 TDMMultiplex A
28-T1 TDMMultiplex B
Microwave RadioDVM10-8T
Tampa DOT/FHP
C
M121
M122
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
CM23
28-T1 TDMMultiplex C
EasternResearch
DACC
(20) T1 to Wildwood(20) T1 to Jacaranda
P12
(7) T1 to Tampa DOT/FHP
(7) T1 to Temple Terrace
(7) T1 to Ruskin
Access 60Channel Bank
Nokia 7705
T1 Aggregation
SITEEQUIPMENT
TAMPA MAINTENANCE – PROPOSEDNOTES:
1. INSTALL NOKIA 7705 SAR-18, SEE SHEET H-18.
2. CUT-OVER DS-1S AND SITE EQUIPMENT IN ACCORDANCE WITH EQUIPMENT INSTALLATION AND CUT-OVER SEQUENCING PLAN, SHEETS A-5, A-6, AND SITE SPECIFIC 7705 CONFIGURATION PARAMETERS.
NOTE 1
NOTE 2
GPS
EQUIPMENT TO BE INSTALLED
EXISTING FDOT EQUIPMENT
LEGEND:
Attachment 1 24
H-18
SHEET NO.TAMPA MAINTENANCE SHELTER FLOOR PLAN
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICNSITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
F6TPF
7705 Rack
+
-48 Volt DCBatteryPlant
DVM6-45XLMicrowaveTerminal
Radio RackU1
DVM10-8TMicrowaveTerminal
Radio RackU2
DVM6-45XLMicrowaveTerminal
Radio RackU3
MASCall Box
Base Station Rack
Network Management
Rack
-48VDCDistribution
Rack
Passport 15kRack
Channel Bank &DACC Rack
U4
Book
shel
f
GPS ANTENNA
SPD
ENTRY PORT
NOTE 3
DS-1 CABLE
NOTE 2 NOTE 2 NOTE 2
NOTE 1
NOTE 4
TAMPA MAINTENANCE 7705 RACK:
A. FUSE PANEL WITH APPROPRIATELY SIZED FUSES
B. FUTURE NOKIA MPR-9500 RADIO SHELF
C. NOKIA 7705 SAR-18 ROUTERD. DSX JACKFIELD – 32 CKTSE. DIN RAIL WITH T-1 SPDS –
28 CKTSF. 19 INCH RELAY RACK
A
B
C
D
F
E
9500 MPT-HLC
9500 MPT-HLC
9500-MPT
9500 MPT-HLC
9500 MPT-HLC
9500-MPT
B
XMDA 1 XMDA 2 XMDA 3 CSM A CSM BXMDA 4 MDA 1 MDA 2 MDA 3 MDA 4 MDA 5 MDA 6 MDA 7 MDA 8 MDA 9 MDA 10 MDA 11 MDA 12
7705 SAR-18
o I
IoONOFF
IoONOFF
Batt A
Batt B
Stat
Pwr
Act
CS
M-2
Com
pact Flash#1C
ompact Flash#2
Mgm
t PortC
onsoleU
SB
2D C
LEI
Stat
Pwr
Act
CS
M-2
Com
pact Flash#1C
ompact Flash#2
Mgm
t PortC
onsoleU
SB
2D C
LEI
Fan
Batt A
Batt B
Critical
MajorMinor
BIT S1
BIT S2
AlarmModule
ExternalAlarms
ACO
Alarms
7705 DSX-1 PANEL
7705 DSX-1 PANEL
D
E
9500 MPT-HLC
9500 MPT-HLC
9500-MPT
7705 DSX-1 PANEL
B
D
E
TAMPA MAINTENANCE – SHELTER FLOOR PLAN
TAMPA MAINTENANCE – 7705 RACK
NOTES:
1. INSTALL NOKIA 7705 SAR-18, -48VDC FUSE PANEL, DSX-1 PANELS, AND SPDS IN NEW 19-INCH EQUIPMENT RACK.
2. CONNECT DS-1s FROM NEW 7705 DSX-1 PANEL TO DVM6-45 DSX-1 PANELS LOCATED IN EACH DVM6-45 RACK.
3. INSTALL APPROPRIATELY SIZED -48VDC A/B BREAKERS, AND WIRE TO FUSE PANEL IN 7705 RACK. THE BREAKERS SHALL BE THE SAME STYLE AS SHOWN ON FIGURE 2 SHEET E-1.
4. AFTER FINAL CUT-OVER, REMOVE THE EQUIPMENT IN THE PASSPORT 15K RACK AND THE 23-IN RACK, AND RELOCATE THE 7705 RACK IN ITS PLACE. THE DPS TELECOM NETGUARDIAN 832A SHALL BE DELIVERED TO THE FDOT.
5. INSTALL GPS ANTENNA, COAX TRANSMISSION LINE THROUGH WAVEGUIDE ENTRY PORT.
EQUIPMENT TO BE INSTALLED
EQUIPMENT TO BE REMOVED
FUTURE INSTALLATION
EXISTING FDOT EQUIPMENT
LEGEND:
Attachment 1 25
H-19
SHEET NO.JACARANDA AS-BUILT NETWORK DIAGRAM
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICNSITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
F6TPF
Microwave RadioDVM6-45
(027)
Microwave RadioDVM6-45
(029)
Fruitville Port Charlotte
B
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
BM23
A
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
AM23
28-T1 TDMMultiplex C
28-T1 TDMMultiplex B
01.03.04
01.02.07
01.05.03
BPS 2000
Nortel BayStack 106 12-Port 10BaseT Hub
(1) DS3(1) DS3
CAC Wide Bank 28
EasternResearch
DACC
(23) T1 to Tampa Maintenance
(23) T1 to Naples
P12 Access 60Channel Bank
CAC Wide Bank 28
Nortel Passsport 15000
DS3 ATM Interface
Gig E 1000 Base SX
Nortel ASN Router
SITEEQUIPMENT JACARANDA – AS-BUILT
EQUIPMENT TO BE REMOVED
EXISTING FDOT EQUIPMENT
LEGEND:
Attachment 1 26
H-20
SHEET NO.JACARANDA PROPOSED NETWORK DIAGRAM
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICNSITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
F6TPF
Microwave RadioDVM6-45
Microwave RadioDVM6-45
Fruitville Port Charlotte
B
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
BM23
A
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
AM23
28-T1 TDMMultiplex A
28-T1 TDMMultiplex B
EasternResearch
DACC
(20) T1 to Tampa Maintenance (20) T1 to Naples
P12
(7) T1 to Fruitville
Access 60Channel Bank
Nokia 7705
T1 Aggregation
Site Equipment
(7) T1 to Port Charlotte
01.03.02
01.02.05
01.04.03
JACARANDA – PROPOSEDNOTES:
1. INSTALL NOKIA 7705 SAR-18, SEE SHEET H-21.
2. CUT-OVER DS-1S AND SITE EQUIPMENT IN ACCORDANCE WITH EQUIPMENT INSTALLATION AND CUT-OVER SEQUENCING PLAN, SHEETS A-5, A-6, AND SITE SPECIFIC 7705 CONFIGURATION PARAMETERS.
NOTE 1
NOTE 2
GPS
EQUIPMENT TO BE INSTALLED
EXISTING FDOT EQUIPMENT
LEGEND:
Attachment 1 27
H-21
SHEET NO.JACARANDA SHELTER FLOOR PLAN
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICNSITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
F6TPF
Passport1500
DVM6-45 MW
Terminal Rack (A2)
Channel BankRack
DVM6-45 MW
Terminal Rack (AA1)
RESERVED RACK
DACCsRack
-48 VDC Distribution
RackNOTE 3
NOTE 1
DS-1 CABLE
JACARANDA RESERVED RACK:
A. FUSE PANEL WITH APPROPRIATELY SIZED FUSES
B. FUTURE NOKIA MPR-9500 RADIO SHELF
C. NOKIA 7705 SAR-18 ROUTER
A
B
C
9500 MPT-HLC
9500 MPT-HLC
9500-MPT
9500 MPT-HLC
9500 MPT-HLC
9500-MPT
B
XMDA 1 XMDA 2 XMDA 3 CSM A CSM BXMDA 4 MDA 1 MDA 2 MDA 3 MDA 4 MDA 5 MDA 6 MDA 7 MDA 8 MDA 9 MDA 10 MDA 11 MDA 12
7705 SAR-18
o I
IoONOFF
IoONOFF
Batt A
Batt B
Stat
Pwr
Act
CS
M-2
Com
pact Flash#1C
ompact Flash#2
Mgm
t PortC
onsoleU
SB
2D C
LEI
Stat
Pwr
Act
CS
M-2
Com
pact Flash#1C
ompact Flash#2
Mgm
t PortC
onsoleU
SB
2D C
LEI
Fan
Batt A
Batt B
Critical
MajorMinor
BIT S1
BIT S2
AlarmModule
ExternalAlarms
ACO
Alarms
-48VDC CABLES
NOTE 2
GPS ANTENNA
SPD
GPS COAXIAL
ENTRY PORT
JACARANDA – SHELTER FLOOR PLANJACARANDA – RESERVED RACK
EQUIPMENT TO BE INSTALLED
EQUIPMENT TO BE REMOVED
FUTURE INSTALLATION
EXISTING FDOT EQUIPMENT
LEGEND:
NOTES:
1. INSTALL NOKIA 7705 SAR-18 AND -48VDC FUSE PANEL IN EXISTING RESERVED RACK.
2. INSTALL (2) NEW 7705 DSX-1 PANELS AND SPD’S IN CHANNEL BANK RACK. CONNECT DS-1s FROM NEW 7705 DSX-1 PANELS TO DVM6-45 DSX-1 PANELS LOCATED IN CHANNEL BANK RACK.
3. INSTALL APPROPRIATELY SIZED -48VDC A/B BREAKERS, AND WIRE TO FUSE PANEL IN 7705 RACK. THE BREAKERS SHALL BE THE SAME STYLE AS SHOWN ON FIGURE 1 SHEET E-1.
4. AFTER FINAL CUT-OVER, REMOVE THE EQUIPMENT IN THE PASSPORT 15K RACK AND THE 23-IN RACK. THE DPS TELECOM NETGUARDIAN 832A SHALL BE DELIVERED TO THE FDOT.
5. INSTALL GPS ANTENNA, COAX TRANSMISSION LINE THROUGH WAVEGUIDE ENTRY PORT.
NOTE 4
Attachment 1 28
H-22
SHEET NO.NAPLES AS-BUILT NETWORK DIAGRAM
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICNSITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
F6TPF
Microwave RadioDVM6-45
Microwave RadioConstellation
Estero Miles City
B
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
BM23
A
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
AM23
28-T1 TDMMultiplex A
28-T1 TDMMultiplex B
BPS 2000
Nortel BayStack 106 12-Port 10BaseT Hub
(1) DS3(1) DS3
CAC Wide Bank 28
EasternResearch
DACC
(23) T1 to Jacaranda(21) T1 to McArthur
P12 Access 60Channel Bank
CAC Wide Bank 28
Nortel Passsport 15000
DS3 ATM Interface
Gig E 1000 Base SX
Nortel ASN Router
SITEEQUIPMENT
01.03.04
01.02.07
01.05.03
T1s for “Others”
NAPLES – AS-BUILT
EQUIPMENT TO BE REMOVED
EXISTING FDOT EQUIPMENT
LEGEND:
Attachment 1 29
H-23
SHEET NO.NAPLES PROPOSED NETWORK DIAGRAM
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICNSITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
F6TPF
Microwave RadioDVM6-45
Microwave RadioConstellation
Estero Miles City
B
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
BM23
A
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
AM23
28-T1 TDMMultiplex A
28-T1 TDMMultiplex B
01.03.02
01.02.05
01.04.03
EasternResearch
DACC
(20) T1 to Jacaranda
(18) T1 to McArthur
P12
(7) T1 to Estero
Access 60Channel Bank
Nokia 7705
T1 Aggregation
Site Equipment
(7) T1 to Miles City
T1s for “Others”
NAPLES – PROPOSED NOTES:
1. INSTALL NOKIA 7705 SAR-18, SEE SHEET H-24.
2. CUT-OVER DS-1S AND SITE EQUIPMENT IN ACCORDANCE WITH EQUIPMENT INSTALLATION AND CUT-OVER SEQUENCING PLAN, SHEETS A-5, A-6, AND SITE SPECIFIC 7705 CONFIGURATION PARAMETERS.
NOTE 1
NOTE 2
GPS
EQUIPMENT TO BE INSTALLED
EXISTING FDOT EQUIPMENT
LEGEND:
Attachment 1 30
H-24
SHEET NO.NAPLES SHELTER FLOOR PLAN
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICNSITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
F6TPF
-48 VDC
Harris MWConst. Rack
-48VDC Rectifier
Rack
Harris MWDVM-65
Rack
DACCs Rack
Channel Bank Rack
5200 Rack
Reserved RackM/A-COM M/A-COM M/A-COM M/A-COM
UPS
-48 VDCDistributionBatteries
15K Rack
GPS ANTENNA
SPD GPS COAXIAL DS-1 CABLE
NAPLES RESERVED RACK:
A. FUSE PANEL WITH APPROPRIATELY SIZED FUSES
B. FUTURE NOKIA MPR-9500 RADIO SHELF
C. NOKIA 7705 SAR-18 ROUTERD. DSX JACKFIELD – 32 CKTSE. DIN RAIL WITH T-1 SPDS –
28 CKTSF. EXITING FIBER OPTIC
A
B
C
D
E
9500 MPT-HLC
9500 MPT-HLC
9500-MPT
9500 MPT-HLC
9500 MPT-HLC
9500-MPT
B
XMDA 1 XMDA 2 XMDA 3 CSM A CSM BXMDA 4 MDA 1 MDA 2 MDA 3 MDA 4 MDA 5 MDA 6 MDA 7 MDA 8 MDA 9 MDA 10 MDA 11 MDA 12
7705 SAR-18
o I
IoONOFF
IoONOFF
Batt A
Batt B
Stat
Pwr
Act
CS
M-2
Com
pact Flash#1C
ompact Flash#2
Mgm
t PortC
onsoleU
SB
2D C
LEI
Stat
Pwr
Act
CS
M-2
Com
pact Flash#1C
ompact Flash#2
Mgm
t PortC
onsoleU
SB
2D C
LEI
Fan
Batt A
Batt B
Critical
MajorMinor
BIT S1
BIT S2
AlarmModule
ExternalAlarms
ACO
Alarms
7705 DSX-1 PANEL
7705 DSX-1 PANEL
D
E
NAPLES RESERVED RACK
Corning Cable Systems
LAN CORNING
F
NOTE 1
NOTE 3
-48VDC CABLES
ENTRY PORTNOTE 2
NAPLES – SHELTER FLOOR PLAN
EQUIPMENT TO BE INSTALLED
EQUIPMENT TO BE REMOVED
FUTURE INSTALLATION
EXISTING FDOT EQUIPMENT
LEGEND:
NOTES:
1. INSTALL NOKIA 7705 SAR-18, DSX-1 PANELS, SPD’S, AND -48VDC FUSE PANEL IN EXISTING RESERVED RACK.
2. CONNECT DS-1s FROM NEW 7705 DSX-1 PANELS TO DVM6-45 DSX-1 PANELS LOCATED IN CHANNEL BANK RACK.
3. INSTALL APPROPRIATELY SIZED -48VDC A/B BREAKERS, AND WIRE TO FUSE PANEL IN 7705 RACK. THE BREAKERS SHALL BE THE SAME STYLE AS SHOWN ON FIGURE 1 SHEET E-1.
4. AFTER FINAL CUT-OVER, REMOVE THE EQUIPMENT IN THE PASSPORT 15K RACK AND THE 23-IN RACK. THE DPS TELECOM NETGUARDIAN 832A SHALL BE DELIVERED TO THE FDOT.
5. INSTALL GPS ANTENNA, COAX TRANSMISSION LINE THROUGH WAVEGUIDE ENTRY PORT.
NOTE 4
Attachment 1 31
H-25
SHEET NO.MCARTHUR AS-BUILT NETWORK DIAGRAM
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICNSITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
F6TPF
Microwave RadioDVM6-45
Andytown
A
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
AM23
28-T1 TDMMultiplex C
M121
M122
M123
M124
M125
M126
M127
BM23
Fiber MUX Terminal
01.03.04
01.02.07
01.05.03
BPS 2000
Nortel BayStack 106 12-Port 10BaseT Hub
(1) DS3(1) DS3
CAC Wide Bank 28
EasternResearch
DACC
(22) T1 to Naples(5) T1 to Stuart Maintenance
P12 Access 60Channel Bank
CAC Wide Bank 28
Nortel Passsport 15000
DS3 ATM Interface
Gig E 1000 Base SX
Nortel ASN Router
SITEEQUIPMENT
B1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
P11
McArthur Interchange
MCARTHUR – AS-BUILTEQUIPMENT TO BE REMOVED
EXISTING FDOT EQUIPMENT
LEGEND:
F.O.C. Patch Panel
Attachment 1 32
Microwave RadioDVM6-45
Andytown
A
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
AM23
28-T1 TDMMultiplex A
M121
M122
M123
M124
M125
M126
M127
BM23
Fiber MUX Terminal
McArthur Interchange
B1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
EasternResearch
DACC
(18) T1 to Naples
P12
(7) T1 to Andytown
Access 60Channel Bank
Nokia 7705
T1 Aggregation
Site Equipment
01.03.02
01.02.05
01.04.03
P11
H-26
SHEET NO.MCARTHUR PROPOSED NETWORK DIAGRAM
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICNSITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
F6TPF
MCARTHUR – PROPOSED
NOTES:
1. INSTALL NOKIA 7705 SAR-18, SEE SHEET H-27.
2. CUT-OVER DS-1S AND SITE EQUIPMENT IN ACCORDANCE WITH EQUIPMENT INSTALLATION AND CUT-OVER SEQUENCING PLAN, SHEETS A-5, A-6, AND SITE SPECIFIC 7705 CONFIGURATION PARAMETERS.
3. INSTALL 10GBPS SM FIBER OPTIC TO MCARTHUR INTERCHANGE IN ACCORDANCE WITH EQUIPMENT INSTALLATION AND CUT-OVER SEQUENCING PLAN, SHEETS A-5, A-6, AND SITE SPECIFIC 7705 CONFIGURATION PARAMETERS.
NOTE 1
NOTE 2GPS
F.O.C. Patch Panel
2 SM 10Gbps Fiber Optic to McArthur Interchange
EQUIPMENT TO BE INSTALLED
EXISTING FDOT EQUIPMENT
LEGEND:
Attachment 1 33
H-27
SHEET NO.MCARTHUR SHELTER FLOOR PLAN
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICNSITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
F6TPF
7705 Rack
Channel BankRack
HarrisConstellation
Rack
NMS/DACCs Rack
-48 VDCRectifier
Rack
-48 VDCBattery Bank
FiberRack
Passport15000
Rack (FR4)
47 MHz Repeater
GPS ANTENNA
SPD ENTRY PORT
GPS COAXIAL
-48VDC CABLES
DS-1 CABLE
NOTE 3
NOTE 2
NOTE 1
MCARTHUR 7705 RACK:
A. FUSE PANEL WITH APPROPRIATELY SIZED FUSES
B. FUTURE NOKIA MPR-9500 RADIO SHELF
C. NOKIA 7705 SAR-18 ROUTERD. DSX JACKFIELD – 32 CKTSE. DIN RAIL WITH T-1 SPDS –
28 CKTSF. 19 INCH RELAY RACK
A
B
C
F
9500 MPT-HLC
9500 MPT-HLC
9500-MPT
9500 MPT-HLC
9500 MPT-HLC
9500-MPT
B
XMDA 1 XMDA 2 XMDA 3 CSM A CSM BXMDA 4 MDA 1 MDA 2 MDA 3 MDA 4 MDA 5 MDA 6 MDA 7 MDA 8 MDA 9 MDA 10 MDA 11 MDA 12
7705 SAR-18
o I
IoONOFF
IoONOFF
Batt A
Batt B
Stat
Pwr
Act
CS
M-2
Com
pact Flash#1C
ompact Flash#2
Mgm
t PortC
onsoleU
SB
2D C
LEI
Stat
Pwr
Act
CS
M-2
Com
pact Flash#1C
ompact Flash#2
Mgm
t PortC
onsoleU
SB
2D C
LEI
Fan
Batt A
Batt B
Critical
MajorMinor
BIT S1
BIT S2
AlarmModule
ExternalAlarms
ACO
Alarms
7705 DSX-1 PANEL D
E
9500 MPT-HLC
9500 MPT-HLC
9500-MPT
B
MCARTHUR – 7705 RACK
MCARTHUR – SHELTER FLOOR PLAN
NOTES:
1. INSTALL NOKIA 7705 SAR-18, -48VDC FUSE PANEL, DSX-1 PANELS, AND SPDS IN NEW 19-INCH EQUIPMENT RACK.
2. CONNECT DS-1s FROM NEW 7705 DSX-1 PANEL TO DVM6-45 DSX-1 PANEL LOCATED IN CONSTELLATION RACK.
3. INSTALL APPROPRIATELY SIZED -48VDC A/B BREAKERS, AND WIRE TO FUSE PANEL IN 7705 RACK. THE BREAKERS SHALL BE THE SAME STYLE AS SHOWN ON FIGURE 2 SHEET E-1.
4. AFTER FINAL CUT-OVER, REMOVE THE EQUIPMENT IN THE PASSPORT 15K RACK AND THE 23-IN RACK. THE DPS TELECOM NETGUARDIAN 832A SHALL BE DELIVERED TO THE FDOT.
5. INSTALL GPS ANTENNA, COAX TRANSMISSION LINE THROUGH WAVEGUIDE ENTRY PORT.
EQUIPMENT TO BE INSTALLED
EQUIPMENT TO BE REMOVED
FUTURE INSTALLATION
EXISTING FDOT EQUIPMENT
LEGEND:
NOTE 4
Attachment 1 34
H-28
SHEET NO.STUART MAINTENANCE AS-BUILT NETWORK
DIAGRAM
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICNSITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
F6TPF
Microwave RadioDVM6-45
Fort Pierce Maintenance
A
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
AM23
28-T1 TDMMultiplex C
BPS 2000
(1) DS3
EasternResearch
DACC
(22) T1 to June Park
P12 Access 60Channel Bank
CAC Wide Bank 28
Nortel Passsport 15000
DS3 ATM Interface
Gig E 1000 Base SX
Nortel ASN Router
TLANNetPro
Nortel BayStack 106 12-Port 10BaseT Hub
Site Equipment
Fiber MUX Terminal
Stuart Interchange
C
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
CM23
CAC Wide Bank 28
P11
Leased T1 to Lake Worth
(1) DS3
(5) T1 to McArthur
(5) T1 to Wildwood
STUART MAINTENANCE – AS-BUILT
EQUIPMENT TO BE REMOVED
EXISTING FDOT EQUIPMENT
LEGEND:
F.O.C. Patch Panel
Attachment 1 35
H-29
SHEET NO.STUART MAINTENANCE PROPOSED NETWORK
DIAGRAM
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICNSITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
F6TPF
Microwave RadioDVM6-45
Fort Pierce Maintenance
A
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
AM23
28-T1 TDMMultiplex A
EasternResearch
DACC
(19) T1 to June Park
01.03.02
01.02.05
P12 Access 60Channel Bank
Nokia 7705
(7) T1 to Ft. Pierce Maintenance
T1 Aggregation
Site Equipment
Fiber MUX Terminal
Stuart Interchange
C
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
CM23
STUART MAINTENANCE – PROPOSED
NOTES:
1. INSTALL NOKIA 7705 SAR-18, SEE SHEET H-30.
2. CUT-OVER DS-1S AND SITE EQUIPMENT IN ACCORDANCE WITH EQUIPMENT INSTALLATION AND CUT-OVER SEQUENCING PLAN, SHEETS A-5, A-6, AND SITE SPECIFIC 7705 CONFIGURATION PARAMETERS.
3. INSTALL 10GBPS SM FIBER OPTIC TO STUART INTERCHANGE IN ACCORDANCE WITH EQUIPMENT INSTALLATION AND CUT-OVER SEQUENCING PLAN, SHEETS A-5, A-6, AND SITE SPECIFIC 7705 CONFIGURATION PARAMETERS.
4. INSTALL PPP T-1 FOR EXISTING LEASED CIRCUIT IN ACCORDANCE WITH SITE SPECIFIC 7705 CONFIGURATION PARAMETERS.
NOTE 1
NOTE 2
GPS
F.O.C. Patch Panel
2 SM 10Gbps Fiber Optic to Stuart Interchange
PPP T-1Leased T1
To Lake Worth New DPS Telecom Netguardian 216T
EQUIPMENT TO BE INSTALLED
EXISTING FDOT EQUIPMENT
LEGEND:
NOTE 4
Attachment 1 36
H-30
SHEET NO.STUART MAINTENANCE SHELTER FLOOR PLAN
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICNSITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
F6TPF
7705 Rack
MAS Call Box Base
StationRack
DVM6-45MW
Terminal Rack (F1)
Channel Bank Rack
(F2)
DACCsRack
-48 VDCBattery Bank
-48 VDCDistribution
RackGE MasterLow Band
FX1
Passport15K Rack
GPS ANTENNA
SPD
ENTRY PORT
GPS COAXIAL
-48VDC CABLES
NOTE 4
NOTE 3
NOTE 2
NOTE 1
STUART MAINTENANCE 7705 RACK:
A. FUSE PANEL WITH APPROPRIATELY SIZED FUSES
B. FUTURE NOKIA MPR-9500 RADIO SHELF
C. NOKIA 7705 SAR-18 ROUTER
D. DSX JACKFIELD – 32 CKTSE. DIN RAIL WITH T-1 SPDS –
28 CKTSF. 19 INCH RELAY RACK
A
B
C
F
9500 MPT-HLC
9500 MPT-HLC
9500-MPT
9500 MPT-HLC
9500 MPT-HLC
9500-MPT
B
XMDA 1 XMDA 2 XMDA 3 CSM A CSM BXMDA 4 MDA 1 MDA 2 MDA 3 MDA 4 MDA 5 MDA 6 MDA 7 MDA 8 MDA 9 MDA 10 MDA 11 MDA 12
7705 SAR-18
o I
IoONOFF
IoONOFF
Batt A
Batt BStat
Pwr
Act
CS
M-2
Com
pact Flash#1C
ompact Flash#2
Mgm
t PortC
onsoleU
SB
2D C
LEI
Stat
Pwr
Act
CS
M-2
Com
pact Flash#1C
ompact Flash#2
Mgm
t PortC
onsoleU
SB
2D C
LEI
Fan
Batt A
Batt B
Critical
MajorMinor
BIT S1
BIT S2
AlarmModule
ExternalAlarms
ACO
Alarms
7705 DSX-1 PANEL
E
D
9500 MPT-HLC
9500 MPT-HLC
9500-MPT
B
STUART MAINTENANCE – 7705 RACKSTUART MAINTENANCE – SHELTER FLOOR PLAN
NOTES:
1. INSTALL NOKIA 7705 SAR-18, -48VDC FUSE PANEL, DSX-1 PANELS, AND SPDS IN NEW 19-INCH EQUIPMENT RACK.
2. CONNECT DS-1s FROM NEW 7705 DSX-1 PANEL TO DVM6-45 DSX-1 PANEL LOCATED IN THE DVM6-45 RACK RACK.
3. INSTALL APPROPRIATELY SIZED -48VDC A/B BREAKERS, AND WIRE TO FUSE PANEL IN 7705 RACK. THE BREAKERS SHALL BE THE SAME STYLE AS SHOWN ON FIGURE 2 SHEET E-1.
4. AFTER FINAL CUT-OVER, REMOVE THE EQUIPMENT IN THE PASSPORT 15K RACK AND THE 23-IN RACK, AND RELOCATE THE 7705 RACK IN ITS PLACE. THE DPS TELECOM NETGUARDIAN 832A SHALL BE DELIVERED TO THE FDOT.
5. INSTALL GPS ANTENNA, COAX TRANSMISSION LINE THROUGH WAVEGUIDE ENTRY PORT.
EQUIPMENT TO BE INSTALLED
EQUIPMENT TO BE REMOVED
FUTURE INSTALLATION
EXISTING FDOT EQUIPMENT
LEGEND:
Attachment 1 37
H-31
SHEET NO.JUNE PARK AS-BUILT NETWORK DIAGRAM
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICNSITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
F6TPF
Microwave RadioDVM6-45
Microwave RadioDVM6-45
Cocoa FHP Brevard County Line
B
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
BM23
A
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
AM23
28-T1 TDMMultiplex A
28-T1 TDMMultiplex B
01.03.04
01.02.07
01.05.03
BPS 2000
Nortel BayStack 106 12-Port 10BaseT Hub
(1) DS3(1) DS3
CAC Wide Bank 28
EasternResearch
DACC
(22) T1 to Port Orange(22) T1 to Ft. Stuart
Maintenance
P12
Access 60Channel Bank
CAC Wide Bank 28
Nortel Passsport 15000
DS3 ATM Interface
Gig E 1000 Base SX
Nortel ASN Router
SITEEQUIPMENT JUNE PARK – AS-BUILT
EQUIPMENT TO BE REMOVED
EXISTING FDOT EQUIPMENT
LEGEND:
Attachment 1 38
H-32
SHEET NO.JUNE PARK PROPOSED NETWORK DIAGRAM
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICNSITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
F6TPF
Microwave RadioDVM6-45
Microwave RadioDVM6-45
Cocoa FHP Brevard County Line
B
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
BM23
A
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
AM23
28-T1 TDMMultiplex A
28-T1 TDMMultiplex B
EasternResearch
DACC
(19) T1 to Port Orange (19) T1 to Stuart
Maintenance
P12
(7) T1 to Cocoa FHP
Access 60Channel Bank
Nokia 7705
T1 Aggregation
Site Equipment
(7) T1 to Brevard County Line
01.03.04
01.02.07
01.05.03
JUNE PARK – PROPOSED NOTES:
1. INSTALL NOKIA 7705 SAR-18, SEE SHEET H-33.
2. CUT-OVER DS-1S AND SITE EQUIPMENT IN ACCORDANCE WITH EQUIPMENT INSTALLATION AND CUT-OVER SEQUENCING PLAN, SHEETS A-5, A-6, AND SITE SPECIFIC 7705 CONFIGURATION PARAMETERS.
NOTE 1NOTE 2 GPS
EQUIPMENT TO BE INSTALLED
EXISTING FDOT EQUIPMENT
LEGEND:
Attachment 1 39
H-33
SHEET NO.JUNE PARK SHELTER FLOOR PLAN
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICNSITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
F6TPF
7705 Rack
Passport15K Rack
DVM6-45MW
TerminalRack(AU1)
DVM6-45MW
TerminalRack(A1)
MASCall Box
BaseStationRack
DACCsand
Channel BankRack
-48VDCBatteryPlant
- +
-48 VDCDistribution
Rack
GPS ANTENNA
SPD
ENTRY PORT
DS-1 CABLE
-48VDC CABLES
GPS COAXIAL
JUNE PARK 7705 RACK:
A. FUSE PANEL WITH APPROPRIATELY SIZED FUSES
B. FUTURE NOKIA MPR-9500 RADIO SHELF
C. NOKIA 7705 SAR-18 ROUTER
D. RELOCATED NETGUARDIAN, RESIZED FOR 19-INCH RACK
E. DSX JACKFIELD – 32 CKTSF. DIN RAIL WITH T-1 SPDS –
28 CKTSG. 19 INCH RELAY RACK
A
B
C
E
G
F
9500 MPT-HLC
9500 MPT-HLC
9500-MPT
9500 MPT-HLC
9500 MPT-HLC
9500-MPT
B
XMDA 1 XMDA 2 XMDA 3 CSM A CSM BXMDA 4 MDA 1 MDA 2 MDA 3 MDA 4 MDA 5 MDA 6 MDA 7 MDA 8 MDA 9 MDA 10 MDA 11 MDA 12
7705 SAR-18
o I
IoONOFF
IoONOFF
Batt A
Batt B
Stat
Pwr
Act
CS
M-2
Com
pact Flash#1C
ompact Flash#2
Mgm
t PortC
onsoleU
SB
2D C
LEI
Stat
Pwr
Act
CS
M-2
Com
pact Flash#1C
ompact Flash#2
Mgm
t PortC
onsoleU
SB
2D C
LEI
Fan
Batt A
Batt B
Critical
MajorMinor
BIT S1
BIT S2
AlarmModule
ExternalAlarms
ACO
Alarms
7705 DSX-1 PANEL
7705 DSX-1 PANEL
E
F
JUNE PARK - 7705 RACK
D
NOTE 4
NOTE 1
NOTE 2
NOTE 3
JUNE PARK – SHELTER FLOOR PLAN
NOTES:
1. INSTALL NOKIA 7705 SAR-18, -48VDC FUSE PANEL, DSX-1 PANELS, AND SPDS IN NEW 19-INCH EQUIPMENT RACK.
2. CONNECT DS-1s FROM NEW 7705 DSX-1 PANEL TO DVM6-45 DSX-1 PANELS LOCATED IN EACH DVM6-45 RACK.
3. INSTALL APPROPRIATELY SIZED -48VDC A/B BREAKERS, AND WIRE TO FUSE PANEL IN 7705 RACK. THE BREAKERS SHALL BE THE SAME STYLE AS SHOWN ON FIGURE 2 SHEET E-1.
4. AFTER FINAL CUT-OVER, REMOVE THE EQUIPMENT IN THE PASSPORT 15K RACK AND THE 23-IN RACK, AND RELOCATE THE 7705 RACK IN ITS PLACE. THE DPS TELECOM NETGUARDIAN 832A #2 SHALL BE DELIVERED TO THE FDOT. THE DPS TELECOM NETGUARDIAN 832A #1 SHALL BE RELOCATED AND INSTALLED IN THE 7705 RACK.
5. INSTALL GPS ANTENNA, COAX TRANSMISSION LINE THROUGH WAVEGUIDE ENTRY PORT.
EQUIPMENT TO BE INSTALLED
EQUIPMENT TO BE REMOVED
FUTURE INSTALLATION
EXISTING FDOT EQUIPMENT
LEGEND:
Attachment 1 40
H-34
SHEET NO.PORT ORANGE AS-BUILT NETWORK DIAGRAM
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICNSITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
F6TPF
Microwave RadioDVM6-45
Microwave RadioDVM6-45
Ormond Beach Edgewater
B
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
BM23
A
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
CM23
28-T1 TDMMultiplex C
28-T1 TDMMultiplex B
Microwave RadioDVM6-45
Deland DOT
A
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
AM23
28-T1 TDMMultiplex A
BPS 2000
EasternResearch
DACC01.02.07
P12Access 60Channel Bank
Nortel Passsport 15000
DS3 ATM Interface
Gig E 1000 Base SX
Nortel ASN Router
TLANNetPro
Nortel BayStack 106 12-Port 10BaseT Hub
SITEEQUIPMENT
01.03.04
01.05.0301.05.04
CAC Wide Bank 28
(23) T1 to June Park(24) T1 to Wilson Road
(24) T1 to Jacksonville
PORT ORANGE – AS-BUILTEQUIPMENT TO BE REMOVED
EXISTING FDOT EQUIPMENT
LEGEND:
Attachment 1 41
H-35
SHEET NO.PORT ORANGE PROPOSED NETWORK DIAGRAM
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICNSITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
F6TPF
Microwave RadioDVM6-45
Microwave RadioDVM6-45
Ormond Beach Edgewater
B
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
BM23
A
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
AM23
28-T1 TDMMultiplex A
28-T1 TDMMultiplex B
Microwave RadioConstellation
Deland DOT
A
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
CM23
28-T1 TDMMultiplex C
EasternResearch
DACC
(20) T1 Jacksonville(20) T1 to June Park
01.02.07
P12
(20) T1 to Wilson Road(7) T1 to Deland (7) T1 to
Ormond Beach(7) T1 to Edgewater
Access 60Channel Bank
Nokia 7705
01.05.03
01.03.04
01.05.04
T1 Aggregation
SITEEQUIPMENT
PORT ORANGE – PROPOSED NOTES:
1. INSTALL NOKIA 7705 SAR-18, SEE SHEET H-36.
2. CUT-OVER DS-1S AND SITE EQUIPMENT IN ACCORDANCE WITH EQUIPMENT INSTALLATION AND CUT-OVER SEQUENCING PLAN, SHEETS A-5, A-6, AND SITE SPECIFIC 7705 CONFIGURATION PARAMETERS.
NOTE 1
NOTE 2
GPS
EQUIPMENT TO BE INSTALLED
EXISTING FDOT EQUIPMENT
LEGEND:
Attachment 1 42
H-36
SHEET NO.PORT ORANGE SHELTER FLOOR PLAN
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICNSITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
F6TPF
DVM6-45 Terminal
Rack (AQ1)
DVM6-45 Terminal
Rack (AQ2)
DVM6-45 Terminal
Rack (AQ3)
-48 VDCDistribution
Rack
Reserved Rack
Passport 15K Rack
Channel Bank Rack
-+
-48VDCBatteryPlant
PORT ORANGE 7705 RACK:
A. FUSE PANEL WITH APPROPRIATELY SIZED FUSES
B. FUTURE NOKIA MPR-9500 RADIO SHELF
C. NOKIA 7705 SAR-18 ROUTERD. FUSE PANEL – RELOCATE
EXISTING CIRCUITS TO NEW FUSE PANEL
E. RELOCATED NETGUARDIAN, RESIZED FOR 19-INCH RACK
F. DSX JACKFIELD – 32 CKTSG. DIN RAIL WITH T-1 SPDS –
28 CKTSH. DC-DC CONVERTER
GPS ANTENNA
SPD
ENTRY PORT
NOTE 1
NOTE 3
DS-1 CABLE
NOTE 2
NOTE 2 NOTE 2
A
B
C
9500 MPT-HLC
9500 MPT-HLC
9500-MPT
9500 MPT-HLC
9500 MPT-HLC
9500-MPT
B
XMDA 1 XMDA 2 XMDA 3 CSM A CSM BXMDA 4 MDA 1 MDA 2 MDA 3 MDA 4 MDA 5 MDA 6 MDA 7 MDA 8 MDA 9 MDA 10 MDA 11 MDA 12
7705 SAR-18
o I
IoONOFF
IoONOFF
Batt A
Batt B
Stat
Pwr
Act
CS
M-2
Com
pact Flash#1C
ompact Flash#2
Mgm
t PortC
onsoleU
SB
2D C
LEI
Stat
Pwr
Act
CS
M-2
Com
pact Flash#1C
ompact Flash#2
Mgm
t PortC
onsoleU
SB
2D C
LEI
Fan
Batt A
Batt B
Critical
MajorMinor
BIT S1
BIT S2
AlarmModule
ExternalAlarms
ACO
Alarms
FUSE PANELFUSE PANELFUSE PANELFUSE PANELFUSE PANELFUSE PANELFUSE PANELFUSE PANELFUSE PANELFUSE PANELFUSE PANELFUSE PANELFUSE PANELFUSE PANELFUSE PANEL
9500 MPT-HLC
9500 MPT-HLC
9500-MPT
7705 DSX-1 PANEL
7705 DSX-1 PANEL
7705 DSX-1 PANEL
B
D
F
F
F
G
G
G
H
E
PORT ORANGE – SHELTER FLOOR PLAN PORT ORANGE – RESERVED RACK
NOTES:
1. INSTALL NOKIA 7705 SAR-18, -48VDC FUSE PANEL, DSX-1 PANELS, AND SPDS IN NEW 1RESERVED RACK.
2. CONNECT DS-1s FROM NEW 7705 DSX-1 PANELS TO DVM6-45 DSX-1 PANEL LOCATED IN EACH DVM6-45 RACK.
3. INSTALL APPROPRIATELY SIZED -48VDC A/B BREAKERS, AND WIRE TO FUSE PANEL IN 7705 RACK. THE BREAKERS SHALL BE THE SAME STYLE AS SHOWN ON FIGURE 2 SHEET E-1.
4. AFTER FINAL CUT-OVER, REMOVE THE EQUIPMENT IN THE PASSPORT 15K RACK AND THE 23-IN RACK. THE DPS TELECOM NETGUARDIAN 832A #2 SHALL BE DELIVERED TO THE FDOT. THE DPS TELECOM NETGUARDIAN 832A #1 SHALL BE RELOCATED AND INSTALLED IN THE 7705 RACK.
5. INSTALL GPS ANTENNA, COAX TRANSMISSION LINE THROUGH WAVEGUIDE ENTRY PORT.
EQUIPMENT TO BE INSTALLED
EQUIPMENT TO BE REMOVED
FUTURE INSTALLATION
EXISTING FDOT EQUIPMENT
LEGEND:
NOTE 4
Attachment 1 43
H-37
SHEET NO.JACKSONVILLE AS-BUILT NETWORK DIAGRAM
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICNSITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
F6TPF
Microwave RadioDVM6-45
Microwave RadioDVM6-45
Baldwin DOT Saint Johns Rest Area
B
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
BM23
A
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
AM23
28-T1 TDMMultiplex A
28-T1 TDMMultiplex B
Microwave RadioDVM6-45
Yulee
A
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
CM23
28-T1 TDMMultiplex C
BPS 2000
(1) DS3
EasternResearch
DACC
(23) T1 to Lake City (24) T1 to Sanlando Springs
01.02.07
P12 Access 60Channel Bank
CAC Wide Bank 28
Nortel Passsport 15000
DS3 ATM Interface
Gig E 1000 Base SX
Nortel ASN Router
TLANNetPro
Nortel BayStack 106 12-Port 10BaseT Hub
SITEEQUIPMENT
01.03.04
01.05.0301.05.04
Nokia 7705
T1 Aggregation
JACKSONVILLE – AS-BUILT NOTES:
1. THE NOKIA 7705 SAR-18 IS INSTALLED AND IN OPERATION.
2. THE EXISTING 24 DS-1 AGGREGATE TO SANLANDO SPRINGS SHALL BE REDESIGNED IN ACCORDANCE WITH THE PROPOSED JACKSONVILLE PHASE II LOW-LEVEL NETWORK DESIGN.
NOTE 1
NOTE 2
GPS
EQUIPMENT TO BE REMOVED
EXISTING FDOT EQUIPMENT
LEGEND:
Attachment 1 44
H-38
SHEET NO.JACKSONVILLE PROPOSED NETWORK DIAGRAM
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICNSITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
F6TPF
Microwave RadioDVM6-45
Microwave RadioDVM6-45
Baldwin DOT Saint Johns Rest Area
B
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
BM23
A
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
CM23
28-T1 TDMMultiplex C
28-T1 TDMMultiplex B
Microwave RadioDVM6-45
Yulee
A
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424 28
21 3 425
M126
M127
AM23
28-T1 TDMMultiplex A
EasternResearch
DACC
(20) T1 to Lake City(20) T1 to Port
Orange
01.02.07
P12
(27) T1 to Yulee (7) T1 to SR 136
Access 60Channel Bank
Nokia 7705
01.05.03
01.03.04
01.05.04
T1 Aggregation
SITEEQUIPMENT
(7) T1 to Saint Johns Rest Area
JACKSONVILLE – PROPOSEDNOTES:
1. NOKIA 7705 SAR-18 INSTALLED AND IN OPERATION.
2. CUT-OVER DS-1S AND SITE EQUIPMENT IN ACCORDANCE WITH EQUIPMENT INSTALLATION AND CUT-OVER SEQUENCING PLAN, SHEETS A-5, A-6, AND SITE SPECIFIC 7705 CONFIGURATION PARAMETERS.
GPS
NOTE 1
NOTE 2
EQUIPMENT TO BE INSTALLED
EXISTING FDOT EQUIPMENT
LEGEND:
Attachment 1 45
H-39
SHEET NO.JACKSONVILLE SHELTER FLOOR PLAN
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICNSITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
F6TPF
PA
SS
PO
RT
1500
0
-48VDCBATTERY
PLANT
-+
FIB
ER
OP
TIC
S
RA
CK
-48V
DC
RA
CK
NM
SR
AC
KIT
SW
AN
-48
VD
C
DIS
TRIB
-U
TIO
NR
AC
K
FDO
T47
MH
ZR
EP
EA
TER
DV
M6-
45
TER
MIN
AL
RA
CK
AG
3
DV
M6-
45
TER
MIN
AL
RA
CK
AG
2
DV
M6-
45
TER
MIN
AL
RA
CK
AG
1 S
T. J
OH
NS
DA
CC
/C
HA
NN
EL
BA
NK
RA
CK
DDD TE66-6 N
TM
6M
6M
6 MV
MV
MV
M RM
55 5 AL
OP
TIC
SD
ISTR
IBO
ER C
8 SC
EP
EA
TER
4 EK O T AC
/N
E AC BA
KN R
RA
CKI N K77
05 R
AC
K
RACK TO BE USED AS PART OF THIS
PROJECT
XMDA 1 XMDA 2 XMDA 3 CSM A CSM BXMDA 4 MDA 1 MDA 2 MDA 3 MDA 4 MDA 5 MDA 6 MDA 7 MDA 8 MDA 9 MDA 10 MDA 11 MDA 12
7705 SAR-18
o I
IoONOFF
IoONOFF
Batt A
Batt B
Stat
Pwr
Act
CS
M-2
Com
pact Flash#1C
ompact Flash#2
Mgm
t PortC
onsoleU
SB
2D C
LEI
Stat
Pwr
Act
CS
M-2
Com
pact Flash#1C
ompact Flash#2
Mgm
t PortC
onsoleU
SB
2D C
LEI
Fan
Batt A
Batt B
Critical
MajorMinor
BIT S1
BIT S2
AlarmModule
ExternalAlarms
ACO
Alarms
7705 DSX-1 PANEL
7705 DSX-1 PANEL
7705 DSX-1 PANEL
DS-1 CABLE
NOTES:
1. CONNECT DS-1s FROM 7705 DSX-1 PANELS TO DVM6-45 DSX-1 PANELS LOCATED IN THE SPECIFIED DVM6-45 RACKS.
2. AFTER FINAL CUT-OVER, REMOVE THE EQUIPMENT IN THE PASSPORT 15K RACK AND THE 23-IN RACK. THE DPS TELECOM NETGUARDIAN 832A SHALL BE DELIVERED TO THE FDOT.
NOTE 1
JACKSONVILLE – SHELTER FLOOR PLAN
JACKSONVILLE – 7705 RACK
NOTE 2
Attachment 1 46
H-40
SHEET NO.SANLANDO SPRINGS NETWORK DIAGRAMS
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICNSITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
F6TPF
P11
MicrowaveRadio A
Deland DOT
DVM6-45 Terminal
A
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424
2821 3 425
M126
M127
AM23
28-T1 TDMMultiplex A
Nortel ASN Router
Access 60Channel Bank
P12
Nokia 7705
T1 Aggregation
(24) T1 to D5 Wilson Road
11GHz Microwave to Wilson Rd
P11
MicrowaveRadio A
Deland DOT
DVM6-45 Terminal
A
M121
M122
M123
M124
M125
1
21 3 44 8
21 3 45 9
21 3 412 16
21 3 413 17
2021 3 4
21
21 3 424
2821 3 425
M126
M127
AM23
28-T1 TDMMultiplex A
Access 60Channel Bank
P12
Nokia 7705
T1 Aggregation
(20) T1 to D5 Wilson Road(7) T1 to Deland
SANLANDO SPRINGS – AS-BUILT SANLANDO SPRINGS – PROPOSED
11GHz Microwave to Wilson Rd
BPS 2000
Nortel BayStack 106 12-Port 10BaseT Hub
SITEEQUIPMENT
10 Gbps F.O. to Wilson Rd.
NOTES:
1. THE NOKIA 7705 SAR-18 IS INSTALLED AND IN OPERATION.
2. THE EXISTING 24 DS-1 AGGREGATE TO SANLANDO SPRINGS SHALL BE REDESIGNED IN ACCORDANCE WITH THE PROPOSED SANLANDO SPRINGS PHASE II LOW-LEVEL NETWORK DESIGN.
NOTES:
1. THE NOKIA 7705 SAR-18 IS INSTALLED AND IN OPERATION.
2. CUT-OVER DS-1S AND SITE EQUIPMENT IN ACCORDANCE WITH EQUIPMENT INSTALLATION AND CUT-OVER SEQUENCING PLAN, SHEETS A-5, A-6, AND SITE SPECIFIC 7705 CONFIGURATION PARAMETERS.
10 Gbps F.O. to Wilson Rd.
SITEEQUIPMENT
EQUIPMENT TO BE INSTALLED
EQUIPMENT TO BE REMOVED
EXISTING FDOT EQUIPMENT
LEGEND:
Attachment 1 47
H-41
SHEET NO.SANLANDO SPRINGS SHELTER FLOOR PLAN
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICNSITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
F6TPF
- 48 VDCDistribution
Rack
District5Fiber/ Video
Rack#1
BaseStationRack
Channel Bank Rack
DVM6- 45MW
TerminalRack(BA1)
NokiaMicrowave
Rack
SANLANDO SPRINGS
A. FUSE PANELB1. NOKIA MPR-9500 RADIO SHELFB2. FUTURE NOKIA MPR-9500
RADIO SHELFC. NOKIA 7705 SAR-18 ROUTERD. DSX JACKFIELD – 28 CKTSE. DIN RAIL WITH T-1 & GIGABIT
ETHERNET SPDsF. WRITING SHELFG. CORNING FIBER OPTIC SPLICE
TRAY/PATCH PANELH. 19 INCH RELAY RACK
A
B1
C
D
G
H
E
9500 MPT-HLC
9500 MPT-HLC
9500-MPT
9500 MPT-HLC
9500 MPT-HLC
9500-MPT
XMDA 1 XMDA 2 XMDA 3 CSM A CSM BXMDA 4 MDA 1 MDA 2 MDA 3 MDA 4 MDA 5 MDA 6 MDA 7 MDA 8 MDA 9 MDA 10 MDA 11 MDA 12
7705 SAR-18
o I
IoONOFF
IoONOFF
Batt A
Batt B
Fan
Batt A
Batt B
Critical
MajorMinor
BIT S1
BIT S2
AlarmModule
ExternalAlarms
ACO
Alarms
Fan FilterRelease
FanModule
Stat
Pwr
Act
CS
M-2
Com
pact Flash#1C
ompact Flash#2
Mgm
t PortC
onsoleU
SB
2D C
LEI
Stat
Pwr
Act
CS
M-2
Com
pact Flash#1C
ompact Flash#2
Mgm
t PortC
onsoleU
SB
2D C
LEI
Lnk1
ActLnk
2Act
Lnk3
ActLnk
4Act
Lnk5
ActLnk
6Act
78
LnkAct
LnkAct
A8-E
TH
Pwr
Stat
A12-S
DI
Stat
Pwr
Act
Port
Ports 4-6
Ports 1-3
Ports 10-12
Ports 7-9
Lnk1
ActLnk
2Act
Lnk3
ActLnk
4Act
Lnk5
ActLnk
6Act
78
LnkAct
LnkAct
A8-E
TH
Pwr
Stat
Lnk1
ActLnk
2Act
Lnk3
ActLnk
4Act
Lnk5
ActLnk
6Act
78
LnkAct
LnkAct
A8-E
TH
Pwr
Stat
Port1
Call
Port2
Call
Port3
Call
Port4
Call
Port5
Call
Port6
Call
A6-E
&M
Pwr
Stat Pwr
StatAct
Port
A32-CH
DS1
-48V / 24V
Ports 1-16Ports 17-32
A8-1GB-SFP
Stat
Pwr
12
34
76
58
LnkAct
LnkAct
LnkAct
LnkAct
LnkAct
LnkAct
LnkAct
LnkAct
-48V/24V
A8-P
MC
Pwr
Stat
MW
3
LnkAct
MW
4
LnkAct
5
LnkAct
6
LnkAct
7
LnkAct
8
LnkAct
LnkM
W1
ActLnk
MW
2Act
-48V/24V
A16-CHDS1 V2Stat
Pwr
Act
PortPorts 1-16
-48/24V
A16-CHDS1 V2Stat
Pwr
Act
PortPorts 1-16
-48/24V
B2
G
F
Corning Cable Systems
LANscape CORNING
LANscape SIECOR
Corning Cable Systems
LANscape CORNING
G
30 EAST
30
RACK TO BE USED AS PART OF THIS
PROJECT
SANLANDO SPRINGS – SHELTER FLOOR PLAN
SANLANDO SPRINGS – NOKIA MICROWAVE RACK
Attachment 1 48
H-42
SHEET NO.D5 RTMCROOM 511 FLOOR PLAN
STATE OF FLORIDADEPARTMENT OF TRANSPORTATION
SICNSITE NAME FINANCIAL PROJECT IDCOUNTY
\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd
424401-2-93-03
FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501
CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION
F6TPF
DACC &Channel Bank
Cabinet
Shelves
Fixed Door
Passport 15K Cabinet
DC Power & NetworkCabinet
Adtran Fiber Splice Tray
Adtran Fiber Mux
RectifierRectifier
DS-1 Cross Connect
District 5 Fiber Patch Panel
DS-3 Interface Panel
Business Policy Switch 2000BPS 2000
Wide Bank 28
D5 RTMC – ROOM 511 FLOOR PLAN
D5 RTMC – DACC & CHANNEL BANK CABINET D5 RTMC – DC POWER & NETWORK CABINET D5 RTMC – PASSPORT 15K CABINET
MultiTech
NOTES:
1. REMOVE THE SPECIFIED EQUIPMENT AND THE ASSOCIATED CABLING FROM THE CABINETS AND DELIVER TO THE FDOT.
2. REMOVE AND PROPERLY DISPOSE OF THE REMAINDER OF THE EQUIPMENT AND EQUIPMENT CABINETS.
EQUIPMENT TO BE REMOVED
EQUIPMENT TO BE DELIVERED TO FDOT
EXISTING FDOT EQUIPMENT
LEGEND:
Attachment 1 49