Nutrient Removal Upgrades

May 9, 2019

Page 2: Williamsburg Treatment Plant: Nutrient Removal Upgrades ......Nutrient Removal Upgrades May 9, 2019 • Williamsburg Plant Background • Recent Process Upgrades (2017 – present)

• Williamsburg Plant Background

• Recent Process Upgrades (2017 – present)

– Improve TN removal

– Decrease ferric sulfate required for TP removal

• Further Enhancements for SWIFT

Agenda

2

Page 3: Williamsburg Treatment Plant: Nutrient Removal Upgrades ......Nutrient Removal Upgrades May 9, 2019 • Williamsburg Plant Background • Recent Process Upgrades (2017 – present)

3

Williamsburg Treatment Objectives

Annual Average Limit Concentration

(mg/L)

TN 14

TP 2

Concentration Based Limits

James River Bubble – WB Objectives

• TN < 4-8 mg/L

• TP < 0.7 mg/L

• As low as reasonably possible without

spending a lot of $$

Page 4: Williamsburg Treatment Plant: Nutrient Removal Upgrades ......Nutrient Removal Upgrades May 9, 2019 • Williamsburg Plant Background • Recent Process Upgrades (2017 – present)

Parameter Value

Daily Influent Flow 9 mgd (1 mgd

from brewery)

Influent COD Conc 815 mg/L

Influent TKN Conc 49 mg/L

Primary Effluent COD Conc 644 mg/L

Intermediate Clarifier

Effluent sCOD Conc 74 mg/L

Page 5: Williamsburg Treatment Plant: Nutrient Removal Upgrades ......Nutrient Removal Upgrades May 9, 2019 • Williamsburg Plant Background • Recent Process Upgrades (2017 – present)

Liquid Process Flow Pre-2011

5

Page 6: Williamsburg Treatment Plant: Nutrient Removal Upgrades ......Nutrient Removal Upgrades May 9, 2019 • Williamsburg Plant Background • Recent Process Upgrades (2017 – present)

Liquid Process Flow - May 2011 to January 2017

6

Aeration

tanks

converted to

MLE process

Page 7: Williamsburg Treatment Plant: Nutrient Removal Upgrades ......Nutrient Removal Upgrades May 9, 2019 • Williamsburg Plant Background • Recent Process Upgrades (2017 – present)

Liquid Process Flow – May 11 to January 2017 – MLE Configuration

Historical Data Review and Modeling

7

Aeration

Effluent

Intermediate Clarifier

Effluent RAS

PE Flow

Diversion

Tank #1

Tank #4

Tank #3

Tank #2

Splitter

Box

Aerobic Anoxic Anoxic

Page 8: Williamsburg Treatment Plant: Nutrient Removal Upgrades ......Nutrient Removal Upgrades May 9, 2019 • Williamsburg Plant Background • Recent Process Upgrades (2017 – present)

Upgrade Evaluation Using Process Modeling

8

Page 9: Williamsburg Treatment Plant: Nutrient Removal Upgrades ......Nutrient Removal Upgrades May 9, 2019 • Williamsburg Plant Background • Recent Process Upgrades (2017 – present)

Phased Upgrades

9

Original MLE

Phase I: 5-Stage

Phase II: 5-Stage

Page 10: Williamsburg Treatment Plant: Nutrient Removal Upgrades ......Nutrient Removal Upgrades May 9, 2019 • Williamsburg Plant Background • Recent Process Upgrades (2017 – present)

• Installation of 3 baffle walls (yellow dashed lines)

• Adjusted NRCY discharge piping

• Addition of step feed of MLSS

• Moved mixer to 2nd anoxic zone

• Aeration grid modifications

Phase I: 5-Stage Upgrade

10

January 2017 – August 2017

Page 11: Williamsburg Treatment Plant: Nutrient Removal Upgrades ......Nutrient Removal Upgrades May 9, 2019 • Williamsburg Plant Background • Recent Process Upgrades (2017 – present)

Phase I: 5-Stage Upgrade

11

Page 12: Williamsburg Treatment Plant: Nutrient Removal Upgrades ......Nutrient Removal Upgrades May 9, 2019 • Williamsburg Plant Background • Recent Process Upgrades (2017 – present)

• Additional baffle wall for swing zone

• Addition of large bubble mixing in swing zone

• Aeration grid modifications

• NRCY intake modifications

• Actuators for DCS control

Phase II: 5-Stage Upgrade

12

August 2017 - current

Page 13: Williamsburg Treatment Plant: Nutrient Removal Upgrades ......Nutrient Removal Upgrades May 9, 2019 • Williamsburg Plant Background • Recent Process Upgrades (2017 – present)

• Controlled by nitrate, phosphate, and ammonia sensors in aeration effluent

• Low DO • DO = 0.2 mg/L

• Anoxic • Not aerated

• Mixing by large bubble

• ABAC (Ammonia Based Aeration Control)

• DO = 0.2 to 2 mg/L

Swing Zone Aeration Control

13

Page 14: Williamsburg Treatment Plant: Nutrient Removal Upgrades ......Nutrient Removal Upgrades May 9, 2019 • Williamsburg Plant Background • Recent Process Upgrades (2017 – present)

• Material costs = $4,000 (each) • Fiberglass

• 1/8” PVC roofing panels

• Stainless steel accessories

• Fabrication & Installation by HRSD maintenance staff

Baffle Wall Addition

14

Page 15: Williamsburg Treatment Plant: Nutrient Removal Upgrades ......Nutrient Removal Upgrades May 9, 2019 • Williamsburg Plant Background • Recent Process Upgrades (2017 – present)

Construction Details – Swing Zone Mixing created by HRSD staff using low pressure air

15

Page 16: Williamsburg Treatment Plant: Nutrient Removal Upgrades ......Nutrient Removal Upgrades May 9, 2019 • Williamsburg Plant Background • Recent Process Upgrades (2017 – present)

Sizes tested ranged from 0.25 cf to 7.0 cf

Construction Details – Development of Big Bubble Mixing System

16

Plastic Cup Small Trashcan Bucket

Aluminum Box Larger Trashcan

Large Trashcan

PVC Fittings

Page 17: Williamsburg Treatment Plant: Nutrient Removal Upgrades ......Nutrient Removal Upgrades May 9, 2019 • Williamsburg Plant Background • Recent Process Upgrades (2017 – present)

Big Bubble Mixers in Action

17

Minion

Page 18: Williamsburg Treatment Plant: Nutrient Removal Upgrades ......Nutrient Removal Upgrades May 9, 2019 • Williamsburg Plant Background • Recent Process Upgrades (2017 – present)

Phase I and II Upgrades Spent to Date – Operating Budget

18

Phase Modifications per Treatment Train Total Cost

I

• Installation of 3 baffle walls

• Adjusted NRCY discharge piping

• Addition of step feed of MLSS

• Moved mixer to 2nd anoxic zone

• Aeration grid modifications

$78,000

II

• Additional baffle wall for swing zone

• Addition of large bubble mixing in swing zone

• Aeration grid modifications

• NRCY intake modifications

• Actuators for DCS control

$100,000

Total $178,000

Page 19: Williamsburg Treatment Plant: Nutrient Removal Upgrades ......Nutrient Removal Upgrades May 9, 2019 • Williamsburg Plant Background • Recent Process Upgrades (2017 – present)

Post-Upgrade Performance – Historical Effluent TN (Monthly Avg.)

19

Page 20: Williamsburg Treatment Plant: Nutrient Removal Upgrades ......Nutrient Removal Upgrades May 9, 2019 • Williamsburg Plant Background • Recent Process Upgrades (2017 – present)

Post-Upgrade Performance – Effluent TN by Phase

20

Page 21: Williamsburg Treatment Plant: Nutrient Removal Upgrades ......Nutrient Removal Upgrades May 9, 2019 • Williamsburg Plant Background • Recent Process Upgrades (2017 – present)

SWIFT Effluent Goals

21

Anticipated Future Effluent Goals Concentration

(mg/L)

TIN < 5 (instantaneous)

TN < 4 (monthly avg)

TP < 1 (monthly avg)

2018 Williamsburg Averages

TN = 3.2 mg/L

TP = 0.6 mg/L

Page 22: Williamsburg Treatment Plant: Nutrient Removal Upgrades ......Nutrient Removal Upgrades May 9, 2019 • Williamsburg Plant Background • Recent Process Upgrades (2017 – present)

Post-Upgrade Performance – Effluent TIN for SWIFT Treatment Goals

22

SWIFT

requires

< 5 mg/L TIN

Page 23: Williamsburg Treatment Plant: Nutrient Removal Upgrades ......Nutrient Removal Upgrades May 9, 2019 • Williamsburg Plant Background • Recent Process Upgrades (2017 – present)

• SWIFT upgrades can build on recent Phase I

and II process modifications

• Further upgrades in support of SWIFT to

enhance TN removal reliability and biological

P removal stability

– $450,000 - HRSD staff designed and constructed

SWIFT Upgrades – Phase 3

23

Page 24: Williamsburg Treatment Plant: Nutrient Removal Upgrades ......Nutrient Removal Upgrades May 9, 2019 • Williamsburg Plant Background • Recent Process Upgrades (2017 – present)

• NRCY flow control based on nitrate sensors

• ABAC in cell 3 and cell 5 (reaeration in effluent channel)

• Better DO control and handling excess air

• BioP improvements in anaerobic zone

Phase 3

24

Page 25: Williamsburg Treatment Plant: Nutrient Removal Upgrades ......Nutrient Removal Upgrades May 9, 2019 • Williamsburg Plant Background • Recent Process Upgrades (2017 – present)

• Capture a portion of influent solids and let settle in the first stage of the anaerobic zone

• Mix this zone every couple days

• Initial results look promising • ORP less than -200 mV

• TSS greater than 30,000 mg/L

Biological Phosphorus Removal Improvements

25

Page 26: Williamsburg Treatment Plant: Nutrient Removal Upgrades ......Nutrient Removal Upgrades May 9, 2019 • Williamsburg Plant Background • Recent Process Upgrades (2017 – present)

• BNR upgrades greatly improved N removal • Phase I: Baffle walls, step feed, NRCY mods

• Phase II: Swing Zone, NRCY mods

• Bio P operation more stable • Anaerobic Zone, NRCY mods

• Design and construction effort completed in-house for only $178,000

• 2018 TN avg = 3.2 mg/L

Summary