One of the presentations from a program called "Where Did the Money Go?!: Understanding Hidden Expenses That Derail Small Scale Renovations". It was coordinated by LLAMA BES at ALA Annual 2010 (June 26, 2010). Many library leaders will find themselves planning a remodel of library space. Whether repurposing for a new use or just improving function and aesthetics, a limited budget can be eaten up by existing building issues: HVAC problems, asbestos abatement, interruption of systems, or simple staging logistics. Experts will share with attendees what to watch for, what questions to ask, and how to plan to anticipate these considerations so that project goals are met.

TRANSCRIPT

Page 1: When You Can’t Have it All: Balancing Cost, Quality & Quantity in Library Remodels

When You Can’t Have It All:Balancing Cost, Quality & Quantity in Library Remodels

When You Can’t Have it All:Balancing Cost, Quality & Quantity in Library Remodels

ALA 2010 Presentation by:

Stephanie Kingsnorth, AIA

June 26, 2010

Page 2: When You Can’t Have it All: Balancing Cost, Quality & Quantity in Library Remodels

When You Can’t Have It All:Balancing Cost, Quality & Quantity in Library Remodels

Finding a Balance

QUANTITYQUALITY

BUDGET

Page 3: When You Can’t Have it All: Balancing Cost, Quality & Quantity in Library Remodels

When You Can’t Have It All:Balancing Cost, Quality & Quantity in Library Remodels

Prepare Yourself - Developing A Project Plan

What is A Project Plan?

Goals and Priorities

Cost Modeling/Estimate

Define Quantity / Quality / Budget

Schedule

Page 4: When You Can’t Have it All: Balancing Cost, Quality & Quantity in Library Remodels

When You Can’t Have It All:Balancing Cost, Quality & Quantity in Library Remodels

Step 1: Identify the Goals

Aesthetics

- Updating the Look/Feel

- Color/Texture

- Furniture/Equipment

Service

- Service Points

- Patron Movement/Comfort

- Materials Movement

- Staff Efficiency

Infrastructure

- Information Technology

- Lighting

- HVAC

Page 5: When You Can’t Have it All: Balancing Cost, Quality & Quantity in Library Remodels

When You Can’t Have It All:Balancing Cost, Quality & Quantity in Library Remodels

Step 2: Prioritize the Goals

Page 6: When You Can’t Have it All: Balancing Cost, Quality & Quantity in Library Remodels

When You Can’t Have It All:Balancing Cost, Quality & Quantity in Library Remodels

Now what?

Page 7: When You Can’t Have it All: Balancing Cost, Quality & Quantity in Library Remodels

When You Can’t Have It All:Balancing Cost, Quality & Quantity in Library Remodels

Step 3: Understanding Your Building

Page 8: When You Can’t Have it All: Balancing Cost, Quality & Quantity in Library Remodels

When You Can’t Have It All:Balancing Cost, Quality & Quantity in Library Remodels

Step 3: Understanding Your Building – What do you look for?

Tangible Factors

Intangible Factors

(aka “Hidden Landmines”)

Page 9: When You Can’t Have it All: Balancing Cost, Quality & Quantity in Library Remodels

When You Can’t Have It All:Balancing Cost, Quality & Quantity in Library Remodels

Step 3: Understanding Your Building – What do you look for?

Tangible Factors

- Structure

- Infrastructure (Building Systems)

- Current Configuration/Layout

Intangible Factors (aka Hidden Landmines)

- Structure

- History (Age of Building)

- Hazardous Materials

- Construction Type

- Codes

- Domino Effect

Page 10: When You Can’t Have it All: Balancing Cost, Quality & Quantity in Library Remodels

When You Can’t Have It All:Balancing Cost, Quality & Quantity in Library Remodels

Step 3: Understanding Your Building – Tangible Factors

Structural Issues

- Previous Building Additions (Connections)

- Floor to Floor Height

- Column Spacing (Grid)1952

19601965

B

1965A 1975

Page 11: When You Can’t Have it All: Balancing Cost, Quality & Quantity in Library Remodels

When You Can’t Have It All:Balancing Cost, Quality & Quantity in Library Remodels

Step 3: Understanding Your Building – Tangible Factors

Building Infrastructure

- Age of Systems

- System Capacities

- Mechanical

- Heating

- Air Conditioning

- System Typology

- Electrical (Outlet Spacing/Location)

- Plumbing

- Fire Suppression

- Telecommunications

- Routing

- Flexibility

- Serviceability

Page 12: When You Can’t Have it All: Balancing Cost, Quality & Quantity in Library Remodels

When You Can’t Have It All:Balancing Cost, Quality & Quantity in Library Remodels

Step 3: Understanding Your Building – Tangible Factors

Current Configuration

- Patron Circulation

- Visibility/Sightlines

- Wayfinding

- Serviceability

Page 13: When You Can’t Have it All: Balancing Cost, Quality & Quantity in Library Remodels

When You Can’t Have It All:Balancing Cost, Quality & Quantity in Library Remodels

Step 3: Understanding Your Building – Intangible Factors

Structural Issues

- Floor Loading

- Floor Slab Construction

Page 14: When You Can’t Have it All: Balancing Cost, Quality & Quantity in Library Remodels

When You Can’t Have It All:Balancing Cost, Quality & Quantity in Library Remodels

Step 3: Understanding Your Building – Intangible Factors

History

- Age of Building?

- Historic?

- Character Defining Features

- Archaic Materials

- Faux Finishes

- Alternate/Unusual Construction Methodologies

- Nostalgia/Emotion

Page 15: When You Can’t Have it All: Balancing Cost, Quality & Quantity in Library Remodels

When You Can’t Have It All:Balancing Cost, Quality & Quantity in Library Remodels

Step 3: Understanding Your Building – Intangible Factors

Hazardous Materials

- LeadPaint

- AsbestosInsulationCeiling TilesFloor FinishesMastic (Adhesives)

- PCBs (Poly-Chlorinated Biphenyls)TransformersLight Ballasts

- CFCs (Chlorofluorocarbons)Air ConditionersFire Extinguishers

- MercurySmoke DetectorsLightsSwitchesThermostats

- Mold

Page 16: When You Can’t Have it All: Balancing Cost, Quality & Quantity in Library Remodels

When You Can’t Have It All:Balancing Cost, Quality & Quantity in Library Remodels

Step 3: Understanding Your Building – Intangible Factors

Construction Type/Condition

- What’s Really…

…Behind the Walls?

Page 17: When You Can’t Have it All: Balancing Cost, Quality & Quantity in Library Remodels

When You Can’t Have It All:Balancing Cost, Quality & Quantity in Library Remodels

Step 3: Understanding Your Building – Intangible Factors

Construction Type/Condition

- What’s Really…

…Behind the Walls?

…Above the Ceiling?

Page 18: When You Can’t Have it All: Balancing Cost, Quality & Quantity in Library Remodels

When You Can’t Have It All:Balancing Cost, Quality & Quantity in Library Remodels

Step 3: Understanding Your Building – Intangible Factors

Construction Type/Condition

- What’s Really…

…Behind the Walls?

…Above the Ceiling?

…Under the Floor?

Page 19: When You Can’t Have it All: Balancing Cost, Quality & Quantity in Library Remodels

When You Can’t Have It All:Balancing Cost, Quality & Quantity in Library Remodels

Step 3: Understanding Your Building – Intangible Factors

Building Codes

- Code Requirements

“Triggers”

Exiting

Fire Sprinklers

Fire Alarm

ADA Upgrades

- January 2011…New Building Code

Page 20: When You Can’t Have it All: Balancing Cost, Quality & Quantity in Library Remodels

When You Can’t Have It All:Balancing Cost, Quality & Quantity in Library Remodels

Step 3: Understanding Your Building – Intangible Factors

Domino Effect

Page 21: When You Can’t Have it All: Balancing Cost, Quality & Quantity in Library Remodels

When You Can’t Have It All:Balancing Cost, Quality & Quantity in Library Remodels

Step 3: Understanding Your Building – Intangible Factors

Domino Effect

- Examples:

1. Additional technology stations…

- Wiring

- Routing

- Floor Slab Construction

Page 22: When You Can’t Have it All: Balancing Cost, Quality & Quantity in Library Remodels

When You Can’t Have It All:Balancing Cost, Quality & Quantity in Library Remodels

Step 3: Understanding Your Building – Intangible Factors

Domino Effect

- Examples:

1. Additional technology stations…

- Wiring

- Routing

- Floor Slab Construction

2. HVAC Improvements…

- Electrical & Plumbing Impacts

- Lighting

- Structural Support

- Hazardous Materials

Page 23: When You Can’t Have it All: Balancing Cost, Quality & Quantity in Library Remodels

When You Can’t Have It All:Balancing Cost, Quality & Quantity in Library Remodels

Step 3: Understanding Your Building – Intangible Factors

Domino Effect

- Examples:

1. Additional technology stations…

- Wiring

- Routing

- Floor Slab Construction

2. HVAC Improvements…

- Electrical & Plumbing Impacts

- Lighting

- Structural Support

- Hazardous Materials

3. New shelving…

- Lighting

- Wall Mounting Attachment

- Fire Suppression

Page 24: When You Can’t Have it All: Balancing Cost, Quality & Quantity in Library Remodels

When You Can’t Have It All:Balancing Cost, Quality & Quantity in Library Remodels

Step 4: Managing the Costs

•Cost Modeling- Define all project elements at the outset- Early exploratory work to eliminate multiple unknowns

•Define Quantity / Quality / Budget- Balance expectations with resources- Determine project priorities

•Monitor Line Items- Look for scope “creep”- Identify alternatives

•Design Priorities and Options- Design and bid alternates

- Early VE list development

•Value Management- Lifecycle costing, sustainability, and

long-term value- Design and bid alternatives

Page 25: When You Can’t Have it All: Balancing Cost, Quality & Quantity in Library Remodels

When You Can’t Have It All:Balancing Cost, Quality & Quantity in Library Remodels

Step 5: Developing the Schedule

•Establish a Clear Work PlanA roadmap for the projects

•Define Decision Making Milestones

Critical path issues – get the right people in the room

•Allocation of Resources

Staffing and consultant performance time frames

•Anticipation

Know the pulse of the project and approval needs

Provide “look ahead” agendas

•CommunicationKeep everyone in the loop

Page 26: When You Can’t Have it All: Balancing Cost, Quality & Quantity in Library Remodels

When You Can’t Have It All:Balancing Cost, Quality & Quantity in Library Remodels

Step 6: Admitting That You Can’t Have it All…

Be Prepared for Change

Change is inevitable - except from a vending machine.

- Robert C. Gallagher

Page 27: When You Can’t Have it All: Balancing Cost, Quality & Quantity in Library Remodels

When You Can’t Have It All:Balancing Cost, Quality & Quantity in Library Remodels

Step 6: Admitting That You Can’t Have it All…

Phasing Options

- Is Phasing An Option?

Domino Effect

Cost Impact

Schedule/Living Through It

Revisit Your Priorities

- Priorities Always Change

Critical…

Important…

Wish List…

Quality, Quantity, Cost – Choose Two

- Unlimited Budget is Rare

- Limit Quantity?

- Limit Quality?

Page 28: When You Can’t Have it All: Balancing Cost, Quality & Quantity in Library Remodels

When You Can’t Have It All:Balancing Cost, Quality & Quantity in Library Remodels

Step 6: Admitting When You Need Help

Possible Partners

- University/College Setting

Capital Planning

Facilities

University Architect

- Public Libraries

Building Department

Planning Department

Reference Information

- RS Means Building Construction Cost Data

- Building Construction Illustrated

- Professional Organizations

- Peer Institutions

Page 29: When You Can’t Have it All: Balancing Cost, Quality & Quantity in Library Remodels

When You Can’t Have It All:Balancing Cost, Quality & Quantity in Library Remodels

When You Can’t Have it All:Balancing Cost, Quality & Quantity in Library Remodels

ALA 2010 Presentation by:

Stephanie Kingsnorth, AIA

June 26, 2010