what\'s hba been up to lately?

14
Introduction Green is Good Belharbour at SoNo Northrop Grumman/Apprentice School Proposal USJFCOM HQ Proposal P-163 MASS-1 Ops/Maintenance P-1253 2d CEB Ops/Maintenance Portsmouth Judicial Center Fredericksburg Judicial Center Proposal Chesapeake Public Library Williams Mullen Center Floyd E. Kellam Replacement High School Why HBA? WHAT’S HBA BEEN UP TO LATELY?

Upload: richard-corner

Post on 29-Jul-2015

269 views

Category:

Business


0 download

TRANSCRIPT

Page 1: What\'s HBA Been Up To Lately?

Introduction Green is GoodBelharbour at SoNoNorthrop Grumman/Apprentice School ProposalUSJFCOM HQ ProposalP-163 MASS-1 Ops/MaintenanceP-1253 2d CEB Ops/MaintenancePortsmouth Judicial CenterFredericksburg Judicial Center ProposalChesapeake Public LibraryWilliams Mullen CenterFloyd E. Kellam Replacement High SchoolWhy HBA?

WHAT’S HBA BEEN UP TO LATELY?

Page 2: What\'s HBA Been Up To Lately?

Founded in 1974 on principles of integrity and ahigh standard of excellence, HBA is committedto providing exceptional design and facilitysolutions to enhance our clients’ business, thequality of our community and the environment.

Introduction

Leadership……Principal Involvement Sustainability…..Community Support 3D…..Cutting Edge Design Capability

Page 3: What\'s HBA Been Up To Lately?

G R E E N I S G O O DRECENT PROJECTS:P-191 2MAW/Base Command HQ, MCAS Cherry Point, NC LEED® Gold Construction underwayNATO SACT Building NH-31 Expansion, NSA Norfolk, VA LEED® Gold Construction begins 2011Virginia Beach Middle School, Virginia Beach, VA LEED® Silver Occupied Spring 2010P-714 Physical Fitness Center, MCAS New River, NC LEED® Gold Construction begins 2011P-1311 I.T./Telecom Complex, MCB Camp Lejeune, NC LEED® Gold Construction begins 2011Chesapeake Public Library LEED® Silver Design complete;

construction begins 2011Kellam High School Replacement, Virginia Beach, VA LEED® Platinum Design complete;

construction begins 2011

Page 4: What\'s HBA Been Up To Lately?

Belharbour at SoNo

Page 5: What\'s HBA Been Up To Lately?

Northrop Grumman/Apprentice School Proposal

Page 6: What\'s HBA Been Up To Lately?

USJFCOM Headquarters (Design-Build Proposal)

Page 7: What\'s HBA Been Up To Lately?

P-163 MASS-1 Ops/Maintenance, MCAS Cherry Point, NC

Page 8: What\'s HBA Been Up To Lately?

P-1253 2d CEB Ops/Maintenance, MCB Camp Lejeune, NC

Page 9: What\'s HBA Been Up To Lately?

Portsmouth Judicial Center

Page 10: What\'s HBA Been Up To Lately?

Fredericksburg Judicial Center Design-Build Proposal

Page 11: What\'s HBA Been Up To Lately?

Chesapeake Public Library

Page 12: What\'s HBA Been Up To Lately?

Williams Mullen Center, Richmond, VA

Page 13: What\'s HBA Been Up To Lately?

Kellam Replacement High School, Virginia Beach, VA

Page 14: What\'s HBA Been Up To Lately?

We Connect to Clients’ Needs Beyond the Building

Project Leadership – Principal Vision & Involvement

Commitment to Team – WE’RE ALL IN

Dedication to Excellence – Design and Service

Delight and Satisfaction of Our Clients

We Think Outside the Box & Set the Bar (Very High)

Why HBA?