western red cedar sustainable designs...• all joints should meet on solid surfaces • solid...

101
Western Red Cedar Sustainable Designs Version 103009 1.0 Sustainable Design CEU This presenta,on was developed by a third party and is not funded by WoodWorks or the So9wood Lumber Board

Upload: others

Post on 19-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Western Red Cedar

Sustainable Designs

Version(103009(1.0(Sustainable(Design(CEU(

This%presenta,on%was%developed%by%a%third%party%and%is%not%funded%by%WoodWorks%or%the%So9wood%Lumber%Board!

Page 2: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

“The Wood Products Council” is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES), Provider #G516. Credit(s) earned on completion of this course will be reported to AIA CES for AIA members. Certificates of Completion for both AIA members and non-AIA members are available upon request.

This course is registered with AIA CES for continuing professional education. As such, it does not include content that may be deemed or construed to be an approval or endorsement by the AIA of any material of construction or any method or manner of handling, using, distributing, or dealing in any material or product. ________________________________________

Questions related to specific materials, methods, and services will be addressed at the conclusion of this presentation.

Page 3: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Course Description

•  This presentation will include some information basic to lumber and forest products while it features the nature of the Western Red Cedar lumber, the benefits unique to these products, and how they are appropriate for incorporation in any sustainable design. The presentation will also touch on information about western red cedar lumber grades, installation, and finishing. Forest Certification will be discussed, as will reasons why using Western Red Cedar affords your clients the best environmental and sustainable products for their design requirements.

Page 4: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Learning Objectives

�1.  Increase awareness of Western Red Cedar, its properties and

performance characteristics

2.  Understand grade and product specification requirements.

3.  Gain greater appreciation of cedar�s versatility and the enhanced

appeal it brings to a project

4.  Get the facts about proper installation, finishing and maintenance of

Western Red Cedar.

Page 5: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Presentation Overview • Introduction – Association • Western Red Cedar�s Heritage • Environmental Management & Certification

• Western Red Cedar Characteristics • Product Grades & Sizes • Western Red Cedar Around the World • Installation, Finishing & Maintenance • Reference Materials and Sources

Page 6: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Western Red Cedar Lumber Association • Non profit trade association, established in 1954,

known worldwide as �the voice of the cedar industry.�

• Producing members account for more than 65 percent of the world�s production of Western Red Cedar and have an annual volume of nearly 1 billion board feet.

• Purpose: Increase market awareness for WRC through education, technical expertise and promotion.

• Offers technical and promotional resource for architects, builders, consumers.

Introduction

Page 7: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Western Red Cedar (Thuja Plicata)

Western Red Cedar trees reach heights of 200 feet with diameters of 16 feet. The trunk of older trees is buttressed, fluted and quite tapered.

The �Tree of Life� is what the first residents of the Pacific Northwest called the stately Western Red Cedar. Its legendary durability made cedar nature�s gift for building ocean-going canoes, post-and-beam houses, ceremonial dance masks and ancestral totem poles, many of which have withstood centuries of weathering.

Today its exceptional beauty brings warmth, character and longevity to homes, and its supreme versatility as a building material has made it the enduring choice of craftsmen for centuries.

Introduction – Real Cedar

Page 8: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Haida �Monster House� (photo 1873)

The Tree of Life

Page 9: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Cedar Totem Pole (nearly 200 years old)

The Tree of Life

Page 10: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Cedar continues to play a key cultural role

The Tree of Life

Page 11: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Two Growth Areas: • West Coast of Canada.

Some in southern Alaska and US Pacific Northwest

• BC Interior Wet Belt. Some in Idaho; Montana & Washington

Growing Region

Page 12: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

• Forests of BC cover 136 million acres. Less than 1/2 of 1% are harvested annually.

• More than 200 million seedlings are planted each year (eight for every tree harvested).

Growing Region

Citation: B.C. Ministry of Forests, Mines and Lands. 2010. The State of British Columbia’s Forests, 3rd ed. Forest Practices and Investment Branch, Victoria, B.C.

Page 13: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Citation: B.C. Ministry of Forests, Mines and Lands. 2010. The State of British Columbia’s Forests, 3rd ed. Forest Practices and Investment Branch, Victoria, B.C.

• The volume of timber in BC’s Forest totals roughly 11 billion m3 and approximately half is located on land suitable for harvest

• Total standing volume of WRC is estimated at 650 million m3

Standing Volume

Page 14: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Annual harvest volumes • 3 million m3 (2.4 million m3 is

from the Coast) in log form. Drastic Changes in Methods: • Variable retention and helicopter

logging are widely practiced and keeps the forest structure intact.

Harvesting Practices

FPInnovations, Wood Market Statistics in British Columbia, 2010 Edition

Page 15: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Harvesting Practices

Page 16: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Helicopter Logging

Page 17: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Helicopter Logging

Page 18: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Variable Retention

Page 19: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Reforestation

Page 20: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Global Forest Certification

UNECE/FAO Forest Products Annual Market Review, 2011-2012

Page 21: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Certification in Canada & BC

Page 22: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

•  FSC (Forest Stewardship Council) •  Three regional standards in Canada endorsed by FSC

International and one draft •  British Columbia, Boreal, Maritimes, and Great Lakes-S.

Lawrence (field-tested draft) •  SFI (Sustainable Forestry Initiative)

•  North America-wide standard •  Endorsed internationally by PEFC

•  CSA (Canadian Standards Association) •  National Standard of Canada approved by the Standards

Council of Canada •  CAN/CSA Z809 and CAN/CSA Z804-08 (woodlots) •  Endorsed internationally by PEFC

Certification in BC

Page 23: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

BC Forests by Certification Scheme

BC Canada BC %

CSA 23.5 40.4 45.3

SFI 27.0 79.3 51.2

FSC 2.2 60.6 3.5

•  As of December 31, 2013 •  Figures in million hectares, includes double counted areas certified to

more than one standard. BC% adjusted to remove double counting

Certification in BC

CertificationCanada.org as of Dec 31, 2013

Page 24: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Life Cycle Assessment

Page 25: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Life Cycle Assessment

Embodied Environmental Impacts of Various Exterior Wall Systems Data compiled by FPInnovations, Forintek Division using the ATHENA EcoCalculator with a data set for Vancouver, British Columbia.

Page 26: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Wood Steel Concrete

Total Energy Use Lowest 140 % more 70 % more

Greenhouse Gases Lowest 45 % more 81 % more

Air Pollution Lowest 42 % more 67 % more

Water Pollution Lowest 1900 % more 90 % more

Solid Waste Lowest 36 % more 96 % more

Ecological Resource Use Lowest 16 % more 97 % more

Life Cycle Assessment

Page 27: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Life Cycle Assessment

Mahalle, L. & O’Connor, J.; 2009. Life Cycle Assessment of Western Red Cedar Siding, Decking, and Alternative Products, FPInnovations, Forintek Division, Vancouver, BC

Page 28: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Life Cycle Assessment

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Global Warming Acidification Resp. Effects Eutrophication Smog Total energy Fossil

WRC Siding Brick Fiber Cement PVC

Mahalle, L. & O’Connor, J.; 2009. Life Cycle Assessment of Western Red Cedar Siding, Decking, and Alternative Products, FPInnovations, Forintek Division, Vancouver, BC

Page 29: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Made with Solar Energy

Page 30: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Characteristic What is means

Dimensional Stability Lays flat & stays straight

Natural Durability Resists rot/decay with natural preservatives

Presence of Thujic Acid Prevents insect attack

Free of pitch & resin Readily accepts a wide range of finishes

Straight grain & uniform texture Easy to cut, saw, nail & glue

Light weight Easy to transport & handle

Class II Flame Spread Resists the spread of fire

Thermal Insulator Energy efficient; does not transfer heat

Acoustic properties Noise insulation and absorption

Natural Aesthetics Unmatched warmth and beauty

WRC Unique Characteristics

Page 31: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Western Red Cedar Siding

Page 32: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Clear Siding Grades

Clear VG Heart NLGA 200a/201a WCLIB 102b/106aa

Siding Grades

Page 33: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

A Clear NLGA 200b/201b WCLIB 106a

Clear Siding Grades

Siding Grades

Page 34: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Knotty Siding Grades

Select Knotty NLGA 204a/205a WCLIB 111e Proprietary WRCLA Members produce custom grades of high quality knotty siding.

Siding Grades

Page 35: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Common Bevel Profiles:

Specialty profiles such as wavy edge bevel are also available from select manufacturers.

Rabbeted bevel siding

Bevel siding, thickness measured at the butt

Siding Options

Page 36: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Common Paneling/T&G Profiles:

Siding Options

Page 37: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Common Lap Siding Profiles:

Siding Options

Page 38: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Western Red Cedar Decking

Page 39: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

A Grade NLGA 200b/202b

Clear Board & Decking Grades

Decking Grades

Page 40: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Knotty Board & Decking Grades

Proprietary WRCLA Members produce high quality knotty boards & decking suitable for appearance end uses

Decking Grades

Page 41: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Western Red Cedar Timbers

Page 42: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Clear Timber Grades

#2 Clear & Better

(B Clear & Better) Export R List 401

Used as finished material or raw material for finely manufactured products.

Timber Grades

Page 43: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Clear Timber Grades

#4 Clear Export R List 401-a

Timber Grades

Page 44: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Knotty Timber Grades Appearance High quality knotty timbers graded for appearance end uses

Timber Grades

Page 45: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Engineered Western Red Cedar

Page 46: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Other Products Include: • Fascia and trim • Screening – Privacy Lattice • Outdoor Furniture • Balusters & Handrails • Sidewall Shingle panels • Custom Profiles & Products • Ready made, precut outdoor structure kits

You�re limited only by your imagination.

Western Red Cedar Products

Page 47: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Project:

The Kilternan Hotel

Ireland.

Commercial Projects

Page 48: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Project: IJsselstein (Netherlands)

Commercial Projects

Page 49: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Project: Retail Outlet (United States)

Commercial Projects

Page 50: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Project: Law Courts, Bordeaux, France

Commercial Projects

Page 51: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Project: Winery (New Zealand)

Commercial Projects

Page 52: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Project: Retail Complex (Australia)

Commercial Projects

Page 53: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Project: Langley Academy of Science (Berkshire, U.K.)

Commercial Projects

Page 54: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Project: Langley Academy of Science (Berkshire, U.K.)

Commercial Projects

Page 55: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Project: UCD Virus Reference Lab, Ireland

Institutional Projects

Page 56: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Project location: Private School (United States)

Institutional Projects

Page 57: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Project: Rensselaer Polytechnic Institute (United States)

Institutional Projects

Page 58: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Project: Rensselaer Polytechnic Institute (United States)

Institutional Projects

Page 59: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Project: University of Cambridge (UK)

Institutional Projects

Page 60: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Project: National Assembly of Wales (UK)

Institutional Projects

Page 61: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Project: The Mint, Historic Houses Trust (Australia)

Institutional Projects

Page 62: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Project: Multi-Family Residence (Canada)

Residential Projects

Page 63: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Residential Projects

Project: Multi-Family Residence (Australia)

Page 64: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Project: Private Residence (Australia)

Residential Projects

Page 65: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Project: Private Residence (Chobham, Surrey, UK)

Residential Projects

Page 66: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Project: Private Residence (United States)

Residential Projects

Page 67: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Residential Projects

Project: Private Residence (United States)

Page 68: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Residential Projects

Project: Private Cottage (Canada)

Page 69: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Product: Cedar windows and doors (Australia)

Residential Projects

Page 70: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Product: Cedar shutters and Venetian blinds (Australia)

Residential Projects

Page 71: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Project: Private Residence (Canada)

Outdoor Living Projects

Page 72: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Project: Private Residence (Ireland)

Outdoor Living Projects

Page 73: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Project: Private Residence (United States)

Outdoor Living Projects

Page 74: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Project: Private Residence (Canada)

Outdoor Living Projects

Page 75: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Product: Knotty Cedar Decking

Cedar is the environmentally friendly

choice for decking

Outdoor Living Projects

Page 76: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Project: Private Residence (Canada) Product: Knotty Timbers and trim, clear decking and shingles

Outdoor Living Projects

Page 77: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

General Rules •  Acclimatize prior to installation •  Use proper wall construction •  Prevent rain penetration •  Prime or seal all surfaces prior to

installation •  Use the appropriate fasteners and follow

recommended nailing patterns

Siding Installation

Source: Western Red Cedar Lumber Assn www.realcedar.com

Page 78: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Provide for Nailing Base • Horizontal applications • Vertical applications

Vapor Barrier • Non-permeable • Installed on warm side of stud

Siding Installation

Source: Western Red Cedar Lumber Assn www.realcedar.com

Wall Construction – The Basics

Page 79: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Siding Installation Wood Frame Construction

Source: Western Red Cedar Lumber Assn www.realcedar.com

Page 80: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Siding Installation Horizontal siding on concrete or brick and block.

Source: Western Red Cedar Lumber Assn www.realcedar.com

Page 81: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Siding Installation Vertical siding on concrete or brick and block

Source: Western Red Cedar Lumber Assn www.realcedar.com

Page 82: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Max. Lumber sizes Spacing

Nominal Actual Preferred Max

Blocking 2x2 1 ½ x 1 ½ 16 24

Battens over sheathing 1x2 ¾ x 1 ½ 16 24

Battens over masonry walls 2x2 1 ½ x 1 ½ 16 24

Lumber Size and Spacing

Siding Installation

Source: Western Red Cedar Lumber Assn www.realcedar.com

Measurements in inches

Page 83: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Use the Correct Fastener • Stainless Steel (preferred)

• 304 Stainless • 316 Stainless

• Aluminum • Galvanized

• Hot dipped galvanized.

Siding Installation

Source: Western Red Cedar Lumber Assn www.realcedar.com

Page 84: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Fasteners - Important Features • Thin Shank • Ring or Spiral Shank • Blunt Tip • Textured Head • Proper Length

Siding Installation

Source: Western Red Cedar Lumber Assn www.realcedar.com

Page 85: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Rules for Fastening • All WRC siding patterns are face nailed (except the narrow profiles of T&G)

• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24� on center, max 16� on center if installed over batten strips or without sheathing

• Ring or spiral shank nails should penetrate solid wood 1 ¼ inches.

Siding Installation

Source: Western Red Cedar Lumber Assn www.realcedar.com

Page 86: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Apply Coating Before Installation Reason for Sealing All Surfaces:

• Keeps Wood From Absorbing moisture Unequally

• Can Increase the Service Life of Finish Coat

• Helps Prevent Extractive Staining

Siding Installation

Source: Western Red Cedar Lumber Assn www.realcedar.com

Page 87: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Prevent Moisture Penetration • Install Breathable Building Paper • Miter Cut Joints and Seal • Use Flashing on Horizontal Trim Pieces • Use Flashing at the Top of Windows and Doors • Caulk Where siding Abuts Vertical Trim • Understand the Rainscreen Principle When

Installing

Siding Installation

Source: Western Red Cedar Lumber Assn www.realcedar.com

Page 88: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Siding Installation

Source: Western Red Cedar Lumber Assn www.realcedar.com

Page 89: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Siding Installation

Source: Western Red Cedar Lumber Assn www.realcedar.com

Page 90: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Siding Installation

Source: Western Red Cedar Lumber Assn www.realcedar.com

Page 91: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

• Trim and siding that extends down to a roof and decks requires a minimum of a 2� gap to avoid wicking.

• Trim, such as water table or skirt boards must be a minimum of 6� above the grade.

Siding Installation

Source: Western Red Cedar Lumber Assn www.realcedar.com

Page 92: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Five Basic Finishes: • Transparent • Semi-transparent • Solid Color Stain • Paint • Bleaching Oils

Enhance the versatility of Western Red Cedar

Finishing Western Red Cedar

Page 93: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Solid Color Stains and Paints •  Perform best on textured surfaces. They are non-penetrating and form a film •  Use a stain-blocking primer followed by a 100% acrylic latex-based top coat

•  Apply stain to all six surfaces.

Finishing Western Red Cedar

Page 94: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Semi Transparent Stains

•  Latex or oil-based.

•  Allows the natural beauty to show

•  Reduced protection from ultraviolet light.

•  Latex stains do not penetrate the surface.

•  Apply stain to all six surfaces.

Finishing Western Red Cedar

Page 95: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

•  Water repellants suitable for above ground uses. •  Reduces water absorption in the short term. •  Accentuates Cedar�s natural beauty but has limited UV protection. •  The addition of a fungicide that inhibits the growth of mildew and fungi is recommended.

Finishing Western Red Cedar

Page 96: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Protect Your investment: • Periodic, preventative maintenance helps coating

performance. • Power washers are not recommended. • Dilute bleach and cleaners to the minimum strength

necessary to accomplish their task. • Oxygen bleach is preferred for treating mold &

mildew growth. • Use wood brighteners to remove weathered fibers

before applying finishes. • Always rinse thoroughly after cleaning, and follow

the coating manufacturers instructions

Finishing Western Red Cedar

Page 97: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

• Western Red Cedar is legal, sustainable and renewable.

• Western Red Cedar siding and decking have a low impact on the environment compared with other non-wood building materials.

• WRC is ideal for a broad range of applications owing to its unique properties and aesthetics.

• WRC has centuries of proven performance. • When specifying grades, use industry standards to

ensure the right product is used on your project. • Remember the old adage �You get what you pay

for�. • Your clients will appreciate the natural beauty and

unsurpassed performance of Western Red Cedar.

Western Red Cedar - Summary

Page 98: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

On Web: www.realcedar.com Key WRC Literature Available (free of charge) Growth, Properties, & Uses of Western Red Cedar How To Specify Western Red Cedar How To Install Western Red Cedar Siding How to Finish Western Red Cedar Architect Advisory Services Western Red Cedar experts available to assist with selection, specification, sourcing and application. Online Training Tool (AIA Certified) www.realcedar.com

WRCLA Resources

Page 99: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Ques&ons?!This(concludes(The(American(Ins@tute(of(Architects(Con@nuing(Educa@on(Systems(Course(

Paul!Mackie!Western(Red(Cedar(Lumber(Associa@on([email protected](

Page 100: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

WRCLA Contacts

WRCLA Head Office #1501 – 700 West Pender St Vancouver, B.C. Canada V6C 1G8 TF. 1 866 778 9096 Tel. 604 891 1262 Fax. 604 687 4930 [email protected]

Page 101: Western Red Cedar Sustainable Designs...• All joints should meet on solid surfaces • Solid nailing should be spaced at max of 24 on center, max 16 on center if installed over batten

Thank you Western Red Cedar