West Lake UpdateMarch 24, 2016

EPA Releases First Round of Comprehensive Phase 1 Investigation Information

EPA is releasing selected data, tables, and figures collected during the Phase 1 site investiga-tion to determine the extent of RIM in Operable Unit 1, Area 1, of the West Lake Landfill. The data, tables, and figures depict the locations of soil borings, sampling locations, and gamma scans that were used to determine the extent of RIM in the landfill. EPA is conducting a thorough Quality Control/Quality Assurance review of the Compre-hensive Phase 1 report and will release it once it’s finalized.

EPA Region 7 has conducted a quality control review of the Comprehensive Phase 1 investiga-tion data and information provided by the Poten-tially Responsible Parties (PRPs). The information and data, including a map depicting the revised extent of radiologically-impacted material (RIM) is now available on the agency’s West Lake Landfill website.

The information and map released today pro-vide data from the field work including the Gam-ma Cone Penetrometer Testing. EPA is releasing the information consistent with its past practices of releasing final information after completion of an extensive review and qual-ity control process. EPA’s review process that is still underway for the final report is a robust effort designed to ensure that the PRPs’ work, and analy-ses meet the agency’s strict scientific standards and the goals of the investigation. As soon as the final report is complete and approved, EPA will post that document to the website. The data and map released help answer the follow-ing three questions:

1.Where is the radiologically-impacted mate-rial (RIM)?

The Extent of RIM map depicts areas of RIM based on sampling points included in the Phase 1 Investigation and from historical site investiga-tions. The Phase 1 investigation was conducted to determine the extent of RIM in Operable Unit

1 (OU-1), Area 1 of the West Lake Landfill. To accom-plish the Phase 1 objective, contractors for the responsible parties under EPA oversight collected more than 120 soil samples from 110 borings and conducted gamma scans from across Area 1, to determine areas with RIM present. The soil samples were then analyzed in a certified labora-tory to ensure the scientific accuracy and integrity of the data. The Phase 1 investigation identified RIM in areas of the landfill not identified during previous site investiga-tions as shown on the Extent of RIM map. The Phase 1 investigation also determined that RIM was not present in certain areas previously presumed to contain RIM.

2. Is there any change to health risks associated with the site as a result of the new data?

While the footprint of RIM within the West Lake Landfill has been revised, the health risks associated with the site remain consistent with previous studies. For the community surrounding the site, there are no significant health risks posed by the radiological wastes contained at the West Lake Landfill. Health risks for on-site work-ers also remain consistent with previous studies. On-site workers that conduct activities on Area 1 and Area 2 are subject to strict health and safety protocols while on-site, including scanning for radiological contamination before exiting the controlled exclusion zones. Additionally, risks associated with the potential for surface fires occurring in areas where RIM is near the surface are being mitigated by the current Removal Action to install the non-combus-tible cover in portions of Areas 1 and 2 of OU-1.

3. How does this new data relate to the subsurface smoldering event (SSE) in the Bridgeton Landfill?

The Phase 1 data indicate that RIM has been identi-fied further south and beneath a portion of the Bridgeton landfill known as the “Muffin Top”. However, on-site monitoring from temperature monitoring probes, gas extraction wells, and landfill subsidence, indicate that the SSE remains in the South Quarry, hundreds of feet from the RIM and that there is no rapid movement of the SSE towards the North Quarry or the RIM in OU-1. The SSE is monitored and managed under the regulatory author-ity of the Missouri Department of Natural Resources. All information related to oversight and monitoring of the Bridgeton Landfill is posted on their website (http://dnr.mo.gov/bridgeton/). In December, EPA announced

Page 3: West Lake Update - US EPA · 3/24/2016  · West Lake Update March 24, 2016 EPA Releases First Round of Comprehensive Phase 1 ... ses meet the agency’s strict scientific standards

Find Us Onwww.facebook.com/WestLakeLandfillSuperfundSite

www.twitter.com/WestLakeSitewww.scribd.com/eparegion7

www3.epa.gov/region07/cleanup/west_lake_landfill

Community InquiriesBen Washburn913-551-7364

[email protected]

its decision to require the Potentially Respon-sible Parties at the site to construct a physical isolation barrier, as well as install additional engineering controls, to prevent the SSE from contacting or impacting the RIM in OU-1. EPA will release additional information regarding the isolation barrier when the technical and legal details of this work are complete.

Progress on Surface Fire Mitigation Field Work

In December 2015, EPA Region 7 issued a unilateral order to the parties at the site to prepare and implement surface fire mitigation measures in Operable Unit 1, Areas 1 and 2, of the West Lake Landfill where radiologically impacted material (RIM) may be at or near the surface. The work includes cutting and laying in place brush, covering the brush with a per-meable geotextile cover, and then placing eight inches of crushed rock on top of the geotextile cover. This layered cover is collectively known as the non-combustible cover. This work will alleviate concerns with potential surface fires in areas where RIM is at or near the surface and reduces the risk of off-site migration of con-taminants that could result from removing the

vegetation. In addition to reducing the risk of surface fires, the non-combustible cover also reduces the health risks for on-site workers who enter OU-1 by providing additional shielding between the RIM and the workers.Work crews under EPA oversight began installing the non-combustible cover in February 2016, and the work is progressing at a steady pace. Construction of the non-combustible cover in Operable Unit 1, Area 1, is complete. Final confirmation from soil sampling will ensure that all areas with RIM known to be at or near the surface are cleared of vegetation and covered. Re-sults from recently collected soil samples are being ana-lyzed for confirmation that identified areas of surface RIM have been covered. In Area 1, about two acres have been covered with the non-combustible cover, while in Area 2, more than eight acres have been covered so far, totaling 21,000 tons of crushed rock for both areas. Crews working for the PRPs under EPA oversight are continuing to work on placing the non-combustible cover in Area 2.

EPA expects the surface fire mitigation field work to be completed later this spring. EPA is providing regu-lar updates, including progress photographs of the site work, to its Facebook and Twitter pages. Links to those pages are included in the West Lake Update.

Page 4: West Lake Update - US EPA · 3/24/2016  · West Lake Update March 24, 2016 EPA Releases First Round of Comprehensive Phase 1 ... ses meet the agency’s strict scientific standards

GC

PT

1-1A

GC

PT

1-1

GC

PT

1-2

GC

PT

2-1

GC

PT

2-2

GC

PT

2-2A

GC

PT

2-2B

GC

PT

2-3

GC

PT

3-1

GC

PT

3-1A

GC

PT

3-2

GC

PT

4-1

GC

PT

4-2

GC

PT

5-1

GC

PT

5-2 G

CP

T 5-

3

GC

PT

5-4A

GC

PT

5-4

GC

PT

6-2

GC

PT

6-3

GC

PT

6-4

GC

PT

6-5

GC

PT

7-1

GC

PT

7-2

GC

PT

7-3

GC

PT

8-1

GC

PT

9-1 G

CP

T 9-

2

GC

PT

9-3A

GC

PT

9-3

GC

PT

10-1

GC

PT

10-2

GC

PT

10-3

AG

CP

T 10

-3G

CP

T 10

-4A

GC

PT

10-4

GC

PT

11-1

GC

PT

11-2

GC

PT

11-3 GC

PT

11-4

GC

PT

12-1

GC

PT

12-2

GC

PT

12-3

GC

PT

12-4

GC

PT

12-5

GC

PT

12-6G

CP

T 13

-1

GC

PT

13-2

AG

CP

T 13

-2

GC

PT

13-3

GC

PT

13-4

GC

PT

13-5

GC

PT

13-6

GC

PT

13-7

GC

PT

14-1

GC

PT

14-2

GC

PT

14-3

GC

PT

14-4 G

CP

T 14

-5

GC

PT

14-6

GC

PT

14-7

GC

PT

15-1

GC

PT

15-2

GC

PT

15-3

GC

PT

15-4

GC

PT

15-5

GC

PT

15-6

GC

PT

15-7

GC

PT

15-8

GC

PT

16-1

GC

PT

16-2

GC

PT

16-4

GC

PT

16-5

GC

PT

16-6

GC

PT

16-7

GC

PT

16-8

GC

PT-

108

GC

PT-

111A

GC

PT-

28A

GC

PT-

25

GC

PT-

36

GC

PT

2-4

GC

TP 9

-4

GC

PT

1C-1

AG

CP

T 1C

-1 GC

PT

1C-2

GC

PT

1C-3

GC

PT

1C-4

GC

PT

1C-5

GC

PT

1C-5

A

GC

PT

1C-7

GC

PT

1C-8

GC

PT

1C-9

GC

PT

1C-1

0

GC

PT

1C-1

1

GC

PT

1C-1

3

GC

PT

28

GC

PT

111

GC

PT

5-5

GC

PT

5-6 G

CP

T 6-

6

GC

PT

13-4

S

GC

PT

13-5

S

GC

PT

13-6

S GC

PT

13-7

S

GC

PT

14-3

S

GC

PT

14-5

S

GC

PT

14-6

S

GP

CT

1C-4

R

GC

PT

1C-6

GC

PT

1C-6

T1

GC

PT

1C-6

T

PV

C-2

5R

GP

1-2

GP

1C

-12

GP

1C

-12B

GP

1C

-12C

GP

1C

-2R

A

GP

1C

-4R

B

GP

1C

-6T1

GP

2-2

GP

2-3

GP

8-1

GP

8-1

BG

P W

L-11

9G

P W

L-11

9B

GP

WL-

119C

S1-

2

S2-

2

S5-

3

S8-

1

S12

-5S13

-3

S13

-6

S14

-2

S14

-4

S14

-5

S14

-7

S15

-2A

S15

-2

S16

-6

S1C

-6

SW

L-11

9

1D-1

1D-2

1D-3

1D-4

1D-5

1D-6 1D

-7

1D-8

A1D

-8

1D-9

A1D

-9

1D-1

0

1D-1

1A

1D-1

1

1D-1

2

1D-1

3B1D

-13A

1D-1

3 1D-1

3C

1D-1

4

1D-1

51D

-16

1D-1

6A

1D-1

7A1D

-17

1D-1

8

1D-1

8A

1D-1

S

1D-2

S1D

-3S

1D-4

S

1D-5

S

1D-6

S

1D-7

S

1D-8

S

1D-9

S

1D-1

0S

1D-1

1S

1D-1

2S

1D-1

3S

1D-1

4S

1D-1

5S1D

-16S

1D-1

7S

1D-1

8S

1D-1

9S

1D-2

0S

PV

C-2

4

PV

C-2

6

PV

C-2

7

PV

C-2

8

PV

C-2

9

PV

C-3

6

PV

C-3

7

PV

C-3

8

PV

C-4

1

WL-

101

WL-

102

WL-

103

WL-

104

WL-

105A

WL-

105B

WL-

105C

WL-

106

WL-

106A

WL-

107

WL-

108

WL-

109A

WL-

109B

WL-

109C

WL-

109D

WL-

110

WL-

111

WL-

112

WL-

113

WL-

114

WL-

115

WL-

116

WL-

117

WL-

118

WL-

119

WL-

120

WL-

121

WL-

122

WL-

123

WL-

124

S16

-3G

CP

T 16

-3

GP

1C

-4R

GC

PT

1C-1

2

GC

PT-

119

S8-

1A

GC

PT

2-2C

GC

PT

2-3A

GC

PT

1C-2

R

PV

C-2

5

Eng

inee

ring

Man

agem

ent S

uppo

rt, In

c.EM

SI

Wes

t Lak

e La

ndfil

l Sup

erfu

nd S

ite

Figu

re 1

5

M:\clients\EMSI\westlake\2015\Comp Report\WL-Fig-15-Extent ofRIM.dwg

NO

TES

:

AE

RIA

L TO

PO

GR

AP

HY

PR

OV

IDE

D B

YC

OO

PE

R A

ER

IAL

SU

RV

EY

S C

O. A

ND

ISD

ATE

D F

EB

RU

AR

Y 1

0, 2

015

A

LL E

LEV

ATI

ON

S A

RE

AB

OV

E M

EA

N S

EA

LE

VE

L (A

MS

L)

EX

TEN

T O

F R

IM

OU

-1 W

AS

TE D

ISP

OS

AL

AR

EA

1

OU

-1 A

PP

RO

XIM

ATE

ED

GE

OF

RE

FUS

E

LEG

EN

D

BO

RIN

GS

WIT

H E

LEV

ATE

D G

AM

MA

AN

D/O

RR

AD

IUM

OR

TH

OR

IUM

AB

OV

E U

NR

ES

TRIC

TED

US

E L

EV

ELS

AP

PR

OX

IMA

TE E

DG

E O

F R

EFU

SE

ED

GE

OF

QU

AR

RY

HIG

HW

ALL

Ext

ent o

f Rad

iolo

gica

lly-Im

pact

edM

ater

ial i

n A

rea

1