WELCOME Asia BRTS Conference 2012
Ahmedabad
BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE.
6-8 September 2012.
![Page 2: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012](https://reader035.vdocuments.us/reader035/viewer/2022081716/551a18f055034619378b50ee/html5/thumbnails/2.jpg)
We would like to share with you
11 About Pimpri Chinchwad CityAbout Pimpri Chinchwad City
22 Institutional set up and key responsibilityInstitutional set up and key responsibility
33
44
Information about BRTS projects Information about BRTS projects
BRTS system BRTS system
![Page 3: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012](https://reader035.vdocuments.us/reader035/viewer/2022081716/551a18f055034619378b50ee/html5/thumbnails/3.jpg)
About Pimpri Chinchwad City
![Page 4: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012](https://reader035.vdocuments.us/reader035/viewer/2022081716/551a18f055034619378b50ee/html5/thumbnails/4.jpg)
• Located towards North of Pune
• Area of 181 sq. kms.
• Population: 1.7 million (approx)
• PCMC received “BEST CITY “ award 0n 13th December From GOI for its best performance in JnNURM
Pimpri Chinchwad at a Glance
• Area under Green Cover: 27%
• Aual Bunndget (2012-2013): Rs. 2862
Crs.
• Credit Rating: AA+ (SO) by CRISIL
Ratings (S&P)
![Page 5: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012](https://reader035.vdocuments.us/reader035/viewer/2022081716/551a18f055034619378b50ee/html5/thumbnails/5.jpg)
Vibrant city in the state of Maharashtra, India
• Strong industrial base
– Small & medium industrial units of about 6,000
– Large industrial units of about 50
– Auto and ancillary industrial Hub
![Page 6: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012](https://reader035.vdocuments.us/reader035/viewer/2022081716/551a18f055034619378b50ee/html5/thumbnails/6.jpg)
Presence of International IT Firms
![Page 7: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012](https://reader035.vdocuments.us/reader035/viewer/2022081716/551a18f055034619378b50ee/html5/thumbnails/7.jpg)
Social and recreational facilities• Strong Social Infrastructure with Municipal Hospitals and
Dispensaries, Public Gardens, Libraries, Auditoriums, Play grounds etc.
• Strong educational infrastructure including Municipal Schools, Medical, Engineering, IT and Management institutes.
![Page 8: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012](https://reader035.vdocuments.us/reader035/viewer/2022081716/551a18f055034619378b50ee/html5/thumbnails/8.jpg)
Population growth• The city has a population of about 1.7 millions growing over
7.2% p.a. (national average 2.1%) • Growth is fuelled by prospects of economic activity, good
quality of infrastructure services and strong connectivity to the industrial capital of India i.e. Mumbai
Population Growth
0
200,000
400,000
600,000
800,000
1,000,000
1,200,000
1951 1961 1971 1981 1991 2001
Year
Pop
ula
tion
PopulationGrowth ofPCMC
![Page 9: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012](https://reader035.vdocuments.us/reader035/viewer/2022081716/551a18f055034619378b50ee/html5/thumbnails/9.jpg)
Urban Sprawl Patterns & Future Growth Scenario - 2031
NOTE: MAP NOT TO SCALE
Pune CityHinjewadi IT Park
Talwade IT Park
Dehu
Talgaon
Chakan New International
Airport
Mumbai-Pune Exp Way
Projected Population for PCMC 29 lakhs (CDP) in 2031
Stage Year Area (Sq. km) % Increase
I 1991 70.64 -
II 2001 87.69 24.13
III 2007 173.07 97.37
Scenario 1 2021 288.30 66.58
Scenario 2 2031 371.10 28.72
![Page 10: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012](https://reader035.vdocuments.us/reader035/viewer/2022081716/551a18f055034619378b50ee/html5/thumbnails/10.jpg)
Institutional Set-up
Key Responsibilities
![Page 11: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012](https://reader035.vdocuments.us/reader035/viewer/2022081716/551a18f055034619378b50ee/html5/thumbnails/11.jpg)
Institutional set up• Pimpri – Chinchwad Municipal Corporation (PCMC) constituted in the
year 1982
• The body constitutes of
– Elected wing headed by – Mayor
– Administrative wing headed by – Municipal Commissioner
• We manage about 181 sq.kms of area through 4 Ward offices
• We have over 40 departments with a workforce of about 7500
employees
![Page 12: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012](https://reader035.vdocuments.us/reader035/viewer/2022081716/551a18f055034619378b50ee/html5/thumbnails/12.jpg)
Institutional set up
• We are fully e-governed Corporation• We have received International Organization of Standard
(ISO) Certification (ISO 9001:2008) for Quality Management System in March 2012.
![Page 13: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012](https://reader035.vdocuments.us/reader035/viewer/2022081716/551a18f055034619378b50ee/html5/thumbnails/13.jpg)
Responsible for• Area planning
• Infrastructure planning, implementation and operation & maintenance
of services in the areas of
• Water Supply,
• Sewerage and Sanitation,
• Solid Waste Management,
• Roads and Transportation,
• Street lighting,
• Health and recreational facilities,
• Education (134 primary and 18 secondary schools)
• Preservation of natural heritage (river conservation),
• Development of housing facility for urban poor/ slums.
![Page 14: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012](https://reader035.vdocuments.us/reader035/viewer/2022081716/551a18f055034619378b50ee/html5/thumbnails/14.jpg)
Vision
To make Pimpri Chinchwad, a city of and for the next generation
Economically vibrant, attracting top business houses
And to meet the requirements of all its citizens
A city to Live, Spend and Entertain
![Page 15: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012](https://reader035.vdocuments.us/reader035/viewer/2022081716/551a18f055034619378b50ee/html5/thumbnails/15.jpg)
Key initiatives taken • Promoting development
– Corridor densification along Bus Rapid Transit
System (BRTS), leveraging TDR
• Providing infrastructure ahead of its time
– Implementing Rs. 26000 Millions projects
sanctioned by JNNURM
– Providing water security
– Investments in sanitation and waste management
• Making the city slum free
– Slum rehabilitation and EWS housing to provide
32,000 houses
• E Initiatives for better governance
– Wi fi city
– GIS based dynamic administration
Water Supply
Total
Project Cost(` in Millions)
Project Cost(` in Millions)
49874987
2600026000
24012401Sewerage
Solid waste management 704704
80328032BRTS & purchase of city transport buses
Housing for slums 86318631
11631163Storm water drainage
9292E-governance
Infrastructure ProjectsInfrastructure Projects
![Page 16: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012](https://reader035.vdocuments.us/reader035/viewer/2022081716/551a18f055034619378b50ee/html5/thumbnails/16.jpg)
PROJECTS EXECUTED
Pune – Mumbai Road
Subway at VallabhnagarIntersection at Finolex Pimpri
Grade Separator at Pimpri
![Page 17: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012](https://reader035.vdocuments.us/reader035/viewer/2022081716/551a18f055034619378b50ee/html5/thumbnails/17.jpg)
INFORMATION OF BRTS PROJECT
![Page 18: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012](https://reader035.vdocuments.us/reader035/viewer/2022081716/551a18f055034619378b50ee/html5/thumbnails/18.jpg)
BRTS PROJECTS IN PCMC AREA
AUNDH RAWET ROAD Length = 14.50 Km. Tender Cost =191.40
KALEWADI ROAD Length = 10.275 Km. Tender Cost =219.20
NASHIK PHATA ROAD Length = 7.90 Km. Tender Cost =206.80
PUNE MUMBAI ROAD Length = 11.90 Km. Tender Cost =120.74
Total BRTS Corridor Length = 44.575 Km.
First Intersection
Second Intersection
![Page 19: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012](https://reader035.vdocuments.us/reader035/viewer/2022081716/551a18f055034619378b50ee/html5/thumbnails/19.jpg)
1. OLD MUMBAI PUNE CORRIDOR (DAPODI TO BHAKTI SHAKTI) – 12 KM
2. AUNDH – RAVET – 14.5 KM
3. NASHIK PHATA – WAKAD – 8 KM
4. KALEWADI PHATA – DEHU ROAD – 10.5 KM
Total Length = 45 km
BRTS Phase- I Corridors
![Page 20: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012](https://reader035.vdocuments.us/reader035/viewer/2022081716/551a18f055034619378b50ee/html5/thumbnails/20.jpg)
![Page 21: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012](https://reader035.vdocuments.us/reader035/viewer/2022081716/551a18f055034619378b50ee/html5/thumbnails/21.jpg)
BRT SYSTEM
![Page 22: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012](https://reader035.vdocuments.us/reader035/viewer/2022081716/551a18f055034619378b50ee/html5/thumbnails/22.jpg)
Cross Section of 45 m Wide BRTS Road
![Page 23: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012](https://reader035.vdocuments.us/reader035/viewer/2022081716/551a18f055034619378b50ee/html5/thumbnails/23.jpg)
Principal elements for considerationConvenient boarding and alightingEfficient fare collectionComfortable and attractive stationsEasy safe signalized/dedicated approaches to Bus StationsModal integrationExcellence in customer service
Bus Rapid Transit Bus Stations
![Page 24: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012](https://reader035.vdocuments.us/reader035/viewer/2022081716/551a18f055034619378b50ee/html5/thumbnails/24.jpg)
Conceptual Layout
BRTS STATIONS -60.0 X 4.0 M SIZE FOR BOTH SIDE DOCKING
![Page 25: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012](https://reader035.vdocuments.us/reader035/viewer/2022081716/551a18f055034619378b50ee/html5/thumbnails/25.jpg)
“Think Railway Stations, Use Bus Stations!”
BRT Bus Stations can give the same quality of service as Metro/Railway Stations to a large number of citizens across the city.
![Page 26: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012](https://reader035.vdocuments.us/reader035/viewer/2022081716/551a18f055034619378b50ee/html5/thumbnails/26.jpg)
Hybrid BRT ! – On & Off the Corridor
RIGHT SIDE LEVEL BOARDING ON THE CORRIDOR LIKE METRO RAIL
LEFT SIDE STEPPED BOARDING OFF THE CORRIDOR ( OUTSIDE BRT CORRIDOR)
![Page 27: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012](https://reader035.vdocuments.us/reader035/viewer/2022081716/551a18f055034619378b50ee/html5/thumbnails/27.jpg)
BRT station side entry from right side door
![Page 28: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012](https://reader035.vdocuments.us/reader035/viewer/2022081716/551a18f055034619378b50ee/html5/thumbnails/28.jpg)
BUS STATION DESIGN AND COMPONENTS
![Page 29: WELCOME Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012](https://reader035.vdocuments.us/reader035/viewer/2022081716/551a18f055034619378b50ee/html5/thumbnails/29.jpg)
PCMC, PIMPRI, PUNE