Wehner Park Festival Area Playground Improvements
ADDENDA 009113 - Page 1
SECTION 009113 - ADDENDA
PART 1 - Addenda
1.1 PROJECT INFORMATION
A. Project Name: Wehner Park Festival Area Playground Improvements
B. Owner: City of Shrewsbury
C. Landscape Architect: SWT Design.
D. Landscape Architect Project Number: 20419.02
E. Date of Addendum: June, 19, 2017
1.2 NOTICE TO BIDDERS
A. This Addendum is issued to all registered plan holders pursuant to the Instructions to Bidders and Conditions of the Contract. This Addendum serves to clarify, revise, and supersede information in the Project Manual, Drawings, and previously issued Addenda. Portions of the Addendum affecting the Contract Documents will be incorporated into the Contract by enumeration of the Addendum in the Owner/Contractor Agreement.
B. The Bidder shall acknowledge receipt of this Addendum in the appropriate space on the Bid Form.
C. The date for receipt of bids is unchanged by this Addendum, at same time and location.
1. Bid Date: June 29, 2017, 10:00 a.m.
1.3 ATTACHMENTS
A. This Addendum includes the following attached Specification Sections:
1. Section 004323 – ALTERNATES FORM
B. This Addendum includes the following Documents 1. Plan Holder List.
C. This Addendum includes the following attached Sheets:
1. SKL-001. REVISION to base bid. Existing water fountain and concrete pad to remain, and Contractor to pour ADA accessible standard concrete pad to connect existing water fountain concrete pad to proposed concrete walk as part of base bid.
2. SKL-002. ADD ALTERNATE. As an add alternate, Contractor to remove existing water fountain and concrete pad. Contractor to pour new concrete pad and install new water fountain in location shown in drawing. Contractor to connect new water fountain to existing water line that was serving existing fountain. New water fountain model to be
Wehner Park Festival Area Playground Improvements
ADDENDA 009113 - Page 2
MDF Drinking Fountain Model 440 SMFA (Front Approach). Existing water fountain to be provided to City for reuse.
3. SKL-003. REVISION to playground underdrain system.
4. SKL-004. REVISION to base bid. For base bid, existing concrete walk adjacent to parking
lot shown in drawing to remain. As an add alternate, City to remove existing concrete walk and subbase, and Contractor to pour new standard concrete walk and base materials in location of existing concrete walk.
1.4 CLARIFICATIONS
A. REVISION to base bid. Concrete pads for benches (2) and trash receptacle (1) to be included in base bid. Benches (2) and trash receptacle (1) to be add alternates. SUBSTITUTE Beacon Hill Recycled Plastic 6’ Contour Bench with Commercial Steel Outdoor Bench with Straight Back by Belson Outdoors Model #CBPB-6SB-BK. SUBSTITUTE Beacon Hill 35 Gal. Recycled Plastic Open Top Trash Receptacle with Flare Top Trash Receptacle w/ Liner and Rain Bonnet Cover by Belson Outdoors Model #CBTR-FTRB-BK.
END OF SECTION 009113
Wehner Park Festival Area Playground Improvements
ALTERNATES FORM 004323 - 1
SECTION 004323 - ALTERNATES FORM
PART 1 - Alternates Form
1.1 BID INFORMATION
A. Bidder: ____________________________________________________.
B. Project Name: Wehner Park Festival Area Playground Improvements
C. Project Location: 5200 Shrewsbury Avenue, approximately 400 feet west of Shrewsbury City Hall.
D. Owner: City of Shrewsbury
E. Landscape Architect: SWT Design.
F. Landscape Architect Project Number: 20419.02.000
1.2 BID FORM SUPPLEMENT
A. This form is required to be attached to the Bid Form.
1.3 DESCRIPTION
A. The undersigned Bidder proposes the amount below be added to or deducted from the Base Bid if particular alternates are accepted by Owner. Amounts listed for each alternate include costs of related coordination, modification, or adjustment.
B. If the alternate does not affect the Contract Sum, the Bidder shall indicate "NO CHANGE."
C. If the alternate does not affect the Work of this Contract, the Bidder shall indicate "NOT APPLICABLE."
D. The Bidder shall be responsible for determining from the Contract Documents the effects of each alternate on the Contract Time and the Contract Sum.
E. Owner reserves the right to accept or reject any alternate, in any order, and to award or amend the Contract accordingly within 60 days of the Notice of Award unless otherwise indicated in the Contract Documents.
F. Acceptance or non-acceptance of any alternates by the Owner shall have no effect on the Contract Time unless the "Schedule of Alternates" Article below provides a formatted space for the adjustment of the Contract Time.
Wehner Park Festival Area Playground Improvements
ALTERNATES FORM 004323 - 2
1.4 SCHEDULE OF ALTERNATES
A. Alternate No. 1: MDF Drinking Fountain Model 440 SMFA (Front Approach) and Concrete Pad
1. ADD____ DEDUCT____ NO CHANGE____ NOT APPLICABLE____.
2. _______________________________________________ Dollars ($______________).
B. Alternate No. 2: Turf Type Tall Fescue Seed in place of Sod.
1. ADD____ DEDUCT____ NO CHANGE____ NOT APPLICABLE____.
2. _______________________________________________ Dollars ($______________).
C. Alternate No. 3: Belson Outdoors Benches Model #CBPB-6SB-BK (2) and Trash Receptacle Model #CBTR-FTRB-BK (1)
1. ADD____ DEDUCT____ NO CHANGE____ NOT APPLICABLE____.
2. _______________________________________________ Dollars ($______________).
D. Alternate No. 4: Standard Concrete Walk Adjacent to Parking Lot.
1. ADD____ DEDUCT____ NO CHANGE____ NOT APPLICABLE____.
2. _______________________________________________ Dollars ($______________).
E. Alternate No. 5: GT Impax Recycled Bonded Rubber Play Surfacing by Gametime, or Approved Equal, in place of Poured-In-Place Play Surfacing
1. ADD____ DEDUCT____ NO CHANGE____ NOT APPLICABLE____.
2. _______________________________________________ Dollars ($______________).
1.5 SUBMISSION OF BID SUPPLEMENT
A. Respectfully submitted this ____ day of ______________________________, 2017.
B. Submitted By:___________________________________(Insert name of bidding firm or corporation).
C. Authorized Signature:____________________________________(Handwritten signature).
D. Signed By:______________________________________________(Type or print name).
E. Title:___________________________________(Owner/Partner/President/Vice President).
Wehner Park Festival Area Playground Improvements
ALTERNATES FORM 004323 - 3
END OF SECTION 004323
Project:
Revision No.:Project No.:
20419.02.000
Sheet Ref.: Detail Ref.: Scale:
Date:
Sketch No.:
WEHNER PARK FESTIVAL AREA PLAYROUND IMPROVEMENTS
Ju
ne
1
9, 2
01
7 - A
DD
EN
DU
M #
1
EXISTING
WATER FOUNTAIN
AND PAD TO REMAIN
CONTRACTOR TO POUR
STANDARD CONCRETE PAD
TO CONNECT WALK WITH
EXISTING FOUNTAIN/PAD
Addendum #1 06-19-2017
1" = 10'-0"
SKL-001
Addendum #1
L-111
5
'
-
0
"
4
8
"
M
I
N
.(
A
D
A
)
3
0
"
M
I
N
.(
A
D
A
)
4
'
-
6
"
Project:
Revision No.:Project No.:
20419.02.000
Sheet Ref.: Detail Ref.: Scale:
Date:
Sketch No.:
WEHNER PARK FESTIVAL AREA PLAYROUND IMPROVEMENTS
Ju
ne
1
9, 2
01
7 - A
DD
EN
DU
M #
1
MDF DRINKING FOUNTAIN,
MODEL 440 SMFA (FRONT
APPROACH.)
STANDARD
CONCRETE
Addendum #1 06-19-2017
1" = 10'-0"
SKL-002
Addendum #1
L-111
33
6" DRAIN INLET
SLOPE OF CONCRETE BASE TO BE
CONSISTENT SLOPE WITH PLAY
SURFACING FINISH GRADE
S
L
O
P
E
O
F
D
R
A
I
N
S
L
O
P
E
O
F
D
R
A
I
N
S
L
O
P
E
O
F
D
R
A
I
N
S
LO
P
E
O
F D
R
A
IN
S
L
O
P
E
O
F
D
R
A
IN
S
L
O
P
E
O
F
D
R
A
I
N
6" DRAIN INLET.
CONTRACTOR TO CONFIRM
TIE IN LOCATION FOR UNDERDRAIN
SYSTEM TO EXISTING STORM SEWER.
PROVIDE DETAILED SHOP
DRAWINGS FOR FINAL APPROVAL.
S
L
O
P
E
O
F
D
R
A
I
N
S
L
O
P
E
O
F
D
R
A
I
N
S
L
O
P
E
O
F
D
R
A
IN
SLOPE OF CONCRETE BASE TO BE
CONSISTENT SLOPE WITH PLAY
SURFACING FINISH GRADE
4" PERF. PVC, SCH. 40.
TYP.
1' WIDE DRAINAGE CHANNEL.
SEE DETAIL A, THIS SHEET.
4" PERF. FLEX PVC, SCH. 40.
TYP.
4" PERF. FLEX PVC, SCH. 40.
TYP.
6" SOLID PVC, SCH. 40.
1' WIDE DRAINAGE CHANNEL.
SEE DETAIL B, THIS SHEET.
Project:
Revision No.:Project No.:
20419.02.000
Sheet Ref.: Detail Ref.: Scale:
Date:
Sketch No.:
WEHNER PARK FESTIVAL AREA PLAYROUND IMPROVEMENTS
Ju
ne
1
9, 2
01
7 - A
DD
EN
DU
M #
1
Addendum #1 06-19-2017
1" = 20'-0"
SKL-003
Addendum #1
A/L-120
NON COMPACTED
AGGREGATE BASE
COMPACTED
AGGREGATE
BASE
CONCRETE HEADER
4" CONCRETE SLAB
PLAY SURFACING
1' WIDE
FORMED
DRAINAGE
CHANNEL
NON COMPACTED
AGGREGATE BASE
COMPACTED
AGGREGATE
BASE
4" CONCRETE SLAB
PLAY SURFACING
1' WIDE
FORMED
DRAINAGE
CHANNEL
N.T.S.
DRAINAGE CHANNEL AT HEADER
A
N.T.S.
DRAINAGE CHANNEL
B
4" PERF. DRAIN PIPE
AND FILTER SOCK
4" PERF. FLEX DRAIN
PIPE AND FILTER
SOCK
Project:
Revision No.:Project No.:
20419.02.000
Sheet Ref.: Detail Ref.: Scale:
Date:
Sketch No.:
WEHNER PARK FESTIVAL AREA PLAYROUND IMPROVEMENTS
Ju
ne
1
9, 2
01
7 - A
DD
EN
DU
M #
1
FOR BASE BID, EXISTING
CONCRETE WALK TO
REMAIN.
AS AN ADD ALTERNATE,
EXISTING CONCRETE
WALK TO BE REMOVED
BY CITY AND CONTRACTOR
TO POUR NEW STANDARD
CONCRETE WALK.
Addendum #1 06-19-2017
1" = 10'-0"
SKL-004
Addendum #1
L-111