WTP Water Hammer - Damage Sphere
Checking the water hammer vessel water rise andnot go down so that mean sphere damaged and to Checked
![Page 2: Week report](https://reader035.vdocuments.us/reader035/viewer/2022070604/546db78baf7959391f8b4adf/html5/thumbnails/2.jpg)
East Delta WTP
page 2/12
WTP Water Hammer - Damage Sphere
Sphere Welding Carck and fll with water
![Page 3: Week report](https://reader035.vdocuments.us/reader035/viewer/2022070604/546db78baf7959391f8b4adf/html5/thumbnails/3.jpg)
East Delta WTP
page 3/12
WTP Water Hammer - Damage Sphere
Sphere Welding Carck and fll with water
![Page 4: Week report](https://reader035.vdocuments.us/reader035/viewer/2022070604/546db78baf7959391f8b4adf/html5/thumbnails/4.jpg)
East Delta WTP
page 4/12
Spare Parts
No new for Spare parts
![Page 5: Week report](https://reader035.vdocuments.us/reader035/viewer/2022070604/546db78baf7959391f8b4adf/html5/thumbnails/5.jpg)
East Delta WTP
page 5/12
Flash Mixer Dry Run damage
Dry Run damage because of twisted a round the mixer
![Page 6: Week report](https://reader035.vdocuments.us/reader035/viewer/2022070604/546db78baf7959391f8b4adf/html5/thumbnails/6.jpg)
East Delta WTP
page 6/12
Flash Mixer Dry Run damage
They assembly the switch but not connected yet
![Page 7: Week report](https://reader035.vdocuments.us/reader035/viewer/2022070604/546db78baf7959391f8b4adf/html5/thumbnails/7.jpg)
East Delta WTP
page 7/12
Filter 03,04 Refill with New Filter Media
The empty 03 and refill 04
![Page 8: Week report](https://reader035.vdocuments.us/reader035/viewer/2022070604/546db78baf7959391f8b4adf/html5/thumbnails/8.jpg)
East Delta WTP
page 8/12
Filter 03,04 Refill with New Filter Media
The empty 03 and refill 04
![Page 9: Week report](https://reader035.vdocuments.us/reader035/viewer/2022070604/546db78baf7959391f8b4adf/html5/thumbnails/9.jpg)
East Delta WTP
page 9/12
Chlorine
Sherkia CO take Drum valve to mainten , till now not installed
![Page 10: Week report](https://reader035.vdocuments.us/reader035/viewer/2022070604/546db78baf7959391f8b4adf/html5/thumbnails/10.jpg)
East Delta WTP
page 10/12
Thickener
Thickener empty or full and pipe blocked and pumps stopped
![Page 11: Week report](https://reader035.vdocuments.us/reader035/viewer/2022070604/546db78baf7959391f8b4adf/html5/thumbnails/11.jpg)
Regular CheckNo Unit Activates
1Intake 1- Checking Raw Water Pump pressure,temprature,power and gland packing leakage.
2- Checking water hammer system working or not.2 Distribution Shift Checking flow, pressure, chlorine dosing and float fix or not.
3 Chlarifier Checking sludge pumping units, cleaning and greasing of knife,air pressure, bridge and mixers.
4 Thickener Checking pump pressure, pipeline blocking and thickener level.
5Filters 1- Checking backwash , backwash waste ,boosters and dewatering.
2- Air system ,compressors,dryer,pressure,…,etc. 3- Checking filters flow , levels , backwash tank level.
6 Under Ground Reservoir Checking rediusal chlorine smaple plan and tanks levels
7
1- Checking pump priming system. 2- Checking Treated Water Pump pressure,temprature,power and mechanical seal leakage.
3- Checking water hammer system working or not. 4- Checking measurement devices.
8Chlorine 1- Checking drums, vacuum units , changeover unit and piping.
2- Checking dosing cabient, dosing , feeding pressure. 3- checking Caustic Soda Pump.
9 Chemical 1- Checking dosing pumps, strianers, pressure , flow and piping. 2- Checking Tanks levels and cleaning.
10 Evaporation ponds 1- Checking air pressure , cleaning and greasing of knife.
Activites and Remarks for week
No Unit Remaks1 Intake
2 Distribution Shaft
3 Clarifier1- Fixing of the flash mixer dry run was bad and cause damage to it.
3 Thickener 1- Thickener empty or full and piping blocked and pumps stopped
4 Filters 1- Filter 03,04 Refill with New Filter Media2- Backwash pumps was stopped because someone played by button.3- Backwash pump 42 coupling extension handed over to AC till install new H-Shape rubber
5 Chlorine1- Sherkia CO take Drum valve to mainten , till now not installed2- General cleaning of drum store
7 Chemical 1- Plastic fall in tanks during filling.
8
9 Evaporation ponds 1-opened valve closed and operation shloud from panel.
Treated Water Pump Station
Central dewatering Station
![Page 12: Week report](https://reader035.vdocuments.us/reader035/viewer/2022070604/546db78baf7959391f8b4adf/html5/thumbnails/12.jpg)
10 Under Ground Reservoir Rediusal Chlorine sample pump not working.
11 Water hammer maintenance
12 Insturctions .lenieregyp
Treated Water Pump Station