wednesday, september 21 st 9:30 am to 2:30 pm georgia gwinnett college 1
TRANSCRIPT
1
iStrategy TrainingExecutive and Power User Courses
Wednesday, September 21st
9:30 am to 2:30 pmGeorgia Gwinnett College
2
AgendaIntroductions and Course ObjectivesUser Ids, Login Compatibility ModeExecutive Course
Data Mapping and Organization SlidesDepartment Level Security
LunchPower User Course
Report Development MethodologyQ&A
5
Data AvailableFY 2006 through 2011
*PERS_SERV_BOR 2011 onlyControlled Budgets, Commitment Control, GL
Journals, AP Detail, PO Detail, Vendors, and now Payroll Detail (PERS_SERV_BOR).
Use of Trees and Hierarchies Descriptions from related tables (Account,
Department, Fund etc.).
6
Data HierarchiesAccount – centralFund – centralProgram, Class - centralDepartment – institution
XXX_BI_DEPARTMENT
Project - institutionAlternative Reporting
7
Organization of Data in iStrategyPerspectives
Budget Management, Accounts Payable, PO, Payroll, Position (Currently all reports based on Budget Management)
DimensionsFund, Account, Program, Class, Department, Budget Ref,
Project, Fiscal Period --- also Vendor, Position Facts
Journals, Vouchers, PERS_SERV_BOR, POs – something with a dollar amount attached
MeasuresBudget, Actuals, Encumbered Amt, Remaining Budget,
YTD Actual, PYTD Actual, % Budget Utilized
8
Source of Data in iStrategy
HierarchyFrom departmentTree in PSoft
KK_ACTIVITY_LOGLedger = APPROP_BD
Calculated Field = Budget - Open Enc - Actual
Calculated Field = (Actual + Open Enc)/Budget
JRNL_HEADER and JRNL_LN, Header Status = P, UKK_AMOUNT_TYPE = 1, 7Ledger = ACTUALS
KK_ACTIVITY_LOGLedger = DETAIL_EN
11
Report Building Methodology1. What is the primary data type (i.e. journals,
vouchers, payroll detail etc.)? 2. Identify the existing report that most closely
matches the desired report (organized by account, by fund etc.)
3. Approach Report by Rows, Columns, and Background Information
a) Define data elements in Rows and Columnsb) Define additional criteria in Backgroundc) Add detail to each item – i.e. which accounts,
which budget periods?
12
Modifying an Existing Report
Step 2 – Define Rows – Account, Step 2b -- Values for Account
Step 1 – Choose report to use as template.
Step 3 – Define Columns – Change measures to Budget PeriodStep 3b – include all Budget Periods
Step 4 – Set Background Criteria.
Step 5 – Refine Report – hide columns, filter zero rows
13
Report Building Methodology - cont4. Refine report with Filters, Sorting etc.5. Consider “Nesting” of Dimensions to improve
presentation of data6. Tips and Techniques
a) Click “Apply” after each change – build incrementally
b) Use Leaf Descendents when a report includes all detail values – reduces keying
c) Save final report as “My View”d) Email “My View” reports to others with
appropriate security