Cost Estimates Currently Available
● From E3’s capital cost estimating tool: link
2
Enhancements Desired
● Distinguish between substation work required in existing versus new substations
● Provide cost estimate for transformers that may be required
● Other cost breakouts needed?
3
Using the New Cost Estimates
● External to the existing E3 spreadsheet?
● Determine for each project, use appropriate cost estimate: Terminations:
#1 – Existing/New Substation?o Transformers required?
#2 – Existing/New Substation?o Transformers required?
Intermediate Substations: #1 – Existing/New Substation?
o Transformers required?
Repeat for n intermediate substations
● Simple approach, so does this improve our cost estimates?