    SCHEDULE"B"(SCOPE OF WORK)

    r.N Description of items Qty. Unit Rate Amount

    1 Excavation for foundation in earth soils, of all types, and ,

    soft murumhard murum etc. upto a depth of 1.5 mtrs.

    Including removing the excavated materials upto a distance

    of 50 mtrs, beyond the building area, stacking,spreading

    as directed,preparing the bed for foundation and necessary

    back filling including dewatering, shoring etc. completed. 20.00 M3

    Ref:W.O.No.2006-2007/6201 dt.3/4/2006 Item No.1-b-1

    2 Excavation for attending leakages in effluent disposal line

    at all types of soil by "JCB" excavator as directed by

    engineer-incharged. 8.00 Hrs

    Ref:W.O.No.2006-2007/6201 dt.3/4/2006 Item No.1-b-III

    3 Excavation for foundation in hard rock by wedging,

    chisellingetc up to depth of 1.5 mtrs including removing the

    excaveted materials up to a distance of 50 mtrs beyondthe building area,stacking,spreading as directed preparing

    the bed for foundation and necessary back filling including

    dewatering ,shoring etc completed. 1.00 M3

    Ref:W.O.No.2006-2007/6201 dt.3/4/2006 Item No.2

    4 Dismantling carefully the masonary in cement mortar of

    U.C.R./B.B. plainand R.C.C. cement concrete structures,

    sorting out materials and stacking the same within a

    distance of 50 meters as directed.

    a) U.C.R. / B.B. Masonary 10.00 M3

    b) R.C.C. work 2.00 M3

    c) P.C.C. work 5.00 M3

    Ref:W.O.No.2006-2007/6201 dt.3/4/2006 Item No.4 a,b,c

    5 Providing and layong rubble stone soling with quarry rubble

    about 250 mm to 300 mm thick including hand packing the

    voids with rubble chips etc. completed. 6.00 M3

    Ref:W.O.No.2006-2007/6201 dt.3/4/2006 Item No.5

    6 Providing & laying insitu cc1:3:6 of trap stone metal 40mm

    and down forfoundation and bedding including de-watering,

    formwork, compacting and curing etc. completed. 4.00 M3

    Ref:W.O.No.2006-2007/6201 dt.3/4/2006 Item No.7

    7 Providing & laying in situ cement concrete with 20 mm &down for foundation and flooring, bedding including de-

    watering formwork, compacting and curing etc. complete

    as directed.

    a) with 1:2:4 cement concrete 4.00 M3

    b) with 1:1.5:3 cement concrete 3.00 M3

    Ref:W.O.No.2006-2007/6201 dt.3/4/2006 Item No8 a,b

    r.N Description of items Qty. Unit Rate Amount

    disposal works at HOC Rasayani for year 2006-2007

    M&R to factory annual maintaince and civil assets of effluent treatment and

  • 7/30/2019 Website(4)

    2/11

    8 Providing & casting in situ R.C.C. for all R.C.C. works like

    column fottings, superstructure beasms, columns, lintels

    slabs, pardies, landings, staircae, equipment foundations

    etc including de-watering if necessary,compacting finishing

    etc complete ( excluding MS/Tor steel reinforcement), but

    including centering, shuttering curing etc. complete as

    directed.

    a) with 1:2:4 cement concrete 2.00 M3

    b) with 1:1.5:3 cement concrete 2.00 M3

    Ref:W.O.No.2006-2007/6201 dt.3/4/2006 Item No9 a,b

    9 Fixing MS/Tor steel bar reinforcement of various diameters.

    for all R.C.C. works including cutting, bending , binding

    hooking, etc. as per schedule and drawing with cost of

    binding wire etc. complete as directed.

    (steel will be issued by Department under Procedure"A" ) 0.40 MT

    Ref:W.O.No.2006-2007/6201 dt.3/4/2006 Item No.10

    10 Providing & constructing U.C.R.masonry with quarry

    stone in cement mortar 1:6 in plinth, foundation and

    superstructure including de-watering striking joints onunexposed faces, & pointing with cement mortar 1:3

    on outside faces, watering, curing, scaffolding etc.

    complete as directed. 5.00 M3

    Market Rate.

    11 Providing & constructing B.B. masonry second sort

    with conventional typebricks in C.M. 1:6 in plinth,

    foundation and superstructure including striking

    joints, raking out joints, watering scaffoldig etc.

    complete as directed. 4.00 M3

    Ref:W.O.No.2006-2007/6201 dt.3/4/2006 Item No.12

    12 Providing cement plaster 12 mm thick in single coat

    in C.M. 1:4 without neeru finishing to concrete or brick

    surface in all position including scaffolding and

    curing etc. complete as directed. 100.00 M2

    Ref:W.O.No.2006-2007/6201 dt.3/4/2006 Item No.13-a

    13 Providing cement plaster 20 mm thick in two coats in

    C.M. 1:4 with sponge finish surface to stone and

    brick masonry surface in all position including

    scaffolding curing etc. completed. 100.00 M2

    Market Rate.

    14 Providing & laying I.P.S. 50 mm thick with 1:2:4 cementconcrete laid to proper level and slope in alternate bays

    including compaction, filling joints, making lines, smooth

    finishing and curing complete as directed 10.00 M2

    Ref:W.O.No.2006-2007/6201 dt.3/4/2006 Item No15

    15 Supplying oversize metal (50mm ) at work site including

    speading uniformly to the required slope etc complete 6.00 M3

    Rate Analysis attached.

  • 7/30/2019 Website(4)

    3/11

    r.N Description of items Qty. Unit Rate Amount

    16 Supplying hard murum at work site including spreading

    as directed. 12.00 M3

    Rate Analysis attached

    17 Supplying grit ( Stone powder) at work site including

    spreading as directed. 12.00 M3

    Rate Analysis attached

    18 supply of sand (Ulva, Ambet or equivalent)at work site as

    directed 6.00 M3

    Rate Analysis attached

    19 Supply of second class burnt bricks of size 3"X4"X9" at

    work site. 2000.00 No

    Rate Analysis attached

    20 Dismantling carefully the existing old plaster in C.M. of 100.00 M2

    old walls includingdisposing of the materials as directed.

    Ref:W.O.No.2006-2007/6201 dt.3/4/2006 Item No.30

    21 Supply of casual labours (Male) to work in the Department

    along with tools like Favada, Koyta, pick axe, Gamela etc.

    the work consist of all types of work like excavation,breaking of concreats ,cutting grass/trees,etc wporking

    with departmental mason plumber, carpenter. The work

    as specified by the department will have to be attended

    (the rate will be for a day of 8 hours working) 220.00 M-Day

    Ref:W.O.No.2006-2007/6201 dt.3/4/2006 Item No.39

    22 Supplying of mason with all tools and tackles for doing

    miscellaneous jobs inside the factory area. The material be

    if any required will supplied by the Department on free of.

    cost (The rate will be for 1 day of 8 hours working ). 15.00 M-Day

    Market Rate.

    23 Transportation of surplus excavated stuff by truck including

    loading, transporting unloading and spreadig as directed.

    The mode of measurementwill be in M3 basis, and the size

    of the truck will be taken for measurement purpose 15.00 M3

    Ref:W.O.No.2006-2007/6201 dt.3/4/2006 Item No.40

    24 Supply of welder with all tools and tackles for welding

    HDPE pipes of all series of various dia. including cutting of

    existing damaged pipes as per requirement & jointing with

    fusion welding with hot plate including cutting to required

    shape filing etc including aligning,jointing with nut and bolts

    etc for Apta 315mm dia HDPE effluent line &160mm dia to

    225 mm dia HDPE effluent line from holding pond to turade.

    (The rate will be for 1 day of 8 hours working ). 12.00 M-Day

    Note: 1)Some jobs are required to be attended beyond Apta village up to

    HOC effluent discharge point.

    2)Free electricity at suitable points will be given by the department

    3)Nut and bolts will be issued free of cost at HOC store.

    4)For HDPE pipe welding work Hot plate (Mirror)and Generator will

    be given by department with free of cost.

    SCHEDULE - A

    CEMENT : 7.50 MT supplied free of cost.

    STEEL : 0.40 MT supplied free of cost.

  • 7/30/2019 Website(4)

    4/11

    CONTRACTOR

  • 7/30/2019 Website(4)

    5/11

  • 7/30/2019 Website(4)

    6/11

  • 7/30/2019 Website(4)

    7/11

  • 7/30/2019 Website(4)

    8/11

  • 7/30/2019 Website(4)

    9/11

  • 7/30/2019 Website(4)

    10/11

  • 7/30/2019 Website(4)

    11/11

    Since Prive

    285.60

    --

    --

    3328.00

    1276.00

    --

    6290.00

    --

    700.00

    11879.60

    831.572

    11048.03

    11048.00 -11048.00