webinar on sbm 2.0 imis on sbm-g 2.0... · 2020. 9. 25. · 15 bihar 456 1,751 24 16 goa 189 356 11...
TRANSCRIPT
-
Webinar on SBM 2.0 IMIS
24 September 2020
-
SBM 2.0 IMIS Mobile App - Data Entry Status
Downloads and user registration
• 69,855 app
downloads
• 66,294 villages
allocated to 23,965
users
Data Entry
• 20 States have
started data entry
• Data entry started
in 10,450 villages
Training and team Formation
• 20 States have
completed District
trainings
• 17 States have
formed District
resource pool
Current State assessment of ODF Plus assets to be completed in all villages by 31st October 2020 through SBM 2.0 IMIS app launched on 1st Sep 2020. Currently entry has started in ~ 10450 villages only
-
S.No. State NameNo. of users allocated to villages for data entry
No. of villages allocated to users
No. of villages – Data entry started
1 Andhra Pradesh 11,240 17,749 6,243
2 Himachal Pradesh 370 2,275 1,186
3 Karnataka 1,412 4,344 780
4 Rajasthan 1,419 5,516 695
5 Arunachal Pradesh 198 1,177 327
6 Assam 675 2,682 247
7 Uttarakhand 888 5,171 214
8 Haryana 751 2,684 163
9 Maharashtra 1,972 5,360 137
10 Meghalaya 94 456 126
11 Tripura 241 965 122
12 Sikkim 25 108 66
13 A & N Islands 91 254 59
Data Entry Status Of SBM 2.0 Mobile App
-
S.No. State NameNo. of users allocated to villages for data entry
No. of villages allocated to users
No. of villages – Data entry started
14 Punjab 90 573 36
15 Bihar 456 1,751 24
16 Goa 189 356 11
17 Uttar Pradesh 956 5,487 5
18 Daman & Diu 5 6 4
19 Kerala 188 269 4
20 Madhya Pradesh 604 1,429 1
Total 23,965 66,294 10,450
Data Entry Status Of SBM 2.0 Mobile App
-
FAQs from States
• Villages having more HHs as prescribed (double if 500)
• CSC still constructing only from SBM funds (2 Lakhs)
• How to capture image in case of Institutions, Aganwadis, Panchayat ghars &
School
• IEC messages will be captured again if uploaded earlier (previous years)
• HH data to be captured for individual SLWM assets if available in village
• Prioritize the entries of villages already declared ODF Plus
-
General Guidelines for SBM 2.0 App and IMIS
• Allocate maximum 10 villages at a time
• Download new version of app only after uploading all pending data
• Reports are available in SBM-II MIS under state/districts login
• There will be only one level approval (district level only)
• Upload the CSC image after completion only
• Upload image of each assets (without showing image it will not allow
booking)
• Solid and liquid waste estimations to be explained properly to field team
members during trainings
-
IMIS – Key issues and concerns
• Complete non-geotagged toilet images – constructed under SBM-I
• Finish pending booking, if amount is not booked against toilet constructed
under SBM program
• Approve all unapproved images
-
Mobile App Validations
-
Village Basic Information
Village Basic Information
Sl.No General Information Units in Numbers
1 No of HHs in the village as per Apr 2020X = Total no. of HHs(BLS+LOB+NOLB) < 500, then Total no. of HHs times 2 otherwise total no. of HHs times 1.5
2 Population in the village as per Apr 2020 X * 6 (X = No. of HHs entered in a village)
3 Total Number of HamletsTotal no. of Hamlet
-
Community Assets
Solid Waste Management
Sl.No General Information Units in Numbers
1 Capacity (in cubic meters) 125
2 No. of HHs being served Total no. of HHs in MIS
3 SWM_Source of funding (max expenditure) 99999
5 No. of Segregation bins at community places 99
6 No. of shops/ offices 99
Grey Water Management
Sl.No General Information Units in Numbers
1 Capacity (in KLD) 999
2 No. of HHs being served Total no. of HHs in MIS
3 GWM_Source of funding (max expenditure) 99999
4 Length in meters 9999
-
Community Sanitary Complexes (Physical + Geotagged)
Sl.No General Information Units in Numbers
1 No of CSC in a village 2
2 Total no. of Toilet seat constructed 9
3 Total no. of Urinal Units 9
5 Estimated Persons days 999
6 Construction Date (min month/ year)Min - Apr 2014
Max – current month / year
-
Financial Validations
-
Financial Validations
• Each village is having maximum CAP of expenditure from GOI funds (SBM, World Bank, EBR, FFC) –
convergence is must in case of SLWM assets creating from 2020-21 onwards (will be shared shortly
• CSC will be mandatory from convergence mode if using any GOI fund
-
Thank You