Document of The World Bank Report No: 69146-SD RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE NATIONAL EMERGENCY TRANSPORT REHABILITATION PROJECT (MDTF–NS GRANT TF057323) APPROVAL DATE: AUGUST 28, 2006 TO THE REPUBLIC OF SUDAN June 22, 2012 Transport Sector MDTF–Sudan (National Secretariat) Country Department AFCE4

Upload: others

Post on 10-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: documents.worldbank.orgdocuments.worldbank.org/.../691460PJPR0P090turing0Pa…  · Web viewThe proposed changes involve: (a) an extension of the project closing to complete the on-going

Document ofThe World Bank

Report No: 69146-SD

RESTRUCTURING PAPER

ON A

PROPOSED PROJECT RESTRUCTURING

OF THE

NATIONAL EMERGENCY TRANSPORT REHABILITATION PROJECT

(MDTF–NS GRANT TF057323)

APPROVAL DATE: AUGUST 28, 2006

TO THE

REPUBLIC OF SUDAN

June 22, 2012

Transport SectorMDTF–Sudan (National Secretariat) Country Department AFCE4Africa Region

Page 2: documents.worldbank.orgdocuments.worldbank.org/.../691460PJPR0P090turing0Pa…  · Web viewThe proposed changes involve: (a) an extension of the project closing to complete the on-going

ABBREVIATIONS AND ACRONYMS

AFESMUGONU

Additional FinancingEnvironment and Social Management UnitGovernment of National Unity

IRND Inland River Navigation DepartmentLCMDTF-NSMoFNEMOT

Letter of CreditMulti Donor Trust Fund for Sudan (National)Ministry of Finance and National EconomyMinistry of Transport

MTRB Ministry of Transport, Roads and Bridges NETREP National Emergency Transport Rehabilitation ProjectNHA National Highway AuthorityNTMP National Transport Master PlanOC Oversight CommitteePDO Project Development Objective PMS Pavement Management SystemPMTPPP

Program Management Team Private Public Partnership

PSP Private Sector ParticipationRPFRTC

Resettlement Policy Framework River Transport Corporation

SDGSRC

Sudanese PoundSudan Railway Corporation

TA Technical Assistance/Technical Advisory ServicesUS$ United States Dollar

Regional Vice President: Makhtar DiopCountry Director:Country Manager:

Bella Deborah Mary Bird Alassane Sow

Sector Director:Sector Manager:

Jamal SaghirSupee Teravaninthorn

Task Team Leader: Tesfamichael Nahusenay Mitiku

Page 3: documents.worldbank.orgdocuments.worldbank.org/.../691460PJPR0P090turing0Pa…  · Web viewThe proposed changes involve: (a) an extension of the project closing to complete the on-going

SUDAN NATIONAL EMERGENCY TRANSPORT REHABILITATION PROJECT

P098837CONTENTS

A. SUMMARY......................................................................................................................1B. PROJECT STATUS........................................................................................................2C. PROPOSED CHANGES.................................................................................................3

ANNEX 1: RESULTS FRAMEWORK AND MONITORING INDICATORS..............................................7

ANNEX 2: DETAILED PROJECT COST TABLE BY COMPONENT AND ACTIVITY.........................14

ANNEX 3: ALLOCATION OF GRANT PROCEEDS BY COMPONENT AND DISBURSEMENT CATEGORY.........................................................................................................................................................19

ANNEX 4: IMPLEMENTATION PLAN..........................................................................................................20

Page 4: documents.worldbank.orgdocuments.worldbank.org/.../691460PJPR0P090turing0Pa…  · Web viewThe proposed changes involve: (a) an extension of the project closing to complete the on-going

Data Sheet

Restructuring Status: DraftRestructuring Type: Level twoLast modified on date : 6/22/2012

1. Basic InformationProject ID & Name P098837: Sudan National Emergency Transport

Rehabilitation ProjectCountry Republic of SudanTask Team Leader Tesfamichael Nahusenay MitikuSector Manager/Director Supee Teravaninthorn/Jamal SaghirCountry Director Bella BirdOriginal Board Approval Date 08/28/2006Original Closing Date: 12/31/2009Current Closing Date 06/30/2012Proposed Closing Date 06/30/2013EA Category B- partial Assessment Revised EA Category B- partial Assessment EA Completion Date August 15, 2006Revised EA Completion Date N.A

2. Revised Financing Plan (US$m)Source Original RevisedBORR 93.68 65.82MDTF 43.50 64.70ZPCO 0.00 0.00Total 137.18 130.52

3. BorrowerOrganization Department LocationMinistry of Transport Roads and Bridges

Sudan

4. Implementing AgencyOrganization Department LocationMinistry of Transport, Roads and Bridges

Sudan

Sudan Railways Corporation SudanNational Highways Authority Sudan

5. Disbursement Estimates (US$m)Actual amount disbursed as of 05/24/2011 46.33Fiscal Year Annual Cumulative2011 0.00 39.17

i

Page 5: documents.worldbank.orgdocuments.worldbank.org/.../691460PJPR0P090turing0Pa…  · Web viewThe proposed changes involve: (a) an extension of the project closing to complete the on-going

2012 8.41 47.582013 17.12 64.70 Total 64.70

6. Policy Exceptions and Safeguard PoliciesDoes the restructured project require any exceptions to Bank policies? N

Does the restructured project trigger any new safeguard policies? If yes, please select from the checklist below and update ISDS accordingly before submitting the package.

N

7a. Project Development Objectives/OutcomesOriginal/Current Project Development Objectives/OutcomesThe PDO is “ to facilitate the country's economic and social recovery through improved physical access to goods, markets, and administrative and social services”.

7b. Revised Project Development Objectives/Outcomes [if applicable] N/A

ii

Page 6: documents.worldbank.orgdocuments.worldbank.org/.../691460PJPR0P090turing0Pa…  · Web viewThe proposed changes involve: (a) an extension of the project closing to complete the on-going

SUDAN - NATIONAL EMERGENCY TRANSPORT REHABILITATION PROJECT (NETREP – P098837)

RESTRUCTURING PAPER

A. SUMMARY

1. The proposed changes involve: (a) an extension of the project closing to complete the on-going road project which is stalled due to insecurity situation in the Blue Nile State; (b) reallocation within and among components to: (i) avail funds to institutional development to continue with the capacity building activities; (ii) provide additional funding to supervision services to cover the increased cost of supervision, during the extended period of roads contracts execution; and (iii) allocate the balance of the Multi Donor Trust Fund for Sudan National Secretariat (MDTF-NS) allocation for the first section of the Damazin-Kurmuk road to the second section of the Damazin- Kurmuk road contract to cover additional financing requirements due to the insecurity, increase in quantities of existing bill items and escalation of prices; (c) drop activities that would not be implemented under the National Emergency Transport Rehabilitation Project (NETREP); and (d) revision of targets to reflect the changes. The MDTF-NS Grant closing date is proposed to be extended to June 30, 2013, to allow the completion of ongoing contracts.

2. NETREP was approved by the Oversight Committee (OC) on August 28, 2006, and became effective on January 29, 2007. The original cost estimate for phase 1 of the project was US$140.36 million and funded in the proportion of US$43.50 million from MDTF-NS grant and US$96.86 million from the Government of National Unity (GONU). An Additional Financing (AF) in the amount of US$43.75 million was made available to the project in 2009, raising the MDTF-NS contribution to US$87.25. The purpose of the AF was mainly to increase the allocations for the road improvement component to improve accessibility on the entire length of Kadugli – Kaouda Road and Section 2 of Damazin – Kurmuk Road. However, due to the taking over of the Kadugli-Kaouda road by the State Administration of South Kordofan, which was construed as mis-procurement US$19.75 million was cancelled, reducing the MDTF-NS contribution to US$67.5 million.

3. NETREP was prepared and implemented in post-conflict environment, but it has overcome the inherent challenges of lack of implementation capacity, meeting the Bank’s fiduciary and safeguard requirements and started delivering results, through: (a) full commitment of the Implementing Entities; (b) strong support of the Bank’s project management team to procurement and contract management tasks; (c) technical assistance; and (iv) applying risk mitigation measures concurrent to project implementation. In the latest ISR, archived on March 11, 2012, the project development objective (PDO) and implementation progress are rated “moderately satisfactory”, mainly due to the suspension of the contracts on Damazin – Kurmuk road, because of conflict and insecurity in the project implementation area, which will be addressed by the measures proposed under the repackaging section (para 12). The ISR rating for safeguards, project management, procurement, and counterpart funding are moderately satisfactory, due to delays in the preparation of Environmental and Social Impact Assessment, procurement, and release of counterpart funding. Except for the latter, the issues have been overcome. The Client, the Project Implementing Entities and the Program Management Teams (PMT) are complying

1

Page 7: documents.worldbank.orgdocuments.worldbank.org/.../691460PJPR0P090turing0Pa…  · Web viewThe proposed changes involve: (a) an extension of the project closing to complete the on-going

with key covenants specified in the Grant Agreement. The Project Implementing Entities have established an acceptable accounting and reporting system for the project that will also be applied to the restructured project. Timely release of counter-part funding to the ongoing road contracts is a challenge re-emerging from time to time. The government has reconfirmed its commitment to meet its obligation, and the Project Team and the Country Management Unit have to follow up this covenant regularly for the remaining life time of the project.

4. There are no unresolved fiduciary, environmental, social or other safeguard issues. The audit for the year ended December 31, 2011 is in progress. The Interim Financial Report (IFR) for the quarter ended March 30, 2012 did not indicate any significant financial management issue. Financial management, procurement arrangement, and institutional roles and responsibilities remain unchanged. There are no changes to the PDO, except the adjustment of the outcome targets on reduction in travel time, beneficiary population, and increase in traffic volume, due to the completion of the upgrading of part of the Damazin – Kurmuk road.

B. PROJECT STATUS

5. The project has three components, namely: component 1 – Rehabilitation of Critical Rail Infrastructure and Services, component 2 - Institutional Strengthening and Improvement to River Transport Services, and component 3- Road Improvement in the Three Areas. Project implementation progress is at a very advanced stage. The Babanusa – Wau rail line rehabilitation project was completed in March 2010 and rail transport services have resumed after 25 years of disruption. The upgrading of Kadugli – Kouda Road Lot B (30 km) and Gadamai – Hamashkoraib Road (81.5 km) has been completed. The engineering design of 945 km of national and rural roads has been completed. The feeder roads study will be completed by the end of June 2012. The studies on the private sector participation (PSP) in rail transport, Port Sudan trade facilitation, and Inland River Navigation Diagnostics, as well as the preparation of the National Transport Master Plan (NTMP) have delivered sound sector development policies and strategies, and implementation is in progress.

6. However, the contracts for the Damazin – Kurmuk road (Sections 1 and 2) have been suspended since September 2011 due to conflict and insecurity in the project area (Blue Nile State). The government and the contractors are monitoring the situation and indications are that the situation has normalized and would allow the contractors to resume works. The two contractors with representatives of the Client jointly visited the project site in March 2012 to assess the damages and finalize claims for compensation. The visit confirmed the contractors’ willingness to go back to work as they have noticed improvement in security in the project area. However, remobilization and recommencement of works will follow fulfillment of certain conditions put forward by the contractors e.g. payment of outstanding counterpart funds for Section 1 and compensation of damaged contractors’ properties.

7. Studies under the institutional development component have been completed. Currently Technical Assistance services in support of the Planning Directorate and the Environmental and Social management Unit (ESMU) are in progress. In addition, the Ministry of Transport, Roads and Bridges (MTRB) is coordinating the implementation of key recommendations of the studies carried out under the support of the MDTF-NS, including: (a) separating/splitting rail infrastructure management responsibilities from rail transport operation; (b) shortening the duration for clearance of goods at Port Sudan; and (c) promoting the establishment of an independent Road Fund.

2

Page 8: documents.worldbank.orgdocuments.worldbank.org/.../691460PJPR0P090turing0Pa…  · Web viewThe proposed changes involve: (a) an extension of the project closing to complete the on-going

C. PROPOSED CHANGES

8. The Project Development Objectives remain unchanged which is “to facilitate the country's economic and social recovery through improved physical access to goods, markets, and administrative and social services”. The outcome targets for reduction in travel time, beneficiary population, and increase in traffic volume, will be reduced to reflect the impact of the changes in the Damazin – Kurmuk road. The section along the Damazin – Kurmuk road to be fully upgraded by the end of the proposed grant closing date of June 2013 will reduce from 92 km to 45 km. For example, the baseline and target values for travel time reduction will change from the original - from 11.6 hours per trip to 1.3 hours to, from 11.6 hours to 2 hours. Also, the number of the beneficiary population will reduce from 301,000 to 287,500. The expected increase in traffic volume on Damazin –Kurmuk road from 40 trucks per day to 110 trucks per day will not be realized until the entire section will be upgraded. Nonetheless, the original objective of creating all season access between Damazin-and Kurmuk through spot improvement has been achieved, as the contractors have reconditioned the existing 92 km embankment, and the Blue Nile State Government has improved the remaining section up to Kurmuk. As an outcome the entire road is passable during the rainy season. Further, the upgrading of the remaining part of Section 1 of the Damazin-Kurmuk road is expected to be fully financed by the government.

9. The Results Framework (RF) is updated and revised as part of this restructuring to reflect the changes and reflect standard/commonly used indicator descriptions and Core Indicators.

10. The Client, based on the request from the implementing institutions, has proposed the following changes:

11. Repackaging the Damazin – Kurmuk road and trading off funds between the two sections of the road as proposed by the Ministry of Finance and National; Economy (MoFNE): To complete section 2 of Damazin – Kurmuk road, which was suspended due to the conflict and insecurity in the Blue Nile State and compensate the contractor for damages caused due to the conflict MoFNE, by a letter dated April 23, 2012, has proposed swapping the provision for compensation (claims settlement) for section 2 of the Damazin – Kurmuk road with the MDTF-NS allocation for the gravel works on section 1 of the Damazin – Kurmuk road. The proposal is to apply US$6.59 million earmarked by the MDTF-NS for section 1, for the compensation of the damage on section 2, while GOS takes over the responsibility for fully financing the outstanding works for section 1, including the completion of the road up to sub-base level. Subsequently, section 1 of the Damazin-Kurmuk road has to be dropped from NETREP, and be taken up by GOS, as there will be no sufficient funding under the MDTF-NS to cover the gravelling work of section 1 and raise the additional resources required to complete section 2. Any additional compensation for section 2 will be borne by GOS. Further, this requires the Bank to verify eligibility of such payment. In addition, the Government has to confirm that the area would be safe to carry out construction activity and will ensure the provision of adequate security coverage around the project site.

12. Due to the separation of South Sudan, the ferry boat that was to be provided for Sobat River crossing near Malakal in Southern Sudan will be dropped from NETREP as requested

3

Page 9: documents.worldbank.orgdocuments.worldbank.org/.../691460PJPR0P090turing0Pa…  · Web viewThe proposed changes involve: (a) an extension of the project closing to complete the on-going

by the Client. The amount of US$240,000 allocated for this activity will be reallocated to other activities.

Financing

13. Project Costs: The Financing Arrangement is proposed to be amended to reflect the changes, as presented in Table 1.

Table 1: Project Cost Summary

Component Original Allocation Current1

Allocation Proposed Restructured Allocation

Total GONU MDTF Total GONU MDTF Total GONU MDTF

1. Rehabilitation of critical rail infrastructure and services

39.98 24.89 15.09 46.14 33.87 12.27 46.14 33.87 12.27

2. Institutional Strengthening and Improvement to River Transport Services

11.01 7.36 3.65 1.70 0.48 1.22 1.17 - 1.17

3. Road Improvements in the Three Areas

86.19 61.43 24.76 88.37 34.36 54.01 83.21 31.95 51.26

Total 137.18 93.68 43.50 136.2

1 68.71 67.50 130.52 65.82 64.70

14. As a result of the proposed changes, the contribution from MDTF-NS will reduce from US$67.5 million to US$64.7 million. Likewise, the contribution from GOS, in a form of counterpart funding, will reduce from US$68.71 million to US$65.82 million, as the counterpart payments for the services concluded at a lower price than budgeted and activities dropped from NETREP will not be required. However, GOS has to provide out of NETREP, additional funds to complete the section 1 of the Demazin - Kurmuk road.

Reallocations:

15. The proposed reallocations, by disbursement category, include:

a. Category 9: An increase of US$190,000 for project coordination and implementation support and Technical Assistance to MTRB.

b. Category 10; An increase of US$310,000 to cover the additional funds required to pay for works executed before repackaging of section one of the Damazin-Kurmuk road.

1 The current allocation reflects the latest approved project costs.

4

Page 10: documents.worldbank.orgdocuments.worldbank.org/.../691460PJPR0P090turing0Pa…  · Web viewThe proposed changes involve: (a) an extension of the project closing to complete the on-going

c. Category 11: An increase of US$180,000 to cover the balance required for the

project implementation support and LC charges for the PMS under the roads improvement component.

d. Category 12: An increase of US$6,590,000 to the civil works contract for Damazin – Kurmuk road (Section 2) to cater for compensation of damages due to the conflict in Blue Nile State and additional costs for supervision services.

e. Category (8): A reduction of US$240,000 due to dropping the procurement of a ferry boat.

f. Category (10): A reduction of US$1,270,000, unutilized funds (saving) from the allocation for Gadamai – Hamashkoraib Road and Kadugli-Kaouda road (Lot B)

g. Category (10): A reduction of US$1,190,000, recovery from advance payment to section one (1) of Damazin-Kurmuk road before repackaging

h. Category (10): A reduction of US$310,000, amount reserved to meet cost increase for projects under the road improvement components

i. Category (11): A reduction of US$160,000, saving from allocation for the feasibility studies and design services

j. Category (13): A reduction of US$6,590,000, to be transferred to Damazin – Kurmuk section two.

Cancellation:

16. Cancellation of US$2.8 million, representing: (a) US$1.61 million, part of the unutilized funds (saving) from the completed feasibility studies and design services, the completed Gadamai – Hamashkoraib and Kadugli – Kaouda road (Lot B), and allocation for the Ferry Boat; and (b) the recovery from the advance payment for section one of the Damazin-Kurmuk road, equivalent to US$1.19 million.

5

Page 11: documents.worldbank.orgdocuments.worldbank.org/.../691460PJPR0P090turing0Pa…  · Web viewThe proposed changes involve: (a) an extension of the project closing to complete the on-going

Table 2: Project Cost by Expenditure Category

Category of Expenditure Allocation (US$) % of FinancingCurrent Revised Current Revised

(1) Works, goods, services and training for Part 1 of the Project (SRC) (per memoria) 11,772.41 11,772.41 33-1/3 33-1/3

(2) Works, goods, services and training for Part 2 of the Project (RTC) (per memoria) 0.00 0.00 33-1/3 33-1/3

(3) Works, goods, services and training for Part 3 of the Project (NHA) (per memoria) 1,802,862.00 1,802,862.00 33-1/3 33-1/3

(4) Goods and services for demining activities (per memoria) 0 0 ----- -----

(5) Goods for Component 1 of the Project (SRC) 12,058,227.59 12,058,227.59 100 100(6) Services, training and operating costs for

Component 1 of the Project (SRC) 200,000.00 200,000.00 100 100

(7) Works for Component 1 of the Project (SRC) -------- ------- -------- --------(8) Goods for Component 2 of the Project (MTRB) 240,000.00 ------- 33-1/3 ----(9) Goods, services, training and operating costs for

Component 2 of the Project (MTRB) 980,000.00 1,170,000.00 100 100

(10) Works and Services for Part 3 (i) (a), (i) (b) and (i) (e) of the Project (NHA) 13,187,138.00 10,727,138.00 33-1/3 33-1/3

(11) Goods, services, training and operating costs for Part 3(ii) to (vi) of the Project (NHA) 11,850,000.00 11,870,000.00 100 100

(12) Works and Services for Part 3 (i) (d) of the Project 20,270,000.00 26,860,000.00 100 100(13) Works and Services for Part 3 (i) (c) of the Project

(NHA) 6,900,000.00 ---- 100 --

TOTAL 67,500,000.00 64,700,000

17. Closing date

The closing date is proposed to be extended from June 30, 2012 until June 30, 2013. The extension of the project closing date will allow the completion of the road construction contracts, establishment of a pavement management system (PMS) , and continue support for the Ministry of Transport, Roads and Bridges through coordination of policy reform implementation, project coordination and TA.

18. Implementation Schedule and Procurement Plan The Client has prepared and submitted updated Project Implementation schedule/Plan and Procurement Plan for the three components acceptable to the Bank. All activities under the project will be completed by the proposed extended closing date of June 30, 2013, and thus the project development objectives will be achieved.

6

Page 12: documents.worldbank.orgdocuments.worldbank.org/.../691460PJPR0P090turing0Pa…  · Web viewThe proposed changes involve: (a) an extension of the project closing to complete the on-going

ANNEX 1: RESULTS FRAMEWORK AND MONITORING INDICATORS

NATIONAL EMERGENCY TRANSPORT PROJECT (NETREP)

Revisions to the Results Framework Comments/Rationale for Change

PDOCurrent (PAD) ProposedTo improve physical access to goods, markets, and administrative and social services

No change

PDO indicatorsCurrent (PAD) Proposed change*1. Increase in access to an all-

season road 1. Number of people with all-season

access (roads/rail)Redefined to streamline with standard/commonly used indicator description

2. Reduction in average travel time to closest market, health clinic, primary school & administrative center

2. Travel time reduction on selected routes 2.1 (Babanousa-Wau Rail) – hours

average2.2 (Kadugli-Kauda Road) (hr) 2.3 (Hamsahkoreib-Gadamai Road)

(hr)2.4 Ed Damazin – El Kurmuk Road)

(hr)

Redefined and customized to streamline with standard/commonly used indicator description

3. Travel volume in selected routes3.1 rail (Babanusa-Wau) –ton/annum3.2 road (Gadamai-Hamashkorieb; Damazin Kurmuk; Kadugli – Kaouda) – Number of Medium Trucks/day

Redefined and customized to streamline with standard/commonly used indicator description

3. Reduced incidence of slowdown and derailment on Babanusa to Wau rail line

Replaced Replaced with travel time reduction and volume on Babanusa to Wau rail line (proposed change item 2 & 3 above)

Share of rural population with access to an all-season road (proportion)

Use of core indicator

Roads in good and fair condition as a share of total classified roadsSupplemental value: Size of the total classified networkBreakdown:

Use of core indicator

Direct Project Beneficiaries (number), of which female (%)

Use of core indicator

Intermediate Results indicatorsCurrent (PAD) Proposed change*Component One: Rail line rehabilitation

7

Page 13: documents.worldbank.orgdocuments.worldbank.org/.../691460PJPR0P090turing0Pa…  · Web viewThe proposed changes involve: (a) an extension of the project closing to complete the on-going

Revisions to the Results Framework Comments/Rationale for Change

446 km of rail line rehabilitated and opened for traffic

1. Rail line rehabilitated (km) streamline with standard/commonly used indicator description

Component Two: Institutional DevelopmentEnvironment and Social Assessment Unit (ESAU) established and functional

2. Environment and Social Assessment Unit Established under the Ministry (Yes/No)

Planning Department of MTRB strengthened and satisfactorily discharging its oversight role

3. Continued, (unit of measure- Yes/No added)

River transport regulatory body strengthened

4. Diagnostic study of the regulatory body in the River Transport Sector completed (Yes/No)

Streamlined with actual outcome

Action plan agreed for trade facilitation at Port Sudan

5. Action Plan for Port Sudan Trade Facilitation adopted by Ministry and recommendations under implementation (Yes/No)

Streamlined with actual outcome

Participation of the private sector in rail transport increased

6. Action Plan for Private Sector Participation in Railway Sector adopted by Ministry (Yes/No)

Streamlined with actual outcome

7. Environment and Social Assessment Framework adopted (Yes/No)

Added to reflect actual outcome

8. Staff trained in planning, budgeting, financing (number) (for all components)

Added to reflect actual outcome

Component ThreeRoads improvement and design

205km of rural roads improved 9. Roads rehabilitated ,- Rural (km) Use of Core Indicator

38km non-rural road improved 10. Roads rehabilitated, Non-Rural (km) Use of Core indicator

Design for 945 km secondary and tertiary roads completed

11. Feasibility and detailed design studies for new roads (km)

streamline with standard/commonly used indicator description

Feeder and community access road program prepared

12. Continued (Yes/No) added

Pilot Performance-Based Road Maintenance contracts initiated

13. Dropped To be carried out by the Client upon completion of the road rehabilitation/improvement works

Pavement Management system established

14. Continued (Yes/No) added

8

Page 14: documents.worldbank.orgdocuments.worldbank.org/.../691460PJPR0P090turing0Pa…  · Web viewThe proposed changes involve: (a) an extension of the project closing to complete the on-going

NETREP - Revised Project M&E Arrangement

PDO Level Results Indicators

Cor

e UOM2

BaselineOriginal ProjectStart

(2007)

Progress To Date(2012)

Cum. Target Values

Frequency Data Source/ Methodology

Responsibility for Data

CollectionComments

2012 2013

Number of people with an all-season access (road/rail) Number 0 272,500 272,500 287,000

Monthlt/Quarterly

local authorities/Site engineer/PMT/NHA Regional Manager

Western manager/Babanousa – Wau line manager/NHA Regional Manager

Original target was 301,500, but it is reduced to 287,000 to reflect the partial completion of the Damazin Kurmuk road upgrading by June 2013

Travel time on selected routes (Babanousa-Wau Rail)

hrs. N.A. 15 15 15

Monthlt/Quarterly

Site eng. Reports/Western Region traffic administration

Western manager/Babanousa – Wau line manager

Travel time on selected routes (Kadugli-Kauda Road)

hrs. 15. 2 2 2Monthlt/Quarterly

Local Authorities Reports

NHA Regional Manager

Travel time on selected routes (Hamsahkoreib-Gadamai Road)

hrs. 10. 1 1 1Monthlt/Quarterly

Local Authorities Reports

NHA Regional Manager

Travel time on selected routes (Ed Damazin-El Kurmuk Road)

hrs. 10 5 5 3 Monthly/Quarterly

Local Authorities Reports

NHA Regional Manager

Travel time was estimated to reduce from 10 to one (1) hour on the entire upgraded section of the Damazin –Kurmuk road. The travel time reduction is revised to be from 10 to three (3) hours due to expected completion of 45 km of the 92 km by the project closing date.

Travel volume for rail (Babanusa-Wau) Tonnage 0 50,000 50,000 50,000 Monthly/

Quarterly

Site engineer’s Reports/Western Region traffic administration

Western manager/Babanousa – Wau line manager

Assuming two (2) trains per week, 20 wagons per train with 25 tons average load per wagon

2 UOM = Unit of Measurement.9

Page 15: documents.worldbank.orgdocuments.worldbank.org/.../691460PJPR0P090turing0Pa…  · Web viewThe proposed changes involve: (a) an extension of the project closing to complete the on-going

Travel volume for road (Gadamai - Hamashkorieb; Damazin - Kurmuk; Kadugli – Kaouda)

Number of

Trucks/ day

N.A. 210 210 210 Annual

Regional Managers/Local authorities

PMT

Data from project design reports. The expected increase in traffic volume on Damazin –Kurmuk road from 40 trucks per day to 110 trucks per day will not be realized until the entire section will be upgraded. Total traffic reduced from 320 to 210.

Share of rural population with access to an all-season road (proportion)

Number%

No data for the share of rural population with access to an all- season road. This will collected during the extension period.

Roads in good and fair condition as a share of total classified roads. Supplemental value: Size of total classified network breakdown:

Percentage

km 6,900

No data for percentage of roads in good and fair condition. This will collected during the extension period. The classified road network is the national road network, which is 6,900 km. The remaining roads are unclassified dray weather roads

Beneficiaries

Direct project beneficiaries Yes Number 0 272,500 272,500 287,000 Monthly/

Quarterly

Site Engineer’sReports/State and local Authorities

PMT

Original target was 301,500, but it is reduced to 287,000 to reflect the partial completion of the Damazin - Kurmuk road upgrading by June 2013

Of which female Yes % 0 48 48 48 State/local authorities PMT

Intermediate C o Unit Baseline Progres Target Values Frequency Data Source/ Responsibility for Comments

10

Page 16: documents.worldbank.orgdocuments.worldbank.org/.../691460PJPR0P090turing0Pa…  · Web viewThe proposed changes involve: (a) an extension of the project closing to complete the on-going

Results Indicators

re

of Measure-

-ment

Original ProjectStart

(2007)

s To Date

(2011)Methodology Data Collection2012 2013

1.1. Rail line rehabilitated Km 0 446 446 446 Monthly/

Quarterly

Site engineer report/PMT/W. Region traffic administration

Babanusa Wau rail line manager/PMT

1. Action Plan for Private Sector Participation in Railway Sector adopted by Ministry (Yes/No)

Y/N N Y Y Y Quarterly

PMT quarterly progress report

PMT and MoT - PD

2. Action Plan for Port Sudan Trade Facilitation adopted by Ministry and recommendations under implementation (Yes/No)

Y/N N Y Y Y Quarterly PMT quarterly progress report PMT

11

Page 17: documents.worldbank.orgdocuments.worldbank.org/.../691460PJPR0P090turing0Pa…  · Web viewThe proposed changes involve: (a) an extension of the project closing to complete the on-going

3. Diagnostic study of the regulatory body in River Transport Sector completed (Yes/No)

Y/N N Y Y Y Quarterly PMT quarterly progress report PMT

4. Environmental and social framework adopted (Yes/No)

Y/N N Y Y Y Quarterly PMT quarterly progress report PMT

5. Environmental and Social Assessment Unit established under the Ministry (Yes/No)

Y/N N Y Y Y Quarterly PMT quarterly progress report

PMT and MoT - PD

6. Staff training in planning, budgeting, financing for all components

Number 0 18 24 30 Monthly/Quarterly

Progress Reports PMT - NHA

Intermediate Result 3: Critical Roads in Post Conflict Areas Improved

1. Roads rehabilitated - Rural Km 0 69 112 112 Monthly/

QuarterlyProgress Reports PMT - NHA

Kadugli – Kauda Road (30km) and Gadamai – Hamashkoreib Road (82km)

2. Roads rehabilitated – Non - Rural Km 0 28 28 45 Monthly/

QuarterlyProgress Reports PMT - NHA

Section 1 of Damazin – Kurmuk Road (7 km) and section 2 of Damazin –Kumruk road (38 km)

3. Feasibility and detailed design studies for new roads

Km 0 310 945 945 Quarterly Progress Reports PMT - NHA

Abu Gebeiha –Talodi Rd (160km), Talodi – Kadugli Rd (150km), Toker – Garora – Rd. (215km), Damazin – Renk Rd (200km) and Muglad – Abyei Rd (220km). The total length reduced from 995 km to 945 km as the Kadugli – Heglig section was dropped.

4. Feeder and community access road program prepared

Yes/No N N N Y Quarterly Progress Reports PMT - NHA

5. Pavement Management system established Yes/No N N N Y Quarterly Progress

Reports PMT - NHA

Planning Department of MTRB strengthened and Yes/No N Y Y Y Quarterly Progress

Report MTRB

12

Page 18: documents.worldbank.orgdocuments.worldbank.org/.../691460PJPR0P090turing0Pa…  · Web viewThe proposed changes involve: (a) an extension of the project closing to complete the on-going

satisfactorily discharging its oversight roleFeeder and community access road program prepared

Yes/No N N Y Y Quarterly Progress Report PMT-NHA

13

Page 19: documents.worldbank.orgdocuments.worldbank.org/.../691460PJPR0P090turing0Pa…  · Web viewThe proposed changes involve: (a) an extension of the project closing to complete the on-going

ANNEX 2: DETAILED PROJECT COST TABLE BY COMPONENT AND ACTIVITYSudan: NETREP - Reallocation of Proceeds

Item Activity Current Allocation Proposed Restructured Allocation Remarks/Status and Next Steps

Total GOS MDTF Total GOS MDTF

COMPONENT 1: REHABILITATION OF CRITICAL RAIL INFRASTRUCTURE AND SERVICES (US$ million)

1.1 Equipment & Rehabilitation of Babanusa – Wau rail line. 43.34 31.27 12.07 43.34 31.27 12.07

All the required equipment was procured. A contract was signed for procurement of pipe culverts at a cost of US$300,000.Communication equipment has to be procured at a cost of about US$230,000. Using some balance remaining under this item spare parts will be purchased

1.2 Rail connection to Port Sudan South Quay. - - - - - -

The infrastructure development has been requested to be considered for future implementation under the Sea Ports Corporation, while the focus at this stage will be on promoting trade facilitation needs. Actions for the latter are incorporated under item 2.2

1.3 Mine clearance 2.60 2.60 - 2.60 2.60 - Completed.

1.4 PMT- support for project implementation including TA. 0.20 - 0.20 0.20 - 0.20

Project implementation support costs (consultancy, workshops TA, operating cost, and IT equipment purchase) are to be covered with these resources.

Component 1 Total 46.14 33.87 12.27 46.14 33.87 12.27

14

Page 20: documents.worldbank.orgdocuments.worldbank.org/.../691460PJPR0P090turing0Pa…  · Web viewThe proposed changes involve: (a) an extension of the project closing to complete the on-going

ANNEX 2: DETAILED PROJECT COST TABLE BY COMPONENT AND ACTIVITY (Continued)Sudan: NETREP - Reallocation of Proceeds

COMPONENT 2: INSTITUTIONAL STRENGTHENING AND IMPROVEMENTS TO RIVER TRANSPORT SEVICES (US$ million)

2.1 Studies and other activities to enhance private sector participation in the railways. 0.05 - 0.05 0.03 - 0.03

Study completed. Recommendations are being considered through a taskforce established within the MTRB.

2.2Improvement to inter-modal operations at Port Sudan (Port Sudan Trade facilitation Study)

0.05 - 0.05 0.03 - 0.03 Study completed and recommendations are being considered through a taskforce established within the MTRB.

2.3 Enhancement of sector management capacity of MTRB. 0.08 - 0.08 0.12 - 0.12

Develop plan of action for the sector management and capacity enhancement. Funds are allocated for the TA for the Planning Directorate.

2.4 Establish environmental and social safeguards unit including short term TA 0.08 - 0.08 0.11 - 0.11

The Unit has been established. Training of staff is to follow.Funds are allocated for the TA.

2.5 Equipment in support of port operations. 0.72 0.48 0.24 - - -Procurement of one ferry boats for operation along R. Sobat cancelled due to separation of South Sudan.

2.6 Study to establish need for emergency dredging and navigational aids. - - - - - -

Develop plan of action following the outcome and recommendations of the NTMP study and implement as part of the joint project.

2.7 Hydrographic survey and mapping of the White Nile. - - - - - -

Develop plan of action following the outcome and recommendations of the NTMP study and implement as part of the joint project.

2.8 PMT- support to project implementation including TA. 0.72 - 0.72 .88 - .88

Diagnostic study for IRND institutional strengthening completed.

ESIA studies for Babanusa – Wau Rail line and the ferry boat completed. Project implementation support costs, including project coordination, Financial Advisor, and operational costs, to be covered from this allocation. . PC + Project Support officer salaries for March-June added. Expected new contracts for FA US$0.066m , PC US$0.072 m; Project Support Officer US$0.024m

Component 2 Total 1.70 0.48 1.22 1.17 - 1.17

15

Page 21: documents.worldbank.orgdocuments.worldbank.org/.../691460PJPR0P090turing0Pa…  · Web viewThe proposed changes involve: (a) an extension of the project closing to complete the on-going

ANNEX 2: DETAILED PROJECT COST TABLE BY COMPONENT AND ACTIVITY (Continued)Sudan: NETREP - Reallocation of Proceeds

COMPONENT 3: ROAD IMPROVEMENTS IN THE THREE AREAS (US$ MILLION)

3.1 Program of Construction and Spot Improvement Works3.1.1 Construction of Kadugli-Kauda Road (135

Km).

(a) Section 1: Km 0.0 – Km 18.6:

(b) Section 2: Km 18.6 – Km 48.9

(c) Section 3: Km 48.9 – Km 123

-

4.50

-

-

3.00

-

-

1.50

-

-

4.50

-

-

3.00

-

-

1.50

-

Section 2 had been completed. Sections 1 and 3 were cancelled due to mis-procurement and implementation will be by the South Kordofan State.

Cost for Section 2 is the final contract amount.

3.1.2 Construction supervision:

(a) Section 2: Km 18.6 – Km 48.9

(b) Section 2: Km 18.6 – Km 48.9

0.17 - 0.17 0.16 - 0.16 Final cost of supervision services.

3.1.3 Construction of Hamsahkoreib – Gadamai (82km).

28.20 19.00 9.20 24.30 16.20 8.10 Works completed. From MDTF allocation cost savings of about US$1.1 million realized.

3.1.4 Construction supervision 1.80 1.20 0.60 1.32 0.88 0.44 Services completed. From MDTF allocation cost savings of about US$0.16 million realized. Additional amount to pay Consultant bills unpaid due to need to extend the contract + supervision of pending contractor work.

16

Page 22: documents.worldbank.orgdocuments.worldbank.org/.../691460PJPR0P090turing0Pa…  · Web viewThe proposed changes involve: (a) an extension of the project closing to complete the on-going

3.2Upgrading to paved road standard – Ed Damazin – El Kurmuk Road (93 Km)

3.2.1 Contract 1 Section 1 (57.7 km) –Combined

Contract 1 –a—1 Section 1 (57.7 km) – base and asphalt wearing course

Contract 1 –a-2– Section 1 (57.7 km)- Up to sub base level (inclusive)

9.60

6.75

6.40

-----

3.20

----

6.75

9.12 6.8

--

------

2.32

----

--

Construction will resume. Amounts shown represent payments already made (including Advance Payment) and value of work executed. (The balance of the advance payment that is not yet recovered through payment certificates prepared before the repackaging, in the amount of US$1.19 million shall be cancelled from NETREP and shall be reimbursed to the MDTF account) ). (amount = actual+retention-1.19) (3.40+.11-1.19). About US$0.31 was reserved for increase in quantity of works executed before repackaging, which is only included in the component and project total costs.

Contract 1-a-1 to be implemented under separate arrangement by Government of Sudan (GOS) on parallel financing. This part may extend beyond the proposed grant closing date and will be executed out of NETREP. Compensation for damage to be covered by GOS.

Contract 1-a-2 Cost of works up to sub base level including all drainage structures to be financed 100% by MDTF. (Variation Order)GOS decided to execute this work as part of Contract 1 –a-1 above and fully cover the associated costs.

3.2.2 Contract 1 - Combined

Construction Supervision – Contract 1-a-1

Construction Supervision – Contract 1-a-2

0.10

0.15

0.07

---

0.03

----

0.15

0.10

---

---

0.07

---

---

0.03

---

---

Actually disbursed amounts for the combined contract.100% increase over the contract amount to cater for any extended supervision services.

Parallel financing by GOS.

To be financed by GOS out of NETREP.3.2.3 Contract 2 – Section 2 (38 km + up to 5 km

road improvement into Section 1)19.50 - 19.50 26.01 - 26.01 Construction will resume . Cost increased to cater for increase in

quantities and price escalation and compensation for damages..

3.2.4 Construction supervision 0.77 - 0.77 0.85 - 0.85 Cost increased to cater for extended supervision services.

3.3 Spot Improvements in the Nuba Mountains – Detailed Designs

3.3.1 Abu Gebeiha-Talodi (160 km) Services completed

3.3.2 Talodi-Kadugli (150 km) 2.35 - 2.35 2.32 - 2.32 Costs are final.

3.3.4 Toker-Garora (215 km)

3.4 Rural Access Program for the Three Areas – Feasibility Studies and detailed Design17

Page 23: documents.worldbank.orgdocuments.worldbank.org/.../691460PJPR0P090turing0Pa…  · Web viewThe proposed changes involve: (a) an extension of the project closing to complete the on-going

3.4.1 Damazin – Renk (200km).1.67 - 1.67 1.54 - 1.54

Services completed.

Costs are final.3.4.2 Kadugli – Hegleig (170km)

3.4.3 Muglad – Abyei (220km)3.5 Studies, Institutional development and Support for Program Implementation

3.5.1 Support for project implementation including technical assistance. 0.25 - 0.25 .43 - .43

Studies and TA to support project implementation completed.. Increase represents $.02 million to cover balance of Financial Advisor contract(March to June) + $.05 million to provide for Letter of Credit opening fees about 1% of PMS value.

3.5.2 Establishing pavement management system and various studies including sustainable road sector financing, road safety and axle load control.

4.56 - 4.56 4.56 - 4.56Cost is based on the latest Financial Proposal received for the PMS design and establishment.

3.5.3 Institutional development and capacity building, including training, workshops, and study tours, etc.

0.20 - 0.20 0.20 - 0.20Training for NHA staff.

3.5.4 Design of pavement management system and improvement to materials testing laboratory -

- --

- -

Included in 3.5.2

3.5.5 Support to demining activities - - - - - - This allocation is cancelled due to mis-procurement of Kadugli – Kaouda Road, Lots A, C, D and E. Amount reallocated to other activities.

3.5.6 Mine clearance 5.00 5.00 - 5.00 5.00 - Completed.

3.5.7 TA for preparatory works in support of improving access to rural community, and ensuring sustainability of the road network.

2.80 - 2.80 2.80 - 2.80 In progress. Amount reflects the actual contract value. The work includes consultancy services to prepare rural community access programs in selected states.

Component 3 Total 88.37 34.36 54.01 83.21 31.95 51.26

GRAND TOTAL 136.21 68.71 67.50 130.52 65.82 64.70

18

Page 24: documents.worldbank.orgdocuments.worldbank.org/.../691460PJPR0P090turing0Pa…  · Web viewThe proposed changes involve: (a) an extension of the project closing to complete the on-going

ANNEX 3: ALLOCATION OF GRANT PROCEEDS BY COMPONENT AND DISBURSEMENT CATEGORY

Category

Current Allocation Proposed Restructured Reallocation

Amount (in US Dollars)

% of Expenditure to

be Financed

Amount (in US Dollars)

% of Expenditu

re to be Financed

1. Works, goods, services and training for Part 1 of the Project (SRC) (per memoria)

11,772.41 33-1/3 11,772.41 33-1/3

2. Works, goods, services and training for Part 2 of the Project (RTC) (per memoria)

------- -------- ------ -----

3. Works, goods, services and training for Part 3 of the Project (NHA) (per memoria)

1,802,862.00 33-1/3 1,802,862.00 33-1/3

4. Goods and services for demining activities (per memoria)

--------- ----- ------ -----

5. Goods for Part 1 of the Project (SRC) 12,058,227.59

100 12,058,227.59 100

6. Services, training and operating costs for Part 1 of the Project (SRC)

200,000.00

100 200,000.00 100

7. Works for Part 1 of the Project (SRC) --------- ---- ------ ----

8. Goods for Part 2 of the Project (MTRB)

240,000.00 33-1/3 ------- -----

9. Goods, Services, training and operating costs for Part 2 of the Project (MTRB)

980,000.00 100 1.170,000.00 100

10. Works for Part 3 (i)(a), (i)(b) an (i)(e) of the project (NHA) (1)

13,187,138.00

33-1/3 10,727,138.00 33-1/3

11. Goods, services, training and operating costs for Component 3 of the Project (NHA)

11,850,000.00

100 11,870,000.00 100

12. Works for Part 3 (i)(d) of the Project (NHA) (2)

20,270,000.00

100 26,860,000.00 100

13. Works and Services for Part 3 (i) (c) of the Project (NHA) (3) 6,900,000.00 100 ---- ---

TOTAL 67,500,000.00 64,700,000.00

Sudan: NETREP - Restructuring for Reallocation

Notes: (1) Category 10: For the costs of construction contracts and supervision contracts for the Gadamai – Hamashkoraib Road,

Damazin – Kurmuk Road, Section 1 (57.7 km) for works completed so far and the construction contract for Kadugli – Kaouda Road, Section 2 (km 18.6 to km 48.9)

(2) Category 12: For the costs of construction contracts and supervision contracts for Damazin – Kurmuk Road, Section 2 (38 km+ up to 5 km road improvement into Section 1).

19

Page 25: documents.worldbank.orgdocuments.worldbank.org/.../691460PJPR0P090turing0Pa…  · Web viewThe proposed changes involve: (a) an extension of the project closing to complete the on-going

(3) Category 13: For costs of works up to sub base level including drainage structures for Section 1 of Damazin – Kurmuk Road, transferred to section 2 of Damazin – Kurmuk road , after reduction of the additional funds required for works executed before repackaging of section 1 (combined contract for section 1).

20

Page 26: documents.worldbank.orgdocuments.worldbank.org/.../691460PJPR0P090turing0Pa…  · Web viewThe proposed changes involve: (a) an extension of the project closing to complete the on-going

ANNEX 4: IMPLEMENTATION PLAN

National Emergency Transport Rehabilitation Project (NETREP)

Component 1 – Rehabilitation of Critical Rail Infrastructure and Services

It No

Category/Activity Cost(US$’000)

Draft TOR/ Invite Cons. Firm/Negotiate and Award contract for design and bid document preparation

Detailed Design and Bid document preparation (Consultants)

Draft TOR/RFP/Evaluation/Award/Mobilization SPN Consultants

Bidding for Works/Evaluation/Award

Contractor(s) mobilization

Works implemented

Responsible/lead Institution

Start Finish Start Finish Start Finish Start Finish Start

Finish Start Finish

Component 1: Rehabilitation of Babanousa Wau Line

Procurement of Equipments1.1 Supply of Corrugated Circular and

Arch pipe culvertsEuros

301,300.00-

2006 2007 June 2008

June 2009

Sep 2009

Sep-09 May 2010

21-Feb-2011

May 2011

July2011

Aug 2011

March 2012

SRC

1.2 Supply of communications Equipments

USD 230,000

2006 2007 2008 April 2011

March2011

April 2011

Sept 2011

Dec 2011

Oct 2011

Oct 2011

Nov 2011

Sep 2012

SRC

1.3 Purchasing of Spare parts for Earth Moving Equipments

USD 30,000

2006 2007 Feb 2010

March 2011

April 2011

June 2011

June 2011

July 2011

Aug 2011

Aug 2011

July 2012

Sep2012

SRC

1.4 Purchase of local materials and tools for Stations rehabilitation

SDG 3157200.0

0

2006 2007 Feb 2011

April 2011

May 2011

June 2011

June 2011

Dec 2011

June 2011

July 2011

Aug 2011

Jun 2013

SRC

1.2 Rehabilitation Works

2.1 Rehabilitation of Stations SDG 2092800.0

0

2006 2007 March 2011

April 2010

April 2011

June 2011

June 2011

Dec 2011

June 2011

July 2011

Aug 2011

Jun 2013

SRC

2.2 Track maintenance SDG 1650000.0

0

2006 2007 - - - - - - - Dec 2008

Feb 2008

Jun 2013

SRC

2.3 Construction & Rehabilitation of Pipes & Small Bridges. &

SDG 1450000.0

0

2006 2007 - - - - - - - - June 2011

Jun 2013

SRC

21

Page 27: documents.worldbank.orgdocuments.worldbank.org/.../691460PJPR0P090turing0Pa…  · Web viewThe proposed changes involve: (a) an extension of the project closing to complete the on-going

Implementation PlanNational Emergency Transport Rehabilitation Project (NETREP)

Component 2 - Institutional Strengthening and Improvements to River Transport Services

Activity

Cost US$(000)EOI Evaluation

Contract Award

ImplementationResponsible/lead Institution

Start Finish Start Finish Start Finish

Technical Assistance to strengthen the

Environmental and Social Management

Unit in the Ministry of Transport110

Feb.

2011March2011 March2011 May2011 June2011 Feb2012 Dec.2012 MoT

Technical Assistance to strengthen the

Planning Directorate of the Ministry of

Transport120

May2011 Jan2012 Dec.2012 MoT

22

Page 28: documents.worldbank.orgdocuments.worldbank.org/.../691460PJPR0P090turing0Pa…  · Web viewThe proposed changes involve: (a) an extension of the project closing to complete the on-going

Implementation PlanNational Emergency Transport Rehabilitation Project (NETREP)

Component 3 – Road Improvements in the Three Areas

It No

Category/Activity Cost(US$’000)

Draft TOR/ Invite Cons. Firm/Negotiate and Award contract for design and bid document preparation

Detailed Design and Bid document preparation (Consultants)

Draft TOR/RFP/Evaluation/Award/Mobilization SPN Consultants

Bidding for Works/Evaluation/Award

Contractor(s) mobilization

Works implemented

Responsible/lead Institution

Start Finish Start Finish Start Finish Start Finish Start

Finish Start Finish

1 Gadamai - Hamashkoraib Road {81.5 Km)

24,300 - - - - Oct-06 Aug-08 Oct-06 Nov-07

Aug-08

Nov-08

Aug-08

June-12

NHA

2 Damazin - Kurmuk Road {57.7 Km.} 30,420 - - - - Nov-08

Apr-09 Jan-08 Jan-09 Apr-09

ongoing

Jun-09 June -13

NHA

3 Damazin - Kurmuk Road- Section 2 26,860 - - - - Jun-09 Apr-10 Apr-09

Nov-09

Jan-10 Mar-10

Mar-10

Mar-13

NHA

4 Kadougli - Kaouda Lot B 4,670 - - - - Oct-08 Dec-09 Sep-08

Jan-09 Oct-09 Dec-09

Dec-09

Dec-10

NHA

5 Abu Gubeiha – Talodi - Kadugli (310 Km) -

1,350 Jun-08 Mar-09 Apr-09 Jun-11 - - - - - - - - NHA

6 Toker - Garora (220 Km) 1,000 Jun-08 Mar-09 Apr-09 Jun-11 - - - - - - - - NHA

7 Damazin - Renk (200Km.) 850 May-07 May-08 Apr-08 Jun-11 - - - - - - - - NHA

8 Muglad- Abyei - Lot C 820 May-07 May-08 Apr-08 Jun-11 - - - - - - - - NHA

9 Feeder Roads & Community Access Program Development

2,799 Dec-09 Nov. 10 Dec-10 Jun-12 - - - - - - - - NHA

10 Pavement Management System 4,560 Dec-09 July -12 Aug-12

Mar-13 = = = = = = = = NHA

23

Page 29: documents.worldbank.orgdocuments.worldbank.org/.../691460PJPR0P090turing0Pa…  · Web viewThe proposed changes involve: (a) an extension of the project closing to complete the on-going

12 Capacity Building 200 May-09 Dec 12 NHA

13 Mine clearance 5,000 2006 2006

24