· web viewnumber of floor above grade key o ccupancy type(s) submission three key ph r ases to...

5
Hong Kong Report on the State of Sustainable Built Environment 2020 Open Call for Content Submission – Public and Industry Projects Submission Deadline: 27 March 2020 (Friday) Submission Guideline: The project to be submitted should have either the inception date or completion date falls between 1 May 2017 and 29 Feb 2020. For content input, please focus on: demonstrating the achievement in the vision of building a sustainable city and community how the project could maintain its environmental sustainability in future operations You may provide 3-5 photos/images to showcase your project (in resolution of 300 dpi) Please return your submission to [email protected] in the following subject line: Hong Kong Report 2020 Content Submission – Public and Industry Projects (project name).

Upload: others

Post on 10-Mar-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1:  · Web viewNumber of floor above grade Key o ccupancy type(s) Submission Three key ph r ases to demonstrate the sustainability performance and features of the project A q uote from

Hong Kong Report on the State of Sustainable Built Environment 2020

Open Call for Content Submission – Public and Industry Projects

Submission Deadline: 27 March 2020 (Friday)

Submission Guideline:

The project to be submitted should have either the inception date or completion date falls between 1 May 2017 and 29 Feb 2020.

For content input, please focus on:

demonstrating the achievement in the vision of building a sustainable city and

community

how the project could maintain its environmental sustainability in future operations

You may provide 3-5 photos/images to showcase your project (in resolution of 300 dpi)

Please return your submission to [email protected] in the following subject line:

Hong Kong Report 2020 Content Submission – Public and Industry Projects (project name).

Page 2:  · Web viewNumber of floor above grade Key o ccupancy type(s) Submission Three key ph r ases to demonstrate the sustainability performance and features of the project A q uote from

General Information

Project Name

Project Address

Project Type

□ Commercial □ Industrial

□ Institution/Community □ Mixed Use

□ Residential □ Neighbourhood / Master Plan

Project Status

□ Existing buildings □ New buildings

□ Interior □ Heritage

□ Others

Project Inception Date

Project Completion Date

Project image submitted piece (s)

Website for further information of the project

Name of Contact Person

Contact Phone No.

Email Address

Project Team

Team or Organisation Name

Name of Owner / Developer

Project Manager

Page 3:  · Web viewNumber of floor above grade Key o ccupancy type(s) Submission Three key ph r ases to demonstrate the sustainability performance and features of the project A q uote from

Architect

C&S Engineer

M&E Engineer

Landscape Architect

Quantity Surveyor

Sustainable Design Consultant

Environmental Consultant

Façade Consultant

Acoustic Consultant

Main Contractor

Others

Project Scale

Site area, hectares (approx.)

Gross floor area, m2 (approx.)

Number of floor above grade

Key occupancy type(s)

Submission

Three key phrases to demonstrate the sustainability performance and features of

Page 4:  · Web viewNumber of floor above grade Key o ccupancy type(s) Submission Three key ph r ases to demonstrate the sustainability performance and features of the project A q uote from

the project

A quote from project-related person to show the sustainability impact of the project

New project: A project team member

Project in operation: end-user or property management

by

Page 5:  · Web viewNumber of floor above grade Key o ccupancy type(s) Submission Three key ph r ases to demonstrate the sustainability performance and features of the project A q uote from

Content submission (Word limit: 500 words)

Demonstrate the achievement in the vision of building a sustainable city and community

How the project could maintain its environmental sustainability in future operations