· web viewgoal ix involve parents 33 goal x support fast track virtual school 34 goal xi...

76
Ketchikan Gateway Borough Schools

Upload: others

Post on 24-Feb-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

Ketchikan Gateway Borough SchoolsTechnology Plan 2012-2015

Page 2:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

Table of Contents

Introduction 3

Philosophy Statement 3Vision 3

KGBSD Educational Technology Plan Goals 4

Goal I Implementation Funding 6Goal II District Technology Committee 8Goal III Technology Representative for Buildings 10Goal IV Technology Support Staff 13Goal V Building Technology Committees 15Goal VI NETS and Technology Literacy Report 16Goal VII New Technologies to Classrooms 28Goal VIII Upgrade Technology Resources 32Goal IX Involve Parents 33Goal X Support Fast Track Virtual School 34Goal XI Technology Support Service Process 38Goal XII Professional Development 41

Participants of Plan Development 45

Timelines 46

Appendix 54

ResourcesBudget/Inventory Analysis, Fall 2011

Internet Safety Policy 2011-2012Acceptable Use Agreement 2011-2012School Board Meeting Minutes (2 Public Hearings)

2

Page 3:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

Introduction

New technologies are being developed continuously which show great promise for enhancing student performance. This plan outlines how technologies could be applied in the Ketchikan Gateway Borough School District. The plan is intended for use by students, staff, parents, community members and administration for technology integration into existing programs. The District Technology Committee, in conjunction with administration and building staff, will strive to seamlessly integrate technology into the day-to-day activities of the district as the Strategic Plan for the district is implemented. Research suggests that the effective and meaningful integration of technology increases student achievement, positive attitude, attendance, and motivation as well as decreases student discipline problems. The KGBSD Technology Plan addresses the effective use of technology in the education of our students.

The Ketchikan Gateway Borough School District has developed this three-year educational technology plan based on the recommendations of the District Technology Committee and the District Administrative Team. Both entities also solicited and represent suggestions from district-wide staff members. This plan not only meets Alaska Department of Educational and Early Development (EED) requirements for a district technology plan, but also provides the blueprint for effective continual implementation of technology in an equitable manner throughout the district.

Philosophy Statement

Instructional technology is a critical component of educating our students with 21st Century skills. We believe that instructional technology provides enormous benefits for students and teachers alike. Instructional technology, as an integral part of classroom curriculum, helps students become successful learners and prepares students to be productive members in our technological/information-based society. It is imperative that the Ketchikan Gateway Borough School District gives a high priority to providing staff development, adequate funding, equitable distribution of instructional technology and access to the learning environment.

Vision

Students, faculty and staff will receive meaningful engaging instruction to utilize a variety of technological tools and problem solving strategies to foster higher order thinking skills. Instructional technology will be used across the curriculum as a tool for teaching, researching, organizing, learning, remediating, assessing and presenting information. As a result, KGBSD students will be able to apply their knowledge and skills in their post K-12 studies, professions and daily lives.

3

Page 4:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

KGBSD Educational Technology Plan Goals

Goal I: Seek and acquire necessary funding to ensure smooth and efficient implementation of the stated goals. (Pgs. 6-7)

Technology Integration

Goal II: Maintain a District Technology Committee to support, evaluate, advise and promote the use of instructional technology in the classroom. (Pgs. 8-9)

Goal III: Provide training, support and compensation for a technology representative in each building. (Pg. 10-12)

Goal IV: The district will maintain support staff in the area of technology. (Pgs. 13-14)

Goal V: Establish technology committees annually for each building to assess building priorities as needed. (Pg. 15)

Goal VI: Improve integration and implementation of instructional technology in all discipline areas to insure all students meet the grade appropriate and required National Education Technology Standards (NETS) in each grade level and to insure proficiency for the any grade technology literacy report. (Pgs. 16-27)

Access

Goal VII: Cost effectively integrate and appropriate new and emerging technologies into the classroom environment that is accessible to all students, faculty, parents and administration. (Pgs. 28-31)

4

Page 5:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

Goal VIII: Continue to upgrade existing wide area and building networks to allow for increased access to Internet and other technology resources. (Pg. 32)

Goal IX: Involve parents in use of technology in the classroom/district. (Pg. 33)

Goal X: Provide continuing to support Fast Track Virtual School. (Pgs. 34-37)

Goal XI: Establish a process for technical support, maintenance, upgrade and replacement of equipment. (Pgs. 38-40)

Staff Development

Goal XII: Provide ongoing professional development to increase the appropriate integration of technology for teachers, staff, and administrators with funding available either through district general funds or grant applications and as it coincides with other curricular revisions. The six-year cycle for curriculum development will generally be followed. (Pgs. 41-44)

5

Page 6:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

Goal I: Seek and acquire necessary funding to ensure smooth and efficient implementation of the stated goals.

Background:KGBSD uses resources for building-based site budgets for individual school needs. E-rate funding has been secured in past years to defray the cost of E-rate eligible services.

A budget is currently in place for the Technology Department, which includes salaries and equipment, supplies, training, and other support for support technicians and the Network Supervisor. Equipment and supplies support the current infrastructure but fall far short of keeping the infrastructure as stable as it should be.

Strategy 1: Secure a separate and sufficient yearly technology budget to successfully implement the plan while continuing to pursue outside funding sources/grants.

Action Steps:

Task Who Funding When

1. Assess necessary acquisition and implementation of modern educational technology software and equipment to continue or further integrate technology into the curriculum and to support administration.

District & building level administration

District and building level funds

Annually in February following the district budget cycle

Use Building Technology Committees (BTC) to establish priorities for the acquisition of equipment needed for successful implementation of the District Technology Plan.

BTR BTR Annually

Develop a budget for the purchase of shared mobile classroom AV carts which include laptops/projectors/document cameras/sound systems and wireless network access.

BTR Grants & BTR Annually

6

Page 7:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

Evaluate the effectiveness and progress made in the implementation of the District Technology Plan. The Educational Technology Plan will further be used in the development of the annual Program Based Budget for technology and support of technology in the classroom.

DTCBTRAdmin

District and BTR Annually as a part of the budget process, usually initiated in February

Seek E-Rate funds annually for eligible services and equipment to continue or further technology integration in the curriculum. KGBSD will utilize the goals and objectives in the Educational Technology Plan to develop needs assessments, budgets and funding requests for the annual USAC E-Rate funding cycle.

District Business Office

District Business Office

Annually due in February

Continue to seek and apply for grants and other outside sources of funding to support technology integration as a means to improved student achievement.

District grant writer

Desired Outcome: Equitable access to technology resources for the students and staff of the Ketchikan Gateway Borough School District.

Evaluation: The budgeted expenditures for technology in the base budget have increased to meet the needs of the district technology infrastructure as well as integration of technology into the classroom/curriculum with updates reviewed each year to adjust for innovation, change in mandates and/or staff or student needs.

Technology Integration

7

Page 8:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

Goal II: Maintain a District Technology Committee to support, evaluate, advise and promote the use of instructional technology in the classroom.

Background:KGBSD has maintained a District Technology Committee (DTC), with the exception of one year, since 1995. The committee has been comprised of various representatives of district buildings, administration, technology support and the community and meets on a regular basis throughout the school year. Tasks have included planning for technology integration, writing, revising, and reviewing the district’s Technology Plan, devising professional development plans, and making technology instructional decisions.

Strategy 1: Maintain or revise procedures as needed for the District Technology Committee to coordinate and evaluate progress.

Action Steps:

Task Who Funding

When Amount

The DTC will be comprised of building technology representatives, administrators, and technicians and will meet six times during the school year

BTR, administration and students

Grant Oct, Nov, Jan, Feb, Mar & April

1,000 per BTR

Investigate methods of providing extra duty contracts or stipend methods.

BTR Grant Annual 1,000 per BTR

Review and update District Technology Plan before the annual budget process.

DTC N/A January N/A

Obtain community and student support for DTC by including community and student representatives.

DTC, Admin. & students, Board member and/or community suggestions

N/A Ongoing meetings

N/A

Desired Outcome: An active, ongoing District Technology Committee that develops, maintains, and supports an integrated educational technology plan.Strategy 2: Align the Educational Technology Plan with the adopted district-wide curriculum.

8

Page 9:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

Action Steps:

Tasks Who Funding When Amount

Align technology use in with adopted curriculum during the planning process

Curriculum committees

Curriculum account

Ongoing Curriculum meetings

Annual curriculum budget based on 6 year revision cycle

Encourage departments and administration to attend conferences for training in educational technology

Attempt rotation to include teachers and administration

General Budget

Grants

Following curriculum process

Registration, per diem, travel expenses as incurred

Provide staff development and training opportunities to infuse meaningful and engaging technologies in web 2.0 or other updated versions in content areas to enrich and increase academic achievement.

StaffBTRConsultants

General Budget

Grants

District Staff Development

SummerAcademies

Online

40,000.

Desired Outcome: A coordinated, cooperative effort resulting in the staff and faculty integrating educational technology into the adopted district-wide curriculum.

Evaluation of Goal: The committee meets and revises goals and objectives. Committee is formed of the building technology representatives, administrators, students and community members. District Educational Technology Plan is reviewed annually.

9

Page 10:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

Goal III: Provide training, support and compensation for a technology representative in each building, as funding is available.

Background:For the last several years, Building Technology Representatives (BTRs) have been identified at individual schools. The BTRs have been responsible for addressing troubleshooting issues at the building levels by either quickly resolving them or reporting them to the Technology Department. The BTRs have also served on the DTC as liaisons from their buildings to the district. An extra duty contract may be offered or the duty becomes part of the district contractual agreement.

Strategy 1: Provide knowledgeable support of trained teachers/students/paraprofessionals to assist staff with software and hardware issues that are quickly resolved.

Action Steps:

Tasks Who Funding When Amount

Review and modify duties of designated Building Technology Representative position for K-12.

Administration District February budget cycle

1,000.

Survey and train staff. Students and certified teachers

District for software license

Before November annually

6,000.

Desired Outcome: Provide trained and effective technology representatives.

10

Page 11:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

Strategy 2: Technology representatives will help coordinate evaluation of the effectiveness of the Educational Technology Plan.

Action Steps:

Tasks Who Funding When Amount

Provide input from DTC to building staff. BTR and Admin District Annual and ongoing 1,000. Per site

Provide release time for Building Technology Representatives (BTR), if necessary but not to inter with FTE position

BTR and Admin District Annual and ongoing N/A

BTR will report progress on meeting goals in their buildings

BTR during DTC District Annual and ongoing N/A

Determine staff needs, concerns and recommendations.

BTR during DTC District Annual and ongoing N/A

Serve on DTC. Appointed by building level administration & teacher

District Annual and ongoing N/A

Provide input for technology effectiveness including schedule for maintaining equipment and replacing technology.

BTR to Technology Staff and Administration

N/A Annual and ongoing N/A

Provide input to evaluate, revise and continue the long range technology plan

BTR to DTC and administration

N/A/ January administration during budget cycle preparation

N/A

Provide a survey instrument for staff & administration to evaluate BTR services

Staff to Administration and BTR

N/A April and annually N/A

11

Page 12:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

Desired Outcome: Building technology representatives will be prepared to offer quality assistance to building staff. They will work closely with DTC to support the goals of the Technology plan

Evaluation: Building Technology Representatives will submit an annual needs assessment for training and support. Clear, concise job descriptions and responsibilities are outlined for technical staff, training staff and Building Technology Representatives. Building technology representatives serve on DTC to communicate ongoing needs and provide data on progress to meeting technology plan goals.

12

Page 13:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

Goal IV: The district will maintain support staff in the area of technology.

Background:The district currently employs a Network Supervisor, an employee that serves as Network Administrator, and workstation support personnel to ensure smooth operation of the district network and hardware. During 2011-2012 a position was added at the district level has been employed to manage district data in programs such as PowerSchool, Compass Learning, and other software licensed options. There is also a need for a position such as Technology Integration Specialist at the district level to provide educational technology leadership and support integration of technology into the classroom/curriculum. Consultant services will continue to be used as an option for some specialized training purposes.

Strategy 1: Acquire additional technician(s) as necessary in support of expanded needs as job descriptions are reviewed and updated.

Action Steps:

Tasks Who Funding When Amount

Review and update job descriptions for technology staff.

Administration Human Resources

N/A Annually as needed N/A

Desired Outcome: Better technology integration support for teachers and staff, more efficient network, and reduced log of IT Requests.

13

Page 14:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

Strategy 2: Establish Technology Integration Specialist position s for support of technology in the classroom.

Action Steps:

Tasks Who Funding When Amount

Establish priority for a Technology Integration Specialist at the district level.

Administration District February 2012 75,000

Establish responsibilities for this position as well as a viable job description that covers K-12.

Administration Human Resources

N/A February 2012 N/A

Desired Outcome: Quality professional development and support for teachers to infuse technology in meaningful engaging learning activities to increase academic performance.

Evaluation: The district budget includes the provision for an additional technician and appropriate training. Technology representatives are appointed by building administrators and may be given release time to accomplish assigned tasks as needed. The district budget includes the provision for a Data Management Specialist to provide reliable data for reports and educational decisions. Consultant services continue to be used for innovative staff training programs, to assist with grants and provide information with regard to changes in regulations and advice regarding policy.

14

Page 15:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

Goal V: Establish technology committees for each building to assess building priorities as needed.

Strategy 1: Initiate building technology committees to plan technology needs according to the priorities of the building.

Action Steps:

Tasks Who Funding When Amount

Develop guidelines for building committees. Building sites N/A Annually Alaska Content Standards/ Performance Standards met

Desired Outcome: Each building has a technology committee that contributes to the increase of technology integration into the curriculum.

Evaluation: Building technology committees are established to determine school priorities and action plans to meet those priorities. The technical support staff and professional consultants assist with staff development programs that are unique to the building sites as well as district-wide programs.

15

Page 16:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

Goal VI: Improve integration and implementation of instructional technology in discipline areas and provide all students the opportunity to acquire technology competencies.

Background: KGBSD student performance objectives are aligned to the Alaska State Performance Standards and GLE. They can be found on the Internet at http :// www . kgbsd . org / curriculum / curriculum . htm listed by subject and grade level or course offering. Technology integration usually incorporates software or programs that have been chosen after careful research for effectiveness. Professional literature, subscriptions to professional magazines, and validated research located on the Worldwide Web are valuable resources for the information sought. An example of curriculum-integrated software is Carnegie in the Algebra I course. Specific software is not listed in the Student Performance Objectives per se since the change is often more rapid than our six-year scheduled review process. However, a few programs currently used are listed below: 

Application Budgeted for: Manager Budget URL Hosted by

Us? Notes

ACFA ALL Whicker State http://alaska.caltesting.org/aca_testbuilder.html

NO AK Computerized Formative Assessments - 1 school of many for login - refer to folder. Preinstalled on all student macs currently.

 

AIMSweb Elem. & Middle

Clarkson District   NO $11,000/year  

AK Career Ready

ALL McClory Purchased State pays for student to take once.

http://www.careerready.alaska.gov/educators.html

NO WIN prepares student for this test. 11 & 12 graders. Career ready assessment, students get cert.

 

AK Career Ready - WIN

ALL McClory Purchased by State

http://akeed.wincshost.com/

NO Flash-based  

ALEKS Math RHS Gregg          

16

Page 17:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

Application Budgeted for: Manager Budget URL Hosted by

Us? Notes

All the Right Type

All 4th

& FME’s 5th & 6th

Weston Purchased   YES Application installed on all student computers, central server for progress tracking hosted virtually.

 

Atomic Learning

ALL Whicker 2-year grant thru 6/12

http://atomiclearning.com/

NO Includes Tech Lit Assessments  

Carnegie Bridge

  Karik          

Compass Learning Odyssey

HTE FME & RHS

Beimler No current support or upgrades

http://odyssey.kgbsd.org/childu/index.html

YES Flash-based. Virtual server as of this year - LAB# 5014353 NTR 172.16.16.100

Susan Scott [email protected] & Eric Giuliani 360-204-1292

Riverdeep Destination Math & Reading

ALL Elem. (SPED)Except FME

Clarkson & Beimler

Special Education

http://destinations.kgbsd.org

YES Virtual server $850.00 per year for Tech Support

 

E2020 KHS RHS FTVS

Whicker No current support

http://school.education2020.com/webadmin_v2/Default.aspx

Hosted offsite. cache server/media hosted by us.

Not administered. Self contained cache server  

Earobics  FME Beimler   http://earobics.kgbsd.org

  URL will only work internally as it translates to a internal IP. There is no yearly support fee. Always accessible support is included in original purchase.

 

Headsprout Pre-K ALL Beimler Special Education

  Cache server hosted by us.

Cache server, appliance. no configuration needed, minor maintenance.

 

17

Page 18:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

Application Budgeted for: Manager Budget URL Hosted by

Us? Notes

MY Access! HTE SMS

Beimler School Sites

http://www.myaccess.com/myaccess/do/log

NO   Tina Hamilton -Vantage Learning - MY Access! 800-230-2213 ext.1226Fax: [email protected]

READ180 Title 1: SMS HTE FME

Weston Title I   YES Virtual Server  

RenPlace FME HTE PHE TSAS KCS SMS has built in usage stats

Beimler School Sites

http://renplace.kgbsd.org/RenaissanceServer/Public/RPM/Login/Login.aspx

YES Virtual server as of this year. RDI is 2 parts. Data export from PowerSchool admin'd by Jürgen, and import admin'd by the vendor.- Renaissance - the company name. RenLearn - the name of the website. RenPlace - the umbrella program that hosts (?) all the products- Accelerated Math, Accelerated Reader, Star Math, Star Reader, Star Early Literacy, Math Facts in a Flash - separate products/programs

 

RenPlace RHS Beimler RHS        

ThinkCentral/ Houghton Mifflin Harcourt/ Storytown

 ALL Elem. Weston District for Elementary

https://www-k6.thinkcentral.com/ePC/start.do

    Sharon [email protected]

ThinkCentral/ Houghton Mifflin Harcourt/ Storytown

 ALL Elem. Weston District for Elementary

https://www-k6.thinkcentral.com/ePC/start.do

     

Achieve 3000

RHS Weston RHS (SES)        

18

Page 19:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

Application Budgeted for: Manager Budget URL Hosted by

Us? Notes

Safari Montage

ALL Peterson School Sites

       

Learn 360 KHS Peterson Kayhi Library

       

ISucceed Math

HTE FME PHE

Worman Title I https://asp.isucceedmath.com/ak/ketchikan/?module=Auth&action=Logout

     

SmartBoard ALL Worman  Title II-A http://smarttech.com/us

     

The district annually surveys faculty to determine individual hardware and software training needs.

Strategy 1: Provide students with experience in using various technologies and other devices as tools to develop skills as defined by the district curriculum.

Action Steps:

Tasks Who Funding When Amount

Provide various applications for student to master to share their knowledge

Staff and through curriculum

District, grants

Annually following six year cycle for curriculum

Varied according to product license and time frame for license

19

Page 20:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

process

Develop a plan to efficiently replace all staff and student workstations, laptops and peripheral hardware as needed. By considering a replacement cycle to stabilize the budget)

Administration District Cycle through the levels every three to four years

Current estimates include $1,300. Per teacher station

Create a district level technology staff development position and continue to include the use of specialized consultants to deliver professional development.

DTC & Administration

District & grants

February 2012 budgeting cycle

$75,000. + Benefits for new Certified position and consultation runs from 2,000. to 9,000 depending on programand training topic

Desired Outcome: Students effectively using technology to increase academic and higher order thinking skills meet state content and performance standards and to make effective and innovative use of what they have learned.

Strategy 2: Expose students to a broad range of technology experiences.

Action Steps:

Task Who Funding When Amount

Provide opportunities for integrated use of technology in the classroom, using digital cameras, iPads, Smart Boards or similar tools

Staff & Administration

District & grants

Review and update annually through the curriculum process

2,000 – 5,000 per classroom device varies

20

Page 21:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

and web 2.0 resources

Integration and implementation of enhanced technologies in these subject areas will be implemented through ongoing training for staff and as new curricula and materials are selected for adoption in the district following the six-year cycle.

Curriculum Committee & Administration

District & grants

Six year cycle review includes Language Arts, Social Studies, Mathematics, Science, Art, Music, Physical Education & Health and Career & Technical programs

Each cycle has been between 350,000 – 400,000 annually

Social networking, web 2.0 and cloud computing for collaborating in group projects

Administration & Staff

District Annual review Varies dependent on software needs

Desired Outcome: Students will master a broad range of technology applications, tools, and skills and know how to choose which application is best for sharing their knowledge or solve problems.

Strategy 3: Provide students with ongoing experiences in developing problem solving skills, producing interpretations and/or simulations of subject matter and expressing their own creativity through technology.

Action Steps:

21

Page 22:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

Tasks Who Funding When Amount

Utilize and update software that promotes problem solving skills, simulations and creativity in alignment with the Alaska State Performance Standards (ASPS) and Grade Level Expectations (GLE).

Staff & Administration

District Annual review Varies dependent on software application

Provide opportunity to use technology to express ideas and exchange information in alignment with the Alaska State Performance Standards and GLE’s.

Staff & Administration

District Annual review N/A

Designate area of school at the secondary level for studio with equipment for student broadcasts, video presentations, and media productions.

Ketchikan High School

District & grants

Begin research 2012 with ongoing implement process

40,000

Desired Outcome: Students apply and utilize advanced software and multimedia technology to demonstrate individual understanding of academic concepts, creativity and communication on state performance standards.

Strategy 4: Technology will be used within discipline areas to assess and provide feedback on student progress.

Action Steps:

22

Page 23:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

Tasks Who Funding When Amount

Implement and monitor appropriate assessment and feedback systems currently in use, such as Compass Learning, Read 180, AIMS Web, Carnegie Math, Renaissance, and other assessment tools in coordination with district curriculum and policies, as well as ASPS and GLE.

Staff & Administration

District & grants

Annual review Varied dependent on license requirements and curriculum review

Academic progress and outcomes will be evaluated as to the effectiveness of technology through staff surveys, student input, longitudinal student performance data

Staff, Students and Admins

N/A Annual review following six-year curriculum cycle

N/A

Desired Outcome: A system providing immediate feedback and tracking of student progress using the student data management process currently Power School, AIMS web, SBA and HSGQE data analysis.

Strategy 5: Sustain a one-to-one laptop initiative, Ketchikan 21 st Century Learning Initiative (K21), which began with Schoenbar 7 th graders in 2008/2009 and currently includes 7-8 th graders.

Action Steps:

23

Page 24:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

Task Who Funding When Amount

Hold planning sessions throughout the year with involved building staff to continue to support the current one-to-one initiative.

7-8th grade teachers and administration

District & grants

Annually Sept and January

Estimate 150 laptops to be replaced 2012 and another 150 replacement 2013 at an estimated cost of 200,000

Provide staff development opportunities to continue to support the creation of technology rich experiences and lessons for students.

BTR, Staff and consultants

District budget and grants

Ongoing staff development and summer institutes

Annual staff development between 9,000 – 20,000 dependent on topic and presenter(s)

Budget funds to sustain the growth of K21. Admin District budget and grants

Annually Approximately every 3-4 years 200,000.

Desired Outcome: The progression of K21 is fully budgeted and smoothly implemented. The K21 Initiative will improve academic achievement.

Strategy 6: Develop a scope and sequence of technology skills, K-8, to prepare students to meet the state’s Technology Literacy expectations at grade 8.

Action Steps:

24

Page 25:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

Tasks Who Funding When Amount

Align ISTE NETs with KGBSD curriculum to develop a scope and sequence for introducing and integrating technology in the classroom.

Staffs, Administration and Curriculum Committee

N/A Following six year curriculum cycle:Science 2011-2012Art, Music, PE & Health 2012-2013Career & Technical 2013-2014Language Arts 2014-2015Social Studies 2015-2016Mathematics 2016-2017

N/A

Obtain School Board approval. Superintendent & School Board

N/A Tech Plan required revisions every three years, annual review as needed

N/A

Desired Outcome: Students will learn technology skills as they are integrated into their curriculum. Eighth grade students will meet Technology Literacy expectations.

Needs For Integrations Tool Who When Amount

Staff survey Google forms Certified Staff Bi-annually N/AStudents survey Google forms All 7-12 grade students Annually N/AAssessments data evaluations Norm referenced and

standardized measuresK-12 students Annually Varied dependent

upon assessment tool, testing budget in district

Alignment documents NETS/Curriculum

Such links as NCTM, NCTE, NSTE, etc.

All content curricular areas Annually following six-year curriculum process

N/A

8th Grade Literacy Assessment Atomic Learning All 8th grade students Annually Nov, 11 N/ATeacher Technology literacy Atomic Learning All certified staff Bi-Annually Nov 11 N/A

Tool to track teachers technology proficiencies

TBD All staff Bi-Annually N/A

Evaluation: Use of computer labs, mobile carts, mobile devices and equipment will be established and reviewed on a three-year cycle. Survey the staff and students to determine the level of integration of technology into the curriculum. Monitor progress of student learning with computer-assisted instruction. K21 Learning Initiative is funded and otherwise supported as the number of grade levels of participating

25

Page 26:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

students increases each year. KGBSD 8th graders will meet Technology Literacy expectations as determined by the assessment the district chooses. Student academic achievement will increase as determined by Adequate Yearly Progress, AK Standards Based Performance Assessment, AIMS Web data, Terra Nova, classroom observation and assessment, and software that monitors student progress.

7th graders take competency test (currently Atomic Learning) in November each year to drive instruction and integration for students to meet the 8th grade technology competencies aligned with NETS*S. 8th graders take competency assessment to show growth as well as to provide data for November’s State Report for technology skills mastery.

26

Page 27:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

NETS’S 8th grade scores 2010-2011 2011-2012 2012-2013 2013-2014

1. Creativity and Innovations % 70

2. Communications and Collaboration % 39

3, Research and Information Fluencies % 47.40

4. Critical Thinking, Problem Solving and Decision Making

% 57.70

5. Digital Citizenship % 55.10

6.Technology Operations and Concepts

% 46.80

The following will help track growth and additional training needs for staff. Starting in 2012, teachers will have mastered required components of PowerSchool, and be able to use other district wide services for student management.

NETS’T for Teachers 2011-2012 2012-2013 2013-2014

1. Facilitate and Inspire Student Learning and Creativity %

2. Design and Develop Digital-Age Learning Experiences and Assessments

%

3, Model Digital- Age Work and Learning %

4. Promote and Model Digital Citizenship and Responsibility %

5. Engage in Professional Growth and Leadership %

27

Page 28:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

Access

Goal VII: Cost effectively integrates appropriate new and emerging technologies into the classroom environment that is accessible to all students, faculty, parents and administration.

Background:Ketchikan Gateway Borough School District’s average level of free and reduced lunch accounts is 53% (2011-12 data analysis). Poverty levels are addressed in the following manner: Schools with poverty level above 35% receive additional assistance for struggling students or those not meeting proficiency level. The School Board goal is to have 80% of students reading at grade level by the end of third grade. The district is using numerous computer-assisted instructional programs, especially for Tier II and Tier III eligible students as well as numerous computer-assisted assessment programs, at each site meeting poverty levels. Additional computer assisted instructional program have been added as a part of the review of the student performance objectives that occurs annually following the six year cycle for curriculum review. As Computer Assisted Instruction is added extensive staff training has been and will be provided in stages.

As examples, the Ketchikan High School Science Department is in a partnership with the Globe worldwide weather project of Texas A & M and has the equipment to continue participation. The district uses the University of Alaska Southeast distance-learning technologies to allow Ketchikan High School Debate Team to compete with other debate teams in states across the Lower 48, as opportunities are available.

The Ketchikan Indian Corporation provides an adult literacy program in lieu of an Adult Education program once operated by SERRC. The district provides contact information for adult literacy, but KIC does an excellent job of disseminating brochures, pamphlets and information through print media, radio announcements and direct contacts with our high school counselors. Currently KIC and Community Connections provide their own programs. UAS-Ketchikan offers literacy assistance and assessment programs for beginning students and tutorial assistance as needed.

Internet access is available in all classrooms.

28

Page 29:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

Strategy 1: Provide staff with current technology tools, which allow increased technology integration into the classroom.

Action Steps:

Tasks Who Funding When Amount

Conduct a district-wide inventory of technology assets to provide information for the required statewide computer count as well as to plan for KGBSD.

Technology Department & Business Office

N/A Annual update N/A

Develop a plan and priority list for the equitable acquisition and distribution of additional hardware and software for use in the classroom

Administration District level and building site levels funds & grants

2012 February as a part of the budget process annually

TBD through the budget process

Utilize E-rate funds for the distribution of technology and support access for all schools and classrooms. Local and State Funds will be combined with and utilized for the acquisition of technology, including hardware, software and services to extend the use of technology.

Business Office and Technology Department

N/A Annual N/A

Maintain direct access to district email and Internet for every teacher and professional in the district.

Technology Department

Technology budget provided by district level budget

Annual, 2012 budget cycle in February and then ongoing annually

Upgrades as needed

29

Page 30:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

Numbers of computers/iPad/iPods/Smart Phones

Dept. of Ed (Chad Calhoon) will fill this in and send you a sheet ready to go, specifically for your district.

# Computers with connection: Instructional Computers for Student Use Computers include

laptops, iPads, Smart phones, iPods, or anything that provides software use via the Internet. Do not include printers or other peripherals. (Fill in with

actual numbers)

Type of connection at school: (Choose One) • None should be used for computers that are not connected to the Internet• Dial-up should be used for any dial-

up modems used for connection to the Internet

• Satellite should be used for any satellite relay connections to the

Internet• High Speed should be used for all

forms of fiber-optic broadband connections.

Broadband A-F a) 128 Kbs or less

b) 128 Kbs to 256 Kbsc) 256 Kbs to 1.5 Mbs

d) 1.5 Mbs (T-1)e) >T-1, but <T-3; or

f) >T3

SPEEDPlease use the

www.connectak.org during a high-use time to determine the speed

in each site.

District # District Name

School Number

School Name Desktop Laptop iPad Smart

Phone OtherNone

Dial-up Satellite High Speed Connectivity Upload Download Comments School

Year

25 KGBSD 250050 Fawn Mountain 176 30 High Speed e) >T-1, but <T-3; or 2198 705 2011

2012

25 KGBSD 250010 Houghtaling 110 11 High Speed e) >T-1, but <T-3; or 2655 4493 2011 2012

25 KGBSD 259010 KCS 30 130 High Speed e) >T-1, but <T-3; or 222 2372 2011 2012

25 KGBSD 250020 Ketchikan HS 252 100 60 High Speed e) >T-1, but <T-3; or 4178 3810 2011

2012

25 KGBSD 257050 KRYF 5 5 High Speed e) >T-1, but <T-3; or 7342 6139 2011 2012

25 KGBSD 250100 Point Higgins 102 High Speed e) >T-1, but <T-3; or 1776 2027 2011 2012

25 KGBSD 257010 Revilla 45 36 High Speed e) >T-1, but <T-3; or 7342 6139 2011 2012

25 KGBSD 250040 Schoenbar 61 350 High Speed e) >T-1, but <T-3; or 8713 7833 2011 2012

25 KGBSD 259020 Tongass 63. High Speed e) >T-1, but <T-3; or 1461 2521 2011 2012

Desired Outcome: Increased availability of instructional technology to the classroom teachers and students or students with population-specific needs, such as high poverty.

Strategy 2: Support school library media centers within schools as a focal point for access to electronic resources.

Action Steps:

30

Page 31:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

1. Provide appropriate staffing for library/media centers.2. Continue participation in the First City Library Consortium, as funds are available. This consortium involves the school district, the

local UAS campus and the City of Ketchikan libraries in a cooperative effort with the ability to share collections and resources.3. Sustain media mini lab with computers and multimedia equipment in each library, as funds are available.

Desired Outcome: Ability to access and utilize information and communication services in each building. Teachers and students have the needed network and Internet connectivity and tools required to accomplish assigned tasks.

Evaluation: Review needs assessment survey and usage of technology that matches the current district curriculum.

31

Page 32:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

Goal VIII: Continue to upgrade existing wide area and building networks to allow for increased access to Internet and other technology resources.

Background:Currently KGBSD is utilizing Astaro Gateway 425 as firewall, Total Traffic Control from Lightspeed Systems for content filter, and evaluating a Bluecoat Product package for Packet Filtration and Proxy services. Email spam and virus scanning is handled by an IronPort email gateway. For Virus protection we use SOPHOS Endpoint Security. Internet and email policies have been established and implemented. District policies are attached.

Strategy 1: Provide ongoing upgrades of the district networks using current cost effective technology that provides adequate service and security.

Action Steps:1. Annually, before E-Rate Form 470 is completed, survey status of current network and infrastructure to determine needs and develop

priority list2. Maintain service and software to provide compliance with the Child Internet Protection Act.3. Utilize E-Rate funding for the acquisition of equipment, services and bandwidth to maintain and improve network connectivity,

including wireless network.4. Provide a safe online experience for all students and staff through the use of filtering, spam and intrusion detection software, in

compliance with CIPA. 5. Upgrade high priority areas that address needs as identified in Action Step 1.6. Improve and replace network wiring to classrooms having an inadequate number of connections.

Desired Outcome: A stronger, more robust and secure wide area network that meets current and projected needs of the district. Secure, dependable and seamless wireless networks for each school building. Bandwidth, which allows the increase of integrating technology in district classrooms.

Evaluation: Maintain records on up time and bandwidth usage for the district network and review annually. Schools are able to access district network and Internet as necessary for desired modern technology integration as determined by annual needs assessment survey.

32

Page 33:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

Goal IX: Involve parents in use of technology in the classroom/district.

Strategy 1: Provide parent training on technology resources available for community use through the district network.

Action Steps:1. Define areas of Power School to be opened for parental access, thereby increasing parental involvement and access to information.2. Publicize and encourage the use of online student management and grade information through Power School.3. Define and optimize use of available software, such as Flash Alert, Compass Learning, and Atomic Learning for parental access.

Desired Outcome: Increased parent involvement in their children’s education through access to online applications.

Strategy 2: Encourage community, businesses and higher education to support technology in schools.

Action Steps:1. Continue to explore and apply for grants. 2. Contract with a grant writer to obtain new funding for technology and other initiatives that support the goals and mission of the

district.3. Develop relationships/partnerships with local businesses in support of technology in the schools.

Desired Outcome: Involvement of school/business community partnership through financial, equipment and training support of new technologies.

Strategy 3: Provide more accessible contact with staff members.

Action Steps:1. Make email contact available via KGBSD Website.2. Provide key staff members with cell phones.

Desired Outcome: Parents, students, and community members enjoy easier access to district staff members.

Evaluation: Review logs of parent logins and usage of parent-accessible systems (Power School, Compass Learning, Atomic Learning) on an annual basis. Feedback from parents, students, and community members indicate satisfaction with communication with key district staff members.

33

Page 34:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

Goal X: Expand virtual school.

Background: The Ketchikan Gateway Borough School District believes that a true student-oriented, quality education may be delivered to any child, one at a time, regardless of their physical location. The use of technology causes this belief to become a reality through correspondence-style, Internet-based teaching which is individually and personally delivered. Statistics have shown that the percentage of students participating in online-learning increases each year, and predictions are made that this trend will continue. Virtual schools prepare students with skills identified as necessary for success in the 21st Century by the Partnership for 21st Century Skills (http://www.21stcenturyskills.org/route21/): Global Awareness, Self-Directed Learning, Information and Communications Technology Literacy, Problem Solving, and Time Management and Personal Responsibility. KGBSD desires to expand a blended environment of face-to-face and online-learning to meet the individual needs of our students and prepare them with 21st Century skills.

Strategy 1: Expand the needs and resources necessary for a virtual school to include asynchronous and synchronous services to meet individual needs of students.

Action Steps:

Task Who Funding When Amount

Survey stakeholders Virtual School District Summer 2012 & annual review 200.

Reconstruct a plan to meet the needs and secure the resources for the virtual school.

Administration & Participants

District & Grants

Summer 2012 & annual review 600.

Desired Outcome: Awareness of the necessary needs to be meet the individual needs of students and resources to be secured based on a wide variety of content.

Strategy 2: Expand a strategic plan for delivery of online education.

34

Page 35:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

Action Steps:

Task Who Funding When Amount

Implement a course management system including a more robust and user friendly course content delivery system, on line collaboration and/or district developed course content

Administration District Summer 2012 & annual review

3,000 annually

Review best practices for course development and implementation

Administration District Summer 2012 & annual review

10,000

Design a professional development strategy for online instruction of 21st Century skills.

Administration Grant Summer 2012 & annual review

5,000.

Desired Outcome: Implementation of the expansion of the virtual school will increase the service level to include an increase of 10% students

Strategy 3: Graduate, retain and initiate participating students, teachers, and an administrator to staff the virtual school.

35

Page 36:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

Action Steps:

Task Who Funding When Amount

Use a variety of methods to seek students for enrollment.

Administration District Ongoing 20,000. That includes summer enrollment

Maintain an administrator and secure support staff to assist with enrollment, registration and other school functions.

District District Ongoing 45,000.

Recruit and train staff and secure location Administration District Match 2012 & ongoing

120,000. or two FTE annually

Desired Outcome: Student population stability and increased participation through a variety collaborations with highly qualified and stable staffing.

Strategy 4: Evaluate the effectiveness of the virtual school.

36

Page 37:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

Action Steps:

Task Who Funding When Amount

Monitor/determine the cost-effectiveness of the program based on maintenance of effort and graduation rates.

Principal District Ongoing N/A

Assess student performance data for achievement increase/proficiency.

Principal /Staff District Ongoing N/A

Students sustain enrollment and complete course work as planned. Administration District Ongoing N/A

Desired Outcome: A determination of the effectiveness of the virtual school both cost-effectively and through student achievement.

Evaluation: The virtual school is cost effective and promotes students to be proficient or better on the Alaska Standards Based Performance Assessment, or HSGQE or any other state mandated assessments.

37

Page 38:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

Goal XI: Establish a process for technical support, maintenance, upgrade and replacement of equipment.

Background: E-rate funds are used on eligible technical support, maintenance, and equipment.

Strategy 1: Provide routine computer equipment cleaning and preventative maintenance on-site, and manage off-site repairs through contracts as needed.

Action Steps:1. Establish annual maintenance schedule and calendar.

Desired Outcome: Maximize hardware use with preventative maintenance schedule.

Strategy 2: Provide professional development for basic preventative maintenance , as funds are available.

Action Steps:1. Establish schedule for training Building Technology Representatives.2. Building Tech Reps share information with building staff.3. Provide technology representatives time to share problem-solving strategies at monthly DTC meetings.

Desired Outcome: Building Technology Representatives are able to perform basic preventative maintenance services.

38

Page 39:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

Strategy 3: Computer services will provide technical support for networking, difficult installation, troubleshooting, and other issues.

Action Steps:1. The IT Request system will be utilized for requesting technology support.2. Expand Student Tech Aide program.3. Curriculum and system software will be installed on file servers when appropriate and maintained by district technicians, including

routine backups of all file serves in K-12 offices.4. Network and operating system software will be reviewed annually on efficiency and capability by the Technology Department.5. Guidelines for technology and courseware upgrade and the district technicians in conjunction will determine replacement with the

District Technology Committee and administration.6. Provide technical support for the First City Consortium of Libraries.

Desired Outcome: Support from Computer Services is prioritized.

Strategy 4: Computer equipment and other technologies will be upgraded when the cost is feasible compared to the cost for additional repair for another year’s use.

Action Steps:1. Equipment will be repaired, replaced, or upgraded depending on cost effectiveness.2. Annually review building inventories of technology hardware.

Desired Outcome: Keep computer equipment in working order through upgrading or reasonable repair costs.

39

Page 40:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

Strategy 5: Technology replacement will occur according to a developed timeline and recommendations from Computer Services and the District Technology Committee.

Background:When new hardware and software is purchased, every effort is made to purchase the most current technology affordable. The Technology Department maintains a standard of minimum requirements for hardware that connects to the district network to ensure interoperability. The district has established a three-year replacement plan for teacher workstations and computers for school labs as follows:

Years Location and Hardware

2009-2010 Replace Schoenbar Middle School teacher stations2011-2012 Replace elementary teacher stations2012-2013 Replace computers in labs in Ketchikan High School 2012-2013 Replace computers in Schoenbar labs 2010-2011 Replace Pt. Higgins & Houghtaling teacher stations6 year cycle Replace Ketchikan High School labs and teachers stations:

Lang. Arts & Foreign Language 2014-2015Social Studies 2015-2016Mathematics 2016-2017Science 2011-2012Art, Music, Physical Education & Health 2012-2013Career & Technical 2013-2014

2011-2012 Replace all elementary teacher stations 2012-2013 Replace Schoenbar & Revilla teacher stations

Action Steps:1. Software will be upgraded/replaced according to instructional/administrative needs as funding becomes available.2. Network and operating system software will be upgraded/replaced as determined by recommendations of Computer Services, the

District Technology Committee, and Administration.

Desired Outcome: A developed plan for replacement and upgrading of software and hardware.

Evaluation: Review of actual developed plan for upgrade/replacement of software and hardware.

40

Page 41:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

Professional Development

Goal XII: Provide ongoing technical professional development for classroom teachers, staff and administrators, as funding is available.

Strategy 1: Maintain person(s) responsible for technology staff development opportunities to meet needs of staff that are routine, frequent and ongoing.

Actions Steps:1. Building Technology Representatives and Administration will recommend staff development needs.2. Develop and maintain a list of currently trained staff/students with schedule of specialty and availability.3. Technology Representatives for each building are to receive intensive training in technology used in the district, as funds become

available. The Tech Representatives will then facilitate and advocate training and support, as well as provide suggestions for the rest of the staff.

4. Provide follow-up training for Building Technology Representatives.5. Provide release time for District Technology Committee members to help plan technology implementation and evaluation if funds are

available.6. Provide opportunity for teachers to share and observe the use of technology in the classroom.7. Provide summer technology training for technology representatives with stipends, if funds are available.

Desired Outcome: Staff development training is supported, well planned and presented in accordance with the needs of the staff.

41

Page 42:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

Strategy 2: Provide specific staff development opportunities for departments or grade levels with recently added technology.

Background:Professional Development topics are generated from building level technology committees, the district staff development committee, and the annual Technology Needs Assessment Survey. Technology staff development has been provided via In-service Days with such workshops as PowerGrade, Compass Learning, Read 180, media usage with peripherals and digital cameras, Microsoft Office, troubleshooting, integrating technology into the elementary classroom, and Filemaker Pro. Professional Development weekend classes have been offered on the topics of iPhoto, iMovie, PowerPoint, and Creating Classroom Webpages. Small group, one-on-one, and after school training has been provided on many and various topics suggested by staff members requesting the training or the Technology Staff Development Coordinator. Professional Development via model teaching methods has been provided on various district software programs. The Technology Staff Development Coordinator’s District Webpage provides online training opportunities. For some daylong training, substitute teachers are provided.

Software integration to meet Alaska Performance Standards for Language Arts includes Scholastic Wiggle Works, Accelerated Reader, Read 180, Inspiration, Kidspiration, Compass Learning, and All the Right Type, as well as a wide variety of individual programs emphasizing practice activities that enhance learning.

Software integration to meet Alaska Performance Standards for mathematics includes Accelerated Math, Math Facts in a Flash, Carnegie, and Compass Learning, as well as a variety of individual practice activities that enhance learning.

Most content area instructional materials come with assessment packages and lab project or simulation software. Nearly all also provide Website connections.

As new software is acquired, professional development opportunities are offered. The district also offers professional development opportunities to integrate technology in content areas on the same 6-year schedule as curriculum is reviewed and revised.

Special projects incorporating technology are available periodically, such as the GLOBE weather station project, which is worldwide. National and international projects are often used in the classroom setting.

Every classroom in the district has Internet access. Individual hardware access ranges from 1:1 in lab settings and the school implementing the 1:1 initiative to 1:15 in classrooms. The district average is 1:2. Each school library is equipped with hardware and Internet access. Every teacher and paraprofessional in the district has direct access to the Internet and e-mail.

The Ketchikan School District will be implementing new Language Arts materials in the 2009-2010 school year, and will receive instruction to integrate the technology component into the curriculum on (need specific in-service day here).  In October 2009, a class focusing on using Excel in Mathematics instruction will be offered.  In February 2010, a class focusing on the creation of digital videos and integrating the process in Science and Social Studies instruction will be offered.

42

Page 43:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

KGBSD implemented the new Social Studies curriculum in the 2010-2011 school year and received instruction to integrate the technology component into the curriculum on a fall in-service day.  A class or in-service focusing on integrating interactive whiteboards into social studies instruction was held in October 2010.  A class or in-service focusing on integrating iPhoto into Language Arts instruction was held in February 2011.

KGBSD will be implementing new Math curriculum in the 2011-2012 school year and will receive instruction to integrate the technology component into the curriculum on a fall in-service day.  A class or in-service focusing on integrating student response systems in Mathematics instruction will be offered in October 2011.  A class or in-service focusing on integrating Inspiration and Kidspiration in Language Arts instruction will be held in February 2012.

Action Steps:1. Determine professional development needs via annual technology needs assessment survey2. Provide planning/hands-on time for staff to become familiar with/incorporate technology into the curriculum.3. Provide professional development opportunities as needed (on-going and continuing vs. “one shot” training).4. Continue technology-training days for new district employees before the beginning of the year to give them opportunity to learn of

technology software and hardware available to integrate technology into their classrooms.

Desired Outcome: Staff fully utilizes and applies current, available technology in the curriculum and classroom.

43

Page 44:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

Strategy 3: Develop a system of information flow that aids all faculty, students and administration in keeping abreast of new developments in technology.

Action Steps:1. Subscribe to periodicals, which inform of new technologies, applications, and integration ideas for DTC, department heads, and other

staff, as funds are available.2. Continue updating the Technology Integration Support Webpage on the district Website.3. Continue use of digital media for bulletins, notices, and school and district news.4. Make “What’s New in Technology” bulletin board for students/staff (both posted and electronic).5. Review and apply relevant research in the development of standards and curricula. 6. Encourage staff membership in organizations such as the International Society for Technology in Education, Northwest Council for

Computers in Education and Alaska Society for Technology in Education.7. Continue distributing Tech Tips for Teachers8. Continue to encourage the use of Atomic Learning by staff, students, and parents during the 3-year period funded by a FRED grant.

Desired Outcome: Knowledgeable and informed students, staff and community that support the acquisition, implementation and maintenance of new technologies.

Strategy 4: Support and encourage staff to do annual visits to see new technologies.

Action Steps:1. Obtain release time for staff to observe the integration of technology into curriculum.2. Make information on meetings, seminars and visits readily available.3. Include report of staff visits/evaluation to staff, administration, and the School Board as appropriate.

Desired Outcome: A well-informed, updated staff that is aware of new and/or applicable technologies.

Evaluation: Records of staff development evaluations and training sessions are maintained and reviewed.

44

Page 45:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

Participants in the Development of the Ketchikan Gateway Borough School District Educational Technology Plan 2012-2014

Chasina Worman, Technology Student Management Coordinator

Linda Hardin, Curriculum Director, School District

Jurgen Johannsen, Technology Supervisor, School District

Barbara Roberts, Principal, Fawn Mountain Elementary School

Sheri Boehlert, Principal, Point Higgins Elementary School

Bill Whicker, Principal Fast Track, Technology Coordinator

David Timmermann, School Board Member

Gary Boatwright, Technology Representative, Ketchikan High School

Jamie Elkins, Technology Representative, Revilla Alternative School

Chad Frey, Technology Representative, Schoenbar Middle School

Cindy Kloxin, Technology Representative, Houghtaling Elementary School

Carrie Fousel, Technology Representative, Point Higgins Elementary School

Melissa Klepser, Technology Representative, Fawn Mountain Elementary School

Julie Cron, Technology Representative, Ketchikan Charter School

Katie Gaggini, Technology Representative, Tongass School of Arts and Sciences

Jens Christianson, Junior Student, Ketchikan High School

Special Consultation with Cheryl Bobo, ITech

45

Page 46:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

Timeline for the Implementation of the KGBSD Educational Technology Plan

2011-2012 Task Who is responsible?

August ● DTC reviews Tech Plan● New Employee Technology Training● K21 meeting with Schoenbar staff● Inventory technology assets (software and hardware)● Determine guidelines for district software and hardware purchases● Building Tech Rep training● Professional Development during in-service days based upon last year’s Tech Needs Assessment Survey● Professional Development during in-service on integrating the technology component of the new Language

Arts curriculum into instruction

September ● Enlist student and community members for District Tech Committee● Parent training on use of PowerSchool, Compass Learning, Atomic Learning, and Flash Alert● Submit computer count to State

October ● DTC reviews Tech Plan and considers revisions for BIA● Annual Technology Needs Assessment Survey district-wide; plan professional development opportunities for

small group or building-level workshops for this year● Weekend Professional Development Class, focusing on using Excel in Mathematics instruction

November ● Submit Budget Inventory Analysis

December ● Review of Tech Plan in consideration of E-Rate Form 470 application

January ● Prepare next year’s budget with consideration for classroom equipment, technology department budget● K21 meeting with Schoenbar staff

February ● Weekend Professional Development Class, focusing on the creation of digital videos and integrating the process in Science and Social Studies instruction

● Prepare next year’s budget with consideration for classroom equipment, technology department budget, new positions for technology staff development, student data management, technicians

● Attend state and regional technology conferences as funding is available

46

Page 47:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

March ● Submit budget

April ● DTC reviews Tech Plan and considers necessary revision● Determine stipends and release time for next year’s Building Tech Reps

May ● Establish Building Tech Reps for next year● Evaluate student academic achievement progress● Determine where technology has been successfully incorporated into the curriculum.

June ● Review sets of student/administration applications● Annual maintenance of student and staff computers● Review and update job descriptions for technology staff

July ● Assess status of current network and infrastructure● Annual maintenance of student and staff computers● Acquire equipment and software for next year

Ongoing ● Building-level Technology Committee meetings as determined by buildings● District Technology Committee meetings monthly● Professional development opportunities for one-on-one, small group or building-level workshops as need is

discovered● Building Tech Rep training as funding becomes available● Integration of technology into curriculum planning● Integration of technology into classroom practices● Monitor academic achievement via computer-assisted assessment and feedback applications● Professional Development opportunities as need is identified in K21 environment● Compliance with Child Internet Protection Act● Seek and apply for grants which will enhance technology integration in the school district● Develop relationships/partnerships with local businesses● Technical support for First City Consortium of Libraries● Receive suggestions from Building Tech Reps for improving technology integration into the classrooms● Teacher observations of technology integration● Update Tech Integration Support Webpage and bulletin board● Distribute Tech Tips

47

Page 48:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

2012-2013 Task Who is responsible?

August ● DTC reviews Tech Plan● New Employee Technology Training● K21 meeting with Schoenbar staff● Inventory technology assets (software and hardware)● Determine guidelines for district software and hardware purchases● Building Tech Rep training● Professional Development during in-service days based upon last year’s Tech Needs Assessment Survey● Professional Development during in-service on integrating the technology component of the new Social

Studies curriculum into instruction●

September ● Enlist student and community members for District Tech Committee● Parent training on use of PowerSchool, Compass Learning, Atomic Learning, and Flash Alert

October ● DTC reviews Tech Plan and considers revisions for BIA● Annual Technology Needs Assessment Survey district-wide; plan professional development opportunities for

small group or building-level workshops for this year● Weekend Professional Development Class, focusing on integrating interactive whiteboards into social studies

instruction

November ● Submit BIA

December ● Review of Tech Plan in consideration of E-Rate Form 470 application

January ● Prepare next year’s budget with consideration for classroom equipment, technology department budget● K21 meeting with Schoenbar staff

February ● Weekend Professional Development Class, focusing on integrating iPhoto into Language Arts instruction● Prepare next year’s budget with consideration for classroom equipment, technology department budget, new

positions for technology staff development, student data management, technicians● Attend state and regional technology conferences as funding is available

March ● Submit budget

48

Page 49:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

April ● DTC reviews Tech Plan and considers necessary revision● Determine stipends and release time for next year’s Building Tech Reps

May ● Establish Building Tech Reps for next year● Evaluate student academic achievement progress● Determine where technology has been successfully incorporated into the curriculum.

June ● Review sets of student/administration applications● Annual maintenance of student and staff computers● Review and update job descriptions for technology staff

July ● Assess status of current network and infrastructure● Annual maintenance of student and staff computers● Acquire equipment and software for next year

Ongoing ● Building-level Technology Committee meetings as determined by buildings● District Technology Committee meetings monthly● Professional development opportunities for one-on-one, small group or building-level workshops as need is

discovered● Building Tech Rep training as funding becomes available● Integration of technology into curriculum planning● Integration of technology into classroom practices● Monitor academic achievement via computer-assisted assessment and feedback applications● Professional Development opportunities as need is identified in K21 environment● Compliance with Child Internet Protection Act● Seek and apply for grants which will enhance technology integration in the school district● Develop relationships/partnerships with local businesses● Technical support for First City Consortium of Libraries● Receive suggestions from Building Tech Reps for improving technology integration into the classrooms● Teacher observations of technology integration● Update Tech Integration Support Webpage and bulletin board● Distribute Tech Tips

49

Page 50:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

2013-2014 Task Who is responsible?

August ● DTC reviews Tech Plan● New Employee Technology Training● K21 meeting with Schoenbar staff● Inventory technology assets (software and hardware)● Determine guidelines for district software and hardware purchases● Building Tech Rep training● Professional Development during in-service days based upon last year’s Tech Needs Assessment Survey● Professional Development during in-service on integrating the technology component of the new Math

curriculum into instruction

September ● Enlist student and community members for District Tech Committee● Parent training on use of PowerSchool, Compass Learning, Atomic Learning, and Flash Alert

October ● DTC reviews Tech Plan and considers revisions for BIA● Annual Technology Needs Assessment Survey district-wide; plan professional development opportunities for

small group or building-level workshops for this year● Weekend Professional Development Class, focusing on integrating student response systems in mathematics

instruction

November ● Submit BIA

December ● Review of Tech Plan in consideration of E-Rate Form 470 application

January ● Prepare next year’s budget with consideration for classroom equipment, technology department budget● K21 meeting with Schoenbar staff

February ● Weekend Professional Development Class, focusing on integrating Inspiration and Kidspiration in Language Arts instruction

● Prepare next year’s budget with consideration for classroom equipment, technology department budget, new positions for technology staff development, student data management, technicians

● Attend state and regional technology conferences as funding is available

March ● Submit budget

50

Page 51:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

April ● DTC reviews Tech Plan and considers necessary revision● Determine stipends and release time for next year’s Building Tech Reps

May ● Establish Building Tech Reps for next year● Evaluate student academic achievement progress● Determine where technology has been successfully incorporated into the curriculum.

June ● Review sets of student/administration applications● Annual maintenance of student and staff computers● Review and update job descriptions for technology staff

July ● Assess status of current network and infrastructure● Annual maintenance of student and staff computers● Acquire equipment and software for next year

Ongoing ● Building-level Technology Committee meetings as determined by buildings● District Technology Committee meetings monthly● Professional development opportunities for one-on-one, small group or building-level workshops as need is

discovered● Building Tech Rep training as funding becomes available● Integration of technology into curriculum planning● Integration of technology into classroom practices● Monitor academic achievement via computer-assisted assessment and feedback applications● Professional Development opportunities as need is identified in K21 environment● Compliance with Child Internet Protection Act● Seek and apply for grants which will enhance technology integration in the school district● Develop relationships/partnerships with local businesses● Technical support for First City Consortium of Libraries● Receive suggestions from Building Tech Reps for improving technology integration into the classrooms● Teacher observations of technology integration● Update Tech Integration Support Webpage and bulletin board● Distribute Tech Tips

51

Page 52:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

Hardware and Network Timeline

The following timeline is in anticipation of district technological needs and will be revised as necessary.

Summer 2009

Image and deploy OS + Software to student workstations.Migrate to new WEB SERVER solutionOD integration for SMS + KHSMigrate RHS Switch rack locationRelocate Library ServerDecommission City Hall location

Wireless survey HTEUPS installationServer room switch arrangement upgradeEmail Server enhancementSMS OD Server installation

2009-2010

Email archive upgradeEmail backup upgradeVM Server installationAD upgrade8th grade 1to1 rolloutSNMP monitoring server migrationComputer Services workstation upgradesUPS maintenance program

VM migrationsKey Management ServerDual DHCP ServersIndependent Print Server solutionEvaluate alternative email archive solution

52

Page 53:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

Summer 2010

Image all Student WorkstationsEvaluate necessary hardware requirement alterations.Evaluate MS Office alternativeEvaluate Collaboration software alternative

KHS Mac OD ServerMigration to SANWiring PHE for additionsAC district switch closets

2010-2011

KHS 9th Grade 1to1 rolloutIncrease switch capacity HTE and PHEVM Server installationMigrate away from AlphaprimeAD upgrade

Increase School switch capacity KCS and TSAS

Summer 2011

Raise Hardware floorImage Student Workstations

VM Server installationAD upgradeOD upgrade

53

Page 54:  · Web viewGoal IX Involve Parents 33 Goal X Support Fast Track Virtual School 34 Goal XI Technology Support Service Process 38 Goal XII Professional Development 41 Participants

Ketchikan Gateway Borough SchoolsTechnology Plan 2012-2015

Appendix Budget/Inventory Analysis, Fall 2011

Board Policy 5139 – Internet Safety Policy

Board Policy 6161.4(a) – Internet Acceptable Use Policy

54