Profiles of Khmelnitsky region investment proposals Khmelnytskyi Section Commentary Name of offer Reconstruction of medical pavilion of Chaika Children's Holiday Camp in Holovchyntsi village of Letychiv district of Khmelnytskyi region Investment offer description and goal Reconstruction of medical pavilion of Chaika Holiday Camp in retaining the institution profile, possible creation of a rehabilitation center for handicapped people Type of economic activity to implement investment project Construction Form of cooperation Transfer of premises on the basis of private and state partnership, co-financing Project total value, thousand USD 112,5 Investment demand, thousand USD (%) 90% Form of ownership; share in state property Property of territorial group of Khmelnytskyi city Resources provision - total area of land ground – 0.8 hectares - total area of the building – 673.3 sq. m - distance to Khmelnytskyi – 45 km - E50 highway at road sector Khmelnytskyi – Vinnytsia - 5 km - location in recreational zone 2 deposits and water towers available on the territory Investment offer Investment offer

Upload: others

Post on 28-Nov-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Profiles of Khmelnitsky region investment proposals

KhmelnytskyiSection Commentary

Name of offer Reconstruction of medical pavilion of Chaika Children's Holiday Camp in Holovchyntsi village of Letychiv district of Khmelnytskyi region

Investment offer description and goal

Reconstruction of medical pavilion of Chaika Holiday Camp in retaining the institution profile, possible creation of a rehabilitation center for handicapped people

Type of economic activity to implement investment project

Construction

Form of cooperation Transfer of premises on the basis of private and state partnership, co-financing

Project total value, thousand USD 112,5Investment demand, thousand USD (%)

90%

Form of ownership; share in state property

Property of territorial group of Khmelnytskyi city

Resources provision - total area of land ground – 0.8 hectares- total area of the building – 673.3 sq. m- distance to Khmelnytskyi – 45 km- E50 highway at road sector Khmelnytskyi –

Vinnytsia - 5 km- location in recreational zone

2 deposits and water towers available on the territory

Investment offer completion level Investment offerEssential elements of the enterprise (organization)

Department of Education of Khmelnytskyi City Council53, Hrushevskyi Str., Khmelnytskyi, 29000Tel.: +38 (0382) 79-47-55e-mail: [email protected]

Initiator contact details Head of departmentTel.: +38 (0382) 79-47-55e-mail: [email protected]

Page 2: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of offer Construction of Palace of Sport in 5/1,

Prybuzka Str. in KhmelnytskyiInvestment offer description and goal

Construction of sports and recreation complex with areas: sports pavilion with bleachers for 2000 lookers of size 44x26 m, sports pavilion (24x12 m), sports pavilion (18x12 m), football field, 2 playgrounds for hand ball, 2 playgrounds for basketball, playground for volleyball, race track of length 1000 m, 4 tennis courts

Type of economic activity to implement investment project

Construction

Form of cooperation ConcessionProject total value, thousand USD 8750,0Investment demand, thousand USD (%)

40%

Form of ownership; share in state property

Property of territorial group of Khmelnytskyi city

Resources provision Land groundInvestment offer completion level Readiness of working project – 50%Essential elements of the enterprise (organization)

Department of Architecture, City Construction and Land Resources of Khmelnytskyi City Council10/1, Podilska Str., Khmelnytskyi, 29013 Tel.: +38 (0382) 76-43-00e-mail: [email protected]

Initiator contact details Director of departmentTel.: +38 (0382) 76-43-00e-mail: [email protected]

Page 3: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of offer Introduction of collection and utilization system

for solid propellant wastes in Khmelnytskyi, withdrawal of biogas and recultivation of acting garbage dump

Investment offer description and goal

Construction of garbage sorting (recycling) plant in Khmelnytskyi, introduction of garbage distributed collection system, recultivation of acting solid propellant wastes ground

Type of economic activity to implement investment project

Construction, modernization

Form of cooperation Lease, creation of joint enterprise on the basis of private-state partnership

Project total value, thousand USD Defined by investorInvestment demand, thousand USD (%)

Defined by investor

Form of ownership; share in state property

Property of territorial group of Khmelnytskyi city

Resources provision Right to use 16 hectares of land (8 hectares under acting garbage dump)

Investment offer completion level Investment offerEssential elements of the enterprise(organization)

Spetskomuntrans City Communal Enterprise 1, Tolstoi Str, Khmelnytskyi, 29000Tel.: +38 (03822) 2-13-94e-mail: [email protected]

Initiator contact details Fedoshchuk Anton StanislavovychTel.: +38 (03822) 2-13-94e-mail: [email protected]

Page 4: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of offer Construction of underground passage complex

at the crossing of Mir Avenue, Svobody Str. and Panas Myrnyi Str.

Investment offer description and goal

Underground passage complex provides a network of corridor communications adjoining the commercial premises. The underground passages link the crossings of Svobody, P. Myrnyi streets and Myru Avenue. It provides direct connection of underground parking, trade and public complex, roofed market and opposite sides of mentioned above streets.

Type of economic activity to implement investment project

Construction

Form of cooperation Land ground is given on the basis of superficies agreement

Project total value, thousand USD Defined by investorInvestment demand, thousand USD (%)

Defined by investor

Form of ownership; share in stateproperty

Property of territorial group of Khmelnytskyi city

Resources provision Total complex area – 5019 sq. m including:- commercial premises – 2156.4 sq. m- corridors – 1629.6 sq. m- engineering and utility services rooms – 179.7 sq.

m- parking – 1052 sq. m

Ceiling height of commercial premises – 3.6 m, corridors – 2.5 m Total structural volume of the complex – 19575 cubic m

Investment offer completion level Investment offerEssential elements of the enterprise (organization)

Department of Architecture, City Construction and Land Resourcesof Khmelnytskyi City Council10/1, Podilska Str., Khmelnytskyi, 29013 Tel.: +38 (0382) 76-43-00e-mail: [email protected]

Initiator contact details Director of departmentTel.: (0382) 76 43-00 e-mail: [email protected]

Page 5: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of offer Reconstruction of the Taras Shevchenko

cinema in Palace of Culture and cinema and construction of non-residential premises in the underground of the cinema

Investment offer description and goal

Reconstruction of the Taras Shevchenko cinema on Proskurivska Str, 40 in Palace of Culture and cinema and simultaneous construction on its base of new areas

Type of economic activity to implement investment project

Reconstruction

Form of cooperation Land ground is given on the basis of superficies agreement. Built facilities in theater with area of 2000 square meters become the property of investor.

Project total value, thousand USD 5000Investment demand, thousand USD (%)

5000

Form of ownership; share in stateproperty

Property of territorial group of Khmelnytskyi city

Resources provision  -Investment offer completion level Investment offerEssential elements of the enterprise(organization)

Department of Culture and Tourism of Khmelnytsky City Council29000, Khmelnytskyi,Proskurivska Str, 30

Initiator contact details Head of Departmenttel. (0382) 65-85-35e-mail: [email protected]

Page 6: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Kamyanets-PodilskyiSection Commentary

Name of offer Reconstruction of integral property complex of the former tobacco factory (3, Krypiakevych Str, Kamyanets-Podilskyi) for an industrial enterprise of food sector

Investment offer description and goal

Reconstruction of integral property complex of the former tobacco factory for an industrial enterprise of food sector (as an offer - confectionery plant).

Type of economic activity to implement investment project

Industry (production of foodstuffs, drinks, and tobacco products)

Form of cooperation - sale of proprietary interest- establishment of coproduction

Project total value, thousand USD 20 000Investment demand, thousand USD (%)

100%

Form of ownership; share in stateproperty

Private - 100%

Resources provision Land ground – 5.8 hectaresNumber of buildings and constructions – 14 units:- permanent accommodation and offices – 2 997 sq. m

- manufacturing and storage facility – 13 244 sq. m- storehouse facilities – 9 616 sq. m

garages – 579 sq. m - Water supply- Power supply - Heating supply

Investment offer completion level Developed concept of investment projectEssential elements of the enterprise (organization)

Contact trough the Department of Economy and Infrastructure Development of the city

Initiator contact details Director of the Department of Economy and Infrastructure Development of the city tel. (03849) 5-07-05

Page 7: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of offer Establishment of a plant for rape seed

processing into biodiesel fuel on the base of Kamyanets-Podilskyi Sugar Mill

Investment offer description and goal

Establishment of an object for oil processing into biodiesel fuel of capacity 75 thousand ton for us in Ukraine and export to EU countries. Mastering of rape oil production. Growing rape on the territory of Khmelnytskyi and Chernivtsi Regions

Type of economic activity to implement investment project

Industry (mining of fuel and energy mineral resources)

Form of cooperation - sale of proprietary interest- establishment of coproduction

Project total value, thousand USD 61 000Investment demand, thousand USD (%)

100%

Form of ownership; share in stateproperty

Private - 100%

Resources provision Ground area – 1.09 hectaresWater supply:Central water supply line from Dniester water passage - ø150 mm Heating supply:Central heating supply from the town thermal power stationAccess communications – town belt-way, rail way track adjoining the territory

Investment offer completion level Developed concept of investment projectEssential elements of the enterprise (organization)

Contact trough the Department of Economy and Infrastructure Development of the city

Initiator contact details Director of the Department of Economy and Infrastructure Development of the city tel. (03849) 5-07-05

Page 8: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of offer Establishment of intake and recycling system of

solid domestic waste in Kamyanets-Podilskyi town

Investment offer description and goal

Implementation of new and expanding and modernization of actingfacilities for collecting and sorting solid domestic waste, creation of effective control system in the sphere of waste treatment

Type of economic activity to implement investment project

Rendering housing and communal services

Form of cooperation State and private partnershipProject total value, thousand USD Defined by investorInvestment demand, thousand USD (%)

100%

Form of ownership; share in stateproperty

Economic activity will be carried out according to an agreement on joint activity

Resources provision Town government will grant a land ground of necessary area to implement the project alongside with the acting domestic solid garbage dump.

Investment offer completion level Ready business case of investment offerEssential elements of the enterprise (organization)

Executive Committee of Kamyanets-Podilskyi Town Council, Kamyanets-Podilskyi, Vidrodzhennia Square, 1Tel.: +380 3849 5-16-50Fax: +380 3849 5-06-00Web site: http://kam-pod.gov.uaE-mail: [email protected]

Initiator contact details Director of the Department of Economy and Infrastructure Development of the city tel. (03849) 5-07-05

Page 9: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of offer Reconstruction of Old Fortress barracks in to

recreation and tourist complex with tourist infrastructure

Investment offer description and goal

Creation of tourist complex with proper infrastructure on the basis ofthe state historical and architectural monument «Old Fortress barracks»

Type of economic activity to implement investment project

Activity of hotels and restaurants

Form of cooperation Sale of proprietary interestProject total value, thousand USD 18750Investment demand, thousand USD (%)

100%

Form of ownership; share in stateproperty

Communal – 100%

Resources provision Ground area – 1.4360 hectaresBuilding complex of total premises area 5 246 sq. m

Investment offer completion level Developed concept of investment projectEssential elements of the enterprise (organization)

Executive Committee of Kamyanets-Podilskyi Town Council, Kamyanets-Podilskyi, Vidrodzhennia Square, 1Tel.: +380 3849 5-16-50Fax: +380 3849 5-06-00Web site: http://kam-pod.gov.uaE-mail: [email protected]

Initiator contact details Director of the Department of Economy and Infrastructure Development of the city tel. (03849) 5-07-05

Page 10: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of offer Construction of sight cableway over the

Smotrych river canyon along the perimeter of the Old City in Kamyanets-Podilskyi

Investment offer description and goal

- establishment of additional attraction of European level;

- increase of tourist flow in 3-5 timesType of economic activity to implement investment project

Tourist and recreation sector

Project total value, thousand USD 15 000Investment demand, thousand USD (%)

100%

Resources provision Personnel, transport communicationInvestment offer completion level Developed concept of investment project. Prepared

engineering decisions.Essential elements of the enterprise (organization)

Executive Committee of Kamyanets-Podilskyi Town Council, Kamyanets-Podilskyi, Vidrodzhennia Square, 1Tel.: +380 3849 5-16-50Fax: +380 3849 5-06-00Web site: http://kam-pod.gov.uaE-mail: [email protected]

Initiator contact details Director of the Department of Economy and Infrastructure Development of the city tel. (03849) 5-07-05

Page 11: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of offer Formation of therapeutic infrastructure of

Kamyanets-Podilskyi balneotherapeutic health resort

Investment offer description and goal

Creation of a modern therapeutic complex on the basis of premises of town policlinics No1 in 30, I.Franko Str., as one of stages in creation and development of a balneotherapeutic health resort in Kamyanets- Podilskyi

Type of economic activity to implement investment project

Tourist and recreation sector

Form of cooperation State and private enterpriseProject total value, thousand USD 490.0Investment demand, thousand USD (%)

100%

Form of ownership; share in state property

Communal

Resources provision Premises of town policlinics No1 located near park zone in 30, I.Franko Str.

Investment offer completion level Developed investment projectEssential elements of the enterprise (organization)

Executive Committee of Kamyanets-Podilskyi Town Council, Kamyanets-Podilskyi, Vidrodzhennia Square, 1Tel.: +380 3849 5-16-50Fax: +380 3849 5-06-00Web site: http://kam-pod.gov.uaE-mail: [email protected]

Initiator contact details Director of the Department of Economy and Infrastructure Development of the city tel. (03849) 5-07-05

Page 12: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Restoration and renovation works on the

adaptation of architectural monuments XVI - XVIII centuries «Kushnirs'ka Tower» by placing authentic restaurant with thematic restaurant and mini-brewery

The essence and purpose of projectThe project is expected to create at the architectural monuments of XVI-XVIII centuries «Kushnirs'ka Tower» complex, which form the authentic accommodation facilities for 27 persons, a themed restaurant restaurants with 42 seats and mini brewery capacity 300 liters / day of distilleries for their own consumption.Estimated number of employees - 14 people

Type of economic activity to invest

Tourist and recreational activities

Form of cooperation Public-Private PartnershipsProject total value, thousand USD 1092.0 (with exchange ratio of 1:8)Investment demand, thousand USD (%)

100%

Form of ownership; share in state property

Communal

Resources provision Spaces architectural monuments XVI-XVIII centuries «Kushnirs'ka Tower», located in the National Historical and Architectural Reserve «Kamenetz»

Investment offer completion level Prepared investment projectEssential elements of the enterprise (organization)

Executive Committee of Kamyanets-Podilskyi Town Council, Kamyanets-Podilskyi, Vidrodzhennia Square, 1Tel.: +380 3849 5-16-50Fax: +380 3849 5-06-00Web site: http://kam-pod.gov.uaE-mail: [email protected]

Initiator contact details Director of the Department of Economy and Infrastructure Development of the city tel. (03849) 5-07-05

Page 13: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

NetishynSection Commentary

Name of project Front facade overhaul of communal еnterprise of Netishyn City Council «Torgovyi centr»

The essence and purpose of project Front facade overhaul of communal еnterprise of Netishyn City Council «Torgovyi centr»

Type of economic activity to invest

Construction

Form of cooperation Co-financingProject total value, thousand USD 83,59Investment demand, thousand USD (%)

58,514 (70%)

Form of ownership; share in state property

Property of territorial community of Netishyn town

Resources provision area of land - 0.2 hectarestotal area of the building - 7094.3 mdistance to Khmelnitsky - 170 kmdistance to Rivne - 60 kmlocated in the city center

Investment offer completion level Developed concept of investment project. Prepared engineering decisions.

Essential elements of the enterprise (organization)

Communal enterprise of Netishyn City Council «Torgovyi centr»30100, Netishyn. Nezalezhnosti Ave, 22tel. (03842) 3-13-28

Initiator contact details Director of Communal enterprise of Netishyn City Council «Torgovyi centr»Yurchuk Evgeniy Volodymyrovych, tel: 067 382 24 62е-mail: [email protected]

Page 14: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Roof overhaul of communal enterprise of

Netishyn City Council «Torgovyi centr»The essence and purpose of project

Roof overhaul of communal enterprise of Netishyn City Council «Torgovyi centr»

Type of economic activity to invest

Construction

Form of cooperation Co-financingProject total value, thousand USD 40 713Investment demand, thousand USD (%)

28,499 (70%)

Form of ownership; share in state property

Property of territorial community of Netishyn town

Resources provision total land area of 0.2 hectarestotal area of the roof 2856.0 square metersdistance to Khmelnitsky - 170 kmdistance to Rivne - 60 km.located in the city center

Investment offer completion level Prepared investment projectEssential elements of the enterprise (organization)

Communal enterprise of Netishyn City Council «Torgovyi centr»30100, Netishyn. Nezalezhnosti Ave, 22tel. (03842) 3-13-28

Initiator contact details Director of Communal enterprise of Netishyn City Council «Torgovyi centr»Yurchuk Evgeniy Volodymyrovych, tel: 067 382 24 62е-mail: [email protected]

Page 15: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Installing and setting up surveillance systems

on the territory of communal enterprise of Netishyn City Council «Torgovyi centr»

The essence and purpose of project

Installing and setting up surveillance systems on the territory of communal enterprise of Netishyn City Council «Torgovyi centr»

Type of economic activity to invest

Construction

Form of cooperation Co-financingProject total value, thousand USD 8,9 Investment demand, thousand USD (%)

6,2 (70%)

Form of ownership; share in state property

Property of territorial community of Netishyn town

Resources provision area of land - 0.2 hectarestotal area of the building - 7094.3 mdistance to Khmelnitsky - 170 kmdistance to Rivne - 60 kmlocated in the city center

Investment offer completion level Prepared investment projectEssential elements of the enterprise (organization)

Communal enterprise of Netishyn City Council «Torgovyi centr»30100, Netishyn. Nezalezhnosti Ave, 22tel. (03842) 3-13-28

Initiator contact details Director of Communal enterprise of Netishyn City Council «Torgovyi centr»Yurchuk Evgeniy Volodymyrovych, tel: 067 382 24 62е-mail: [email protected]

Page 16: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Construction of outdoor lighting networks on

Energetykiv Str. (highway № 1) Netishyn, Khmelnitsky region.

The essence and purpose of projectConstruction of outdoor lighting networks on Energetykiv Str. (highway № 1) Netishyn, Khmelnitsky region.

Type of economic activity to invest

Construction

Form of cooperation Co-financingProject total value, thousand USD 191,0 Investment demand, thousand USD (%)

134,0 (70%)

Form of ownership; share in state property

Property of territorial community of Netishyn town

Resources provision The total area of land (easement agreement) - 22.4 hectaresThe length of the lighting network - 6 kmDistance to Khmelnitsky 170 kmDistance to Rivne 60 km.

Investment offer completion level In the final stage of development of construction documents (currently on civil construction expertise)

Essential elements of the enterprise (organization)

Communal enterprise of Netishyn City Council «Torgovyi centr»30100, Netishyn. Nezalezhnosti Ave, 22tel. (03842) 3-13-28Yurchuk Evgeniy Volodymyrovych, Director of Communal enterprise of Netishyn City Council «Torgovyi centr»tel: 067 382 24 62е-mail: [email protected]

Initiator contact details Chief of Communal enterprise of Netishyn City Council «Housing and communal union» - Kalinskyy Konstantin Mukolaiovychtel.: (03842) 3-44-00

Page 17: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Social taxi. Netishin

The essence and purpose of projectTransportation of persons with limited physical activity

Type of economic activity to invest

Social services

Form of cooperation Partnership, co-financingProject total value, thousand USD 40,00Investment demand, thousand USD (%)

30,00 (75%)

Form of ownership; share in state property

Property of territorial community of Netishyn town

Resources provision The organization of services is the responsibility of Netishyn territorial center of social services (provision of social services)

Investment offer completion level Prepared investment projectEssential elements of the enterprise (organization)

Netishyn territorial center of social services (provision of social services) 30100,Netishyn, Nezalezhnosti Ave, 29

Initiator contact details Director of Netishyn territorial center of social services (provision of social services)tel. (03842) 4 27 50е-mail: [email protected]

Page 18: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Completion №№3 and 4 power units of the

Khmelnitsky NPPThe essence and purpose of project Construction and commissioning of new power

unitsType of economic activity to invest

Electricity, gas and water distribution

Form of cooperation Partnership, co-financingProject total value, thousand USD 3356000Investment demand, thousand USD (%)

3356000

Form of ownership; share in state property

State

Resources provision Available industrial sitesInvestment offer completion level Інвестиційна пропозиціяEssential elements of the enterprise (organization)

OP «Khmelnytsky NPP»30100,Netishin, Energetykiv Str., 20

Initiator contact details OP «Khmelnytsky NPP» CEOPanaschenko Mykola Serhiyovych, tel.: (03842) 33350Fax: (03842) 33360e-mail: officе[at]khnpp.atom.gov.ua

Page 19: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Low-rise building construction in Netishyn,

Khmelnytskyi regionThe essence and purpose of project Construction of new housing estatesType of economic activity to invest

Construction

Form of cooperation Sale of property rightsProject total value, thousand USD 500,0Investment demand, thousand USD (%)

100%

Form of ownership; share in state property

Property of territorial community of Netishyn town

Resources provision Total area - 55.69 haLand located in highways area which has increased city forming value. There are also more free land nearby Distance to the railway - 5 km

Investment offer completion level Chosen land areas for construction 6-7 town districts, available zoning plan. A detailed plan of territory.

Essential elements of the enterprise (organization)

Executive Committee of Netishyn City Council 30100Netishyn, Shevchenka Str,1tel.(03842) 3-37-02 е-mail: [email protected]

Initiator contact details Head of planning and architecture department of Executive Committee of Netishyn City Council, chief Architect tel.(03842) 9-01-51 е-mail [email protected]

Page 20: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Construction of amusement park in Netishyn,

Khmelnytskyi regionThe essence and purpose of project Construction of amusement parkType of economic activity to invest

Construction

Form of cooperation Rent, co-financingProject total value, thousand USD 200,0Investment demand, thousand USD (%)

100%

Form of ownership; share in state property

Property of territorial community of Netishyn town

Resources provision Available park zoneInvestment offer completion level Available sketch intentions of the areaEssential elements of the enterprise (organization)

Executive Committee of Netishyn City Council 30100Netishyn, Shevchenka Str,1tel.(03842) 3-37-02 е-mail: [email protected]

Initiator contact details Head of planning and architecture department of Executive Committee of Netishyn City Council, chief Architect tel.(03842) 9-01-51 е-mail [email protected]

Page 21: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Overhaul of facade insulation house at the

Varshavska Str, 21 in Netishyn, Khmelnytskyi region

The essence and purpose of project Overhaul of facade insulation house, reduce heat consumption by 20-30%

Type of economic activity to invest

Construction

Form of cooperation Co-financingProject total value, thousand USD 140,0Investment demand, thousand USD (%)

98,0 (70%)

Form of ownership; share in state property

Property of territorial community of Netishyn town

Resources provision Total area of residential buildings - 9207 sq.m.Distance to Khmelnitsky 170 km.Distance to Rivne 60 km.Available all communications

Investment offer completion level Available project estimates with relevant expert reports

Essential elements of the enterprise (organization)

Communal enterprise of Netishyn City Council « Housing and communal union « 30100, Netishyn. Nezalezhnosti Ave, 31, PO Box № 42

Initiator contact details Chief of Communal enterprise of Netishyn City Council «Housing and communal union» - Kalinskyy Konstantin Mukolaiovychtel.: (03842) 3-44-00

Page 22: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Overhaul of the building (facade wall

insulation) School I- III degrees №1 on Nezalezhnosti Ave, 7 in Netishyn, Khmelnytskyi region

The essence and purpose of project School facade wall insulation, consumption of thermal energy savings 20-30%

Type of economic activity to invest

Construction

Form of cooperation Co-financingProject total value, thousand USD 68,0Investment demand, thousand USD (%)

48,0 (70%)

Form of ownership; share in state property

Property of territorial community of Netishyn town

Resources provision Total land area - 3.2949 haDistance to Khmelnitsky 170 km.Distance to Rivne 60 km.Available all communications

Investment offer completion level available project estimates with relevant expert reports

Essential elements of the enterprise (organization)

School I- III degrees №1 30100 Netishyn. Nezalezhnosti Ave, 7

Initiator contact details Principal tel. (03842) 3-10-79, 9-11-37 e-mail: [email protected]

Page 23: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Design, coordination and installation of tables

and ceilings for traders at open area of Communal enterprise of Netishyn City Council «Netishyn city market»

The essence and purpose of project

Market improvement. Arrangement of 72 jobs

Type of economic activity to invest

Construction

Form of cooperation Co-financingProject total value, thousand USD 7,0Investment demand, thousand USD (%)

5,0 (70%)

Form of ownership; share in state property

Property of territorial community of Netishyn town

Resources provision Total land area - 2 haDistance to Rivne - 60 km.Distance to Khmelnitsky - 170 km.Available all communications

Investment offer completion level Developed design estimatesEssential elements of the enterprise (organization)

Communal enterprise of Netishyn City Council «Netishyn city market»30100 Netishyn, Rynkova Str, 4tel. (03842) 3-13-61, 3-20-70

Initiator contact details Director of Communal enterprise of Netishyn City Council «Netishyn city market»Volodumur Covalchuk, tel. (03842) 3-13-61, 3-20-70

Page 24: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Design, coordination, outdoor parking

installation for Communal enterprise of Netishyn City Council «Netishyn city market»

The essence and purpose of project Construction of parking area for 126 car lotsType of economic activity to invest

Construction

Form of cooperation Co-financing Project total value, thousand USD 9,0Investment demand, thousand USD (%)

6,0 (70%)

Form of ownership; share in state property

Property of territorial community of Netishyn town

Resources provision Total land area - 2 haDistance to Rivne - 60 km.Located in the city centerAvailable all communications

Investment offer completion level Developed design estimatesEssential elements of the enterprise (organization)

Communal enterprise of Netishyn City Council «Netishyn city market»30100 Netishyn, Rynkova Str, 4tel. (03842) 3-13-61, 3-20-70

Initiator contact details Director of Communal enterprise of Netishyn City Council «Netishyn city market»Volodumur Covalchuk, tel. (03842) 3-13-61, 3-20-70

Page 25: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

SlavutaSection Commentary

Name of project Industrial park «Slavuta»The essence and purpose of project Attracting investments to the economy of the city,

providing favorable conditions for functioning and development of modern high-tech industry, development of modern production and market infrastructure, improvement of investment image of the city, economic development and competitiveness of the territory, creating of new jobs, increase revenues to the city budget and the state budget of Ukraine

Type of economic activity to invest

Manufacture of wood and wood products;manufacture of basic pharmaceutical products and pharmaceutical preparations; manufacture of other non-metallic mineral products; fabricated metal products; Manufacture of computer, electronic and optical products; manufacture of electrical equipment; manufacture of machinery and equipment; manufacture of motor vehicles, trailers and semi-trailers

Form of cooperation Land transfer to management company under a lease.

Project total value, thousand USD 150Investment demand, thousand USD (%)

135 (90%)

Form of ownership; share in state property

Property of territorial community of Slavuta

Resources provision Total land area - 50 haInvestment offer «greenfield»Industrial park located outside the residential areas. Closest housing construction 791 m. far.At a distance of 0.5 - 1 km from land runs a highway of regional importance R05 Gorodyshche - Starokostyantyniv Rail - 2 km, Electricity - 300 m ,Gas supply - 150 m ater - 50 m

Investment offer completion level Investment offerEssential elements of the enterprise (organization)

Slavuta City Council, 30000Slavuta, Sobornosti Str, 7

Initiator contact details Head of Economic Development Departmenttel. (03842) 7-17-25e-mail: [email protected]

Page 26: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Reconstruction of boiler room in Central

District Hospital with installation of boilers COLVI-1500 (2 pieces) and replacement of pumping park

The essence and purpose of project Decrease in consumption of electricity and natural gas for production and transportation of heat

Type of economic activity to invest

Boiler room reconstruction

Form of cooperation -Project total value, thousand USD 287,5Investment demand, thousand USD (%)

287,5 (100%)

Form of ownership; share in state property

Communal property

Resources provision -Investment offer completion level Design estimatesEssential elements of the enterprise (organization)

Communal enterprise «Slavutske Municipal Housing Association», 30000, Slavuta, Myru Str, 14а

Initiator contact details Communal enterprise «Slavutske Municipal Housing Association», tel./fax (03842) 7-29-40

Page 27: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Reconstruction of boiler room on Kosatska Str.

with installation of boilers COLVI-4500 (2 pieces) and replacement of pumping park

The essence and purpose of project Decrease in consumption of electricity and natural gas for production and transportation of heat

Type of economic activity to invest

Boiler room reconstruction

Form of cooperation -Project total value, thousand USD 410Investment demand, thousand USD (%)

410 (100%)

Form of ownership; share in state property

Communal property

Resources provision -Investment offer completion level Design estimatesEssential elements of the enterprise (organization)

Communal enterprise «Slavutske Municipal Housing Association», 30000, Slavuta, Myru Str, 14а

Initiator contact details Communal enterprise «Slavutske Municipal Housing Association», tel./fax (03842) 7-29-40

Page 28: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Arrangement of facades thermal insulation in 4

residential buildings (Lisna Str, 19 and 13, Kozatska Str,73, Tserkovna Str,34)

The essence and purpose of project Improvement of thermal performance of residential buildings and a corresponding decrease in heat loss through exterior walls in total heat loss

Type of economic activity to invest

Insulation of facades

Form of cooperation -Project total value, thousand USD 150Investment demand, thousand USD (%)

150 (100%)

Form of ownership; share in state property

Communal property

Resources provision -Investment offer completion level Design estimatesEssential elements of the enterprise (organization)

Communal enterprise «Slavutske Municipal Housing Association», 30000, Slavuta, Myru Str, 14а

Initiator contact details Communal enterprise «Slavuta Municipal Housing Association», tel./fax (03842) 7-29-40

Page 29: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Replacement of old heating networks with pre-

insulatedThe essence and purpose of project Decrease heat losses through the insulation of

heating networks of during heat transportation to the final consumer

Type of economic activity to invest

Pre-insulated networks replacement

Form of cooperation -Project total value, thousand USD 132,5Investment demand, thousand USD (%)

132,5 (100%)

Form of ownership; share in state property

Communal property

Resources provision -Investment offer completion level Design estimatesEssential elements of the enterprise (organization)

Communal enterprise «Slavutske Municipal Housing Association», 30000, Slavuta, Myru Str, 14а

Initiator contact details Communal enterprise «Slavuta Municipal Housing Association», tel./fax (03842) 7-29-40

Page 30: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Reconstruction of treatment facilities of the city

Reconstruction of facilities for the treatment of sewage sludge on CBS Slavuta

The essence and purpose of project Replacement equipment with high-tech, energy saving, improvement of ecological conditions

Type of economic activity to invest

Reconstruction

Form of cooperation -Project total value, thousand USD 625Investment demand, thousand USD (%)

625 (100%)

Form of ownership; share in state property

Communal property

Resources provision -Investment offer completion level Design estimatesEssential elements of the enterprise (organization)

Communal enterprise «Salavuta UVKH», 30000, Slavuta, Yaroslav Mudryi Str., 52

Initiator contact details Communal enterprise «Salavuta UVKH», tel./fax (03842) 2-33-15

Page 31: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Reconstruction KNS Slavuta with capacity of

500m3/dayThe essence and purpose of project Overhaul of the building

Replacement equipment with high-techType of economic activity to invest

Reconstruction

Form of cooperation  -Project total value, thousand USD 94Investment demand, thousand USD (%)

94 (100%)

Form of ownership; share in state property

Communal property

Resources provision Availability of buildingsInvestment offer completion level Design estimatesEssential elements of the enterprise (organization)

Communal enterprise «Salavuta UVKH», 30000, Slavuta, Yaroslav Mudryi Str., 52

Initiator contact details Communal enterprise «Salavuta UVKH», tel./fax (03842) 2-33-15

Page 32: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Reconstruction of boiler building on Knyaziv

Str., Sangushkiv Str. and installing of solid fuel pyrolysis boiler with capacity of 1 MW

The essence and purpose of project The reduction of natural gas consumptionType of economic activity to invest

Reconstruction of boiler building

Form of cooperation  -Project total value, thousand USD 400Investment demand, thousand USD (%)

400 (100%)

Form of ownership; share in state property

Communal property

Resources provision -Investment offer completion level -Essential elements of the enterprise (organization)

Housing and communal services, energy conservation and improvement Department30000, Slavuta, Tserkovna Str, 46а

Initiator contact details Director of Housing and communal services, energy conservation and improvement Department tel./fax (03842) 2-35-02

Page 33: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

StarokostyantynivSection Commentary

Name of project Reconstruction of sewage treatment facilities with capacity of 5000 m3 / day Starokostyantyniv, Khmelnytskyi region

The essence and purpose of project

The elimination of the threat of an emergency. Providing residents with quality drainage services

Type of economic activity to invest

Provision of communal services

Form of cooperation Own businessProject total value, thousand USD 701,1Investment demand, thousand USD (%)

701,1 (100%)

Form of ownership; share in state property

Communal

Resources provision Transportation

Investment offer completion level The project was developed and approved by the Director of Starokostyantyniv water supply and sanitation enterprise «Vodokanal» №120а dated 15.10.2014, project also got a positive expert opinion

Essential elements of the enterprise (organization)

Starokostyantyniv water supply and sanitation enterprise «Vodokanal»31100Starokostyantyniv, Zhovtneva Str., 19

Initiator contact details Director of Starokostyantyniv water supply and sanitation enterprise «Vodokanal» - Laktionov Oleksandr Dmytrovychtel. (03854) 3-16-10, 3-16-68, e-mail: [email protected]

Page 34: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Reconstruction of treatment plants and

sewerage of housing estate «Vokzal №2» in Starokostyantyniv, Khmelnytskyi region

The essence and purpose of project

The elimination of the threat of an emergency. Providing residents with quality drainage services, improvement of the environment

Type of economic activity to invest

Provision of communal services

Form of cooperation Own businessProject total value, thousand USD 150Investment demand, thousand USD (%)

150 (100%)

Form of ownership; share in state property

Communal

Resources provision TransportationInvestment offer completion level The project was developed and approved by the

mayor 07.05.2010 №165/2010-р, the positive conclusion of state expertise №23-00154-09, 17.06.2010

Essential elements of the enterprise (organization)

Starokostyantyniv water supply and sanitation enterprise «Vodokanal»31100Starokostyantyniv, Zhovtneva Str., 19

Initiator contact details Director of Starokostyantyniv water supply and sanitation enterprise «Vodokanal»Laktionov Oleksandr Dmytrovychtel. (03854) 3-16-10, 3-16-68, e-mail: [email protected]

Page 35: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Reconstruction of sewer collector on Franko

Str., Myru Str., and Varchuk Str., Starokostyantyniv, Khmelnytskyi region

The essence and purpose of project

Providing residents with quality drainage services, improvement of the environment

Type of economic activity to invest

Provision of communal services

Form of cooperation Own businessProject total value, thousand USD 866,7Investment demand, thousand USD (%)

866,7 (100%)

Form of ownership; share in state property

Communal

Resources provision TransportationInvestment offer completion level Project developer «Tekos LTD», currently runs

expertise

Essential elements of the enterprise (organization)

Starokostyantyniv water supply and sanitation enterprise «Vodokanal»31100Starokostyantyniv, Zhovtneva Str., 19

Initiator contact details Director of Starokostyantyniv water supply and sanitation enterprise «Vodokanal»Laktionov Oleksandr Dmytrovychtel. (03854) 3-16-10, 3-16-68, e-mail: [email protected]

Page 36: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Technical re-equipment and replacement of

heating systems on Myru Str starting from boiler rooms on Myru Str. 1/136 and Komsomolska Str. 8/3 laying stress on the boiler room on Myru Str. 1/139, Starokostyantyniv, Khmelnytskyi region

The essence and purpose of project

Technical re-equipment and replacement of heating systems on Myru Str., reducing specific fuel consumption and improving the heat supply quality

Type of economic activity to invest

Provision of communal services

Form of cooperation Getting the equipment by loanProject total value, thousand USD 430,3Investment demand, thousand USD (%)

430,3 (100%)

Form of ownership; share in state property

Communal

Resources provision Engineering and technical support by municipal enterprise «Teplovyk»

Investment offer completion level Consolidated estimated calculation developed and approved by the Mayor in 16.05.2013, №204/2013-р, expert report designed by branch of government enterprise «Hmelnytskyyderzhbudekspertyza» in 08.12.2011 № 23-01178-11

Essential elements of the enterprise (organization)

Municipal enterprise operating in thermal management «Teplovyk» 31100Starokostyantyniv, Esenska Str.,2, block 4

Initiator contact details Director of the municipal enterprise operating in thermal management «Teplovyk» Polishchuk Mykola Mykolajovytch tel. (03854) 4-96-42, e-mail: [email protected]

Page 37: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Replacement of boiler heating systems on

Franko Str., 35 Starokostyantyniv, Khmelnytskyi region

The essence and purpose of project

Replacement of old pipes with pre-insulated. Reducing heat losses in networks, improved heating

Type of economic activity to invest

Provision of communal services

Form of cooperation Getting the equipment by loan

The financial performance of the project (data submitted if available)

The expected payback period - 9 years

Project total value, thousand USD 300Investment demand, thousand USD (%)

300 (100%)

Form of ownership; share in state property

Communal

Resources provision Engineering and technical support by municipal enterprise «Teplovyk»

Investment offer completion level Сonsolidated estimated calculation developed and approved by the Director of municipal enterprise operating in thermal management «Teplovyk» №17, 05.12.2008, expert report designed by branch of government enterprise «Hmelnytskyyderzhbudekspertyza» in 08.12.2011 № 23-01172-11

Essential elements of the enterprise (organization)

Municipal enterprise operating in thermal management «Teplovyk» 31100Starokostyantyniv, Esenska Str.,2, block 4

Initiator contact details Director of the municipal enterprise operating in thermal management «Teplovyk» Polishchuk Mykola Mykolajovytch tel. (03854) 4-96-42, e-mail: [email protected]

Page 38: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Implementation of CHP units on Myru Str.,

1/139 (after its technical upgrading), Starokostyantyniv, Khmelnytskyi region

The essence and purpose of project

Installing of CHP with electric capacity of 0.5 MW and thermal - 0.12 MW to produce its own electricity and thermal energy for hot water

Type of economic activity to invest

Provision of communal services

Form of cooperation Getting the equipment by loan Project total value, thousand USD 230Investment demand, thousand USD (%)

230 (100%)

Form of ownership; share in state property

Communal

Resources provision Engineerin «Teplovyk»Investment offer completion level Сonsolidated estimated calculation developed and

approved by the Director of municipal enterprise operating in thermal management «Teplovyk» №5, 03.05.2012, expert report designed by branch of government enterprise «Hmelnytskyyderzhbudekspertyza» in 15.08.2012 № 23-00603-12

Essential elements of the enterprise (organization)

Municipal enterprise operating in thermal management «Teplovyk» 31100Starokostyantyniv, Esenska Str., 2, block 4

Initiator contact details Director of the municipal enterprise operating in thermal management «Teplovyk» Polishchuk Mykola Mykolajovytch tel. (03854) 4-96-42, e-mail: [email protected]

Page 39: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Bank protection of reservoir banks on rivers

Sluch and Ikopot with clearing and deepening in the city Starokonstantinov of Khmelnytskyi region

The essence and purpose of project

Activity in culture and sport, fishing, protection from flooding the coast, sanitation and ecological environment improvement, lowering the current water level by 0.9 m.

Type of economic activity to invest

Other

Form of cooperation RentProject total value, thousand USD 1550Investment demand, thousand USD (%)

1550 (100%)

Form of ownership; share in state property

Communal

Resources provision Developed design and estimate documentation, completed expertise

Investment offer completion level The project approved by the Head of Starokostyantyniv Plant of communal enterprises №61/1, 10.08.2011, expert report designed by branch of government enterprise «Hmelnytskyyderzhbudekspertyza»in 09.08.2011 р. № 23-00059-10

Essential elements of the enterprise (organization)

Plant of communal enterprises3110Starokostyantyniv, Krasovskogo Str., 1/1

Initiator contact details Head of the plant of communal enterprises Bulich Volodymyr Evgenijovychtel. (03854) 3-20-57, e-mail: [email protected]

Page 40: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Overhaul of Starokostyantyniv School №5 on

Pugachova Str., 3 in Starokonstantinov, Khmelnytskyi region

The essence and purpose of project

School building №5 of Starokostyantyniv City Council of Khmelnytskyi region built in 1905 and is currently due to sanitary standards and requirements for security and safety needs urgent overhaul

Type of economic activity to invest

Other

Form of cooperation LeasingProject total value, thousand USD 606Investment demand, thousand USD (%)

606 (100%)

Form of ownership; share in state property

Communal

Resources provision Developed design and estimate documentation, completed expertise

Investment offer completion level The project approved by Head of Education Department 13.02.2013, №2, expert report №23-01065-12 from 13.09.2012 year

Essential elements of the enterprise (organization)

The Executive Committee of Starokostyantyniv City Council 31100Starokostyantyniv, Ostrozkogo Str., 41

Initiator contact details Mayor tel. (03854) 3-12-36, 3-23-55, e-mail: [email protected]

Page 41: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

ShepetivkaSection Commentary

Name of project Reconstruction and overhaul of the stadium «Locomotive» with arrangement of fitness facilities

The essence and purpose of project

The project aims at improving the provision of public with sports halls, playgrounds, stadiums, wich will help to create conditions for development of physical culture and sports in the district, achievement of high sports results and conduct sports and recreation and sports mass work among all sections of the population

Type of economic activity to invest

Construction

Form of cooperation Targeted subvention co-financingProject total value, thousand USD 2500Investment demand, thousand USD (%)

2250 (90%)

Form of ownership; share in state property

Property of the territorial community of Shepetivka

Resources provision Total area - 1,8 hectares, located in the recreational area

Investment offer completion level Investment offerEssential elements of the enterprise (organization)

The Executive Committee of Shepetivka City Council30400, Shepetivka, Ostrozkogo Str., 4

Initiator contact details Acting mayor, City Council Secretarytel. (03840) 5-14-50 e-mail: [email protected]

Page 42: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Reconstruction of the main water supply pump

starting from ВНС-2 on Nekrasova Str., 127 to V.Kotyka, 110 in Shepetivka, Khmelnytskyi region

The essence and purpose of project

The project provides implementation of new technologies and water treatment disinfection. This will improve the reliability of water supply and drainage system

Type of economic activity to invest

Construction

Form of cooperation Targeted subvention, co-financingProject total value, thousand USD 500Investment demand, thousand USD (%)

450 (90%)

Form of ownership; share in state property

Property of the territorial community of Shepetivka

Resources provision Length over 4 km.Investment offer completion level Investment offerEssential elements of the enterprise (organization)

Shepetivka water supply and sanitation enterprise,30400, Shepetivka, Nekrasova Str., 127

Initiator contact details Director - Bykov Vitaliy Petrovich, tel. (03840) 5-11-03

Page 43: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Completion of Children's Educational

Institution №1 «Perlynka» for 2 preschool groups, gym and canteen on Sheshukova Str., 6 in Shepetivka

The essence and purpose of project

Providing educational process in accordance with the requirements of the legislation of Ukraine and creation of appropriate conditions for meals, classes on creative, spiritual and physical development of children, observance of sanitary norms.

Type of economic activity to invest

Construction

Form of cooperation Targeted subvention, co-financing Project total value, thousand USD 650Investment demand, thousand USD (%)

585 (90%)

Form of ownership; share in state property

Property of the territorial community of Shepetivka

Resources provision Area - 850 sq.m.Distance to Khmelnitsky - 106 km.

Investment offer completion level Ready documentation and state examinationEssential elements of the enterprise (organization)

The Executive Committee of Shepetivka City Council30400, Shepetivka, Ostrozkogo Str., 4

Initiator contact details Acting mayor, City Council Secretarytel. (03840) 5-14-50 e-mail: [email protected]

Page 44: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Overhaul of the house of culture in ShepetivkaThe essence and purpose of project

The project of building overhaul designed due to latest modern technology with the extension of the building functional assignments. After repairs the quality of cultural services to city residents will increase significantly, the activities of the institution of recreation and leisure will also expand.

Type of economic activity to invest

Construction

Form of cooperation Targeted subvention, co-financing Project total value, thousand USD 630Investment demand, thousand USD (%)

567(90%)

Form of ownership; share in state property

Property of the territorial community of Shepetivka

Resources provision Distance to Khmelnitsky - 103 kmTotal area - 4109.3 sq. mLocated - Khmelnytsky region, Shepetivka, Karl Marks Str., 54, downtown.

Investment offer completion level Investment projectEssential elements of the enterprise (organization)

The Executive Committee of Shepetivka City Council30400, Shepetivka, Ostrozkogo Str., 4

Initiator contact details Acting mayor, City Council Secretarytel. (03840) 5-14-50 e-mail: [email protected]

Page 45: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Bilogirja districtSection Commentary

Name of project Upgrading plant equipment for manufacturing finely dispersed chalk

The essence and purpose of project

Investment attraction to upgrade equipment of chalk production plant in Trostjanka village of Bilogirja district. Chalk production improvement, access to the planned production capacity of 50 thousand tons of chalk per year, increasing uses of chalk in industry and agriculture, creation of new jobs. Automation technology with the use of boiling layer Dryers and finely dispersed grinding technology.

Type of economic activity to invest

Mining

Form of cooperation Investment loanProject total value, thousand USD 1000Investment demand, thousand USD (%)

1000 (100%)

Form of ownership; share in state property

Private

Resources provision Built factory and production line. Reserves of Trostyanetske chalk deposits - 2.2 million tons, that's enough for 50.0 tons per year, life of the plant is 44 years.Land, permit and license is available.

Investment offer completion level 100%Essential elements of the enterprise (organization)

29000Khmelnytsky , Kurchatova Str., 103

Initiator contact details General Director Yaremchuk Ivan Dmytrovychtel. (0382) 70-90-97, (0382) 66-40-61(096)263 59 76e-mail: [email protected]

Page 46: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Vinkivtsi districtSection Commentary

Name of project Construction of plant for processing of glauconitic arenaceous quartz

The essence and purpose of project

Creation of enterprise for processing of glauconitic arenaceous quartz

Type of economic activity to invest

Extraction of commercial minerals, except fuel and energy

Form of cooperation Creation of enterpriseProject total value, thousand USD 4000Investment demand, thousand USD (%)

4000 (100%)

Form of ownership; share in state property

Private property

Resources provision Anticipated reserves – 150 thousand tons, cover thickness from 30 to70 meters, layer thickness from 7 to 12 meters

Investment offer completion level Investment offer

Essential elements of the enterprise (organization)

District State Administration32500, Vinkivtsi, Soborna Ukraina Str., 15

Initiator contact details Head of District State Administrationtel. (03846) 2-12-55; 2-12-74;fax (03846) 2-16-47; e-mail: [email protected]

Page 47: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Creation of Zinkiv recreation complexThe essence and purpose of project

Creation of recreation complex on the base of premises of former school in Zinkiv village, development of tourism and provision of proper rest for population in the ecologically clear area of Zinkiv village, creation of 20 new work places

Type of economic activity to invest

Tourist and recreation sector

Form of cooperation Creation of recreation complexProject total value, thousand USD 250Investment demand, thousand USD (%)

250 (100%)

Form of ownership; share in state property

Private

Resources provision Complex of premises in communal property of Village Council, theauthorities are ready to sell the premises, land area of 1.3 hectares

Investment offer completion level Investment offerEssential elements of the enterprise (organization)

Zinkiv village Council32514, Vinkivtsi district,Zinkiv, Lesi Ukrainky Str., 57а

Initiator contact details Village head tel.: (03846) 2-52-36; 2-54-01;fax: (03846) 2-52-36

Page 48: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Volochysk districtSection Commentary

Name of project Mineral water plantThe essence and purpose of project

The mineral water plant construction

Type of economic activity to invest

Industry

Form of cooperation Direct investmentsProject total value, thousand USD 300Investment demand, thousand USD (%)

300 (100%)

Form of ownership; share in state property

State

Resources provision Land is communally owned by village council and currently not being used. Distance to Volochysk railway station - 24.5 km.Zaichyky Village connected to the district center with paved highway. Gas and electricity point – 0,3 км.To organize water pouring, 2-storey former school building can be used with a total area of 1250 square meters.

Investment offer completion level Investment offerEssential elements of the enterprise (organization)

Zaichyky village council31274, Volochysk district Zaichyky

Initiator contact details Village head tel. (03845) 9-38-30, 0680596290

Page 49: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Construction of waste processing complexThe essence and purpose of project

The transition from waste dumps to a waste processing complex (WPC) with mechanical processing of all types of waste

Type of economic activity to invest

Environmental Protection

Form of cooperation Direct investmentsProject total value, thousand USD 35000Investment demand, thousand USD (%)

33250 (95%)

Form of ownership; share in state property

State

Resources provision Availability of landInvestment offer completion level Investment offerEssential elements of the enterprise (organization)

Volochysk District State Administration 31200, Volochysk, Centralna Square., 1

Initiator contact details First Head Deputy of Volochysk District State Administration tel. (03845) 3-43-84

Page 50: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Construction of 2 mini hydroelectric power

stations in Zavaliiky village of Volochysk district, Khmelnytskyi region

The essence and purpose of project

Use of water power, construction of waterwork, creation of new work places, decrease the electricity cost for village inhabitants at 20-25%

Type of economic activity to invest

Production and distribution of electricity, gas and water

Form of cooperation Direct investmentsProject total value, thousand USD 3000Investment demand, thousand USD (%)

2940 (98%)

Form of ownership; share in state property

State

Resources provision Availability of water reach and hydraulic facilities with a water drop of 3.6 meters

Investment offer completion level Investment offerEssential elements of the enterprise (organization)

Zavalijky village council 31257Volochysk districtZavalijky

Initiator contact details Village Head тел. (03845) 9-17-31

Page 51: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Construction of mini hydroelectric power station in

Fedirky village of Volochysk district, Khmelnytskyi region

The essence and purpose of project

Use of water power, construction of waterwork, creation of new work places, decrease the electricity cost for village inhabitants at 20-25%

Type of economic activity to invest

Production and distribution of electricity, gas and water

Form of cooperation Direct investments Project total value, thousand USD 1500Investment demand, thousand USD (%)

1470 (98%)

Form of ownership; share in state property

State

Resources provision Availability of water reach and hydraulic facilities with a water drop of 4 meters

Investment offer completion level Investment offerEssential elements of the enterprise (organization)

Fedirky village council 31246Volochysk districtFedirky

Initiator contact details Village Head tel. (03845) 9-35-12

Page 52: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Construction of mini hydroelectric power

station in Bronivka village of Volochysk district, Khmelnytskyi region

The essence and purpose of project

Use of water power, construction of waterwork, creation of new work places, decrease the electricity cost for village inhabitants at 20-25%

Type of economic activity to invest

Production and distribution of electricity, gas and water

Form of cooperation Direct investmentsProject total value, thousand USD 1500Investment demand, thousand USD (%)

1470 (98%)

Form of ownership; share in state property

State

Resources provision Availability of water reach and hydraulic facilities with a water drop of 3 meters

Investment offer completion level Investment offerEssential elements of the enterprise (organization)

Bronivka village council31270Volochysk districtBronivka

Initiator contact details Village Headtel.: (03845) 9-87-42

Page 53: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Gorodok districtSection Commentary

Name of project Creating an information tourist center of Gorodok district

The essence and purpose of project

Gorodok district brand formation as a sports and recreational tourism zone with access for everybody

Type of economic activity to invest

Tourism and recreation

Form of cooperation Creation of juridical person.Project total value, thousand USD 126,6Investment demand, thousand USD (%)

126,6 (100%)

Form of ownership; share in state property

Private

Resources provision 3% of district included in area of the National Park «Podilski Tovtry». Podilski Tovtry, which smoothly passes the Carpathians, densely covered with forests, has clean air, mild climate and «Naftusia» mineral water. All this things creating conditions for recreation and health of people. The project involves the creation of tourism information center, which will accumulate information about touristic potential of the area and provide information to customers.

Investment offer completion level Business plan developing

Essential elements of the enterprise (organization)

Economic Development and Trade Department of Gorodok District State Administration 32000, Gorodok, Shevchenko Str., 20

Initiator contact details Head of Departmenttel. (03851) 3-18-08; (03851) 3-15-35

Page 54: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Development of district touristic potentialThe essence and purpose of project

Development and renewal of tourist and recreation potential of the district by creation of conditions for family vacation in summer and winter periods.

Type of economic activity to invest

Tourist and recreation sector

Form of cooperation Creation of juridical person.Project total value, thousand USD 206,8Investment demand, thousand USD (%)

206,8 (100%)

Form of ownership; share in state property

Private

Resources provision Gorodok district has a great tourist potential. Various archaeological, cultural and historical monuments, medical water, picturesque natural sites (rivers, forests and picturesque villages) and hospitality of population of district that are attractive to tourists.

Investment offer completion level Business plan developing

Essential elements of the enterprise (organization)

Economic Development and Trade Department of Gorodok District State Administration 32000, Gorodok, Shevchenko Str., 20

Initiator contact details Head of Departmenttel. (03851) 3-18-08; (03851) 3-15-35

Page 55: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Upgrade and enhancement of «Hover» Ltd.The essence and purpose of project

Realization of the project will enable to upgrade and enhance the enterprise, save and provide employment opportunities; improve current production; master new production.

Type of economic activity to invest

Engineering

Organizational form of cooperation

Coproduction.Creation of juridical person.

Form of cooperation Pay-back period – 1,5 years;Profitableness – 10 %

Project total value, thousand USD 12500Investment demand, thousand USD (%)

12500,0 (100%)

Form of ownership; share in state property

Private

Resources provision Available productive capacity– 22,2 thousand sq. m;Warehouses - 1,0 thousand sq. m; Land parcel – 7,0 hectares

Investment offer completion level Business plan is being worked outEssential elements of the enterprise (organization)

«Hover» Ltd32000, Gorodok, Shevchenko Str., 39

Initiator contact details Knysh Viktor Mykhailovychtel./fax (0351)3-18-53Mobile. 066-767-94-70

Page 56: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Derazhnya districtSection Commentary

Name of project Creation of production of canned meat and porridges, establishment of a workshop for production of canned fish under «Dekos» trade mark

The essence and purpose of project

Expansion of product assortment, creation of new work places

Type of economic activity to invest

Production of foodstuffs

Form of cooperation  -Project total value, thousand USD 378,7Investment demand, thousand USD (%)

378,7 (100%)

Form of ownership; share in state property

Collective

Resources provision Available production space, personnel, transport communication, power supply

Investment offer completion level Business plan

Essential elements of the enterprise (organization)

32200, Derazhnya,Myru Str.,126

Initiator contact details DirectorGrycak Roman Volodymyrovich, tel. (03856)2-27-59, (03856) 2-10-04, Mobile. 0975080617, e-mail: [email protected]

Page 57: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Production of fuel briquettes and granules on

AGTC «Flora»The essence and purpose of project

Production of fuel briquettes and granules. Expansion of production, creation of new work places.

Type of economic activity to invest

 -

Form of cooperation  -Project total value, thousand USD 437,3Investment demand, thousand USD (%)

437,3 (100%)

Form of ownership; share in state property

Communal

Resources provision  -Investment offer completion level 100%Essential elements of the enterprise (organization)

AGTC «Flora»32200, Derazhnya,Myru Str.,120

Initiator contact details Director of AGTC «Flora»Denysuk Genadiy Ivanovych, tel. (03856) 2-25-54, fax (03856) 2-25-54, е-mаil: [email protected] Mobile. 096-306-36-90

Page 58: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Reconstruction of fixed assets on VC

«Lozivskyy tool factory» 

The essence and purpose of project

Expansion of product assortment and quality

Type of economic activity to invest

Manufacture of support tightening tool in metal cutting tools

Form of cooperation  -Project total value, thousand USD 110Investment demand, thousand USD (%)

110 (100%)

Form of ownership; share in state property

 -

Resources provision Available manufacturing facilities

Investment offer completion level Investment offer

Essential elements of the enterprise (organization)

32216, Derazhnya district, Lozove, Radyanska Str., 21

Initiator contact details ChairmanArchyshevskyy I.G.tel. (03856) 9-75-86, fax (03856) 9-34-42

Page 59: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Dunayivtsi districtSection Commentary

Name of project Operational renewal of Dunayivtsi Fruit Cannery instrumentality of Khmelnytskyi regional consumers union

The essence and purpose of project

Operational renewal of Dunayivtsi Fruit Cannery instrumentality of Khmelnytskyi regional consumers union; purchase and installation of equipment for production of apple juice concentrate, renewal of cannery production, renewal of mineral water production (using water deposits of «Navtusia» and «Myrhorodska» type in «Ukraina» sanatorium in Makiv village). Creation of 100 new work places.

Type of economic activity to invest

Industry (production of foodstuffs, drinks, and tobacco products)

Form of cooperation Sale of proprietary interests – 100% of factory assets are for sale at price 8600 thousand UAH

Organizational form of cooperation

Pay-back period - 10 yearsAnnual income from realization – 11 million UAH Net profit - 1 million UAH

Project total value, thousand USD 1365Form of ownership; share in state property

Association

Resources provision Main building – 2 floors of area 3441.4 sq. m, office – 575.8 sq. m,shop for juices and drying – 2305.5 sq. m, shop for soft drinks -1418.3 sq. m, fruit storage – 1440.4 sq. m, distribution centre – 532.2 sq. m.Land ground: 7.8 hectares

Investment demand, thousand USD (%)

Investment need is 1365 thousand USD, to be used for:- factory purchase – 1100 thousand USD- running repairs of workshops, warehouses, technological equipment, engineering communications – 200 thousand USD- purchase of equipment for production line to produce juice concentrate (Bukher type press), development of engineering design, assembly and launch of the line, selection and training of personnel, etc – 100 thousand USDreplenish of working capital – 70 thousand USD

Investment offer completion level Investment offer

Page 60: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Essential elements of the enterprise (organization)

2, Pershogo Travnya Str., Dunayivtsi, Dunayivtsidistrict,

Khmelnytskyi region, 32413Tel./Fax: + 38 (03858) 7-11-68, 7-11-69

Initiator contact details Head of District State Administration tel.: (03858) 3-13-02;fax: (03858) 3-38-33;е-mаil: [email protected] Director Yashchyshyn Anatolii Mykhailovych tel/fax. (03858) 7-11-68, 7-11-69

Page 61: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Creation of a new production on the vacant

areas of Dunayivtsi Repair and Engineering Works Ltd.

The essence and purpose of project

Creation of a new production on the vacant areas of Dunayivtsi Repair and Engineering Works Ltd. In Dunayivtsi

Type of economic activity to invest

Engineering

Form of cooperation Organization of joint production, rental of vacant areas, possible partial sale

Project total value, thousand USD Defined by investorInvestment demand, thousand USD (%)

Defined by investor

Form of ownership; share in state property

Private

Resources provision Total area of main and auxiliary production is 5.5 thousand sq. m. The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and gas networks, booster station to provide the process with compressed air. Total area of land ground: 3.5 hectares, 100% with surfaced roads

Investment offer completion level Investment offerEssential elements of the enterprise (organization)

Dunayivtsi Repair and Engineering Works Ltd32400 DunayivtsiIII Internathionalu Str. 24

Initiator contact details Head of District State Administration tel.: (03858) 3-13-02;fax: (03858) 3-38-33;е-mаil: [email protected] of Dunayivtsi Repair and Engineering Works Tuliuk Volodymyr MykhailovychTel.: + 38 (03858) 3-13-33

Page 62: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Finishing of construction of sports and fitness

complex in Dunayivtsi urban settlement of Dunayivtsi District

The essence and purpose of project

Redemption or rent of incomplete construction, equipment and setting of the object into operation

Type of economic activity to invest

Construction

Form of cooperation SaleProject total value, thousand USD 400Investment demand, thousand USD (%)

400,00 (100%)

Form of ownership; share in state property

State

Resources provision 2.2 hectares, incomplete building of sports and fitness complex with connected engineering services (sewage, water supply), object completion level – 75%

Investment offer completion level Object of incomplete construction, 75% completion level, available design estimate documentation

Essential elements of the enterprise (organization)

32413Dunayivtsi district Dunayivtsi Lermontova Str., 1

Initiator contact details Head of District State Administration Tel. (03858) 3-16-46, 3-11-78;fax. (03858) 3-13-02Director Kovbasiuk Nadia Mytrofanivna Tel.: + 38 (03858) 7-10-49

Page 63: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Finishing of construction of sports and culture

complex in Mynkivtsi village of Dunayivtsi district

The essence and purpose of project

Finishing of construction of sports and culture complex in Mynkivtsi village of Dunayivtsi district

Type of economic activity to invest

Construction, activity in sphere of culture and sport

Form of cooperation Sale or rentProject total value, thousand USD 2500Investment demand, thousand USD (%)

1000 (40%)

Form of ownership; share in state property

Communal

Resources provision 0.7 hectares, incomplete building of sports complex, object completion level – 60%

Investment offer completion level Building of incomplete construction, design estimate documentation

Essential elements of the enterprise (organization)

Mynkivtsi Village CouncilMynkivtsi, Dunayivtsi district, Khmelnytskyi region Head of village Oliinyk Natalia VasylivnaTel.: + 38 (03858) 6-51-94

Initiator contact details Head of District State AdministrationTel.: + 38 (03858) 3-13 02Head of village Tel.: + 38 (03858) 6-51-94

Page 64: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Construction of milking parlor for 1000 cows of

Kozatska Dolyna 2006 Ltd., Vykhrivka village of Dunayivtsi district Khmelnytskyi region

The essence and purpose of project

Construction of milking parlor for 1000 cows, attraction of additional investment into district agriculture, production increase of qualitative animal production – milk. Kozatska Dolyna 2006 Ltd., Vykhrivka village, Dunayivtsi district, Khmelnytskyi region

Type of economic activity to invest

Agriculture(animal breeding)

Form of cooperation Leasing of equipment or organization of joint production

Financial indicators of Project Project payback period – 4 yearsProject total value, thousand USD 200Investment demand, thousand USD (%)

200 (100%)

Form of ownership; share in state property

Private

Resources provision Available vacant land for construction of new milking parlor for 1000cows, available 564 cows, food reserve

Investment offer completion level Suggested projectEssential elements of the enterprise (organization)

Kozatska Dolyna 2006 Ltd 32436Vykhrivka village Dunayivtsi district

Initiator contact details Head of District State AdministrationTel. (03858) 3-16-46, 3-11-78;Fax (03858) 3-13-02Head of enterpriseZahorodnii Vitalii Mykhailovych Tel.: + 38 (03858) 2-10-26

Page 65: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Operational renewal of milk-ware complex for

400 cows, Mala Kruzhelivka village of Dunayivtsi district Khmelnytskyi region

The essence and purpose of project

Reconstruction of premises for 400 cows

Type of economic activity to invest

Agriculture (animal breeding)

Form of cooperation Organization of joint production, redemption or rent

Project total value, thousand USD 150Investment demand, thousand USD (%)

150 (100%)

Form of ownership; share in state property

Association of shareholders in Mala Kruzhelivka village

Resources provision Arable land total area - 1914 hectares, Territory of dairy production complex - 20 hectares. There are 2 brick premises with reinforced- concrete flooring.There is a dairy block, a premise for artificial insemination, a veterinary drugstore, two water towers, electric mains. Distance to road of regional connection - 7 km.Availability of land for dairy - commodity complex for 400 cows, the availability of fodder.

Initiator contact details Head of District State AdministrationTel. (03858) 3-16-46, 3-11-78;Fax (03858) 3-13-02

Page 66: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Operational renewal of milk-ware complex for

500 cows, Zelenche village of Dunayivtsi district Khmelnytskyi region

The essence and purpose of project

Reconstruction of premises, operational renewal of milk-ware complex for 500 cows

Type of economic activity to invest

Agriculture (animal breeding)

Form of cooperation Organization of joint production, redemption or rent

Financial indicators of Project Milk-ware complex for 500 cows.Annual milk gross output – 2000 tons. Milk cow productivity – 4000 kg. Payback – 4 years

Project total value, thousand USD 200Investment demand, thousand USD (%)

200 (100%)

Form of ownership; share in state property

Zelenche village of Dunayivtsi district Khmelnytskyi region

Resources provision Arable land total area - 1675 hectares, Territory of dairy production complex - 15 hectares. There are 3 brick premises with reinforced concrete flooring.There is a dairy block, a premise for artificial insemination, a veterinary drugstore, two water towers, and electric mains. Distance to road of regional connection - 8 km. Available vacant land for milk- ware complex for 500 cows, the availability of fodder.

Initiator contact details Head of District State AdministrationTel. (03858) 3-16-46, 3-11-78;Fax (03858) 3-13-02

Page 67: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Izyaslav districtSection Commentary

Name of project Reconstruction of electrical distribution networks 10/1,4 kV in Soshne village

The essence and purpose of project

Reducing of energy losses by its transportation and reliability improving of electricity consumers

Type of economic activity to invest

Construction

Form of cooperation Co-financingProject total value, thousand USD 260Investment demand, thousand USD (%)

254,8 (98 %)

Form of ownership; share in state property

Communal

Resources provision developed design estimates, which were examinedInvestment offer completion level Investment offerEssential elements of the enterprise (organization)

Soshne village council 30300Izyaslav district, Soshne

Initiator contact details Village head tel. (03852) 4-12-35е-mаil: [email protected]

Page 68: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Iziaslav district house of culture reconstruction

in Izyaslav Khmelnitsky regionThe essence and purpose of project

Iziaslav district house of culture reconstruction, improving the quality of cultural services to city residents, expansion of activities of the recreation and leisure institution for different population groups

Type of economic activity to invest

Construction

Form of cooperation Implementation of joint projectsProject total value, thousand USD 95 (approximately)Investment demand, thousand USD (%)

95 (100%)

Form of ownership; share in state property

Communal

Resources provision Total area of the building – 2786, 4 sq. mDistance to Khmelnitsky – 103 kmLocation in the recreational areaAvailable all communications

Investment offer completion level Investment offer

Essential elements of the enterprise (organization)

Iziaslav district house of culture 30300Iziaslav, Shevchenko Str., 40-а

Initiator contact details Director of Iziaslav district house of culture tel. (03852) 4-23-84е-mаil: [email protected]

Page 69: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Reconstruction of Pumping Station with the

establishment of facilities for disinfection of drinking water in Izyaslav, Khmelnitsky region

The essence and purpose of project

Reducing of energy consumption, improving water quality

Type of economic activity to invest

Water supply and sewerage

Form of cooperation InvestmentsProject total value, thousand USD 36Investment demand, thousand USD (%)

36 (100%)

Form of ownership; share in state property

Communal

Resources provision Pumping Station located near Soshenko tributary of Horyn ryver.Developed design estimates, which were examined

Investment offer completion level investment projectEssential elements of the enterprise (organization)

Communal Enterprise «Izyaslavvodokanal»30300Izyaslav, Shevchenko Str.,19

Initiator contact details Chief Technologist of Communal Enterprise «Izyaslavvodokanal»Polischuk Serhiy Mykolayovych, tel.(03852) 4-23-99е-mаil: [email protected]

Page 70: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Overhaul of 200mm D asbestos cement water

pipe from water reservoirs to PJSC «Iziaslav realizable base of bread» in the Khmelnitsky region m.Izyaslav

The essence and purpose of project

Replacing emergency water supply

Type of economic activity to invest

Water supply and sewerage

Form of cooperation InvestmentsProject total value, thousand USD 29Investment demand, thousand USD (%)

29 (100%)

Form of ownership; share in state property

Comunnal

Resources provision Developed design estimates, which were examined Investment offer completion level investment projectEssential elements of the enterprise (organization)

Communal Enterprise «Izyaslavvodokanal»30300Izyaslav, Shevchenko Str.,19

Initiator contact details Chief Technologist of Communal Enterprise «Izyaslavvodokanal»Polischuk Serhiy Mykolayovych, tel.(03852) 4-23-99е-mаil: [email protected]

Page 71: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Boiler house pipelines reconstruction on

Stanislavsky Str., 2, IzyaslavThe essence and purpose of project

Replacing of physically worn central heating underground pipelines with a diameter of 273 and 219 mm with the pre-insulated pipes of similar diameter.

Type of economic activity to invest

Production and distribution of heat

Form of cooperation Co-financingProject total value, thousand USD 48Investment demand, thousand USD (%)

48 (100%)

Form of ownership; share in state property

Communal

Resources provision Availability of equipment and personnel for construction works

Investment offer completion level Investment offerEssential elements of the enterprise (organization)

Communal Enterprise «Izyaslavteplomerezha»30300Izyaslav, Shevchenko Str., 10 А

Initiator contact details Communal Enterprise «Izyaslavteplomerezha»Chief Accountant Zhytynsky Valeriy Stanislavovychtel.(03852) 4-17-47е-mаil: і[email protected]

Page 72: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Production expansion of fuel pelletsThe essence and purpose of project

Production expansion of fuel pellets

Type of economic activity to invest

Production of alternative types of fuel

Form of cooperation Commodity production of parallel-sequential formProject total value, thousand USD 240Investment demand, thousand USD (%)

240 (100%)

Form of ownership; share in state property

State EnterpriseOn a contractual basis

Resources provision Closed type enterpriseDistance to Khmelnitsky -103 kmInstalled equipment for the production of fuel pellets and charcoal makes it possible to produce 100 tons of pellets and 25 tons of charcoal per month.Area of production capacity - 111.7 thousand square meters, equipped woodworking, welding, metalworking and sewing equipment. There are additional facilities available (3 shops), free area to install facilities for making charcoal.

Investment offer completion level The investment project is under developmentEssential elements of the enterprise (organization)

SE «Enterprise Izyaslav correctional facility UDPtSU in Khmelnytsky region (№ 31)»30300, Izyaslav, Haharina Str., 4

Initiator contact details Director Kozachuk Volodymyr Oleksiyovychtel.: (03852) 4-10-42, е-mаil: [email protected]

Page 73: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Extraction of peat, peat briquettes and lump

peat productionThe essence and purpose of project

Extraction of mineral resources (peat)

Type of economic activity to invest

Industry - extraction of fuel and energy minerals

Form of cooperation Foreign investmentProject total value, thousand USD 150Investment demand, thousand USD (%)

150 (100%)

Form of ownership; share in state property

Communal

Resources provision Explored reserves of peatInvestment offer completion level Project proposalEssential elements of the enterprise (organization)

Sahnovetska village council30364, Izyaslav district, Sahnivtsi

Initiator contact details Village head tel./fax: (03852) 35331 е-mаil: [email protected]

Page 74: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Waste recycling plant constructionThe essence and purpose of project

Recycling of solid waste

Type of economic activity to invest

Construction, housing and communal services

Form of cooperation Ltd. creationProject total value, thousand USD 1500Investment demand, thousand USD (%)

1500 (100%)

Form of ownership; share in state property

Municipal property share

Resources provision Available land area - 16.5 hectares.Available access road, power supply.Distance to water supply and sanitation - 0.5 km.

Investment offer completion level Investment proposalEssential elements of the enterprise (organization)

Municipal Enterprise «Komunenergo»30300Izyaslav, Podilska Str.,3

Initiator contact details Director of enterprise Matviichuk Vyacheslav Viktorovich, tel. (03852) 413-49Head of Sector of housing and communal services of District State Administrationtel. (03852) 4-21-94, е-mаil: [email protected]

Page 75: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Creating of infrastructure for development of

rural tourism on the Myslyatynska village council territory

The essence and purpose of project

The picturesque area and the availability of water resources (Myslyatynske reservoir and pond in the Bilchyn village) is a potential for rural tourism development. At an appropriate infrastructure (wharf, places for parking cars, spending the night, bathing, beach, etc.) above mentioned resources can be actively used for the development of tourism, including water sports.

Type of economic activity to invest

Tourist activity

Form of cooperation Attracted investmentsProject total value, thousand USD 100Investment demand, thousand USD (%)

100 (100%)

Form of ownership; share in state property

Communal

Resources provision Available free buildingsInvestment offer completion level Investment proposal as an ideaEssential elements of the enterprise (organization)

Myslyatynska village council30344Izyaslav district, Myslyatyn,Horynska Str., 21А

Initiator contact details Village headtel.(03852) 32-542е-mаil: [email protected]

Page 76: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Mill work restoring in Poliske village of

Izyaslav districtThe essence and purpose of project

Reconstruction

Type of economic activity to invest

Agriculture

Form of cooperation Attracted investmentsProject total value, thousand USD 35Investment demand, thousand USD (%)

35 (100%)

Form of ownership; share in state property

Communal

Resources provision Available buildings, communicationsInvestment offer completion level Project proposalEssential elements of the enterprise (organization)

Poliske village council 30334Izyaslav district, Poliske

Initiator contact details Chairman of citizens - owners unionBaliychuk Nataliya Vasylivna, tel. (03852) 32736

Page 77: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Construction of kindergarten for 87 places

Bortnyka Str. in Pluzhne village of Izyaslav district

The essence and purpose of project

Providing preschool education for children

Type of economic activity to invest

Construction

Form of cooperation Co-financingProject total value, thousand USD 750Investment demand, thousand USD (%)

735 (98%)

Form of ownership; share in state property

Communal

Resources provision Developed design estimates documentation, which passed the expertise

Investment offer completion level Investment proposalEssential elements of the enterprise (organization)

Pluzhne village council30320Izyaslav district,Pluzhne

Initiator contact details Village headtel.fax (3852) 5-02-52, 31-557е-mаil: [email protected]

Page 78: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Kamyanets-Podilskyi districtSection Commentary

Name of project Construction of the recreation center in Vrublivtsi village of Kamyanets-Podilskyi district

The essence and purpose of project

Construction of a skiing type recreational center on the territory of Vrublivtsi village council

Type of economic activity to invest

Hotels and restaurants

Form of cooperation Creation of a new business entityProject total value, thousand USD 200Investment demand, thousand USD (%)

200 (100%)

Form of ownership; share in state property

Communal

Resources provision Proposed site with appropriate relief and the possibility of necessary infrastructure highways construction.

Investment offer completion level Business plan developmentEssential elements of the enterprise (organization)

Vrublivtsi village council 32394Kamyanets-Podilskyi district, Vrublivtsi

Initiator contact details Village headtel.(03849) 9-35-42; 0973805941

Page 79: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Construction of the recreation center in

Slobidka Malynovetska village of Kamyanets-Podilskyi district

The essence and purpose of project

Construction of a recreational center on the territory of the Hrynchuk village council

Type of economic activity to invest

Hotels and restaurants

Form of cooperation Creation of a new business entity Project total value, thousand USD 100Investment demand, thousand USD (%)

100 (100%)

Form of ownership; share in state property

Communal

Resources provision Proposed the old premises and surrounding areas with possibility of necessary infrastructure highways construction

Investment offer completion level Business plan development

Essential elements of the enterprise (organization)

Hrynchuk village council 32378Kamyanets-Podilskyi district, Hrynchuk

Initiator contact details Village headtel. (03849) 9-54-220672888825

Page 80: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Construction of production facilities on 2

industrial sites in Hryshka village of Kamyanets-Podilskyi district

The essence and purpose of project

2 industrial sites proposed for construction of production facilities

Type of economic activity to invest

Industry

Form of cooperation Creation of a new business entity

Project total value, thousand USD Determined by investor

Investment demand, thousand USD (%)

 Determined by investor

Form of ownership; share in state property

Communal

Resources provision 2 proposed land area of 0.5 hectares for industrial use with possibility of necessary infrastructure highways construction

Investment offer completion level Business plan development

Essential elements of the enterprise (organization)

Hrushka village council32380Kamyanets-Podilskyi district, Hrushka

Initiator contact details Village headtel.(03849) 9-95-65; 9-83-22, 0967479085

Page 81: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Resumption of cattle farm work in Derevjane

village of Kamyanets-Podilskyi districtThe essence and purpose of project

Proposed cattle farms

Type of economic activity to invest

Agriculture

Form of cooperation Lease, saleProject total value, thousand USD 300Investment demand, thousand USD (%)

300 (100%)

Form of ownership; share in state property

Communal

Resources provision Proposed cattle farms buildings with possibility of necessary infrastructure highways construction

Investment offer completion level Business plan developmentEssential elements of the enterprise (organization)

Derevjane village council 32356Kamyanets-Podilskyi district, Derevjane

Initiator contact details Village headtel.(03849) 9-38-33; 0973441307

Page 82: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Construction of production facilities at the

industrial site in Dumaniv village of Kamyanets-Podilskyi district

The essence and purpose of project

Proposed industrial site for the construction of production facilities

Type of economic activity to invest

Industry

Form of cooperation Creation of a new business entity Project total value, thousand USD  Determined by investorInvestment demand, thousand USD (%)

 Determined by investor

Form of ownership; share in state property

Private

Resources provision Proposed land area of 1 hectares for industrial use with possibility of necessary infrastructure highways construction

Investment offer completion level Business plan developmentEssential elements of the enterprise (organization)

Dumaniv village council 32321Kamyanets-Podilskyi district, Dumaniv

Initiator contact details Village headtel.(03849) 9-21-450964602437

Page 83: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Resumption of cattle farm work in Dumaniv

village of Kamyanets-Podilskyi districtThe essence and purpose of project

Proposed cattle farms

Type of economic activity to invest

Agriculture

Form of cooperation Lease, saleProject total value, thousand USD 300Investment demand, thousand USD (%)

300 (100%)

Form of ownership; share in state property

Private

Resources provision Proposed cattle farms buildings with possibility of necessary infrastructure highways construction

Investment offer completion level Business plan developmentEssential elements of the enterprise (organization)

Dumaniv village council 32321Kamyanets-Podilskyi district, Dumaniv

Initiator contact details Village headtel.(03849) 9-21-450964602437

Page 84: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Construction of the market of agricultural

products in Zhvanets village of Kamyanets-Podilskyi district

The essence and purpose of project

Proposed area at the intersection of highways for adjustment of the rural market

Type of economic activity to invest

Trading

Form of cooperation Creation of a new business entity Project total value, thousand USD 20Investment demand, thousand USD (%)

20 (100%)

Form of ownership; share in state property

Private

Resources provision Proposed plot of 0.5 ha for adjustment of the rural market

Investment offer completion level Business plan development

Essential elements of the enterprise (organization)

Zhvanets village council32365Kamyanets-Podilskyi district, Zhvanets

Initiator contact details Village head tel.(03849) 7-53-42, 0673818375

Page 85: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Construction of production facilities at the

industrial site in Zalissya Pershe village of Kamyanets-Podilskyi district

The essence and purpose of project

Proposed industrial site for the construction of production facilities

Type of economic activity to invest

Industry

Form of cooperation Creation of a new business entity

Project total value, thousand USD  Determined by investor

Investment demand, thousand USD (%)

 Determined by investor

Form of ownership; share in state property

Private

Resources provision Proposed land area of 1,5 hectares (territory of the former tractor garage) for industrial use with possibility of necessary infrastructure highways construction

Investment offer completion level Business plan development

Essential elements of the enterprise (organization)

Zalissya village council 3233Kamyanets-Podilskyi district,Zalissya Pershe

Initiator contact details Village head tel.(03849) 9-26-42,0673413711

Page 86: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Construction of production facilities at the

industrial site in Kamjanka village of Kamyanets-Podilskyi district

The essence and purpose of project

Proposed industrial site for the construction of production facilities

Type of economic activity to invest

Industry

Form of cooperation Creation of a new business entity Project total value, thousand USD  Determined by investorInvestment demand, thousand USD (%)

 Determined by investor

Form of ownership; share in state property

Communal

Resources provision Proposed land area of 1 hectares for industrial use (territory of the former airport) with possibility of necessary infrastructure highways construction

Investment offer completion level Business plan developmentEssential elements of the enterprise (organization)

Kamjanka village council32300Kamyanets-Podilskyi district,Kamjanka

Initiator contact details Village head tel.(03849) 7-75-05, 0965999691, 0673830231

Page 87: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Сomplete property production complex in

Kamjanka village of Kamyanets-Podilskyi district

The essence and purpose of project

Proposed industrial complex

Type of economic activity to invest

Industry

Form of cooperation Lease, saleProject total value, thousand USD  Determined by investor

Investment demand, thousand USD (%)

 Determined by investor

Form of ownership; share in state property

Private

Resources provision Complete property production complex is proposed with area of 1.5 hectares, which includes warehouses, woodworking machines, garages

Investment offer completion level Business plan development

Essential elements of the enterprise (organization)

Podilska construction company32300Kamyanets-Podilskyi district Kamjanka

Initiator contact details Povar Anatoly Sergeyevichtel. 0673842055

Page 88: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Construction of a recreational center on the

territory of Kytajgorod village of Kamyanets-Podilskyi district

The essence and purpose of project

Construction of a recreational center on the territory of Kytajgorod village

Type of economic activity to invest

Tourism, recreation

Form of cooperation Creation of a new business entity

Project total value, thousand USD  Determined by investor

Investment demand, thousand USD (%)

 Determined by investor

Form of ownership; share in state property

Private

Resources provision Proposed old manor estate building and adjoining plot of 1 ha with possibility of necessary infrastructure highways construction

Investment offer completion level Business plan development

Essential elements of the enterprise (organization)

Kytajgorod village council 32392Kamyanets-Podilskyi districtKytajgorod

Initiator contact details Village headtel.(03849) 9-81-18; 0961644528

Page 89: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Reconstruction of the old school in Chaharivka

village of Kamyanets-Podilskyi district

The essence and purpose of project

Reconstruction of the old school

Type of economic activity to invest

 -

Form of cooperation Creation of a new business entity

Project total value, thousand USD  Determined by investor

Investment demand, thousand USD (%)

 Determined by investor

Form of ownership; share in state property

Communal

Resources provision Proposed premises of the old school and the surrounding area with possibility of necessary infrastructure highways construction

Investment offer completion level Business plan development

Essential elements of the enterprise (organization)

Kolybaivka village council 32370Kamyanets-Podilskyi district Kolybaivka

Initiator contact details Village headtel. (03849) 7-05-50, 9-14-37

Page 90: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Reconstruction of the old school in Suprunkivtsi

village of Kamyanets-Podilskyi district The essence and purpose of project

Reconstruction of the old school

Type of economic activity to invest

services sector

Form of cooperation Creation of a new business entityProject total value, thousand USD  Determined by investorInvestment demand, thousand USD (%)

 Determined by investor

Form of ownership; share in state property

Communal

Resources provision Proposed premises of the old school and the surrounding area with possibility of necessary infrastructure highways construction

Investment offer completion level Business plan developmentEssential elements of the enterprise (organization)

Suprunkivtsi village council 32350Kamyanets-Podilskyi district Suprunkivtsi

Initiator contact details Village headtel. (03849) 9-23-35

Page 91: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Reconstruction of the old baths in Panivtsi

village of Kamyanets-Podilskyi district The essence and purpose of project

Reconstruction of the old baths

Type of economic activity to invest

Tourism, recreation

Form of cooperation Creation of a new business entityProject total value, thousand USD  Determined by investorInvestment demand, thousand USD (%)

 Determined by investor

Form of ownership; share in state property

Communal

Resources provision Proposed premises of the old baths and the surrounding area with possibility of necessary infrastructure highways construction

Investment offer completion level Business plan developmentEssential elements of the enterprise (organization)

Panivtsi village council 32376Kamyanets-Podilskyi district Panivtsi

Initiator contact details Village headtel. (03849) 9-87-18, 9-88-37

Page 92: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Reconstruction of the castle complex in Panivtsi

village of Kamyanets-Podilskyi district The essence and purpose of project

Reconstruction of the castle complex into recreational

Type of economic activity to invest

Tourism, recreation

Form of cooperation Creation of a new business entity Project total value, thousand USD 300Investment demand, thousand USD (%)

300 (100%)

Form of ownership; share in state property

Communal

Resources provision Proposed castle complex and the surrounding area with possibility of necessary infrastructure highways construction

Investment offer completion level Business plan developmentEssential elements of the enterprise (organization)

Panivtsi village council 32376Kamyanets-Podilskyi district Panivtsi

Initiator contact details Village headtel. (03849) 9-87-18, 9-88-37

Page 93: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Reconstruction of the castle complex in Rykhta

village of Kamyanets-Podilskyi district The essence and purpose of project

Reconstruction of the castle complex into recreational

Type of economic activity to invest

Tourism, recreation

Form of cooperation Creation of a new business entity Project total value, thousand USD 300Investment demand, thousand USD (%)

300 (100%)

Form of ownership; share in state property

Communal

Resources provision Proposed castle complex and the surrounding area with possibility of necessary infrastructure highways construction

Investment offer completion level Business plan developmentEssential elements of the enterprise (organization)

Rykhta village council32346Kamyanets-Podilskyi district Rykhta

Initiator contact details Village headtel.(03849) 9-56-41,0978842007

Page 94: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Reconstruction of the building of the former

health post in Slobidka Rykhtivska village of Kamyanets-Podilskyi district

The essence and purpose of project

Planned construction of a mini hotel, cafes, saunas, tourist shelter

Type of economic activity to invest

Hotels and restaurants

Form of cooperation Creating a companyProject total value, thousand USD 100Investment demand, thousand USD (%)

100 (100%)

Form of ownership; share in state property

Communal

Resources provision The total area - 80 sq.m. Availability of energy and transporttation.Distance to the city of Kamyanets-Podilskyi - 25 km.

Investment offer completion level Development of investment proposalEssential elements of the enterprise (organization)

Slobidka Rykhtivska village council32360Kamyanets-Podilskyi district Slobidka Rykhtivska

Initiator contact details Village headtel. (03849) 9-11-29, 9-85-84, 0964230170

Page 95: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Reconstruction of the castle complex in

Chornokozyntsi village of Kamyanets-Podilskyi district

The essence and purpose of project

Reconstruction of the castle complex into recreational

Type of economic activity to invest

Tourism, recreation

Form of cooperation Creation of a new business entity Project total value, thousand USD 300Investment demand, thousand USD (%)

300 (100%)

Form of ownership; share in state property

Communal

Resources provision Proposed castle complex and the surrounding area with possibility of necessary infrastructure highways construction

Investment offer completion level Business plan developmentEssential elements of the enterprise (organization)

Shustivtsi village council 32335Kamyanets-Podilskyi district Shustivtsi

Initiator contact details Village headtel.(03849) 9-89-84, 0978794229

Page 96: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Reconstruction of the former pioneer camp in

Kolybaivtsi village of Kamyanets-Podilskyi district

The essence and purpose of project

Planned construction of a mini hotel, cafes, saunas, tourist shelter

Type of economic activity to invest

Hotels and restaurants

Form of cooperation Creating a companyProject total value, thousand USD 100Investment demand, thousand USD (%)

100 (100%)

Form of ownership; share in state property

Communal

Resources provision Total area - 4 hectares.Availability of energy and transportation.Distance to the city of Kamyanets-Podilskyi - 10 km.

Investment offer completion level Development of investment proposalEssential elements of the enterprise (organization)

Humentsi village council32325Kamyanets-Podilskyi district Humentsi

Initiator contact details Village headtel.(03849) 7-59-10, 7-59-74, 0672988579

Page 97: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Construction of children's camp in Stara

Ushytsya village of Kamyanets-Podilskyi district

The essence and purpose of project

Proposed industrial site with area of 5 ha for construction of children's camp

Type of economic activity to invest

Recreational activities

Form of cooperation Creation of a new business entity

Project total value, thousand USD 245Investment demand, thousand USD (%)

245 (100%)

Form of ownership; share in state property

Communal

Resources provision Proposed area for construction of children's camp with appropriate relief and possibility of necessary infrastructure highways construction

Investment offer completion level Business plan developmentEssential elements of the enterprise (organization)

32385Kamyanets-Podilskyi district Stara Ushytsya

Initiator contact details Matskov Vasiliy Ivanovichtel. (03849) 9-95-65,0673830227

Page 98: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Krasyliv districtSection Commentary

Name of project Production and supply of heat energy with usage of alternative energy sources by installing modular boiler on solid type of fuel for heating budget institutions: Krasyliv School of I-III degree № 2 and Krasyliv Central Hospital

The essence and purpose of project

Providing of heat to social facilities during all heating season, reducing the burden on local budgets

Type of economic activity to invest

Construction

Form of cooperation Project financing, co-financingProject total value, thousand USD 50Investment demand, thousand USD (%)

50 (100%)

Form of ownership; share in state property

State

Resources provision Formed investment offerInvestment offer completion level Investment offerEssential elements of the enterprise (organization)

Department of economy, trade, infrastructure development and tourism of district state administration31000KrasylivNezalezhnosti square, 2

Initiator contact details Head of Department of economy, trade, infrastructure development and tourism of district state administrationtel. (03855) 42297е-mail: [email protected]

Page 99: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Krasyliv Central hospital corpus № 1 façade

overhaul (southern and northern sides) insulation on Hrushevskogo Str. 140 in Krasyliv

The essence and purpose of project

Effective energy supply for hospital by reducing the unit cost of energy carriers by 40%reduction of budget expenditures for consumed energy, improvement medical facility sanitary conditions for patients by improving the energy efficiency of buildings

Type of economic activity to invest

Construction

Form of cooperation Project financing, co-financingProject total value, thousand USD 40Investment demand, thousand USD (%)

40 (100%)

Form of ownership; share in state property

Communal property

Resources provision Developed design and estimate documentation

Investment offer completion level Investment offer

Essential elements of the enterprise (organization)

Krasyliv central district hospital31000Krasyliv,Hrushevskogo Str. 140

Initiator contact details Head Physician of Krasyliv central district hospitaltel. (03855) 44200e-mail: [email protected]

Page 100: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Letychiv districtSection Commentary

Name of project Recovery of industrial activity on the territory and production areas of former JSC «Medzhybizhskyy tinned food factory»

The essence and purpose of project

Recovery of the processing enterprise (fruit and vegetable processing, preservation, drying, storage etc.). It may be considered as an option to purchase the entire property complex by the investor from private owner to create on a land plot of 4.5 hectares new production structure

Type of economic activity to invest

Industrial food production

Form of cooperation Share participation. Possible holder replacement option by purchasing the entire property complex

Project total value, thousand USD  Determined by investorInvestment demand, thousand USD (%)

 Determined by investor

Form of ownership; share in state property

Private ownership of buildings, land is a property of Trebuhivtsi village council and is used by lease

Resources provision Land area of 4.5 hectares. Production facilities, warehouses maintained in good condition. The area is protected by the owner.

Investment offer completion level Investment offerEssential elements of the enterprise (organization)

Trebuhivtsi village council 31530Letychiv districtTrebuhivtsi

Initiator contact details Village headtel: (03857) 9-86-46

Page 101: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Modernization and expansion of acting

production or establishment of new type of activity on the base of integral property complex of Medzhybizh RTP Open Joint-Stock Company

The essence and purpose of project

To start operating capacities in full, and also to introduce new technologies at the enterprise concerning technics service.

Type of economic activity to invest

Engineering

Form of cooperation Sale of proprietary interests, creation of enterprise; organization of a joint production

Project total value, thousand USD Determined by investorInvestment demand, thousand USD (%)

Determined by investor

Form of ownership; share in state property

Private property

Resources provision Area - 2.6 hectares, fabrication facilities – 1600 sq. m, workshops – 700 sq. m, utility rooms – 1200 sq. m. Own electric main facility, water tower. Railway – at distance 22 km. Highway Stryi-Ternopil-Kirovohrad-Znamianka at distance 3 km.

Investment offer completion level Investment offer

Essential elements of the enterprise (organization)

Medzhybizh RTP Open Joint-Stock Company, 31531 Letychiv district, Stavnytsya, Lenin Str.,4

Initiator contact details Director Sokalskiy Anatoliy Yevgenovychtel. (038257) 9-83-72, 9-71-85;Head of Medzhybizh village counciltel. (03857) 9-71-66, 9-71-71, 9-71-55

Page 102: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Modernization and expansion of production of

Letychiv Aggregate Works Open Joint-Stock Company on the basis of participatory interest

The essence and purpose of project

It is suggested to carry out modernization and expansion of production on the basis of participatory interest. Purchase and installation of new and modern equipment in the sphere of production of finished hardware

Type of economic activity to invest

Metallurgical production and production of finished hardware

Form of cooperation Organization of a joint productionProject total value, thousand USD 500Investment demand, thousand USD (%)

250 (50%)

Form of ownership; share in state property

Private property

Resources provision Land ground 3.2 hectares. Fabrication facilities: workshop – 3000 sq.m comprising sections: blank, mechanical, painting, welding, grinding.

Investment offer completion level Investment offerEssential elements of the enterprise (organization)

Letychiv Aggregate Works Open Joint-Stock Company31500 Letychiv, Ivan Franko Str., 33

Initiator contact details DirectorBortnyk Volodymyr Ivanovych, tel.(0382) 78-38-25; 72-01-44e-mail: [email protected]

Page 103: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Nova Ushytsya districtSection Commentary

Name of project Construction of brick factory for manufacturing ceramic brick

The essence and purpose of project

Construction of brick factory for manufacturing ceramic brick. Greenfield type of land plot

Type of economic activity to invest

Industry

Form of cooperation InvestmentProject total value, thousand USD 3500Investment demand, thousand USD (%)

3500 (100%)

Form of ownership; share in state property

State

Resources provision The land area - 17 haType of soil - gray loamThe level of groundwater - 7.10 mThe nearest highway - 0,1 kmThe nearest railway track - 40 kmThe nearest airport - 110 km

Investment offer completion level Investment offerEssential elements of the enterprise (organization)

Zamikhiv village council32630Nova Ushytsya district, Zamikhiv

Initiator contact details Village headtel.(03847) 2-46-41

Page 104: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Construction of brick factory for

manufacturing ceramic brickThe essence and purpose of project

Construction of brick factory for manufacturing ceramic brick. Greenfield type of land plot

Type of economic activity to invest

Industry

Form of cooperation InvestmentProject total value, thousand USD 2000Investment demand, thousand USD (%)

2000 (100%)

Form of ownership; share in state property

State

Resources provision Land area - 5 haType of soil - gray loamThe level of groundwater - 5.7 mThe nearest motorway - 5 kmThe nearest railway track - 48 kmThe nearest airport - 110 km

Investment offer completion level Investment offerEssential elements of the enterprise (organization)

Brailivka village council 32616Nova Ushytsya district,Brailivka

Initiator contact details Village headtel. (03847) 2-53-21

Page 105: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Construction of tourist recreational complex,

trade facilitiesThe essence and purpose of project

Construction of tourist recreational complex, trade facilities Greenfield type of land plot

Type of economic activity to invest

Tourism and recreation

Form of cooperation InvestmentProject total value, thousand USD 1500Investment demand, thousand USD (%)

1500 (100%)

Form of ownership; share in state property

State

Resources provision Land area - 3 hectaresType of soil - gray loamThe level of groundwater - 5 mThe nearest motorway - 42 kmThe nearest railway track - 65 kmThe nearest airport - 150 km

Investment offer completion level Investment offer

Essential elements of the enterprise (organization)

Beresivka village council32643Nova Ushytsya district,Beresivka

Initiator contact details Village head tel. (03847) 2-66-22

Page 106: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Construction of industrial facilities, livestock

buildingsThe essence and purpose of project

Construction of industrial facilities, livestock buildings Greenfield type of land plot

Type of economic activity to invest

Agriculture

Form of cooperation InvestmentProject total value, thousand USD 5500Investment demand, thousand USD (%)

5500 (100%)

Form of ownership; share in state property

State

Resources provision The land area - 25 haThe level of groundwater - 7 mThe nearest highway - 6 kmThe nearest railway track - 44 kmThe nearest airport - 100 km

Investment offer completion level Investment offerEssential elements of the enterprise (organization)

Otrokiv village council 32620Nova Ushytsya district, Otrokiv

Initiator contact details Village head tel. (03847) 2-41-41

Page 107: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Polonne districtSection Commentary

Name of project Construction of medical and preventive center with radon curative water

The essence and purpose of project

Construction of medical and preventive center, available radon water wells on the territory

Type of economic activity to invest

Tourism and recreational activities

Form of cooperation Creation of joint enterpriseFinancial indicators of project Payback - 10 yearsProject total value, thousand USD 43200Investment demand, thousand USD (%)

43200 (100%)

Form of ownership; share in state property

Communal

Resources provision Land ground – 15.84 hectares with available explored radon well bores. Water supply, gas network, electricity and communication lines nearby.

Investment offer completion level Investment offerEssential elements of the enterprise (organization)

Polonne district State administration 30500Polonne, Lesia Ukrainka Str., 114

Initiator contact details Head of district State administrationtel. (03843) 3-20-66, 3-23-72, e-mail: [email protected]

Page 108: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Construction of 30 camping sites and parking lotsThe essence and purpose of project

Construction of 30 camping sites, 7-8 houses for 4 persons and covered parking for 12-15 cars in the area of RLP «Malovanka» of Burtyn village council of Polonne district

Type of economic activity to invest

Tourism and recreational business

Form of cooperation Acquisition of property by investorFinancial indicators of project Payback period 5 yearsProject total value, thousand USD 650Investment demand, thousand USD (%)

650 (100%)

Form of ownership; share in state property

Private

Resources provision The possibility of land allocation. Asphalt road nearby, electricity and communications.

Investment offer completion level Інвестиційна пропозиціяEssential elements of the enterprise (organization)

Polonne district State administration 30500Polonne, Lesia Ukrainka Str., 114

Initiator contact details Head of district State administrationtel. (03843) 3-20-66, 3-23-72, e-mail: [email protected]

Page 109: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Construction of brick factory in Velyki

Kalenychi village of Polonne districtThe essence and purpose of project

Construction of brick factory on the red clay deposit with capacity of 12 million pcs. Bricks or roof tiles per year (red clay deposits - 2,000 thousand. Sq.m.)

Type of economic activity to invest

Manufacture of other non-metallic mineral products

Form of cooperation Enterprise establishment Financial indicators of project Payback period 5 yearsProject total value, thousand USD 2400Investment demand, thousand USD (%)

2400 (100%)

Form of ownership; share in state property

Private

Resources provision Proposed land for construction of the plant in close proximity to the clay deposits. There is an industrial building of brick factory with an area of 4080 sq. m. Construction readiness 30%, construction began in 1991. Power lines and roads with hard surface are nearby.

Investment offer completion level Investment offerEssential elements of the enterprise (organization)

Polonne district State administration 30500Polonne, Lesia Ukrainka Str., 114

Initiator contact details Head of district State administrationtel. (03843) 3-20-66, 3-23-72, e-mail: [email protected]

Page 110: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Creation of enterprise for fuel pellets

production The essence and purpose of project

Production of fuel briquettes by briquetting straw, sawdust, shavings, sunflower husk etc., can meet the needs of the population and enterprises in the clean and efficient fuel

Type of economic activity to invest

Construction

Form of cooperation Enterprise establishment Financial indicators of project  -Project total value, thousand USD 400Investment demand, thousand USD (%)

400 (100%)

Form of ownership; share in state property

Private

Resources provision  -Investment offer completion level Investment offerEssential elements of the enterprise (organization)

Polonne district State administration 30500Polonne, Lesia Ukrainka Str., 114

Initiator contact details Head of district State administrationtel. (03843) 3-20-66, 3-23-72, e-mail: [email protected]

Page 111: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Creation of crayfish breeding farmThe essence and purpose of project

Breeding crayfish, prepared for sale in prepared reservoirs

Type of economic activity to invest

Agriculture

Form of cooperation Farm creationFinancial indicators of project  -Project total value, thousand USD 100Investment demand, thousand USD (%)

100 (100%)

Form of ownership; share in state property

Private

Resources provision Availability of pond with area of 2.5 haInvestment offer completion level Investment offer

Essential elements of the enterprise (organization)

Polonne district State administration 30500Polonne, Lesia Ukrainka Str., 114

Initiator contact details Head of district State administrationtel. (03843) 3-20-66, 3-23-72, e-mail: [email protected]

Page 112: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Slavuta districtSection Commentary

Name of project Construction of mineral water bottling plant in Varvarivka village of Slavuta district of Khmelnytsky region

The essence and purpose of project

Establishment and development of the enterprise with the subsequent formations of work places

Type of economic activity to invest

Water bottling

Form of cooperation RentProject total value, thousand USD 70,0-100,0Investment demand, thousand USD (%)

70,0-100,0 (100%)

Form of ownership; share in state property

Private

Resources provision Land area 4.0 hectares. Land is free from construction. Well in the Varvarivka village with depth of 110m, debit 39,9 m3/h. You can get around 950m³ / day at lower levels in the well 20-25m. Passport of well -1988 year.

Investment offer completion level Investment offerEssential elements of the enterprise (organization)

POP «Gorin»30016Slavuta district Varvarivka

Initiator contact details Director of POP «Gorin»Labunets Serhiy Volodymyrovychtel. 0672622847

Page 113: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Development of Trostyanetske granite depositsThe essence and purpose of project

Creation of new enterprise. Extraction of granite and processing it into macadam

Type of economic activity to invest

Extraction of granite

Form of cooperation RentProject total value, thousand USD 300Investment demand, thousand USD (%)

300 (100%)

Form of ownership; share in state property

State

Resources provision The maximum available area - 30 hectare.A geological study of 12 hectares.On the soil surface is a mass of granite suitable for development.The nearest highway (road of national importance) - Kyiv – Chop - 6 km.The nearest railway track is located in. Slavuta (40 km). Available water deposits on the territory.

Investment offer completion level Investment offerEssential elements of the enterprise (organization)

Piddubtsi village council 30040Slavuta districtPiddubtsi

Initiator contact details Village headtel.(03842)54-442

Page 114: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Development of poultry, livestock and crop

sectors in the private enterprise «Dzyubak»The essence and purpose of project

Growing of goose and quail

Type of economic activity to invest

Agriculture

Form of cooperation Creation of joint enterprise and distribution of profits

Project total value, thousand USD 500Investment demand, thousand USD (%)

450 (90%)

Form of ownership; share in state property

Private

Resources provision Available three rooms and reconstructed for poultry breeding; Availability of land plot; available incubator and hoverer for growing of a day old saplings

Investment offer completion level Investment offerEssential elements of the enterprise (organization)

Private enterprise «Dzyubak»30073Slavuta district, Vachiv

Initiator contact details Head of the company Dzyubak Volodymyr Petrovychе-mail: - [email protected]. 0673825610 Fax (03842) 2-18-86

Page 115: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Development of Tashky and Varvarivka

saponite depositsThe essence and purpose of project

Industrial extraction of saponite clays to produce feed additives, soil reclamations and other products based on saponite

Type of economic activity to invest

Mining industry

Form of cooperation Possible co-financing from own funds to the 30% stake in the company

Project total value, thousand USD 7213Investment demand, thousand USD (%)

5770,4 (80%)

Form of ownership; share in state property

Private

Resources provision LLC «Veles» is the sole rights owner to develop a unified in Ukraine and the world's largest saponite clay deposits. A saponite deposit located in Slavuta district of Khmelnytskyi region of Ukraine and consists of two parts: Varvarivka and Tashky deposits. Highway Slavuta- Iziaslav passes nearby.

Investment offer completion level Investment offerEssential elements of the enterprise (organization)

Agricultural limited liability company «Veles»30014Slavuta district,Tashky

Initiator contact details CEOYanchuk Olexander Serhijovychtel.(067) 504-6125; e-mail: [email protected]; www.saponit.com

Page 116: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Starokostyantyniv districtSection Commentary

Name of project Construction of small hydropower plants on the river Sluch in Samchyky, Hubyn and Staryi Ostropil villages of Starokostyantyniv district

The essence and purpose of project

Restoration of hydraulic structures, dams of hydropower plant, bridges, etc. Installation of a new, modern energy-saving equipment, automation and transformers.

Type of economic activity to invest

Industry (production and distribution of electricity, gas and water)

Form of cooperation External and internal investmentsProject total value, thousand USD 2400Investment demand, thousand USD (%)

367,5 (15,3%)

Form of ownership; share in state property

Private

Resources provision Memorandum between Ltd. «Resurs eko energo» and State Administration about joint activities on restoration and construction of hydropower plants on the rivers of the region. Made evaluation of objects, technical report, prospecting works and hydrological calculations on the river Sluch reservoirs in Samchyky, Hubyn and Staryi Ostropil villages by Khmelnytsky industrial administration of Reclamation and Water Management.

Investment offer completion level Project estimates documentation readiness – 20%Essential elements of the enterprise (organization)

Ltd. «Resurs eko energo» 29000Khmelnytskyi,Teatralna Str., 36

Initiator contact details Dzvinchuk Tetyana Igorivna, tel. (0382) 79-49-93mobile 050-418-22-02

Page 117: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Reconstruction of fruit and vegetable juice

production enterpriseThe essence and purpose of project

Restoration of the company

Type of economic activity to invest

Industry (production of fruit and vegetable juice)

Form of cooperation Foreign investmentіProject total value, thousand USD 1000,0Investment demand, thousand USD (%)

800,0 (80%)

Form of ownership; share in state property

Private

Resources provision Area - 22.46 ha. Total floor area - 1579 sq.m.Production area - 1426 sq.m. Area of administrative and residential premises - 153 sq.mWarehouse for containers storage - 286 sq.m.Transformer substation with capacity of 400 kVASewerage, water from two own artesian wells, one water tower. Heating: gas boilers «Vaillant», «RTNE-100»

Investment offer completion level - Essential elements of the enterprise (organization)

Private enterprise «Ho-Da», 31160, Starokostyantyniv districtMyrolubneEsenin Str., 1

Initiator contact details ManagerZayets Vasyl Vasylovych,tel. 067-763-83-31

Page 118: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Reconstruction of the bakeryThe essence and purpose of project

Resumption of bakery plant

Type of economic activity to invest

Industry (production of bread and bakery products)

Form of cooperation Foreign investmentProject total value, thousand USD 50,0Investment demand, thousand USD (%)

40,0 (80%)

Form of ownership; share in state property

Private

Resources provision Area - 0,7 hectares. Bakery plant building: one-storey, area - 736.4 sq.m, missing equipment;Pastry shop building, one floor, area - 345.2 sq. m., outdated equipment;Warehouse building: area - 380.3 sq. m.;Warehouse building: area - 108.6 sq. m.;Artesian well

Investment offer completion level Investment offerEssential elements of the enterprise (organization)

31146, Starokostyantyniv districtLevakivka, Lenin Str., 77

Initiator contact details Soltyk Lydia Petrivna, tel. (03854) 61-583

Page 119: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Construction of power plant in Korzhivka

village of Starokostyantyniv district of Khmelnytkyi region (production of electricity from solar energy)

The essence and purpose of project

 Construction of power plant

Type of economic activity to invest

Production of electricity from solar energy

Form of cooperation  -Project total value, thousand USD 335Investment demand, thousand USD (%)

235 (70%)

Form of ownership; share in state property

 -

Resources provision  -Investment offer completion level Investment offerEssential elements of the enterprise (organization)

31145Starokostyantyniv districtKorzhivka

Initiator contact details tel. (03854) 40-447

Page 120: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Stara Synyava districtSection Commentary

Name of project Reconstruction of water supply system in Stara Synyava village of Khmelnytskyi region

The essence and purpose of project

The main problem that caused the need to implement investment program (Reconstruction of water supply system in Stara Synyava village of Khmelnytskyi region) is it`s obsolescence by 93%. The expected result of investment program is providing a stable water supply to the village.

Type of economic activity to invest

Reconstruction

Form of cooperation Public-private partnershipsProject total value, thousand USD 545,22Investment demand, thousand USD (%)

272,61 (50%)

Form of ownership; share in state property

Communal property of Stara Synyava village

Resources provision The total length of water supply - 22.6 km2 water towers available in the district

Investment offer completion level Investment offerEssential elements of the enterprise (organization)

Stara Synyava village council, 31400, Stara Synyava Ivan Franko Str., 8

Initiator contact details Village head tel. (03850) 2 10 89

Page 121: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Khmelnytskyi districtSection Commentary

Name of project Reconstruction of the Pshezdetskyh Palace in Chornyi ostriv village of Khmelnytskyi district of Khmelnytskyi region

The essence and purpose of project

Reconstruction of the Pshezdetskyh Palace in Chornyi ostriv village of Khmelnytskyi district of Khmelnytskyi region

Type of economic activity to invest

Provision of services

Form of cooperation Public-private partnership, co-financingProject total value, thousand USD 842.5 thousand. grn (costs are indicated in grn

because of unstable exchange rate)Investment demand, thousand USD (%)

758,25 (90%)

Form of ownership; share in state property

Communal

Resources provision - Total land area - 1,9 ha- Total building area - 864.5 square meters. - The distance to the nearest railway - 1.5 km- Object is connected to electricity (distance to gas, water, sewerage 500 m)

Investment offer completion level Prepared documentation of the project

Essential elements of the enterprise (organization)

Chornyi ostriv children's music school31310,Chornyi ostriv, Vovchohoryanskyi pass, 9

Initiator contact details Director of Chornyi ostriv children's music schooltel. (0382) 62-26-10e-mail: [email protected]

Page 122: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Chemerivtsi districtSection Commentary

Name of project Creation of modern autoservice enterpriseThe essence and purpose of project

Purchase of vehicles for the implementation of of passenger transportation, opening new routes, providing services for vehicles.

Type of economic activity to invest

Transport and communications

Form of cooperation Joint ventureProject total value, thousand USD 510Investment demand, thousand USD (%)

510 (100%)

Form of ownership; share in state property

Collective

Resources provision Existing production, support and repair facilities. Energy, transport and communication. Available license.

Investment offer Investment offer

Essential elements of the enterprise (organization)

ALC «Chemerivtsi ATP-16847»31600 Chemerivtsi Husiatyn highway Str., 3.

Initiator contact details Chairman of the BoardGonchar Viktor Ivanovychtel/fax (03859)-9-12-41

Page 123: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Processing and manufacturing of wood

productsThe essence and purpose of project

Construction of production workshop, purchasing equipment. Silvicultural tree nurseries, construction and production activities, acquisition of fixed assets.

Type of economic activity to invest

Manufacture of wood and of products of wood, except furniture

Form of cooperation Joint ventureProject total value, thousand USD 600Investment demand, thousand USD (%)

600 (100%)

Form of ownership; share in state property

Communal enterprise, District Council property

Resources provision Lease of premises and land. Existing production facilities, office. Available electricity, transport and communications

Investment offer completion level Investment offerEssential elements of the enterprise (organization)

Chemerivtsi Specialized Forestry Association «Ahrolis»31600 Chemerivtsi Husiatyn highway Str., 7

Initiator contact details Frankivskyi Boleslav Stanislavovychtel/fax (03859)-9-21-24

Page 124: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Resumption of bread-baking plant in

Chemerivtsi villageThe essence and purpose of project

Building of modern baking of bread and bakery products industrial enterprise on the former industrial bread-baking plant

Type of economic activity to invest

Food, beverages and tobacco products

Form of cooperation Creation of own enterpriseProject total value, thousand USD 500Investment demand, thousand USD (%)

500 (100%)

Form of ownership; share in state property

Private

Resources provision Former bread-baking plant buildings were built in 1960, the area of 1234 square meters., rubble tape foundation, brick walls, precast concrete flooring, decoration tiles, plaster, metal floor tiles. Available electricity, transport and communications

Investment offer completion level 20%Essential elements of the enterprise (organization)

-

Initiator contact details Economic Development and Trade Department of Chemerivtsi State Administrationtel. (03859) 9-11-31

Page 125: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Resumption of mini bakery in Iurkivtsi villageThe essence and purpose of project

Creating of baking of bread and bakery products enterprise on a production base of mini bakery

Type of economic activity to invest

Food, beverages and tobacco products

Form of cooperation Creation of own enterpriseProject total value, thousand USD 10Investment demand, thousand USD (%)

10 (100%)

Form of ownership; share in state property

Private

Resources provision Available electricity, transport and communications

Investment offer completion level 80%Essential elements of the enterprise (organization)

31609Chemerivtsi,Iurkivtsi

Initiator contact details Baitser О.V., tel. 0675939882

Page 126: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Creating a modern food processing industryThe essence and purpose of project

Production of meat and sausages (traditional for region)

Type of economic activity to invest

Food, beverages and tobacco products

Form of cooperation Creation of own enterpriseProject total value, thousand USD 250Investment demand, thousand USD (%)

250 (100%)

Form of ownership; share in state property

Private

Resources provision Available electricity, transport and communications. Advantageous location, availability of production facilities and land

Investment offer completion level Investment offerEssential elements of the enterprise (organization)

-

Initiator contact details Haryachyi Franz Yosypovychtel. 096471042

Page 127: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Shepetivka districtSection Commentary

Name of project Development of Burtyn graphite depositThe essence and purpose of project

The aim of the project is the extraction of raw materials and manufacturing graphite products

Type of economic activity to invest

Extraction of minerals except fuel and energy

Form of cooperation Creation of own enterpriseProject total value, thousand USD 30000Investment demand, thousand USD (%)

30000 (100%)

Form of ownership; share in state property

 -

Resources provision Availability of the largest in Western Europe graphite deposit, availability of railway and road traffic

Investment offer completion level Investment offer

Essential elements of the enterprise (organization)

 -

Initiator contact details First Deputy Head of Administration tel. (03840)4-04-82,e-mail [email protected]

Page 128: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Development of forest communal enterpriseThe essence and purpose of project

The aim of the project is to increase production volume and improve quality of products

Type of economic activity to invest

(forest communal enterprise)Construction, acquisition of trucks and skidders

Form of cooperation Direct investmentsProject total value, thousand USD 100Investment demand, thousand USD (%)

70 (70%)

Form of ownership; share in state property

Communal

Resources provision Active profitable ventureInvestment offer completion level Investment offerEssential elements of the enterprise (organization)

30430Shepetivka district, Sudylkiv, Gagarin Str., 1

Initiator contact details Trofymchuk Petro Petrovych,tel. (03840)5-88-57

Page 129: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Yarmolyntsi districtSection Commentary

Name of project Construction of plant for production of sorbent glauconite LLC «Scientific and production commercial enterprise «EKORESURS»

The essence and purpose of project

It is necessary to attract investors to establish waste processing of glauconite quartz sand. The design load capacity per shift producing 80 tons of waste sifted dried quartz sand with fraction less than 0.25 mm which is the raw material for manufacturing of dry mixes; 10 tons of sand fraction 0,25-0,3 mm - for the production of concrete; 2-3 tons of sand fraction more than 3 mm - for jewelry

Type of economic activity to invest

Extraction of minerals except fuel and energy

Form of cooperation Joint ventureProject total value, thousand USD 6300Investment demand, thousand USD (%)

3500 (55,5%)

Form of ownership; share in state property

Private

Resources provision Completed geological exploration of local deposit «Adamivske» Reserves of 2.5 mln. tons and techno-economic analysis condition of minerals approved by the State Commission of Mineral Resources of Ukraine. Obtained special permission for mining of quartz glauconite sands.Land on which the deposits located is taken on lease for 50 years with purchase option.Available business-plan of building the plant.

Investment offer completion level Working project for the extraction of raw materials is designed and passed the state examination. Available business-plan of building the plant.

Essential elements of the enterprise (organization)

LLC «Scientific and production commercial enterprise «EKORESURS», 32143, Yarmolyntsi district Baranivka

Initiator contact details DirectorKozub Yuriy Bohdanovychtel.(050) 430 59 97, (032) 294 97 55, e-mail: [email protected]@svitonline.com

Page 130: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Manufacture of canned fruit and vegetable

production at the subsidiary enterprise «Canning Plant» of agricultural firm «Agroprod-MAT» LLC

The essence and purpose of project

1. Establishing of fruit and vegetable canned and frozen products manufacture.2. Entering the market with its own brand.3. Reconstruction and / or major maintenance of buildings, boiler, purchase of technological equipment, construction of vegetable stores

Type of economic activity to invest

Food, beverages and tobacco products

Form of cooperation Joint venture; possible sale of the property rightsProject total value, thousand USD 1000Investment demand, thousand USD (%)

1000 (100%)

Form of ownership; share in state property

Private

Resources provision Production base: canning plant for processing apples, milk and juice production workshop, mechanical and turning workshops, fish workshop, enter gate weighing up to 30 tons of weight.Total production area 3320 sq.m.Warehouse area of 640 sq.m.

Investment offer completion level Development of investment proposalEssential elements of the enterprise (organization)

Subsidiary enterprise «Canning Plant» of agricultural firm «Agroprod-MAT» LLC 32100, Yarmolyntsi, Khmelnytskyi Str.,3

Initiator contact details Agricultural firm «Agroprod-MAT» LLC founder Babiy Irina Vitaliyivnatel/fax: (03853) 2-14-55

Page 131: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and

Section CommentaryName of project Manufacture of mineral medical-table water

«Olena» at the subsidiary enterprise «Olena» of agricultural company «Agroprod-MAT» LLC

The essence and purpose of project

1. Establishing of mineral medical-table water «Olena» manufacture.2. Entering the market with its own brand.3. The use of production areas of the company, which has suspended the production activities.4. Participation in social and economic development of the area, increasing revenues to budgets of all levels.5. Reconstruction of artesian well, facilities, landscaping, acquisition of facilities for the production of water, information support for sales.

Type of economic activity to invest

Food, beverages and tobacco products

Form of cooperation Joint venture; possible sale of the property rightsProject total value, thousand USD 800Investment demand, thousand USD (%)

800 (100%)

Form of ownership; share in state property

Private (no public share)

Resources provision Subsidiary enterprise «Olena» stopped production activities due to the lack of working capital to enter the market mineral waters of Ukraine more than 10 years ago. However, the existing artesian well allows to produce 9.7 cbm / h. Estimated annual production of 4320 thousand liters of soda. Land area 1.52 ha. Industrial complex includes 2 drying workshops, 2 shops for manufacture of soft drinks. Manufacturing base supplied with natural gas (medium pressure gas pipeline) available boiler that needs repairing, artesian well, water treatment facilities, and electricity power 160-10-04 kVA.Total production area 3434 sq.m.Warehouse area 540 sq.m.

Investment offer completion level Development of investment proposalEssential elements of the enterprise (organization)

Agricultural company «Agroprod-MAT» LLC 32100, Yarmolyntsi, Khmelnytskyi Str.,3

Initiator contact details Agricultural firm «Agroprod-MAT» LLC founder Babiy Irina Vitaliyivnatel/fax: (03853) 2-14-55

Page 132: storage.googleapis.com€¦  · Web view08/08/2017  · The enterprise has a substation with power and reserve transformers installed of power 630 kVA each. There is own GRP and