Waterway Renewal: Infrastructure Investment

Presented by: Vanta Coda, Executive Director Duluth Seaway Port Authority

Page 2: Waterway Renewal: Infrastructure Investment Presented by: Vanta Coda, Executive Director Duluth Seaway Port Authority

The Port of Duluth-Superior

Page 3: Waterway Renewal: Infrastructure Investment Presented by: Vanta Coda, Executive Director Duluth Seaway Port Authority

Port of Duluth-Superior

Duluth-Superior to Atlantic Ocean 2,342 miles (3,769 km) • Less than a week’s sailing time

Duluth-Superior to Atlantic Ocean 2,342 miles (3,769 km) • Less than a week’s sailing time

Port of Duluth-Superior

Mid-America’s Gateway

Page 4: Waterway Renewal: Infrastructure Investment Presented by: Vanta Coda, Executive Director Duluth Seaway Port Authority

GREAT LAKES SYSTEM DELIVERS

• Raw Materials that Drive U.S. Economy

Iron Ore.......Steel...............................60 Million Tons

Coal...............Power Generation..........40 Million Tons

Stone............Construction & Steel......35 Million Tons

Other Cargo ...................................35 Million Tons

170 Million Tons

Page 5: Waterway Renewal: Infrastructure Investment Presented by: Vanta Coda, Executive Director Duluth Seaway Port Authority

Martin Associates (Oct. 2011)

Port of Duluth-Superior Economic Impacts

SHIPPING via the Twin Ports

=

11,510 JOBS ♦

$546 million in WAGES ♦

$1.5 billion in Business

Revenue

Page 6: Waterway Renewal: Infrastructure Investment Presented by: Vanta Coda, Executive Director Duluth Seaway Port Authority

Cargo 2014

Total tonnage: 37.6 million st Coal 14.1 st, Iron Ore 17.8 st, Grain 1.3 st, Other 4.3 st

Page 7: Waterway Renewal: Infrastructure Investment Presented by: Vanta Coda, Executive Director Duluth Seaway Port Authority

…was created as a public agency in 1955 by the Minnesota legislature in preparation for the 1959 opening of the St. Lawrence Seaway.

The Port Authority owns and manages multiple properties including: Clure Public Marine Terminal, Dock C&D, Erie Pier and Duluth Airpark.

Bringing Business to the Port and Economic Development to the Region

Page 8: Waterway Renewal: Infrastructure Investment Presented by: Vanta Coda, Executive Director Duluth Seaway Port Authority
Page 9: Waterway Renewal: Infrastructure Investment Presented by: Vanta Coda, Executive Director Duluth Seaway Port Authority

Northeast Minnesota Historical Center (Robert Young, Duluth 1951)

U. S. Steel Duluth Works site Morgan Park 1951

Page 10: Waterway Renewal: Infrastructure Investment Presented by: Vanta Coda, Executive Director Duluth Seaway Port Authority

Port Authority Brownfield Redevelopment Project

Page 11: Waterway Renewal: Infrastructure Investment Presented by: Vanta Coda, Executive Director Duluth Seaway Port Authority

Dock 7

Page 12: Waterway Renewal: Infrastructure Investment Presented by: Vanta Coda, Executive Director Duluth Seaway Port Authority

Dock 7

Page 13: Waterway Renewal: Infrastructure Investment Presented by: Vanta Coda, Executive Director Duluth Seaway Port Authority

Cargill Grain Elevator Site Acquired by Duluth

Seaway Port Authority – 1997

Demolition & Environmental

Clean Up – 2001

Port Authority Industrial Development Dock C&D

Page 14: Waterway Renewal: Infrastructure Investment Presented by: Vanta Coda, Executive Director Duluth Seaway Port Authority

Port Authority Industrial Development Dock C&D

Page 15: Waterway Renewal: Infrastructure Investment Presented by: Vanta Coda, Executive Director Duluth Seaway Port Authority

Proposed Sheetpile Dock Walls

Dock C&D Redevelopment

Page 16: Waterway Renewal: Infrastructure Investment Presented by: Vanta Coda, Executive Director Duluth Seaway Port Authority

Clure Public Marine Terminal & Dock C&D

Page 17: Waterway Renewal: Infrastructure Investment Presented by: Vanta Coda, Executive Director Duluth Seaway Port Authority

Europe just got a lot closer. Spliethoff’s Great Lakes service

Page 18: Waterway Renewal: Infrastructure Investment Presented by: Vanta Coda, Executive Director Duluth Seaway Port Authority

Public/Private Investment in Port Infrastructure

Page 19: Waterway Renewal: Infrastructure Investment Presented by: Vanta Coda, Executive Director Duluth Seaway Port Authority

Primary Highway

and

Class I Railway Corridors

serving thePort of Duluth-

Superior

Page 20: Waterway Renewal: Infrastructure Investment Presented by: Vanta Coda, Executive Director Duluth Seaway Port Authority

Duluth-Superior to/from: Northern Europe 15 days Spain 15 days Italy/North Africa 18 days

Page 21: Waterway Renewal: Infrastructure Investment Presented by: Vanta Coda, Executive Director Duluth Seaway Port Authority

Private & Public Sector Investments

$4.5B Private

$2.3B Public

Capital Investments

$4.0B Vessels

$1.2B Waterways

$1.7B Ports & Terminals

Page 22: Waterway Renewal: Infrastructure Investment Presented by: Vanta Coda, Executive Director Duluth Seaway Port Authority

Making Marine Transportation Infrastructure Renewal a Top Priority

218.727.8525 │ www.duluthport.com