waste management perspectives_ in st.petersburg
Post on 18-Oct-2014
663 views
DESCRIPTION
Team Finland Future Watch reportTRANSCRIPT
![Page 1: Waste management perspectives_ in st.petersburg](https://reader034.vdocuments.us/reader034/viewer/2022051512/5442e35eafaf9ff7098b474b/html5/thumbnails/1.jpg)
Waste Management Perspectives in St.Petersburg
St.Petersburg City Improvement Committee
Denis ZavyalovHead of the Development and Investment Projects Department
![Page 2: Waste management perspectives_ in st.petersburg](https://reader034.vdocuments.us/reader034/viewer/2022051512/5442e35eafaf9ff7098b474b/html5/thumbnails/2.jpg)
St.Petersburg
St.Petersburg: Russia’s second largest city, industrial, scientific & culture centre Supportive local authorities Strong FDI – Toyota, General Motors, Ford, Nokian Tyres Major tourist destination – “Venice of the North”
Key Facts: Population – 5,028 million people Area –1,439 km² Area of industrial zones –
240 km² Gross Regional Product 2012 –
US$ 67 billion
![Page 3: Waste management perspectives_ in st.petersburg](https://reader034.vdocuments.us/reader034/viewer/2022051512/5442e35eafaf9ff7098b474b/html5/thumbnails/3.jpg)
«The Western High Speed Diameter Road»Project description:
Whole length of the route: 46,6 km
Traffic capacity: up to 128 000 vehicle per day
Financing form: PPP
The Northern and Southern parts of the road have alreadybeen finished till this moment. Only the Central part isbuilding now
«Pulkovo Airport Development Project»Project description:
Passenger traffic capacity: up to 17 million per year
Financing form: PPP
Construction is completed and testing of airport operationsbegan on October 1, 2013
St.Petersburg Key Projects
![Page 4: Waste management perspectives_ in st.petersburg](https://reader034.vdocuments.us/reader034/viewer/2022051512/5442e35eafaf9ff7098b474b/html5/thumbnails/4.jpg)
St.Petersburg generates about 10 million m3
of MSW annually
Waste treatment plants treat about 15% oftotal amount of waste
The rest 85% are disposed at the landfills
Forecast for 2020 is more than 12 million m3
(2 million tons) of MSW to be generated
Waste Treatment Industryin figures
![Page 5: Waste management perspectives_ in st.petersburg](https://reader034.vdocuments.us/reader034/viewer/2022051512/5442e35eafaf9ff7098b474b/html5/thumbnails/5.jpg)
2 plants«Yanino» and «Volkhonka»Using technology: mechanical-biological treatmentUseful materials such as paper, plastic and metals arerecovered first through the mechanical separation stage.The rest organic material goes through the compostingstage. The end product is CLO (Compost-like output).
2 landfill sites«Novosyolki»Capacity: 34 million tons (residual capacity in 2012 -3,7 million tons)«Novy Svet»Capacity: 18 million tons (residual capacity in 2012 -7 million tons)
Existing Infrastructure of the WasteTreatment Industry
![Page 6: Waste management perspectives_ in st.petersburg](https://reader034.vdocuments.us/reader034/viewer/2022051512/5442e35eafaf9ff7098b474b/html5/thumbnails/6.jpg)
Waste Collection System
St.Petersburg has 25 060 wastecollection sites including:
arranged collection sites (outside thebuildings and structures) – 8 951
collection sites with undergroundcontainers – 271
collection systems (inside thebuildings and structures) – 15 838
![Page 7: Waste management perspectives_ in st.petersburg](https://reader034.vdocuments.us/reader034/viewer/2022051512/5442e35eafaf9ff7098b474b/html5/thumbnails/7.jpg)
According to the «Regional target program for municipal and industrial wastemanagement in St.Petersburg in 2012-2020» the key directions of waste managementdevelopment are the following:
Waste Management Perspectives
MSW treatment facilities construction Hazardous and medical treatment facilities construction Construction of modern landfill sites Improving of the waste collection system Establishing the efficient monitoring system Development of the general scheme of the city sanitation
![Page 8: Waste management perspectives_ in st.petersburg](https://reader034.vdocuments.us/reader034/viewer/2022051512/5442e35eafaf9ff7098b474b/html5/thumbnails/8.jpg)
Modernization of the Sorting Unit of the Plant «Yanino»
Technology: mechanical-biological treatment Current stage: the design works are carrying out Planning capacity after modernization: 250 000 tons per year Planning commissioning date: end of 2014
![Page 9: Waste management perspectives_ in st.petersburg](https://reader034.vdocuments.us/reader034/viewer/2022051512/5442e35eafaf9ff7098b474b/html5/thumbnails/9.jpg)
Investor: Helector S.A.–Aktor Concessions S.A.–Aktor S.A. Capacity: 350 000 tons per year Financing form: PPP Technology:
- mechanical and optical separation- biological treatment – biodrying- residual fraction of the plant is not more than 20%
Current stage:- tender procedure took place in 2009-2010- due to Greek financial crisis the project was suspended and now is under negotiation
Waste Treatment Plant
![Page 10: Waste management perspectives_ in st.petersburg](https://reader034.vdocuments.us/reader034/viewer/2022051512/5442e35eafaf9ff7098b474b/html5/thumbnails/10.jpg)
Medical Waste Management Complex
Technology: the high temperature incineration system of all typesof medical waste with flue gas treatment
Current stage:- expertise of the design documentation- equipment ordered
Planning capacity: 5 000 tons per year Planning commissioning date: July 2014
![Page 11: Waste management perspectives_ in st.petersburg](https://reader034.vdocuments.us/reader034/viewer/2022051512/5442e35eafaf9ff7098b474b/html5/thumbnails/11.jpg)
Technology: reclamation with active degassing process Current stage: expertise of the design documentation Planning commissioning date: 2017
Reclamation of the landfill «Novosyolki»
![Page 12: Waste management perspectives_ in st.petersburg](https://reader034.vdocuments.us/reader034/viewer/2022051512/5442e35eafaf9ff7098b474b/html5/thumbnails/12.jpg)
Thank You for Your attention