warm welcome to judges & delegates · (agm ele amr) presentation team. dr. bps reddy, (cmd,...
TRANSCRIPT
HETERO
Warm WelcomeTo
Judges & Delegates
19th CII National Award Competition for
Excellence in Energy Management – 2018
HICC, Hyderabad
« Mr.G.Venubabu
(AGM- TSD, EnMR) Mr B Sambi Reddy
(AGM ELE AMR)
Presentation Team
Dr. BPS Reddy, (CMD, Hetero Group
of Companies)
HETEROCompany Profile
Column
ANFD
REACTOR
DISTILLED
RECEIVER
ANFD
ML’S
RECEIVER STORAGE
TANK
PHARMASTORES
STORAGE TANK
16
Recovered
Solvent
REFLUX
REBOILER
3
HETERO* Process Flow in Our HLL-I Kazipally
* Major Equipment's (Process Equipment's and Utilities)
+5,-5,-15,-20,-40,-70°C chillers
Air Compressors
Nitrogen Plants-500,300m^3/Hr
Cooling Towers- 1000TR,750TR
Boilers- 16TPH, 8 TPH
Reactors- 1KL to 10KL
Filters ( ANFD’s, CF)
Dryers TD,VTD,Spray,FBD,ATFD,RCVD)
Vacuum Pumps (DRV,ORV,Jet)
3
7
2
250+
12
11
HETERO
100+
200+
50+
HETEROEnergy Policy and Certificate
To
Produce
Steam
For General
Application
To Produce
Electricity
Energy Usage In HLL-I(Percentages are in terms of GJ)
HETERO
Consumption
A-BLOCK, 2.26%
B-BLOCK, 3.70%
C-BLOCK, 3.55%
D-BLOCK, 5.18%E-BLOCK, 0.46%
F-BLOCK, 1.24%
G-BLOCK, 0.73%
H-BLOCK, 2.36%
I-BLOCK, 4.35%
J-BLOCK, 4.10%
K-BLOCK, 4.16%L-BLOCK,
0.61%
M-BLOCK, 0.89%
KILO LAB,
0.76%QC, 1.51%
MB, 0.53%WH-1, 0.62%WH-2, 0.26%
FSA-1&2, 1.39%
FSA-3, 0.41%
QC(O), 1.60%
WH(O), 0.74%FSA(O), 0.39%
SB-2, 14.26%
SB-4, 27.45%
8 TPHB & RO,
0.27%
16TPHB, 3.37%
200TR CHILLER,
1.90%
LIGHTING, 1.20%
PUMP HOUSE, 0.25%
CANTEEN, 0.11%
ETP, 6.49%
R&D, 0.14%
QA, 0.25% PWS, 1.20% SRS, 1.18%
333
Lakh Units
Consumed in
2017-18
Energy Contribution of Different Sections-
2017-18 HETERO
More than 4%
contributed
section is
considered as
Significant
Energy use
area
Focused Areas:
1. Service block –
IV
2. Service block –II
3. ZLD
4. PD-I block
5. PD-J block
6. PD-K block
7. PD- D block
41.17 43.1938.22
32.4735.32
Overall Specific Energy Consumption (Kwh/Kg)
6.15
3.69
0
2
4
6
8
2016-17 2017-18
CAP4.25
2.33
0
1
2
3
4
5
2016-17 2017-18
SAN
40
25
0
10
20
30
40
50
2016-17 2017-18
GEM
12
11
10.5
11
11.5
12
12.5
2016-17 2017-18
ATM
HETERO
14
13
12.5
13
13.5
14
14.5
2016-17 2017-18
IMA
820
870
942
740760780800820840860880900920940960
Production (Tons)
Kwh/Kg decreased In
Products
857734 739
647 630 613 610 662
12.6 10.1 10.7 9.4 8.2 8.5 9.1 90
100200300400500600700800900
Sol.Qty Qty/ KG
63%57% 56%
49%
72% 73%70% 70%
0%
10%
20%
30%
40%
50%
60%
70%
80%
1 2 3 4
Before ModificationEfficiency
After ModificationEfficiency
1.011.08
1.020.97
0.730.65
0.7 0.69
0
0.2
0.4
0.6
0.8
1
1.2
1 2 3 4
Before ModificationKWh/TR
After ModificationKWh/TR
* Specific energy consumption in Chillers
* Solvent loss minimization and decrease in consumption/Kg of production
HETERO
HETERO
0.9
98
0.9
99
0.9
99
0.9
98
0.9
98
0.9
98
0.9
96
0.9
96
0.9
99
1.0
00
0.9
97
0.9
91
0.984
0.986
0.988
0.990
0.992
0.994
0.996
0.998
1.000
1.002Power factor
0.9
9
0.9
91
0.9
98
0.9
98
0.9
98
0.9
99
0.9
99
0.9
99
0.9
99
0.9
99 0
.998
0.9
99
0.984
0.986
0.988
0.99
0.992
0.994
0.996
0.998
1
Power factor
* Installation of Capacitor Bank 400 KVAR & 300 KVAR to maintain Power factor
Before Modification
After Modification
HETERO
HETERO
S.No. Title of Project Year
Annual
Electrical
Saving,
Million kWh
Annual
Electrical
Cost
Saving,
Rs Million
Annual
Thermal
Saving,
Million
kcal
Annual
Thermal
Saving,
Rs Million
Total
Annual
Savings,
Million Rs
Investment
Made
(Rs million)
1 Capacity enhancements of products 2017-18 1 7.2 - - 7.2 30
2Increase the condenstate recovery by
installing the steam traps.2017-18 - - 2365 5.256 5.256 0.174
3Installation of Chiller flow meters for existing
chillers2017-18 0.77 5.39 - - 5.39 2.465
4Replacing the old fixtures by fitting FLP LED
lights2017-18 0.0040 0.0281 - - 0.0281 0.309
5Installation of capacitor banks, filters for
existing capacitor banks and power saver2017-18 0.5 3.5 - - 3.5 0.23
6Installed HK vaccum pumps 150 m3/hrs 5HP
motor2017-18 0.13 0.88 - - 0.88 1.36
7 Modified all utility lines for better efficiency 2017-18 1.2 8.4 1363 3.64 12.04 3
8Installation of AOD pumps to minimize
Process pumps2017-18 0.0381 0.127 - - 0.127 0.42
9 Installation of HCL gas generation plant 2017-18 - - - - 15.04 4
10 Modifications in Cooling towers 2017-18 - - 62 0.13 0.13 1.13
11Data Logging system for STEAM Flow meter
Readings2017-18 - - 1773.9 3.942 3.9 0.2
Total 3.642 53.53301 50.68365
* Projects for 2017-18 year
HETERO
Innovative Energy Saving Projects-
2017-2018
HETERO
Advantages:
✓ Solvent Loss minimization by better heat transfer
✓ Time Cycle reduction-power consumption
decrease
✓ Maintenance costs decreases
✓ No need of chemicals dosage
✓ RO membranes and equipment life time increases
✓ RO permeate % increases
✓ Make up water quantity decreases
✓ Frequent line holes or punchers can be decreases
by avoiding corrosion
UOMCOOLING
TOWERS
Investment Lakh INR 3.3
Annual savings Lakh INR 60
Annual Energy Savings Units 2,10,000
Pay back period Month Below one month
* Installation of Electronic Anti scale System for Cooling tower Pipe lines
1/4
Found clean
inner surface of
pipe lines
clean heat
exchangers
with out scale
formation
HETERO* Installation of filter System to remove TSS from Cooling towers water
Advantages:
✓ Maintains cooling tower Efficiency
✓ Maintains efficient Heat transfer in Condensers & heat exchangers
✓ Which helps to increase Productivity
✓ Saves power
✓ Minimizes blow down time & maintenance cost
✓ Saves water treatment chemicals
✓ Saves treated water (helps increases COC)
PARAMETERSINPUT
ANALYSIS
OUTPUT
ANALYSIS
SLUDGE
ANALYSIS
TSS 272 95 252
TDS 5360 5240 4940
pH 7.78 7.81 7.79
COD 6454 6401 6450
2/4
HETERO* Installation of Zero Air loss Automatic Drain Valve System
Advantages: ✓ Protects the Energy loss
by discharging the condensate based on the collection level
✓ Auto drain system
✓ Integrated dirt screen sized amply to reduce the maintenance
✓ Convenient to installation and maintenance
❖ Annual Energy Savings:
66500 Units
❖ Annual saving: 5.32 lakh
INR
❖ Investment: 10,000/piece
❖ Pay Back: less than a
Month
3/4
HETERO* Installation of Liquid-Liquid Extractor System
(Continuous counter current )
♦ Recently we installed 8 kl capacity liquid liquid Extractor in our HLL-I site
UOM
Investment Lakh INR 10
Annual saving Lakh INR 9.8
Annual Energy savings Million Kcal 3,835
Pay back period Months 12 Months
✓ Getting high efficiency
✓ Continuous process
✓ There is no heating or cooling media require
✓ Low maintenance cost
✓ Easy to operate
✓ Less manpower require
BEFORE AFTRE
LLE FEED GC LLE OUT PUT GC
n-hexane THF others n-hexane THF others
Purity% % Purity%
57.36% 34.37% 8.20% 99.30% - 0.26%
62.50% 35% 2.30% 99.49% - 0.50%
67.44% 28.91% 3.10% 99.45% - 0.35%
4/4
HETERO
Road Map Projects-
2018-2019
Tubular Reactor for reduction of particle size
which reduces the down stream powder
processing.
✓ Economix mixing system for improvement in mixing
with reduction in power consumption.
HETERO
✓ Aids in particle size reduction which results in less
consumption of air compressor for downstream
powder processing by using Homogenizer and
sonicator
* Upcoming Projects for 2018-19 year
1
2
3
1/2
✓ Newreka Catalyst ® for elimination of effluent
treatment through MEE.
HETERO
4
S.No. Title of Project
1Installation of Cirrus VEC System for liquid Nitrogen to emission control and
solvent recovery
2 Installation of 173 TR (+5°C) Chiller
3 All Insulation & steam line leakages rectification
4 Installation of chiller line cleaning Copper strip (Anti scale system)
5 Proposed for HCL gas generation operation on Automation system
6 Installation of PPU pumps for steam condensate
7 Installation of filters for chiller lines
8 Trails on Tubular reactor
9 Installation of LED bulbs in existing areas
10 Installation of capacitor power banks
11 Installation of VFDs to required process equipment's
12 Installation of AOD pumps to minimize load on PP
13Reconciliation of nitrogen, air consumption by implementation of flow
meters.
2/2
HETERO* Zero Investment Projects
S.NO Title of Project
Total Annual
Savings in
Lacks
Investment
1High power consumption operations Will be planned
based upon the tariff .30 0
2 Changing the coal blending ratio for 16 TPH Boiler 28 0
3In CAP product Capacity Enhanced from 1.2 MT to 5 MT
by reducing the Solvent Volume & separation tub used29.64 0
5In GTB product Capacity Enhanced by using available
ANFD from 1.2 MT to 2.5 MT by 108 %13.26 0
6In APO product Capacity Enhanced by using available 2KL
Receiver from 0.6 MT to 0.9 MT by 50%4.54 0
7In IDBA product Capacity Enhanced from 1.8 MT to 4.2
MT by 133% by reducing the Solvent volume20.16 0
8In SAN product Capacity Enhanced from 3 MT to 7 MT by
133% by reducing the Solvent volume22.08 0
TOTAL SAVINGS IN LACKS 147.68
ParametersOrdinary
Bike
Electric
Bike
Savings/
Bike
Savings (Rs/Km) 1.23 0.021.19
Cost 66 k 34 k 32 k
Fuel Type Petrol Electricity -
CO2 emission/Mileage (kg) 2.31 1.32 0.9
Mileage (km) 65/ Lit80/ Full
charge
HETERO* Distributed Electric Bikes to employs
♦ To reduce fuel pollution , motivate people to drive electric bike
HETERO
Installed FLP-LED bulbs of 70 Nos in place of CFL bulbs
Installed Solar street light of 5 Nos in out site
Replaced Aluminum Blade with FRP blades for all cooling
towers
Renewable Energy Source
Provided Variable Frequency Drive (VFD’s) to all Cooling
towers, Reactors, ANFD’s, CF’s, AHU’s, Chillers
* Energy Saving Initiatives By Energy Management Team in our Unit
1
2
3
4
By giving a Miss call, we are getting each & every chiller
temperature Instantly.
Installed Energy Efficient Motors (IE 3 ) of 20 Nos in place
of existing motors.
Installed of compact pressured powered pump package unit
of 4 Nos
HETERO
5
6
7
8 Installed float type Steam traps of 50 Nos in place of old
traps
HETERO
✓ Getting 90 to 95 °C temperature condensate from unit which leads to benefit
the boiler.
✓ There is less consumption of fuel to generate steam due condensate
✓ Make up water % decreased
✓ Flash steam reduced due to close loop lines
✓ Eliminates pre-heating water system
1
2
34
* CPPPPU installation layout in our Unit
✓ Constructed 2000 kl storage Capacity
tanks-3 Nos & and 160 kl-5 Nos for Rain
water collection
✓ Saved 1200 kl water consumption due
to proper utilization of rain water
HETERO* Rain Water Harvesting System
Applications in different area's :
✓ For cooling towers
✓ Fire Hydrant System
✓ Washroom purpose
✓ Gardening
Domed shape Roof tops
Pipe lines
❑ Generation of Organic waste: 1) Canteen food 2) Garden waste.
❑ By using Organic waste converter (OWC) machine we are Feeding the
waste to Earth warm which generates compost for the Trees.
❑ In FY 2017-2018 around 21 Tons waste generated which used as a
compost.
HETERO
2012-13 2013-14 2014-15 2015-16 2016-17 2017-18
837
11601388
1562
2652
3412
CO2 reduction by Plantation(In MT)
* Utilization of waste and CO2reduction
HETERO
Steam Flow Meters Chillers Flow Meters
Energy Consumption
Indicators
Steam Flow Detection
System
Water Parameters Detection
Instrument
* Energy monitoring system in Our HLL-I Unit
Energy consumption
Monitoring System
✓ Daily review of source wise Energy Consumption
✓ If the consumption exceeds the baseline, then analysis will be done for the
deviation for relevant areas with the help of HOD
✓ Identification of Significant energy deviations
✓ Investigation for the significant energy deviations
✓ Responding according to the investigation
✓ Discussion of Energy Performance in monthly over heads meeting with all
HOD’s and Management
✓ External technical audits & Internal assessment by certified internal auditors,
and implementation of corrective actions if any non conformities during
assessment to improve the energy performance
✓ Every Saturday has declared as leaks arresting day
✓ Every Monday has declared as insulation checking day
✓ Frequent uninformed audits and inspections
✓ Coal crushing is done only in Night time, Unit price Rs 5.5
* Energy Monitoring Methodology HETERO
❖BSI-ISO:50001:2011 certification Audit for EnMS
* ENERGY AUDITS BY EXTERNAL AGENCIES IN OUR UNIT
❖Flash Steam recovery Identification by Forbs Marshall
❖Steam traps Operational Survey by Forbs Marshall
❖Chemical Dosage for Evaporative Condensers in Utility
Section
❖Internal Energy Audits Twice in a Year
HETERO
Employee Awarenessand
Motivation ☺
HETERO
✓ Longer Lasting
✓ CO2 reduction
✓ Safer and easier to install
✓ Distributed Each Employee -2Bulbs
✓ 9 Watt capacity
✓ With 3yr warranty
✓ Every Month you can save Rs 16/-
/BULB by Installing LEDs
* LED BULBS DISTRIBUTION-2017-18(3000 No's)
HETERO1/3
HETERO
* Distributed Clay Made GANESHA to Employees (Eco-Friendly)
-1500 Nos * On the Occasion of world Environment Day Distributed Jute
Bags to Employees (Eco-Friendly Bags)-1500 Nos
2/3
❑ Conducting EnMS awareness training classes to all employs in our Unit
❑ Every month we are conducting Mock drills of Fire- Fighting, first Aid,
SCABA etc in plant premises
❑ As a Energy point of view-Giving training on Boiler operation, steam trap
operation, On job training, Any new mechanical equipment operation
like- compressor, vacuum pump, chillers etc
93
9798
96
90
91
92
93
94
95
96
97
98
99
Training Attendance of EnMS 2018
(%)
HETERO3/3
Training Motivation & Team work Appreciation
Energy Awareness
Pledge Awareness
HETERO
HETERO
CII-Award 2015-16
CII-Award 2016-17
Establishment of EnMS 2015-16
Awards & Certificates
Hetero Honored with “ IP
Excellence in India” Award
2018
HETERO
V
S -STEAM LOSS
A -AIR (COMPRESSOR) LOSS
V -WATER LOSS
E -ELECTRICITY LOSS
E
N
E
R
G
Y
E
N
VI
R O N ME
N
T
« Mr.G.Venubabu
(AGM- TSD HLL-I, EnMR)