Wallasea Island Wild Coast Project

Chris Tyas – Wallasea Island Project Manager

Page 2: Wallasea Island Wild Coast Project - wwf.de · Wallasea Island Wild Coast Project Chris Tyas – Wallasea Island Project Manager

Coastal Habitat Restoration

Nigg Bay and Freiston Shore

Page 3: Wallasea Island Wild Coast Project - wwf.de · Wallasea Island Wild Coast Project Chris Tyas – Wallasea Island Project Manager

Managing a changing coast

Threats of sea level rise and climate change –

keeping pace with losses (30,000ha by 2050)

Developing technical solutions

Building public understanding and support

Page 4: Wallasea Island Wild Coast Project - wwf.de · Wallasea Island Wild Coast Project Chris Tyas – Wallasea Island Project Manager

Wallasea Island Wild Coast Project

Four main aims:

To create new intertidal habitats to compensate for losses in the Crouch/Roach Estuaries and to offset historic losses of coastal BAP habitats and species in the UK

To avoid the flood damage risks to the Crouch/Roach Estuaries and Wallasea Island that exist from a future unmanaged breach of the existing seawalls

To create an extensive area of accessible coastal land for the quiet enjoyment of nature and open space, reconnecting people with their coastal heritage

To demonstrate through a large-scale practical example adaptation to climate change and sea level rise on the coast.

Europe’s largest inter-tidal habitat creation project of its type

Page 5: Wallasea Island Wild Coast Project - wwf.de · Wallasea Island Wild Coast Project Chris Tyas – Wallasea Island Project Manager
Page 6: Wallasea Island Wild Coast Project - wwf.de · Wallasea Island Wild Coast Project Chris Tyas – Wallasea Island Project Manager
Page 7: Wallasea Island Wild Coast Project - wwf.de · Wallasea Island Wild Coast Project Chris Tyas – Wallasea Island Project Manager
Page 8: Wallasea Island Wild Coast Project - wwf.de · Wallasea Island Wild Coast Project Chris Tyas – Wallasea Island Project Manager
Page 9: Wallasea Island Wild Coast Project - wwf.de · Wallasea Island Wild Coast Project Chris Tyas – Wallasea Island Project Manager

Allfleets Marsh

Page 10: Wallasea Island Wild Coast Project - wwf.de · Wallasea Island Wild Coast Project Chris Tyas – Wallasea Island Project Manager
Page 11: Wallasea Island Wild Coast Project - wwf.de · Wallasea Island Wild Coast Project Chris Tyas – Wallasea Island Project Manager
Page 12: Wallasea Island Wild Coast Project - wwf.de · Wallasea Island Wild Coast Project Chris Tyas – Wallasea Island Project Manager

Saltmarsh creation

Page 13: Wallasea Island Wild Coast Project - wwf.de · Wallasea Island Wild Coast Project Chris Tyas – Wallasea Island Project Manager

Saltmarsh development

August 2008

October 2007

May 2006

Page 14: Wallasea Island Wild Coast Project - wwf.de · Wallasea Island Wild Coast Project Chris Tyas – Wallasea Island Project Manager

Allfleets Marsh – progress to-date

Developing very well

Behaving as predicted

Net importer of sediments – 5cm/annum

Excellent bird populations

Hit bird targets in Year V – 200%!

93 species of bird recorded using the site

Peak of 12,371 waterfowl cf 34,232 for

Crouch/Roach system

Page 15: Wallasea Island Wild Coast Project - wwf.de · Wallasea Island Wild Coast Project Chris Tyas – Wallasea Island Project Manager

RSPB Wallasea Island

Wild Coast Project

Page 16: Wallasea Island Wild Coast Project - wwf.de · Wallasea Island Wild Coast Project Chris Tyas – Wallasea Island Project Manager

744ha arable/saltmarsh

Page 17: Wallasea Island Wild Coast Project - wwf.de · Wallasea Island Wild Coast Project Chris Tyas – Wallasea Island Project Manager
Page 18: Wallasea Island Wild Coast Project - wwf.de · Wallasea Island Wild Coast Project Chris Tyas – Wallasea Island Project Manager

Recent history

Started talking to Wallasea Farms in 2000

Allfleets Marsh managers since March 2007

750k on studies etc

11 million m3 down to 2 million m3

Option to buy announced Oct 2007

RTE (Regulated Tidal Exchange)

Crossrail – Nov 2008

Managed realignment route

Page 19: Wallasea Island Wild Coast Project - wwf.de · Wallasea Island Wild Coast Project Chris Tyas – Wallasea Island Project Manager

Crossrail Route

Page 20: Wallasea Island Wild Coast Project - wwf.de · Wallasea Island Wild Coast Project Chris Tyas – Wallasea Island Project Manager

7.20m

THAMES TIDEWAY

ALL DIMENSIONS

REFER TO

INTERNAL

DIAMETER

7.15m

CHANNEL TUNNEL RAIL LINK

JUBILEE LINE EXTENSION

CROSSRAIL

VICTORIA LINE

3.81m

Comparative Running Tunnels

Page 21: Wallasea Island Wild Coast Project - wwf.de · Wallasea Island Wild Coast Project Chris Tyas – Wallasea Island Project Manager
Page 22: Wallasea Island Wild Coast Project - wwf.de · Wallasea Island Wild Coast Project Chris Tyas – Wallasea Island Project Manager

Excavated Material – Central Section (Tonnes)

Westbourne Park

- Western

Tunnelling Site

Northfleet

- 1.7M T

Wallasea Island

- 4.5M T

Barking

Riverside

- 1.5M T

Limmo - Eastern

Tunnelling Site

- 1.3M T

Other

Stations &

Shafts

PAD/BOS/TCR

Boxes

By Tunnel

conveyor

Early Material

- Elsewhere by

road - 0.6M T

Drive Z – PML

- 0.5M T

Probably by rail

Thames Tunnel

- 0.6M T

Page 23: Wallasea Island Wild Coast Project - wwf.de · Wallasea Island Wild Coast Project Chris Tyas – Wallasea Island Project Manager
Page 24: Wallasea Island Wild Coast Project - wwf.de · Wallasea Island Wild Coast Project Chris Tyas – Wallasea Island Project Manager

Consents

Planning permission (Essex county Council)

Land drainage consent x 2 – Environment Agency (EA)

Discharge consent / Abstraction License exemption (EA)

Environmental Permit (Waste Management License) (EA)

Protected species (Natural England)

Footpath closure (Rochford District Council)

FEPA / Coast Protection Act x 3 (MMO)

Crouch Harbour Authority Works Licenses x 5

Crown Estates commissioners

Page 25: Wallasea Island Wild Coast Project - wwf.de · Wallasea Island Wild Coast Project Chris Tyas – Wallasea Island Project Manager

Licenses

Section 106 agreement (ECC)

Allfleets Marsh access license (Defra)

UK Power Networks – power cable relocation easement

Environment Agency – partnership

Land deal

Crossrail license

Page 26: Wallasea Island Wild Coast Project - wwf.de · Wallasea Island Wild Coast Project Chris Tyas – Wallasea Island Project Manager

Enabling works

Enabling works commenced 27th July 2009

Phase I of water vole mitigation

Conveyor belt access bank construction

Works completed on 26th September – ahead of time and

under budget

Page 27: Wallasea Island Wild Coast Project - wwf.de · Wallasea Island Wild Coast Project Chris Tyas – Wallasea Island Project Manager
Page 28: Wallasea Island Wild Coast Project - wwf.de · Wallasea Island Wild Coast Project Chris Tyas – Wallasea Island Project Manager
Page 29: Wallasea Island Wild Coast Project - wwf.de · Wallasea Island Wild Coast Project Chris Tyas – Wallasea Island Project Manager
Page 30: Wallasea Island Wild Coast Project - wwf.de · Wallasea Island Wild Coast Project Chris Tyas – Wallasea Island Project Manager
Page 31: Wallasea Island Wild Coast Project - wwf.de · Wallasea Island Wild Coast Project Chris Tyas – Wallasea Island Project Manager

Recently/what next

Unloading facility – work started in mid-August 2011

completed August 2012

First material to site on 22 August 2012

Launch event 17 September

Complete Cell 1 in 2015/16

Cell 2?

Other suppliers

Completion?

Page 32: Wallasea Island Wild Coast Project - wwf.de · Wallasea Island Wild Coast Project Chris Tyas – Wallasea Island Project Manager
Page 33: Wallasea Island Wild Coast Project - wwf.de · Wallasea Island Wild Coast Project Chris Tyas – Wallasea Island Project Manager
Page 34: Wallasea Island Wild Coast Project - wwf.de · Wallasea Island Wild Coast Project Chris Tyas – Wallasea Island Project Manager

Badger sett plan

Page 35: Wallasea Island Wild Coast Project - wwf.de · Wallasea Island Wild Coast Project Chris Tyas – Wallasea Island Project Manager
Page 36: Wallasea Island Wild Coast Project - wwf.de · Wallasea Island Wild Coast Project Chris Tyas – Wallasea Island Project Manager
Page 37: Wallasea Island Wild Coast Project - wwf.de · Wallasea Island Wild Coast Project Chris Tyas – Wallasea Island Project Manager

Public Engagement

Consultation events

Talks to interest groups

Site visits for key stakeholders

News updates

Local liaison group

Public Engagement Manager – April 2010

Page 38: Wallasea Island Wild Coast Project - wwf.de · Wallasea Island Wild Coast Project Chris Tyas – Wallasea Island Project Manager

Nature Reserve

Current planning permission includes hides, paths and

car parks but excludes visitor centre

Phased addition of facilities over time

Best guess 30-50,000 visitors

Promote access from Burnham

Wilderness experience aimed at local people, families,

community groups and tourists