Wadleigh Library Building Project

INVESTING IN THE COMMUNITY

2016: WARRANT ARTICLE 3

Page 2: Wadleigh Memorial Library Building Project

2015 ELECTION

• 1st time on the ballot• Supported by the BAC

• Building problems and needs not going away

• Cost increase of 2.7% ($160k)

2016 ELECTION

Page 3: Wadleigh Memorial Library Building Project

RECEIVED NEEDED0

10203040506070

% VOTES

VOTES

2015 ELECTION

Page 4: Wadleigh Memorial Library Building Project

DUE DILIGENCE

• Board of elected officials o Guidance from Facilities Committee, Community Development

• Responsible planning• Decades of evaluation & study• Recommended for funding 16 times by CIP:

o 1998, 2001, 2002, 2003, 2004, 2005, 2006, 2007, 2008, 2009, 2010, 2011, 2012, 2014, 2015, 2016

Page 5: Wadleigh Memorial Library Building Project

IN THE LAST 20 YEARS…

Page 6: Wadleigh Memorial Library Building Project

IN THE LAST 10 YEARS…

STRUCTURAL ENGINEERS

BUILDING PROJECT CONSULTANT

Page 7: Wadleigh Memorial Library Building Project

IN THE LAST 10 YEARS…

STRATEGIC PLANNING

FOCUSGROUPS

COMMUNITYSURVEYS

Page 8: Wadleigh Memorial Library Building Project

MANYPENNY | MURPHY

ARCHITECTURELAVALLEE | BRENSINGER ARCHITECTS

IN THE LAST 8 YEARS…

ADAMS & SMITHArchitects/Consultants

Page 9: Wadleigh Memorial Library Building Project

12 DIFFERENT BUILDING CONCEPTS

*• BUILDING

CONCEPT

*• BUILDING

CONCEPT

*• BUILDING

CONCEPT

*• BUILDING

CONCEPT

*• BUILDING

CONCEPT

*• BUILDING

CONCEPT

*• BUILDING

CONCEPT

*• BUILDING

CONCEPT

*• BUILDING

CONCEPT

*• BUILDING

CONCEPT

*• BUILDING

CONCEPT

*• BUILDING

CONCEPT

12 DIFFERENT BUILDING CONCEPTS

Page 10: Wadleigh Memorial Library Building Project

• 2007: Renovation/additiono 27,000 gross sq.fto $5,625,000 (2007 dollars)o Taxpayers: $5.12 million

2011-A: Renovation/addition 31,600 gross sq.ft. $8,474,316 (2011 dollars) Taxpayers: $7.97 million

2011-B: Renovation/addition 23,600 gross sq.ft. $5,615,052 (2012 dollars) Taxpayers: $5.15 million

4 MORE FULLY DEVELOPED

FOR EVALUATION1

32

Page 11: Wadleigh Memorial Library Building Project

• 2014: Rebuild/additiono 21,000 gross sq.fto $5,460,000 total costo Taxpayers: $4.96 million

4

4 MORE FULLY DEVELOPED

FOR EVALUATION

Page 12: Wadleigh Memorial Library Building Project

WHY THE SAME PLAN FOR 2016?

Page 13: Wadleigh Memorial Library Building Project

BECAUSE IT’S THE RIGHT PLAN

• Least expensive• Smallest / most

efficiento Creative use of spaceo Future cost savingso Brings library up to state

average sq.ft/capita

• Meets community needs

• Vetted by elected officials

• Allows for future flexibility

• It’s “the year”“Creative, flexible spaces in future libraries will meet the needs of digital learners…while at the same time continuing to

accommodate the traditional user searching for a quiet space to read.”

Hendrix, Jennifer C. “Checking out the future: perspectives from the library community on information technology and 21st century libraries.” ALA Policy Brief No. 2, February 2010.

Page 14: Wadleigh Memorial Library Building Project

2016: SECOND TIME ON THE BALLOT

2016: Rebuild/addition 21,000 gross sq.ft $5.1 million cost to taxpayers $5.6 million total project cost Guaranteed Maximum Price

Cost adjusted from last year to account for inflation and donations/funds raised.

Page 15: Wadleigh Memorial Library Building Project

• Been studied/evaluated/planned this long (20 years)• By this many different committees (5)• Involved this many consultants/architectural firms

(6)• Had this many design concepts (12)• Had this many designs more fully developed (4)• Solicited this much public input

o (2 surveys, a focus group series and 4 open houses)

No other town facility project has…

Page 16: Wadleigh Memorial Library Building Project

• Reduced the cost to taxpayers prior to vote o Approximately $500,000 spent on real estate, professional services

• Source: Impact fees, trustee funds

• Had this much money pledged to further reduce costo $512,000 gifts received/fundraised (as of 12/2015)o …and counting…

No other town facility project has…

even

Page 17: Wadleigh Memorial Library Building Project

Current state of affairs• Systems are 30+ years old and failing• Minor repairs made when possible• Didn’t want to waste taxpayer $$ on costly

repairs or replacements when…• Anticipating a project CIP recommended for

fundingo Recommended funding year kept getting postponed…since 1998o Vicious cycle

Page 18: Wadleigh Memorial Library Building Project

Why not fix what we have?

• All major systems need to be replaced• Highly invasive• How do we provide service while walls,

ceilings being ripped open?o 10,000-12,000 people coming through our doors each montho Most heavily utilized/trafficked town facility other than schools

Page 19: Wadleigh Memorial Library Building Project

Why not fix what we have?

• Expensive &more time consuming to renovate • Least cost effective solution• Still left with an inefficient building envelope• Still left with a space that does *not* address

needs expressed by the community

Page 20: Wadleigh Memorial Library Building Project

Why not relocate?

• Look to the past

• 1944 Library Site Committee

• Findings issued as supplement to 1944 town report.

* ”Report of Library Site Committee March 14, 1944.” Supplement to Annual Reports of the Town Officers of Milford, New Hampshire for the Year Ending January 31, 1944.

Page 21: Wadleigh Memorial Library Building Project

Why not relocate?• Among their requirements:

o “It must be located where the people who want to use it can do so conveniently without going out of their way…being near the stores, town hall…, etc.”

o “It must be located where it can count as a memorial building and not be injured by surroundings unsuitable to a library.”

o “It must be easily reached by people on foot as well as by automobiles. This means that the entrance must be nearly at the street level, with only a few steps and no steep pathways.”

Page 22: Wadleigh Memorial Library Building Project

Lull Estate: “IDEAL”

Page 23: Wadleigh Memorial Library Building Project

Lull Estate

• AKA: current library site

• Among 5 sites evaluated o Others deemed unsuitable

• Property and land donated to the town

• Town vote unanimously approved Lull site

Committee members: C.S. Emerson, Minnie Falconer, Benjamin Prescott, Gertrude Howison, Mario Bianchi, Owen Fisk, A. Wallace Wilkins.

Page 24: Wadleigh Memorial Library Building Project

Ideal location

The times may have changed….

but the requirements established by this committee of

residents have not.

Page 25: Wadleigh Memorial Library Building Project

Ideal location

• Significant monthly foot traffic provides boost to local economy…without competing with stores

• Walking distance from most schools, senior housing

• Provides additional downtown parking

• Literal & figurative Community Center

Page 26: Wadleigh Memorial Library Building Project

Ideal location

TOWN HALL

Page 27: Wadleigh Memorial Library Building Project

Benefits• Larger space for Children’s services

• Bigger space for Young Adult Services

• Larger, flexible community meeting room space o For the library’s more popular programs o For area Seniors’ groupo After-hours accesso More technologically conducive to modern day meeting use

Page 28: Wadleigh Memorial Library Building Project

CHILDREN’S DEPT

TEEN DEPT

Page 29: Wadleigh Memorial Library Building Project

MULTI-PURPOSE

ROOM

Page 30: Wadleigh Memorial Library Building Project

Benefits

• Technology center o Support & mobile workspace for local businesseso Access for everyone to learn, practice, improve skillso Creative, collaborative space to invent… and innovateo Access to current/new technologies

• 3D printers• Specialized tools • Design software• And robust workstations

Page 31: Wadleigh Memorial Library Building Project

Benefits

• Smaller quiet/meeting/group study rooms• More energy efficient & cost effective to run• Easier to staff & secure

o 2 floors instead of 3, better lines of sight• Flexible floorplans to better accommodate

changes in library services and use…for decades to come

Page 32: Wadleigh Memorial Library Building Project

Libraries aren’t just books anymore….and they haven’t been for some time.

They’re so much more.

Let us show you.

Page 33: Wadleigh Memorial Library Building Project

Wadleigh Memorial Library

Page 34: Wadleigh Memorial Library Building Project

• http://www.wadleighlibrary.org/building/

• www.tinyurl.com/2014-CIP-LIBRARYo Includes Q&A with Architect Ron Lamarre

FOR MORE INFORMATION: