dnca +Studio GP VLADEM CONTEMPORARY ADDENDUM #3 Date: May 11, 2020 This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents dated April 15, 2020 noted below. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject the Bidder to disqualification. In addition to this 2-page document, this Addendum consists of 32 pages: 6 pages of Specifications, 3 pages of MEP addendum description, and 23 pages of Revised Drawings. ADDENDUM TO THE SPECIFICATIONS Item No. Spec. Section 1. Specification Section 00 01 10 Table of Contents: Add Section 08 51 30, Steel Frame Windows. 2. Add Specification Section 08 51 30 Steel Frame Windows 3. Specification Section 08 80 00 Glazing, add paragraph H to section 2.7 Glass type: H. Glass Type G7 - Exterior: Obscured spandrel glass. 1.Thickness of Glass: 1/2 inch. 2.'Opaque White' by Pilkington or approved equal. ADDENDUM TO THE DRAWINGS Item No. 4. (Re: Architectural drawings) Windows G, E1, E2, E3, E4, and H are to be new steel frame Jamestown125 Series windows by Hope’s. Openings for G, E1, E2, E3, and E4 2’-4 1/2”x3’-0”, windows are to be awnings. The opening for H is 3’-0”x7’-0”, and is to be fixed glazing. Refer to Specification Section 08 51 30 Steel Frame Windows. 5. Add Bridgers & Paxton’s ‘Vladem Contemporary - Addendum 03” document, dated 5/11/2020. 6. Replace Sheet #187, MH100 HVAC Plan Level 0 Basement, in its entirety with sheet of the same name with revision date of 5/8/2020. 7. Replace Sheet #188, MH101 HVAC Plan Level 01 Ground, in its entirety with sheet of the same name with revision date of 5/8/2020. 8. Replace Sheet #189, MH102 HVAC Plan Level 02 Upper, in its entirety with sheet of the same name with revision date of 5/8/2020. 9. Replace Sheet #191, MP100 Mechanical Piping Plan Level 0 Basement, in its entirety with sheet of the same name with revision date of 5/8/2020. 10. Replace Sheet #194, M-401 Enlarged Mechanical Plans, in its entirety with sheet of the same name with revision date of 5/8/2020. 11. Replace Sheet #195, M-402 Enlarged Mechanical Plans, in its entirety with sheet of the same name with revision date of 5/8/2020. 125 Jefferson N.E., Albuquerque, New Mexico 87108 ph 505-255-4033 p of 1 2

Upload: others

Post on 16-Feb-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

  • d n c a + S t u d i o G P

    VLADEM CONTEMPORARY

    ADDENDUM #3

    Date: May 11, 2020

    This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents dated April 15, 2020 noted below. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject the Bidder to disqualification.

    In addition to this 2-page document, this Addendum consists of 32 pages: 6 pages of Specifications, 3 pages of MEP addendum description, and 23 pages of Revised Drawings.

    ADDENDUM TO THE SPECIFICATIONS

    Item No. Spec. Section

    1. Specification Section 00 01 10 Table of Contents: Add Section 08 51 30, Steel Frame Windows.

    2. Add Specification Section 08 51 30 Steel Frame Windows

    3. Specification Section 08 80 00 Glazing, add paragraph H to section 2.7 Glass type:

    H. Glass Type G7 - Exterior: Obscured spandrel glass.1.Thickness of Glass: 1/2 inch.2.'Opaque White' by Pilkington or approved equal.

    ADDENDUM TO THE DRAWINGS

    Item No.

    4. (Re: Architectural drawings) Windows G, E1, E2, E3, E4, and H are to be new steel frame Jamestown125 Series windows by Hope’s. Openings for G, E1, E2, E3, and E4 2’-4 1/2”x3’-0”, windows are to be awnings. The opening for H is 3’-0”x7’-0”, and is to be fixed glazing. Refer to Specification Section 08 51 30 Steel Frame Windows.

    5. Add Bridgers & Paxton’s ‘Vladem Contemporary - Addendum 03” document, dated 5/11/2020.

    6. Replace Sheet #187, MH100 HVAC Plan Level 0 Basement, in its entirety with sheet of the same name with revision date of 5/8/2020.

    7. Replace Sheet #188, MH101 HVAC Plan Level 01 Ground, in its entirety with sheet of the same name with revision date of 5/8/2020.

    8. Replace Sheet #189, MH102 HVAC Plan Level 02 Upper, in its entirety with sheet of the same name with revision date of 5/8/2020.

    9. Replace Sheet #191, MP100 Mechanical Piping Plan Level 0 Basement, in its entirety with sheet of the same name with revision date of 5/8/2020.

    10. Replace Sheet #194, M-401 Enlarged Mechanical Plans, in its entirety with sheet of the same name with revision date of 5/8/2020.

    11. Replace Sheet #195, M-402 Enlarged Mechanical Plans, in its entirety with sheet of the same name with revision date of 5/8/2020.

    1 2 5 J e f f e r s o n N . E . , A l b u q u e r q u e , N e w M e x i c o 8 7 1 0 8 p h 5 0 5 - 2 5 5 - 4 0 3 3 p o f 1 2

  • d n c a + S t u d i o G P 12. Replace Sheet #199, M-504 Mechanical Details, in its entirety with sheet of the same name with revision date

    of 5/8/2020.

    13. Replace Sheet #201, M-601 Heating Water Piping Schematic, in its entirety with sheet of the same name with revision date of 5/8/2020.

    14. Replace Sheet #202, M-602 Chilled Water Piping Schematic, in its entirety with sheet of the same name with revision date of 5/8/2020.

    15. Replace Sheet #203, M-701 Mechanical Schedules, in its entirety with sheet of the same name with revision date of 5/8/2020.

    16. Replace Sheet #204, M-702 Mechanical Schedules, in its entirety with sheet of the same name with revision date of 5/8/2020.

    17. Replace Sheet #205, M-703 Mechanical Schedules, in its entirety with sheet of the same name with revision date of 5/8/2020.

    18. Replace Sheet #206, M-704 Mechanical Schedules, in its entirety with sheet of the same name with revision date of 5/8/2020.

    19. Replace Sheet #209, MI602 Mechanical Controls Diagrams, in its entirety with sheet of the same name with revision date of 5/8/2020.

    20. Replace Sheet #213, MI606 Controls Sequence of Operations, in its entirety with sheet of the same name with revision date of 5/8/2020.

    21. Replace Sheet #216, ED101 Electrical Demolition Plan, in its entirety with sheet of the same name with revision date of 5/8/2020.

    22. Replace Sheet #217, ES101 Electrical Site Plan, in its entirety with sheet of the same name with revision date of 5/8/2020.

    23. Replace Sheet #221, EP100 Power Plan Level 0 Basement, in its entirety with sheet of the same name with revision date of 5/8/2020.

    24. Replace Sheet #225, ET100 Special Systems Plan Level 0 Basement, in its entirety with sheet of the same name with revision date of 5/8/2020.

    25. Replace Sheet #231, E-401 Enlarged Power Plans, in its entirety with sheet of the same name with revision date of 5/8/2020.

    26. Replace Sheet #239, E-702 Electrical Schedules, in its entirety with sheet of the same name with revision date of 5/8/2020.

    27. Replace Sheet #240, E-703 Electrical Schedules, in its entirety with sheet of the same name with revision date of 5/8/2020.

    28. Replace Sheet #242, E-705 Electrical Panel Schedules, in its entirety with sheet of the same name with revision date of 5/8/2020.

    ATTACHMENTS Attachments as listed above and also: - none

    By: dnca/StudioGP cc: File

    All other provisions and conditions of the Drawings and Specifications remain unchanged.

    END OF ADDENDUM #3

    1 2 5 J e f f e r s o n N . E . , A l b u q u e r q u e , N e w M e x i c o 8 7 1 0 8 p h 5 0 5 - 2 5 5 - 4 0 3 3 p o f 2 2

  • VLADEM CONTEMPORARY 404 MONTEZUMA AVE, SANTA FE, NM 87501

    08 51 30- Steel Frame Windows -

    1

    SECTION 08 51 30 STEEL FRAME WINDOWS

    PART 1 - GENERAL

    1.1 DESCRIPTION

    A. Work included:

    1. Hot-rolled steel triple weatherstripped windows to replace existing fixed windows at locations described and as scheduled.

    2. All window anchors, mullions, covers and trim.

    3. Stainless steel insect screens for all operating ventilators. (optional)

    4. Factory applied Hope’s Power of 5 Finishing System.

    B. Related work specified elsewhere:

    1. Glass, glazing and glazing materials, Section 08810.

    2. Perimeter caulking, Section 07915.

    3. Miscellaneous structural items, Section 05100.

    1.2 QUALITY ASSURANCE

    A. Manufacturer shall have not less than 10 years experience in the fabrication of heavy custom steel windows and be a member of The Steel Window Institute (SWI).

    B. Installation of windows shall be done by experienced window installers.

    C. Allowable tolerances: Size dimensions + 1/16 inch.

    D. Source quality control:

    1. Air infiltration test:

    a. Meets or exceeds ASTM E283.

    b. Maximum air infiltration 0.50 CFM/Ft. of crack length with differential pressure across window unit of 1.57 PSF.

    2. Water penetration test:

    a. Meets or exceeds ASTM E331.

    b. No water penetration for 15 minutes when window is subjected to a rate of flow of 5 gal./hr./sq. ft. with differential pressure across window unit of 2.86 PSF.

    3. Field test:

    a. Field testing criteria (when applicable) shall be in accordance with AAMA 502-12.

    4. Quality of Power of 5 non-coastal finishing process shall meet or exceed the following designations (non-coastal application – greater than (1) mile from salt water and/or similar corrosive environments):

    a. Paint Blistering: ASTM D714.

    b. Humidity: ASTM D4585.

  • VLADEM CONTEMPORARY 404 MONTEZUMA AVE, SANTA FE, NM 87501

    08 51 30- Steel Frame Windows -

    2

    c. Salt Spray (Fog): ASTM B117.

    d. Painted Products in Corrosive Environments: ASTM D1654.

    e. Cyclic Fog/Dry (Prohesion): ASTM G85.

    f. Slat Fog/UV Painted Metal: ASTM D5894.

    g. Pull off Strength of Coating: ASTM D4541.

    5. Upon request, the window manufacturer shall provide a test report from a qualified independent U.S. testing laboratory regularly engaged in testing windows to verify that products conform to test requirement as outlined.

    1.3 SUBMITTALS

    A. Samples (as requested by architect):

    1. Typical 6" long window profile with glazing beads.

    2. Sample of specified muntin, showing welded intersections and glazing beads.

    3. Color sample of finish.

    4. Hardware.

    B. Shop drawings and manufacturer's literature:

    1. Submit for approval shop drawings showing window and installation details, including anchorage, fastening and recommended sealing methods.

    2. Dimensioned elevations showing window opening and window sizes.

    3. The manufacturer shall not commence any work until shop drawings have been approved.

    4. Color charts for finishes.

    1.4 PRODUCT, STORAGE AND HANDLING

    A. The General Contractor shall be responsible for the protection and storage of the windows after delivery to the site.

    B. Store in designated areas in an upright position on wood slats or on a dry floor in a manner that will prevent damage. Ventilate canvas or plastic coverings to prevent humidity buildup.

    1.5 WARRANTY

    A. Provide Hope’s standard 10 year Limited Warranty.

    PART 2 - PRODUCT AND FABRICATION

    2.1 Manufacturers:

    A. Furnish all labor and materials to complete the fabrication of windows as shown on architect's drawings and as specified herein. All windows covered by this specification shall be domestically manufactured in the U.S.A.

    B. Manufacturers: Subject to compliance with requirements covered in this specification, provide products by Hope’s Windows, Inc. – Jamestown, NY (phone: 716-665-5124, e-mail: [email protected]) whose name and products are used to establish the standard of workmanship.

    C. Substitutions: Written approval necessary 10 days prior to bid through submission of the following:

    1. Full-size window/door samples matching required scope.

  • VLADEM CONTEMPORARY 404 MONTEZUMA AVE, SANTA FE, NM 87501

    08 51 30- Steel Frame Windows -

    3

    2. Applicable test reports as outlined in Quality Assurance Section 1.2

    3. List of (5) recently completed projects of similar size and scope.

    2.2 MATERIALS

    A. Heavy custom triple weatherstripped windows shall be manufactured from solid hot-rolled steel profiles.

    1. Profiles made from steel with flanges rolled integrally at the mill.

    2. Perimeter frames and ventilator profiles shall have glazing rebates providing an unobstructed glazing surface of at least 3/4".

    3. Glazing rebate surfaces must be perpendicular to the web or stem of the profile. Applied glazing rebate extensions and rebate surfaces that are tapered will not be acceptable.

    4. Combined weight of frame and ventilator profiles shall be a minimum of 4.20 pounds per lineal foot. Frame profile alone shall not weigh less than 1.80 pounds per lineal foot.

    5. All steel profiles must be a minimum of 1-3/4″ in depth.

    6. The frame and ventilator profiles shall have integral grooves located in the exterior and interior bedding contacts for the reception of triple weatherstripping.

    B. Muntins:

    1. True Divided Lite muntins:

    a. Muntins shall be manufactured from solid hot-rolled steel, size to be determined by design.

    b. Glazing rebate surfaces must be perpendicular to the stem of this profile. Rebate surfaces that are tapered will not be acceptable.

    c. 1-3/4” tee shall weigh 1.62 pounds per lineal foot, the 1-3/8” tee shall weigh 1.44 pounds per lineal foot and the 7/8” tee shall weigh 1.19 pounds per lineal foot (specify).

    d. All steel muntin profiles must be a minimum of 1-3/4″ in depth.

    C. Glazing beads shall be extruded aluminum Alloy 6063-T5 with a minimum thickness of .062 inches.

    D. Weatherstripping shall be extruded EPDM closed cell sponge, flexible silicone or polyethylene clad urethane foam.

    E. Operable Hardware:

    1. Pivots: Bronze cup pivots.

    2. Fasteners: Brass or Bronze cam fasteners.

    3. Friction and limit device: Stainless steel with sliding brass shoe and screw adjusted friction.

    F. All screws that are furnished by Hope’s, for hardware, trim, covers, anchoring, weatherbars, water dams, screens, etc. shall be non-ferrous brass or stainless steel. Glazing bead retainer screws are plated steel.

    G. Power of 5 Finishing

    1. Non-Coastal – greater than (1) mile from salt water and/or similar corrosive environments.

    a. Cleaning.

    b. Pretreatment.

    c. Epoxy E-Coat primer.

  • VLADEM CONTEMPORARY 404 MONTEZUMA AVE, SANTA FE, NM 87501

    08 51 30- Steel Frame Windows -

    4

    d. Epoxy powder primer.

    e. Ultrathane polyurethane top coat.

    2.3 FABRICATION

    A. Fabricate steel windows in accordance with approved shop drawings.

    B. Corners of frame and ventilator shall be mitered or coped then solidly welded. Exposed and contact surfaces shall be finished smooth flush with the adjacent surfaces. All interior and exterior rail bar and muntin joints shall be face welded and ground smooth.

    C. Muntins

    1. True Divided Lite muntins shall be coped and welded to the perimeter frame. Muntin intersections shall be slotted, cross notched and welded. All interior and exterior muntin joints shall be face welded and ground smooth.

    D. Glazing:

    1. All windows shall be designed for inside glazing.

    2. Provide replaceable continuous glazing beads to suit the glass as specified.

    3. Glazing beads shall be cut and shop fitted to each glass lite prior to shipment.

    4. Manufacturer to provide correct glazing wedge and tape in accordance with the tested assembly.

    E. Weatherstrip:

    1. All ventilators shall receive continuous weatherstripping that shall be applied to the integral weatherstrip grooves in the interior and exterior contact surfaces of the frame and ventilator profiles. Weatherstripping that is surface applied or requires additional retainer or requires screws for application shall not be acceptable.

    F. Operable Hardware:

    1. Ventilators shall be hung on bronze cup pivots located at the head and sill.

    2. Provide one cam fastener at each jamb. Provide double grip fasteners for ventilators over 5'6" in height.

    3. Friction device shall be applied to the swing-out portion at the head.

    2.4 FACTORY FINISHING

    A. Power of 5

    1. Cleaning:

    a. All hot-rolled steel profiles must be acid pickled as defined by SSPC – SP8 to ensure a pristine, white metal substrate prior to fabrication.

    2. Pretreatment:

    a. Following welding and all machining operations, hot-rolled products and accessories are subjected to the following pretreatments geared specific to projects proximity to corrosive environment. Cold-rolled, formed sheet steel components are manufactured from A60 galvannealed sheet and subjected to applicable processes outlined below.

    b. Inland locations (12-stage process) – Greater than one (1) mile from salt water and/or similar corrosive environments.

  • VLADEM CONTEMPORARY 404 MONTEZUMA AVE, SANTA FE, NM 87501

    08 51 30- Steel Frame Windows -

    5

    i. Alkaline cleaning spray.

    ii. Alkaline cleaning submersion.

    iii. Water immersion rinse combo.

    iv. Water immersion rinse clean.

    v. Acid immersion.

    vi. Neutralizing rinse.

    vii. Water immersion rinse clean.

    viii. Conditioner immersion.

    ix. Zinc phosphate immersion.

    x. Rinse immersion.

    xi. Sealer immersion.

    xii. Water reverse osmosis rinse immersion.

    3. Epoxy E-coat Primer:

    All pickled and pretreated frames and accessories are immersed into an electrostatic (E-coat) bath of PPG epoxy primer to ensure all substrates are encapsulated evenly and completely. Use of spray primers only will not be an acceptable alternative to this process due to benefits from additional cleaning and frame submersion.

    a. Permeate spray.

    b. Permeate rinse.

    c. Epoxy primer immersion and electrostatic encapsulation

    d. Water reverse osmosis rinse

    e. Oven-cure, 45 minutes @ 350° F

    4. Epoxy Powder Primer:

    Following pre-treatments and E-coat system, all frames and accessories shall receive an abrasion resistant powder coating prior to final top-coat.

    a. Powder is applied electrostatically over cured E-coat to a dry film thickness (DFT) of 2.0 – 3.0 mils.

    b. Parts oven baked at 325° F to completely cure prior to final top coat.

    c. Powder coat is intended as an intermediate finish applied prior to the final finish top coat.

    5. Polyester Powder Top Coat.

    Following all pre-treatments, e-coat and powder abrasion layer, all products shall receive Hope’s ultrathane polyurethane finish with touch-up capability, low chalking and fading characteristics, unlimited color matching, and 70,000+ standard colors, including metallics.

    6. Power of 5 Overview (non-coastal):

    a. Combined overall dry film thickness (DFT) shall be a minimum of 4.6 mils (inland locations)

    b. Overall process shall provide full documented compliance with the following criteria:

  • VLADEM CONTEMPORARY 404 MONTEZUMA AVE, SANTA FE, NM 87501

    08 51 30- Steel Frame Windows -

    6

    i. Acid Pickling: SSPC-SP8.

    ii. Paint Blistering: ASTM D714.

    iii. Humidity: ASTM D4585.

    iv. Painted Products in Corrosive Environment: ASTM D1654.

    v. Salt Spray (Fog): ASTM B117.

    vi. Cyclic Fog/Dry (Prohesion): ASTM G85.

    vii. Salt Fog/UV Painted Metal: ASTM D5894.

    viii. Pull Off Strength of Coating: ASTM D4541.

    PART 3 - EXECUTION

    3.1 INSPECTION

    A. Window openings shall conform with details, dimensions and tolerances shown on the window manufacturer's approved shop drawings.

    B. Conditions which may adversely affect the window installation must be corrected before installation commences.

    C. The wash down of the adjacent masonry or surrounding substrate must be completed before erection commences to prevent damage to the finish by the cleaning materials.

    3.2 INSTALLATION

    A. Windows specified under this section shall be installed by experienced personnel.

    B. Install windows in openings in strict accordance with approved shop drawings.

    1. Set units plumb, level and true to line, without warp or rack of frames.

    2. Anchor units securely to surrounding construction with approved fasteners.

    3. The exterior joints between the windows, trim and mullions shall be properly sealed watertight with an approved sealant and neatly pointed.

    C. Attach ventilator hardware, as required, and adjust ventilators to operate smoothly free from twist and to be weathertight when closed.

    D. Attach loose muntin grids per approved shop drawings, if applicable.

    E. Repair any abraded areas of the factory finish.

    3.3 CLEANING

    A. Window installer shall leave window surfaces clean after installation and ready to receive glass and glazing. The window installer will not be responsible for final cleaning.

    END OF SECTION 08 51 30

  • 4600 C Montgomery Blvd. NE Albuquerque, NM 87109 main 505.883.4111 www.bpce.com

    May 11th 2020 Devendra Contractor 125 Jefferson NE, Albuquerque, NM 87108 SUBJECT: VLADEM CONTEMPORARY – ADDENDUM 03 Dear Mr. Contractor: Please include the following information in your addendum to the bidders. We have prepared this addendum on a separate sheet such that your office need not retype this addendum information. Sincerely, BRIDGERS & PAXTON CONSULTING ENGINEERS, INC.

  • TO: Devendra Contractor RE: Vladem Contemporary – addendum 03 5/11/2020 Page 2

    4600 C Montgomery Blvd. NE, Albuquerque, NM 87109 main 505.883.4111 www.bpce.com

    PRIOR APPROVALS The following manufacturers have properly submitted their request to be allowed to bid substitute equipment and services for the referenced project. Based on information submitted, and our knowledge of and previous experience with the companies and products represented, we feel that the following are capable of providing products and services equivalent to those specified. EQUIPMENT SUBSTITUTE SPECIFICATIONS 1. Section [ ]:

    a. Comments if any DRAWINGS 1. MH100 – HVAC PLAN LEVEL 0 BASEMENT (Re-issued sheet attached):

    a. ADD keyed notes 16 and 17. 2. MH101 – HVAC PLAN LEVEL 01 GROUND (Re-issued sheet attached):

    a. ADD keyed notes 24 through 34. b. ADD manual balancing dampers. c. REVISE return air path through 111-STAFF OFFICES.

    3. MH102 – HVAC PLAN LEVEL 02 UPPER (Re-issued sheet attached): a. ADD keyed notes 22 through 31. b. ADD manual balancing dampers.

    4. MP100 – MECHANICAL PIPING PLAN LEVEL 0 BASEMENT (Re-issued sheet attached): a. REVISE keyed notes 2, 3 and 4. b. REVISE HWS/R and CHS/R piping.

    5. M-401 – ENLARGED MECHANICAL PLANS (Re-issued sheet attached): a. REVISE keyed note 3. b. ADD keyed notes 6 through 10. c. REVISE piping/equipment layout in 002-PUMP ROOM. d. REVISE piping/equipment layout in 004-MECHANICAL.

    6. M-402 – ENLARGED MECHANICAL PLANS (Re-issued sheet attached): a. REVISE AHU-1 unit section label.

    7. M-504 – MECHANICAL DETAILS (Re-issued sheet attached): a. REVISE details A3, C1 and C3.

    8. M-601 – HEATING WATER PIPING SCHEMATIC (Re-issued sheet attached): a. REVISE heating water piping schematic.

    9. M-602 – CHILLED WATER PIPING SCHEMATIC (Re-issued sheet attached): a. REVISE chilled water piping schematic.

    10. M-701 – MECHANICAL SCHEDULES (Re-issued sheet attached): a. REVISE hot water heating coil section of DEDICATED OUTSIDE AIR SYSTEM (DOAS)

    schedule. b. REVISE air washer section of GALLERY VAV AIR HANDLING UNIT schedule. c. REVISE hot water heating coil section of VAV AIR HANDLING UNIT schedule. d. REVISE boxed sheet note.

    11. M-702 – MECHANICAL SCHEDULES (Re-issued sheet attached): a. REVISE PUMPS schedule.

  • TO: Devendra Contractor RE: Vladem Contemporary – addendum 03 5/11/2020 Page 3

    4600 C Montgomery Blvd. NE, Albuquerque, NM 87109 main 505.883.4111 www.bpce.com

    b. ADD IP-3 to PUMPS schedule. c. REVISE VARIABLE FREQUENCY DRIVES schedule. d. REVISE boxed sheet note.

    12. M-703 – MECHANICAL SCHEDULES (Re-issued sheet attached): a. REVISE boxed sheet note.

    13. M-704 – MECHANICAL SCHEDULES (Re-issued sheet attached): a. REVISE GLYCOL FILL SYSTEM schedule. b. ADD BRAZED PLATE HEAT EXCHANGERS schedule. c. REVISE GRILLES AND DIFFUSERS schedule. d. REVISE boxed sheet note.

    14. MI602 – MECHANICAL CONTROLS DIAGRAMS (Re-issued sheet attached): a. ADD SNOW MELT SYSTEM CONTROL DIAGRAM. b. ADD keyed note 4.

    15. MI606 – CONTROLS SEQUENCE OF OPERATIONS (Re-issued sheet attached): a. ADD snow melt system sequence of operation.

    16. ED101 – ELECTRICAL DEMOLITION PLAN (Re-issued sheet attached): a. REVISE scale. b. REVISE routing of underground utilities due to separate site utility package. c. ADD keynote 6 for protection of existing underground Century Link at location of new

    building construction. 17. ES101 – ELECTRICAL SITE PLAN (Re-issued sheet attached):

    a. REVISE scale and remove bar scale. b. REVISE routing of underground utilities due to separate site utility package. c. ADD routing of Century Link fiber and copper to MDF.

    18. EP100 – POWER PLAN LEVEL 0 BASEMENT (Re-issued sheet attached): a. ADD power for P-1/VFD-1, P-2/VFD-2, IP-1/VFD-3, IP-2/VFD-4, and IP-3 in Mechanical

    004. b. REVISE thermal overload switch to receptacle for GF-1.

    19. ET100 – SPECIAL SYSTEMS PLAN LEVEL 0 BASEMENT (Re-issued sheet attached): a. REMOVE routing of conduit to MDF. This is shown on ES101.

    20. E-401 – ENLARGED POWER PLANS (Re-issued sheet attached): a. REMOVE power IP-1/VFD-3 and IP-2/VFD-4 in Pump Room 002.

    21. E-702 – ELECTRICAL SCHEDULES (Re-issued sheet attached): a. REVISE Manufacturer/Model for luminaire types TR04, TR06, TR08, TR12, TS, TS04,

    TS06, TS08, TS10, and TS12 in Electrical Luminaire Schedule. 22. E-703 – ELECTRICAL SCHEDULES (Re-issued sheet attached):

    a. ADD IP-3 to Electrical Connections For Mechanical Equipment Schedule. 23. E-705 – ELECTRICAL PANEL SCHEDULES (Re-issued sheet attached):

    a. REVISE circuits 7-12 in panel M0A. b. REVISE circuits 32, 34, and 36-42 in panel M0B.

  • SE

    LE

    CT

    .

    S

    MO

    DELNUMBERTRADENAM

    EPRO

    DUCTM

    ATERIAL

    UP

    TU1-1

    TU1-2

    TU1-3

    TU1-4

    TU2-2

    8"ø

    14"ø

    M-4011

    M-4013

    10"x8"

    10"x8"

    18"x

    10"

    20"x

    12"

    6"ø

    1

    2

    3 4 6

    EA

    EB

    EC

    ED

    EE

    EF

    E1 E2 E3 E4 E5 E6

    5

    16"ø

    6A5A

    8x6150

    SR-18x6150

    SR-18x6150

    SR-1

    8x6150

    SR-18x6150

    SR-18x6150

    SR-1

    8x6150

    SR-1

    8x6150

    SR-1

    8x6170

    SR-1

    8x6170

    SR-1

    10"x8" 14"x8"14"x10"

    ACU-2

    ACU-1

    CH-1

    020

    Mechanical Yard

    Stair S4

    005

    Janitorial /

    Housekeeping

    002

    Pump Room001

    Electrical Room

    007

    Workshop

    Stair 2

    000

    Hall 1

    015

    Study Room

    003

    MDF Room /

    SecurityEquipment

    004

    Mechanical

    010

    Layout / Exhibit

    Staging Elevator 1Elevator 2

    008

    Loading

    Photography

    014

    Transit Storage

    013

    Clean Room /

    Framing

    012

    Cold Storage

    011

    Collections

    006

    Elevator Machine

    009

    W/C

    Stair 4

    10"ø

    12"ø 10"ø

    8"ø6"ø

    8x680

    ER-38x680

    ER-3

    8x660

    SR-1

    8x660

    SR-1

    8x8120

    SR-1

    8x8150

    SR-18x8140

    SR-1

    LSD-2

    255

    LSD-2

    255

    LSD-2250

    LSD-2200

    LSD-2200

    LSD-2290

    10"ø

    ILF-1

    LSD-2250

    FCU-4

    16x12970

    SR-1

    18x12RG-3

    18"x12"

    16"x12"

    16"x6"

    CSE-1

    DD-1

    6"ø

    8x6TG-1

    10x8TG-1

    14x12TG-1

    16x14TG-1

    12"ø

    ABBAS

    SH I R I AN

    11383

    GI N

    EE

    R

    ONL

    E

    A

    N

    SROFES

    EDP

    I

    IR

    EG

    STER

    NEW

    ME X I CO

    404

    Mon

    tezu

    ma

    Ave

    , S

    anta

    Fe

    , N

    M

    87

    50

    1

    Sheet Title

    Set

    Drawn by Checked by

    Date

    Co

    nsulta

    nt

    File

    Date Issue

    NE

    W M

    EX

    ICO

    MU

    SE

    UM

    OF

    AR

    T

    VL

    AD

    EM

    CO

    NT

    EM

    PO

    RA

    RY

    1 2

    5

    J e

    f f

    e r

    s o

    n

    S t

    r e

    e t

    N

    E

    A

    l b

    u q

    u e

    r q

    u e

    N M

    8

    7 1

    0 8

    p h

    (

    5 0

    5 )

    2

    5 5

    -4 0

    3 3

    Bridgers

    & P

    axto

    n P

    roje

    ct N

    o: 7773

    Sheet of

    No.

    5/8

    /20

    20 2

    :25

    :18

    PM

    D:\R

    evit 2

    01

    8\P

    roje

    cts

    \777

    3_

    ME

    P-N

    MM

    oA

    -RA

    ILY

    AR

    D_p

    zp

    ha

    res@

    bpce.c

    om

    .rvt

    April 15, 2020

    Bid Set

    PZP AS

    HVAC PLAN LEVEL 0BASEMENT

    MH100SCALE: 1/8" = 1'-0"MH100

    1 HVAC LEVEL 0 BASEMENT PLAN

    GENERAL SHEET NOTES

    KEYNOTES1. SEE SHEET M-401 FOR CONTINUATION OF DUCTWORK.2. 8"Ø EXHAUST DUCT UP TO LEVEL ABOVE.3. WATER HEATER 4"Ø GALVANIZED STEEL COMBUSTION AIR INTAKE. INSTALL PER

    MANUFACTURER'S INSTALLATION MANUAL.4. BOILER 6"Ø GALVANIZED STEEL COMBUSTION AIR INTAKE. INSTALL PER

    MANUFACTUER'S INSTALLATION MANUAL.5. AIR-COOLED CHILLER. REFER TO EQUIPMENT SCHEDULE.6. COLD STORAGE DESICCANT DEHUMIDIFER, INSTALLED ON FINISHED FLOOR.

    REFER TO EQUIPMENT SCHEDULE.7. 8"Ø PROCESS AIR INLET. TRIM DUCT FLUSH WITH INSIDE SURFACE OF COLD

    STORAGE PANEL AND PROTECT WITH SCREEN.8. 8"Ø PROCESS AIR OUTLET. TRIM DUCT FLUSH WITH INSIDE SURFACE OF COLD

    STORAGE PANEL AND PROTECT WITH SCREEN.9. 6"Ø REACTIVATION AIR INLET. PENETRATE WALL 6" BELOW DECK. PROVIDE TRIM

    RING AND CUT DUCT FLUSH.10. 6"Ø REACTIVATION AIR OUTLET, DISCHARGE TO 004-MECHANICAL. PENETRATE

    WALL 6" BELOW DECK. PROVIDE TRIM RING AND CUT DUCT FLUSH.11. COLD STORAGE EVAPORATOR, INSTALLED INSIDE COLD STORAGE ENCLOSURE.

    MOUNT FLUSH WITH CEILING PANEL. REFER TO EQUIPMENT SCHEDULE.12. COLD STORAGE TEMPERATURE/HUMIDITY CONTROLLER. REFER TO

    SPECIFICATION 2X XXXX.13. DOUBLE-WALL INSULATED COLD STORAGE ENCLOSURE. REFER TO

    SPECIFICATION XX XXXX.14. INTERLOCK MOTORIZED DAMPER WITH FIRE ALARM SYSTEM.15. RECIRCULATING FILTERED FAN UNIT, BAILEIGH INDUSTRIAL AFS-1000 OR

    EQUIVALENT. UNIT SHALL HAVE 1/3 HP MOTOR, 4 AMP FLA, WITH 3-PRONG CORD AND PLUG. UNIT SHALL BE PROVIDED WITH RF REMOTE CONTROL. SUSPEND UNIT FROM STRUCTURE.

    16. LINEAR SLOT DIFFUSER. 4' LENGTH, (2) 1" SLOTS.17. PROVIDE FACTORY FACE-OPERATED CABLE BALANCING DAMPER WITH LINEAR

    SLOT DIFFUSER.

    A. COORDINATE DUCT ROUTING AND EQUIPMENT INSTALLATION WITH STRUCTURE, ARCHITECTURAL AND ELECTRICAL PLANS. GIVE SPECIAL ATTENTION TO STRUCTURAL BEAM ELEVATIONS, CEILING HEIGHTS, CABLE TRAYS AND ANY ROOF DRAIN LEADERS.

    B. PROVIDE WALL MOUNTED TEMPERATURE ZONE SENSORS. REFER TO CONTROLS SPECIFICATIONS FOR MOUNTING HEIGHTS.

    C. COORDINATE WITH ARCHITECTURAL REFLECTED CEILING PLAN FOREXACT LOCATION OF GRILLES AND DIFFUSERS.

    D. SEE DETAIL A2/M-502 FOR DIFFUSER AND REGISTER CONNECTIONS.PROVIDE MANUAL BALANCING DAMPERS FOR EACH CONNECTION.

    E. SEE DETAIL D1/M-503 FOR EXHAUST GRILLE CONNECTION.F. SEE DETAIL C5/M-501 FOR MEDIUM VELOCITY FITTING DETAILS.G. SEE DETAIL A1/M-501 FOR LOW VELOCITY FITTING DETAILS.H. TEMPERATURE SENSORS LOCATED IN COMMON AREAS SHALL BE PROVIDED

    WITH CLEAR PLASTIC COVER AND LOCK.I. ALL EXPOSED DUCTWORK TO BE PAINTED PER ARCHITECTURAL SPECIFICATIONS.J. PROVIDE SOUND ELBOWS FOR ALL CEILING RETURN AIR GRILLES PER DETAIL

    A5/M-501.K. SEE TERMINAL UNIT DETAILS A5/M-502 & C5/M-502. REFER TO TERMINAL UNIT

    SCHEDULE FOR VAV BOX INLET DUCT DIAMETER.L. REFER TO SHEETS M-501 THROUGH M-505 FOR MECHANICAL DETAILS.M. REFER TO MECHANICAL LEGEND SHEET M-001 FOR ADDITIONAL GENERAL

    NOTES.

    1

    1

    1

    2

    34

    5

    0' 4' 8' 16'

    N

    6

    7

    8

    11

    9

    10

    12

    13

    14

    14

    14

    15

    1616

    1616

    16

    16

    16

    1

    1

    1

    1

    1

    1

    1

    1 5/8/2020 Addendum #3

    Digitally signed by Abbas ShirianDate: 2020.05.08 14:36:31-06'00'

    187

    Deirdre Harris244

  • UP

    SE

    LE

    CT

    .

    S

    MODELNUMBER

    TRADENAME

    PRODUCT

    MATERIAL

    {B8523F9B-3463-40AD-B1A5-A671FF52A739}

    95590{

    50EC46A0-B368-49B0-BE74-F3BB46658F2B}95590

    30"x20"

    TU1-5A

    TU1-5B

    48"x36"

    30"x

    20"

    36"x24"

    TU2-6

    TU2-5

    44"x22"

    40"x

    20"

    TU2-4A

    TU2-4B

    LSD-1260

    LSD-1260

    LSD-1260

    LSD-1260

    LSD-1260

    LSD-1260

    LSD-1220LSD-1

    220LSD-1220LSD-1

    220LSD-1

    220LSD-1220LSD-1

    220LSD-1

    220

    84x20RG-3

    LSD-1135

    LSD-1135

    LSD-1130

    LSD-1135

    LSD-1130LSD-1

    130

    TU2-7

    TU2-8

    TU2-3

    22"x16"

    16"ø

    36"x

    24"

    16"ø

    12"ø16"ø

    30"x20"

    20"x

    14"

    24"x

    12"

    LSD-1135LSD-1

    135LSD-1135LSD-1

    135

    LSD-1

    14"ø

    12"ø

    22"x

    14"

    16"x

    12"

    12"x8"

    14"x12"

    12"x8"

    18"x12"

    22"x12"

    18"x8"

    LSD-1

    135

    24"x

    18"

    24"x18"

    18"x10"

    16"x10"

    LSD-1210

    LSD-1210

    LSD-1210

    16"x14"

    14"x10"

    TU1-5C

    14"x12"

    LSD-1135

    14"x8"

    ER-1100

    ER-2300

    ER-2250

    ER-280

    ER-1

    120

    CEF-1

    L-1

    CH-1

    SD-1240

    LSD-2195

    LSD-2195

    LSD-2195

    LSD-2195

    1

    2

    3 4 6

    7

    A

    B

    C

    D

    E

    EA

    EB

    EC

    ED

    EE

    EF

    E1 E2 E3 E4 E5

    E6

    5

    8

    9

    22"x14"

    6A5A

    8"x20"

    RG-2

    FSD FSD

    FSD

    60x48RG-4

    26"x26"

    SD-2300

    SD-2300

    40"x

    20"

    LSD-1150LSD-1

    150LSD-1150

    LSD-1

    150

    LSD-1150

    LSD-1150

    LSD-1150

    LSD-1

    150

    LSD-1150

    LSD-1150

    LSD-1

    150

    LSD-1150LSD-1

    150LSD-1

    150

    LSD-1

    170

    LSD-1170

    16"x12"

    22"x16"

    LSD-1200

    SD-190

    26"x

    22"

    SD-1

    80

    SD-1

    50

    RG-2

    12"ø

    10"ø

    24"x18"

    10"x12"

    10"ø

    SD-2

    220

    SD-2120

    10"x10"

    SD-280

    8"x10"

    6x650

    SR-1

    ACU-3

    LSD-1450

    60"x

    28"

    LSD-1LSD-1

    LRG-2

    LSD-1

    108

    Classroom

    100

    Vestibule 1

    102

    Lobby

    109

    Event Storage

    110

    W/C 2 Family

    115

    W/C 3 Staff

    113

    Breakroom

    112

    Conference

    111

    Staff Offices

    Stair 1Elevator 1

    Elevator 2

    118

    W/C 4 Women

    119

    W/C 5 Men 123

    Elec. Cl.

    120

    Receiving

    101

    Vestibule 2

    Covered Terrace

    103

    Gallery 1

    125

    Gift Shop

    127

    W/C

    129

    Vestibule 3

    105

    Alcove 1

    Stair 2

    Stair 3

    121

    Janitor122

    IDF

    Loading Dock

    114

    Guard Changing

    Copy / Supply

    107

    Classroom

    Hall

    Mechanical Yard

    Stair S5

    Existing

    concrete laodingdock

    LSD-1

    16"ø

    RG-1

    6"ø

    12"ø

    80x32RG-3

    6"ø

    8"ø

    16"ø

    14"ø

    LSD-2300

    LSD-2300

    LSD-2300

    LSD-2300

    10"ø

    FCU-5

    L-3

    LSD-1320

    LSD-1320

    LSD-1

    320

    LSD-1320

    LSD-1320

    16"x

    14"

    BCU-1

    8"ø

    42"x12"

    RG-2

    12"ø

    12"x10"

    117

    Coat Hall

    116

    Elevator Hall

    128

    Elec

    LSD-2160

    LSD-1200

    RG-1

    RG-1

    24"x18"

    24"x18"

    32"x24"

    36x24RG-3

    LRG-1120

    30x36RG-3

    ABBAS

    SH I R I AN

    11383

    GI N

    EE

    R

    ONL

    E

    A

    N

    SROFES

    EDP

    I

    IR

    EG

    STER

    NEW

    ME X I CO

    404

    Mon

    tezu

    ma

    Ave

    , S

    anta

    Fe

    , N

    M

    87

    50

    1

    Sheet Title

    Set

    Drawn by Checked by

    Date

    Co

    nsulta

    nt

    File

    Date Issue

    NE

    W M

    EX

    ICO

    MU

    SE

    UM

    OF

    AR

    T

    VL

    AD

    EM

    CO

    NT

    EM

    PO

    RA

    RY

    1 2

    5

    J e

    f f

    e r

    s o

    n

    S t

    r e

    e t

    N

    E

    A

    l b

    u q

    u e

    r q

    u e

    N M

    8

    7 1

    0 8

    p h

    (

    5 0

    5 )

    2

    5 5

    -4 0

    3 3

    Bridgers

    & P

    axto

    n P

    roje

    ct N

    o: 7773

    Sheet of

    No.

    5/8

    /20

    20 2

    :25

    :21

    PM

    D:\R

    evit 2

    01

    8\P

    roje

    cts

    \777

    3_

    ME

    P-N

    MM

    oA

    -RA

    ILY

    AR

    D_p

    zp

    ha

    res@

    bpce.c

    om

    .rvt

    April 15, 2020

    Bid Set

    PZP AS

    HVAC PLAN LEVEL 01GROUND

    MH101SCALE: 1/8" = 1'-0"MH101

    1 HVAC LEVEL 1 GROUND PLAN

    GENERAL SHEET NOTES

    KEYNOTES1. 14"x20" SUPPLY AIR DUCT FOR FUTURE. CAP DUCTWORK IN GIFT SHOP SHELL. SEE

    SHEET MH102 FOR CONTINUATION.2. 14"x20" MAKE-UP AIR DUCT FOR FUTURE KITCHEN HOOD. CAP DUCTWORK IN GIFT

    SHOP SHELL. SEE SHEET MH102 FOR CONTINUATION.3. NOT USED.4. 8"Ø EXHAUST DUCT UP IN CHASE TO LEVEL ABOVE. SEE SHEET MH102 FOR

    CONTINUATION.5. ELECTRIC UNIT HEATER FOR GIFT SHOP SHELL SPACE.6. INSTALL RETURN GRILLE WITH BOTTOM EDGE 4" A.F.F..7. ACOUSTICALLY LINED SOUND BOOT ON BACK OF GALLERY RETURN GRILLE.8. 28"x56" RETURN DUCT DOWN TO BASEMENT MECHANICAL ROOM. SEE SHEET

    M-401 FOR CONTINUATION.9. OUTSIDE AIR LOUVER. REFER TO EQUIPMENT SCHEDULE.10. 30"x22" AHU-1 SUPPLY DUCT IN CHASE. SEE SHEET M-401 FOR CONTINUATION.11. 48"x36" AHU-2 RETURN DUCT IN CHASE. SEE SHEET M-401 FOR CONTINUATION.12. 44"x24" AHU-2 SUPPLY DUCT IN CHASE. SEE SHEET M-401 FOR CONTINUATION.13. 26"x24" AHU-2 SUPPLY DUCT UP TO SECOND LEVEL. SEE SHEET MH102 FOR

    CONTINUATION.14. 40"x20" RETURN DUCT UP TO SECOND FLOOR GALLERY. SEE SHEET MH102 FOR

    CONTINUATION.15. 14"x12" EXHAUST DUCT UP THRU ROOF TO EF-1.16. 8"Ø EXHAUST DUCT UP FROM THE BASEMENT. SEE SHEET MH100 FOR

    CONTINUATION.17. 24"Ø AHU-1 SUPPLY DUCT UP IN CHASE TO SECOND LEVEL. SEE SHEET MH102 FOR

    CONTINUATION.18. 18. 42"x42" RELIEF DUCT UP THRU ROOF TO RF-1.19. 6"Ø STAINLESS STEEL DOUBLE-WALLED CATEGORY IV VENT. ALL JOINTS AND

    SEAMS MUST BE SEALED GAS TIGHT AND SHALL NOT BE COMMON VENTED. INSTALL PER MANUFACTURER'S INSTALLATION MANUAL.

    A. COORDINATE DUCT ROUTING AND EQUIPMENT INSTALLATION WITH STRUCTURE, ARCHITECTURAL AND ELECTRICAL PLANS. GIVE SPECIAL ATTTENTION TO STRUCTURAL BEAM ELEVATIONS, CEILING HEIGHTS, CABLE TRAYS AND ANY ROOF DRAIN LEADERS.

    B. PROVIDE WALL MOUNTED TEMPERATURE ZONE SENSORS. REFER TO CONTROLS SPECIFICATIONS FOR MOUNTING HEIGHTS.

    C. COORDINATE WITH ARCHITECTURAL REFLECTED CEILING PLAN FOREXACT LOCATION OF GRILLES AND DIFFUSERS.

    D. SEE DETAIL A2/M-502 FOR DIFFUSER AND REGISTER CONNECTIONS.PROVIDE MANUAL BALANCING DAMPERS FOR EACH CONNECTION.

    E. SEE DETAIL D1/M-503 FOR EXHAUST GRILLE CONNECTION.F. SEE DETAIL C5/M-501 FOR MEDIUM VELOCITY FITTING DETAILS.G. SEE DETAIL A1/M-501 FOR LOW VELOCITY FITTING DETAILS.H. TEMPERATURE SENSORS LOCATED IN COMMON AREAS SHALL BE PROVIDED

    WITH CLEAR PLASTIC COVER AND LOCK.I. ALL EXPOSED DUCTWORK TO BE PAINTED PER ARCHITECTURAL

    SPECIFICATIONS.J. PROVIDE SOUND ELBOWS FOR ALL CEILING RETURN AIR GRILLES PER DETAIL

    C1/M-502.K. SEE TERMINAL UNIT DETAILS A5/M-502 & C5/M-502. REFER TO TERMINAL UNIT

    SCHEDULE FOR VAV BOX INLET DUCT DIAMETER.L. REFER TO SHEETS M-501 THROUGH M-505 FOR MECHANICAL DETAILS.M. REFER TO MECHANICAL LEGEND SHEET M-001 FOR ADDITIONAL GENERAL

    NOTES.

    4

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    KEYNOTES (CONT.)20. 4"Ø STAINLESS STEEL DOUBLE-WALLED CATEGORY IV VENT. ALL JOINTS AND

    SEAMS MUST BE SEALED GAS TIGHT AND SHALL NOT BE COMMON VENTED. INSTALL PER MANUFACTURER'S INSTALLATION MANUAL.

    21. 6"Ø SUPPLY DUCT UP IN CHASE TO SECOND LEVEL. SEE SHEET MH102 FOR CONTINUATION.

    22. 36"x24" RETURN AIR DUCT FROM LEVEL ABOVE. SEE SHEET MH102 FOR CONTINUATION.

    23. HUMIDISTAT FOR MONITORING/TRENDING ONLY.24. PROVIDE FACTORY FACE-OPERATED CABLE BALANCING DAMPER WITH LINEAR

    SLOT DIFFUSER.25. PROVIDE FACTORY FABRICATED MITERED CORNER MODULE. CONTRACTOR SHALL

    MEASURE AND COORDINATE LENGTHS OF MITERED CORNER MODULES TO KEEP FIELD CUTTING TO AN ABSOLUTE MINIMUM.

    26. INACTIVE SLOT DIFFUSER FOR CONTINUOUS APPEARANCE. BLANK OFF BACK OF LINEAR SLOT DIFFUSER WITH SHEET METAL. PAINT INSIDE OF SHEET METAL BLACK.

    17

    18

    19

    20

    0' 4' 8' 16'

    N

    21

    22

    23

    25

    25

    26

    26

    26

    KEYNOTES (CONT.)27. LINEAR SLOT DIFFUSER. 4' LENGTH, (2) 1" SLOTS.28. LINEAR SLOT DIFFUSER. 4' LENGTH, (3) 1" SLOTS.29. LINEAR SLOT DIFFUSER. 5' LENGTH, (4) 1" SLOTS.30. LINEAR SLOT DIFFUSER. 5' LENGTH, (3) 1" SLOTS.31. LINEAR SLOT DIFFUSER. 4' LENGTH, (1) 1" SLOTS.32. LINEAR SLOT DIFFUSER. 3' LENGTH, (3) 1" SLOTS.33. LINEAR SLOT DIFFUSER. 4' LENGTH, (4) 1" SLOTS.34. BALANCING DAMPER IN VERTICAL DUCT.

    28

    28

    28

    24

    24

    24

    28

    28

    281

    24

    24

    24

    29

    1

    24

    30

    1

    24

    30

    24

    301

    24

    28

    241

    28

    24 28

    241

    28

    24 28

    24128

    24 28

    24128

    24

    1

    30 1

    31

    31

    31

    31

    31

    31

    31

    1

    3124

    3124

    3124

    3124

    1

    131

    31

    24

    31

    24

    31

    241

    28

    1

    26

    1

    27

    271

    271

    27

    27

    27

    27

    2727

    1

    27

    27

    27

    27

    27

    27

    27

    1

    1

    1

    1

    1

    1

    1

    1

    1

    1

    1

    1

    32

    32

    32

    321

    1

    1

    1

    1

    1

    1

    1

    1

    1

    1

    321

    31

    1

    31

    1

    31

    1

    31

    1

    30

    33

    33

    33

    33

    33

    1

    1

    1

    24

    24

    1

    24

    1

    1

    1

    1

    34

    TYP.

    24

    24

    24

    24

    24

    24

    1 5/8/2020 Addendum #3

    Digitally signed by Abbas ShirianDate: 2020.05.08 14:36:56-06'00'

    188

    Deirdre Harris244

  • SE

    LE

    CT

    .

    S

    DN

    {6D0A672A-010B-4AB8-AB55-D072C8E400E1}

    15240

    Open to

    Below

    Open to

    Below

    Open to

    Below

    LSD-1135LSD-1

    135LSD-1135LSD-1

    135LSD-1

    135

    TU1-6A

    TU1-6B

    LSD-1250

    LSD-1250

    LSD-1250

    LSD-1250

    LSD-1

    250

    LSD-1

    250

    LSD-1250

    LSD-1

    250

    TU2-10

    18"x14"

    12"ø

    26"x22"

    16"ø

    14"ø

    10"ø

    TU2-9A

    TU2-9B

    TU1-7

    24"x16"

    16"ø

    ER-2

    60

    ER-280

    14x6200

    ER-310"x10"

    TU2-11

    1

    2

    3 4 6

    7

    A

    B

    C

    D

    E

    EA

    EB

    EC

    ED

    EE

    EF

    E1 E2 E3 E4 E5 E6

    5

    8

    9

    6A5A

    RF-1

    EF-1

    14"ø

    36x54RG-3

    24"x14"

    CU-1CU-2

    8"ø

    CU-3

    LSD-1125

    LSD-1125

    16x10RG-3

    14"ø

    LSD-2300

    LSD-2

    310

    LSD-2310

    24x16RG-3

    16x10RG-3

    LSD-1

    280LSD-1

    280LSD-1

    280LSD-1

    280LSD-1280LSD-1

    280LSD-1

    280LSD-1

    280LSD-1

    280LSD-1

    AD

    LSD-1

    280

    202

    Light Gallery

    200

    Hall

    201

    Gallery 2

    Chase

    Stair 1

    Elevator 1

    Elevator 2

    206

    W/C 7

    Family

    211

    Artist's Studio

    207

    Catering / Loading

    209

    Collections

    214

    Roof Terrace

    204

    Women's Board

    Storage

    212

    Studio Terrace

    Stair 3

    203

    Hall

    208

    Janitor

    205

    Vestibule

    Stair 2

    Roof below

    Loading Dock

    Canopy below

    Loading Dock

    Canopy below

    pla

    nte

    r

    planter

    pla

    nte

    r

    210

    Bridge Hall

    14"ø

    18"x14"

    14"ø

    12"ø

    14"ø

    L-2

    SD-1310

    SD-1

    310

    RG-1

    14"ø

    24"x20"

    18x12550

    ER-3

    10"x10"

    10"ø

    LSD-2190

    LSD-2

    190

    10"ø

    LSD-1130LSD-1

    130LSD-1130LSD-1

    130LSD-1

    130

    LSD-1135LSD-1

    135LSD-1135LSD-1

    135LSD-1135

    LSD-1130

    LSD-1130

    LSD-1

    130

    LSD-1130

    LSD-1130

    VFD-14

    SD-380

    16"x14"

    10"x12"

    24"x14"

    24"x14"

    24"x14"

    26"x22"

    26"x22"

    28"x24"

    24"ø

    6"ø

    ABBAS

    SH I R I AN

    11383

    GI N

    EE

    R

    ONL

    E

    A

    N

    SROFES

    EDP

    I

    IR

    EG

    STER

    NEW

    ME X I CO

    404

    Mon

    tezu

    ma

    Ave

    , S

    anta

    Fe

    , N

    M

    87

    50

    1

    Sheet Title

    Set

    Drawn by Checked by

    Date

    Co

    nsulta

    nt

    File

    Date Issue

    NE

    W M

    EX

    ICO

    MU

    SE

    UM

    OF

    AR

    T

    VL

    AD

    EM

    CO

    NT

    EM

    PO

    RA

    RY

    1 2

    5

    J e

    f f

    e r

    s o

    n

    S t

    r e

    e t

    N

    E

    A

    l b

    u q

    u e

    r q

    u e

    N M

    8

    7 1

    0 8

    p h

    (

    5 0

    5 )

    2

    5 5

    -4 0

    3 3

    Bridgers

    & P

    axto

    n P

    roje

    ct N

    o: 7773

    Sheet of

    No.

    5/8

    /20

    20 2

    :25

    :23

    PM

    D:\R

    evit 2

    01

    8\P

    roje

    cts

    \777

    3_

    ME

    P-N

    MM

    oA

    -RA

    ILY

    AR

    D_p

    zp

    ha

    res@

    bpce.c

    om

    .rvt

    April 15, 2020

    Bid Set

    PZP AS

    HVAC PLAN LEVEL 02UPPER

    MH102SCALE: 1/8" = 1'-0"MH102

    1 HVAC LEVEL 2 UPPER PLAN

    GENERAL SHEET NOTES

    KEYNOTES1. 14"x20" SUPPLY AIR DUCT FOR FUTURE. CAP DUCTWORK ABOVE CEILING. SEE

    SHEET MH101 FOR CONTINUATION.2. 14"x20" MAKE-UP AIR DUCT FOR FUTURE KITCHEN HOOD. CAP DUCTWORK ABOVE

    CEILING. SEE SHEET MH101 FOR CONTINUATION.3. NOT USED.4. 8"Ø EXHAUST DUCT UP THRU ROOF. TERMINATE IN CODE COMPLIANT MANNER.

    REFER TO SHEET MH103 FOR CONTINUATION.5. 10"x10" EXHAUST DUCT UP THRU ROOF TO EF-2.6. 24"Ø AHU-1 SUPPLY DUCT UP FROM FLOOR BELOW. SEE SHEET MH101 FOR

    CONTINUATION.7. 5"Ø STAINLESS STEEL DOUBLE-WALLED CATEGORY IV VENT. ALL JOINTS AND

    SEAMS MUST BE SEALED GAS TIGHT AND SHALL NOT BE COMMON VENTED. INSTALL PER MANUFACTURER'S INSTALLATION MANUAL.

    8. 4"Ø STAINLESS STEEL DOUBLE-WALLED CATEGORY IV VENT. ALL JOINTS AND SEAMS MUST BE SEALED GAS TIGHT AND SHALL NOT BE COMMON VENTED. INSTALL PER MANUFACTURER'S INSTALLATION MANUAL.

    9. EXHAUST FAN ON ROOF CURB, PER EQUIPMENT SCHEDULE.10. RELIEF FAN ON ROOF CURB, PER EQUIPMENT SCHEDULE.11. CONDENSING UNIT INSTALLED ON ROOF CURB. ROUTE REFRIGERANT PIPING TO

    ROOF PENETRATION HOUSING PER DETAIL X/M-50X. PROVIDE REFRIGERANT PIPING AND ALL ACCESSORIES FOR A COMPLETE AND FUNCTIONAL SYSTEM PER MANUFACTURER'S INSTALLATION MANUAL.

    12. ROOF PENETRATION HOUSING, THE VAULT MODEL NUMBER 201412. INSTALL PER DETAIL D4/M-505 AND MANUFACTURER'S INSTALLATION MANUAL.

    13. 20"x40" RETURN DUCT DOWN TO FIRST FLOOR. SEE SHEET MH101 FOR CONTINUATION.

    14. 26"x22" AHU-2 SUPPLY DUCT UP FROM FIRST FLOOR. SEE SHEET MH101 FOR CONTINUATION.

    A. COORDINATE DUCT ROUTING AND EQUIPMENT INSTALLATION WITH STRUCTURE, ARCHITECTURAL AND ELECTRICAL PLANS. GIVE SPECIAL ATTENTION TO STRUCTURAL BEAM ELEVATIONS, CEILING HEIGHTS, CABLE TRAYS AND ANY ROOF DRAIN LEADERS.

    B. PROVIDE WALL MOUNTED TEMPERATURE ZONE SENSORS. REFER TO CONTROLS SPECIFICATIONS FOR MOUNTING HEIGHTS.

    C. COORDINATE WITH ARCHITECTURAL REFLECTED CEILING PLAN FOREXACT LOCATION OF GRILLES AND DIFFUSERS.

    D. SEE DETAIL A2/M-502 FOR DIFFUSER AND REGISTER CONNECTIONS.PROVIDE MANUAL BALANCING DAMPERS FOR EACH CONNECTION.

    E. SEE DETAIL D1/M-50X FOR EXHAUST GRILLE CONNECTION.F. SEE DETAIL C5/M-501 FOR MEDIUM VELOCITY FITTING DETAILS.G. SEE DETAIL A1/M-501 FOR LOW VELOCITY FITTING DETAILS.H. TEMPERATURE SENSORS LOCATED IN COMMON AREAS SHALL BE PROVIDED

    WITH CLEAR PLASTIC COVER AND LOCK.I. ALL EXPOSED DUCTWORK TO BE PAINTED PER ARCHITECTURAL

    SPECIFICATIONS.J. PROVIDE SOUND ELBOWS FOR ALL CEILING RETURN AIR GRILLES PER DETAIL

    A5/M-501.K. SEE TERMINAL UNIT DETAILS A5/M-502 & C5/M-502. REFER TO TERMINAL UNIT

    SCHEDULE FOR VAV BOX INLET DUCT DIAMETER.L. REFER TO SHEETS M-501 THROUGH M-505 FOR MECHANICAL DETAILS.M. REFER TO MECHANICAL LEGEND SHEET M-001 FOR ADDITIONAL GENERAL

    NOTES.

    5

    6

    7

    8

    9

    10

    111111

    KEYNOTES (CONT.)15. 6" SUPPLY DUCT UP FROM FIRST FLOOR. SEE SHEET MH101 FOR CONTINUATION.16. 36"x24" RETURN AIR DUCT TO LEVEL BELOW. SEE SHEET MH101 FOR

    CONTINUATION.17. STRUCTURE, FOR REFERENCE ONLY.18. 28"x24" RETURN DUCT UNDERNEATH 24"x14" SUPPLY DUCT.19. 26"x22" SUPPLY DUCT UNDERNEATH 24"x14" SUPPLY DUCT.20. 6"Ø EXHAUST DUCT UP IN CHASE FROM GIFT SHOP TO ROOF. SEE SHEET MH103

    FOR CONTINUATION.21. INACTIVE SLOT DIFFUSER FOR CONTINUOUS APPEARANCE. BLANK OFF BACK OF

    LINEAR SLOT DIFFUSER WITH SHEET METAL. PAINT INSIDE OF SHEET METAL BLACK. 22. MOTORIZED DAMPER. CONNECT TO FMS.23. RELIEF AIR LOUVER. REFER TO M-704.24. BACKDRAFT DAMPER. CONNECT TO BACK OF RETURN AIR GRILLE.25. LINEAR SLOT DIFFUSER. 3' LENGTH, (2) 1" SLOTS.26. LINEAR SLOT DIFFUSER. 4' LENGTH, (1) 1" SLOTS.27. LINEAR SLOT DIFFUSER. 4' LENGTH, (3) 1" SLOTS.28. LINEAR SLOT DIFFUSER. 4'-11" LENGTH, (4) 1" SLOTS.29. LINEAR SLOT DIFFUSER. 5' LENGTH, (4) 1" SLOTS.30. BALANCING DAMPER IN VERTICAL DUCT.

    12

    13

    14

    0' 4' 8' 16'

    N

    15

    1617

    18

    19

    20

    21

    KEYNOTES (CONT.)31. CHASE IS TO FUNCTION AS A RELIEF AIR PLENUM. CONSTRUCT AND SEAL IN AN AIR

    TIGHT MANNER.

    22

    23

    24

    1

    1

    1

    26

    26

    26

    26

    261

    26

    26

    26

    26

    261

    29

    29

    29

    29

    29

    29

    29

    29

    1

    1

    26

    26

    26

    26

    26

    1

    26

    26

    26

    26

    26

    1

    28

    28

    28

    28

    28

    28

    28

    28

    28

    28

    28

    1

    28 1

    27 1

    27 1

    27 1

    1

    26

    26

    1

    1

    251

    25

    130

    TYP.

    30

    TYP.

    1 5/8/2020 Addendum #3

    31

    Digitally signed by Abbas ShirianDate: 2020.05.08 14:37:20-06'00'

    189

    Deirdre Harris244

  • SE

    LE

    CT

    .

    S

    MO

    DELNUMBERTRADENAM

    EPRO

    DUCTM

    ATERIAL

    UP

    020

    Mechanical Yard

    Stair 4

    003

    MDF

    Room/SecurityEquipment

    002

    Pump Room 001

    Electrical Room

    006

    Elevator Machine

    007

    Workshop

    Stair 2000

    Hall 1

    015

    Study Room

    009

    W/C

    004

    Mechanical

    010

    Layout / Exhibit

    Staging

    Elevator 1

    Elevator 2008

    Loading

    Photography

    014

    Transit Storage

    013

    Clean Room /

    Framing

    012

    Cold Storage

    011

    Collections

    005

    Janitorial/

    Housekeeping

    CH-1

    M-4012

    M-4014

    1

    2

    3 4 6

    EA

    EB

    EC

    ED

    EE

    EF

    E1 E2 E3 E4 E5 E6

    5 6A5A

    ACU-2

    ACU-1

    TU1-3

    TU1-2TU1-1

    TU1-4

    1"1"

    1 1/4"

    1 1/4"

    1 1/4"

    1 1/4"

    3/4"

    HW

    RH

    WS

    HWRHWS

    CHS

    CSE-1

    1 1/2"

    1 1/2"

    TU2-2

    CHR

    1 1/2"1 1/2"

    RL RS

    FCU-4

    3/4"

    ABBAS

    SH I R I AN

    11383

    GI N

    EE

    R

    ONL

    E

    A

    N

    SROFES

    EDP

    I

    IR

    EG

    STER

    NEW

    ME X I CO

    404

    Mon

    tezu

    ma

    Ave

    , S

    anta

    Fe

    , N

    M

    87

    50

    1

    Sheet Title

    Set

    Drawn by Checked by

    Date

    Co

    nsulta

    nt

    File

    Date Issue

    NE

    W M

    EX

    ICO

    MU

    SE

    UM

    OF

    AR

    T

    VL

    AD

    EM

    CO

    NT

    EM

    PO

    RA

    RY

    1 2

    5

    J e

    f f

    e r

    s o

    n

    S t

    r e

    e t

    N

    E

    A

    l b

    u q

    u e

    r q

    u e

    N M

    8

    7 1

    0 8

    p h

    (

    5 0

    5 )

    2

    5 5

    -4 0

    3 3

    Bridgers

    & P

    axto

    n P

    roje

    ct N

    o: 7773

    Sheet of

    No.

    5/8

    /20

    20 2

    :25

    :24

    PM

    D:\R

    evit 2

    01

    8\P

    roje

    cts

    \777

    3_

    ME

    P-N

    MM

    oA

    -RA

    ILY

    AR

    D_p

    zp

    ha

    res@

    bpce.c

    om

    .rvt

    April 15, 2020

    Bid Set

    PZP AS

    MECHANICAL PIPINGPLAN LEVEL 0 BASEMENT

    MP100SCALE: 1/8" = 1'-0"MP100

    1 MECHANICAL PIPING LEVEL 0 BASEMENT PLAN

    GENERAL SHEET NOTES

    KEYNOTES1. COLD STORAGE REFRIGERANT PIPING TO MECHANICAL ROOM. SEE SHEET M-401

    FOR CONTINUATION.2. 4" HWS/R PIPING TO MECHANICAL ROOM. SEE SHEET M-401 FOR CONTINUATION.3. 1-1/2" CHS/R AND HWS/R PIPING TO MECHANICAL ROOM. SEE SHEET M-401 FOR

    CONTINUATION.4. 3/4" CHS/R PIPING TO BOILER ROOM. SEE SHEET M-401 FOR CONTINUATION.5. 1-1/2" CHS PIPING TO FIRST FLOOR. SEE SHEET MP101 FOR CONTINUATION.6. 1-1/2" CHR PIPING FROM FIRST FLOOR. SEE SHEET MP101 FOR CONTINUATION.7. 4" CHS/R PIPING TO MECHANICAL ROOM. SEE SHEET M-401 FOR CONTINUATION.8. LINE SIZE ISOLATION VALVES.

    A. SEE EQUIPMENT SCHEDULE FOR PIPE SIZES TO EACH TERMINAL UNIT AND FAN COIL UNITS.

    B. SEE DETAIL A2/M-501 AND B5/M-503 FOR PIPING PENETRATION DETAIL.C. SEE DETAIL D5/M-503 FOR PIPE HANGING DETAIL.D. VENT ALL HIGH POINTS IN PIPING SYSTEMS PER DETAIL A5/M-503.E. PROVIDE DRAINS AT ALL LOW POINT OF PIPING SYSTEMS PER DETAIL D1/M-505.F. SEE SHEET M-501 THROUGH M-505 FOR MECHANICAL DETAILS.

    0' 4' 8' 16'

    N

    1

    3

    2

    4

    6

    7

    5

    8

    1 5/8/2020 Addendum #3

    1

    1

    Digitally signed by Abbas ShirianDate: 2020.05.08 14:37:39-06'00'

    191

    Deirdre Harris244

  • AS-2

    P-1 P-2

    AS-1

    ET-2

    ET-1

    CF-2

    CF-1

    DOAS-1

    AHU-2

    VFD-2VFD-1

    VFD-3

    VFD-4

    38"x16"

    12"ø

    48"x

    36"

    20"x

    24"

    L-1

    004

    Mechanical

    EA

    EB

    EC

    ED

    EE

    EF

    E1 E2

    40"x12"

    30"x22"

    38"x16"

    28"x

    48"

    Stair 4

    30"x40"

    AHU-1

    26"x

    18"

    72"x

    22"

    44"x

    22"

    16"ø 16"ø

    FCU-1

    FCU-2

    FCU-1FCU-2

    VFD-5

    VFD-6

    VFD-7

    VFD-8

    VFD-9

    VFD-10

    VFD-11

    VFD-12

    VFD-13

    FMS

    CSC-1

    GF-1

    IP-1

    IP-2

    PHX-1IP-3

    004

    Mechanical

    VFD-1

    P-1

    VFD-2

    P-2

    VFD-3

    VFD-4

    AS-1

    ET-2

    ET-1

    AS-2

    CF-1

    CF-2

    DOAS-1

    AHU-2

    2 1/2" HWS2 1/2" HWR

    2" CHR2" CHS

    1 1/2" HWS1 1/2" HWR

    3" CHS

    3" CHR

    3" CHS

    3" CHR

    2" HWS2" HWR

    3"

    CH

    R

    4"

    CH

    R

    EA

    EB

    EC

    ED

    EE

    EF

    E1 E2

    CSC-1

    FCU-1

    FCU-2

    RLRS

    FMS

    VFD-10

    VFD-11

    VFD-12

    VFD-13

    VFD-5

    VFD-6

    VFD-7

    VFD-9

    VFD-8

    AHU-1

    IP-2

    IP-1

    PHX-1

    IP-3

    GF-1

    ~~

    1 1

    /2"

    HW

    S

    4"

    CH

    R1 1

    /2"

    HW

    R4"

    CH

    R

    4"

    HW

    S

    3"

    HW

    R

    4" HWR

    4" HWS3" HWS

    3" HWS

    2"

    HW

    R

    3"

    CH

    S2"

    HW

    S

    4" CHS

    4" CHR

    1 1/2" CHR

    4"4"

    4"

    4"

    1"

    1"1"

    002

    Pump Room

    EA

    E3

    B-1 B-2

    FCU-3

    4" HWR

    4" HWS

    002

    Pump RoomB-1 B-2

    FCU-3

    ABBAS

    SH I R I AN

    11383

    GI N

    EE

    R

    ONL

    E

    A

    N

    SROFES

    EDP

    I

    IR

    EG

    STER

    NEW

    ME X I CO

    404

    Mon

    tezu

    ma

    Ave

    , S

    anta

    Fe

    , N

    M

    87

    50

    1

    Sheet Title

    Set

    Drawn by Checked by

    Date

    Co

    nsulta

    nt

    File

    Date Issue

    NE

    W M

    EX

    ICO

    MU

    SE

    UM

    OF

    AR

    T

    VL

    AD

    EM

    CO

    NT

    EM

    PO

    RA

    RY

    1 2

    5

    J e

    f f

    e r

    s o

    n

    S t

    r e

    e t

    N

    E

    A

    l b

    u q

    u e

    r q

    u e

    N M

    8

    7 1

    0 8

    p h

    (

    5 0

    5 )

    2

    5 5

    -4 0

    3 3

    Bridgers

    & P

    axto

    n P

    roje

    ct N

    o: 7773

    Sheet of

    No.

    5/8

    /20

    20 2

    :25

    :14

    PM

    D:\R

    evit 2

    01

    8\P

    roje

    cts

    \777

    3_

    ME

    P-N

    MM

    oA

    -RA

    ILY

    AR

    D_p

    zp

    ha

    res@

    bpce.c

    om

    .rvt

    April 15, 2020

    Bid Set

    PZP AS

    ENLARGED MECHANICALPLANS

    M-401

    3/16" = 1'-0"1

    ENLARGED MECHANICAL ROOM DUCTWORK3/16" = 1'-0"

    2ENLARGED MECHANICAL ROOM PIPING

    1/4" = 1'-0"3

    ENLARGED PUMP ROOM VENTING

    1/4" = 1'-0"4

    ENLARGED PUMP ROOM PIPING

    GENERAL SHEET NOTESA. COORDINATE DUCT ROUTING AND EQUIPMENT INSTALLATION WITH STRUCTURE,

    ARCHITECTURAL AND ELECTRICAL PLANS. GIVE SPECIAL ATTENTION TO STRUCTURAL BEAM ELEVATIONS, CEILING HEIGHTS, CABLE TRAYS AND ANY ROOF DRAIN LEADERS.

    B. PROVIDE WALL MOUNTED TEMPERATURE ZONE SENSORS. REFER TO CONTROLS SPECIFICATIONS FOR MOUNTING HEIGHTS.

    C. SEE DETAIL C5/M-501 FOR MEDIUM VELOCITY FITTING DETAILS.D. SEE DETAIL A1/M-501 FOR LOW VELOCITY FITTING DETAILS.E. ALL EXPOSED DUCTWORK TO BE PAINTED PER ARCHITECTURAL

    SPECIFICATIONS.F. SEE TERMINAL UNIT DETAILS A5/M-502 & C5/M-502. REFER TO TERMINAL UNIT

    SCHEDULE FOR VAV BOX INLET DUCT DIAMETER.G. REFER TO SHEETS M-501 THROUGH M-505 FOR MECHANICAL DETAILS.H. SEE EQUIPMENT SCHEDULE FOR PIPE SIZES TO EACH TERMINAL UNIT AND FAN

    COIL UNITS.I. SEE DETAIL A2/M-501 AND B5/M-503 FOR PIPING PENETRATION DETAIL.J. SEE DETAIL D5/M-503 FOR PIPE HANGING DETAIL.K. VENT ALL HIGH POINTS IN PIPING SYSTEMS PER DETAIL A5/M-503.L. PROVIDE DRAINS AT ALL LOW POINT OF PIPING SYSTEMS PER DETAIL D1/M-505.M. REFER TO MECHANICAL LEGEND SHEET M-001 FOR ADDITIONAL GENERAL

    NOTES.

    KEYNOTES1. BASE MOUNTED PUMP ON HOUSEKEEPING PAD. SEE DETAIL B2/M-505. 2. VERTICAL EXPANSION TANKS ON HOUSEKEEPING PAD.3. 3/4" MAKE-UP WATER CONNECTION. REFER TO PIPING DIAGRAMS ON SHEETS

    M-601 AND M-602, AS WELL AS PLUMBING DRAWINGS, FOR ADDITIONAL INFORMATION.

    4. 2-1/2" HWS/HWR PIPING UP TO FLOOR ABOVE. SEE SHEET MP101 FOR CONTINUATION.

    5. COLD STORAGE CONDENSING UNIT. SUSPEND FROM DECK ABOVE WITH SPRING ISOLATORS. REFER TO EQUIPMENT SCHEDULE.

    6. 2-WAY CHW CONTROL VALVE. REFER TO DETAIL C1/M-504.7. 3-WAY CHW CONTROL VALVE. REFER TO DETAIL A1/M-504.8. 2-WAY HW CONTROL VALVE. REFER TO DETAIL A3/M-504.9. 3-WAY HW CONTROL VALVE. REFER TO DETAIL C3/M-504.10. TO/FROM SNOW MELT TUBING MANIFOLDS.

    11 11

    2

    2

    2

    2

    3

    3

    4

    5

    5

    1 5/8/2020 Addendum #3

    1

    3

    1

    9 6

    7

    7

    8

    10

    1 1

    1

    1

    Digitally signed by Abbas ShirianDate: 2020.05.08 14:38:00-06'00'

    194

    Deirdre Harris244

  • DIS

    CH

    AR

    GE

    P

    LE

    NU

    M

    ME

    RV

    14

    FIL

    TE

    R

    AC

    CE

    SS

    S

    EC

    TIO

    N

    AC

    CE

    SS

    S

    EC

    TIO

    N

    SUPPLY FAN SECTION

    AC

    CE

    SS

    S

    EC

    TIO

    N

    AC

    CE

    SS

    S

    EC

    TIO

    N

    CH

    ILLE

    D

    WA

    TE

    R C

    OIL

    AC

    CE

    SS

    S

    EC

    TIO

    N

    HO

    T W

    AT

    ER

    CO

    IL

    AIR

    MIX

    ING

    S

    EC

    TIO

    N

    OUTSIDE AIR

    DIS

    CH

    AR

    GE

    P

    LE

    NU

    M

    ME

    RV

    14

    FIL

    TE

    R

    AC

    CE

    SS

    S

    EC

    TIO

    N

    AC

    CE

    SS

    S

    EC

    TIO

    N

    SUPPLY FAN SECTION

    AC

    CE

    SS

    S

    EC

    TIO

    N

    AC

    CE

    SS

    S

    EC

    TIO

    N

    CH

    ILLE

    D

    WA

    TE

    R C

    OIL

    AC

    CE

    SS

    S

    EC

    TIO

    N

    HO

    T W

    AT

    ER

    CO

    IL

    AIR

    MIX

    ING

    S

    EC

    TIO

    N

    OUTSIDE AIR

    3' -

    5 1

    /4"

    5' -

    1 1

    /2"

    19' - 3 1/32"

    PLAN VIEW

    ELEVATION VIEW

    SUPPLY AIR

    SU

    PP

    LY

    FA

    N S

    EC

    TIO

    N

    AC

    CE

    SS

    SE

    CT

    ION

    CH

    ILLE

    D W

    AT

    ER

    CO

    IL

    RE

    TU

    RN

    FA

    N S

    EC

    TIO

    N

    AIR

    MIX

    ING

    S

    EC

    TIO

    N

    AC

    CE

    SS

    SE

    CT

    ION

    AC

    CE

    SS

    SE

    CT

    ION

    ME

    RV

    14 F

    ILT

    ER

    SE

    CT

    ION

    DIS

    CH

    AR

    GE

    PLE

    NU

    M

    AIR

    WA

    SH

    ER

    AC

    CE

    SS

    SE

    CT

    ION

    AC

    CE

    SS

    SE

    CT

    ION

    CH

    ILLE

    D W

    AT

    ER

    CO

    IL

    AIR

    MIX

    ING

    S

    EC

    TIO

    N

    AC

    CE

    SS

    SE

    CT

    ION

    ME

    RV

    14 F

    ILT

    ER

    SE

    CT

    ION

    DIS

    CH

    AR

    GE

    PLE

    NU

    M

    AIR

    WA

    SH

    ER

    5' -

    5"

    7' -

    9 1

    /2"

    RELIEF AIR

    OUTSIDE AIR

    RETURN AIR

    SUPPLY AIR

    PLAN VIEW

    ELEVATION VIEW

    30' - 5 29/32"

    AC

    CE

    SS

    SE

    CT

    ION

    AC

    CE

    SS

    SE

    CT

    ION

    SU

    PP

    LY

    FA

    N S

    EC

    TIO

    N

    RE

    TU

    RN

    FA

    N S

    EC

    TIO

    N

    DIS

    CH

    AR

    GE

    PLE

    NU

    M

    ME

    RV

    14 F

    ILT

    ER

    SE

    CT

    ION

    SU

    PP

    LY

    FA

    N S

    EC

    TIO

    N

    AC

    CE

    SS

    SE

    CT

    ION

    CH

    ILLE

    D W

    AT

    ER

    CO

    IL

    AC

    CE

    SS

    SE

    CT

    ION

    HO

    T W

    AT

    ER

    CO

    IL

    RE

    TU

    RN

    FA

    N S

    EC

    TIO

    N

    AIR

    MIX

    ING

    SE

    CT

    ION

    AC

    CE

    SS

    SE

    CT

    ION

    ME

    RV

    14 F

    ILT

    ER

    SE

    CT

    ION

    AC

    CE

    SS

    SE

    CT

    ION

    CH

    ILLE

    D W

    AT

    ER

    CO

    IL

    AC

    CE

    SS

    SE

    CT

    ION

    HO

    T W

    AT

    ER

    CO

    IL

    AIR

    MIX

    ING

    SE

    CT

    ION

    AC

    CE

    SS

    SE

    CT

    ION

    5' -

    5"

    PLAN VIEW

    ELEVATION VIEW

    26' - 6 15/16"

    7' -

    9 1

    /2"

    DIS

    CH

    AR

    GE

    PLE

    NU

    M

    SUPPLY AIR

    SU

    PP

    LY

    FA

    N S

    EC

    TIO

    N

    RE

    TU

    RN

    FA

    N S

    EC

    TIO

    N

    ABBAS

    SH I R I AN

    11383

    GI N

    EE

    R

    ONL

    E

    A

    N

    SROFES

    EDP

    I

    IR

    EG

    STER

    NEW

    ME X I CO

    404

    Mon

    tezu

    ma

    Ave

    , S

    anta

    Fe

    , N

    M

    87

    50

    1

    Sheet Title

    Set

    Drawn by Checked by

    Date

    Co

    nsulta

    nt

    File

    Date Issue

    NE

    W M

    EX

    ICO

    MU

    SE

    UM

    OF

    AR

    T

    VL

    AD

    EM

    CO

    NT

    EM

    PO

    RA

    RY

    1 2

    5

    J e

    f f

    e r

    s o

    n

    S t

    r e

    e t

    N

    E

    A

    l b

    u q

    u e

    r q

    u e

    N M

    8

    7 1

    0 8

    p h

    (

    5 0

    5 )

    2

    5 5

    -4 0

    3 3

    Bridgers

    & P

    axto

    n P

    roje

    ct N

    o: 7773

    Sheet of

    No.

    5/8

    /20

    20 2

    :25

    :15

    PM

    D:\R

    evit 2

    01

    8\P

    roje

    cts

    \777

    3_

    ME

    P-N

    MM

    oA

    -RA

    ILY

    AR

    D_p

    zp

    ha

    res@

    bpce.c

    om

    .rvt

    April 15, 2020

    Bid Set

    Author Checker

    ENLARGED MECHANICALPLANS

    M-402

    SCALE: NOT TO SCALE3

    DEDICATED OUTSIDE AIR UNIT, DOAS-1

    SCALE: NOT TO SCALE1

    AIR HANDLING UNIT, AHU-1SCALE: NOT TO SCALE

    2AIR HANDLING UNIT, AHU-2

    1 5/8/2020 Addendum #3

    1

    1

    Digitally signed by Abbas ShirianDate: 2020.05.08 14:38:21-06'00'

    195

    Deirdre Harris244

  • SCALE = NONE

    CHILLED WATER COIL PIPING SCHEMATIC (3-WAY)A1

    SUPPLY WATER SHALL BE CONNECTED TO AIR LEAVING SIDE OF COIL

    COLLECT ALL DRAINS, INSTALL HOSE CONNECTION AND CAP

    TEMPERATURE AND PRESSURE (T&P) FITTING, TYP.

    PRESSURE GAUGE, TYP

    THERMOMETER , TYP

    UNION, TYP.

    AUTOMATIC THREE-WAY CONTROL VALVE. COORDINATE PORT CONFIGURATION WITH CONTROLS CONTRACTOR.

    ISOLATION VALVE, TYP.

    MANUAL AIR VENT

    1/2" SHUT-OFF VALVE AND DRAIN

    DASHED PIPING AND COILS INDICATE TYPICAL PIPING REQUIREMENTS FOR MULTIPLE COILS

    [FLOW BALANCE VALVE] [AUTOMATIC FLOW LIMITING VALVE]. SEE SPECIFICATIONS.

    UNION OR FLANGE. INSTALL SO AS TO ALLOW REMOVAL OF COIL WITHOUT MAJOR REMOVAL OF PIPING.

    GAUGE COCK, TYP.

    1

    2

    3

    4

    6

    7

    8

    9

    10

    11

    12

    CHS

    CHR

    COIL

    AIR FLOW

    COIL

    5 4 8

    6 12

    7

    3

    5

    369

    1

    3

    11

    3

    10

    8

    3

    2

    13

    14

    5

    14

    1313

    11

    NC C

    NO

    GENERAL NOTES

    A. PROVIDE MANUAL AIR VENTS AT ALL HIGH POINTS IN SYSTEM. SEE MANUAL AIR VENT DETAIL

    B. SEE PLANS AND/OR PIPING SCHEMATIC FOR PIPE SIZES.

    C. T&P FITTINGS INSTALLED IN PIPING 2" AND SMALLER SHALL BE INSTALLED IN ELBOW OR IN THE BRANCH SIDE OF A 2" TEE.

    D. DRAIN VALVE AT ALL LOW POINTS OF PIPING. SEE DRAIN VALVE DETAIL

    THE OTHERGLYCOL WATERSYSTEMS

    FROM OTHERSYSTEMPRESSURESENSOR

    PROVIDE ADDITIONAL PUMP(S)FOR OTHER SYSTEMS WHERENOTED

    SET REGULATING VALVE TO MAINTAIN MAKE-UP PRESSURE 15 PSIG ABOVE HIGHEST SYSTEM PRV SETTING.

    GLYCOL-WATER FEED UNIT

    CW FROM BACKFLOW PREVENTER

    AIR VENT,TYPICAL.SEE SPECS

    RELIEF VALVE

    PRESSURESENSOR TO ACTIVATE PUMP

    FROM BOILERAND OTHERRELIEF VALVES

    LINE TOPUMPSUCTION

    3" CONCRETE PAD

    AIR PURGE

    3/4" 3/4"

    NOTE:

    AIR CONTROL AND MAKE-UP FOR GLYCOL SYSTEMSCALE = NONEC4

    TANK

    A

    S

    D

    HB

    AUTOMATICAIR VENT

    TO F.STO PUMPSUCTION

    AIR SEPARATOR- WHENSCHEDULED

    HIGH CAPACITYFLOAT TYPE AIRVENT, TYPICAL

    TO F.S

    RELIEF VALVE

    TO F.S

    SCHEDULED AIRPURGER-LINE SIZE

    TO F.S

    RELIEF VALVESET AT 10%ABOVE PRVSETTING

    PRESSUREREDUCING VALVE

    TYPICAL DRAINVALVE WITH 3/4"HOSE CONNECTION

    SCHEDULEDEXPANSIONTANK

    VERTICALTANKAPPLICATION

    TEE FORPARALLELTANKS IF SCHEDULED

    TO F.S

    FROM REDUCEDPRESSUREBACKFLOWPREVENTER, SEEPLUMBINGDRAWING

    3/4" BYPASS

    12" MIN.

    TEE FOR PARALLELTANKS IF SCHEDULED

    HORIZONTAL TANKAPPLICATION

    LINE TO PUMP SUCTION

    PROVIDE TANK SADDLESAND HANGER RODS

    SCHEDULEDEXPANSION TANK

    A

    A

    A

    A

    6

    3

    4

    2

    5

    1

    1

    3

    7

    SCALE = NONE

    AIR CONTROL AND MAKE-UP WATER DETAILA4

    1. PROVIDE ONLY THE DASHED PIPING FOR TYPE OF TANK SCHEDULED

    2. CONNECT TO SIDE OF MAIN TO PREVENT AIR OF DEBRIS FROM ENTERING PIPE TO TANK. TOP OR BOTTOM CONNECTION NOT PERMITTED.

    3. PROVIDE 1.2" MINIMUM DROP ANTI-THERMOSYPHON LOOP TO PREVENT GRAVITY HEATING OF TANK. (HEATING SYS. ONLY)

    4. SEE PIPING SCHEMATIC FOR LINE SIZES.

    5. RELIEF VALVE FOR CHILLED WATER SYSTEM IS SHOWN. OMIT WHEN RELIEF VALVE IS SHOWN ON CONVERTOR OR BOILER DETAIL.

    6. PROVIDE STRAINER IN AIR SEPARATOR WHEN INDICATED ON EQUIPMENT SCHEDULE.

    7. SET PRESSURE REDUCING VALVE SO PRESSURE AT HIGH POINT IN SYSTEM HAS A MINIMUM OF 4 PSIG.

    KEYNOTES

    1. SUPPLY WATER SHALL BE CONNECTED TO AIR LEAVING SIDE OF COIL

    2. COLLECT ALL DRAINS, INSTALL HOSE CONNECTION AND CAP

    3. TEMPERATURE AND PRESSURE (T&P) ITTING, TYP.

    4. PRESSURE GAUGE, TYP

    5. THERMOMETER, TYP

    6. UNION, TYP

    7. AUTOMATIC TWO-WAY CONTROL VALVE

    8. ISOLATION VALVE

    9. MANUAL AIR VENT

    10. 1/2" SHUT-OFF VALVE AND DRAIN

    11. DASHED PIPING AND COILS INDICATE TYPICAL PIPING REQUIREMENTS FOR MULTIPLE COILS

    12. [FLOW BALANCE VALVE] [AUTOMATIC FLOW LIMITING VALVE]. SEE SPECIFICATIONS. NOT REQUIRED IF PRESSURE-INDEPENDENT CONTROL VALVE IS SPECIFIED.

    13. UNION OR FLANGE. INSTALL SO AS TO ALLOW REMOVAL OF COIL WITHOUT MAJOR REMOVAL OF PIPING.

    14. GAUGE COCK, TYP.

    NOTE:

    • PROVIDE MANUAL AIR VENTS AT ALL HIGH POINTS IN SYSTEM. SEE MANUAL AIR VENT DETAIL

    • SEE PLANS AND/OR PIPING SCHEMATIC FOR PIPE SIZES.

    • T&P FITTINGS INSTALLED IN PIPING 2" AND SMALLER SHALL BE INSTALLED IN ELBOW OR IN THE BRANCH SIDE OF A 2" TEE.

    • DRAIN VALVE AT ALL LOW POINTS OF PIPING. SEE DRAIN VALVE DETAIL

    SCALE = NONE

    CHILLED WATER COIL PIPING SCHEMATIC (2-WAY)

    CHS

    CHR

    COIL

    AIR FLOW

    COIL

    5 4 8

    6 1273

    5

    369

    1

    3

    11

    3

    10

    8

    3

    2

    C1

    14

    1313

    11

    KEYNOTES

    SCALE = NONE

    HOT WATER COIL PIPING SCHEMATIC (2-WAY)A3

    NOTE:

    • PROVIDE MANUAL AIR VENTS AT ALL HIGH POINTS IN SYSTEM. SEE MANUAL AIR VENT DETAIL

    • SEE PLANS AND/OR PIPING SCHEMATIC FOR PIPE SIZES.

    • T&P FITTINGS INSTALLED IN PIPING 2" AND SMALLER SHALL BE INSTALLED IN ELBOW OR IN THE BRANCH SIDE OF A 2" TEE.

    • DRAIN VALVE AT ALL LOW POINTS OF PIPING. SEE DRAIN VALVE DETAIL

    HWS

    HWR

    COIL

    AIR FLOW

    COIL

    5 4 8

    6 1273

    5

    369

    1

    3

    11

    3

    10

    8

    3

    2

    14

    1313

    11

    1. SUPPLY WATER SHALL BE CONNECTED TO AIR LEAVING SIDE OF COIL

    2. COLLECT ALL DRAINS, INSTALL HOSE CONNECTION AND CAP

    3. TEMPERATURE AND PRESSURE (T&P) FITTING, TYP.

    4. PRESSURE GAUGE, TYP

    5. THERMOMETER, TYP

    6. UNION, TYP

    7. AUTOMATIC TWO-WAY CONTROL VALVE

    8. ISOLATION VALVE

    9. MANUAL AIR VENT

    10. 1/2" SHUT-OFF VALVE AND DRAIN

    11. DASHED PIPING AND COILS INDICATE TYPICAL PIPING REQUIREMENTS FOR MULTIPLE COILS

    12. [FLOW BALANCE VALVE] [AUTOMATIC FLOW LIMITING VALVE]. SEE SPECIFICATIONS. NOT REQUIRED IF PRESSURE-INDEPENDENT CONTROL VALVE IS SPECIFIED.

    13. UNION OR FLANGE. INSTALL SO AS TO ALLOW REMOVAL OF COIL WITHOUT MAJOR REMOVAL OF PIPING.

    14. GAUGE COCK, TYP.

    KEYNOTES

    SCALE = NONE

    HOT WATER COIL PIPING SCHEMATIC (3-WAY)C3

    1. SUPPLY WATER SHALL BE CONNECTED TO AIR LEAVING SIDE OF COIL

    2. COLLECT ALL DRAINS, INSTALL HOSE CONNECTION AND CAP

    3. TEMPERATURE AND PRESSURE (T&P) FITTING, TYP.

    4. PRESSURE GAUGE, TYP

    5. THERMOMETER , TYP

    6. UNION, TYP.

    7. AUTOMATIC THREE-WAY CONTROL VALVE. COORDINATE PORT CONFIGURATION WITH CONTROLS CONTRACTOR.

    8. ISOLATION VALVE, TYP.

    9. MANUAL AIR VENT

    10. 1/2" SHUT-OFF VALVE AND DRAIN

    11. DASHED PIPING AND COILS INDICATE TYPICAL PIPING REQUIREMENTS FOR MULTIPLE COILS

    12. [FLOW BALANCE VALVE] [AUTOMATIC FLOW LIMITING VALVE]. SEE SPECIFICATIONS.

    13. UNION OR FLANGE. INSTALL SO AS TO ALLOW REMOVAL OF COIL WITHOUT MAJOR REMOVAL OF PIPING.

    14. GAUGE COCK, TYP.

    HWS

    HWR

    COIL

    AIR FLOW

    COIL

    5 4 8

    6 12

    7

    3

    5

    369

    1

    3

    11

    3

    10

    8

    3

    2

    14

    1313

    11

    NC C

    NO

    NOTE:

    • PROVIDE MANUAL AIR VENTS AT ALL HIGH POINTS IN SYSTEM. SEE MANUAL AIR VENT DETAIL

    • SEE PLANS AND/OR PIPING SCHEMATIC FOR PIPE SIZES.

    • T&P FITTINGS INSTALLED IN PIPING 2" AND SMALLER SHALL BE INSTALLED IN ELBOW OR IN THE BRANCH SIDE OF A 2" TEE.

    • DRAIN VALVE AT ALL LOW POINTS OF PIPING. SEE DRAIN VALVE DETAIL

    KEYNOTES

    ABBAS

    SH I R I AN

    11383

    GI N

    EE

    R

    ONL

    E

    A

    N

    SROFES

    EDP

    I

    IR

    EG

    STER

    NEW

    ME X I CO

    404

    Mon

    tezu

    ma

    Ave

    , S

    anta

    Fe

    , N

    M

    87

    50

    1

    Sheet Title

    Set

    Drawn by Checked by

    Date

    Co

    nsulta

    nt

    File

    Date Issue

    NE

    W M

    EX

    ICO

    MU

    SE

    UM

    OF

    AR

    T

    VL

    AD

    EM

    CO

    NT

    EM

    PO

    RA

    RY

    1 2

    5

    J e

    f f

    e r

    s o

    n

    S t

    r e

    e t

    N

    E

    A

    l b

    u q

    u e

    r q

    u e

    N M

    8

    7 1

    0 8

    p h

    (

    5 0

    5 )

    2

    5 5

    -4 0

    3 3

    Bri

    dge

    rs &

    Pa

    xto

    n P

    roje

    ct N

    o: 7

    77

    3

    Sheet of

    No.

    5/8

    /20

    20 2

    :25

    :15

    PM

    D:\R

    evit 2

    01

    8\P

    roje

    cts

    \777

    3_

    ME

    P-N

    MM

    oA

    -RA

    ILY

    AR

    D_p

    zp

    ha

    res@

    bpce.c

    om

    .rvt

    April 15, 2020

    Bid Set

    PZP AS

    MECHANICAL DETAILS

    M-504

    1 5/8/2020 Addendum #3

    1

    1

    1

    Digitally signed by Abbas ShirianDate: 2020.05.08 14:38:40-06'00'

    199

    Deirdre Harris244

  • PLUMBING DRAWING 6/P-401

    3/4" NPW MAKE-UP, FORCONTINUATION SEE

    TO F.S.

    ~

    4"

    4"

    3/4"

    WITH FILTERBYPASS FEEDER

    4"HWS

    EXPANSION TANK

    HOT WATER

    AS-1

    AUTOMATIC AIR VENT

    A

    TO FLOOR SINK

    FIRST FLOOR

    HWR

    HWS

    BOILER

    IP-1

    B-1

    VENT TOATMOSPHERE

    FOR CONTINUATION

    GAS TRAIN

    GAS

    VENTAIR

    TO F.S.~

    CONDENSATE NEUTRALIZER

    BOILER

    IP-2

    B-2

    VENT TOATMOSPHERE

    SEE PLUMBING DRAWING 6/P-401FOR CONTINUATION

    GAS TRAIN

    GAS

    6"∅ 6"∅

    VENTAIR

    TO F.S.

    ~

    CONDENSATE NEUTRALIZER

    4"

    4"

    4"

    4"

    3/4"

    CF-1

    ~~

    ~

    ~

    ~

    ET-1

    ~

    4"

    HWS

    HW

    S

    HWR

    BASEMENT

    002

    FROM BASEMENTTERMINAL UNITS

    TO BASEMENT TERMINAL UNITS

    ~~

    SLEEVEPIPE

    SEE DETAIL C1/M-505.

    SEE DETAIL B1/M-505.

    PUMP ROOM

    ~~

    SECOND FLOOR

    ROOF

    ~~

    ~~

    FIRST FLOOR

    SECOND FLOOR

    ROOF

    TO 2ND FLR.TERMINAL UNITS

    FROM 2ND FLR. TERMINAL UNITS

    TO GIFTSHOPBLOWER COIL UNIT

    FROM GIFTSHOPBLOWER COIL UNIT

    FROM BASEMENTAHUs

    TO BASEMENT AHUs

    SEE PLUMBING DRAWING 6/P-401

    KEEP THIS VALVE NORMALLY CLOSED. ONCE THESYSTEM IS FILLED AND AIR IS REMOVED, THE MAKEUP WATER CONNECTION SHOULD BE VALVED OFF. WHEN THE SYSTEM HAS SMALL NORMAL WATER LOSSES, E.G., AT AUTOMATIC AIR VENTS AND PUMP SEALS, THE VALVE WILL HAVE TO BE MANUALLY REOPENED OCCASIONALLY TO FILL SYSTEM.

    QUICK FILL BYPASS.NORMALLY CLOSED.

    6"∅6"∅

    PHX-1

    BRAZED PLATE HEAT EXCHANGER

    004

    MECHANICAL~

    ~

    ~~

    IP-3

    SNOW MELT TUBING CIRCUIT (TYP.)

    SNOW MELT TUBING MANIFOLD (TYP.)

    ~~

    ~~

    ~~

    TO 1ST FLR.TERMINAL UNITS

    FROM 1ST FLR. TERMINAL UNITS

    M

    ABBAS

    SH I R I AN

    11383

    GI N

    EE

    R

    ONL

    E

    A

    N

    SROFES

    EDP

    I

    IR

    EG

    STER

    NEW

    ME X I CO

    404

    Mon

    tezu

    ma

    Ave

    , S

    anta

    Fe

    , N

    M

    87

    50

    1

    Sheet Title

    Set

    Drawn by Checked by

    Date

    Co

    nsulta

    nt

    File

    Date Issue

    NE

    W M

    EX

    ICO

    MU

    SE

    UM

    OF

    AR

    T

    VL

    AD

    EM

    CO

    NT

    EM

    PO

    RA

    RY

    1 2

    5

    J e

    f f

    e r

    s o

    n

    S t

    r e

    e t

    N

    E

    A

    l b

    u q

    u e

    r q

    u e

    N M

    8

    7 1

    0 8

    p h

    (

    5 0

    5 )

    2

    5 5

    -4 0

    3 3

    Bridgers

    & P

    axto

    n P

    roje

    ct N

    o: 7773

    Sheet of

    No.

    5/8

    /20

    20 2

    :25

    :16

    PM

    D:\R

    evit 2

    01

    8\P

    roje

    cts

    \777

    3_

    ME

    P-N

    MM

    oA

    -RA

    ILY

    AR

    D_p

    zp

    ha

    res@

    bpce.c

    om

    .rvt

    April 15, 2020

    Bid Set

    PZP AS

    HEATING WATER PIPINGSCHEMATIC

    M-601SCALE: NOT TO SCALE1HEATING WATER PIPING SCHEMATIC

    1 5/8/2020 Addendum #3

    1

    Digitally signed by Abbas ShirianDate: 2020.05.08 14:39:09-06'00'

    201

    Deirdre Harris244

  • CWR

    CWS

    AUTOMATIC AIR VENT

    AIR SEPARATORTANGENTIAL

    CW

    R CW

    R

    CH-1

    BASEMENT

    FIRST FLOOR

    CW

    R

    CW

    R

    3/4"

    WITH FILTERBYPASS FEEDER

    CHILLER YARD

    4"

    CWS

    CWR

    AS-2

    100% STAND-BYLEAD

    PADCONCRETE

    CWS

    CWR

    CWR

    CWR

    CWS

    4"

    4"

    4"4" 4"

    4"4"

    4"

    4"

    FLOW METERCONNECT TO FMS

    CF-2 P-1 P-2

    CWS

    CWR

    PIPESLEEVE

    ~~

    ~~

    SEE DETAIL B2/M-505.SEE DETAIL

    C1/M-505.

    SEE DETAIL B2/M-505.

    CHASE

    004

    MECH ROOM

    TO BASEMENT AHUs

    FROM BASEMENT AHUsCWR

    CWS

    4"

    ~~

    SLEEVEPIPE

    ~~

    TO FCUs

    FROM FCUs

    CWR

    CWS

    4"

    ~~

    WITH PUMPGLYCOL FEEDER

    GF-1

    1-1/2"

    3/4"

    PLUMBING DRAWING 6/P-401

    3/4" NPW MAKE-UP, FORCONTINUATION SEE

    TO F.S.

    ~

    EXPANSION TANK

    HOT WATER

    3/4"

    ET-2

    ~

    KEEP THIS VALVE NORMALLY CLOSED. ONCE THESYSTEM IS FILLED AND AIR IS REMOVED, THE MAKEUP WATER CONNECTION SHOULD BE VALVED OFF. WHEN

    THE SYSTEM HAS SMALL NORMAL WATER LOSSES, E.G., AT AUTOMATIC AIR VENTS AND PUMP SEALS, THE VALVE

    WILL HAVE TO BE MANUALLY REOPENED OCCASIONALLY TO FILL SYSTEM.

    QUICK FILL BYPASS.NORMALLY CLOSED.

    1"

    4"

    PR

    V

    PR

    V

    ~TO HWR

    ABBAS

    SH I R I AN

    11383

    GI N

    EE

    R

    ONL

    E

    A

    N

    SROFES

    EDP

    I

    IR

    EG

    STER

    NEW

    ME X I CO

    404

    Mon

    tezu

    ma

    Ave

    , S

    anta

    Fe

    , N

    M

    87

    50

    1

    Sheet Title

    Set

    Drawn by Checked by

    Date

    Co

    nsulta

    nt

    File

    Date Issue

    NE

    W M

    EX

    ICO

    MU

    SE

    UM

    OF

    AR

    T

    VL

    AD

    EM

    CO

    NT

    EM

    PO

    RA

    RY

    1 2

    5

    J e

    f f

    e r

    s o

    n

    S t

    r e

    e t

    N

    E

    A

    l b

    u q

    u e

    r q

    u e

    N M

    8

    7 1

    0 8

    p h

    (

    5 0

    5 )

    2

    5 5

    -4 0

    3 3

    Bridgers

    & P

    axto

    n P

    roje

    ct N

    o: 7773

    Sheet of

    No.

    5/8

    /20

    20 2

    :25

    :16

    PM

    D:\R

    evit 2

    01

    8\P

    roje

    cts

    \777

    3_

    ME

    P-N

    MM

    oA

    -RA

    ILY

    AR

    D_p

    zp

    ha

    res@

    bpce.c

    om

    .rvt

    April 15, 2020

    Bid Set

    PZP AS

    CHILLED WATER PIPINGSCHEMATIC

    M-602

    SCALE: NOT TO SCALE1CHILLED WATER PIPING SCHEMATIC

    1 5/8/2020 Addendum #3

    1

    Digitally signed by Abbas ShirianDate: 2020.05.08 14:39:31-06'00'

    202

    Deirdre Harris244

  • ABBAS

    SH I R I AN

    11383

    GI N

    EE

    R

    ONL

    E

    A

    N

    SROFES

    EDP

    I

    IR

    EG

    STER

    NEW

    ME X I CO

    404

    Mon

    tezu

    ma

    Ave

    , S

    anta

    Fe

    , N

    M

    87

    50

    1

    Sheet Title

    Set

    Drawn by Checked by

    Date

    Co

    nsulta

    nt

    File

    Date Issue

    NE

    W M

    EX

    ICO

    MU

    SE

    UM

    OF

    AR

    T

    VL

    AD

    EM

    CO

    NT

    EM

    PO

    RA

    RY

    1 2

    5

    J e

    f f

    e r

    s o

    n

    S t

    r e

    e t

    N

    E

    A

    l b

    u q

    u e

    r q

    u e

    N M

    8

    7 1

    0 8

    p h

    (

    5 0

    5 )

    2

    5 5

    -4 0

    3 3

    Bridgers

    & P

    axto

    n P

    roje

    ct N

    o: 7773

    Sheet of

    No.

    5/8

    /20

    20 2

    :25

    :16

    PM

    D:\R

    evit 2

    01

    8\P

    roje

    cts

    \777

    3_

    ME

    P-N

    MM

    oA

    -RA

    ILY

    AR

    D_p

    zp

    ha

    res@

    bpce.c

    om

    .rvt

    April 15, 2020

    Bid Set

    PZP AS

    MECHANICALSCHEDULES

    M-701

    DEDICATED OUTSIDE AIR SYSTEM (DOAS)

    SYMBOLTRANE

    MODEL NO. TYPE LOCATION

    SUPPLY FAN CHILLED WATER COOLING COIL HOT WATER HEATING COIL

    OPER.WEIGHT(LBS.)

    MINOUTSIDE

    AIR

    OVERALL UNITDIMENSIONS (IN.)

    AIRFLOW(CFM)

    EXT.SP.(IN.WC)

    TOTALSP.(IN.WC)

    FANBHP

    FANRPM

    MOTOR DATA

    FAN SIZE ANDTYPE

    MAX.FACEVEL.(FPM)

    TOTALCAPACITY

    (MBH)

    SENSIBLECAPACITY

    (MBH)

    EAT (°F) LAT (°F)

    GPMCOIL

    ROWS

    WATERTEMP (°F)

    MAX PRESSURELOSS

    MAX.FACEVEL.(FPM)

    TOTALCAPACITY

    (MBH)EAT(°F)

    LAT(°F) GPM

    WATER TEMP(°F)

    MAX PRESSURELOSS

    LENGTH WIDTH HEIGHTHP V PH HZ DB WB DB WB ENT. LVG.AIR (IN.

    WC)WATER(FT. WC) ENT. LVG.

    AIR (IN.WC)

    WATER(FT. WC)

    DOAS-1 CSAA010UA INDOOR PERFORMANCECLIMATE CHANGER

    BASEMENTMECHANICAL

    4,500 0.5 4.6 5.26 2697 7.5 460 3 60 18.25 IN.DIRECT DRIVE

    463 175 153 90 64 50 49.02 29 6 38 50 0.37 2.44 463 320 5 90 16 180 140 0.105 0.86 2600 4,500 247 62 42

    GALLERY VAV AIR HANDLING UNIT

    SYMBOLTRANE

    MODEL NO. TYPE LOCATION

    SUPPLY FAN RETURN/RELIEF FAN

    TOTALAIRFLOW

    (CFM)

    FANARRAY

    QTY.

    EACH FANAIRFLOW

    (CFM)

    EACHEXT. SP.(IN. WC)

    EACHTOTAL SP.

    (IN. WC)

    EACHFANBHP

    EACHFANRPM

    MOTOR DATA(EACH)

    FAN SIZE AND TYPE

    TOTALAIRFLOW

    (CFM)

    FANARRAY

    QTY.

    EACH FANAIRFLOW

    (CFM)

    EACHEXT. SP.(IN. WC)

    EACHTOTAL SP.

    (IN. WC)EACH FAN

    BHP

    EACHFANRPM

    MOTORHP (EACH) FAN SIZE AND TYPEHP V PH HZ

    AHU-1 CSAA030UA INDOOR PERFORMANCE CLIMATE CHANGER BASEMENT MECHANICAL 12,000 2 6,000 2.0 4.9 7.39 2440 10 460 3 60 20 IN. DIRECT DRIVE 12,000 2 6,000 0.8 1.0 2.38 1,706 5 20 IN. DIRECT DRIVE

    VAV AIR HANDLING UNIT

    SYMBOLTRANE

    MODEL NO. TYPE LOCATION

    SUPPLY FAN RETURN/RELIEF FAN

    TOTALAIRFLOW

    (CFM)

    FANARRAY

    QTY.

    EACH FANAIRFLOW

    (CFM)

    EACHEXT. SP.(IN. WC)

    EACHTOTAL SP.

    (IN. WC)

    EACHFANBHP

    EACH

    FANRPM

    MOTOR

    FAN SIZE AND TYPE

    TOTALAIRFLOW

    (CFM)

    FANARRAY

    QTY.

    EACH FANAIRFLOW

    (CFM)

    EACHEXT. SP.(IN. WC)

    EACHTOTAL SP.

    (IN. WC)

    EACHFANBHP

    EACHFANRPM

    MOTOR

    FAN SIZE AND TYPEHP

    (EACH)HP

    (EACH)

    AHU-2 CSAA040UA INDOOR PERFORMANCE CLIMATE CHANGER BASEMENT MECHANICAL 13,500 2 6,750 2.0 4.7 7.5 2175 10 22.25 IN. DIRECT DRIVE 13,500 2 6,750 1.0 1.7 3.4 1716 5 22.25 IN. DIRECT DRIVE

    VAV AIR HANDLING UNIT (CONTINUED)

    SYMBOL

    CHILLED WATER COOLING COIL HOT WATER HEATING COIL

    MINOUTSIDE

    AIR(CFM)

    OPER.WEIGHT(LBS.)

    OVERALL UNIT DIMENSIONS (IN.)

    NOTES

    MAX.FACEVEL.(FPM)

    TOTALCAPACITY

    (MBH)

    SENSIBLECAPACITY

    (MBH)

    EAT (°F) LAT (°F)

    GPMCOIL

    ROWS

    WATERTEMP (°F)

    MAX PRESSURELOSS TOTAL

    AIRFLOW(CFM)

    MAX.FACEVEL.(FPM)

    TOTALCAPACITY

    (MBH)EAT(°F)

    LAT(°F) GPM

    WATER TEMP(°F)

    MAX PRESSURELOSS

    LENGTH WIDTH HEIGHTDB WB DB WB ENT. LVG.AIR (IN.

    WC)WATER(FT. WC) ENT. LVG.

    AIR (IN.WC)

    WATER (FT.WC)

    AHU-2 471 423 323 80 63 52 51.09 71 4 38 50 0.288 2.89 13,500 471 565 45 95 28.2 180 140 0.067 1.84 5,000 6,227 349 94 65

    GALLERY VAV AIR HANDLING UNIT (CONTINUED)

    SYMBOL

    CHILLED WATER COOLING COIL AIR WASHER SECTION

    OPER.WEIGHT(LBS.)

    MIN OUTSIDEAIR

    OVERALL UNIT DIMENSIONS (IN.)

    MAX.FACEVEL.(FPM)

    TOTALCAPACITY

    (MBH)

    SENSIBLECAPACITY

    (MBH)

    EAT (°F) LAT (°F)

    GPM

    WATERTEMP (°F)

    MAX PRESSURELOSS

    EAT(°F)

    EVAPORATIONRATE (GPH)

    LAT(°F)

    MEDIATYPE EFFICENCY

    PRESSUREDROP

    (IN WC) LENGTH WIDTH HEIGHTDB WB DB WB ENT. LVG.AIR (IN.

    WC)WATER(FT. WC)

    AHU-1 418 377 287 80 63 52 51.05 62.5 38 50 0.23 2.34 80 17.2 64.7 CELDEK 90% 0.15 6,600 SEE DOAS-1 398 94 65

    AIR COOLED CHILLER

    SYMBOLTRANE

    MODEL NO. TYPEREFR.TYPE

    EVAPORATOR/ CONDENSOR DATA SINGLE PO