visiting the...cowboys stadium • 73 acre site • 292 feet high • stadium length = 900 feet •...
TRANSCRIPT
NEW PARKLAND
HOSPITAL – HALF
TIME
VISITING THE
PROJECT TEAM’S
LOCKER ROOM
H A N K A D A M S , A I A , A C H A , E D A C
V I C E P R E S I D E N T / D I R E C T O R
H E A L T H C A R E , H D R
D E S I G N M A N A G E R F O R H D R + C O R G A N J V
T H R E E Y E A R S A G O
» THE FIELD
» DEFINING THE PLAYS
» LOCKER ROOM AT HALF TIME
» REVIEWING TAPE
PRESENTATION AGENDA
THE FIELD
EVERYTHING IS BIGGER
IN TEXAS
» Cowboys Stadium
• 73 Acre Site
• 292 Feet High
• Stadium Length = 900 Feet
• Total Area = 3M Square Feet
• Cost = $1.3B
» New Parkland Hospital
• 64 Acre Campus
• 17 Stories = 300 Feet High
• Patient Tower Length = 600 Feet
• Total Area Campus = 2.7M Square Feet
• Cost = $1.271B
T H E T E A M
N O V E M B E R 4 , 2 0 0 8 By an overwhelming majority, the citizens of
Dallas County voted for the construction of a
new Parkland Hospital
82%
T H E G A M E I S F O U R Q U A R T E R S …
2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
Original Parkland Master Plan
Programming
Bond Approval (November 4, 2008)
A/E Selection Process
Design & Construction Team Awarded (March
2009)
Master Plan
Schematic Design
Design Development
Construction Documents
Construction
Transition / Occupancy
KICK OFF
» October 28, 2010
GROUNDBREAKING
MASTER PLAN CONCEPT
Acute Care
Tower
ED Parking Garage Med/Surg
Clinic
DART WISH WISH
Clinic
MASTER PLAN CONCEPT SITE AERIAL
WISH Tower
Acute Tower
WISH clinic/
Administration
Parking Patient/Visitor
Trauma Tower
PUT THE “PARK” BACK IN
PARKLAND …FROM ITS ORIGIN AS WOODED PARK LAND
DEFINING THE PLAYS
THE COLLABORATIVE TEAM
T H E T E A M : C O L L A B O R AT I V E P R O J E C T
D E L I V E RY
• Team Members
» Big Room
» Meeting Space
» IT Infrastructure
» Interior Mock-Up Spaces
» Exterior Mock-Ups
• Team Members
• Big Room
• Meeting Space
• IT Infrastructure
• Interior Mock-Up Spaces
• Exterior Mock-Ups
• Team Members
• Big Room
• Meeting Space
• IT Infrastructure
• Interior Mock-Up Spaces
• Exterior Mock-Ups
• Team Members
• Big Room
• Meeting Space
• IT Infrastructure
• Interior Mock-Up Spaces
• Exterior Mock-Ups
• Team Members
• Big Room
• Meeting Space
• IT Infrastructure
• Interior Mock-Up Spaces
• Exterior Mock-Ups
• Team Members
• Big Room
• Meeting Space
• IT Infrastructure
• Interior Mock-Up Spaces
• Exterior Mock-Ups
• Team Members
• Big Room
• Meeting Space
• IT Infrastructure
• Interior Mock-Up Spaces
• Exterior Mock-Ups
• Team Members
• Big Room
• Meeting Space
• IT Infrastructure
• Interior Mock-Up Spaces
• Exterior Mock-Ups
• Team Members
• Big Room
• Meeting Space
• IT Infrastructure
• Interior Mock-Up Spaces
• Exterior Mock-Ups
T H E P L AY B O O K :
» Decision Making Strategy
• Visioning
• Decision Making Structure
• Clinical Liaison Role
T H E P L AY B O O K :
» Decision Making Strategy
• Visioning
• Decision Making Structure
• Clinical Liaison Role
T H E P L AY B O O K :
» Decision Making Strategy
• Visioning
• Decision Making Structure
• Clinical Liaison Role
A S S E S S I N G F I E L D C O N D I T I O N S : P L A N N I N G F O R
C O N S T R U C T I O N
Enablers
Risks Enablers Opportunities
A S S E S S I N G F I E L D C O N D I T I O N S : P L A N N I N G F O R
C O N S T R U C T I O N
» Pre-Fab
PT Wall
Lean and
Technology
O P P O R T U N I T Y: P R E FA B R I C AT I O N
» 750 bathroom pods
» Three miles of overhead
mechanical/electrical racks
» 850 headwalls
Prefabrication enhanced the project schedule, maximized the quality of the finished
product and enhanced safety by allowing several trades to work at “waist-to-
shoulder” height instead of using ladders in a congested construction zone.
O P P O R T U N I T Y: P R E FA B R I C AT I O N
» 750 bathroom pods
» Three miles of overhead
mechanical/electrical racks
» 850 headwalls
Prefabrication enhanced the project schedule, maximized the quality of the finished
product and enhanced safety by allowing several trades to work at “waist-to-
shoulder” height instead of using ladders in a congested construction zone.
O P P O R T U N I T Y: P R E FA B R I C AT I O N
» 750 bathroom pods
» Three miles of overhead
mechanical/electrical racks
» 850 headwalls
Prefabrication enhanced the project schedule, maximized the quality of the finished
product and enhanced safety by allowing several trades to work at “waist-to-
shoulder” height instead of using ladders in a congested construction zone.
O P P O R T U N I T Y: P R E FA B R I C AT I O N
» 750 bathroom pods
» Three miles of overhead
mechanical/electrical racks
» 850 headwalls
Prefabrication enhanced the project schedule, maximized the quality of the finished
product and enhanced safety by allowing several trades to work at “waist-to-
shoulder” height instead of using ladders in a congested construction zone.
D I A G R A M M I N G P L AY S : B I M /
C O N S T R U C T I O N M O D E L Practice makes perfect
RISK: POST-TENSION WALL
RISK: Post-Tension Wall
RISK: Post-Tension Wall
E N A B L E R S : L E A N A N D T E C H N O L O G Y
LOCKER ROOM AT HALF TIME
YOUR HALF TIME SHOW
REVIEWING THE TAPES:
PREPARING FOR THE
SECOND HALF
TO U C H D O W N !
» On-stage/off-stage incorporated
» Integrated Design
» Sustainability tracking LEED Silver, New Construction
» On schedule
» On budget
F L A G O N T H E P L AY
» Stoppage of Co-Location too Soon
» Pre-fabrication efforts could have been more robust
» Changes in regulatory requirements
» Parkland leadership changes
» Volume changes outpacing expectations
T I M E O U T
» Create a Strong Vision
» Co-Locate and Collaborate
» Design for the Future
» Mock Ups as Design Tools
» Plan Early for Occupancy
NEW PARKLAND
HOSPITAL – HALF
TIME
VISITING THE
PROJECT TEAM’S
LOCKER ROOM
H A N K A D A M S , A I A , A C H A , E D A C
V I C E P R E S I D E N T / D I R E C T O R
H E A L T H C A R E , H D R
D E S I G N M A N A G E R F O R H D R + C O R G A N J V