Bayshore Regional Sewerage Authority 24 acre plant flooded 3 to 4 feet deep Water levels recorded above 13.8 feet (NGVD 29) app 12.3 (NAVD 88) Entry at floor drains, unit heaters, conduits, air intake ducts Both Fluidized Bed Incinerators and ancillary equipment Entire blower building 1 – Main pump station – Administration building

Upload: eustace-grant

Post on 18-Jan-2016

214 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Bayshore Regional Sewerage Authority 24 acre plant flooded 3 to 4 feet deep Water levels recorded above 13.8 feet (NGVD 29) app 12.3 (NAVD 88) Entry at

Bayshore Regional Sewerage Authority

24 acre plant flooded 3 to 4 feet deepWater levels recorded above 13.8 feet (NGVD 29) app 12.3 (NAVD 88)Entry at floor drains, unit heaters, conduits, air intake ducts

Both Fluidized Bed Incinerators and ancillary equipmentEntire blower building 1 – Main pump station – Administration building5 major motor control centers – Lab building – Maintenance shopBoth primary sludge pump stations & 1 Return activated sludge station

Page 2: Bayshore Regional Sewerage Authority 24 acre plant flooded 3 to 4 feet deep Water levels recorded above 13.8 feet (NGVD 29) app 12.3 (NAVD 88) Entry at
Page 3: Bayshore Regional Sewerage Authority 24 acre plant flooded 3 to 4 feet deep Water levels recorded above 13.8 feet (NGVD 29) app 12.3 (NAVD 88) Entry at
Page 4: Bayshore Regional Sewerage Authority 24 acre plant flooded 3 to 4 feet deep Water levels recorded above 13.8 feet (NGVD 29) app 12.3 (NAVD 88) Entry at
Page 5: Bayshore Regional Sewerage Authority 24 acre plant flooded 3 to 4 feet deep Water levels recorded above 13.8 feet (NGVD 29) app 12.3 (NAVD 88) Entry at
Page 6: Bayshore Regional Sewerage Authority 24 acre plant flooded 3 to 4 feet deep Water levels recorded above 13.8 feet (NGVD 29) app 12.3 (NAVD 88) Entry at

Fischer

Incident Command

Operations Planning Logistics Finance / purchasing

Anderson/Theodora Broyles/Theodora Dubey / Izzo

FuelChemicalsHauling & DispEquipmentInventorycommunications

Prioritize recoveryManpower requirement

Locate vendorsProcess claimsPayroll processingPick up suppliesApplications and formsPhones

Maintain systemsAssign manpowerDetermine staff needsDirect recovery

Support System recovery

Komerek/Dow

R3M/Canal

Engineering Support

Short-term systems designLong-term systems designIdentify BRSA as-built

Electrical system recoveryPhone, network, SCADA, internetcomputers

Contractor Support

various

Temp Pumping, sludge haulingMechanical-electrical repairHeavy labor & equipmentCleaningDisposal

Broyles/Anderson

Page 7: Bayshore Regional Sewerage Authority 24 acre plant flooded 3 to 4 feet deep Water levels recorded above 13.8 feet (NGVD 29) app 12.3 (NAVD 88) Entry at

Admin0%

Supplies0% Chemicals

1%Fuel2%

Materials2%

Labor4%

Engineering & Consulting

4%

Equipment Rental 5%

Service6%

Cake Hauling & Disposal

7%

Plant Equipment

16%

Emergency Repair23%

Sludge Haul-ing & Dis-

posal30%

Administrative Issues:

• Workforce• Logistics• Procurement• Insurance• FEMA• Cash flow

Technical Issues

• Communication• Sludge

Management• Power supply• Temporary systems

Page 8: Bayshore Regional Sewerage Authority 24 acre plant flooded 3 to 4 feet deep Water levels recorded above 13.8 feet (NGVD 29) app 12.3 (NAVD 88) Entry at

Mitigation Plans

1. Raise all Motor Control Centers2. Raise Blower Building3. Flood-proof buildings

Page 9: Bayshore Regional Sewerage Authority 24 acre plant flooded 3 to 4 feet deep Water levels recorded above 13.8 feet (NGVD 29) app 12.3 (NAVD 88) Entry at
Page 10: Bayshore Regional Sewerage Authority 24 acre plant flooded 3 to 4 feet deep Water levels recorded above 13.8 feet (NGVD 29) app 12.3 (NAVD 88) Entry at