bayshore regional sewerage authority 24 acre plant flooded 3 to 4 feet deep water levels recorded...
TRANSCRIPT
Bayshore Regional Sewerage Authority
24 acre plant flooded 3 to 4 feet deepWater levels recorded above 13.8 feet (NGVD 29) app 12.3 (NAVD 88)Entry at floor drains, unit heaters, conduits, air intake ducts
Both Fluidized Bed Incinerators and ancillary equipmentEntire blower building 1 – Main pump station – Administration building5 major motor control centers – Lab building – Maintenance shopBoth primary sludge pump stations & 1 Return activated sludge station
Fischer
Incident Command
Operations Planning Logistics Finance / purchasing
Anderson/Theodora Broyles/Theodora Dubey / Izzo
FuelChemicalsHauling & DispEquipmentInventorycommunications
Prioritize recoveryManpower requirement
Locate vendorsProcess claimsPayroll processingPick up suppliesApplications and formsPhones
Maintain systemsAssign manpowerDetermine staff needsDirect recovery
Support System recovery
Komerek/Dow
R3M/Canal
Engineering Support
Short-term systems designLong-term systems designIdentify BRSA as-built
Electrical system recoveryPhone, network, SCADA, internetcomputers
Contractor Support
various
Temp Pumping, sludge haulingMechanical-electrical repairHeavy labor & equipmentCleaningDisposal
Broyles/Anderson
Admin0%
Supplies0% Chemicals
1%Fuel2%
Materials2%
Labor4%
Engineering & Consulting
4%
Equipment Rental 5%
Service6%
Cake Hauling & Disposal
7%
Plant Equipment
16%
Emergency Repair23%
Sludge Haul-ing & Dis-
posal30%
Administrative Issues:
• Workforce• Logistics• Procurement• Insurance• FEMA• Cash flow
Technical Issues
• Communication• Sludge
Management• Power supply• Temporary systems
Mitigation Plans
1. Raise all Motor Control Centers2. Raise Blower Building3. Flood-proof buildings