visit report apr 2013 to march 2014.doc

Upload: joshua-sanders

Post on 02-Jun-2018

219 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/10/2019 VISIT REPORT Apr 2013 to March 2014.doc

    1/31

    VISIT REPORT

    From: Soumitra Chakraborty To:Mr.S.Nagendran&Mr.Supriya Das

    NAME OF THE !IENT: Hosur IE! O"#e & IE! $ennai O"#e

    DATE OF VISIT:

    From: %1-04-13 To. %-04-13

    P'RPOSE:Appraisal and attend meeting

    for Sail Bokaro, Bokaro Power, Rungta Mines

    & other Projects

    Person Me()In(era#(ed.

    Name Designa(ion

    on(a#( No. )Mai* id.

    Mr.S.Nagendran(Hosur)

    Mr. Saju Mathew

    (Hosur)

    Mr.Goldson (Chennai)

    Dev.Manar

    Project

    Hosur

    IEL

    De(ai* o+ Dis#ussion He*d:

    From 01.04.13 to 03.04.13 visited at Hosur IEL office and attend meeting forSAIL Bokaro Proect on 01!04!13. "# A$$raisa% &as 'een com$%eted on0(.04.13 and attend meeting for Bokaro Po)er * ot&er Proect on 03.04.13. I&ave attended IEL +&ennai% office for discussion )it& "r. ,o%dson * "r.Sat#a-a regarding -ungta "ines omando * +&a%i#ama $rogress on 04.04.

    Regards,

    Soumitra +&akra'ort#

    VISIT REPORT

    From: Soumitra Chakraborty To:Mr. S. Nagendran

  • 8/10/2019 VISIT REPORT Apr 2013 to March 2014.doc

    2/31

    NAME OF THE !IENT: Me#on Ran#$i +or -oaro Po/er, Sai* -oaro,NIN!

    DATE OF VISIT:

    From: %9-04-13 To. 01-04-13

    P'RPOSE: Dra/ings su2mission and#o**e#(ion o+ appro3a* o+ dra/ings

    Person Me()In(era#(ed.

    Name Designa(ion

    on(a#( No. )Mai* id.

    1. Mr. Arun Mingh

    2.Mr.S.P.Chakraborty

    3.Mr.A.K.Kujur

    D.E (PP &

    EE)

    DGM

    (Elect-

    I & PC)

    Sr. Mgr

    (FS&PD)

    [email protected]

    [email protected]

    De(ai* o+ Dis#ussion He*d:

    We have submitted draing o! "PS#$ !or a%%roval and e have got the a%%roval o! nos o! draings o!"PS#$.

    We have discussed ith Sail "okaro %roject Mr.'aldar and Mr.S.P.#hakrabort !or nstrument Data

    Sheet. We have collected commented co% o! nstrument Data Sheet !or our necessar action.

    We have meet to Mr.*.+ujur !or ,,$ -rection billing Schedule and Mecon anchi has given clearanceon our erection billing and no it is under scrutin at Mecon Duburi !or commercial %art.

    egards/

    Soumitra +&akra'ort#

  • 8/10/2019 VISIT REPORT Apr 2013 to March 2014.doc

    3/31

    VISIT REPORT

    From: Soumitra Chakraborty To:Mr.S.Nagendran&Mr.Supriya Das

    NAME OF THE !IENT: NIN! Pg 4 51

    DATE OF VISIT:

    From: 67-04-13 To. 1%-04-13

    P'RPOSE: GRN inspection by Mecon

    Duburi & Pending Invoice accounts clearance

    from NINL. Approval for Erection Billing

    Schedule.

    Person Me()In(era#(ed.

    Name Designa(ion on(a#( No. )Mai* id.

    Mr.P.R.Das

    Mr. Arnab Ghosh

    Mr.Arnold Kujur

    AGM

    DE

    Sr.Mgr.

    (Fluid

    Sys. &

    piping)

    [email protected]@gmail.com

    [email protected]

    De(ai* o+ Dis#ussion He*d:

    From (/.04.13 to 30.04.13 visited at IL Site 2a$ur for conducting ,-ins$ection '# "econ u'uri of instruments B" "++ $ane% * va%ves forinvoice c%earance and co%%ection of a$$rova% for Erection Bi%%ing Sc&edu%e. 5e&ave successfu%%# com$%eted ins$ection and get t&e c%earance from "econu'uri as )e%% as invoice c%earance from IL. 5e &ave a%so co%%ected

    tec&nica% c%earance of erection 'i%%ing sc&edu%e and su'mitted to "econu'uri for commercia% c%earance for t&e same

    Regards,

    Soumitra +&akra'ort#

  • 8/10/2019 VISIT REPORT Apr 2013 to March 2014.doc

    4/31

    VISIT REPORT

    From: Soumitra Chakraborty To:Mr.S.Nagendran&Mr.

    Supriya Das

    NAME OF THE !IENT: Ispa( Damodar !(d & Super Sme*(er !(d

    DATE OF VISIT:

    From: %6-05-13 To. %1-05-13

    P'RPOSE: Pending payment collection &

    plant hand over of M/s Ispat Damodar and

    Super Smelter for material checking and

    collection of pending payment.

    Person Me()In(era#(ed.

    Name Designa(ion

    on(a#( No. )Mai* id.

    Mr.S. Nandi

    Mr. Biplab Paul

    GM(Power

    Plant)

    Ispat

    Damodar

    AGM Power

    Plant,Super

    Smelter

    [email protected]

    bi%lab.%aul@su%ershakti.in

    De(ai* o+ Dis#ussion He*d:

    From 0(.06.13 to 03.06.13 visited at Is$at amodar Site * Su$er Sme%ter sitefor Is$at amodar70(!06!138 tr#ing to $%ant &and over 'ut it &as 'een &o%d

    due to 2onson $um$ not in )ork and $ending Pa#ment co%%ection it &as 'een$rocess * $a#ment )i%% made )it& in 10 da#s.For Su$er Sme%ter703!06!138 for materia% c&ecking )it& "r. "uku% Baid#a 7IESL8

    * &e &as engaged for materia% c&ecking. As $er "r. Bi$%a' Pau% t&at $ending$a#ment )i%% re%ease )it& in 6 da#s.

    Regards,

    Soumitra +&akra'ort#

  • 8/10/2019 VISIT REPORT Apr 2013 to March 2014.doc

    5/31

    VISIT REPORT

    From: Soumitra Chakraborty To:Mr.Sa8u Ma($e/ &Mr.Supriya Das

    NAME OF THE !IENT: A -argar$ !imi(ed

    DATE OF VISIT:

    From: 69-05-13 To. %0-06-13

    P'RPOSE:To attend modification of pipe

    line of AMT & N-Pit for before PG Test.To

    finalized balance work of AVGF. Installation

    of instrument and payment follow up.

    Person Me()In(era#(ed.

    Name Designa(ion

    on(a#( No. )Mai* id.

    Mr.Manoj Yadav

    Mr. Binoy Kr. Sinha

    Chief Mgr

    (Power

    Plant)

    Asst.Mgr.

    DM

    Plant

    [email protected]

    [email protected]

    De(ai* o+ Dis#ussion He*d:

    From 0(/.06.13 to 31.06.13 visited at A++ Bargar& Site. 5e &ave discussed for

    conducting P, est and c%ient are agree to start t&e P, est )it& in 30 t&2une(013 'ut after com$%etion of modification )ork of A" * !Pit $i$e %ineA%%instrument commissioned and ca%i'ration. 5e &ave c&ecked 'a%ance o' *materia% of A9,F.

    Regards,

    Soumitra +&akra'ort#

  • 8/10/2019 VISIT REPORT Apr 2013 to March 2014.doc

    6/31

    VISIT REPORT

    From: Soumitra Chakraborty To:Mr.Sa8u Ma($e/ &Mr.Supriya Das

    NAME OF THE !IENT: SAI! -oaro S(ee* & -oaro Po/er

    DATE OF VISIT:

    From: %-06-13 To. %;-06-13

    P'RPOSE: Follow up for pending payment

    from SAIL Bokaro and Client visit of Bokaro

    Power for Project meeting.

    Person Me()In(era#(ed.

    Name Designa(ion

    on(a#( No. )Mai* id.

    Mr.V. Agrawal DGM (Project)[email protected]

    De(ai* o+ Dis#ussion He*d:

    From %.%;.01 (o %;.%;.01 3isi(ed a( SAI! -oaro & -oaro Po/er /i($Mr. Tus$ar -is/as.

  • 8/10/2019 VISIT REPORT Apr 2013 to March 2014.doc

    7/31

    VISIT REPORT

    From: Soumitra Chakraborty To:Mr.Sa8u Ma($e/ &Mr.Supriya Das

    NAME OF THE !IENT: Nee*a#$a* Ispa( Nigam

    DATE OF VISIT:

    From: 00-06-13 To. 06-06-13

    P'RPOSE: Payment follow up & attend

    client meeting for some site related issues.

    Person Me()In(era#(ed.

    Name Designa(ion

    on(a#( No. )Mai* id.

    Mr.Sarat Ku. Shroff

    Mr. P.R.Das

    GM (Project)

    AGM (Project)

    [email protected]

    %[email protected]

    De(ai* o+ Dis#ussion He*d:

    From 00.%;.01 (o 06.%;.01 3isi(ed a( NIN! /i($ Mr. Su2$adip !a$a.

  • 8/10/2019 VISIT REPORT Apr 2013 to March 2014.doc

    8/31

    VISIT REPORT

    From: Soumitra Chakraborty To:Mr.Sa8u Ma($e/ &Mr.Supriya Das

    NAME OF THE !IENT: Me#on Ran#$i +or -PS! & Sai* -oaro, NIN!

    DATE OF VISIT:

    From: 6-06-13 To. 65-06-13

    P'RPOSE:To a((end engineeringmee(ing +or -PS! Pro8e#(, Sai*

    -oaro Pro8e#( & NIN! Pro8e#(.

    Person Me()In(era#(ed.

    Name Designa(ion

    on(a#( No. )Mai* id.

    1. Mr. Arun Mingh

    2.Mr.S.P.Chakraborty

    3.Mr.A.K.Kujur

    4. Mr. Isan Gupta

    D.E (PP &

    EE)

    DGM

    (Elect-

    I & PC)

    Sr. Mgr

    (FS&PD)

    DE (Elect- I

    & PC)

    [email protected]

    s%[email protected]

    [email protected]

    De(ai* o+ Dis#ussion He*d:From 6.%;.01 (o 65.%;.01 3isi(ed a( Me#on Ran#$i /i($ Mr. S.Vi#(or Ra8,

    Mr.De32ra($ De3, Mr. @ar(i, Mr. Ra2inson +or a((end engineeringmee(ing.

    T$e s(a(us o+ engineering mee(ing o+ 1 nos dra/ingsAppro3ed 9 nos B P & ID, Da(a S$ee( o+ D=T -*o/er, Da(a s$ee( o+-*o/er +or M-,PSF,N4Pi(CRe#ei3ed +or In+orma(ion 0 nos B Dosing Tan, =A o+ -*o/er, D *oad*is(Commen(ed ; nos BP!, ompressor C'nder S#ru(iny /i($ dis#ussion 06 nos B 3a*3e s#$edu*e , Ins(rumen(

    S#$edu*e, Agi(a(or Mo(orsC'nder S#ru(iny 00 nos B Da(a S$ee( o+ Ins(rumen(Re(urned 6 nosNIN ! "ommented Instrument "able #ata Sheet

    e3uired P$# vendor visit !or a%%roval o! P$# oriented draings !or "PS#$ Project.

    Regards,

    Soumitra +&akra'ort#

  • 8/10/2019 VISIT REPORT Apr 2013 to March 2014.doc

    9/31

    VISIT REPORT

    From: Soumitra Chakraborty To:Mr.Sa8u Ma($e/ &Mr.Supriya Das

    NAME OF THE !IENT: SAI! -oaro S(ee* & -oaro Po/er

    DATE OF VISIT:

    From: %6-07-13 To. %1-06-13

    P'RPOSE: Follow up for pending payment

    from SAIL Bokaro and Client visit of Bokaro

    Power for Project meeting.

    Person Me()In(era#(ed.

    Name Designa(ion on(a#( No. )Mai* id.

    Mr.V. Agrawal

    Mr. S. #hatto%adha

    Mr. A.K.Singh

    DGM (Project)

    DGM (Project)

    4ur 5endor

    [email protected]

    subrata.chatto%[email protected]

    De(ai* o+ Dis#ussion He*d:

    From %6.%9.01 (o %1.%9.01 3isi(ed a( SAI! -oaro & -oaro Po/er /i($Mr. De32ra($ De3.( re3ie/ mee(ing and mee( our#on(ra#(or +or progress o+ our +a2ri#a(ion & ere#(ion a#(i3i(ies o+DMST.

    Regards,

    Soumitra +&akra'ort#

  • 8/10/2019 VISIT REPORT Apr 2013 to March 2014.doc

    10/31

    VISIT REPORT

    From: Soumitra Chakraborty To:Mr.Sa8u Ma($e/ &Mr.Supriya Das

    NAME OF THE !IENT: Ispa( Damodar & Super Sme*(er

    DATE OF VISIT:

    From: %-07-13 To. %;-07-13

    P'RPOSE: Follow up for pending payment

    & pump issue from Ispat Damodar and Super

    Smelter for expedite the erection work.

    Person Me()In(era#(ed.

    Name Designa(

    ion

    on(a#( No. )Mai* id.

    Mr. Surajit Nandi

    Mr."i%lab Paul

    G.M DM Plant

    *:M

    Poer Plant4ur 5endor

    [email protected]

    bi%lab.%aul@su%ershakti.in

    De(ai* o+ Dis#ussion He*d:

    From %.%9.01 (o %;.%9.01 3isi(ed a( M)s Ispa( Damodar and M)s SuperSme*(er !(d /i($ Mr.Sudd$asi* -asu.

  • 8/10/2019 VISIT REPORT Apr 2013 to March 2014.doc

    11/31

    VISIT REPORT

    From: Soumitra Chakraborty To:Mr.Sa8u Ma($e/ &Mr.Supriya Das

    NAME OF THE !IENT: -oaro Po/er & SAI! -oaro S(ee*

    DATE OF VISIT:

    From: %0-08-13 To. %1-08-13

    P'RPOSE:Attend Project meeting at

    Bokaro Power and Erection Progress of SAIL

    Bokaro

    Person Me()In(era#(ed.

    Name Designa(ion

    on(a#( No. )Mai* id.

    Mr.V. Agrawal

    Mr. S. #hatto%adha

    Mr. A.K.Singh

    DGM (Project)

    DGM (Project)

    4ur 5endor

    [email protected]

    subrata.chatto%[email protected]

    De(ai* o+ Dis#ussion He*d:

    From %0.%5.01 (o %1.%5.01 3isi(ed a( -oaro Po/er & SAI! -oaro /i($Mr. De32ra($ De3, Mr. Supriyo Das, S.Vi#(orRa8 & =N Sir.

  • 8/10/2019 VISIT REPORT Apr 2013 to March 2014.doc

    12/31

    From: Soumitra Chakraborty To:Mr.Sa8u Ma($e/ &Mr.Supriya Das

    NAME OF THE !IENT: Spe#(rum oa* & S/as(iPo/er

    DATE OF VISIT:

    From: %9-08-13 To. 0%-08-13

    P'RPOSE: Re#on#i*ia(ion o+ ma(eria*a( Spe#(rum oa* & Fo**o/up for

    pending payment from Swastik Power with

    account reconciliation.

    Person Me()In(era#(ed.

    Name Designa(ion

    on(a#( No. )Mai* id.

    Mr.Vijay.K.Chawarashe

    Mr. S.P.ege

    GM (Power)

    -.D o! SastikPoer

    [email protected]%[email protected]

    subrata.chatto%[email protected]

    De(ai* o+ Dis#ussion He*d:

    From %9.%5.01 (o 0%.%5.01 3isi(ed a( Spe#(rum oa* & S/as(i

    Po/er /i($ Mr. Tus$ar -is/as.

  • 8/10/2019 VISIT REPORT Apr 2013 to March 2014.doc

    13/31

    VISIT REPORT

    From: Soumitra Chakraborty To:Mr.Sa8u Ma($e/ &Mr.Supriya Das

    NAME OF THE !IENT: Nee*a#$a* Ispa( Nigam

    DATE OF VISIT:

    From: 07-08-13 To. 60-08-13

    P'RPOSE: Payment follows up & attend

    client meeting for some site related issues.

    Person Me()In(era#(ed.

    Name Designa(ion on(a#( No. )Mai* id.

    Mr.Sarat Ku. Shroff

    Mr. P.R.Das

    GM (Project)

    AGM (Project)

    [email protected]

    %[email protected]

    De(ai* o+ Dis#ussion He*d:

    From 07.%5.01 (o 60.%5.01 3isi(ed a( NIN! /i($ Mr. M.T$u3aaran.

  • 8/10/2019 VISIT REPORT Apr 2013 to March 2014.doc

    14/31

    VISIT REPORT

    From: Soumitra Chakraborty To:Mr.Sa8u Ma($e/ &Mr.Supriya Das

    NAME OF THE !IENT: Me#on Ran#$i +or -PS! & NIN! , Sai* -oaro

    DATE OF VISIT:

    From: %6-09-13 To. %;-09-13

    P'RPOSE: For -PS! Pro8e#(Drg)Do# #o**e#(ing appro3a*,su2mission Do# +or Sai* -oaroPro8e#( & For NIN! Pro8e#( #o**e#(ing

    I

  • 8/10/2019 VISIT REPORT Apr 2013 to March 2014.doc

    15/31

    From: Soumitra Chakraborty To:Mr.Sa8u Ma($e/ &Mr.Supriya Das

    NAME OF THE !IENT: '*(ra(e#$ Ra/an , Spe#(rum oa* & S/as(i#Po/er

    DATE OF VISIT:

    From: %5-09-13 To. 0-09-13

    P'RPOSE: For a((end si(e re3ie/mee(ing a( Ra/an '*(ra(e#$, Fo**o/up & #o**e#( ma(eria* re#on#i*ia(iona( Spe#(rum oa* and si(e 3isi( o+S/as(i# Po/er +or pro8e#( #*osing.

    Person Me()In(era#(ed.

    Name Designa(ion

    on(a#( No. )Mai* id.

    1. Mr.Asish Kr. Jain

    2.Mr.Vijay.K.Chawara

    she

    3. Mr.S.P.Rege

    Manager

    Project

    :M Poer

    Plant

    -.D

    [email protected]

    [email protected]

    [email protected]

    De(ai* o+ Dis#ussion He*d:%rom 07.0'.(& to (8.0'.(& visited at +awan 9ltra 5ech "ement lant 6 Spectrum "oal 1 Swasti$

    ower.

    We have visited >ltratech aan on 27?27?6 ith Mr.Aaved & Mr. Debasish :hosh/ We are came to

    kno a!ter reaching that revie meet has been reschedule on 6?27?6 / e have returned a!ter site visit.

    We have visited S%ectrum #oal site on 66?27?6 and meet to Mr. 5. #haarashe (:M Poer Plant) &collected Material econciliation Sheet !or Plant closing and %ament %ur%ose.

    We have visited Sastic Poer on 61?27?6 and meet to Mr. S.P.ege (-D o! Plant) and discussion !or

    %lant handing over / he has agreed that %lant ill taken over a!ter %ainting and "alance s? 6.9B $akh

    ill released a!ter %ainting.

    *gain We have visited >ltra;ech aan !or attending Site evie Meeting and meet to Mr. *tul +ansal(*5P o! Project). During the meeting have %ro%osed !or amendment o! erection %rice and the have

    agreed that our submission o! -scalation re%ort.

    Regards,

    Soumitra +&akra'ort#

    VISIT REPORT

  • 8/10/2019 VISIT REPORT Apr 2013 to March 2014.doc

    16/31

    From: Soumitra Chakraborty To:Mr.Sa8u Ma($e/ &Mr.Supriya Das

    NAME OF THE !IENT: Nee*a#$a* Ispa( Nigam B%%%7%%16C

    DATE OF VISIT:

    From: 1%-09-13 To. %0-10-13

    P'RPOSE: Payment follows up &

    Reconciliation of accounts. Discussion of

    some site issues.

    Person Me()In(era#(ed.

    Name Designa(ion

    on(a#( No. )Mai* id.

    Mr.Sarat Ku. Shroff

    Mr. P.R.Das

    Mr. Kaustav Ghosh

    GM (Project)

    AGM (Project)

    Mecon

    Finance

    [email protected]

    %[email protected]/Mob? 27C698C2

    [email protected] Mob? 27B96B6C

    De(ai* o+ Dis#ussion He*d:

    From 1%.%7.01 (o %0.0%.01 3isi(ed a( NIN! /i($ Mr. M.Tus$ar -is/as.

  • 8/10/2019 VISIT REPORT Apr 2013 to March 2014.doc

    17/31

    NAME OF THE !IENT: Super Sme*(er B%%%%06%%5;C

    DATE OF VISIT:

    From: 65-10-13 To. 65-10-13

    P'RPOSE: Erection follows up and find out

    of mismatch materials.

    Person Me()In(era#(ed.

    Name Designa(ion

    on(a#( No. )Mai* id.

    Mr."i%lab Paul A=MPo/erP*an(

    bi%lab.%aul@su%ershakti.in

    De(ai* o+ Dis#ussion He*d:

  • 8/10/2019 VISIT REPORT Apr 2013 to March 2014.doc

    18/31

    VISIT REPORT

    From: Soumitra Chakraborty To:Mr.Sa8u Ma($e/ &Mr.Supriya Das

    NAME OF THE !IENT: Me#on Ran#$i +or -PS! & NIN! , Sai* -oaro

    DATE OF VISIT:

    From: 00-11-13 To. 0-11-13

    P'RPOSE: For -PS! Pro8e#( & Sai*Drg)Do# #o**e#(ing appro3a*,su2mission Do# +or -oaro Po/erPro8e#( & For NIN! Pro8e#( #o**e#(ingappro3a* o+ Ins(rumen( #a2*e Da(a

    s$ee(.

    Person Me()In(era#(ed.

    Name Designa(ion

    on(a#( No. )Mai* id.

    1. Mr.S.K.Sinha

    2.Mr. Isan Gupta

    3. Mr. V.K.Jha

    4. Mr.Saurav

    8. Mr. .S.P. #hauhan

    AGM (PP &

    EE)

    DE (Elect- I

    & PC)

    DGMProject

    Sail

    DE(Project

    Sail)

    DGM (PINL

    Project)

    [email protected]

    i%[email protected]

    [email protected]

    [email protected]

    %[email protected]

    De(ai* o+ Dis#ussion He*d:%rom 0(2.((.(& to (8.((.(& visited at *econ +anchi. *eet to *r. S.,.Sinha -/* ! 13 4or

    Inspectionclearance o4 #osing 5an$s 1 #ata Sheet o4 "ompressor 1 jector ssy o4 :S".

  • 8/10/2019 VISIT REPORT Apr 2013 to March 2014.doc

    19/31

    have met to Mr. 5.+.Aha (D:M "S$ Project.) !or collecting o! a%%roval o! Dia%hragm 5alve draings

    & Data Sheet o! Dosing sstem !or S*$ "okaro.

    have met to Mr.Fulendra (D- FSPD.) !or collecting a%%roval o! -jector & 5entur -jector !or "PS#$.

    have met to Mr.*."ose (D- nst.) !or instrument o! "PS#$ & nstrument cable !or "PS#$.

    have met to Mr.shan :u%ta (D- nst.) !or collecting a%%roval o! nstrument Signal & #ontrol #able.

    I got the approval of following drawings :-

    a) :* & #S o! Dia%hragm 5alve !or Sail "okaro Project .b) nstrument #able !or Signal & #ontrol !or ,,$ Project.

    c) Data Sheet o! #om%ressor !or "PS#$ Project

    d) Draing o! -jector & 5entur -jector *ss.

    -egardsSoumitra +&akra'ort#

    VISIT REPORT

    From: Soumitra Chakraborty To:Mr.Sa8u Ma($e/ &Mr.Supriya Das

    NAME OF THE !IENT: -oaro Po/er & SAI! -oaro S(ee*

    DATE OF VISIT:

    From: 6;-11-13 To. 65-11-13

    P'RPOSE :o**e#( ($e MD &appro3a* o+ addi(iona* 3endor +or De*Va*3e & $em(ro* Ins(rumen( +rom-PS!. o**e#(ing ($e a##ep(an#e o+

    e>(ra s#ope o+ /orfor BPSCL DM Plant.

    Collecting of payment details for SAIL

    Bokaro.

    Person Me()In(era#(ed.

    Name Designa(ion

    on(a#( No. )Mai* id.

    Mr.V. Agrawal

    Mr. S. #hatto%adha

    Mr. Aloke Jain

    DGM (Project)

    DGM (Project)

    on n!ra

    [email protected]

    subrata.chatto%[email protected]

    [email protected]

    De(ai* o+ Dis#ussion He*d:

  • 8/10/2019 VISIT REPORT Apr 2013 to March 2014.doc

    20/31

    From 6;.00.01 (o 65.00.01 3isi(ed a( -oaro Po/er & SAI! -oaro /i($Mr. Tus$ar -is/as, Mr.M.T$u3aaran & Mr.Dipa -is/as. (ra s#ope o+ /or +or -PS!, a*ready -PS!$as +or/arded (o Me#on +or s#ru(iny o+ our e>(ra s#ope o+ /or and /e$a3e #o**e#(ed ME +or A#id & aus(i# Tans and a*so #o**e#(eda##ep(an#e o+ addi(iona* 3endor +or De* Va*3e & $em(ro* o+Ins(rumen(.

  • 8/10/2019 VISIT REPORT Apr 2013 to March 2014.doc

    21/31

    -egards

    Soumitra +&akra'ort#

    VISIT REPORT

    From: Soumitra Chakraborty To:Mr.Sa8u Ma($e/ &Mr.

    Supriya Das

    NAME OF THE !IENT: Me#on Ran#$i +or -PS! & Sai* -oaro

    DATE OF VISIT:

    From: 0%-12-13 To. 06-12-13

    P'RPOSE: For a((end mee(ing +or-PS! Pro8e#( addi(iona* s#ope /orna*iGa(ion and -PS! re3ised2i**ing s#$edu*e .

    Person Me()In(era#(ed.

    Name Designa(ion

    on(a#( No. )Mai* id.

    1. Mr.S.K.Sinha

    2.Mr.MD.Aziz Ahmad

    . Mr.S.+.Diedi

    AGM (PP &

    EE)

    Sr.Mgr.

    (Fluid

    Sys. &

    piping)*:M

    (nstrument)

    [email protected]

    [email protected]@meconlimited.co.inG

    i%[email protected]

    De(ai* o+ Dis#ussion He*d:

    From 0%.06.01 (o 06.06.01 3isi(ed a( Me#on Ran#$i. A((end Mee(ing +oraddi(iona* s#ope o+ /or na*iGa(ion o+ -PS!. Mr. [email protected]$a BA=M PP&EEC, Mr.MD AGiG BSr Mgr FSPDC, Mr. [email protected]/i/edi BA=M Ins(rumen(C & Mr.As$oe PandeyBA=M E*e#(ri#a*C $as a((ended o+ a2o3e mee(ing o+ 1 days. A+(er a** dis#ussion

  • 8/10/2019 VISIT REPORT Apr 2013 to March 2014.doc

    22/31

    ($a( $as na*iGed IEI! $as (o su2mi( a** re*e3an( do#umen( +or s#ru(iny andMe#on $as agree +or e>(ra s#ope 2u( (y /i** na*iGed a+(er a#(ua* ere#(ion.

    -egards$

    Soumitra +&akra'ort#

    VISIT REPORT

    From: Soumitra Chakraborty To:Mr.Sa8u Ma($e/ &Mr.Supriya Das

    NAME OF THE !IENT: Me#on Ran#$i +or Sai* -oaro & -PS!

    DATE OF VISIT:

    From: 09-12-13 To. 05-12-13

    P'RPOSE: For su2mission & ge((ingappro3a* o+ da(a s$ee( o+ Sai*-oaro FIT and #o**e#(ed appro3a* o+

    Va*3es dra/ings and su2mission o+Agi(a(or Inspe#(ion #a** +or Sai*-oaro Pro8e#(.

    Person Me()In(era#(ed.

    Name Designa(ion

    on(a#( No. )Mai* id.

    1. Mr.S.K.Sinha

    2.Mr.MD.Aziz Ahmad

    . Mr. *nu%am

    #houdhuri

    AGM (PP &

    EE)Sr.Mgr.

    (Fluid

    Sys. &

    piping)

    D-

    (nstrument)

    [email protected]

    [email protected]@meconlimited.co.inG

    i%[email protected]

    De(ai* o+ Dis#ussion He*d:

  • 8/10/2019 VISIT REPORT Apr 2013 to March 2014.doc

    23/31

    From 09.06.01 (o 05.06.01 3isi(ed a( Me#on Ran#$i +or su2mission Da(a s$ee( o+FIT +or Sai* -oaro 2y $and and mee( (o Mr. Anupam $oud$uri A((end B DEIns(rumen( -S! C +or s#ru(iny o+ da(a s$ee( +or FIT and same day e3ening I go(($e appro3a* +rom ($em o+ da(a s$ee( FIT BRe3 ;C. I $a3e su2mi((ed (o -S!Pro8e#( Me#on o+ inspe#(ion #a** +or Agi(a(or o+ Sai* -oaro Pro8e#(. I $a3e mee(/i($ Mr.Fu*ender BDE FSPD Me#on C +or #o**e#(ing appro3a* o+ ON O Va*3e +or-PS! and #o**e#(ed a( same day e3ening. 05 ($De#01 I $a3e again mee( (oMr.Fu*ender +or #o**e#(ing appro3a* o+ o($er 3a*3es o+ Pre(rea(men( o+ -PS!and ge( ($e appro3a* o+ a** 3a*3es. I $a3e su2mi((ed inspe#(ion #a** +or

    ompressor o+ -PS!

    -egards

    Soumitra +&akra'ort#

    VISIT REPORT

    From: Soumitra Chakraborty To:Mr.Sa8u Ma($e/ &Mr.Supriya Das

    NAME OF THE !IENT: Rung(a Mines @omanda

    DATE OF VISIT:

    Si(e Visi( on : 6%406401 (o 60406 401

    P'RPOSE: For 8oin( inspe#(ion o+ma(eria* /$i#$ $as 2een #ome +romHosur.

    Person Me()In(era#(ed.

    Name Designa(ion on(a#( No. )Mai* id.

    1.Mr.P.C.Dixit()

    2.Mr. Biswajit Mishra

    Sr.ManagerPower

    Plant

    Komanda

    >5 ! ?"

    [email protected][email protected]

    ?????? Do ?????

    De(ai* o+ Dis#ussion He*d:

  • 8/10/2019 VISIT REPORT Apr 2013 to March 2014.doc

    24/31

    6%.06.01 I $a3e 3isi(ed a( Rung(a Mines @omanda si(e +or 8oin( inspe#(ion o+ma(eria* /$i#$ $as 2een #ome +rom Hosur /i($ Mr. -is/a8i( Mis$ra B

  • 8/10/2019 VISIT REPORT Apr 2013 to March 2014.doc

    25/31

    De(ai* o+ Dis#ussion He*d:

    I $a3e 3isi(ed a( Super Sme*(er Si(e on 0%)%0)0 +or +o**o/ up o+#ommissioning a#(i3i(ies.

  • 8/10/2019 VISIT REPORT Apr 2013 to March 2014.doc

    26/31

    1.Mr.Alif Ghosh

    Accounts

    Officer

    [email protected][email protected]

    De(ai* o+ Dis#ussion He*d:1BthAan 126C msel! and Mr. ;ushar :hosh has met to Mr. *li! :hosh at ungta mines accounts !or

    reconciliation o! +omando accounts.

    -egards

    Soumitra +&akra'ort#

    VISIT REPORT

    From: Soumitra Chakraborty To:Mr.Sa8u Ma($e/ &Mr.

    Supriya Das

    NAME OF THE !IENT: Super Sme*(er B%%%%06%%5;C

    DATE OF VISIT: 104%046%0

    P'RPOSE: Commissioning follow up at site

    and client meet for extension of project .

    Person Me()In(era#(ed.

  • 8/10/2019 VISIT REPORT Apr 2013 to March 2014.doc

    27/31

    Name Designa(ion

    on(a#( No. )Mai* id.

    Mr."i%lab Paul A=MPo/erP*an(

    bi%lab.%aul@su%ershakti.in

    De(ai* o+ Dis#ussion He*d:

    I $a3e 3isi(ed a( Super Sme*(er Si(e on 10)%0)0 +or +o**o/ up o+#ommissioning a#(i3i(ies. (ension.

    egards/

    Soumitra #hakrabort

    VISIT REPORT

    From: Soumitra Chakraborty To:Mr.Sa8u Ma($e/ &Mr.Supriya Das

    NAME OF THE !IENT: -PS! #onsu*(an( MEON

    DATE OF VISIT:

    From: %-02-14 To. %;-02-14

    & 10-02-2014 to 12-02-2014

    P'RPOSE:To attend meeting for additional

    scope of work

    Person Me()In(era#(ed.

  • 8/10/2019 VISIT REPORT Apr 2013 to March 2014.doc

    28/31

    Name Designa(ion

    on(a#( No. )Mai* id.

    *r. Dalaj ,r. Sing

    Mr. Fulendar +umar

    DEE*e#(ri#a*PP

    D- PP

    FSPD

    [email protected]

    [email protected]

    De(ai* o+ Dis#ussion He*d:

    28?21?126C We have %re%ared & submit all electrical documents !or scrutin o! additional sco%e o! ork

    o! electrical. We have met on 9thFeb 6C to Mr. Aalaj +r. Singh ith our Mr. ;huvakaran/ Mr. DevbrathDev/ Mr. S/+artik and M## vendor engineer . "ut Mr. Aalaj has commented on our M## draing and

    e have meet on same da to Mr. Fulendrar +umar and discussed ith Mr. ;huvakaran Mr. Devbrath

    and msel! !or additional sco%e o! mechanical ork. *!ter discussion ith Mecon that the have agreedo! additional sco%e o! ork are increased o! mechanical & electrical and accordingl Mecon has asked

    to submit additional 3uantit !or their scrutin.

    We have submitted additional sco%e o! mechanical vide letter no ? +4$HC2C272218H Mecon ?

    DesignH"PS#$H6C / dt I 66?21?126C and additional sco%e o! electrical vide letter no ?+4$HC2C272218H Mecon ? DesignH"PS#$H68 / dt 61?21?126C.

    We have submitted electrical draings ? #able Schedule o! Poer & #ontrol/ nstrument/ A"

    *rrangement & ;" Details/ nstrument & A" $ocation Plan/ Data Sheet o! Poer/ #ontrol &

    nstrument/ M## Draings and mechanical :* Drg o! 5alvels !or "PS#$ Project.

    egards/

    Soumitra #hakrabort

    VISIT REPORT

    From: Soumitra Chakraborty To:Mr.Sa8u Ma($e/ &Mr.Supriya Das

    NAME OF THE !IENT: Rung(a Mines @omanda 'ni(

    DATE OF Si(e VISIT: %54%646%0

    From: %94%640 To. %74%640

    P'RPOSE: For Re#on#i*ia(ion o+manpo/er used during E & a(@omando si(e 2y M)s Roop $and &o.

    Person Me()In(era#(ed.

    Name Designa(ion on(a#( No. )Mai* id.

  • 8/10/2019 VISIT REPORT Apr 2013 to March 2014.doc

    29/31

    1.Mr.S.P.Shrivastava

    2.Mr.Rajat Kamal

    Sr.Manager

    Q/C of DM

    Plant

    Komanda

    *anager*aintenance

    [email protected][email protected]

    ?????? Do ?????

    De(ai* o+ Dis#ussion He*d:

    "r. &uvakaran and m#se%f &as visited omando site from "econ -anc&i on 0:!0(!(014 via ata agar for $urc&ase some instrument materia% for komando t&engo to Bar'i%. 0;!0(!(014 )e &ave met "r.S.P.S&rivastav for reconci%iation ofman$o)er from omando register and meet "r. -aat ama% for arrangingman$o)er form contractor for starting 'a%ance erection )ork.

    -egards

    Soumitra +&akra'ort#

    VISIT REPORT

    From: Soumitra Chakraborty To:Mr.Sa8u Ma($e/ &Mr.Supriya Das

    NAME OF THE !IENT: '*(ra(e#$ Ra/an & S/as(i Po/er

    DATE OF VISIT:

    From: 05-02-14 To. 60-02-14

    P'RPOSE: For a((end si(e re3ie/mee(ing a( Ra/an '*(ra(e#$, Fo**o/up o+ ma(eria* re#on#i*ia(ion a(Ra/an si(e. Si(e 3isi( o+ S/as(i#Po/er +or pro8e#( #*osing.

    Person Me()In(era#(ed.

  • 8/10/2019 VISIT REPORT Apr 2013 to March 2014.doc

    30/31

    Name Designa(ion

    on(a#( No. )Mai* id.

    1. Mr.Asish Kr. Jain

    3. Mr.S.P.Rege

    Manager

    Project

    5P

    [email protected]

    [email protected]

    De(ai* o+ Dis#ussion He*d:%rom ,ol$ata oEce on(7.02.(8 we have started 4or visit along with *r. shim

    "howdhry 4or attend meeting at +awan 9ltra5ech "ement on ('.02.(8.>e have visited 9ltratech +awan on ('F02F(8 with *r.shim "howdhry 1

    *r.S.Suresh. 4ter a long discussion6 client has agreed that balance items havebeen missing and II has to submit revised Guotation 4or the same.

    >e have visited Swastic ower on 20F02F(8 and met to *r. S..+ege -H o4 lant3

    and discussion 4or plant handing over 6 he has agreed 4or handing over the plant 1will ta$en over a4ter II will shown to the () m& hr ow plant capacity. >e havechec$ plant power and 4ound that rating current has not come properly 6 soreGuired 1I engineer visit 4or recti4y the pump problem.

    Regards,

    Soumitra +&akra'ort#

    VISIT REPORT

  • 8/10/2019 VISIT REPORT Apr 2013 to March 2014.doc

    31/31

    From: Soumitra Chakraborty To:Mr.Sa8u Ma($e/ &Mr.Supriya Das

    NAME OF THE !IENT: -oaro Po/er & SAI! -oaro S(ee*

    DATE OF VISIT:

    From: %-03-14 To. %9-03-14

    P'RPOSE :A((end mee(ing +or -PS!

    regarding redu#e o+ -= amoun( andna*iGa(ion o+ addi(iona* s#ope o+/or.Mee( /i($ Mr. A*oe ?ain +or#o**e#(ion o+ paymen( and #o**e#(ed +orm.

    Person Me()In(era#(ed.

    Name Designa(ion

    on(a#( No. )Mai* id.

    Mr.J.K.Roy

    Mr. S. #hatto%adha

    Mr. Aloke Jain

    DGM (Finance

    BPSCL )

    DGM (Project)

    on n!ra

    [email protected]

    subrata.chatto%[email protected]

    [email protected]

    De(ai* o+ Dis#ussion He*d:

    From ($ Mar#$ (o 9($ Mar#$ 3isi( (o -PS! si(e and Sai* -oaro si(e /i($Mr. Tus$ar -is/as .