Project: “Trinity” Commercial Colony Project, Village-Sihi Sector 83-84 Gurgaon Haryana SIX- MONTHLY ENVIRONMENTAL COMPLIANCE REPORT FOR STIPULATED & GENERAL CONDITIONS OF ENVIRONMENTAL CLEARANCE (APRIL 2015 TO NOVEMBER 2015) FOR COMMERCIAL COLONY PROJECT TRINITY SEC-84, AT VILLAGE SIHI DISTRICT GURGAON HARYANA SUBMITTED TO: Ministry of Environment & Forests (MoEF) Northern Regional office Bays No 24-25 Sector 31- A Dakshin Marg Chandigarh SUBMITTED BY: RAHEJA DEVELOPERS LTD DECEMBER 2015 1

Upload: trananh

Post on 04-Apr-2018

214 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: nromoef.gov.innromoef.gov.in/SMPR/12012016/98.docx · Web viewAmbient noise level monitoring was carried out dated 27.11.2015 in the commercial project and it was found within the

Project: “Trinity” Commercial Colony Project, Village-Sihi Sector 83-84 Gurgaon Haryana

SIX- MONTHLY ENVIRONMENTAL COMPLIANCE REPORT FOR STIPULATED & GENERAL CONDITIONS OF ENVIRONMENTAL CLEARANCE

(APRIL 2015 TO NOVEMBER 2015)

FOR

COMMERCIAL COLONY PROJECT TRINITY SEC-84, AT VILLAGE SIHI DISTRICT GURGAON HARYANA

SUBMITTED TO:

Ministry of Environment & Forests (MoEF)Northern Regional office Bays No 24-25 Sector 31- A Dakshin Marg Chandigarh

SUBMITTED BY:

RAHEJA DEVELOPERS LTD

DECEMBER 2015

1

Page 2: nromoef.gov.innromoef.gov.in/SMPR/12012016/98.docx · Web viewAmbient noise level monitoring was carried out dated 27.11.2015 in the commercial project and it was found within the

Project: “Trinity” Commercial Colony Project, Village-Sihi Sector 83-84 Gurgaon Haryana

Table of Contents

DESCRIPTION Page No.Chapter 1 Introduction and Project Description

1.1 Introduction 41.2 Project Description 41.3 Present Status 51.4 Purpose of the report 5

Chapter 2 Compliance of Stipulated Conditions of Environmental ClearancePart A Specific Conditions for buildings in operational phase

I. Construction Phase 6II. Operation Phase 11

Part B General Conditions 17Chapter 3 Details of Environmental Monitoring

3.1 Ambient Air Quality Monitoring 213.1.1 Ambient Air Quality Monitoring Stations 213.1.2 Ambient Air Quality Monitoring Methodology 213.1.3 Discussion on Ambient Air Quality in the Study Area 223.2 Ambient Noise Monitoring 22

3.2.1 Ambient Noise Monitoring Locations 223.2.2 Methodology of Noise Monitoring 233.2.3 Ambient Noise Monitoring Results 233.2.4 Discussion on Ambient Noise Levels in the Study Area 233.3 Groundwater Quality Monitoring 24

3.3.1 Groundwater Quality Locations 243.3.2 Methodology of Groundwater Quality Monitoring 243.3.3 Groundwater Quality Monitoring Results 243.3.4 Discussion on Groundwater Quality in the Study Area 253.4 Soil Monitoring 25

3.4.1 Soil Monitoring Locations 253.4.2 Methodology of Soil Monitoring 263.4.3 Soil Monitoring Results 263.4.4 Discussion on Soil Characteristics in the Study Area 27

TABLES3.1 Details of Ambient Air Quality Monitoring Stations 213.2 Techniques used for Ambient Air Quality Monitoring 223.3 Ambient Air Quality Monitoring Results 223.4 Ambient Air Quality Monitoring Results 223.5 Details of Ambient Noise Monitoring Stations 233.6 Ambient Noise Monitoring Results 233.7 Details of Water Quality Monitoring Station 243.8 Groundwater Quality Monitoring Results 253.9 Details of soil quality monitoring locations 263.10 Physico-Chemical Characteristics of soil in the Study Area 26

2

Page 3: nromoef.gov.innromoef.gov.in/SMPR/12012016/98.docx · Web viewAmbient noise level monitoring was carried out dated 27.11.2015 in the commercial project and it was found within the

Project: “Trinity” Commercial Colony Project, Village-Sihi Sector 83-84 Gurgaon Haryana

LIST OF ANNEXURES

S.NO. DESCRIPTION ANNEXURE1 Environmental Clearance letter Annexure-I2 Latest Monitoring report Annexure-II3 License Copy Annexure-III4 CTE COPY Annexure-IV

3

Page 4: nromoef.gov.innromoef.gov.in/SMPR/12012016/98.docx · Web viewAmbient noise level monitoring was carried out dated 27.11.2015 in the commercial project and it was found within the

Project: “Trinity” Commercial Colony Project, Village-Sihi Sector 83-84 Gurgaon Haryana

CHAPTER 1

INTRODUCTION AND PROJECT DESCRIPTION

1.1 INTRODUCTION

“Trinity” a Commercial Colony Project measuring area 2.281acres is being developed at village Sihi Sector 84 District Gurgaon Haryana, by M/s Raheja Developers Ltd. to facilitate commercial colony facilities services in the nearby area. The project includes all facilities which will give enhance the green area and other facilities in the nearby area.

The project has been awarded Environmental Clearance with ‘Gold’ grading by State Environmental Impact Assessment Authority, under category 8(a) Haryana, vide reference number SEIAA/HR/2014/1262 dated 17/10/2014.

The project has been sanctioned License vide letter number 26 of 2013 dated 17.05.2013 by the Department of Town and Country Planning (DTCP), Govt. of Haryana .

1.2 PROJECT DESCRIPTION

SALIENT FEATURES:

This project involves construction of commercial colony project on a plot area of 2.281 Acres or 9,230.865 m2. Total Built–up area is 36,507.259 m2. The commercial colony project several facilities including the solar lighting, commercial facilities, parking, landscaping, lift facilities etc.

The maximum permissible height of the building is 45 m for which the permission is already being taken from the airport authority of India vide letter no AAI/NOC/2014/74/4803-808.

The total water requirement for the project is 123 KLD. The fresh water demand for the project is 47.2 KLD and the waste water generation will be about 75 KLD which will be treated in STP of 100 KLD capacity. The treated water will be reused in horticulture, cooling of DG, flushing and washing and the excess water will be discharged into the public sewer with permission.

Total waste generation will be 323.25 kg/day, which will be disposed off as per SWM & Handling Rules.

PARKING:

Adequate parking will be provided in the Commercial colony project. Total of 410 ECS has been provided for the parking. Due care will be taken for the movement of the vehicles to tackle the traffic movement. The project will have complete parking facility and no outside open parking area will be used.

WATER SUPPLY:

The primary source of water for the construction phase will be treated STP water supplied through private tankers and during the operational phase water will be sourced through HUDA.

ELECTRICITY:

The maximum demand load for the Commercial Colony Project will be approximately 2454 kVA and the power will be sourced through Dakshin Haryana Bijli Vitran Nigam Limited.

4

Page 5: nromoef.gov.innromoef.gov.in/SMPR/12012016/98.docx · Web viewAmbient noise level monitoring was carried out dated 27.11.2015 in the commercial project and it was found within the

Project: “Trinity” Commercial Colony Project, Village-Sihi Sector 83-84 Gurgaon Haryana

1.3 PRESENT STATUS

Project construction has just started.

1.4 PURPOSE OF THE REPORT

This six- monthly report is being submitted as per the condition stipulated in the Environmental Clearance letter.

Further, the study will envisage the environmental impacts that have generated in the local environment due to the project.

The environment assessment is being carried out to verify:

That the project does not have any adverse environmental impacts in the project area and it’s surrounding.

Compliance with the conditions stipulated in the Environmental Clearance letter. That the Project Management is implementing the environmental mitigation measures as suggested in

the approved Form-1, Form-1A, Environmental Management Plan (EMP) and building plans. The project proponent is implementing the environmental safeguards in the true spirit. Any non-conformity in the project with respect to the environmental implication of the project.

CHAPTER 2

5

Page 6: nromoef.gov.innromoef.gov.in/SMPR/12012016/98.docx · Web viewAmbient noise level monitoring was carried out dated 27.11.2015 in the commercial project and it was found within the

Project: “Trinity” Commercial Colony Project, Village-Sihi Sector 83-84 Gurgaon Haryana

Compliance of Stipulated condition of Environmental Clearance for Buildings in Construction & Operational Phase.

PART A – SPECIFIC CONDITIONS

I. CONSTRUCTION PHASE

S. No.

Conditions of Environmental Clearance Status of Compliance

1 Consent to establish shall be obtained from Haryana State pollution control board under air and water act and a copy shall be submitted to SEIAA Haryana before the start of any construction at site.

Agreed. CTE has been obtained from HSPCB before the commencement of the construction of the project.

2 A first aid room will be provided in the project both during construction and operation phase of the project.

Agreed. First aid facility is readily available at the project site for the safety of the workers during the construction phase and is in the custody of the project in charge. The facility will be maintained even during the operation phase of the project.

3 Adequate drinking water and sanitary facilities should be provided for construction workers at site. Provision should be made for mobile toilets. Open desiccation by the labors strictly prohibited. The safe disposal of waste water and solid wastes generated during the construction phase should be ensured.

Agreed. Adequate drinking water and sanitary facility will be provided for the construction workers during the construction phase. There is provision of mobile toilets in the construction site and these are proper facility of waste water and solid waste disposal.

4 All the topsoil excavated during construction activities should be stored for use in horticulture/landscape development within the project site

Agreed. All the top soil from the excavation of the project will be stored at the safest secured location and will be used for the horticulture and landscaping purpose once the construction of the project is complete.

5 The project proponent shall ensure that the building materials required during the construction phase is properly stored within the project area and disposal of construction waste should not create any adverse effect on the neighboring communities and should be disposed of after taking necessary precautions for general safety and health aspects of the people. Only in approved site with the approval of competent authority.

Agreed. Building material will be stored in the safest possible place for the protection and preservation of the environment. Permission from the competent authority will be taken if required.

6 Construction spoils, including bituminous material and other hazardous materials, must not be allowed to contaminate watercourses and the dump sites for such material must be secured so that they should not leach into the ground water and any hazardous waste generated during construction phase, should be disposed off as per applicable rules and norms with necessary approval of the Haryana State Pollution Control

Agreed. Construction spoils, including bituminous material and other hazardous materials will be disposed off in scientific manner. Due care will be taken to have zero impact on the watercourse.

6

Page 7: nromoef.gov.innromoef.gov.in/SMPR/12012016/98.docx · Web viewAmbient noise level monitoring was carried out dated 27.11.2015 in the commercial project and it was found within the

Project: “Trinity” Commercial Colony Project, Village-Sihi Sector 83-84 Gurgaon Haryana

Board.7 The diesel generator sets to be used during

construction phase should be of low sulphur diesel type and should conform to Environment (Protection) Rules prescribed for air and noise emission standards

Agreed. Low sulphur diesel will be used to run the DG sets during power failure and it conforms to Environment (Protection) Rules prescribed for air and noise emission standards.

8 The diesel required for operating DG sets shall be stored in underground tanks and if required, clearance from Chief Controller of Explosives shall be taken.

Agreed. Very low quantity of diesel will be required during the power failure and DG sets are being run only during the power failure. The diesel required for operating DG sets will be stored /secured in such a way that no accidents, spillage and leakage is possible. Due care will be taken during the storage and transportation of the diesel.

9 Ambient noise levels should conform to residential standards both during day and night. Incremental pollution loads on the ambient air and noise quality should be closely monitored during construction phase. Adequate measures should be taken to reduce ambient air and noise level during construction phase, so as to conform to the stipulated standards.

Agreed. Ambient noise level monitoring was carried out dated 27.11.2015 in the commercial project and it was found within the prescribed limit of residential standards during day and night. Incremental pollution loads on the ambient air and noise quality will be closely monitored during construction phase. Water sprinklers and other specific measures will be used for reducing the pollution level in and around the construction site. Adequate measures will be taken to reduce ambient air and noise level during construction phase.

10 Fly ash should be used as building material in the construction as per the provisions of Fly Ash Notification of September, 1999 and

amended as on 27 August 2003

Fly Ash will be used in Ready Mix Concrete as building material in the construction as per the provisions of Fly Ash Notification of September, 1999 and amended as on 27th August 2003.

11 Storm water control and its re-use as per CGWB and BIS standards for various applications

Storm water will be controlled by laying proper internal drainage network within the project site as per the CGWB and BIS standards.

12 Water demand during construction should be reduced by use of pre-mixed concrete, curing agents and other best practices referred

Agreed. To conserve water, pre-mixed concrete, curing agents and other best practices will be followed in the project.

13 Roof should meet prescribed requirement as per Energy Conservation Building Code by using appropriate thermal insulation materials to fulfill requirement

Energy conservation measures will be adopted for roof treatment.

14 Opaque wall should meet prescriptive requirement as per Energy Conservation Building Code which is proposed to be mandatory for all air conditioned spaces while it is aspiration for non-air-conditioned spaces by use of appropriate thermal insulation material to fulfill requirement.

Energy conservation measures will be adopted for walls.

15 The approval of the competent authority shall be o b t a i n e d f o r structural s a f e t y o f the building due to earthquake, adequacy of fire fighting equipments etc. as per National Building Code including protection measures from

Agreed. All approvals from the competent authority has been obtained for structural safety of the building for earthquake, adequacy of fire fighting equipments etc.

7

Page 8: nromoef.gov.innromoef.gov.in/SMPR/12012016/98.docx · Web viewAmbient noise level monitoring was carried out dated 27.11.2015 in the commercial project and it was found within the

Project: “Trinity” Commercial Colony Project, Village-Sihi Sector 83-84 Gurgaon Haryana

lighting etc. If any forest land is involved in the proposed site, clearance under forest Conservation Act shall be taken from the competent Authority

16 The PP as stated in the proposal shall construct total 3 RWH pits to recharge the ground water within the project premises. RWH pits shall be designed to make provision for silting chamber and removal of floating matter before entering harvesting pit. Maintenance budget and person responsible for maintenance must be provided. Care shall also be taken that contaminated water do not enter any RWH Pit.

There is provision of 3 RWH pits as per the provision as committed. Proper care will be taken for maintaining the RWH pits.

17 The project proponent shall provide the adequate fire safety measures and equipment as required by the Haryana Fire safety service act 2009 and instructions issued by the local authority /directorate of fire from time to time. Further the project proponent shall take necessary permission regarding fire safety scheme /NOC from competent authority as required.

Agreed. Adequate fire safety measures and equipment as required by the Haryana Fire safety service act 2009 and instructions issued by the local authority /directorate of fire from time to time will be taken. Necessary permission regarding fire safety scheme /NOC from competent authority is in process.

18 The project proponent shall obtained assurance from the DHBVN for supply of 2454 kVA of power supply before the start of construction. In no case project will be operational solely on generators without any power supply from the external power utility.

Agreed. Permission for the same has been obtained.

19 Detail calculation of power load and ultimate power load of the project shall be submitted to DHBVN under intimation to SEIAA Haryana before the start of construction. Provisions shall be made for electrical infrastructure in the project area.

Agreed. There will be proper provisions for electrical infrastructure in the project area.

20 The project proponent shall not raise any construction in the natural land depression/Nallah/water course and shall ensure that the natural flow from the Nallah/water course is not obstructed.

Agreed. We will not raise any construction in the natural land depression/Nallah/water course and we shall ensure that the natural flow from the Nallah/water course is not obstructed.

21 The project proponent shall keep the plinth level of the building blocks sufficiently above the level of approach road to the project as per prescribed by laws. Level of other area in the project shall also be kept suitably so as to avoid flooding.

Agreed. We shall keep the plinth level of the building blocks sufficiently above the level of approach road to the project as per prescribed by laws. Level of other area in the project will also be kept suitably so as to avoid flooding.

22 Construction shall be carried so that density of population does not exceed norms approved by Director General Town and Country Planning Department Haryana

Agreed. The Construction will be carried out as per the directions and will not exceed norms approved by Director General Town and Country Planning Department Haryana

23 The project proponent shall submit the affidavit with the declaration that ground water will not be used for construction and only treated water should be used for construction.

Agreed.

8

Page 9: nromoef.gov.innromoef.gov.in/SMPR/12012016/98.docx · Web viewAmbient noise level monitoring was carried out dated 27.11.2015 in the commercial project and it was found within the

Project: “Trinity” Commercial Colony Project, Village-Sihi Sector 83-84 Gurgaon Haryana

24 The project proponent shall not cut any existing tress and project landscaping plan should be modified to include those trees in the green area.

Agreed and due care will be taken for developing the landscaping and other green including the existing trees in the project.

25 The PP shall ensure that ECBC norms for composite climate zone are met. In particular building envelop ,HVAC service ,water heating .pumping ,lighting and electrical infrastructure must met ECBC norms.

Agreed.

26 The project proponent shall provide 3 m high barricade around the project area, dust screen for every floor above the ground proper sprinkling and covering of stored materials to restrict dust and air pollution during construction.

Agreed. We will provide 3 m high barricade around the project area, dust screen for every floor above the ground proper sprinkling and covering of stored materials to restrict dust and air pollution during construction.

27 The project proponent shall construct a sedimentation basin in the lower level of the project site to trap pollutant and other waste during rains.

Agreed and same will be complied.

28 The project proponent shall provide proper rasta of proper width and proper strength for each project before the start of the construction.

Agreed. Proper rasta with adequate width will be provided for the free movement of the construction vehicles inside the project premises.

29 The project proponent shall ensure that the U Value of the glass is less than 3.177 and maximum solar heat gain co-efficient is 0.25 for vertical fenestration.

Agreed and same will be complied further.

30 The project proponent shall adequately control construction dusts like silica dust non silica dust wood dust. Such dusts shall not spread outside project premises. Project proponent shall provide respiratory protective equipment to all construction workers.

Agreed and same will be complied further.

31 The project proponent shall provide fie control room and fire officer for building above 30 m as per the building code.

Agreed a fire control room will be provided as per the building code.

32 The PP shall obtain permission from Mines and Geology Department for excavation of soil before the start of the construction.

Agreed and same will be complied further.

33 The project proponent shall provide one refuse area till 24 m and one till 39 m and one after every 15 m as per the national building code. The PP shall not convert any refuse area in the habitable space and it should not be sold out commercialized.

Agreed and same will be complied further.

34 The project proponent shall seek specific prior approval from concerned local authority/HUDA regarding provision of storm drainage and sewerage system including their integration with external services of HUDA/local authorities besides other required services before taking up any construction activity.

Agreed and same will be complied further.

35 The site for solid waste management plant be Agreed. There is proper marking of the solid waste

9

Page 10: nromoef.gov.innromoef.gov.in/SMPR/12012016/98.docx · Web viewAmbient noise level monitoring was carried out dated 27.11.2015 in the commercial project and it was found within the

Project: “Trinity” Commercial Colony Project, Village-Sihi Sector 83-84 Gurgaon Haryana

earmarked on the layout plan and the detailed project for setting up the solid waste management shall be submitted to the authority within one month.

management and collection point as per the site plan.

36 The PP shall discharge excess treated waste water/storm water in the public drainage system and shall seek permission of HUDA before the start of the construction.

Agreed and same will be complied further.

37 The PP shall ensure that the stack height is 6 m more than the highest tower.

Agreed and same will be complied further.

38 The project proponent shall ensure structural stability to withstand earthquake of the richer scale 8.5.

Agreed and same will be complied further.

38 The project proponent shall submit the copy of the fire safety plan duly approved by the fire department before the start of construction.

Agreed and same will be complied further.

39 Vertical fenestration shall not exceed 40 % of total wall area.

Agreed and same will be complied further.

40 The PP shall implement the revised traffic circulation plan (marked “A-10/75st) dated 15.09.2014 as submitted in the meeting (Bell mouth shape at the entry and exit point, 2 no each of entry and exit point on the 12 meter wide road and addition ramp in the basement so that the vehicle can enter and exit the basement from both gates.

Agreed and same will be complied further.

41 The PP shall provide the services in the 1st

Basement.Agreed and same will be complied further.

II. OPERATION PHASE

1 Consent to operate shall be obtained from Haryana state Pollution control Board under Air and water act and a copy shall be submitted to the SEIAA Haryana

Agreed and once the project gets operation phase the same will be obtained from the concern authority.

2 The STP shall be installed for the treatment of the sewage generated to the prescribed standards including odour and treated effluent will be recycled to achieve zero discharge. The STP should be installed shall be certified by the independent expert and a report in this regards should be submitted to the SEIAA Haryana before the project commissioned for operation. Tertiary treatment of waste water is mandatory. Discharge of the treated sewerage shall conform to the norms and adequate of HSPCB Panchkula. Project proponent shall implement such STP technology which does not require filter backwash.

Agreed and same will be complied further.

10

Page 11: nromoef.gov.innromoef.gov.in/SMPR/12012016/98.docx · Web viewAmbient noise level monitoring was carried out dated 27.11.2015 in the commercial project and it was found within the

Project: “Trinity” Commercial Colony Project, Village-Sihi Sector 83-84 Gurgaon Haryana

3 Separation of gray and black water should be done by the use of dual plumbing line. Treatment of 100% gray water by decentralized treatment should be done ensuring that the re circulated water should have BOD maximum 10 pm and the recycled water will be used for flushing, gardening and HVAC makeup and DG set cooling.

Provision of dual plumbing line will be made for separation of grey and black water. Treated waste water will be used for flushing, landscaping and DG cooling.

4 For disinfections of the treated wastewater ultra violate radiation or ionization should be used.

Use of UV Treatment will be proposed for disinfection of treated waste water in the STP.

5 Diesel power generating sets proposed as source of backup power for lifts, common area illumination and for domestic use should be of enclosed type and conform to rules made under the Environment (Protection) Act, 1986. The location of the DF sets should be in the basement as promised by the project proponent with appropriate stack height as per the CPCB norms. The diesel used for DG sets should be of low sulphur contents (Maximum 0.25%)

DG sets installed would be of enclosed enclosure type conforming to the rules made under EP Act 1986.

Proper stack height above the rooftop will be provided for the easy dispersion of the emissions as per the rules.

Low sulphur diesel (with maximum sulphur content of 0.25%) is in practice while running the DG sets during the power failure.

6 Ambient Noise level should be controlled to ensure that it does not exceed the prescribed standards both within and at the boundary of the proposed Commercial Complex.

Ambient Noise level at the project site during operation phase will be in practice on a regular basis. Due care will be taken for maintaining minimum noise level both within and around the construction site for the welfare of the residential.

7 The project proponent as stated in the proposal should maintain at least 20 % as green area for tree plantation especially all around the project periphery of the project and on the road sides preferably with local species which can provide protection against noise and suspended particulates matter. The open spaces inside the project should be preferably landscaped and covered with vegetation/grass herbs and shrubs. Only locally available species shall be used.

Agreed. We will maintain 20 % of the green area as committed.

8 The PP shall strive to minimize water in irrigation of landscape by minimizing green area using native variety xeriscaping and mulching utilizing efficient irrigation system scheduling irrigation only after checking evapo transpiration data.

Agreed and same will be complied further.

9 Rain water harvesting for roof run-off and surface run-off as per plan submitted should be implemented. Before recharging the surface runoff, pre run off treatment must be done to remove suspended matter, oil and grease. The bore well for rain water recharging should be kept at least 5 m above the highest ground water table. Efforts will be made by the project proponent to utilize the runoff water during the construction phase for recharging by providing

Adequate number of RWH pits will be constructed in the operational part of the building. RWH pits have been designed as per CGWB norms.

11

Page 12: nromoef.gov.innromoef.gov.in/SMPR/12012016/98.docx · Web viewAmbient noise level monitoring was carried out dated 27.11.2015 in the commercial project and it was found within the

Project: “Trinity” Commercial Colony Project, Village-Sihi Sector 83-84 Gurgaon Haryana

water harvesting system simultaneously. The PP shall avoid rain water harvesting of first 10 minutes of rain fall. Roof top of the building shall be without any toxic materials or paints which can contaminate rain water. Wire mess and filters should be used whenever required.

10 The ground water level and its quality should be monitored regularly in consultation with Central Ground Water Authority.

The ground water level and its quality is being monitored on a regular basis and due care is being and will be taken further for maintaining and conserving the ground water.

11 A report on the energy conservation measures conforming to energy conservation norms finalize by Bureau of Energy Efficiency should be prepared incorporating details about building materials and technology, R & U Factors etc. and submit to the IA Division of Environment Department, Haryana in three months time

The report on the energy conservation measures conforming to energy conservation norms finalized by Bureau of Energy Efficiency will be prepared and the same will be submitted to the IA Division of Environment Department, Haryana.

12 Energy conservation measures like installation of CFLs/ TELs for lighting the areas outside the building should be integral part of the project design and should be in place before project commissioning. Used CFLs and TFLs should be properly collected and disposed off/ sent for recycling as per the prevailing guidelines/ rules of the regulatory authority to avoid mercury contamination. Use of solar panels should be done to maximum extent possible.

Energy efficient luminaries like CFL and LED etc is integral part of the project and are in practice and will be encouraged further during the operational phase of the project.

13 The project proponent shall maintain zero ozone depleting potential material in insulation refrigeration air conditioning and adhesive. The PP shall also provide Halon free fire suppression system.

Agreed and same will be complied further.

14 The solid waste generated should be properly collected and segregated as per the requirement of the MSW Rules 2000 and as. The biodegradable waste should be treated by appropriate technology at the site earmarked within the project area and dry/inert solid waste should be disposed off to the approved sires for land filling after recovering recyclable material

Solid waste will be disposed through authorized waste collector and will be disposed to the government approved disposal site. Practice of daily collection and segregation is being followed and will be practiced further.

15 The provision of the solar water heating system shall be as per the norms specified by HAREDA and shall be made operational in each building block

Agreed and will be complied.

16 The traffic plan and the parking plan proposed by the PP should be adhered to meticulously with further scope of additional parking for future requirement. There should be no traffic congestion near the entry and exit points from the roads adjoin the project site. Parking should

The traffic plan and the parking plan proposed by us will adhere to meticulously with further scope of additional parking for future requirement. There will be no traffic congestion near the entry and exit points from the roads adjoin the project site. Parking will be fully internally and no public space shall be used.

12

Page 13: nromoef.gov.innromoef.gov.in/SMPR/12012016/98.docx · Web viewAmbient noise level monitoring was carried out dated 27.11.2015 in the commercial project and it was found within the

Project: “Trinity” Commercial Colony Project, Village-Sihi Sector 83-84 Gurgaon Haryana

be fully internally and no public space shall be used.

17 The PP shall be operational zed only when HUDA local authority will provide domestic water supply system in the area.

Agreed and same will be complied further.

18 Operation and maintained of the STP solid waste management and electrical infrastructure pollution control measures shall be ensured even after the completion of sale.

Agreed and same will be complied further.

19 Different type of waste should be disposed off as per the provisions of municipal solid waste biomedical waste hazardous waste e waste batteries and plastic rules made under environment protection act 1986 particularly E waste and battery waste shall be disposed off as per existing E waste Management rule 2011 and batteries management rules 2001. The project proponent shall maintain a collection center for E waste and it should be disposed of to only registered and authorized dismelter /recycler.

Agreed and same will be complied further.

20 Standards for discharge of environmental pollutants as enshrined in various scheduled of rule 3 of EPA 1986 shall be strictly complied with.

Agreed and same will be complied further.

21 The PP shall make provision of guard pond and other provision for safety against the failure in the operation of waste water treatment facilities. The PP shall also identify acceptance outfall for treated effluent.

Agreed and same will be complied further.

22 The PP shall ensure the stack height of DG set is as per the CPCB guide lines and also ensure that the emission standards of noise and air are within the CPCB prescribed limits. Noise emission level of the DG set generator then 800 kVA shall be as per the CPCB latest standards for high capacity DG sets

Agreed. For the proper dispersion of fuel gases stack height above roof top will be provided as per the norms approved by the CPCB.

23 All electric supply exceeding 100 amp,3 phase shall maintain the power factor between 0.98 lag to 1 at the point of connection.

Agreed and same will be complied further.

24 The PP shall minimize the heat island effect through shading and reflective or previous surface instead of surface.

Agreed and same will be complied further.

25 The PP shall use only treated water instead of fresh water for DG cooling. PP shall also use evaporation cooling technology and double stage cooling system for HVAC in order to reduce water consumption. Further temperature relative humidity during summer and winter seasons should be kept at optional level. Variable speed drive best coefficient of performance as well as optimal integrated point load value and minimum

Agreed and same will be complied further.

13

Page 14: nromoef.gov.innromoef.gov.in/SMPR/12012016/98.docx · Web viewAmbient noise level monitoring was carried out dated 27.11.2015 in the commercial project and it was found within the

Project: “Trinity” Commercial Colony Project, Village-Sihi Sector 83-84 Gurgaon Haryana

outside fresh air supply may be restored for conservation of power and water. Coil type cooling DG sets shall be used for saving cooling water consumption for water cooled DG sets.

26 The PP shall ensure that the transformer is constructed with high quality grain oriented low loss silicon steel and virgin electrolyte grade cooper. The PP shall obtain manufacture certificate also for that.

Agreed and same will be complied further.

aa Water supply shall be metered among different users and different utilities.

Agreed and same will be complied further.

ab The PP shall ensure that the exit velocity from the stack should be sufficiently high. Stack shall be designed in such a way that there is no stack down wash under any meteorological conditions.

Agreed and same will be complied further.

ac The PP shall provide water sprinkling system in the project area to suppress the dust in addition to the already suggested mitigation measures in the air environment chapter of the EMP.

Agreed. For the purpose of reducing the dust level and other pollutants inside the project premises proper water sprinkling system will be provided as committed during the EMP.

ad The PP shall provide the green area on terrace and roof top.

Agreed and same will be complied further.

ae The PP shall ensure proper air ventilation and light system in the basement area for comfortable living of human being and shall ensure that number of air change as per hour /ACH in basement never falls below 1.5 m. In case of emergency capacity for increasing ACH to the extent of 30 must be provided by the PP.

Agreed and same will be complied further.

af The PP shall in the PP stall a solar panel for energy conservations.

Agreed and same will be complied further.

PART B- GENERAL CONDITIONS

S.No

Conditions of Environmental Clearance Status of Compliance

I The PP shall ensure that the commitments made in the Form 1 and Form 1 A EIA/EMP and other documents submitted to the SEIAA for the protection of the Environment and proposed environmental safeguards are complied with in letter and spirit. In case of contradiction between two or more documents or any point the most environmentally friendly commitment on the point shall be taken as committed by PP.

Agreed and same will be complied further.

II Six monthly compliance report should be submitted to the HSPCB and regional office MOEF GOI Northern regional Chandigarh and a copy to the SEIAA Haryana.

Agreed. Six monthly compliance report are being complied on a regular basis.

III STP outlet after stabilization and stack emission shall be monitored monthly. Other

Agreed and same will be complied further.

14

Page 15: nromoef.gov.innromoef.gov.in/SMPR/12012016/98.docx · Web viewAmbient noise level monitoring was carried out dated 27.11.2015 in the commercial project and it was found within the

Project: “Trinity” Commercial Colony Project, Village-Sihi Sector 83-84 Gurgaon Haryana

environmental parameters and green belt shall be monitored on quarterly basis. After every 3 months the PP shall conduct environmental audit and shall take corrective measures if required without delay.

IV The SEIAA, Haryana reserves the right to add additional safeguard measures subsequently, if found necessary. Environment Clearance granted will be revoked if it is found that false information has been given for getting approval of this project. SEIAA reserve the right to revoke the clearance if condition stipulated is not implemented to the satisfaction of SEIAA /MOEF.

Agreed. The project will accept any suggestion by the SEIAA for environmental safeguard for the welfare of the society. There is no change in the scope of the project.

V The PP shall not violet any judicial orders/pronouncements issued by any court/Tribunal.

Agreed.

VI All other statutory clearances such as the approvals for storage of diesel from Chief Controller of Explosives, Fire Department, Civil Aviation Department, Forest Conservation Act, 1980 and Wildlife (Protection) Act, 1972, shall be obtained, as applicable by project proponents from the respective authorities.

Agreed. All other statutory clearances required for the project will be obtained from the concerned authorities. However, approval from AAI has been obtained.

VII The PP should inform the public that the project has been accorded EC by the SEIAA and copies of the clearance letter are available with the HSPCB and SEIAA. This should be advertised within 7 days from the date of issue of the clearance letter at least in 2 local newspapers that are widely circulated in the region and a copy of the same should be forward to SEIAA Haryana. A copy of EC conditions shall also put on PP website for public awareness.

Agreed and same will be complied further.

VIII Under the provision of EPA act 1986 legal action shall be initiated against the PP if it was found that construction of the Project has been started before obtaining the EC.

Agreed and same will be complied further.

IX Any appeal against this EC shall lie with the NGT if preferred with a period of 30 days as prescribed under section 16 of NGT Act 2010.

Agreed.

X The CSER shall be laid down by the PP (2 % shall be earmarked) as per guidelines of MoEF GoI Office memorandum No J 11013/41/2006-IA.II (I) dated 18.05.2012 and ministry of corporate affairs GOI Notification dated 27.02.2014. A separate audit statement shall be submitted in the compliance environmental related work proposed to be executed under this responsibility shall be undertaken simultaneously. The PP shall select and prepare list of the work

Agreed and same will be complied further.

15

Page 16: nromoef.gov.innromoef.gov.in/SMPR/12012016/98.docx · Web viewAmbient noise level monitoring was carried out dated 27.11.2015 in the commercial project and it was found within the

Project: “Trinity” Commercial Colony Project, Village-Sihi Sector 83-84 Gurgaon Haryana

for implementation of CSER of its own choice and shall submit the same before the start of the construction.

XI The fund ear-marked for environmental protection measures should be kept in separate account and should not be delivered for other purposes and year wise expenditure shall be reported to the SEIAA/RO/MOEF/GOI under rules prescribed for the environmental audit.

Agreed and same will be complied further.

XII The PP shall ensure that compliance of the forest department Haryana notification no S.O. 121/PA2/1900/s4/97 dated 28.11.1997.

Agreed.

XIII The PP shall ensure that no vehicle during the construction /operation phase enter the project premises without valid pollution under control certificate from competent authority.

Agreed and same will be complied further.

XIV The PP shall seek fresh EC if at any stage there is change in the planning of the proposed project.

Agreed.

XV Besides the developer the responsibility to ensure the compliance of Environmental safeguards conditions imposed in the EC letter shall also lie on the license/licensees in whose name/names the license/CLU has been granted by the TCP Haryana.

Agreed and same will be complied further.

XVI The PP shall upload the status of the compliance of the stipulated EC conditions including the results of monitoring data on their website and shall update the same periodically. It shall simultaneously be sent to the regional office of the MoEF the respective Zonal office of the CPCB and SPCB. The criteria pollutants level namely PM 2.5,PM 10 NOX SOX Ozone Lead CO Benzene Ammonia Benzopyrine arsenic and Nickel (ambient levels as well as stack emissions) or critical sectoral parameters indicated for the project shall be monitored and displayed at a convenient location near the main gate of the company in the public domain.

Agreed and same will be complied further.

XVII The Environmental statement for each financial year ending 31st March in form V as it mandated to be submitted by the PP to the HSPCB Panchkula as prescribed under the Environmental Protection act 1986 as amended subsequently shall also be put on the website of the company along with the status of compliance of the EC conditions and shall also be sent to the respective regional office of MOEF by Email.

Agreed and same will be complied further.

XVIII The PP shall conduct environmental audit at every three month interval and therefore corrected measures shall be taken without any delay. Details of environmental audit and corrective

Agreed and same will be complied further.

16

Page 17: nromoef.gov.innromoef.gov.in/SMPR/12012016/98.docx · Web viewAmbient noise level monitoring was carried out dated 27.11.2015 in the commercial project and it was found within the

Project: “Trinity” Commercial Colony Project, Village-Sihi Sector 83-84 Gurgaon Haryana

measures shall be submitted in the monitoring report.

CHAPTER 3

DETAILS OF ENVIRONMENTAL MONITORING

3.1 AMBIENT AIR QUALITY MONITORING

3.1.1 AMBIENT AIR QUALITY MONITORING STATIONS

Ambient air quality monitoring has been carried out at one location near the site office to access the ambient air quality. This will enable us to have analytical understanding about air quality and the changes in the air environment in the study area with respect to the condition prevailing. The locations of the ambient air quality monitoring stations are given in Table 3.1

Table 3.1 Details of Ambient Air Quality Monitoring Station

S. No. Location Code Location Name / Description Environmental Setting1. AAQ-1 At project site Commercial

3.1.2 AMBIENT AIR QUALITY MONITORING METHODOLOGY

Monitoring was conducted in respect of the following parameters

Particulate Matter 2.5 (PM 2.5) Particulate Matter 10 (PM 10 ) Sulphur Dioxide ( SO2) Nitrogen Dioxide (NO2) Ozone as O3

The said monitoring for all parameters were done with the method IS 5182 and UL/STM for 24 hours except O3 which was conducted for 1 hour. Grab sample of ambient air was taken to analyze while O3 was monitored on 1-hourly basis. This is to allow a comparison with the National Ambient Air Quality Standards. Colorimetric Measurement techniques have been used for sampling and analysis protocol for the estimation of Ozone as O3. The air samples were analyzed as per standard methods specified by Central Pollution Control Board (CPCB) and IS: 5182 (Pt-2, Pt-6 and Pt-23), UL/STM/A/11 and also UL/STM/A/09. The test protocols are given in Table 3.2.

Table 3.2 Techniques used for Ambient Air Quality Monitoring

S. No. Parameter Technique Technical ProtocolGuidelines for planning the sampling IS- 5182 (Part-14)

1 Particulate Matter PM 2.5 Fine particulate sampler APM 460, Gravimetric Method

UL/STM/A/11

2 Particulate Matter PM 10 Respirable Dust Sampler AAS 190, Gravimetric Method

IS- 5182 (Part-23)

3 Sulphur Dioxide Improved West and Geake method IS-5182 (Part-II)4 Nitrogen Dioxide Jacob & Hochheister IS-5182 (Part- VI)5 Ozone as O3 Colorimetric Measurement Method UL/STM/A/092

17

Page 18: nromoef.gov.innromoef.gov.in/SMPR/12012016/98.docx · Web viewAmbient noise level monitoring was carried out dated 27.11.2015 in the commercial project and it was found within the

Project: “Trinity” Commercial Colony Project, Village-Sihi Sector 83-84 Gurgaon Haryana

3.1.3 DISCUSSION ON AMBIENT AIR QUALITY IN THE STUDY AREA

PM 10 levels and PM 2.5 levels were within the permissible limit i.e. 100 µg/m3 while 60 µg/m3 (for residential, rural and other areas as stipulated in the National Ambient Air Quality Standards) and also the Limits for SO 2, NO2 and O3 limits were within the permissible limit. Monitoring data for the ambient air quality is being described in table 3.3.

Table 3.3 Detailed monitoring data for Ambient Air Quality Monitoring

S. No. Parameter Units Results NAAQS TWA Technical Protocol1 Particulate Matter PM 2.5 µg/m3 38 60 24 hrs IS- 5182 (Part-23)2 Particulate Matter PM 10 µg/m3 79 100 24 hrs UL/STM/A/113 Sulphur Dioxide µg/m3 8.4 80 24 hrs IS-5182 (Part-II)4 Nitrogen Dioxide µg/m3 15.1 80 24 hrs IS-5182 (Part- VI)5 Ozone as O3 µg/m3 58 180 1 hrs UL/STM/A/096 Carbon monoxide as CO mg/m3 0.62 4 1 hrs IS5182( PT-10)7 Ammonia as NH3 µg/m3 70 400 24 hrs UL/STM/A/04

Table 3.4 Detailed monitoring data for Ambient Air Quality Monitoring

S. No. Parameter Units Results NAAQS TWA Technical Protocol1 Particulate Matter PM 2.5 µg/m3 36 60 24 hrs IS- 5182 (Part-23)2 Particulate Matter PM 10 µg/m3 66 100 24 hrs UL/STM/A/113 Sulphur Dioxide µg/m3 6.3 80 24 hrs IS-5182 (Part-II)4 Nitrogen Dioxide µg/m3 13.7 80 24 hrs IS-5182 (Part- VI)5 Ozone as O3 µg/m3 53 180 1 hrs UL/STM/A/096 Carbon monoxide as CO mg/m3 0.55 4 1 hrs IS5182( PT-10)7 Ammonia as NH3 µg/m3 55 400 24 hrs UL/STM/A/04

3.2 AMBIENT NOISE MONITORING

3.2.1 AMBIENT NOISE MONITORING LOCATIONS The main objective of noise monitoring in the study area is to assess the present ambient noise levels in the nearby area of project site and project boundary due to various construction allied activities and increased vehicular movement. A preliminary reconnaissance survey has been undertaken to identify the major noise generating sources in the area. Ambient noise monitoring was conducted at one location about 1 meter distance from the boundary inside the project as given in Table 3.5.

Table 3.5 Details of Ambient Noise Monitoring Stations

S. No Location Code Location Name/Description Present Land use1. N1 1 m distance from the east boundary inside the

project.Commercial

3.2.2 METHODOLOGY OF NOISE MONITORING

18

Page 19: nromoef.gov.innromoef.gov.in/SMPR/12012016/98.docx · Web viewAmbient noise level monitoring was carried out dated 27.11.2015 in the commercial project and it was found within the

Project: “Trinity” Commercial Colony Project, Village-Sihi Sector 83-84 Gurgaon Haryana

Ambient noise level and source was monitored by using a calibrated Sound Level Meter. The instrument has a range to record noise level between 30 – 130 dB. Noise level was monitored inside the project premises at selected location for day and night, continuously for 24 hours.During each hour Leq were directly computed by the instrument based on the sound pressure levels. Lday (Ld), Lnight (Ln) and Ldn values were computed using corresponding hourly Leq. Monitoring methodology used were IS 9876 & IS 9989.

3.2.3 AMBIENT NOISE MONITORING RESULTS

The time wise ambient noise monitoring results is summarized in Table 3.6.

Table 3.6 Ambient Noise Monitoring Results

Sr.No.

Test Locations

Day Time – dB (A) Night Time – dB(A)

ResultsLimits as per

CPCB Guidelines Results

Limits as per CPCB

Guidelines

1.Near site office at 1 m distance from the southern periphery inside the project.

49.9 65 30.4 55

3.2.4 DISCUSSION ON AMBIENT NOISE LEVELS IN THE STUDY AREA

Day Time Noise Levels (Lday):The day time noise levels were found to be lower than the limit prescribed near the site office location.

Night Time Noise Levels ( Lnight):The night time noise levels were found much within the limit prescribed for Residential area i.e. 45 dB (A)

3.3 GROUNDWATER QUALITY MONITORING

3.3.1 GROUNDWATER QUALITY MONITORING LOCATIONS

Keeping in view the importance of groundwater as an important source of drinking water to the local population, sample of ground water was collected near the project site for the impact assessment of the project on the groundwater quality.

Water sample was collected from one location near the project site. The sample was analyzed for various parameters to compare with the standards for drinking water as per IS: 3025 (Part –I) for ground water sources. The details of water sampling are given in Table 3.7.

Table 3.7 Details of Water Quality Monitoring Station

S. No Location Code Location Name / Description1. GW 1 Near Project Site

3.3.2 METHODOLOGY OF GROUNDWATER QUALITY MONITORING

Sampling of ground water was carried out on 02.04.2015. Samples were collected as grab sample and sampling forms were filled in as per the sampling plan. Grab sample were drawn, kept in a clean and dry container and

19

Page 20: nromoef.gov.innromoef.gov.in/SMPR/12012016/98.docx · Web viewAmbient noise level monitoring was carried out dated 27.11.2015 in the commercial project and it was found within the

Project: “Trinity” Commercial Colony Project, Village-Sihi Sector 83-84 Gurgaon Haryana

preserved in ice box in the manner, as prescribed in IS 3025 (Part 1). The samples were transported to the laboratory for further analysis. Soon after the completion of sampling, chain of custody sheets for the samples were filled in and then were transported by road to Ultratec Labs Pvt. Ltd, Gurgoan for further analysis. Proper care was taken during packing and transportation of samples. All the samples reached the central laboratory within the holding times for different parameters. After ensuring the same the samples were forwarded immediately for analysis.

The samples were analyzed as per the standard procedures specified in ‘Standard Methods for the Examination of Water and Wastewater’ published by American Public Health Association (APHA) and CPCB. The analytical techniques and the test methods adopted for testing of ground water are given in Table 3.7.

3.3.3 GROUNDWATER QUALITY MONITORING RESULTS

The detailed groundwater quality monitoring results are presented in Table 3.8

Table 3.8 Groundwater Quality Monitoring Results (I)

S. No Parameter Unit Results Test Protocol

1. Colour Hazen <5 IS:3025(PART-4)2. Odour … Agreeable IS 3025(PART5)3. pH value at 25˚C … 7.93 IS 3025(PART 11)4. Turbidity NTU 1.3 IS:3025(PART-10)5. Total dissolved Solids mg/l 519 IS:3025 Part 166. Total Hardness as CaCo3 mg/l 258 IS 3025( Part 21)7. Calcium as Ca mg/l 56 IS:3025(PART-40)8. Magnesium as Mg mg/l 29 IS:3025 (Part 46)9. Total Alkanity as Calcium Carbonate mg/l 371 IS:3025(Part 23)10. Chloride as Cl mg/l 50 IS:3025(PART-32)11. Sulphate as SO4 mg/l 36 IS:3025(Part 24)12. Iron as Fe mg/l 0.26 IS:3025 Part 5313. Fluoride as F mg/l 0.70 IS:3025 Part 6014. Nitrite Nitrigen as NO2-N mg/l <0.5 IS:3025 Part 3415. Total Phosphorous as P mg/l 4.3 IS:3025 Part 3116. Potassium as K mg/l 37 IS:3025 Part 4517. Sodium as Na mg/l 76 IS:3025 (Part 45)18. Total Coliform* MPN/100ML ND IS:1622-198119. Boron* mg/l 0.091 IS:3025 Part 5720. Nitrite as NO3 * mg/l 5.8 IS:3025 (PART 34)

*Not covered under NABL scope.

3.3.4 DISCUSSION ON GROUNDWATER QUALITY IN THE STUDY AREA

The ground water quality in the project area is observed to having total alkalinity up to 371 mg/l which is slightly higher than desirable limit of 200 mg/L. Total dissolved solids in the ground water is 519 mg/L which is also as per the prescribed permissible limit of 500 mg/L.

3.4 SOIL MONITORING

20

Page 21: nromoef.gov.innromoef.gov.in/SMPR/12012016/98.docx · Web viewAmbient noise level monitoring was carried out dated 27.11.2015 in the commercial project and it was found within the

Project: “Trinity” Commercial Colony Project, Village-Sihi Sector 83-84 Gurgaon Haryana

3.4.1 SOIL MONITORING LOCATIONSThe objective of soil monitoring is to identify the impact of ongoing project activities on soil quality and also predict impacts, which have arisen due to execution of various constructions and allied activities and in consonance of the above, take corrective measures. Accordingly, a study of assessment of the soil quality has been carried out.

To assess impacts of ongoing project activities on the soil in the area, the physic-chemical characteristics of soils were examined by obtaining soil samples and analysis of the same. One sample of soil was collected from back side of the site office from a depth of approximately 6’’ to 9” below the earth surface for studying soil characteristics, the location of which is listed in Table 3.9.

Table 3.9 Details of Soil Quality Monitoring Location

S. No Location Code Location Name / Description1 S1 Commercial colony Project

3.4.2 METHODOLOGY OF SOIL MONITORING

Samples of top soil, from a depth of nearly 6″-9″ below the surface, were collected from the project premises. The samples were preserved in clean and lock-in polyethylene and transported to the laboratory for testing. Testing was performed with reference to the standard methods prescribed in UL/SOP/EX/02.The samples were analyzed as per the established scientific methods for physic-chemical parameters. The heavy metals have been analyzed by using Atomic Absorption Spectrophotometer and Inductive Coupled Plasma Analyzer.

3.4.3 SOIL MONITORING RESULTS

The physic-chemical characteristics of the soil, as obtained from the analysis of the soil sample, are presented in Table 3.10

Table 3.10 Physico-Chemical Characteristics of Soil in the Study Area

S. No Parameter Unit Observed Value Test Protocol1. pH value at 25˚C .. 8.86 IS: 2720 Pt 262. Conductivity at 25˚C µmhos/cm 101 IS: 2720 Pt 213. Moisture Content % 20.7 IS : 2720 Pt 24. Texture based soil classification - Sandy Clay Loam UL/SOP/EX/235. Water Holding Capacity % 15.1 UL/SOP/EX/136. Phosphorous as P2 O5 Kg/Hectare 23 UL.STM.S.047. Potassium as K2 O Kg/Hectare 110 UL.STM.S.058. Nitrogen as N Kg/Hectare 212 UL.STM.S.039. Boron Ppm 0.43 UL.STM.S.0710. Organic Content % 0.44 IS:2720 Pt 2211. Soluble Sulphate % 9.7 IS: 2720 Pt 27

3.4.4 DISCUSSION ON SOIL CHARACTERISTICS IN THE STUDY AREA

The soil in study area is characterized by slightly alkaline in nature. The soil quality in the project area has not been affected by the project activities. Desirable range of the pH value is 6.0–7.5 for horticultural purpose. pH 6.6 – 6.9 is slightly acidic, 7.1 – 8.5 is moderately alkaline, >8.5 is strongly alkaline.

21

Page 22: nromoef.gov.innromoef.gov.in/SMPR/12012016/98.docx · Web viewAmbient noise level monitoring was carried out dated 27.11.2015 in the commercial project and it was found within the

Project: “Trinity” Commercial Colony Project, Village-Sihi Sector 83-84 Gurgaon Haryana

22