DAILY TIME SHEET Project Name Wattens Autoslice and QCS Name Wendra Kurniawan Project/Job No 14801480 Positi on Field Service Engineer DATE DAY WORKING HOUR WORKING HOURS OVERTIME HOURS ACTIVITY FROM TO 13 May 19 Monday Travel from Surabaya to Ho Chi Min Customer Signatur e 14 May 19 Tuesday 08:00 17:00 8 0 Meeting preparation for the pre-shutdown work Customer Signatur e 15 May 19 Wednesda y 08:00 17:00 8 0 Size scanner UPMP cable termination Customer Signatur e 16 May 19 Thursday 08:00 17:00 8 0 Autoslice CDWEB cable termination Customer Signatur e 17 May 19 Friday 08:00 17:00 8 0 Autoslice equipment preparation Porosity sheet guide preparation Customer Signatur e 18 May 19 Saturday Customer Signatur e 19 May 19 Sunday Customer Signatur e TOTAL 32 Lunch Break 60 minutes/day Normal Working Hour From 08.00 To 16.30

Upload: others

Post on 13-Sep-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: balibago.orgbalibago.org/Files/16600/Word version/Wattens timeshee…  · Web viewSize press scanner terminationreel scanner head alignment. CustomerSignature 22

DAILY TIME SHEETProject Name Wattens Autoslice and QCS Name Wendra Kurniawan

Project/Job No

14801480 Position Field Service Engineer

DATE DAY

WORKING HOUR WORKING

HOURS

OVERTIME

HOURSACTIVITYFROM TO

 13

May

19

Monday

       

Travel from Surabaya to Ho Chi MinCustomerSignature

 14

May

19

Tuesday 08:00 17:00 80

Meeting preparation for the pre-shutdown workCustomer

Signature

 15

May

19

Wednesday 08:00 17:00 8

0Size scanner UPMP cable termination

CustomerSignature

 16

May

19

Thursday 08:00 17:00 80

Autoslice CDWEB cable terminationCustomerSignature

 17

May

19

Friday 08:00 17:00 80

Autoslice equipment preparationPorosity sheet guide preparationCustomer

Signature

 18

May

19

Saturday

     

CustomerSignature

 19

May

19

Sunday

     

CustomerSignature

    TOTAL 32  

Lunch Break 60 minutes/day Normal Working Hour From 08.00 To 16.30

Submitted by Honeywell

Customer Company Stamp(if available)

Certified by Customer

Signature/Date: 19 May 19 Signature/Date:

   

Wendra Kurniawan Name:

Page 2: balibago.orgbalibago.org/Files/16600/Word version/Wattens timeshee…  · Web viewSize press scanner terminationreel scanner head alignment. CustomerSignature 22
Page 3: balibago.orgbalibago.org/Files/16600/Word version/Wattens timeshee…  · Web viewSize press scanner terminationreel scanner head alignment. CustomerSignature 22

DAILY TIME SHEETProject Name Wattens Autoslice and QCS Name Wendra Kurniawan

Project/Job No

14801480 Position Field Service Engineer

DATE DAY

WORKING HOUR WORKING

HOURS

OVERTIME

HOURSACTIVITYFROM TO

 20

May

19

Monday 08:00 17:00 8

0 Machine shutdown, reel scanner installation to pedestalReel scanner cable terminationOld slice beam remove by customerCustomer

Signature

 21

May

19

Tuesday 08:00 17:00 80

Size press scanner terminationreel scanner head alignmentCustomer

Signature

 22

May

19

Wednesday 08:00 17:00 8

0 Autoslice actuator and rod installationBlower and cooling line installationCustomer

Signature

 23

May

19

Thursday 08:00 17:00 80 Slice installation

Function test reel scannerFunction test size scannerCustomer

Signature

 24

May

19

Friday 08:00 17:00 80

Autoslice zero calibration and power up to test movementCustomer

Signature

 25

May

19

Saturday 08:00 23:00 140

Start up assistance, autoslice slice lip troubleshootingCustomer

Signature

 26

May

19

Sunday 08:00 19:00 110 Start up assistance, mapping autoslice

alignmentCustomerSignature

    TOTAL 57  

Lunch Break 60 minutes/day Normal Working Hour From 08.00 To 16.30

Submitted by Honeywell

Customer Company Stamp(if available)

Certified by Customer

Signature/Date: 26 May 19 Signature/Date:

   

Wendra Kurniawan Name:

Page 4: balibago.orgbalibago.org/Files/16600/Word version/Wattens timeshee…  · Web viewSize press scanner terminationreel scanner head alignment. CustomerSignature 22

DAILY TIME SHEETProject Name Wattens Autoslice and QCS Name Wendra Kurniawan

Project/Job No

14801480 Position Field Service Engineer

DATE DAY

WORKING HOUR WORKING

HOURS

OVERTIME

HOURSACTIVITYFROM TO

 27

May

19

Monday 08:00 17:00 8

0Start up assistanceMD tuning start

CustomerSignature

 28

May

19

Tuesday 08:00 17:00 80

Maintenance trainingMD tuning, check sensorCustomer

Signature

 29

May

19

Wednesday 08:00 17:00 8

0Maintenance training

CustomerSignature

 30

May

19

Thursday 08:00 17:00 80 Maintenance training

Porosity sensor troubleshootingCustomerSignature

 31

May

19

Friday 08:00 17:00 80

Maintenance trainingCustomerSignature

 01

Jun

19

Saturday 08:00 15:00 60

Porosity sensor troubleshootingCustomerSignature

 02

Jun

19

Sunday0

CustomerSignature

    TOTAL 46  

Lunch Break 60 minutes/day Normal Working Hour From 08.00 To 16.30

Submitted by Honeywell

Customer Company Stamp(if available)

Certified by Customer

Signature/Date: 02 Jun 19 Signature/Date:

   

Wendra Kurniawan Name:

Page 5: balibago.orgbalibago.org/Files/16600/Word version/Wattens timeshee…  · Web viewSize press scanner terminationreel scanner head alignment. CustomerSignature 22

DAILY TIME SHEETProject Name Wattens Autoslice and QCS Name Wendra Kurniawan

Project/Job No

14801480 Position Field Service Engineer

DATE DAY

WORKING HOUR WORKING

HOURS

OVERTIME

HOURSACTIVITYFROM TO

 03

Jun

19

Monday 08:00 17:00 8

0

MD tuningCustomerSignature

 04

Jun

19

Tuesday 08:00 17:00 80

Single point verification procedure trainingCustomer

Signature

 05

Jun

19

Wednesday Travelling back to Indonesia

CustomerSignature

CustomerSignature

    TOTAL 16  

Lunch Break 60 minutes/day Normal Working Hour From 08.00 To 16.30

Submitted by Honeywell

Customer Company Stamp(if available)

Certified by Customer

Signature/Date: 05 Jun 19 Signature/Date:

   

Wendra Kurniawan Name:

Page 6: balibago.orgbalibago.org/Files/16600/Word version/Wattens timeshee…  · Web viewSize press scanner terminationreel scanner head alignment. CustomerSignature 22
Page 7: balibago.orgbalibago.org/Files/16600/Word version/Wattens timeshee…  · Web viewSize press scanner terminationreel scanner head alignment. CustomerSignature 22

AttachmentPasport detail

Floor test 22 April – 27 April 2019

Page 8: balibago.orgbalibago.org/Files/16600/Word version/Wattens timeshee…  · Web viewSize press scanner terminationreel scanner head alignment. CustomerSignature 22

Shutdown and start-up assistance13 May 2019 – 05 Jun 2019