vani water supply project
TRANSCRIPT
![Page 1: Vani Water Supply Project](https://reader034.vdocuments.us/reader034/viewer/2022042522/55cb1e43bb61eb5f498b4614/html5/thumbnails/1.jpg)
![Page 2: Vani Water Supply Project](https://reader034.vdocuments.us/reader034/viewer/2022042522/55cb1e43bb61eb5f498b4614/html5/thumbnails/2.jpg)
Rehabilitation of Vani Water Supply System (EIB/WIMP/W/ICB/12-L2) Installation of Distribution Network, 1,720m of PE100 Pipe (OD110, OD90 & OD63), 467nr House
Connections and associated 3,341m of PE100 Pipe (OD63 & OD25).
Installation of SCADA System including 2nr Ultrasonic Flow Meters, 2nr Residual Chlorine Monitoring Devices, 3nr Actuated Valves, 1nr Pressure Reducing Valve & Pump Control.
Contract Value 320,000GEL (€135,000), FIDIC Red Book MDB 2006
Commencement Date – 23rd April 2012 Completion Date – 10th November 2012
![Page 3: Vani Water Supply Project](https://reader034.vdocuments.us/reader034/viewer/2022042522/55cb1e43bb61eb5f498b4614/html5/thumbnails/3.jpg)
3,341M OF PE100 PIPE (OD63 & OD25) 1,720M OF PE100 PIPE (OD110, OD90 & OD63)
![Page 4: Vani Water Supply Project](https://reader034.vdocuments.us/reader034/viewer/2022042522/55cb1e43bb61eb5f498b4614/html5/thumbnails/4.jpg)
PVC WATER METER BOXES WATER METER BOX FITTINGS (1ST VALVE, FILTER, WATER METER, CONNECTION FITTINGS)
![Page 5: Vani Water Supply Project](https://reader034.vdocuments.us/reader034/viewer/2022042522/55cb1e43bb61eb5f498b4614/html5/thumbnails/5.jpg)
CROSSING THE BRIDGE (26TH MAY STREET, PE100, PN10, DN110, L=380M)
CROSSING THE MAGISTERIAL ROAD (TAMAR MEPE STREET PE100, PN10, DN90)
![Page 6: Vani Water Supply Project](https://reader034.vdocuments.us/reader034/viewer/2022042522/55cb1e43bb61eb5f498b4614/html5/thumbnails/6.jpg)
SECONDARY PIPELINE (TAMAR MEPE STREET PE100, PN10, DN63)
PE EF PIPE SADDLE FOR HOUSE CONNECTION SERVICE LINE
![Page 7: Vani Water Supply Project](https://reader034.vdocuments.us/reader034/viewer/2022042522/55cb1e43bb61eb5f498b4614/html5/thumbnails/7.jpg)
HOUSE CONNECTIONS TRENCH EXCAVATION PE EF PIPE SADDLE FOR HOUSE CONNECTION SERVICE LINE
![Page 8: Vani Water Supply Project](https://reader034.vdocuments.us/reader034/viewer/2022042522/55cb1e43bb61eb5f498b4614/html5/thumbnails/8.jpg)
HOUSE CONNECTIONS BACKFILLING PLATE LOAD TEST ON CROSSINGS OF MAGISTERIAL ROAD
![Page 9: Vani Water Supply Project](https://reader034.vdocuments.us/reader034/viewer/2022042522/55cb1e43bb61eb5f498b4614/html5/thumbnails/9.jpg)
PRESSURE TESTING AS PER “SNIP” CONSTRUCTION NORMS AND REGULATIONS 3.05.04-85
WATER METER BOX
![Page 10: Vani Water Supply Project](https://reader034.vdocuments.us/reader034/viewer/2022042522/55cb1e43bb61eb5f498b4614/html5/thumbnails/10.jpg)
![Page 11: Vani Water Supply Project](https://reader034.vdocuments.us/reader034/viewer/2022042522/55cb1e43bb61eb5f498b4614/html5/thumbnails/11.jpg)
2,000m3 Reservoir SCADA Works
Reservoir Inlet Ultrasonic Flow Meter Shaft
![Page 12: Vani Water Supply Project](https://reader034.vdocuments.us/reader034/viewer/2022042522/55cb1e43bb61eb5f498b4614/html5/thumbnails/12.jpg)
ULTRASONIC FLOW METER ULTRASONIC SENSOR-PROBES
![Page 13: Vani Water Supply Project](https://reader034.vdocuments.us/reader034/viewer/2022042522/55cb1e43bb61eb5f498b4614/html5/thumbnails/13.jpg)
2,000m3 Reservoir SCADA Works
2,000m3 Reservoir - Ultrasonic Water Level Meter
![Page 14: Vani Water Supply Project](https://reader034.vdocuments.us/reader034/viewer/2022042522/55cb1e43bb61eb5f498b4614/html5/thumbnails/14.jpg)
RESERVOIR ULTRASONIC WATER LEVEL METER
![Page 15: Vani Water Supply Project](https://reader034.vdocuments.us/reader034/viewer/2022042522/55cb1e43bb61eb5f498b4614/html5/thumbnails/15.jpg)
RESERVOIR OUTLET – AUTOMATIC VALVE SHAFT
![Page 16: Vani Water Supply Project](https://reader034.vdocuments.us/reader034/viewer/2022042522/55cb1e43bb61eb5f498b4614/html5/thumbnails/16.jpg)
RESERVOIR OUTLET – ULTRASONIC FLOW METER SHAFT
![Page 17: Vani Water Supply Project](https://reader034.vdocuments.us/reader034/viewer/2022042522/55cb1e43bb61eb5f498b4614/html5/thumbnails/17.jpg)
RESERVOIR OUTLET – SCADA “ROOM” ACTUATING VALVE CONTROL CABINET; RESIDUAL CHLORINE MONITORING DEVICE; ULTRASONIC FLOW METER
![Page 18: Vani Water Supply Project](https://reader034.vdocuments.us/reader034/viewer/2022042522/55cb1e43bb61eb5f498b4614/html5/thumbnails/18.jpg)
SCADA “ROOM” SCADA “ROOM” RESIDUAL CHLORINE MONITORING DEVICE
![Page 19: Vani Water Supply Project](https://reader034.vdocuments.us/reader034/viewer/2022042522/55cb1e43bb61eb5f498b4614/html5/thumbnails/19.jpg)
SCADA “ROOM” RESIDUAL CHLORINE PROBE
![Page 20: Vani Water Supply Project](https://reader034.vdocuments.us/reader034/viewer/2022042522/55cb1e43bb61eb5f498b4614/html5/thumbnails/20.jpg)
SCADA “ROOM” ACTUATING VALVE CONTROL PANEL
![Page 21: Vani Water Supply Project](https://reader034.vdocuments.us/reader034/viewer/2022042522/55cb1e43bb61eb5f498b4614/html5/thumbnails/21.jpg)
PRESSURE REGULATING VALVE & FILTER SHAFTS
![Page 22: Vani Water Supply Project](https://reader034.vdocuments.us/reader034/viewer/2022042522/55cb1e43bb61eb5f498b4614/html5/thumbnails/22.jpg)
PRESSURE REGULATING VALVE & FILTER SHAFTS
![Page 23: Vani Water Supply Project](https://reader034.vdocuments.us/reader034/viewer/2022042522/55cb1e43bb61eb5f498b4614/html5/thumbnails/23.jpg)
PRESSURE REGULATING VALVE “CSA XLC 410” DN200, PN25 (16)
![Page 24: Vani Water Supply Project](https://reader034.vdocuments.us/reader034/viewer/2022042522/55cb1e43bb61eb5f498b4614/html5/thumbnails/24.jpg)
“FABER” STRAINER DN200, PN16
![Page 25: Vani Water Supply Project](https://reader034.vdocuments.us/reader034/viewer/2022042522/55cb1e43bb61eb5f498b4614/html5/thumbnails/25.jpg)
Pump Station SCADA Works
Feeder Tank Water Level Meter
![Page 26: Vani Water Supply Project](https://reader034.vdocuments.us/reader034/viewer/2022042522/55cb1e43bb61eb5f498b4614/html5/thumbnails/26.jpg)
FEEDER TANK ULTRASONIC WATER LEVEL METER
![Page 27: Vani Water Supply Project](https://reader034.vdocuments.us/reader034/viewer/2022042522/55cb1e43bb61eb5f498b4614/html5/thumbnails/27.jpg)
INSTALLATION OF ACTUATORS WITH BUTTERFLY VALVES DN200, PN10-16 ON EXISTING PRESSURE PIPES SYSTEM
![Page 28: Vani Water Supply Project](https://reader034.vdocuments.us/reader034/viewer/2022042522/55cb1e43bb61eb5f498b4614/html5/thumbnails/28.jpg)
INSTALLATION OF ACTUATORS WITH BUTTERFLY VALVES DN200, PN10-16 ON EXISTING PRESSURE PIPES SYSTEM
![Page 29: Vani Water Supply Project](https://reader034.vdocuments.us/reader034/viewer/2022042522/55cb1e43bb61eb5f498b4614/html5/thumbnails/29.jpg)
ACTUATING VALVES CONTROL CABINETS
![Page 30: Vani Water Supply Project](https://reader034.vdocuments.us/reader034/viewer/2022042522/55cb1e43bb61eb5f498b4614/html5/thumbnails/30.jpg)
RESIDUAL CHLORINE ANALYSER
![Page 31: Vani Water Supply Project](https://reader034.vdocuments.us/reader034/viewer/2022042522/55cb1e43bb61eb5f498b4614/html5/thumbnails/31.jpg)
RESIDUAL CHLORINE ANALYSER SYSTEM
![Page 32: Vani Water Supply Project](https://reader034.vdocuments.us/reader034/viewer/2022042522/55cb1e43bb61eb5f498b4614/html5/thumbnails/32.jpg)
SCADA CONTROL ROOM
![Page 33: Vani Water Supply Project](https://reader034.vdocuments.us/reader034/viewer/2022042522/55cb1e43bb61eb5f498b4614/html5/thumbnails/33.jpg)
SCADA CONTROL PANEL AUTOMATIC PUMP WORK REGULATION BASED ON 2,000M3 RESERVOIR WATER LEVEL (LOW/HIGH)
![Page 34: Vani Water Supply Project](https://reader034.vdocuments.us/reader034/viewer/2022042522/55cb1e43bb61eb5f498b4614/html5/thumbnails/34.jpg)