validation audit workflow rev3 may 26 2011

Upload: sanchitdalvi

Post on 07-Jul-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/18/2019 Validation Audit Workflow Rev3 May 26 2011

    1/2

    VAPMOcreates and maintains

    VA Schedule

    VAPMO Arranges potential

    observers.

     AB

    notifies Org < 45 days or

    > 30 days of VA (two week

    window to schedule VA)*

    Will the AB be observed?

     AB collects Org’s Pre-

     Audit Info Pkg from CB to

    verify site suitability

    Has AB been observed?

    VAPMO forwards VA

    Schedule to AB

    Is site suitable for VA?

     AB confirms with VAPMO

    site suitability

     AB contacts VAPMO to obtain

    QFO information and

    obtains Org approval ofQF Observer 

    Yes

    Yes

    VAPMO selects next

    sample on list andforwards to AB

    No

    Validation Audit Process Workflow

    Page 1 of 2 Date: May 26, 2011 Rev 3

     AB = Accreditation Body

    CB = Certification Body

    VAPMO = Validation Audit Project Management Office

    Org = TL 9000 Certified Organization

    QF Observer = QF TL 9000 Subject Matter Expert

    Is a VA date confirmed?

    (Refer to exclusion critiera)

     AB

    Notifies VAPMO

    Yes

    No

    Yes

    No

    Does Org approve QF Observer?

    VAPMO

    arranges QF observer.

    Yes

     AB

    Conducts VA with no

    QF Observer 

    No

     AB

    conducts VA withQF Observer.

     A

    *NOTE: Where international

    flight arrangements are required,

    a 60-day notification is permitted

    to allow for scheduling.

     

  • 8/18/2019 Validation Audit Workflow Rev3 May 26 2011

    2/2