v3s infratech limited group we are one of the most reputed & well established infrastructure...

37
WELCOME

Upload: aileen-floyd

Post on 17-Dec-2015

222 views

Category:

Documents


0 download

TRANSCRIPT

  • Slide 1
  • Slide 2
  • V3S INFRATECH LIMITED GROUP
  • Slide 3
  • We are one of the most reputed & well established infrastructure developers & contractors with its brand name Provide the entire range of services involved in conceptualization, design, construction & commissioning of any nature of Infrastructure development work Client conscious approach All solutions under single roof
  • Slide 4
  • Areas of Activity Malls Commercial complexes Hospitals Hotels Residential complexes IT parks Mall management
  • Slide 5
  • TurnoverTurnover for the year (2008-09) has been Rs 1350 millions for the year (2009-2010) is Rs 2000 millions ProjectedProjected turnover for the year (2010-2011) is Rs 2500 millions COMPANY TURNOVER
  • Slide 6
  • Our Motto Quality, Timely completion and Client SatisfactionOur Motto Quality, Timely completion and Client Satisfaction Specialize in Buildings with Intricate Architectural Design and High Quality FinishSpecialize in Buildings with Intricate Architectural Design and High Quality Finish Dedicated & experienced Team of Staff in various disciplines of constructionDedicated & experienced Team of Staff in various disciplines of construction Providing Turnkey Solutions Through Single WindowProviding Turnkey Solutions Through Single Window
  • Slide 7
  • In House Services Civil :Design & Execution Electrical :Design & Execution Plumbing & Fire Fighting :Design & Execution HVAC :Design & Execution
  • Slide 8
  • Presence in India Kolkata Ambala Faridabad
  • Slide 9
  • Slide 10
  • V3S Mall at Plot No 10 Laxmi Nagar Covered Area : 1,50,000 sq ft Covered Area : 1,50,000 sq ft No. of Floors : 2 basements +Ground+ 3 floors No. of Floors : 2 basements +Ground+ 3 floors Project Highlights Project Highlights Projected Completion : Aug06 Duration : 12 months
  • Slide 11
  • Covered Area : 5,20,000 sq ft Covered Area : 5,20,000 sq ft No. of Floors : 2 basements +Ground+ 3 floors No. of Floors : 2 basements +Ground+ 3 floors Completed in : Aug 07 Duration : 12 months Duration : 12 months
  • Slide 12
  • Project Highlights Covered Area : 2,58,000 sq ft Covered Area : 2,58,000 sq ft Completed in : Jan 10 Completed in : Jan 10 Duration : 12 Months Duration : 12 Months
  • Slide 13
  • Project Highlights Covered Area : 1,65,000 sq ft Covered Area : 1,65,000 sq ft No. of Bed : 200 Bed No. of Bed : 200 Bed Fully Air -Conditioned Fully Air -Conditioned Projected Completion : Jul 2010 Projected Completion : Jul 2010 Duration : 24 months Duration : 24 months
  • Slide 14
  • Slide 15
  • Covered Area : 1,50,000 sq ft Covered Area : 1,50,000 sq ft No. of Flats : 150 flats No. of Flats : 150 flats Project Highlights Artists impression
  • Slide 16
  • InfoTech Park at MIDC Adheri Covered Area : 1,00,000 sq ft Covered Area : 1,00,000 sq ft No. of Floors : 1 basement +Ground+ 6 floors No. of Floors : 1 basement +Ground+ 6 floors Project Highlights Artists impression
  • Slide 17
  • Sl. No. Project detailsLocationDuration 1Housing complex for D.D.A composite job Delhi24 months 2HUDA EWS, GurgaonGurgaon18 months 3HUDA EWS, FaridabadFaridabad18 months Other Government Jobs under Execution
  • Slide 18
  • 4NHPC, FARIDABADFaridabad24 months 5HUDA EWS, AmbalaAmbala18 months 6IFCI Hotel, DelhiDelhi12 months 7ESIC, KolkataKolkata18 months 8NDMCNew Delhi12 months
  • Slide 19
  • OUR STRENGTH Resources Resources -Manpower -Plant & Machinery Speedy Construction Speedy Construction Quality Quality
  • Slide 20
  • Strongly backed by Technical Staff with extensive experience in the Construction Industry Strongly backed by Technical Staff with extensive experience in the Construction Industry 150 qualified and dedicated Engineers 150 qualified and dedicated Engineers Total Staff of 450 People on Regular Payroll Total Staff of 450 People on Regular Payroll 3500 regular Work Force 3500 regular Work Force
  • Slide 21
  • Batching Plant ( 30 Cum/hr)- 8 nos Concrete pump ( 30cum/hr)- 8 nos Tower Cranes- 5 nos ExcavatorMini Excavator- 4 nos Pick & Carry Hydra- 4 nos Formwork Material- 1000 MT Diesel generator- 62.5 KVA-12 nos, 125 KVA-10 nos, 250 KVA-1 no
  • Slide 22
  • FINANCIAL PARAMETERS
  • Slide 23
  • Slide 24
  • SAFETY
  • Slide 25
  • Safety is a critical component of Quality. We believe safety is essential to the completion of a quality project Safety is our top priority. We have no tolerance for any practice that does not promote safety at work. We have worked hard at developing a safety culture.
  • Slide 26
  • Our goal is tough: we want to eliminate all accidents from project site workplaces. Our positive approach to safety has enabled us to grow. Our commitment to safety is an important part of our vision.
  • Slide 27
  • SAFETY MANAGEMENT We consider safety as no accident. We constantly work at it with hands-on training. Proactive safety management keeps our job site injury-free. Safety Record Thanks to the efforts of our safety conscious employees, we hold the best safety records.
  • Slide 28
  • Management Commitment to Safety We are committed to maintaining a safe and healthful working environment. We pledge our best efforts to work together safely to achieve this goal. We regularly communicate our goal to all employees.
  • Slide 29
  • Our Program Our Safety Program includes: Employee Orientation Project Safety Plan Emergency and Communication Plan Safety Inspections Safety Committee Meetings
  • Slide 30
  • Safety Philosophy All injuries can be prevented. Management and every individual is responsible for preventing injuries. Working safely is a condition of employment. All operating exposures can be safeguarded. Training employees to work safely is essential. Prevention of personal injuries is good business. Safety Department We have qualified, experienced, committed and result focused safety engineers.
  • Slide 31
  • QUALITY ASSURANCE
  • Slide 32
  • Quality assurance system may be visualized as a series of inter-related controls which are exercised to achieve the desired Quality Objectives.They are:- Quality assurance system may be visualized as a series of inter-related controls which are exercised to achieve the desired Quality Objectives.They are:- 1.PROCESS CONTROL- Drawing & Technical Specification, Construction Methodology,Quality Assurance Plan,Resource based planning etc. 1.PROCESS CONTROL- Drawing & Technical Specification, Construction Methodology,Quality Assurance Plan,Resource based planning etc. 2.PROCUREMENT CONTROL- Vendor evaluation & Registration, Specification for Work order,Qualification of Procured items. 2.PROCUREMENT CONTROL- Vendor evaluation & Registration, Specification for Work order,Qualification of Procured items. 3.MATERIALS CONTROL- Material receipt, QA/QC verification,Storage,Non conforming material segregation storage,Issue of materials,Stores Register. 3.MATERIALS CONTROL- Material receipt, QA/QC verification,Storage,Non conforming material segregation storage,Issue of materials,Stores Register. 4.INSPECTION & TEST CONTROL- Quality Assurance Plan,Calibration of measuring Equipments,Inspection Records,Statistical Analysis. 4.INSPECTION & TEST CONTROL- Quality Assurance Plan,Calibration of measuring Equipments,Inspection Records,Statistical Analysis. 5.NON-CONFORMANCE CONTROL- Preventive & Corrective Action. 5.NON-CONFORMANCE CONTROL- Preventive & Corrective Action. 6.DESIGN CONTROL- Basic Design,Process Design 6.DESIGN CONTROL- Basic Design,Process Design 7.DOCUMENT CONTROL- Controlled copy,Distribution,Old copy Disposition. 7.DOCUMENT CONTROL- Controlled copy,Distribution,Old copy Disposition. 8.RECORD CONTROL- Document identification,Storage,Retrieval, Maintenance,Permanent & Temporary records. 8.RECORD CONTROL- Document identification,Storage,Retrieval, Maintenance,Permanent & Temporary records. 9.TRAINING CONTROL- In-House Training,Institutional Training. 9.TRAINING CONTROL- In-House Training,Institutional Training. 10.QUALITY SYSTEM AUDIT- Audit by Internal Quality Auditors 10.QUALITY SYSTEM AUDIT- Audit by Internal Quality Auditors
  • Slide 33
  • QUALITY Having ISO 9001:2008, ISO 14001:2004 & OHSAS 18001:2007 (EMS) certification together Having ISO 9001:2008, ISO 14001:2004 & OHSAS 18001:2007 (EMS) certification together As a part of Quality Management System, strict Quality Control at all our Projects for incoming materials as well as processes As a part of Quality Management System, strict Quality Control at all our Projects for incoming materials as well as processes Control of Monitoring and Measuring Devices and their timely calibration Control of Monitoring and Measuring Devices and their timely calibration
  • Slide 34
  • Slide 35
  • Slide 36
  • Slide 37
  • Thank you !!!