uzbek-korean business forum

19
Current environment and Current environment and perspectives of cooperation in perspectives of cooperation in energy sector of the energy sector of the Republic of Uzbekistan Republic of Uzbekistan Mr. Shavkat Majitov Mr. Shavkat Majitov First Deputy Chairman, First Deputy Chairman, National Holding Company “UZBEKNEFTEGAZ” National Holding Company “UZBEKNEFTEGAZ” Uzbek-Korean Business Forum 8 th of May 2007, Tashkent, Uzbekistan

Upload: yori

Post on 19-Jan-2016

68 views

Category:

Documents


0 download

DESCRIPTION

Uzbek-Korean Business Forum. 8 th of May 2007, Tashkent, Uzbekistan. Current environment and perspectives of cooperation in energy sector of the Republic of Uzbekistan Mr. Shavkat Majitov First Deputy Chairman, National Holding Company “UZBEKNEFTEGAZ”. HISTORICAL DATES. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Uzbek-Korean Business Forum

Current environment and Current environment and perspectives of cooperation perspectives of cooperation in energy sector of in energy sector of

the Republic of the Republic of UzbekistanUzbekistan

Mr. Shavkat MajitovMr. Shavkat Majitov

First Deputy Chairman,First Deputy Chairman,National Holding Company “UZBEKNEFTEGAZ”National Holding Company “UZBEKNEFTEGAZ”

Uzbek-Korean Business Forum

8th of May 2007, Tashkent, Uzbekistan

Page 2: Uzbek-Korean Business Forum

2

HISTORICAL DATES

Page 3: Uzbek-Korean Business Forum

UZBEKNEFTEGAZ UZBEKNEFTEGAZ National Holding CompanyNational Holding Company

Page 4: Uzbek-Korean Business Forum

4

OIL & GAS PRODUCTION

TODAY THE LEVEL OF HYDROCARBON PRODUCTION IS 33% HIGHER THAN THE REACHED ONE IN 1991

52,9

54,5

57,9

61,2

67,4 67,668,7

69,770,0 69,8 70,6

69,4

70,671,3

71,372,1

52

57

62

67

72

77

mln

. ton

s of oi

l equ

ival

ent

1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006

1991 is the base year

Page 5: Uzbek-Korean Business Forum

5

Exploration & Development

193 hydrocarbon fields have been discovered in the Republic of Uzbekistan. 93 fields are under the development. 67 are prepared for development. On the other 33 field exploration works are being done

Page 6: Uzbek-Korean Business Forum

6

FERGHANA REFINERY (1958) rehabilitated in 2000

Refinery & Processing of Refinery & Processing of Oil&GasOil&Gas

BUKHARA REFINERY (1997)

MUBAREK GAS PROCESSING PLANT (1971)

SHURTAN GAS PROCESSING PLANT (1980)

SHURTAN GAS CHEMICAL COMPLEX (2001)

Page 7: Uzbek-Korean Business Forum

7

Gas Transportation Gas Transportation SystemSystem

TOTAL LENGTH OF THE MAIN PIPELINES

MORE THAN 13 000 km

QUANTITY OF COMPRESSORS

MORE THAN 250

Page 8: Uzbek-Korean Business Forum

8

Gas Transportation Gas Transportation SystemSystem

Page 9: Uzbek-Korean Business Forum

9

Legislation on Legislation on InvestmentsInvestments

The Subsoil LawThe Subsoil Law

The Investment Activity LawThe Investment Activity Law

The Production Sharing Agreements LawThe Production Sharing Agreements Law

The Law on Guarantees and Measures on The Law on Guarantees and Measures on Protection of Foreign InvestorsProtection of Foreign Investors

The Foreign Investments LawThe Foreign Investments Law

Page 10: Uzbek-Korean Business Forum

10

LOCATION OF

INVESTMENT BLOCKS IN THE TERRITORY OF THE

REPUBLIC OF UZBEKISTAN

Page 11: Uzbek-Korean Business Forum

11

NEW PROJECTS (2005-2007)

I

IIIIIIVV

I

II

III

IV

V

Usturt

Buhara-Khiva

SurkhandaryaV Ferghana

Tashkent

SamarkandBukhara

Gazli

Termez

Urganch

Nukus

Ferghana

AndijanNamangan

III South-West Gissar

PSA between Republic of Uzbekistan and UNG, LUKOIL Overseas, PETRONAS Carigali, CNPC International, KNOC for exploration Uzbek part of Aral Sea

Joint Study of UNG and PETRONAS

UNG & CNPC signed an exploration contract for 4 investment blocks

New Gas Chemical Complex

Oil Tech E&P Singapore

development project

Page 12: Uzbek-Korean Business Forum

12

NAMAGAN-TERGACHI & CHUST-PAP PROJECT

1. Location: Namangan region

2. Total area: Chust-Pap – 2000 sq.km; Namangan-Tergachi – 2800 sq.km

3. Minimum Work Program: Chust-Pap: – 1500 km 2D seismic – drilling of 2 wells Namangan-Tergachi: – 1000 km 2D seismic – drilling of 3 wells

4. Estimated investments: Chust-Pap – $ 25 M ; Namangan-Tergachi – $ 25 M

Page 13: Uzbek-Korean Business Forum

13

UZUNKUI-TUARKYR PROJECT

1. Location: Ustyurt region

2. Total area: 9300 sq.km

3. Minimum Work Program: - 3840 km 2D seismic - drilling of 6 wells 4. Estimated investments: $ 62.4 M

Page 14: Uzbek-Korean Business Forum

14

DENGIZKUL COMPRESSOR STATION PROJECT

UNG-KDB Cooperation

PAMUK COMPRESSOR STATION PROJECT

CO-FINACING OF 2 PROJECTS

$30 M

OTHER LENDERS:1. Fund of Reconstruction & Development of

Uzbekistan2. Uzpromsrtoyban

k

Page 15: Uzbek-Korean Business Forum

15

SURGIL PROJECT

1. Location: Karakalpakstan Muynak region

2. Objectives: - Development of Surgil Field - Construction of Ustyurt Gas Chemical Complex PE = 362.000 tons/year

PP = 83.000 tons/year

3. Estimated Investments: ~ $ 1.5 Billion

Page 16: Uzbek-Korean Business Forum

16

Business OpportunitiesBusiness Opportunities

Creating Joint Ventures in Creating Joint Ventures in different areas of oil & gas different areas of oil & gas businessbusiness

Loans and InsuranceLoans and Insurance Alternative sources of energy Alternative sources of energy

(e.g. biomass, biofuel, GTL) (e.g. biomass, biofuel, GTL) Energy Conservation Energy Conservation

Page 17: Uzbek-Korean Business Forum

17

OIL&GAS of UzbekistanOIL&GAS of Uzbekistan

OGU - Uzbekistan International Oil & Gas Exhibition & Conference

15-17 May 2007, Tashkent, Uzbekistan

OGU - 2007

Page 18: Uzbek-Korean Business Forum

18

“UZBEKNEFTEGAZ” National Holding Company

21, Akhunbabaeva str., Tashkent, 700047Republic of Uzbekistan

tel:(+ 99871) 133 57 57(+ 99871) 136 02 10

fax:(+ 99871) 136 77 71

http:www.uzneftegaz.uz

Page 19: Uzbek-Korean Business Forum

19

Thank you for your Thank you for your attention!attention!