usg logix™ integrated systems (english) - is268 · pdf fileyoke the usg logix yoke is an...

205
USG Ceiling Solutions LOGIX Integrated Ceiling Systems SYSTEMS GUIDE

Upload: ngodang

Post on 19-Mar-2018

223 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

USG Ceiling Solutions

LOGIX™

Integrated Ceiling Systems

SYSTEMS GUIDE

Page 2: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension
Page 3: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Logix™ Brand Integrated Ceiling Systems from USG allow you to design ceilings that meet

building requirements without being constrained by the limits of traditional acoustical ceilings.

Logix transforms visual distractions such as lighting, air vents, and other utilities into dramatic

design elements by concentrating these fixtures on narrow channels. This allows for open

ceilings that are uncluttered by ceiling utilities and offer a clean, monolithic, custom look with

standard components.

Logix is compatible with a wide selection of 4 in., 6 in., and 12 in. luminaires and utilities,

as well as 100 mm, 150 mm 300 mm luminaires and utilities.

SYSTEMS GUIDE

Page

Logix Integrated Ceiling Systems Overview

Reflected Ceiling Plan

Definitions

2

Plan Your System Options

Connector Panels

Logix Yoke

12

Design Considerations Layout Options

Drywall Ceilings

Chilled Beams

19

Select Your System 0n-Module Channel Spacing

Off-Module Channel Spacing28

Metric Systems 142

For More Information Technical Service 800 USG.4YOU

Website usg.com

Page 4: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

2 Systems Guide Logix Integrated Ceiling Systems

A wide selection of acoustical and specialty panels as well as corresponding suspension

system profiles are available to enhance and customize your design. Plus, with a wide

selection of Logix partners, you can be assured that ceiling utilities will complement your

design and integrate seamlessly into the ceiling.

LOGIX INTEGRATED CEILING SYSTEMS

Office Space

Overview

Page 5: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

3 Systems Guide Logix Integrated Ceiling Systems

Transform lighting, ventilation, and other utilities from visual distractions to dramatic design

elements by concentrating these fixtures on narrow bands running the length of a ceiling.

Suddenly, the ceiling is neat and orderly, allowing wide-open spaces uninterrupted by

mechanical components.

LOGIX INTEGRATED CEILING SYSTEMS

Lobby

Overview

Page 6: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

4 Systems Guide Logix Integrated Ceiling Systems

Accentuate vertical elements and create a custom look without the custom cost while

using standard products, panels, and components. Positioning channels between main

tees allows you to enliven your design with continuous, uninterrupted, decorative, and

functional channels.

Airport

LOGIX INTEGRATED CEILING SYSTEMS

Overview

Page 7: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

5 Systems Guide Logix Integrated Ceiling Systems

1 Stabilizer bar required if opening ≥ 60!. For more information about stabilizer bars, please refer to Plank and Large Panel Stabilizer Bars — Application Guide, IC592.

LOGIX INTEGRATED CEILING SYSTEMS

Reflected Ceiling Plan

Example Reflected Ceiling Plan (RCP) Layout 1 1 1

2 4 42

6

27 7

2

2

3

5

5

5

8

5

1 Utility Channel

Infill Panel4

Opening for Luminaire, Mechanical Grille, or Other Utility

2

Channel Panel3

Connector Panel

Yoke

Accessible Stabilizer Bar1

Channel-to-Channel Module Unit

Page 8: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

6 Systems Guide Logix Integrated Ceiling Systems

Definitions

Module The module is the measurement basis for coordinating the dimensions of the various suspended ceiling materials and layouts to be designed and constructed.

There are two key module measurements in a Logix ceiling system:

Channel Module The measurement from the centerline of two adjacent utility channels, also referred to as channel-to-channel spacing

Ceiling Module The measurement from the centerline of the suspension system tees installed perpendicular to the utility channels

Module Measurements Channel ModuleCe

iling

Mod

ule

Utilit

y ch

anne

l

Utilit

y ch

anne

l

LOGIX INTEGRATED CEILING SYSTEMS

Page 9: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

7 Systems Guide Logix Integrated Ceiling Systems

Definitions

Utility Channel Utility channels are used to organize the lighting, ventilation, and other utilities in narrow bands that facilitate dramatic design elements that are versatile and functional. These narrow suspended ceiling channels are created by main tees or cross tees. The length of utility channels can vary allowing the freedom of various infill layout options.

Imperial Utility Channels

4 in., 6 in., and 12 in.

Metric Utility Channels

100 mm, 150 mm, and 300 mm

Configurations There are four types of configurations used to design a utility channel.

Continuous utility channels are uninterrupted by tees. This is created by main tees that frame the channel.

Fixed utility channels have intersecting tees.This is created by cross tees that frame the channel

Separated utility channels are non-continuous.

Crosscut utility channels have intersecting channels.

Other Ceiling Mounted Devices

•##Air diffusers

•##Sprinkler systems

•##Lighting fixtures

•##Cameras

•##Fire alarms

•##Smoke detectors

•##Speakers

LOGIX INTEGRATED CEILING SYSTEMS

Page 10: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

8 Systems Guide Logix Integrated Ceiling Systems

Panels A variety of panel options are available to design a Logix ceiling system. There are three types of panels.

Channel Panel Channel panels are narrow acoustical or metal ceiling panels used in utility channels. Channel panels can be installed in a continuous manner creating a monolithic and uninterrupted aesthetic or in conjunction with lighting, ventilation and other utilities.

Infill Panel Infill panels are larger acoustical or metal ceiling panels installed in the space between utility channels.

Connector Panel Connector panels are a unique option for USG Logix ceiling systems. Connector panels visually connect various utilities in a utility channel such as luminaires and channel panels. Connector panels are configured to carry the adjacent panel or fixture. No special fixture types or tile edges are needed. Connector panels are metal and available in perforated and smooth finishes. Imperial and metric sizes are available.

Definitions

LOGIX INTEGRATED CEILING SYSTEMS

Page 11: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

9 Systems Guide Logix Integrated Ceiling Systems

Module Unit A module unit is a representative section of the ceiling system consisting of two utility channels and the adjoining infill panels. Module units can be used to estimate the materials needed to install a ceiling assembly. There are two types of module units.

Off-Module Unit Off-Module units represent assemblies where typical ceiling panel sizes are utilized between the utility channels. With the addition of the utility channel, this creates off-module or nonstandard channel module (channel-to-channel) spacing.

52! Channel Module

On-Module Unit On-Module units represent assemblies where atypical ceiling panel sizes are utilized between the utility channels. With the addition of the utility channel, this creates on-module or a standard channel module (channel-to-channel) spacing.

48! Channel Module

24" 24"4" channel panel 4" channel panel

4in.

cha

nnel

4in.

cha

nnel

52" Channel Module

Typical Infill Panel Size

22" 22"4" channel panel 4" channel panel

4in.

cha

nnel

4in.

cha

nnel

48" Channel Module

Atypical Infill Panel Size

For further module unit options, see page 20.

Definitions

LOGIX INTEGRATED CEILING SYSTEMS

Page 12: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

10 Systems Guide Logix Integrated Ceiling Systems

Suspension Systems There are three types of grid suspension systems used in a Logix system.

Donn® DX®/DXL™ Standard

Centricitee™ DXT™Narrow

Identitee™ DXI™Double Reveal

Main Tee Utility Channel

A utility channel created with main tees that frame that channel. This type of channel is used in a continuous utility channel configuration.

Cross Tee Utility Channel

A utility channel created with cross tees that frame the channel. This type of channel is used in a fixed, separated, or crosscut utility channel configuration.

See layout details on page 19.

Cross Tee

Main Tee

Main Tee

Utility Channel

Cross Tee

Main Tee

Cross Tee

Utility Channel

Main Tee

Main Tee

Cross Tee

Cross Tee

Definitions

LOGIX INTEGRATED CEILING SYSTEMS

Page 13: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

11 Systems Guide Logix Integrated Ceiling Systems

Yoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension of parallel main tees with one hanger wire. The Logix yoke is compatible with both metric and imperial utility channel sizes. The yoke also keeps hanger wire wraps away from linear luminaires and can reduce the number of hanger wires required. The yoke also helps to brace the utility channel.

Accessible Stabilizer Bar The USG Accessible Stabilizer Bar is a suspension system installation accessory used in plank and large panel suspension systems. Specially notched safety bars attach to the main tees and cross tees, which prevents the tee ends from spreading and enhances the rigidity of large ceiling modules.

USG stabilizer bars are available in different sizes and options for various applications. If the panel length is ≥ 60 in., then one stabilizer is required at midpoint. If the panel length is ≥ 96 in., then two stabilizer bars are required at the 1/3 and 2/3 points. These safety bars enhance system performance and safety without limiting accessibility.

See layout details and assemblies on pages 17-18.

Definitions

LOGIX INTEGRATED CEILING SYSTEMS

Page 14: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

12 Systems Guide Logix Integrated Ceiling Systems

1 Utility Channel Configuration Continuous Fixed Separated Crosscut

5 Infill Panel Specification Mars™ Mars™ High-NRC Halcyon™ Panz® Metal

Unperforated

True™ Wood

6 Infill Panel Edge Profile Square FL SL FLB SLT

7 Grid Profile DXI Identitee DXT Centricitee Donn DX

8 Channel Panel Specification Mars Mars High-NRC Halcyon Panz Metal

C116D

9 Channel Panel Edge Profile Square FL SL FLB SLT

2 Utility Channel Width Imperial Metric Custom

4!, 6!, 12! 100 mm, 150 mm, 300 mm Contact your Sales Representative for custom options.3 Channel Module Spacing

(Channel-to-Channel)4" 5" 6" 7" 8"-$6!

4"-$4! 5"-$4! 6"-$6! 7"-$6! 10"-$6!

4"-$6! 5"-$6! 12"

1200 mm 1500 mm1300 mm 1900 mm1350 mm 1950 mm

4 Ceiling Module Dimension 4", 5", 6" ceiling module 1.25 m, 1.5 m, 1.75 m ceiling module

Selector Options

PLAN YOUR SYSTEM

Page 15: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

13 Systems Guide Logix Integrated Ceiling Systems

Imperial 4! Channel 6! Channel

4" 6"

12! Channel

12"

Metric 100 mm Channel 150 mm Channel

100 mm 150 mm

300 mm Channel

300 mm

Utility Channel Options

PLAN YOUR SYSTEM

Page 16: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

14 Systems Guide Logix Integrated Ceiling Systems

Infill Panel Options Halcyon™ Fiberglass Mars™ X-Technology Mineral Fiber

Mars™ High-NRC X-Technology Mineral Fiber

Panz® Unperforated Metal Aluminum

Panz® Wood ToneMetal

True™ WoodNatural Wood Veneers

Unperforated

Channel Panel Options Halcyon™ Fiberglass Mars™ X-Technology Mineral Fiber

Mars™ High-NRC X-Technology Mineral Fiber

Panz® Unperforated Metal Aluminum

Panz® Perforated, C116 Aluminum

Panz® Perforated, C116D Aluminum

Panz® Wood ToneMetal

Unperforated C116 C116D

The panel options listed below correspond to our standard fixed ceiling modules. However, virtually all standard ceiling panels are possible with a continuous utility channel system. Contact your sales representative for more information.

Panel Options

PLAN YOUR SYSTEM

Page 17: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

15 Systems Guide Logix Integrated Ceiling Systems

Maximum 2"x$$2" SQ Edge panels with DXT.

Panel Edge Options

FL FLB SL SLT SQ

Suspension Systems

Centricitee™ DXT™

DXT Grid – FL Panel DXT Grid – FLB Panel DXT Grid – SQ Panel PanZ® Metal

DXT Grid – FL PanzTrue™ Wood

DXT Grid – FL True PanelIdentitee™ DXI™

DXI Grid – FL Panel DXI Grid – FLB PanelPanz Metal

DXI Grid – FL PanzDonn® DX®/DXL™

DX Grid – SL Panel DX Grid – SLT Panel DX Grid – SQ Panel True™ Wood

DX Grid – SL True Panel

Suspension System Options

PLAN YOUR SYSTEM

Page 18: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

16 Systems Guide Logix Integrated Ceiling Systems

The Logix connector panel is a unique way to visually connect various utilities such as luminaires and channel panels. The connector panels are configured to carry the adjacent panel or fixture. No special fixture types or tile edges are needed.

Options Finish Smooth, Unperforated Perforated, C116 Perforated, C116D

Unperforated

C116 C116D

Color Flat White Painted

Edge Profile Reveal Edge Flush Mount

4! Channel 6! Channel

Imperial 4! x 12! 4! x 24! 6! x 12! 6! x 24!

100 mm Channel 150 mm Channel

Metric 100 mm x 300 mm 100 mm x 600 mm 1500 mm x 300mm 1500 mm x 600 mm

Connector Panels

PLAN YOUR SYSTEM

Page 19: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

17 Systems Guide Logix Integrated Ceiling Systems

YokeImperial

4! Channel 6! Channel 12! Channel

8 1/8"

fastener placement(2 required)

4 25/32"

8 1/8"

fastener placement(2 required)

6 25/32" 12 25/32"

fastener placement(4 required)

cut main tee to be used as a bridge to lengthen yoke

8 1/8"

hanger wires (2 required)

YokeMetric

100 mm Channel 150 mm Channel 300 mm Channel

120.40 mm

fastener placement(2 required)

206.38 mm

170.18 mm

206.38 mm

fastener placement(2 required)

206.38 mm

fastener placement(4 required)

cut main tee to be used as a bridge to lengthen yoke

hanger wires (2 required)

320.18 mm

The Logix yoke is compatible with both metric and imperial utility channel sizes. The yoke keeps hanger wire wraps away from linear luminaires and may reduce the number of hanger wires required. The yoke also helps to brace the utility channel. The yoke is easy to install and is seismic tested.

Note: The USG yoke provides connections that exceed the 180 lb. requirement for Seismic Design Categories D-F.

Logix Yoke

PLAN YOUR SYSTEM

Page 20: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

18 Systems Guide Logix Integrated Ceiling Systems

Yoke with Connector Panel The Logix yoke is compatible with all utility channel options and applications. The connector panel shown is one of many options allowing the freedom to transform the utilities into dramatic design elements.

The connector panel is secured to the adjacent main tees by folding tabs; the folding tabs should be folded inwards to insure ceiling section alignment.

hanger wire

cross tee

main tee

4" or 6" connector panel

4" or 6" adjustable yoke

secure tab with 1/8" pop-rivet

Yoke with Recessed Linear Luminaires

Logix is compatible with a wide selection of 4!, 6!, and 12! luminaires including Lumination™ LED Luminaires by GE Lighting Solutions. For more information visit: www.gelightingsolutions.com.

hanger wire

cross tee

main tee

lighting fixture

4" or 6" adjustable yoke

Yoke Assemblies

PLAN YOUR SYSTEM

Page 21: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

19 Systems Guide Logix Integrated Ceiling Systems

Utility Channel Created with Main Tees

Utility Channel Created with Cross Tees

lighting fixture

hanger wire

main tee

cross tees

If opening is ≥ 60", then one stabilizer bar is required at midpoint.

If opening is ≥ 96", then two stabilizer bars are required at 1/3 and 2/3 points.

utility panel

cross tee

nom. 4" to 12" channel width accommodates continuous fixtures

variable channel width

yoke

connector panel

main tees

variable length fixtures

lighting fixturefield panel

main tee

hanger wire

If opening is ≥ 60", then one stabilizer bar is required at midpoint.

If opening is ≥ 96", then two stabilizer bars are required at 1/3 and 2/3 points.

yoke or two vertical hanger wires

Layout Options

DESIGN CONSIDERATIONS

Page 22: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

20 Systems Guide Logix Integrated Ceiling Systems

22"4" 4"22"

48" Channel Module

Ceili

ng M

odul

e

Utili

ty C

hann

el

Utili

ty C

hann

el

24"4" 4"24"

52" Channel Module Off-Module On-Module

48" (4'-0")60" (5'-0") 72" (6'-0") 144" (12'-0")

52" (4'-4")54" (4'-6")64" (5'-4")66" (5'-6")78" (6'-6")90" (7'-6")100" (8'-4")102" (8'-6")126" (10'-6") Ce

iling

Mod

ule

Utili

ty C

hann

el

Utili

ty C

hann

el

Module Unit Module Unit

Off-Module UnitsOff-Module units represent assemblies where typical ceiling panel sizes are utilized between the utility channels. With the addition of the utility channel, this creates off-module or nonstandard channel-to-channel spacing.

On-Module UnitsOn-Module units represent assemblies where atypical ceiling panel sizes are utilized between the utility channels. With the addition of the utility channel, this creates on-module or standard channel-to-channel spacing.

Ceiling Modules

DESIGN CONSIDERATIONS

Page 23: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

21 Systems Guide Logix Integrated Ceiling Systems

Other ceiling mounted devices not shown such as: • Cameras• Fire Alarms• Smoke Detectors• Speakers, etc.

sprinkler

fixture attachment

4", 6" or 12"

4", 6" or 12"

4", 6" or 12"

Air Diffuser

Utility Applications

Sprinkler System

Lighting Fixture

Channel Panel Options • Perforated Metal• Unperforated Metal• Halcyon™

• Mars™ • Mars™ High-NRC

Utility Channel Example Layouts

Numerous mechanical configurations in the utility channel are possible. Coordination of light fixtures, mechanical grilles, channel panels, and infill panels can vary based on function, code requirements, and architectural design intent. Contact your sales representative for more information.

Utility Channel Options

DESIGN CONSIDERATIONS

Page 24: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

22 Systems Guide Logix Integrated Ceiling Systems

Virtually all suspended ceiling systems are possible with a continuous utility channel system. Nearly all suspended ceiling systems can be installed between continuous utility channels. Contact your sales representative for more information.

Standard 2" x 2" Ceiling Layout Standard 2" x 4" Ceiling LayoutStandard 2'x2' Ceiling Layoutwith a continuous utility channel

continuousutility channel

standard 2'x 2'suspended ceiling

Standard 2'x4' Ceiling Layoutwith a continuous utility channel

continuousutility channel

standard 2'x4'suspended ceiling

Standard 30! x 30! Ceiling Layout Standard 4" x 4" Ceiling LayoutStandard 30"x30" Ceiling Layoutwith a continuous utility channel

continuousutility channel

standard 30"x 30"suspended ceiling

Standard 4'x4' Ceiling Layoutwith a continuous utility channel

continuousutility channel

standard 4'x 4'suspended ceiling

DESIGN CONSIDERATIONS

Continuous Utility Channels

Page 25: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

23 Systems Guide Logix Integrated Ceiling Systems

DESIGN CONSIDERATIONS

Drywall Ceilings

The USG drywall suspension system is a pre-engineered drywall ceiling system specifically created to simplify the design and construction of drywall ceilings. The system allows you to create unique and conventional drywall ceilings. The system assembles quickly and easily for faster installation and allows for the easy transition to acoustical ceilings, and vertical, horizontal, and curved surfaces. The USG drywall suspension system components come with a 10-year warranty and the system has a lifetime limited warranty when used with USG Sheetrock® Brand gypsum panels.

Integrating linear luminaires with the USG drywall suspension system creates a ceiling with advanced engineering, crisp lines and a strikingly pure aesthetic.

Example Layouts

wall channel

6’ cross tee

main tee

fasteners 6" to 8" o.c.

hanger wire 48" o.c.

adjustable yoke

SHEETROCK gypsum panels

54" wide SHEETROCK gypsum panels

Page 26: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

24 Systems Guide Logix Integrated Ceiling Systems

DESIGN CONSIDERATIONS

Drywall Ceilings

Example Layouts

Example Luminaire Applications

Trim Flange Luminaire Trimless LuminaireTrim Flange Luminaire

lighting support bracket

drywall suspension tee

screw attached through drywall into grid

lighting unit trim flange

lighting unit

flush light cover

Trimless Luminaire

drywall suspension tee

screw attached through drywall into grid

tape and mud finished

flush light cover

lighting unit

wall angle

6' cross tee

main tee

fasteners 6" to 8" o.c.

hanger wire 48" o.c.

lighting fixture

SHEETROCK gypsum panels

Page 27: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

25 Systems Guide Logix Integrated Ceiling Systems

Chilled beams are part of a convection HVAC system where pipes of water are fed through a heat exchanger called a chilled beam for the purpose of controlling the climate of the space below. Chilled beams can be either active or passive. Active beams provide ventilation air in addition to cooling, while passive beams consist of a cooling coil in an enclosure. Multi-service chilled beams can integrate a variety of other services including speakers, lighting, sprinkler heads, etc. Chilled beams can either be exposed below the suspended ceiling or integrated into the suspended ceiling. Logix is designed to accommodate 12 in. chilled beam fixtures and integrate them into the 12 in. Logix utility channel. Larger chilled beams may be incorporated between utility channels.

Example Layouts

Continuous Utility Channels 12! Chilled Beam Typical 12! x 6" Chilled Beam

12! Chilled Beam Typical 12! x 6" Chilled Beam

DESIGN CONSIDERATIONS

Chilled Beams

12"x 6' chilled beam

30"x 60" infill panel

12" utility channel

12"x 6' chilled beam

2'x 6' infill panel

12" utility channel

Page 28: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

26 Systems Guide Logix Integrated Ceiling Systems

Example Layouts

Fixed Utility Channel 12! Chilled Beam Typical 12! x 6" Chilled Beam

Large Chilled Beam 2" x 8" Chilled Beam Between Utility Channels Typical 2" x 8" Chilled Beam

DESIGN CONSIDERATIONS

Chilled Beams

12" x 6' chilled beam

2'x 6' infill panel

12" utility channel

2'x8' infill panel

2'x8' chilled beam

4" or 6" utility channel

Typical 2'x8' Chilled Beam

Page 29: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

27 Systems Guide Logix Integrated Ceiling Systems

LogiX Partners Logix is compatible with a wide selection of 4 in., 6 in., and 12 in. luminaires and utilities, as well as 100 mm, 150 mm, and 300 mm luminaires and utilities. lumi-naires and utilities. USG has dedicated a permanent space to test and evaluate compatible products and prequalify them for fit and finish. For more informa-tion about the dimensions of Logix components and assemblies, please refer to IC609 Logix Critical System Dimensions.

Lighting • Amerlux

• A Light

• Focal Point

• GE Lighting

• Zumtobel

Diffuser • Carnes

Sprinkler • SprinkFlex

DESIGN CONSIDERATIONS

Logix Partners

Page 30: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

28 Systems Guide LOGIX Integrated Ceiling Systems

Channel Width

Ceiling Module

On-Center Channel Spacing

Infill Panels PANZ Metal Option System Page

InfillPanel

ChannelPanel

4! Channel

4! 4" 4" 22! x 48! 764 34-35

4! 4" 4" 22! x 24! 996 36-37

4! 4" 4" 44! x 24! 952 38-39

4! 4" 4" 44! x 48! 375 40-41

4! 5" 5" 56! x 20! 537 42-43

4! 5" 5" 28! x 30! 339 44-45

4! 5" 5" 28! x 60! 433 46-47

4! 5" 5" 56! x 30! 524 48-49

4! 4" 12" 46! x 48! 48! x 48!

795 50-51

On-Module Channel Spacing

4" and 5" Ceiling Modules

Overview

Page 31: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

LOGIX Integrated Ceiling Systems Systems Guide 29

On-Module Channel Spacing

4" and 5" Ceiling Modules

Overview

Channel Width

Ceiling Module

On-Center Channel Spacing

Infill Panels PANZ Metal Option System Page

InfillPanel

ChannelPanel

6! Channel

6! 4" 4" 42! x 48! • 346 52-53

6! 4" 4" 42! x 24! • 727 54-55

6! 4" 4" 21! x 24! • 838 56-57

6! 4" 4" 21! x 48! • 646 58-59

6! 4" 5" 54! x 48! • 363 60-61

6! 5" 5" 54! x 20! • 753 62-63

6! 5" 5" 27! x 30! • 856 64-65

6! 5" 5" 27! x 60! • 343 66-67

6! 5" 5" 54! x 30! • 865 68-69

6! 5" 12" 45! x 48! 48! x 48!

• 275 70-71

Page 32: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

30 Systems Guide LOGIX Integrated Ceiling Systems

On-Module Channel Spacing

4" and 5" Ceiling Modules

Overview

Channel Width

Ceiling Module

On-Center Channel Spacing

Infill Panels PANZ Metal Option System Page

InfillPanel

ChannelPanel

12! Channel

12! 4" 5" 24! x 48! • • 944 72-73

12! 4" 5" 24! x 24! • • 464 74-75

12! 4" 5" 48! x 48! • 279 76-77

12! 5" 6" 30! x 60! • • 372 78-79

12! 5" 6" 30! x 30! • • 934 80-81

12! 5" 6" 60! x 20! • • 649 82-83

12! 6" 5" 24! x 48! • • 997 84-85

12! 6" 5" 24! x 24! • • 665 86-87

12! 6" 5" 24! x 72! • • 785 88-89

Page 33: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

LOGIX Integrated Ceiling Systems Systems Guide 31

Channel Width

Ceiling Module

On-Center Channel Spacing

Infill Panels PANZ Metal Option System Page

InfillPanel

ChannelPanel

4! 4" 4"- 4! 24! x 48! • 367 90-91

6! 4" 4"- 6! 24! x 48! • • 598 92-93

4! 4" 4"- 4! 24! x 24! • 977 94-95

6! 4" 4"- 6! 24! x 24! • • 862 96-97

4! 4" 4"- 4! 48! x 48! 527 98-99

6! 4" 4"- 6! 48! x 48! • 244 100-101

4! 4" 6"- 6! 72! x 24! • 529 102-103

6! 4" 6"- 6! 72! x 24! • • 755 104-105

6! 4" 6"- 6! 24! x 24! • • 574 106-107

6! 4" 7"- 6! 42! x 48! • 497 108-109

4! 4" 8"- 4! 96! x 24! 722 110-111

6! 4" 8"- 6! 48! x 48! • 754 112-113

Off-Module Channel Spacing

4", 5" and 6" Ceiling Modules4!, 6! and 12! Configurations

Overview

Page 34: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

32 Systems Guide LOGIX Integrated Ceiling Systems

Off-Module Channel Spacing

4", 5" and 6" Ceiling Modules4!, 6! and 12! Configurations

Overview

Channel Width

Ceiling Module

On-Center Channel Spacing

Infill Panels PANZ Metal Option System Page

InfillPanel

ChannelPanel

6! 4" 8"- 6! 96! x 24! • 664 114-115

6! 4" 8"- 6! 96! x 48! • 979 116-117

6! 4" 8"- 6! 24! x 24! • • 776 118-119

6! 4" 10"- 6! 120! x 24! • 383 120-121

4! 5" 5"- 4! 30! x 60! • 697 122-123

6! 5" 5"- 6! 30! x 60! • • 369 124-125

4! 5" 5"- 4! 30! x 30! • 378 126-127

6! 5" 5"- 6! 30! x 30! • • 642 128-129

4! 6" 4"- 4! 24! x 48! • • 859 130-131

6! 6" 4"- 6! 24! x 48! • • 824 132-133

Page 35: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

LOGIX Integrated Ceiling Systems Systems Guide 33

Channel Width

Ceiling Module

On-Center Channel Spacing

Infill Panels PANZ Metal Option System Page

InfillPanel

ChannelPanel

6! 4" 8"- 6! 96! x 24! • 664 114-115

6! 4" 8"- 6! 96! x 48! • 979 116-117

6! 4" 8"- 6! 24! x 24! • • 776 118-119

6! 4" 10"- 6! 120! x 24! • 383 120-121

4! 5" 5"- 4! 30! x 60! • 697 122-123

6! 5" 5"- 6! 30! x 60! • • 369 124-125

4! 5" 5"- 4! 30! x 30! • 378 126-127

6! 5" 5"- 6! 30! x 30! • • 642 128-129

4! 6" 4"- 4! 24! x 48! • • 859 130-131

6! 6" 4"- 6! 24! x 48! • • 824 132-133

Channel Width

Ceiling Module

On-Center Channel Spacing

Infill Panels PANZ Metal Option System Page

InfillPanel

ChannelPanel

4! 6" 4"- 4! 24! x 24! • • 724 134-135

6! 6" 4"- 6! 24! x 24! • • 292 136-137

4! 6" 4"- 4! 24! x 72! • • 562 138-139

6! 6" 4"- 6! 24! x 72! • • 643 140-141

Off-Module Channel Spacing

4", 5" and 6" Ceiling Modules4!, 6! and 12! Configurations

Overview

Page 36: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

34 Systems Guide LOGIX Integrated Ceiling Systems

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

4! 4"(48!)

4"(48!)

HALCYON 22! x 48! x 1! FL DXT, DXI

SL DX

SQ DX

MARS 22! x 48 x 3/4! FLB DXT, DXI

SLT DX

SQ DX

MARS High-NRC 22! x 48! x 7/8! FLB DXT, DXI

SLT DX

SQ DX

Panel Layout Suspension System Layout

22" x 48" Infill Panel

4" Channel Panel 4" Channel Panel

Cross Tee 1

Main Tee

Cross Tee 2

On-Module Channel Spacing 4" Ceiling Module 4! ChannelSystem 764 22! x 48! Infill Panel

Module Layout

22"4" 4"22"

48"Channel Module

48"

Ceilin

g M

odul

e

4in.

cha

nnel

4in.

cha

nnel

Page 37: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 22! x 48! x 1! FL ¨ 97468 SL ¨ 97441 SQ ¨ 97414

MARS 22! x 48! x 3/4! FLB ¨ 86575 SLT ¨ 86553 SQ ¨ 86525

MARS High-NRC 22! x 48! x 7/8! FLB ¨ 86486 SLT ¨ 86454 SQ ¨ 86417

Channel Panels HALCYON 4! x 48! x 1! FL ¨ 97460 SL ¨ 97430 SQ ¨ 97402

MARS 4! x 48! x 3/4! FLB ¨ 86568 SLT ¨ 86540 SQ ¨ 86514

MARS High-NRC 4! x 48! x 7/8! FLB ¨ 86475 SLT ¨ 86440 SQ ¨ 86402

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24SP101

Cross Tee 1 2 ¨ DXT424

Cross Tee 2 1 ¨ DXT424

IDENTITEE DXI Main Tee ¨ DXI24SP101

Cross Tee 1 2 ¨ DXI424

Cross Tee 2 1 ¨ DXI424

DONN DX Main Tee ¨ DX24SP101 ¨ DX24SP101

Cross Tee 1 2 ¨ DX422 2 ¨ DX422

Cross Tee 2 1 ¨ DX422 1 ¨ DX422

Order Information 4" Ceiling Module 4! ChannelSystem 764 22! x 48! Infill Panel

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

Cross Tee 2Usage Per Sq. Ft.

System Module 48! 16 0.25 0.50 0.25

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

LOGIX Integrated Ceiling Systems Systems Guide 35

Step 1. Select Panels Step 2. Select Edge for Panels

Page 38: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

36 Systems Guide LOGIX Integrated Ceiling Systems

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

4! 4"(48!)

4"(48!)

HALCYON 22! x 24! x 1! FL DXT, DXI

SL DX

SQ DX, DXT

MARS 22! x 24! x 3/4! FLB DXT, DXI

SLT DX

SQ DX, DXT

MARS High-NRC 22! x 24! x 7/8! FLB DXT, DXI

SLT DX

SQ DX, DXT

Panel Layout Suspension System Layout

22" x 24" Infill Panel

4" Channel Panel 4" Channel Panel

Cross Tee 3 Main Tee

Cross Tee 1

Cross Tee 2

On-Module Channel Spacing 4" Ceiling Module 4! ChannelSystem 996 22! x 24! Infill Panel

Module Layout

24"

24"

22"4" 4"22"

48"Channel Module

48"

Ceilin

g M

odul

e

4in.

cha

nnel

4in.

cha

nnel

Page 39: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 22! x 24! x 1! FL ¨ 97467 SL ¨ 97440 SQ ¨ 97413

MARS 22! x 24! x 3/4! FLB ¨ 86574 SLT ¨ 86552 SQ ¨ 86524

MARS High-NRC 22! x 24! x 7/8! FLB ¨ 86485 SLT ¨ 86453 SQ ¨ 86416

Channel Panels HALCYON 4! x 48! x 1! FL ¨ 97460 SL ¨ 97430 SQ ¨ 97402

MARS 4! x 48! x 3/4! FLB ¨ 86568 SLT ¨ 86540 SQ ¨ 86514

MARS High-NRC 4! x 48! x 7/8! FLB ¨ 86475 SLT ¨ 86440 SQ ¨ 86402

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24SP101 ¨ DXT24SP101

Cross Tee 1 2 ¨ DXT424 2 ¨ DXT424

Cross Tee 2 1 ¨ DXT424 1 ¨ DXT424

Cross Tee 3 2 ¨ DXT2222 2 ¨ DXT2222

IDENTITEE DXI Main Tee ¨ DXI24SP101

Cross Tee 1 2 ¨ DXI424

Cross Tee 2 1 ¨ DXI424

Cross Tee 3 2 ¨ DXT2222

DONN DX Main Tee ¨ DX24SP101 ¨ DX24SP101

Cross Tee 1 2 ¨ DX422 2 ¨ DX422

Cross Tee 2 1 ¨ DX422 1 ¨ DX422

Cross Tee 3 2 ¨ DX2216 2 ¨ DX2216

Order Information 4" Ceiling Module 4! ChannelSystem 996 22! x 24! Infill Panel

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

Cross Tee 2Usage Per Sq. Ft.

Cross Tee 3Usage Per Sq. Ft.

System Module 48! 16 0.25 0.50 0.25 0.23

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

LOGIX Integrated Ceiling Systems Systems Guide 37

Step 1. Select Panels Step 2. Select Edge for Panels

Page 40: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

38 Systems Guide LOGIX Integrated Ceiling Systems

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

4! 4"(48!)

4"(48!)

HALCYON 44! x 24! x 1! FL DXT, DXI

SL DX

SQ DX

MARS 44! x 24! x 3/4! FLB DXT, DXI

SLT DX

SQ DX

MARS High-NRC 44! x 24! x 7/8! FLB DXT, DXI

SLT DX

SQ DX

Panel Layout Suspension System Layout

44" x 24" Infill Panel

4" Channel Panel 4" Channel Panel

Cross Tee 1

Main TeeCross Tee 2

Module Layout

24"

24"

4" 4"44"

48"Channel Module

48"

Ceilin

g M

odul

e

4in.

cha

nnel

4in.

cha

nnel

On-Module Channel Spacing 4" Ceiling Module 4! ChannelSystem 952 44! x 24! Infill Panel

Page 41: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

Cross Tee 2Usage Per Sq. Ft.

System Module 48! 16 0.25 0.50 0.23

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 44! x 24! x 1! FL ¨ 97470 SL ¨ 97444 SQ ¨ 97416

MARS 44! x 24! x 3/4! FLB ¨ 86578 SLT ¨ 86556 SQ ¨ 86528

MARS High-NRC 44! x 24! x 7/8! FLB ¨ 86489 SLT ¨ 86457 SQ ¨ 86420

Channel Panels HALCYON 4! x 48! x 1! FL ¨ 97460 SL ¨ 97430 SQ ¨ 97402

MARS 4! x 48! x 3/4! FLB ¨ 86568 SLT ¨ 86540 SQ ¨ 86514

MARS High-NRC 4! x 48! x 7/8! FLB ¨ 86475 SLT ¨ 86440 SQ ¨ 86402

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24SP101

Cross Tee 1 2 ¨ DXT424

Cross Tee 2 1 ¨ DXT4422

IDENTITEE DXI Main Tee ¨ DXI24SP101

Cross Tee 1 2 ¨ DXI424

Cross Tee 2 1 ¨ DXI4424

DONN DX Main Tee ¨ DX24SP101 ¨ DX24SP101

Cross Tee 1 2 ¨ DX422 2 ¨ DX422

Cross Tee 2 1 ¨ DX44 1 ¨ DX44

Order Information 4" Ceiling Module 4! ChannelSystem 952 44! x 24! Infill Panel

LOGIX Integrated Ceiling Systems Systems Guide 39

Step 1. Select Panels Step 2. Select Edge for Panels

Page 42: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

40 Systems Guide LOGIX Integrated Ceiling Systems

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

4! 4"(48!)

4"(48!)

HALCYON 44! x 48! x 1! FL DXT, DXI

SL DX

SQ DX

Panel Layout Suspension System Layout

44" x 48" Infill Panel

4" Channel Panel 4" Channel Panel

Cross Tee 1

Main Tee

Module Layout

4" 4"44"

48"Channel Module

48"

Ceilin

g M

odul

e

4in.

cha

nnel

4in.

cha

nnel

On-Module Channel Spacing 4" Ceiling Module 4! ChannelSystem 375 44! x 48! Infill Panel

Page 43: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

System Module 48! 16 0.25 0.50

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 44! x 48! x 1! FL ¨ 97475 SL ¨ 97455 SQ ¨ 97425

Channel Panels HALCYON 4! x 48! x 1! FL ¨ 97460 SL ¨ 97430 SQ ¨ 97402

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24SP101

Cross Tee 1 2 ¨ DXT424

IDENTITEE DXI Main Tee ¨ DXI24SP101

Cross Tee 1 2 ¨ DXI424

DONN DX Main Tee ¨ DX24SP101 ¨ DX24SP101

Cross Tee 1 2 ¨ DX422 2 ¨ DX422

Order Information 4" Ceiling Module 4! ChannelSystem 375 44! x 48! Infill Panel

LOGIX Integrated Ceiling Systems Systems Guide 41

Step 1. Select Panels Step 2. Select Edge for Panels

Page 44: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

42 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

56" x 20" Infill Panel

4" Channel Panel 4" Channel Panel

Cross Tee 1

Main TeeCross Tee 2

Module Layout

56"4" 4"

20"

20"

20"

60"Channel Module

60"

Ceilin

g M

odul

e

4in.

cha

nnel

4in.

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

4! 5" (60!)

5"(60!)

HALCYON 56! x 20! x 1! FL DXT, DXI

SL DX

SQ DX

MARS 56! x 20! x 3/4! FLB DXT, DXI

SLT DX

SQ DX

MARS High-NRC 56! x 20! x 7/8! FLB DXT, DXI

SLT DX

SQ DX

On-Module Channel Spacing 5" Ceiling Module 4! ChannelSystem 537 56! x 20! Infill Panel

Page 45: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

Cross Tee 2Usage Per Sq. Ft.

System Module 60! 25 0.20 0.40 0.37

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 56! x 20! x 1! FL ¨ 97464 SL ¨ 97437 SQ ¨ 97408

MARS 56! x 20! x 3/4! FLB ¨ 86571 SLT ¨ 86548 SQ ¨ 86520

MARS High-NRC 56! x 20! x 7/8! FLB ¨ 86480 SLT ¨ 86448 SQ ¨ 86411

Channel Panels HALCYON 4! x 60! x 1! FL ¨ 97461 SL ¨ 97431 SQ ¨ 97403

MARS 4! x 60! x 3/4! FLB ¨ 86569 SLT ¨ 86541 SQ ¨ 86515

MARS High-NRC 4! x 60! x 7/8! FLB ¨ 86476 SLT ¨ 86441 SQ ¨ 86403

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24SP102

Cross Tee 1 2 ¨ DXT524

Cross Tee 2 2 ¨ DXT5622

IDENTITEE DXI Main Tee ¨ DXI24SP102

Cross Tee 1 2 ¨ DXI524

Cross Tee 2 2 ¨ DXI5624

DONN DX Main Tee ¨ DX24SP102 ¨ DX24SP102

Cross Tee 1 2 ¨ DX524 2 ¨ DX524

Cross Tee 2 2 ¨ DX5616 2 ¨ DX5616

Order Information 5" Ceiling Module 4! ChannelSystem 537 56! x 20! Infill Panel

LOGIX Integrated Ceiling Systems Systems Guide 43

Step 1. Select Panels Step 2. Select Edge for Panels

Page 46: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

44 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

4" Channel Panel 4" Channel Panel

28" x 30" Infill Panel

Cross Tee 1

Main TeeCross Tee 3

Cross Tee 2

Module Layout

28"4" 4"28"

30"

30"

60"Channel Module

60"

Ceilin

g M

odul

e

4in.

cha

nnel

4in.

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

4! 5"(60!)

5"(60!)

HALCYON 28! x 30! x 1! FL DXT, DXI

SL DX

SQ DX

MARS 28! x 30! x 3/4! FLB DXT, DXI

SLT DX

SQ DX

MARS High-NRC 28! x 30! x 7/8! FLB DXT, DXI

SLT DX

SQ DX

On-Module Channel Spacing 5" Ceiling Module 4! ChannelSystem 339 28! x 30! Infill Panel

Page 47: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

Cross Tee 2Usage Per Sq. Ft.

Cross Tee 3Usage Per Sq. Ft.

System Module 60! 25 0.20 0.40 0.20 0.19

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 28! x 30! x 1! FL ¨ 97335 SL ¨ 97449 SQ ¨ 97419

MARS 28! x 30! x 3/4! FLB ¨ 86834 SLT ¨ 86559 SQ ¨ 86532

MARS High-NRC 28! x 30! x 7/8! FLB ¨ 86492 SLT ¨ 86459 SQ ¨ 86423

Channel Panels HALCYON 4! x 60! x 1! FL ¨ 97461 SL ¨ 97431 SQ ¨ 97403

MARS 4! x 60! x 3/4! FLB ¨ 86569 SLT ¨ 86541 SQ ¨ 86515

MARS High-NRC 4! x 60! x 7/8! FLB ¨ 86476 SLT ¨ 86441 SQ ¨ 86403

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24SP102

Cross Tee 1 2 ¨ DXT524

Cross Tee 2 1 ¨ DXT524

Cross Tee 3 2 ¨ DXT2822

IDENTITEE DXI Main Tee ¨ DXI24SP102

Cross Tee 1 2 ¨ DXI524

Cross Tee 2 1 ¨ DXI524

Cross Tee 3 2 ¨ DXT2822

DONN DX Main Tee ¨ DX24SP102 ¨ DX24SP102

Cross Tee 1 2 ¨ DX524 2 ¨ DX524

Cross Tee 2 1 ¨ DX524 1 ¨ DX524

Cross Tee 3 2 ¨ DX2816 2 ¨ DX2816

Order Information 5" Ceiling Module 4! ChannelSystem 339 28! x 30! Infill Panel

LOGIX Integrated Ceiling Systems Systems Guide 45

Step 1. Select Panels Step 2. Select Edge for Panels

Page 48: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

46 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

28" x 60" Infill Panel

4" Channel Panel 4" Channel Panel

Cross Tee 1

Main Tee

Cross Tee 2

Module Layout

28"4" 4"28"

60"Channel Module

60"

Ceilin

g M

odul

e

4in.

cha

nnel

4in.

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

4! 5"(60!)

5"(60!)

HALCYON 28! x 60! x 1! FL DXT, DXI

SL DX

SQ DX

MARS 28! x 60! x 3/4! FLB DXT, DXI

SLT DX

SQ DX

MARS High-NRC 28! x 60! x 7/8! FLB DXT, DXI

SLT DX

SQ DX

On-Module Channel Spacing 5" Ceiling Module 4! ChannelSystem 433 28! x 60! Infill Panel

Page 49: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

Cross Tee 2Usage Per Sq. Ft.

System Module 60! 25 0.20 0.40 0.20

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 28! x 60! x 1! FL ¨ 97355 SL ¨ 97450 SQ ¨ 97420

MARS 28! x 60! x 3/4! FLB ¨ 86580 SLT ¨ 86560 SQ ¨ 86533

MARS High-NRC 28! x 60! x 7/8! FLB ¨ 86493 SLT ¨ 86461 SQ ¨ 86424

Channel Panels HALCYON 4! x 60! x 1! FL ¨ 97461 SL ¨ 97431 SQ ¨ 97403

MARS 4! x 60! x 3/4! FLB ¨ 86569 SLT ¨ 86541 SQ ¨ 86515

MARS High-NRC 4! x 60! x 7/8! FLB ¨ 86476 SLT ¨ 86441 SQ ¨ 86403

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24SP102

Cross Tee 1 2 ¨ DXT524

Cross Tee 2 1 ¨ DXT524

IDENTITEE DXI Main Tee ¨ DXI24SP102

Cross Tee 1 2 ¨ DXI524

Cross Tee 2 1 ¨ DXI524

DONN DX Main Tee ¨ DX24SP102 ¨ DX24SP102

Cross Tee 1 2 ¨ DX524 2 ¨ DX524

Cross Tee 2 1 ¨ DX524 1 ¨ DX524

Order Information 5" Ceiling Module 4! ChannelSystem 433 28! x 60! Infill Panel

LOGIX Integrated Ceiling Systems Systems Guide 47

Step 1. Select Panels Step 2. Select Edge for Panels

Page 50: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

48 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

4" Channel Panel 4" Channel Panel

56" x 30" Infill Panel

Cross Tee 1

Main TeeCross Tee 2

Module Layout

56"4" 4"

30"

30"

60"Channel Module

60"

Ceilin

g M

odul

e

4in.

cha

nnel

4in.

cha

nnel

On-Module Channel Spacing 4" Ceiling Module 4! ChannelSystem 524 56! x 30! Infill Panel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

4! 5"(60!)

5"(60!)

HALCYON 56! x 30! x 1! FL DXT, DXI

SL DX

SQ DX

MARS 56! x 30! x 3/4! FLB DXT, DXI

SLT DX

SQ DX

MARS High-NRC 56! x 30! x 7/8! FLB DXT, DXI

SLT DX

SQ DX

Page 51: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

Cross Tee 2Usage Per Sq. Ft.

System Module 60! 25 0.20 0.40 0.19

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 56! x 30! x 1! FL ¨ 97473 SL ¨ 97453 SQ ¨ 97423

MARS 56! x 30! x 3/4! FLB ¨ 86583 SLT ¨ 86563 SQ ¨ 86535

MARS High-NRC 56! x 30! x 7/8! FLB ¨ 86496 SLT ¨ 86465 SQ ¨ 86428

Channel Panels HALCYON 4! x 60! x 1! FL ¨ 97461 SL ¨ 97431 SQ ¨ 97403

MARS 4! x 60! x 3/4! FLB ¨ 86569 SLT ¨ 86541 SQ ¨ 86515

MARS High-NRC 4! x 60! x 7/8! FLB ¨ 86476 SLT ¨ 86441 SQ ¨ 86403

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24SP102

Cross Tee 1 2 ¨ DXT524

Cross Tee 2 1 ¨ DXT5622

IDENTITEE DXI Main Tee ¨ DXI24SP102

Cross Tee 1 2 ¨ DXI524

Cross Tee 2 1 ¨ DXI5624

DONN DX Main Tee ¨ DX24SP102 ¨ DX24SP102

Cross Tee 1 2 ¨ DX524 2 ¨ DX524

Cross Tee 2 1 ¨ DX5616 1 ¨ DX5616

Order Information 5" Ceiling Module 4! ChannelSystem 524 56! x 30! Infill Panel

LOGIX Integrated Ceiling Systems Systems Guide 49

Step 1. Select Panels Step 2. Select Edge for Panels

Page 52: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

50 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout

46" x 48" Infill Panel 48" x 48" Infill Panel 46" x 48" Infill Panel

4" Channel Panel 4" Channel Panel

Suspension System Layout

Cross Tee 1

Main Tee

Cross Tee 2

Module Layout

46" 46"48"4" 4"

144"Channel Module

48"

Ceilin

g M

odul

e

4in.

cha

nnel

4in.

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

4! 4"(48!)

12"(144!)

HALCYON 46! x 48! x 1!48! x 48! x 1!

FL DXT, DXI

SL DX

SQ DX

On-Module Channel Spacing 4" Ceiling Module 4! ChannelSystem 795 46! x 48! Infill Panel 48! x 48! Infill Panel

Page 53: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

Cross Tee 2Usage Per Sq. Ft.

System Module 144! 48 0.25 0.17 0.17

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 46! x 48! x 1! FL ¨ 97477 SL ¨ 97457 SQ ¨ 97427

Channel Panels HALCYON 4! x 48! x 1! FL ¨ 97460 SL ¨ 97430 SQ ¨ 97402

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24SP104

Cross Tee 1 2 ¨ DXT424

Cross Tee 2 2 ¨ DXT424

IDENTITEE DXI Main Tee ¨ DXI24SP104

Cross Tee 1 2 ¨ DXI424

Cross Tee 2 2 ¨ DXI424

DONN DX Main Tee ¨ DX24SP104 ¨ DX24SP104

Cross Tee 1 2 ¨ DX422 2 ¨ DX422

Cross Tee 2 2 ¨ DX422 2 ¨ DX422

Order Information 4" Ceiling Module 4! ChannelSystem 795 46! x 48! Infill Panel 48! x 48! Infill Panel

LOGIX Integrated Ceiling Systems Systems Guide 51

Step 1. Select Panels Step 2. Select Edge for Panels

Page 54: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

52 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

6" Channel Panel 6" Channel Panel

42" x 48" Infill Panel

Main Tee

Cross Tee 1

Module Layout

42"6" 6"

48"Channel Module

48"

Ceilin

g M

odul

e

6in.

cha

nnel

6in.

cha

nnel

On-Module Channel Spacing 4" Ceiling Module 6! ChannelSystem 346 42! x 48! Infill Panel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

6! 4"(48!)

4"(48!)

HALCYON 42! x 48! x 1! FL DXT, DXI

SL DX

SQ DX

Page 55: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

System Module 48! 16 0.25 0.50

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 42! x 48! x 1! FL ¨ 98343 SL ¨ 97454 SQ ¨ 97424

Channel Panels HALCYON 6! x 48! x 1! FL ¨ 98198 SL ¨ 99271 SQ ¨ 97227

PANZ Metal Panels, Solid 6! x 48! FL ¨ 256820 SL ¨ 256819 SQ ¨ 256768

Panz Metal Panels, Perf C116 6! x 48! FL ¨ 256062 SL ¨ 257248 SQ ¨ 256397

Panz Metal Panels, Perf C116D 6! x 48! FL ¨ 257585 SL ¨ 257584 SQ ¨ 257406

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24

Cross Tee 1 2 ¨ DXT424

IDENTITEE DXI Main Tee ¨ DXI24

Cross Tee 1 2 ¨ DXI424

DONN DX Main Tee ¨ DX/DXL24 ¨ DX/DXL24

Cross Tee 1 2 ¨ DX422 2 ¨ DX422

Order Information 4" Ceiling Module 6! ChannelSystem 346 42! x 48! Infill Panel

Step 3. Select Corresponding Grid for Selected Panels

LOGIX Integrated Ceiling Systems Systems Guide 53

Step 1. Select Panels Step 2. Select Edge for Panels

Page 56: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

54 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

6" Channel Panel 6" Channel Panel

42" x 24" Infill Panel

Cross Tee 1

Main TeeCross Tee 2

Module Layout

24"

24"

42"6" 6"

48"Channel Module

48"

Ceilin

g M

odul

e

6in.

cha

nnel

6in.

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

6! 4"(60!)

4"(60!)

HALCYON 42! x 24! x 1! FL DXT, DXI

SL DX

SQ DX

MARS 42! x 24 x 3/4! FLB DXT, DXI

SLT DX

SQ DX

MARS High-NRC 42! x 24! x 7/8! FLB DXT, DXI

SLT DX

SQ DX

On-Module Channel Spacing 4" Ceiling Module 6! ChannelSystem 727 42! x 24! Infill Panel

Page 57: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

Cross Tee 2Usage Per Sq. Ft.

System Module 48! 16 0.25 0.50 0.22

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 42! x 24! x 1! FL ¨ 98196 SL ¨ 97443 SQ ¨ 97277

MARS 42! x 24! x 3/4! FLB ¨ 86577 SLT ¨ 86555 SQ ¨ 86527

MARS High-NRC 42! x 24! x 7/8! FLB ¨ 86488 SLT ¨ 86456 SQ ¨ 86419

Channel Panels HALCYON 6! x 48! x 1! FL ¨ 98198 SL ¨ 99271 SQ ¨ 97227

MARS 6! x 48! x 3/4! FLB ¨ 88887 SLT ¨ 86542 SQ ¨ 86325

MARS High-NRC 6! x 48! x 7/8! FLB ¨ 86331 SLT ¨ 86442 SQ ¨ 86404

PANZ Metal Panels, Solid 6! x 48! FL ¨ 256820 SL ¨ 256819 SQ ¨ 256768

Panz Metal Panels, Perf C116 6! x 48! FL ¨ 256062 SL ¨ 257248 SQ ¨ 256397

Panz Metal Panels, Perf C116D 6! x 48! FL ¨ 257585 SL ¨ 257584 SQ ¨ 257406

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24

Cross Tee 1 2 ¨ DXT424

Cross Tee 2 1 ¨ DXT4224

IDENTITEE DXI Main Tee ¨ DXI24

Cross Tee 1 2 ¨ DXI424

Cross Tee 2 1 ¨ DXI4224

DONN DX Main Tee ¨ DX/DXL24 ¨ DX/DXL24

Cross Tee 1 2 ¨ DX422 2 ¨ DX422

Cross Tee 2 1 ¨ DX4224 1 ¨ DX4224

Order Information 4" Ceiling Module 6! ChannelSystem 727 42! x 24! Infill Panel

Step 3. Select Corresponding Grid for Selected Panels

LOGIX Integrated Ceiling Systems Systems Guide 55

Step 1. Select Panels Step 2. Select Edge for Panels

Page 58: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

56 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

6" Channel Panel 6" Channel Panel

21" x 24" Infill Panel

Cross Tee 1

Main TeeCross Tee 3

Cross Tee 2

Module Layout

24"

24"

21"6" 6"21"

48"Channel Module

48"

Ceilin

g M

odul

e

6in.

cha

nnel

6in.

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

6! 4"(48!)

4"(48!)

HALCYON 21! x 24! x 1! FL DXT, DXI

SL DX

SQ DX, DXT

MARS 21! x 24! x 3/4! FLB DXT, DXI

SLT DX

SQ DX, DXT

MARS High-NRC 21! x 24! x 7/8! FLB DXT, DXI

SLT DX

SQ DX, DXT

On-Module Channel Spacing 4" Ceiling Module 6! ChannelSystem 838 21! x 24! Infill Panel

Page 59: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

Cross Tee 2Usage Per Sq. Ft.

Cross Tee 3Usage Per Sq. Ft.

System Module 48! 16 0.25 0.50 0.25 0.22

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 21! x 24! x 1! FL ¨ 98195 SL ¨ 98220 SQ ¨ 97411

MARS 21! x 24! x 3/4! FLB ¨ 88840 SLT ¨ 86550 SQ ¨ 86522

MARS High-NRC 21! x 24! x 7/8! FLB ¨ 86483 SLT ¨ 86451 SQ ¨ 86414

Channel Panels HALCYON 6! x 48! x 1! FL ¨ 98198 SL ¨ 99271 SQ ¨ 97227

MARS 6! x 48! x 3/4! FLB ¨ 88887 SLT ¨ 86542 SQ ¨ 86325

MARS High-NRC 6! x 48! x 7/8! FLB ¨ 86331 SLT ¨ 86442 SQ ¨ 86404

PANZ Metal Panels, Solid 6! x 48! FL ¨ 256820 SL ¨ 256819 SQ ¨ 256768

Panz Metal Panels, Perf C116 6! x 48! FL ¨ 256062 SL ¨ 257248 SQ ¨ 256397

Panz Metal Panels, Perf C116D 6! x 48! FL ¨ 257585 SL ¨ 257584 SQ ¨ 257406

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24SP105 ¨ DXT24SP105

Cross Tee 1 2 ¨ DXT424 2 ¨ DXT424

Cross Tee 2 1 ¨ DXT424 1 ¨ DXT424

Cross Tee 3 2 ¨ DXT2122 2 ¨ DXT2122

IDENTITEE DXI Main Tee ¨ DXI24SP105

Cross Tee 1 2 ¨ DXI424

Cross Tee 2 1 ¨ DXI424

Cross Tee 3 2 ¨ DXI2122

DONN DX Main Tee ¨ DX24SP105 ¨ DX24SP105

Cross Tee 1 2 ¨ DX422 2 ¨ DX422

Cross Tee 2 1 ¨ DX422 1 ¨ DX

Cross Tee 3 2 ¨ DX2116 2 ¨ DX2116

Order Information 4" Ceiling Module 6! ChannelSystem 838 21! x 24! Infill Panel

Step 3. Select Corresponding Grid for Selected Panels

LOGIX Integrated Ceiling Systems Systems Guide 57

Step 1. Select Panels Step 2. Select Edge for Panels

Page 60: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

58 Systems Guide LOGIX Integrated Ceiling Systems

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

4! 4"(48!)

4"(48!)

HALCYON 21! x 48! x 1! FL DXT, DXI

SL DX

SQ DX

MARS 21! x 48 x 3/4! FLB DXT, DXI

SLT DX

SQ DX

MARS High-NRC 21! x 48! x 7/8! FLB DXT, DXI

SLT DX

SQ DX

Panel Layout Suspension System Layout

6" Channel Panel 6" Channel Panel

21" x 48" Infill Panel

Cross Tee 1

Main Tee

Cross Tee 2

Module Layout

21"6" 6"21"

48"Channel Module

48"

Ceilin

g M

odul

e

6in.

cha

nnel

6in.

cha

nnel

`

On-Module Channel Spacing 4" Ceiling Module 6! ChannelSystem 646 21! x 48! Infill Panel

Page 61: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

Cross Tee 2Usage Per Sq. Ft.

System Module 48! 16 0.25 0.50 0.25

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 21! x 48! x 1! FL ¨ 97466 SL ¨ 97439 SQ ¨ 97412

MARS 21! x 48! x 3/4! FLB ¨ 86573 SLT ¨ 86551 SQ ¨ 86523

MARS High-NRC 21! x 48! x 7/8! FLB ¨ 86484 SLT ¨ 86452 SQ ¨ 86415

Channel Panels HALCYON 6! x 48! x 1! FL ¨ 98198 SL ¨ 99271 SQ ¨ 97227

MARS 6! x 48! x 3/4! FLB ¨ 88887 SLT ¨ 86542 SQ ¨ 86325

MARS High-NRC 6! x 48! x 7/8! FLB ¨ 86331 SLT ¨ 86442 SQ ¨ 86404

PANZ Metal Panels, Solid 6! x 48! FL ¨ 256820 SL ¨ 256819 SQ ¨ 256768

Panz Metal Panels, Perf C116 6! x 48! FL ¨ 256062 SL ¨ 257248 SQ ¨ 256397

Panz Metal Panels, Perf C116D 6! x 48! FL ¨ 257585 SL ¨ 257584 SQ ¨ 257406

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24SP105

Cross Tee 1 2 ¨ DXT424

Cross Tee 2 1 ¨ DXT424

IDENTITEE DXI Main Tee ¨ DXI24SP105

Cross Tee 1 2 ¨ DXI424

Cross Tee 2 1 ¨ DXI424

DONN DX Main Tee ¨ DX24SP105 ¨ DX24SP105

Cross Tee 1 2 ¨ DX422 2 ¨ DX422

Cross Tee 2 1 ¨ DX422 1 ¨ DX422

Order Information 4" Ceiling Module 6! ChannelSystem 646 21! x 48! Infill Panel

Step 3. Select Corresponding Grid for Selected Panels

LOGIX Integrated Ceiling Systems Systems Guide 59

Step 1. Select Panels Step 2. Select Edge for Panels

Page 62: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

60 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

6" Channel Panel 6" Channel Panel

54" x 48" Infill Panel

Cross Tee 1

Main Tee

Module Layout

`

54"6" 6"

60"Channel Module

48"

Ceilin

g M

odul

e

6in.

cha

nnel

6in.

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

6! 4"(48!)

5"(60!)

HALCYON 54! x 48! x 1! FL DXT, DXI

SL DX

SQ DX

On-Module Channel Spacing 4" Ceiling Module 6! ChannelSystem 363 54! x 48! Infill Panel

Page 63: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

System Module 60! 20 0.25 0.40

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 54! x 48! x 1! FL ¨ 98344 SL ¨ 97458 SQ ¨ 97428

Channel Panels HALCYON 6! x 48! x 1! FL ¨ 98198 SL ¨ 99271 SQ ¨ 97227

PANZ Metal Panels, Solid 6! x 48! FL ¨ 256820 SL ¨ 256819 SQ ¨ 256768

Panz Metal Panels, Perf C116 6! x 48! FL ¨ 256062 SL ¨ 257248 SQ ¨ 256397

Panz Metal Panels, Perf C116D 6! x 48! FL ¨ 257585 SL ¨ 257584 SQ ¨ 257406

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24

Cross Tee 1 2 ¨ DXT424

IDENTITEE DXI Main Tee ¨ DXI24

Cross Tee 1 2 ¨ DXI424

DONN DX Main Tee ¨ DX/DXL24 ¨ DX/DXL24

Cross Tee 1 2 ¨ DX422 2 ¨ DX422

Order Information 4" Ceiling Module 6! ChannelSystem 363 54! x 48! Infill Panel

LOGIX Integrated Ceiling Systems Systems Guide 61

Step 1. Select Panels Step 2. Select Edge for Panels

Page 64: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

62 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

6" Channel Panel 6" Channel Panel

54" x 20" Infill Panel

Cross Tee 1

Main TeeCross Tee 2

Module Layout

54"6" 6"

20"

20"

20"

60"Channel Module

60"

Ceilin

g M

odul

e

6in.

cha

nnel

6in.

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

6! 5"(60!)

5"(60!)

HALCYON 54! x 20! x 1! FL DXT, DXI

SL DX

SQ DX

MARS 54! x 20! x 3/4! FLB DXT, DXI

SLT DX

SQ DX

MARS High-NRC 54! x 20! x 7/8! FLB DXT, DXI

SLT DX

SQ DX

On-Module Channel Spacing 5" Ceiling Module 6! ChannelSystem 753 54! x 20! Infill Panel

Page 65: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

System Module 609 20 0.25 0.40

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels Halcyon 549 x 209 x 19 FL ¨ 98360 SL ¨ 97436 SQ ¨ 97407

Mars 549 x 209 x 3/49 FLB ¨ 88845 SLT ¨ 86547 SQ ¨ 86519

Mars High-NRC 549 x 209 x 7/89 FLB ¨ 86479 SLT ¨ 86447 SQ ¨ 86410

Channel Panels Halcyon 69 x 609 x 19 FL ¨ 98199 SL ¨ 99272 SQ ¨ 97228

Mars 69 x 609 x 3/49 FLB ¨ 86835 SLT ¨ 86543 SQ ¨ 86507

Mars High-NRC 69 x 609 x 7/89 FLB ¨ 86333 SLT ¨ 86443 SQ ¨ 86145

Panz Metal Panels, Solid 69 x 609 FL ¨ 258036 SL ¨ 257972 SQ ¨ 257586

Panz Metal Panels, Perf C116 69 x 609 FL ¨ 259228 SL ¨ 259010 SQ ¨ 259009

Panz Metal Panels, Perf C116D 69 x 609 FL ¨ 259353 SL ¨ 259344 SQ ¨ 259308

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

centricitee DXt Main Tee ¨ DXT24

Cross Tee 1 2 ¨ DXT524

Cross Tee 2 2 ¨ DXT5424

iDentitee DXI Main Tee ¨ DXI24

Cross Tee 1 2 ¨ DXI524

Cross Tee 2 2 ¨ DXI5424

Donn DX Main Tee ¨ DX/DXL24 ¨ DX/DXL24

Cross Tee 1 2 ¨ DX524 2 ¨ DX524

Cross Tee 2 2 ¨ DX5424 2 ¨ DX5424

Order Information 58 Ceiling Module 69 ChannelSystem 753 549 x 209 Infill Panel

Step 3. Select Corresponding Grid for Selected Panels

Logix Integrated Ceiling Systems Systems Guide 63

Step 1. Select Panels Step 2. Select Edge for Panels

Page 66: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

64 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

6" Channel Panel 6" Channel Panel

27" x 30" Infill Panel

Cross Tee 1

Main TeeCross Tee 3

Cross Tee 2

Module Layout

27"6" 6"27"

30"

30"

60"Channel Module

60"

Ceilin

g M

odul

e

6in.

cha

nnel

6in.

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

6! 5"(60!)

5"(60!)

HALCYON 27! x 30! x 1! FL DXT, DXI

SL DX

SQ DX

MARS 27! x 30! x 3/4! FLB DXT, DXI

SLT DX

SQ DX

MARS High-NRC 27! x 30! x 7/8! FLB DXT, DXI

SLT DX

SQ DX

On-Module Channel Spacing 5" Ceiling Module 6! ChannelSystem 856 27! x 30! Infill Panel

Page 67: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

Cross Tee 2Usage Per Sq. Ft.

Cross Tee 3Usage Per Sq. Ft.

System Module 60! 25 0.20 0.40 0.20 0.18

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 27! x 30! x 1! FL ¨ 97333 SL ¨ 97477 SQ ¨ 97417

MARS 27! x 30! x 3/4! FLB ¨ 86850 SLT ¨ 86557 SQ ¨ 86530

MARS High-NRC 27! x 30! x 7/8! FLB ¨ 86490 SLT ¨ 86458 SQ ¨ 86421

Channel Panels HALCYON 6! x 60! x 1! FL ¨ 98199 SL ¨ 99272 SQ ¨ 97228

MARS 6! x 60! x 3/4! FLB ¨ 86835 SLT ¨ 86543 SQ ¨ 86507

MARS High-NRC 6! x 60! x 7/8! FLB ¨ 86333 SLT ¨ 86443 SQ ¨ 86145

PANZ Metal Panels, Solid 6! x 60! FL ¨ 258036 SL ¨ 257972 SQ ¨ 257586

Panz Metal Panels, Perf C116 6! x 60! FL ¨ 259228 SL ¨ 259010 SQ ¨ 259009

Panz Metal Panels, Perf C116D 6! x 60! FL ¨ 259353 SL ¨ 259344 SQ ¨ 259308

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24SP109

Cross Tee 1 2 ¨ DXT524

Cross Tee 2 1 ¨ DXT524

Cross Tee 3 2 ¨ DXT2722

IDENTITEE DXI Main Tee ¨ DXI24SP109

Cross Tee 1 2 ¨ DXI524

Cross Tee 2 1 ¨ DXI524

Cross Tee 3 2 ¨ DXI2724

DONN DX Main Tee ¨ DX24SP109 ¨ DX24SP109

Cross Tee 1 2 ¨ DX524 2 ¨ DX524

Cross Tee 2 1 ¨ DX524 1 ¨ DX524

Cross Tee 3 2 ¨ DX2716 2 ¨ DX2716

Order Information 5" Ceiling Module 6! ChannelSystem 856 27! x 30! Infill Panel

Step 3. Select Corresponding Grid for Selected Panels

LOGIX Integrated Ceiling Systems Systems Guide 65

Step 1. Select Panels Step 2. Select Edge for Panels

Page 68: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

66 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

27" x 60" Infill Panel

6" Channel Panel 6" Channel Panel

Cross Tee 1

Main Tee

Cross Tee 2

Module Layout

27"6" 6"27"

60"Channel Module

60"

Ceilin

g M

odul

e

6in.

cha

nnel

6in.

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

6! 5"(60!)

5"(60!)

HALCYON 27! x 60! x 1! FL DXT, DXI

SL DX

SQ DX

MARS 27! x 60! x 3/4! FLB DXT, DXI

SLT DX

SQ DX

MARS High-NRC 27! x 60! x 7/8! FLB DXT, DXI

SLT DX

SQ DX

On-Module Channel Spacing 5" Ceiling Module 6! ChannelSystem 343 27! x 60! Infill Panel

Page 69: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

Cross Tee 2Usage Per Sq. Ft.

System Module 60! 25 0.20 0.40 0.20

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 27! x 60! x 1! FL ¨ 98440 SL ¨ 97448 SQ ¨ 97418

MARS 27! x 60! x 3/4! FLB ¨ 86579 SLT ¨ 86558 SQ ¨ 86531

MARS High-NRC 27! x 60! x 7/8! FLB ¨ 86491 SLT ¨ 86460 SQ ¨ 86422

Channel Panels HALCYON 6! x 60! x 1! FL ¨ 98199 SL ¨ 99272 SQ ¨ 97228

MARS 6! x 60! x 3/4! FLB ¨ 86835 SLT ¨ 86543 SQ ¨ 86507

MARS High-NRC 6! x 60! x 7/8! FLB ¨ 86333 SLT ¨ 86443 SQ ¨ 86145

PANZ Metal Panels, Solid 6! x 60! FL ¨ 258036 SL ¨ 257972 SQ ¨ 257586

Panz Metal Panels, Perf C116 6! x 60! FL ¨ 259228 SL ¨ 259010 SQ ¨ 259009

Panz Metal Panels, Perf C116D 6! x 60! FL ¨ 259353 SL ¨ 259344 SQ ¨ 259308

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24SP109

Cross Tee 1 2 ¨ DXT524

Cross Tee 2 1 ¨ DXT524

IDENTITEE DXI Main Tee ¨ DXI24SP109

Cross Tee 1 2 ¨ DXI524

Cross Tee 2 1 ¨ DXI524

DONN DX Main Tee ¨ DX24SP109 ¨ DX24SP109

Cross Tee 1 2 ¨ DX524 2 ¨ DX524

Cross Tee 2 1 ¨ DX524 1 ¨ DX524

Order Information 5" Ceiling Module 6! ChannelSystem 343 27! x 60! Infill Panel

Step 3. Select Corresponding Grid for Selected Panels

LOGIX Integrated Ceiling Systems Systems Guide 67

Step 1. Select Panels Step 2. Select Edge for Panels

Page 70: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

68 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

54" x 30" Infill Panel

6" Channel Panel 6" Channel Panel

Cross Tee 1

Main TeeCross Tee 2

Module Layout

54"6" 6"

30"

30"

60"Channel Module

60"

Ceilin

g M

odul

e

6in.

cha

nnel

6in.

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

6! 5"(60!)

5"(60!)

HALCYON 54! x 30! x 1! FL DXT, DXI

SL DX

SQ DX

MARS 54! x 30! x 3/4! FLB DXT, DXI

SLT DX

SQ DX

MARS High-NRC 54! x 30! x 7/8! FLB DXT, DXI

SLT DX

SQ DX

On-Module Channel Spacing 4" Ceiling Module 4! ChannelSystem 865 54! x 30! Infill Panel

Page 71: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

Cross Tee 2Usage Per Sq. Ft.

System Module 60! 25 0.20 0.40 0.18

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 54! x 30! x 1! FL ¨ 98359 SL ¨ 98337 SQ ¨ 97422

MARS 54! x 30! x 3/4! FLB ¨ 86831 SLT ¨ 88686 SQ ¨ 86503

MARS High-NRC 54! x 30! x 7/8! FLB ¨ 86501 SLT ¨ 86464 SQ ¨ 86427

Channel Panels HALCYON 6! x 60! x 1! FL ¨ 98199 SL ¨ 99272 SQ ¨ 97228

MARS 6! x 60! x 3/4! FLB ¨ 86835 SLT ¨ 86543 SQ ¨ 86507

MARS High-NRC 6! x 60! x 7/8! FLB ¨ 86333 SLT ¨ 86443 SQ ¨ 86145

PANZ Metal Panels, Solid 6! x 60! FL ¨ 258036 SL ¨ 257972 SQ ¨ 257586

Panz Metal Panels, Perf C116 6! x 60! FL ¨ 259228 SL ¨ 259010 SQ ¨ 259009

Panz Metal Panels, Perf C116D 6! x 60! FL ¨ 259353 SL ¨ 259344 SQ ¨ 259308

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24

Cross Tee 1 2 ¨ DXT524

Cross Tee 2 1 ¨ DXT5424

IDENTITEE DXI Main Tee ¨ DXI24

Cross Tee 1 2 ¨ DXI524

Cross Tee 2 1 ¨ DXI5424

DONN DX Main Tee ¨ DX/DXL24 ¨ DX/DXL24

Cross Tee 1 2 ¨ DX524 2 ¨ DX524

Cross Tee 2 1 ¨ DX5416 1 ¨ DX5416

Order Information 5" Ceiling Module 6! ChannelSystem 865 54! x 30! Infill Panel

Step 3. Select Corresponding Grid for Selected Panels

LOGIX Integrated Ceiling Systems Systems Guide 69

Step 1. Select Panels Step 2. Select Edge for Panels

Page 72: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

70 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout

45" x 48" Infill Panel

6" Channel Panel 6" Channel Panel

48" x 48" Infill Panel 45" x 48" Infill Panel

Module Layout

45"6" 6"48" 45"

144"Channel Module

48"

Ceilin

g M

odul

e

6in.

cha

nnel

6in.

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

6! 4"(48!)

12"(144!)

HALCYON 45! x 48! x 1!48! x 48! x 1!

FL DXT, DXI

SL DX

SQ DX

On-Module Channel Spacing 4" Ceiling Module 6! ChannelSystem 275 45! x 48! Infill Panel 48! x 48! Infill Panel

Suspension System Layout

Cross Tee 1

Main Tee

Cross Tee 2

Page 73: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

Cross Tee 2Usage Per Sq. Ft.

System Module 144! 48 0.25 0.17 0.17

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 45! x 48! x 1! FL ¨ 97476 SL ¨ 97456 SQ ¨ 97426

Channel Panels HALCYON 6! x 48! x 1! FL ¨ 98198 SL ¨ 99271 SQ ¨ 97227

PANZ Metal Panels, Solid 6! x 48! FL ¨ 256820 SL ¨ 256819 SQ ¨ 256768

Panz Metal Panels, Perf C116 6! x 48! FL ¨ 256062 SL ¨ 257248 SQ ¨ 256397

Panz Metal Panels, Perf C116D 6! x 48! FL ¨ 257585 SL ¨ 257584 SQ ¨ 257406

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24SP106

Cross Tee 1 2 ¨ DXT424

Cross Tee 2 2 ¨ DXT424

IDENTITEE DXI Main Tee ¨ DXI24SP106

Cross Tee 1 2 ¨ DXI424

Cross Tee 2 2 ¨ DXI424

DONN DX Main Tee ¨ DX24SP106 1 ¨ DX24SP106

Cross Tee 1 2 ¨ DX422 2 ¨ DX422

Cross Tee 2 2 ¨ DX422 2 ¨ DX422

Order Information 4" Ceiling Module 6! ChannelSystem 275 45! x 48! Infill Panel 48! x 48! Infill Panel

Step 3. Select Corresponding Grid for Selected Panels

LOGIX Integrated Ceiling Systems Systems Guide 71

Step 1. Select Panels Step 2. Select Edge for Panels

Page 74: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

72 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

12" Channel Panel 12" Channel Panel

24" x 48" Infill Panel

Cross Tee 1

Main Tee

Cross Tee 2

Module Layout

24"12" 12"24"

60"Channel Module

48"

Ceilin

g M

odul

e

12in

. cha

nnel

12in

. cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

12! 4"(48!)

5"(60!)

HALCYON 24! x 48! x 1! FL DXT, DXI

SL DX

SQ DX

MARS 24! x 48 x 3/4! FLB DXT, DXI

SLT DX

SQ DX

MARS High-NRC 24! x 48! x 7/8! FLB DXT, DXI

SLT DX

SQ DX

PANZ Metal Panels, Solid 24! x 48! FL DXT, DXI

On-Module Channel Spacing 4" Ceiling Module 12! ChannelSystem 944 24! x 48! Infill Panel

Page 75: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

Cross Tee 2Usage Per Sq. Ft.

System Module 60! 20 0.25 0.40 0.20

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 24! x 48! x 1! FL ¨ 98245 SL ¨ 98243 SQ ¨ 98241

MARS 24! x 48! x 3/4! FLB ¨ 88985 SLT ¨ 88785 SQ ¨ 88185

MARS High-NRC 24! x 48! x 7/8! FLB ¨ 89500 SLT ¨ 89600 SQ ¨ 86300

PANZ Metal Panels, Solid 24! x 48! FL ¨ 212164

Channel Panels HALCYON 12! x 48! x 1! FL ¨ 97575 SL ¨ 97571 SQ ¨ 97491

MARS 12! x 48! x 3/4! FLB ¨ 86321 SLT ¨ 86544 SQ ¨ 86516

MARS High-NRC 12! x 48! x 7/8! FLB ¨ 86505 SLT ¨ 86444 SQ ¨ 86407

PANZ Metal Panels, Solid 12! x 48 FL ¨ 212144

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24

Cross Tee 1 2 ¨ DXT424

Cross Tee 2 1 ¨ DXT424

IDENTITEE DXI Main Tee ¨ DXI24

Cross Tee 1 2 ¨ DXI424

Cross Tee 2 1 ¨ DXI424

DONN DX Main Tee ¨ DX/DXL24 ¨ DX/DXL24

Cross Tee 1 2 ¨ DX422 2 ¨ DX422

Cross Tee 2 1 ¨ DX422 1 ¨ DX422

Order Information 4" Ceiling Module 12! ChannelSystem 944 24! x 48! Infill Panel

Step 3. Select Corresponding Grid for Selected Panels

LOGIX Integrated Ceiling Systems Systems Guide 73

Step 1. Select Panels Step 2. Select Edge for Panels

Page 76: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

74 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

12" Channel Panel 12" Channel Panel

24" x 24" Infill Panel

Cross Tee 1

Main TeeCross Tee 3

Cross Tee 2

Module Layout

24"

24"

24"12" 12"24"

60"Channel Module

48"

Ceilin

g M

odul

e

12in

. cha

nnel

12in

. cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

12! 4"(48!)

5"(60!)

HALCYON 24! x 24! x 1! FL DXT, DXI

SL DX

SQ DX, DXT

MARS 24! x 24 x 3/4! FLB DXT, DXI

SLT DX

SQ DX, DXT

MARS High-NRC 24! x 24! x 7/8! FLB DXT, DXI

SLT DX

SQ DX, DXT

PANZ Metal Panels, Solid 24! x 24! FL DXT, DXI

On-Module Channel Spacing 4" Ceiling Module 12! ChannelSystem 464 24! x 24! Infill Panel

Page 77: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

Cross Tee 2Usage Per Sq. Ft.

Cross Tee 3Usage Per Sq. Ft.

System Module 60! 20 0.25 0.40 0.20 0.20

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 24! x 24! x 1! FL ¨ 98225 SL ¨ 98223 SQ ¨ 98221

MARS 24! x 24! x 3/4! FLB ¨ 86985 SLT ¨ 86785 SQ ¨ 86185

MARS High-NRC 24! x 24! x 7/8! FLB ¨ 87100 SLT ¨ 87200 SQ ¨ 86100

PANZ Metal Panels, Solid 24! x 24! FL ¨ 275616

Channel Panels HALCYON 12! x 48! x 1! FL ¨ 97575 SL ¨ 97571 SQ ¨ 97491

MARS 12! x 48! x 3/4! FLB ¨ 86321 SLT ¨ 86544 SQ ¨ 86516

MARS High-NRC 12! x 48! x 7/8! FLB ¨ 86505 SLT ¨ 86444 SQ ¨ 86407

PANZ Metal Panels, Solid 12! x 48! FL ¨ 212144

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24 ¨ DXT24

Cross Tee 1 2 ¨ DXT424 2 ¨ DXT424

Cross Tee 2 1 ¨ DXT424 1 ¨ DXT424

Cross Tee 3 2 ¨ DXT222 2 ¨ DXT222

IDENTITEE DXI Main Tee ¨ DXI24

Cross Tee 1 2 ¨ DXI424

Cross Tee 2 1 ¨ DXI424

Cross Tee 3 2 ¨ DXI222

DONN DX Main Tee ¨ DX/DXL24 ¨ DX/DXL24

Cross Tee 1 2 ¨ DX422 2 ¨ DX422

Cross Tee 2 1 ¨ DX422 1 ¨ DX422

Cross Tee 3 2 ¨ DX216 2 ¨ DX216

Order Information 4" Ceiling Module 12! ChannelSystem 464 24! x 24! Infill Panel

Step 3. Select Corresponding Grid for Selected Panels

LOGIX Integrated Ceiling Systems Systems Guide 75

Step 1. Select Panels Step 2. Select Edge for Panels

Page 78: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

76 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

12" Channel Panel 12" Channel Panel

48" x 48" Infill Panel

Cross Tee 1

Main Tee

Module Layout

48"12" 12"

60"Channel Module

48"

Ceilin

g M

odul

e

12in

. cha

nnel

12in

. cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

12! 4"(48!)

5"(60!)

HALCYON 48! x 48! x 1! FL DXT, DXI

SL DX

SQ DX

On-Module Channel Spacing 4" Ceiling Module 12! ChannelSystem 279 48! x 48! Infill Panel

Page 79: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

System Module 60! 20 0.25 0.40

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 48! x 48! x 1! FL ¨ 98445 SL ¨ 98443 SQ ¨ 98441

Channel Panels HALCYON 12! x 48! x 1! FL ¨ 97575 SL ¨ 97571 SQ ¨ 97491

PANZ Metal Panels, Solid 12! x 48! FL ¨ 212144

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24

Cross Tee 1 2 ¨ DXT424

IDENTITEE DXI Main Tee ¨ DXI24

Cross Tee 1 2 ¨ DXI424

DONN DX Main Tee ¨ DX/DXL24 ¨ DX/DXL24

Cross Tee 1 2 ¨ DX422 2 ¨ DX422

Order Information 4" Ceiling Module 12! ChannelSystem 279 48! x 48! Infill Panel

Step 3. Select Corresponding Grid for Selected Panels

LOGIX Integrated Ceiling Systems Systems Guide 77

Step 1. Select Panels Step 2. Select Edge for Panels

Page 80: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

78 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

12" Channel Panel 12" Channel Panel

30" x 60" Infill Panel

Cross Tee 1

Main Tee

Module Layout

30"12" 12"30"

72"Channel Module

60"

Ceilin

g M

odul

e

12in

. cha

nnel

12in

. cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

12! 5"(60!)

6"(72!)

HALCYON 30! x 60! x 1! FL DXT, DXI

SL DX

SQ DX

MARS 30! x 60! x 3/4! FLB DXT, DXI

SLT DX

SQ DX

MARS High-NRC 30! x 60! x 7/8! FLB DXT, DXI

SLT DX

SQ DX

PANZ Metal Panels, Solid 30! x 60! FL DXT, DXI

On-Module Channel Spacing 5" Ceiling Module 12! ChannelSystem 372 30! x 60! Infill Panel

Page 81: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

Cross Tee 2Usage Per Sq. Ft.

System Module 72! 30 0.20 0.33 0.17

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 30! x 60! x 1! FL ¨ 98336 SL ¨ 99270 SQ ¨ 97266

MARS 30! x 60! x 3/4! FLB ¨ 86267 SLT ¨ 86564 SQ ¨ 86536

MARS High-NRC 30! x 60! x 7/8! FLB ¨ 86497 SLT ¨ 86466 SQ ¨ 86429

PANZ Metal Panels, Solid 30! x 60! FL ¨ 212201

Channel Panels HALCYON 12! x 60! x 1! FL ¨ 97576 SL ¨ 97434 SQ ¨ 97492

MARS 12! x 60! x 3/4! FLB ¨ 88885 SLT ¨ 86545 SQ ¨ 86517

MARS High-NRC 12! x 60! x 7/8! FLB ¨ 86477 SLT ¨ 86445 SQ ¨ 86408

PANZ Metal Panels, Solid 12! x 60! FL ¨ 212160

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24

Cross Tee 1 2 ¨ DXT524

IDENTITEE DXI Main Tee ¨ DXI24

Cross Tee 1 2 ¨ DXI524

DONN DX Main Tee ¨ DX/DXL24 ¨ DX/DXL24

Cross Tee 1 2 ¨ DX524 2 ¨ DX524

Order Information 5" Ceiling Module 12! ChannelSystem 372 30! x 60! Infill Panel

Step 3. Select Corresponding Grid for Selected Panels

LOGIX Integrated Ceiling Systems Systems Guide 79

Step 1. Select Panels Step 2. Select Edge for Panels

Page 82: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

80 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

30" x 30" Infill Panel

12" Channel Panel 12" Channel Panel

Cross Tee 1

Main TeeCross Tee 2

Module Layout

30"12" 12"30"

30"

30"

72"Channel Module

60"

Ceilin

g M

odul

e

12in

. cha

nnel

12in

. cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

12! 5"(60!)

6"(72!)

HALCYON 30! x 30! x 1! FL DXT, DXI

SL DX

SQ DX

MARS 30! x 30! x 3/4! FLB DXT, DXI

SLT DX

SQ DX

MARS High-NRC 30! x 30! x 7/8! FLB DXT, DXI

SLT DX

SQ DX

PANZ Metal Panels, Solid 30! x 30! FL DXT, DXI

On-Module Channel Spacing 5" Ceiling Module 12! ChannelSystem 934 30! x 30! Infill Panel

Page 83: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

Cross Tee 2Usage Per Sq. Ft.

Cross Tee 3Usage Per Sq. Ft.

System Module 729 30 0.20 0.33 0.17 0.17

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 30! x 30! x 1! FL ¨ 98335 SL ¨ 98333 SQ ¨ 98331

MARS 30! x 30! x 3/4! FLB ¨ 86830 SLT ¨ 86875 SQ ¨ 86815

MARS High-NRC 30! x 30! x 7/8! FLB ¨ 86400 SLT ¨ 86500 SQ ¨ 86426

PANZ Metal Panels, Solid 30! x 30! FL ¨ 212123

Channel Panels HALCYON 12! x 60! x 1! FL ¨ 97576 SL ¨ 97434 SQ ¨ 97492

MARS 12! x 60! x 3/4! FLB ¨ 88885 SLT ¨ 86545 SQ ¨ 86517

MARS High-NRC 12! x 60! x 7/8! FLB ¨ 86477 SLT ¨ 86445 SQ ¨ 86408

PANZ Metal Panels, Solid 12! x 60! FL ¨ 212160

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24

Cross Tee 1 2 ¨ DXT524

Cross Tee 2 2 ¨ DXT3022

IDENTITEE DXI Main Tee ¨ DXI24

Cross Tee 1 2 ¨ DXI524

Cross Tee 2 2 ¨ DXI3022

DONN DX Main Tee ¨ DX/DXL24 ¨ DX/DXL24

Cross Tee 1 2 ¨ DX524 2 ¨ DX524

Cross Tee 2 2 ¨ DX3016 2 ¨ DX3016

Order Information 5" Ceiling Module 12! ChannelSystem 934 30! x 30! Infill Panel

Step 3. Select Corresponding Grid for Selected Panels

LOGIX Integrated Ceiling Systems Systems Guide 81

Step 1. Select Panels Step 2. Select Edge for Panels

Page 84: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

82 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

12" Channel Panel 12" Channel Panel

20" x 60" Infill Panel

Cross Tee 1

Main TeeCross Tee 2

Module Layout

60"12" 12"

20"

20"

20"

72"Channel Module

60"

Ceilin

g M

odul

e

12in

. cha

nnel

12in

. cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

12! 5"(60!)

6"(72!)

HALCYON 60! x 20! x 1! FL DXT, DXI

SL DX

SQ DX

MARS 60! x 20! x 3/4! FLB DXT, DXI

SLT DX

SQ DX

MARS High-NRC 60! x 20! x 7/8! FLB DXT, DXI

SLT DX

SQ DX

PANZ Metal Panels, Solid 60! x 20! FL DXT, DXI

On-Module Channel Spacing 5" Ceiling Module 12! ChannelSystem 649 60! x 20! Infill Panel

Page 85: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

Cross Tee 2Usage Per Sq. Ft.

System Module 72! 30 0.20 0.33 0.33

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 60! x 20! x 1! FL ¨ 98194 SL ¨ 99267 SQ ¨ 98261

MARS 60! x 20! x 3/4! FLB ¨ 86164 SLT ¨ 86905 SQ ¨ 86160

MARS High-NRC 60! x 20! x 7/8! FLB ¨ 86481 SLT ¨ 86449 SQ ¨ 89501

PANZ Metal Panels, Solid 60! x 20! FL ¨ 212181

Channel Panels HALCYON 12! x 60! x 1! FL ¨ 97576 SL ¨ 97434 SQ ¨ 97492

MARS 12! x 60! x 3/4! FLB ¨ 88885 SLT ¨ 86545 SQ ¨ 86517

MARS High-NRC 12! x 60! x 7/8! FLB ¨ 86477 SLT ¨ 86445 SQ ¨ 86408

PANZ Metal Panels, Solid 12! x 60! FL ¨ 212160

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24

Cross Tee 1 2 ¨ DXT524

Cross Tee 2 2 ¨ DXT524

IDENTITEE DXI Main Tee ¨ DXI24

Cross Tee 1 2 ¨ DXI524

Cross Tee 2 2 ¨ DXI524

DONN DX Main Tee ¨ DX/DXL24 ¨ DX/DXL24

Cross Tee 1 2 ¨ DX524 2 ¨ DX524

Cross Tee 2 2 ¨ DX524 2 ¨ DX524

Order Information 5" Ceiling Module 12! ChannelSystem 649 60! x 20! Infill Panel

Step 3. Select Corresponding Grid for Selected Panels

LOGIX Integrated Ceiling Systems Systems Guide 83

Step 1. Select Panels Step 2. Select Edge for Panels

Page 86: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

84 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

24" x 48" Infill Panel

12" Channel Panel 12" Channel Panel

Cross Tee 1

Main TeeCross Tee 2

Module Layout

24"

24"

24"

48"12" 12"

60"Channel Module

72"

Ceilin

g M

odul

e

12in

. cha

nnel

12in

. cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

12! 6" (72!)

5"(60!)

HALCYON 24! x 48! x 1! FL DXT, DXI

SL DX

SQ DX

MARS 24! x 48 x 3/4! FLB DXT, DXI

SLT DX

SQ DX

MARS High-NRC 24! x 48! x 7/8! FLB DXT, DXI

SLT DX

SQ DX

PANZ Metal Panels, Solid 24! x 48! FL DXT, DXI

On-Module Channel Spacing 6" Ceiling Module 12! ChannelSystem 997 24! x 48! Infill Panel

Page 87: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

Cross Tee 2Usage Per Sq. Ft.

System Module 60! 30 0.17 0.40 0.27

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 24! x 48! x 1! FL ¨ 98245 SL ¨ 98243 SQ ¨ 98241

MARS 24! x 48! x 3/4! FLB ¨ 88985 SLT ¨ 88785 SQ ¨ 88185

MARS High-NRC 24! x 48! x 7/8! FLB ¨ 89500 SLT ¨ 89600 SQ ¨ 86300

PANZ Metal Panels, Solid 24! x 48! FL ¨ 212164

Channel Panels HALCYON 12! x 72! x 1! FL ¨ 97463 SL ¨ 97435 SQ ¨ 97406

MARS 12! x 72! x 3/4! FLB ¨ 86570 SLT ¨ 86546 SQ ¨ 86518

MARS High-NRC 12! x 72! x 7/8! FLB ¨ 86478 SLT ¨ 86446 SQ ¨ 86409

PANZ Metal Panels, Solid 12! x 72! FL ¨ 202654

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24

Cross Tee 1 2 ¨ DXT624

Cross Tee 2 2 ¨ DXT424

IDENTITEE DXI Main Tee ¨ DXI24

Cross Tee 1 2 ¨ DXI624

Cross Tee 2 2 ¨ DXI424

DONN DX Main Tee ¨ DX/DXL24 ¨ DX/DXL24

Cross Tee 1 2 ¨ DX624 2 ¨ DX624

Cross Tee 2 2 ¨ DX422 2 ¨ DX422

Order Information 6" Ceiling Module 12! ChannelSystem 997 24! x 48! Infill Panel

Step 3. Select Corresponding Grid for Selected Panels

LOGIX Integrated Ceiling Systems Systems Guide 85

Step 1. Select Panels Step 2. Select Edge for Panels

Page 88: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

86 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

24" x 24" Infill Panel

12" Channel Panel 12" Channel Panel

Cross Tee 1

Main TeeCross Tee 3

Cross Tee 2

Module Layout

24"

24"

24"

24"12" 12"24"

60"Channel Module

72"

Ceilin

g M

odul

e

12in

. cha

nnel

12in

. cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

12! 6"(72!)

5"(60!)

HALCYON 24! x 24! x 1! FL DXT, DXI

SL DX

SQ DX, DXT

MARS 24! x 24! x 3/4! FLB DXT, DXI

SLT DX

SQ DX, DXT

MARS High-NRC 24! x 24! x 7/8! FLB DXT, DXI

SLT DX

SQ DX, DXT

PANZ Metal Panels, Solid 24! x 24! FL DXT, DXI

On-Module Channel Spacing 6" Ceiling Module 12! ChannelSystem 665 24! x 24! Infill Panel

Page 89: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

Cross Tee 2Usage Per Sq. Ft.

Cross Tee 3Usage Per Sq. Ft.

System Module 60! 30 0.17 0.40 0.20 0.27

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 24! x 24! x 1! FL ¨ 98225 SL ¨ 98223 SQ ¨ 98221

MARS 24! x 24! x 3/4! FLB ¨ 86985 SLT ¨ 86785 SQ ¨ 86185

MARS High-NRC 24! x 24! x 7/8! FLB ¨ 87100 SLT ¨ 87200 SQ ¨ 86100

PANZ Metal Panels, Solid 24! x 24! FL ¨ 275616

Channel Panels HALCYON 12! x 72! x 1! FL ¨ 97463 SL ¨ 97435 SQ ¨ 97406

MARS 12! x 72! x 3/4! FLB ¨ 86570 SLT ¨ 86546 SQ ¨ 86518

MARS High-NRC 12! x 72! x 7/8! FLB ¨ 86478 SLT ¨ 86446 SQ ¨ 86409

PANZ Metal Panels, Solid 12! x 72! FL ¨ 202654

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24 ¨ DXT24

Cross Tee 1 2 ¨ DXT624 2 ¨ DXT624

Cross Tee 2 1 ¨ DXT624 1 ¨ DXT624

Cross Tee 3 4 ¨ DXT222 4 ¨ DXT222

IDENTITEE DXI Main Tee ¨ DXI24

Cross Tee 1 2 ¨ DXI624

Cross Tee 2 1 ¨ DXI624

Cross Tee 3 4 ¨ DXI222

DONN DX Main Tee ¨ DX/DXL24 ¨ DX/DXL24

Cross Tee 1 2 ¨ DX624 2 ¨ DX624

Cross Tee 2 1 ¨ DX624 1 ¨ DX624

Cross Tee 3 4 ¨ DX216 4 ¨ DX216

Order Information 6" Ceiling Module 12! ChannelSystem 665 24! x 24! Infill Panel

Step 3. Select Corresponding Grid for Selected Panels

LOGIX Integrated Ceiling Systems Systems Guide 87

Step 1. Select Panels Step 2. Select Edge for Panels

Page 90: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

88 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

12" Channel Panel 12" Channel Panel

72" x 24" Infill Panel

Cross Tee 1

Main Tee

Cross Tee 2

Module Layout

24"12" 12"24"

60"Channel Module

72"

Ceilin

g M

odul

e

12in

. cha

nnel

12in

. cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

12! 6"(72!)

5"(60!)

HALCYON 24! x 72! x 1! FL DXT, DXI

SL DX

SQ DX

MARS 24! x 72! x 3/4! FLB DXT, DXI

SLT DX

SQ DX

MARS High-NRC 24! x 72! x 7/8! FLB DXT, DXI

SLT DX

SQ DX

PANZ Metal Panels, Solid 24! x 72! FL DXT, DXI

On-Module Channel Spacing 6" Ceiling Module 12! ChannelSystem 785 24! x 72! Infill Panel

Page 91: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

Cross Tee 2Usage Per Sq. Ft.

System Module 60! 30 0.17 0.40 0.20

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 24! x 72! x 1! FL ¨ 98348 SL ¨ 99268 SQ ¨ 99234

MARS 24! x 72! x 3/4! FLB ¨ 88996 SLT ¨ 86166 SQ ¨ 86223

MARS High-NRC 24! x 72! x 7/8! FLB ¨ 89670 SLT ¨ 89660 SQ ¨ 86360

PANZ Metal Panels, Solid 24! x 72! FL ¨ 212192

Channel Panels HALCYON 12! x 72! x 1! FL ¨ 97463 SL ¨ 97435 SQ ¨ 97406

MARS 12! x 72! x 3/4! FLB ¨ 86570 SLT ¨ 86546 SQ ¨ 86518

MARS High-NRC 12! x 72! x 7/8! FLB ¨ 86478 SLT ¨ 86446 SQ ¨ 86409

PANZ Metal Panels, Solid 12! x 72! FL ¨ 202654

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24

Cross Tee 1 2 ¨ DXT624

Cross Tee 2 1 ¨ DXT624

IDENTITEE DXI Main Tee ¨ DXI24

Cross Tee 1 2 ¨ DXI624

Cross Tee 2 1 ¨ DXI624

DONN DX Main Tee ¨ DX/DXL24 ¨ DX/DXL24

Cross Tee 1 2 ¨ DX624 2 ¨ DX624

Cross Tee 2 1 ¨ DX624 1 ¨ DX624

Order Information 6" Ceiling Module 12! ChannelSystem 785 24! x 72! Infill Panel

Step 3. Select Corresponding Grid for Selected Panels

LOGIX Integrated Ceiling Systems Systems Guide 89

Step 1. Select Panels Step 2. Select Edge for Panels

Page 92: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

90 Systems Guide LOGIX Integrated Ceiling Systems

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

4! 4"(48!)

4"- 4!(52!)

HALCYON 24! x 48! x 1! FL DXT, DXI

SL DX

SQ DX

MARS 24! x 48! x 3/4! FLB DXT, DXI

SLT DX

SQ DX

MARS High-NRC 24! x 48! x 7/8! FLB DXT, DXI

SLT DX

SQ DX

PANZ Metal Panels, Solid 24! x 48! FL DXT, DXI

Panel Layout Suspension System Layout

24" x 48" Infill Panel

4" Channel Panel 4" Channel Panel

Cross Tee 1

Main Tee

Cross Tee 2

Module Layout

24"4" 4"24"

52"Channel Module

48"

Ceilin

g M

odul

e

4in.

cha

nnel

4in.

cha

nnel

Off-Module Channel Spacing 4" Ceiling Module 4! ChannelSystem 367 24! x 48! Infill Panel

Page 93: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

Cross Tee 2Usage Per Sq. Ft.

System Module 52! 17.333 0.25 0.46 0.23

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 24! x 48! x 1! FL ¨ 98245 SL ¨ 98243 SQ ¨ 98241

MARS 24! x 48! x 3/4! FLB ¨ 88985 SLT ¨ 88785 SQ ¨ 88185

MARS High-NRC 24! x 48! x 7/8! FLB ¨ 89500 SLT ¨ 89600 SQ ¨ 86300

PANZ Metal Panels, Solid 24! x 48! FL ¨ 212164

Channel Panels HALCYON 4! x 48! x 1! FL ¨ 97460 SL ¨ 97430 SQ ¨ 97402

MARS 4! x 48! x 3/4! FLB ¨ 86568 SLT ¨ 86540 SQ ¨ 86514

MARS High-NRC 4! x 48! x 7/8! FLB ¨ 86475 SLT ¨ 86440 SQ ¨ 86402

PANZ Metal Panels, Solid 4! x 48! FL ¨ 202636

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24SP103

Cross Tee 1 2 ¨ DXT424

Cross Tee 2 1 ¨ DXT424

IDENTITEE DXI Main Tee ¨ DXI24SP103

Cross Tee 1 2 ¨ DXI424

Cross Tee 2 1 ¨ DXI424

DONN DX Main Tee ¨ DX24SP103 ¨ DX24SP103

Cross Tee 1 2 ¨ DX422 2 ¨ DX422

Cross Tee 2 1 ¨ DX422 1 ¨ DX422

Order Information 4" Ceiling Module 4! ChannelSystem 367 24! x 48! Infill Panel

LOGIX Integrated Ceiling Systems Systems Guide 91

Step 1. Select Panels Step 2. Select Edge for Panels

Page 94: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

92 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

24" x 48" Infill Panel

6" Channel Panel 6" Channel Panel

Cross Tee 1

Main Tee

Cross Tee 2

Module Layout

24"6" 6"24"

54"Channel Module

48"

Ceilin

g M

odul

e

6in.

cha

nnel

6in.

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

6! 4"(48!)

4"- 6!(54!)

HALCYON 24! x 48! x 1! FL DXT, DXI

SL DX

SQ DX

MARS 24! x 48 x 3/4! FLB DXT, DXI

SLT DX

SQ DX

MARS High-NRC 24! x 48! x 7/8! FLB DXT, DXI

SLT DX

SQ DX

PANZ Metal Panels, Solid 24! x 48! FL DXT, DXI

Off-Module Channel Spacing 4" Ceiling Module 6! ChannelSystem 598 24! x 48! Infill Panel

Page 95: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

Cross Tee 2Usage Per Sq. Ft.

System Module 54! 18 0.25 .44 .22

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 24! x 48! x 1! FL ¨ 98245 SL ¨ 98243 SQ ¨ 98241

MARS 24! x 48! x 3/4! FLB ¨ 88985 SLT ¨ 88785 SQ ¨ 88185

MARS High-NRC 24! x 48! x 7/8! FLB ¨ 89500 SLT ¨ 89600 SQ ¨ 86300

PANZ Metal Panels, Solid 24! x 48! FL ¨ 212164

Channel Panels HALCYON 6! x 48! x 1! FL ¨ 98198 SL ¨ 99271 SQ ¨ 97227

MARS 6! x 48! x 3/4! FLB ¨ 88887 SLT ¨ 86542 SQ ¨ 86325

MARS High-NRC 6! x 48! x 7/8! FLB ¨ 86331 SLT ¨ 86442 SQ ¨ 86404

PANZ Metal Panels, Solid 6! x 48! FL ¨ 256820 SL ¨ 256819 SQ ¨ 256768

Panz Metal Panels, Perf C116 6! x 48! FL ¨ 256062 SL ¨ 257248 SQ ¨ 256397

Panz Metal Panels, Perf C116D 6! x 48! FL ¨ 257585 SL ¨ 257584 SQ ¨ 257406

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24

Cross Tee 1 2 ¨ DXT424

Cross Tee 2 1 ¨ DXT424

IDENTITEE DXI Main Tee ¨ DXI24

Cross Tee 1 2 ¨ DXI424

Cross Tee 2 1 ¨ DXI424

DONN DX Main Tee ¨ DX/DXL24 ¨ DX/DXL24

Cross Tee 1 2 ¨ DX422 2 ¨ DX422

Cross Tee 2 1 ¨ DX422 1 ¨ DX422

Order Information 4" Ceiling Module 6! ChannelSystem 598 24! x 48! Infill Panel

Step 3. Select Corresponding Grid for Selected Panels

LOGIX Integrated Ceiling Systems Systems Guide 93

Step 1. Select Panels Step 2. Select Edge for Panels

Page 96: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

94 Systems Guide LOGIX Integrated Ceiling Systems

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

4! 4"(48!)

4"- 4!(52!)

HALCYON 24! x 24! x 1! FL DXT, DXI

SL DX

SQ DX, DXT

MARS 24! x 24! x 3/4! FLB DXT, DXI

SLT DX

SQ DX, DXT

MARS High-NRC 24! x 24! x 7/8! FLB DXT, DXI

SLT DX

SQ DX, DXT

PANZ Metal Panels, Solid 24! x 24! FL DXT, DXI

Panel Layout Suspension System Layout

24" x 24" Infill Panel

4" Channel Panel 4" Channel Panel

Cross Tee 1

Main TeeCross Tee 3

Cross Tee 2

Module Layout

24"

24"

24"4" 4"24"

52"Channel Module

48"

Ceilin

g M

odul

e

4in.

cha

nnel

4in.

cha

nnel

Off-Module Channel Spacing 4" Ceiling Module 4! ChannelSystem 977 24! x 24! Infill Panel

Page 97: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

Cross Tee 2Usage Per Sq. Ft.

Cross Tee 3Usage Per Sq. Ft.

System Module 54! 18 0.25 0.44 0.22 0.22

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 24! x 24! x 1! FL ¨ 98225 SL ¨ 98223 SQ ¨ 98221

MARS 24! x 24! x 3/4! FLB ¨ 86985 SLT ¨ 86785 SQ ¨ 86185

MARS High-NRC 24! x 24! x 7/8! FLB ¨ 87100 SLT ¨ 87200 SQ ¨ 86100

PANZ Metal Panels, Solid 24! x 24! FL ¨ 275616

Channel Panels HALCYON 4! x 48! x 1! FL ¨ 97460 SL ¨ 97430 SQ ¨ 97402

MARS 4! x 48! x 3/4! FLB ¨ 86568 SLT ¨ 86540 SQ ¨ 86514

MARS High-NRC 4! x 48! x 7/8! FLB ¨ 86475 SLT ¨ 86440 SQ ¨ 86402

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24SP103 1 ¨ DXT24SP103

Cross Tee 1 2 ¨ DXT424 2 ¨ DXT424

Cross Tee 2 1 ¨ DXT424 1 ¨ DXT424

Cross Tee 3 2 ¨ DXT222 2 ¨ DXT222

IDENTITEE DXI Main Tee ¨ DXI24SP103

Cross Tee 1 2 ¨ DXI424

Cross Tee 2 1 ¨ DXI424

Cross Tee 3 2 ¨ DXI222

DONN DX Main Tee ¨ DX24SP103 ¨ DX24SP103

Cross Tee 1 2 ¨ DX422 2 ¨ DX422

Cross Tee 2 1 ¨ DX422 1 ¨ DX422

Cross Tee 3 2 ¨ DX216 2 ¨ DX216

Order Information 4" Ceiling Module 4! ChannelSystem 977 24! x 24! Infill Panel

LOGIX Integrated Ceiling Systems Systems Guide 95

Step 1. Select Panels Step 2. Select Edge for Panels

Page 98: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

96 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

24" x 24" Infill Panel

6" Channel Panel 6" Channel Panel

Cross Tee 1

Main TeeCross Tee 3

Cross Tee 2

Module Layout

24"

24"

24"6" 6"24"

54"Channel Module

48"

Ceilin

g M

odul

e

6in.

cha

nnel

6in.

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

6! 4"(48!)

4"- 6!(54!)

HALCYON 24! x 24! x 1! FL DXT, DXI

SL DX

SQ DX, DXT

MARS 24! x 24! x 3/4! FLB DXT, DXI

SLT DX

SQ DX, DXT

MARS High-NRC 24! x 24! x 7/8! FLB DXT, DXI

SLT DX

SQ DX, DXT

PANZ Metal Panels, Solid 24! x 24! FL DXT, DXI

Off-Module Channel Spacing 4" Ceiling Module 6! ChannelSystem 862 24! x 24! Infill Panel

Page 99: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

Cross Tee 2Usage Per Sq. Ft.

Cross Tee 3Usage Per Sq. Ft.

System Module 54! 18 0.25 0.44 0.22 0.22

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 24! x 24! x 1! FL ¨ 98225 SL ¨ 98223 SQ ¨ 98221

MARS 24! x 24! x 3/4! FLB ¨ 86985 SLT ¨ 86785 SQ ¨ 86185

MARS High-NRC 24! x 24! x 7/8! FLB ¨ 87100 SLT ¨ 87200 SQ ¨ 86100

PANZ Metal Panels, Solid 24! x 24! FL ¨ 275616

Channel Panels HALCYON 6! x 48! x 1! FL ¨ 97572 SL ¨ 99271 SQ ¨ 97227

MARS 6! x 48! x 3/4! FLB ¨ 88887 SLT ¨ 86542 SQ ¨ 86325

MARS High-NRC 6! x 48! x 7/8! FLB ¨ 86331 SLT ¨ 86442 SQ ¨ 86404

PANZ Metal Panels, Solid 6! x 48! FL ¨ 256820 SL ¨ 256819 SQ ¨ 256768

Panz Metal Panels, Perf C116 6! x 48! FL ¨ 256062 SL ¨ 257248 SQ ¨ 256397

Panz Metal Panels, Perf C116D 6! x 48! FL ¨ 257585 SL ¨ 257584 SQ ¨ 257406

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24 ¨ DXT24

Cross Tee 1 2 ¨ DXT424 2 ¨ DXT424

Cross Tee 2 1 ¨ DXT424 1 ¨ DXT424

Cross Tee 3 2 ¨ DXT222 2 ¨ DXT222

IDENTITEE DXI Main Tee ¨ DXI24

Cross Tee 1 2 ¨ DXI424

Cross Tee 2 1 ¨ DXI424

Cross Tee 3 2 ¨ DXI222

DONN DX Main Tee ¨ DX/DXL24 ¨ DX/DXL24

Cross Tee 1 2 ¨ DX422 2 ¨ DX422

Cross Tee 2 1 ¨ DX422 1 ¨ DX422

Cross Tee 3 2 ¨ DX216 2 ¨ DX216

Order Information 4" Ceiling Module 6! ChannelSystem 862 24! x 24! Infill Panel

Step 3. Select Corresponding Grid for Selected Panels

LOGIX Integrated Ceiling Systems Systems Guide 97

Step 1. Select Panels Step 2. Select Edge for Panels

Page 100: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

98 Systems Guide LOGIX Integrated Ceiling Systems

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

4! 4"(48!)

4"- 4!(52!)

HALCYON 48! x 48! x 1! FL DXT, DXI

SL DX

SQ DX

Panel Layout Suspension System Layout

48" x 48" Infill Panel

4" Channel Panel 4" Channel Panel

Cross Tee 1

Main Tee

Module Layout

48"4" 4"

52"Channel Module

48"

Ceilin

g M

odul

e

4in.

cha

nnel

4in.

cha

nnel

`

Off-Module Channel Spacing 4" Ceiling Module 4! ChannelSystem 527 48! x 48! Infill Panel

Page 101: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

System Module 52! 17.333 0.25 0.46

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 48! x 48! x 1! FL ¨ 98445 SL ¨ 98443 SQ ¨ 98441

Channel Panels HALCYON 4! x 48! x 1! FL ¨ 97460 SL ¨ 97430 SQ ¨ 97402

HALCYON 6! x 48! x 1! FL ¨ 98198 SL ¨ 99271 SQ ¨ 97227

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24SP103

Cross Tee 1 2 ¨ DXT424

IDENTITEE DXI Main Tee ¨ DXI24SP103

Cross Tee 1 2 ¨ DXI424

DONN DX Main Tee ¨ DX24SP103 ¨ DX24SP103

Cross Tee 1 2 ¨ DX422 2 ¨ DX422

Order Information 4" Ceiling Module 4! ChannelSystem 527 48! x 48! Infill Panel

LOGIX Integrated Ceiling Systems Systems Guide 99

Step 1. Select Panels Step 2. Select Edge for Panels

Page 102: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

100 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

48" x 48" Infill Panel

6" Channel Panel 6" Channel Panel

Cross Tee 1

Main Tee

Module Layout

48"6" 6"

54"Channel Module

48"

Ceilin

g M

odul

e

6in.

cha

nnel

6in.

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

6! 4"(48!)

4"- 6!(54!)

HALCYON 48! x 48! x 1! FL DXT, DXI

SL DX

SQ DX

Off-Module Channel Spacing 4" Ceiling Module 6! ChannelSystem 244 48! x 48! Infill Panel

Page 103: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

System Module 54! 18 0.25 0.44

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 48! x 48! x 1! FL ¨ 98445 SL ¨ 98443 SQ ¨ 98441

Channel Panels HALCYON 6! x 48! x 1! FL ¨ 98198 SL ¨ 99271 SQ ¨ 97227

PANZ Metal Panels, Solid 6! x 48! FL ¨ 256820 SL ¨ 256819 SQ ¨ 256768

Panz Metal Panels, Perf C116 6! x 48! FL ¨ 256062 SL ¨ 257248 SQ ¨ 256397

Panz Metal Panels, Perf C116D 6! x 48! FL ¨ 257585 SL ¨ 257584 SQ ¨ 257406

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24

Cross Tee 1 2 ¨ DXT424

IDENTITEE DXI Main Tee ¨ DXI24

Cross Tee 1 2 ¨ DXI424

DONN DX Main Tee ¨ DX/DXL24 ¨ DX/DXL24

Cross Tee 1 2 ¨ DX422 2 ¨ DX422

Order Information 4" Ceiling Module 6! ChannelSystem 244 48! x 48! Infill Panel

LOGIX Integrated Ceiling Systems Systems Guide 101

Step 1. Select Panels Step 2. Select Edge for Panels

Page 104: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

102 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

72" x 24" Field Panel

4" Channel Panel 4" Channel Panel

Cross Tee 1

Main TeeCross Tee 2

Module Layout

24"

24"

72"4" 4"

76"Channel Module

48"

Ceilin

g M

odul

e

4in.

cha

nnel

4in.

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

4! 4"(48!)

6"- 4!(76!)

HALCYON 72! x 24! x 1! FL DXT, DXI

MARS 72! x 24! x 3/4! FLB DXT, DXI

MARS High-NRC 72! x 24! x 7/8! FLB DXT, DXI

PANZ Metal Panels, Solid 72! x 24! FL DXT, DXI

Off-Module Channel Spacing 4" Ceiling Module 4! ChannelSystem 529 72! x 24! Infill Panel

Page 105: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

Cross Tee 2Usage Per Sq. Ft.

System Module 78! 26 0.25 0.31 0.23

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 72! x 24! x 1! FL ¨ 98348

MARS 72! x 24! x 3/4! FLB ¨ 88996

MARS High-NRC 72! x 24! x 7/8! FLB ¨ 89670

PANZ Metal Panels, Solid 72! x 24! FL ¨ 212192

Channel Panels HALCYON 4! x 48! x 1! FL ¨ 97460 SL ¨ 97430 SQ ¨ 97402

MARS 4! x 48! x 3/4! FLB ¨ 86568

MARS High-NRC 4! x 48! x 7/8! FLB ¨ 86475

PANZ Metal Panels, Solid 4! x 48! FL ¨ 202636

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXTSP110

Cross Tee 1 2 ¨ DXT424

Cross Tee 2 1 ¨ DXT624

IDENTITEE DXI Main Tee ¨ DXISP110

Cross Tee 1 2 ¨ DXI424

Cross Tee 2 1 ¨ DXI624

Order Information 4" Ceiling Module 4! ChannelSystem 529 72! x 24! Infill Panel

Step 3. Select Corresponding Grid for Selected Panels

LOGIX Integrated Ceiling Systems Systems Guide 103

Step 1. Select Panels Step 2. Select Edge for Panels

Page 106: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

104 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

72" x 24" Infill Panel

6" Channel Panel 6" Channel Panel

Cross Tee 1

Main TeeCross Tee 2

Module Layout

24"

24"

72"6" 6"

78"Channel Module

48"

Ceilin

g M

odul

e

6in.

cha

nnel

6in.

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

6! 4"(48!)

6"- 6!(78!)

HALCYON 72! x 24! x 1! FL DXT, DXI

SL DX

SQ DX

MARS 72! x 24! x 3/4! FLB DXT, DXI

SLT DX

SQ DX

MARS High-NRC 72! x 24! x 7/8! FLB DXT, DXI

SLT DX

SQ DX

PANZ Metal Panels, Solid 72! x 24! FL DXT, DXI

Off-Module Channel Spacing 4" Ceiling Module 6! ChannelSystem 755 72! x 24! Infill Panel

Page 107: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

Cross Tee 2Usage Per Sq. Ft.

System Module 78! 26 0.25 0.31 0.23

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 72! x 24! x 1! FL ¨ 98348 SL ¨ 99268 SQ ¨ 99234

MARS 72! x 24! x 3/4! FLB ¨ 88996 SLT ¨ 86166 SQ ¨ 86223

MARS High-NRC 72! x 24! x 7/8! FLB ¨ 89670 SLT ¨ 89660 SQ ¨ 86360

PANZ Metal Panels, Solid 72! x 24! FL ¨ 212192

Channel Panels HALCYON 6! x 48! x 1! FL ¨ 98198 SL ¨ 99271 SQ ¨ 97227

MARS 6! x 48! x 3/4! FLB ¨ 88887 SLT ¨ 86542 SQ ¨ 86325

MARS High-NRC 6! x 48! x 7/8! FLB ¨ 86331 SLT ¨ 86442 SQ ¨ 86404

PANZ Metal Panels, Solid 6! x 48! FL ¨ 256820 SL ¨ 256819 SQ ¨ 256768

Panz Metal Panels, Perf C116 6! x 48! FL ¨ 256062 SL ¨ 257248 SQ ¨ 256397

Panz Metal Panels, Perf C116D 6! x 48! FL ¨ 257585 SL ¨ 257584 SQ ¨ 257406

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24

Cross Tee 1 2 ¨ DXT424

Cross Tee 2 1 ¨ DXT624

IDENTITEE DXI Main Tee ¨ DXI24

Cross Tee 1 2 ¨ DXI424

Cross Tee 2 1 ¨ DXI624

DONN DX Main Tee ¨ DX/DXL24 ¨ DX/DXL24

Cross Tee 1 2 ¨ DX422 2 ¨ DX422

Cross Tee 2 1 ¨ DX624 1 ¨ DX624

Order Information 4" Ceiling Module 6! ChannelSystem 755 72! x 24! Infill Panel

Step 3. Select Corresponding Grid for Selected Panels

LOGIX Integrated Ceiling Systems Systems Guide 105

Step 1. Select Panels Step 2. Select Edge for Panels

Page 108: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

106 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

24" x 24" Infill Panel

6" Channel Panel 6" Channel Panel

Cross Tee 1

Main Tee

Cross Tee 3

Cross Tee 2

Module Layout

24"

24"

24" 24" 24"6" 6"

78"Channel Module

48"

Ceilin

g M

odul

e

6in.

cha

nnel

6in.

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

6! 4"(48!)

6"- 6!(78!)

HALCYON 24! x 24! x 1! FL DXT, DXI

SL DX

SQ DX, DXT

MARS 24! x 24! x 3/4! FLB DXT, DXI

SLT DX

SQ DX, DXT

MARS High-NRC 24! x 24! x 7/8! FLB DXT, DXI

SLT DX

SQ DX, DXT

PANZ Metal Panels, Solid 24! x 24! FL DXT, DXI

Off-Module Channel Spacing 4" Ceiling Module 6! ChannelSystem 574 24! x 24! Infill Panel

Page 109: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

Cross Tee 2Usage Per Sq. Ft.

Cross Tee 3Usage Per Sq. Ft.

System Module 78! 26 0.25 0.31 0.31 0.23

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 24! x 24! x 1! FL ¨ 98225 SL ¨ 98223 SQ ¨ 98221

MARS 24! x 24! x 3/4! FLB ¨ 86985 SLT ¨ 86785 SQ ¨ 86185

MARS High-NRC 24! x 24! x 7/8! FLB ¨ 87100 SLT ¨ 87200 SQ ¨ 86100

PANZ Metal Panels, Solid 24! x 24! FL ¨ 275616

Channel Panels MARS 4! x 48! x 3/4! FLB ¨ 86568 SLT ¨ 86540 SQ ¨ 86514

MARS High-NRC 4! x 48! x 7/8! FLB ¨ 86475 SLT ¨ 86440 SQ ¨ 86402

PANZ Metal Panels, Solid 4! x 48! FL ¨ 202636

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24 ¨ DXT24

Cross Tee 1 2 ¨ DXT424 2 ¨ DXT424

Cross Tee 2 2 ¨ DXT424 2 ¨ DXT424

Cross Tee 3 3 ¨ DXT222 3 ¨ DXT222

IDENTITEE DXI Main Tee ¨ DXI24

Cross Tee 1 2 ¨ DXI424

Cross Tee 2 3 ¨ DXI424

Cross Tee 3 3 ¨ DXI222

DONN DX Main Tee ¨ DX/DXL24 ¨ DX/DXL24

Cross Tee 1 2 ¨ DX422 2 ¨ DX422

Cross Tee 2 2 ¨ DX422 2 ¨ DX422

Cross Tee 3 3 ¨ DX216 3 ¨ DX216

Order Information 4" Ceiling Module 6! ChannelSystem 574 24! x 24! Infill Panel

LOGIX Integrated Ceiling Systems Systems Guide 107

Step 1. Select Panels Step 2. Select Edge for Panels

Page 110: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

108 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

42" x 48" Infill Panel

6" Channel Panel 6" Channel Panel

Cross Tee 1

Main Tee

Cross Tee 2

Module Layout

42"6" 6"42"

86"Channel Module

48"

Ceilin

g M

odul

e

6in.

cha

nnel

6in.

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

6! 4"(48!)

7"- 6!(80!)

HALCYON 42! x 48! x 1! FL DXT, DXI

SL DX

SQ DX

Off-Module Channel Spacing 4" Ceiling Module 4! ChannelSystem 497 42! x 48! Infill Panel

Page 111: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

Cross Tee 2Usage Per Sq. Ft.

System Module 90! 30 0.25 0.27 0.13

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 42! x 48! x 1! FL ¨ 98343 SL ¨ 97454 SQ ¨ 97424

Channel Panels HALCYON 6! x 48! x 1! FL ¨ 98198 SL ¨ 99271 SQ ¨ 97227

PANZ Metal Panels, Solid 6! x 48! FL ¨ 256820 SL ¨ 256819 SQ ¨ 256768

Panz Metal Panels, Perf C116 6! x 48! FL ¨ 256062 SL ¨ 257248 SQ ¨ 256397

Panz Metal Panels, Perf C116D 6! x 48! FL ¨ 257585 SL ¨ 257584 SQ ¨ 257406

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24

Cross Tee 1 2 ¨ DXT424

Cross Tee 2 1 ¨ DXT424

IDENTITEE DXI Main Tee ¨ DXI24

Cross Tee 1 2 ¨ DXI424

Cross Tee 2 1 ¨ DXI424

DONN DX Main Tee ¨ DX/DXL24 ¨ DX/DXL24

Cross Tee 1 2 ¨ DX422 2 ¨ DX422

Cross Tee 2 1 ¨ DX422 1 ¨ DX422

Order Information 4" Ceiling Module 4! ChannelSystem 497 42! x 48! Infill Panel

LOGIX Integrated Ceiling Systems Systems Guide 109

Step 1. Select Panels Step 2. Select Edge for Panels

Page 112: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

110 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

96" x 24" Infill Panel

4" Channel Panel 4" Channel Panel

Cross Tee 1

Main TeeCross Tee 2

Module Layout

24"

24"

96"4" 4"

100"Channel Module

48"

Ceilin

g M

odul

e

4in.

cha

nnel

4in.

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

4! 4"(48!)

8"- 4!(100!)

HALCYON 96! x 24! x 1! FL DXT, DXI

SL DX

SQ DX

Off-Module Channel Spacing 4" Ceiling Module 4! ChannelSystem 722 96! x 24! Infill Panel

Page 113: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

Cross Tee 2Usage Per Sq. Ft.

System Module 100! 33.333 0.25 0.24 0.24

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 96! x 24! x 1! FL ¨ 98197 SL ¨ 99269 SQ ¨ 98351

Channel Panels HALCYON 4! x 48! x 1! FL ¨ 97460 SL ¨ 97430 SQ ¨ 97402

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24SP108

Cross Tee 1 2 ¨ DXT424

Cross Tee 2 1 ¨ DXT824

IDENTITEE DXI Main Tee ¨ DXI24SP108

Cross Tee 1 2 ¨ DXI424

Cross Tee 2 1 ¨ DXI824

DONN DX Main Tee ¨ DX24SP108 ¨ DX24SP108

Cross Tee 1 2 ¨ DX422 2 ¨ DX422

Cross Tee 2 1 ¨ DX824 1 ¨ DX824

Order Information 4" Ceiling Module 4! ChannelSystem 722 96! x 24! Infill Panel

LOGIX Integrated Ceiling Systems Systems Guide 111

Step 1. Select Panels Step 2. Select Edge for Panels

Page 114: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

112 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

48" x 48" Infill Panel

6" Channel Panel 6" Channel Panel

Cross Tee 1

Main Tee

Cross Tee 2

Module Layout

48" 48"6" 6"

102"Channel Module

48"

Ceilin

g M

odul

e

6in.

cha

nnel

6in.

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

6! 4"(48!)

8"- 6!(102!)

HALCYON 48! x 48! x 1! FL DXT, DXI

SL DX

SQ DX

MARS 48! x 48 x 3/4! FLB DXT, DXI

SLT DX

SQ DX

MARS High-NRC 48! x 48! x 7/8! FLB DXT, DXI

SLT DX

SQ DX

Off-Module Channel Spacing 4" Ceiling Module 6! ChannelSystem 754 48! x 48! Infill Panel

Page 115: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

Cross Tee 2Usage Per Sq. Ft.

System Module 102! 34 0.25 0.24 0.12

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 48! x 48! x 1! FL ¨ 98445 SL ¨ 98443 SQ ¨ 98441

Channel Panels HALCYON 6! x 48! x 1! FL ¨ 98198 SL ¨ 99271 SQ ¨ 97227

PANZ Metal Panels, Solid 6! x 48! FL ¨ 256820 SL ¨ 256819 SQ ¨ 256768

Panz Metal Panels, Perf C116 6! x 48! FL ¨ 256062 SL ¨ 257248 SQ ¨ 256397

Panz Metal Panels, Perf C116D 6! x 48! FL ¨ 257585 SL ¨ 257584 SQ ¨ 257406

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24

Cross Tee 1 2 ¨ DXT424

Cross Tee 2 1 ¨ DXT424

IDENTITEE DXI Main Tee ¨ DXI24

Cross Tee 1 2 ¨ DXI424

Cross Tee 2 1 ¨ DXI424

DONN DX Main Tee ¨ DX/DXL24 ¨ DX/DXL24

Cross Tee 1 2 ¨ DX422 2 ¨ DX422

Cross Tee 2 1 ¨ DX422 1 ¨ DX422

Order Information 4" Ceiling Module 6! ChannelSystem 754 48! x 48! Infill Panel

LOGIX Integrated Ceiling Systems Systems Guide 113

Step 1. Select Panels Step 2. Select Edge for Panels

Page 116: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

114 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

96" x 24" Infill Panel

6" Channel Panel 6" Channel Panel

Cross Tee 1

Main TeeCross Tee 2

Module Layout

24"

24"

96"6" 6"

102"Channel Module

48"

Ceilin

g M

odul

e

6in.

cha

nnel

6in.

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

6! 4"(48!)

8"- 6!(102!)

HALCYON 96! x 24! x 1! FL DXT, DXI

SL DX

SQ DX

Off-Module Channel Spacing 4" Ceiling Module 6! ChannelSystem 664 96! x 24! Infill Panel

Page 117: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

Cross Tee 2Usage Per Sq. Ft.

System Module 102! 34 0.25 0.24 0.12

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 96! x 24! x 1! FL ¨ 98197 SL ¨ 99269 SQ ¨ 98351

Channel Panels HALCYON 6! x 48! x 1! FL ¨ 98198 SL ¨ 99271 SQ ¨ 97227

PANZ Metal Panels, Solid 6! x 48! FL ¨ 256820 SL ¨ 256819 SQ ¨ 256768

Panz Metal Panels, Perf C116 6! x 48! FL ¨ 256062 SL ¨ 257248 SQ ¨ 256397

Panz Metal Panels, Perf C116D 6! x 48! FL ¨ 257585 SL ¨ 257584 SQ ¨ 257406

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24

Cross Tee 1 2 ¨ DXT424

Cross Tee 2 1 ¨ DXT824

IDENTITEE DXI Main Tee ¨ DXI24

Cross Tee 1 2 ¨ DXI424

Cross Tee 2 1 ¨ DXI824

DONN DX Main Tee ¨ DX/DXL24 ¨ DX/DXL24

Cross Tee 1 2 ¨ DX422 2 ¨ DX422

Cross Tee 2 1 ¨ DX824 1 ¨ DX824

Order Information 4" Ceiling Module 6! ChannelSystem 664 96! x 24! Infill Panel

LOGIX Integrated Ceiling Systems Systems Guide 115

Step 1. Select Panels Step 2. Select Edge for Panels

Page 118: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

116 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

96" x 48" Infill Panel

6" Channel Panel 6" Channel Panel

Cross Tee 1

Main Tee

Module Layout

96"6" 6"

102"Channel Module

48"

Ceilin

g M

odul

e

6in.

cha

nnel

6in.

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

6! 4"(48!)

8"- 6!(102!)

HALCYON 96! x 48! x 1! SL DX

SQ DX

Off-Module Channel Spacing 4" Ceiling Module 6! ChannelSystem 979 96! x 48! Infill Panel

Page 119: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

System Module 102! 34 0.25 0.24

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 96! x 48! x 1! SL ¨ 98483 SQ ¨ 98481

Channel Panels HALCYON 6! x 48! x 1! SL ¨ 99271 SQ ¨ 97227

PANZ Metal Panels, Solid 6! x 48! SL ¨ 256819 SQ ¨ 256768

Panz Metal Panels, Perf C116 6! x 48! SL ¨ 257248 SQ ¨ 256397

Panz Metal Panels, Perf C116D 6! x 48! SL ¨ 257584 SQ ¨ 257406

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

DONN DX Main Tee ¨ DX/DXL24 ¨ DX/DXL24

Cross Tee 1 2 ¨ DX422 2 ¨ DX422

Order Information 4" Ceiling Module 6! ChannelSystem 979 96! x 48! Infill Panel

LOGIX Integrated Ceiling Systems Systems Guide 117

Step 1. Select Panels Step 2. Select Edge for Panels

Page 120: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

118 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

24" x 24" Infill Panel 24" x 24" Infill Panel

6" Channel Panel 6" Channel Panel

Cross Tee 1

Main Tee

Cross Tee 3

Cross Tee 2

Module Layout

24"

24"

6" 6"24" 24" 24" 24"

102"Channel Module

48"

Ceilin

g M

odul

e

6in.

cha

nnel

6in.

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

6! 4"(48!)

8"- 6!(102!)

HALCYON 24! x 24! x 1! FL DXT, DXI

SL DX

SQ DX, DXT

MARS 24! x 24! x 3/4! FLB DXT, DXI

SLT DX

SQ DX, DXT

MARS High-NRC 24! x 24! x 7/8! FLB DXT, DXI

SLT DX

SQ DX, DXT

PANZ Metal Panels, Solid 24! x 24! FL DXT, DXI

Off-Module Channel Spacing 4" Ceiling Module 6! ChannelSystem 776 24! x 24! Infill Panel

Page 121: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

Cross Tee 2Usage Per Sq. Ft.

Cross Tee 3Usage Per Sq. Ft.

System Module 102! 34 0.25 0.24 0.35 0.24

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 24! x 24! x 1! FL ¨ 98225 SL ¨ 98223 SQ ¨ 98221

MARS 24! x 24! x 3/4! FLB ¨ 86985 SLT ¨ 86785 SQ ¨ 86185

MARS High-NRC 24! x 24! x 7/8! FLB ¨ 87100 SLT ¨ 87200 SQ ¨ 86100

PANZ Metal Panels, Solid 24! x 24! FL ¨ 275616

Channel Panels HALCYON 6! x 48! x 1! FL ¨ 98198 SL ¨ 99271 SQ ¨ 97227

MARS 6! x 48! x 3/4! FLB ¨ 88887 SLT ¨ 86542 SQ ¨ 86325

MARS High-NRC 6! x 48! x 7/8! FLB ¨ 86331 SLT ¨ 86442 SQ ¨ 86404

PANZ Metal Panels, Solid 6! x 48! FL ¨ 256820 SL ¨ 256819 SQ ¨ 256768

Panz Metal Panels, Perf C116 6! x 48! FL ¨ 256062 SL ¨ 257248 SQ ¨ 256397

Panz Metal Panels, Perf C116D 6! x 48! FL ¨ 257585 SL ¨ 257584 SQ ¨ 257406

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24 ¨ DXT24

Cross Tee 1 2 ¨ DXT424 2 ¨ DXT424

Cross Tee 2 3 ¨ DXT424 3 ¨ DXT424

Cross Tee 3 4 ¨ DXT222 4 ¨ DXT222

IDENTITEE DXI Main Tee ¨ DXI24

Cross Tee 1 2 ¨ DXI424

Cross Tee 2 3 ¨ DXI424

Cross Tee 3 4 ¨ DXI222

DONN DX Main Tee ¨ DX/DXL24 ¨ DX/DXL24

Cross Tee 1 2 ¨ DX422 2 ¨ DX422

Cross Tee 2 3 ¨ DX422 3 ¨ DX422

Cross Tee 3 4 ¨ DX216 4 ¨ DX216

Order Information 4" Ceiling Module 6! ChannelSystem 776 24! x 24! Infill Panel

Step 3. Select Corresponding Grid for Selected Panels

LOGIX Integrated Ceiling Systems Systems Guide 119

Step 1. Select Panels Step 2. Select Edge for Panels

Page 122: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

120 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout

120" x 24" Infill Panel

6" Channel Panel 6" Channel Panel

Module Layout

24"

24"

120"6" 6"

126"Channel Module

48"

Ceilin

g M

odul

e

6in.

cha

nnel

6in.

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

6! 4"(48!)

10"- 6!(126!)

HALCYON 120! x 24! x 1! FL DXT, DXI

Off-Module Channel Spacing 4" Ceiling Module 6! ChannelSystem 383 120! x 24! Infill Panel

Suspension System Layout

Cross Tee 1

Main TeeCross Tee 2

Page 123: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

LOGIX Integrated Ceiling Systems Systems Guide 121

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

Cross Tee 2Usage Per Sq. Ft.

System Module 126! 34 0.25 0.19 0.24

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 120! x 24! x 1! FL ¨ 99213

Channel Panels HALCYON 6! x 48! x 1! FL ¨ 98198

PANZ Metal Panels, Solid 6! x 48! FL ¨ 256820

Panz Metal Panels, Perf C116 6! x 48! FL ¨ 256062

Panz Metal Panels, Perf C116D 6! x 48! FL ¨ 257585

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24SP110

Cross Tee 1 2 ¨ DXT424

Cross Tee 2 1 ¨ DXT1024

IDENTITEE DXI Main Tee ¨ DXI24SP110

Cross Tee 1 2 ¨ DXI424

Cross Tee 2 1 ¨ DXI1024

Order Information 4" Ceiling Module 6! ChannelSystem 383 120! x 24! Infill Panel

Step 1. Select Panels Step 2. Select Edge for Panels

Page 124: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

122 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

30" x 60" Infill Panel

4" Channel Panel 4" Channel Panel

Cross Tee 1

Main Tee

Cross Tee 2

Module Layout

30" 30"4" 4"

64"Channel Module

60"

Ceilin

g M

odul

e

4in.

cha

nnel

4in.

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

4! 5"(60!)

5"- 4!(64!)

HALCYON 30! x 60! x 1! FL DXT, DXI

SL DX

SQ DX

MARS 30! x 60! x 3/4! FLB DXT, DXI

SLT DX

SQ DX

MARS High-NRC 30! x 60! x 7/8! FLB DXT, DXI

SLT DX

SQ DX

PANZ Metal Panels, Solid 30! x 60! FL DXT, DXI

Off-Module Channel Spacing 5" Ceiling Module 4! ChannelSystem 697 30! x 60! Infill Panel

Page 125: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

Cross Tee 2Usage Per Sq. Ft.

System Module 64! 26.667 0.20 0.38 0.19

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 30! x 60! x 1! FL ¨ 98336 SL ¨ 99270 SQ ¨ 97266

MARS 30! x 60! x 3/4! FLB ¨ 86267 SLT ¨ 86564 SQ ¨ 86536

MARS High-NRC 30! x 60! x 7/8! FLB ¨ 86497 SLT ¨ 86466 SQ ¨ 86429

PANZ Metal Panels, Solid 30! x 60! FL ¨ 212201

Channel Panels HALCYON 4! x 60! x 1! FL ¨ 97461 SL ¨ 97431 SQ ¨ 97403

MARS 4! x 60! x 3/4! FLB ¨ 86569 SLT ¨ 86541 SQ ¨ 86515

MARS High-NRC 4! x 60! x 7/8! FLB ¨ 86476 SLT ¨ 86441 SQ ¨ 86403

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24SP107

Cross Tee 1 2 ¨ DXT524

Cross Tee 2 1 ¨ DXT524

IDENTITEE DXI Main Tee ¨ DXI24SP107

Cross Tee 1 2 ¨ DXI524

Cross Tee 2 1 ¨ DXI524

DONN DX Main Tee ¨ DX24SP107 ¨ DX24SP107

Cross Tee 1 2 ¨ DX524 2 ¨ DX524

Cross Tee 2 1 ¨ DX524 1 ¨ DX524

Order Information 5" Ceiling Module 4! ChannelSystem 697 30! x 60! Infill Panel

LOGIX Integrated Ceiling Systems Systems Guide 123

Step 1. Select Panels Step 2. Select Edge for Panels

Page 126: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

124 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

30" x 60" Infill Panel

6" Channel Panel 6" Channel Panel

Cross Tee 1

Main Tee

Cross Tee 2

Module Layout

30" 30"6" 6"

66"Channel Module

60"

Ceilin

g M

odul

e

6in.

cha

nnel

6in.

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

6! 5"(60!)

5"- 6!(66!)

HALCYON 30! x 60! x 1! FL DXT, DXI

SL DX

SQ DX

MARS 30! x 60! x 3/4! FLB DXT, DXI

SLT DX

SQ DX

MARS High-NRC 30! x 60! x 7/8! FLB DXT, DXI

SLT DX

SQ DX

PANZ Metal Panels, Solid 30! x 60! FL DXT, DXI

Off-Module Channel Spacing 5" Ceiling Module 6! ChannelSystem 369 30! x 60! Infill Panel

Page 127: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

Cross Tee 2Usage Per Sq. Ft.

System Module 66! 27.5 0.20 0.36 0.18

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 30! x 60! x 1! FL ¨ 98336 SL ¨ 99270 SQ ¨ 97266

MARS 30! x 60! x 3/4! FLB ¨ 86267 SLT ¨ 86564 SQ ¨ 86536

MARS High-NRC 30! x 60! x 7/8! FLB ¨ 86497 SLT ¨ 86466 SQ ¨ 86429

PANZ Metal Panels, Solid 30! x 60! FL ¨ 212201

Channel Panels HALCYON 6! x 60! x 1! FL ¨ 98199 SL ¨ 99272 SQ ¨ 97228

MARS 6! x 60! x 3/4! FLB ¨ 86835 SLT ¨ 86543 SQ ¨ 86507

MARS High-NRC 6! x 60! x 7/8! FLB ¨ 86333 SLT ¨ 86443 SQ ¨ 86145

PANZ Metal Panels, Solid 6! x 60! FL ¨ 258036 SL ¨ 257972 SQ ¨ 257586

Panz Metal Panels, Perf C116 6! x 60! FL ¨ 259228 SL ¨ 259010 SQ ¨ 259009

Panz Metal Panels, Perf C116D 6! x 60! FL ¨ 259353 SL ¨ 259344 SQ ¨ 259308

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24

Cross Tee 1 2 ¨ DXT524

Cross Tee 2 1 ¨ DXT524

IDENTITEE DXI Main Tee ¨ DXI24

Cross Tee 1 2 ¨ DXI524

Cross Tee 2 1 ¨ DXI524

DONN DX Main Tee ¨ DX/DXL24 ¨ DX/DXL24

Cross Tee 1 2 ¨ DX524 2 ¨ DX524

Cross Tee 2 1 ¨ DX524 1 ¨ DX524

Order Information 5" Ceiling Module 6! ChannelSystem 369 30! x 60! Infill Panel

Step 3. Select Corresponding Grid for Selected Panels

LOGIX Integrated Ceiling Systems Systems Guide 125

Step 1. Select Panels Step 2. Select Edge for Panels

Page 128: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

126 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

30" x 30" Infill Panel

4" Channel Panel 4" Channel Panel

Cross Tee 1

Main TeeCross Tee 3

Cross Tee 2

Module Layout

30" 30"4" 4"

30"

30"

64"Channel Module

60"

Ceilin

g M

odul

e

4in.

cha

nnel

4in.

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

4! 5"(60!)

5"- 4!(64!)

HALCYON 30! x 30! x 1! FL DXT, DXI

SL DX

SQ DX

MARS 30! x 30! x 3/4! FLB DXT, DXI

SLT DX

SQ DX

MARS High-NRC 30! x 30! x 7/8! FLB DXT, DXI

SLT DX

SQ DX

PANZ Metal Panels, Solid 30! x 30! FL DXT, DXI

Off-Module Channel Spacing 5" Ceiling Module 4! ChannelSystem 378 30! x 30! Infill Panel

Page 129: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

Cross Tee 2Usage Per Sq. Ft.

System Module 66! 27.5 0.20 0.36 0.18

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 30! x 30! x 1! FL ¨ 98335 SL ¨ 98333 SQ ¨ 98331

MARS 30! x 30! x 3/4! FLB ¨ 86830 SLT ¨ 86875 SQ ¨ 86815

MARS High-NRC 30! x 30! x 7/8! FLB ¨ 86400 SLT ¨ 86500 SQ ¨ 86426

PANZ Metal Panels, Solid 30! x 30! FL ¨ 212123

Channel Panels HALCYON 4! x 60! x 1! FL ¨ 97461 SL ¨ 97431 SQ ¨ 97403

MARS 4! x 60! x 3/4! FLB ¨ 86569 SLT ¨ 86541 SQ ¨ 86515

MARS High-NRC 4! x 60! x 7/8! FLB ¨ 86476 SLT ¨ 86441 SQ ¨ 86403

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24SP107

Cross Tee 1 2 ¨ DXT524

Cross Tee 2 1 ¨ DXT524

Cross Tee 3 1 ¨ DXT3022

IDENTITEE DXI Main Tee ¨ DXI24SP107

Cross Tee 1 2 ¨ DXI524

Cross Tee 2 1 ¨ DXI524

Cross Tee 3 1 ¨ DXI3022

DONN DX Main Tee ¨ DX124SP107 ¨ DX124SP107

Cross Tee 1 2 ¨ DX524 2 ¨ DX524

Cross Tee 2 1 ¨ DX524 1 ¨ DX524

Cross Tee 3 1 ¨ DX3016 1 ¨ DX3016

Order Information 5" Ceiling Module 4! ChannelSystem 378 30! x 30! Infill Panel

LOGIX Integrated Ceiling Systems Systems Guide 127

Step 1. Select Panels Step 2. Select Edge for Panels

Page 130: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

128 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

30" x 30" Infill Panel

6" Channel Panel 6" Channel Panel

Cross Tee 1

Main TeeCross Tee 3

Cross Tee 2

Module Layout

30" 30"6" 6"

30"

30"

66"Channel Module

60"

Ceilin

g M

odul

e

6in.

cha

nnel

6in.

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

6! 5"(60!)

5"- 6!(66!)

HALCYON 30! x 30! x 1! FL DXT, DXI

SL DX

SQ DX

MARS 30! x 30! x 3/4! FLB DXT, DXI

SLT DX

SQ DX

MARS High-NRC 30! x 30! x 7/8! FLB DXT, DXI

SLT DX

SQ DX

PANZ Metal Panels, Solid 30! x 30! FL DXT, DXI

Off-Module Channel Spacing 5" Ceiling Module 6! ChannelSystem 642 30! x 30! Infill Panel

Page 131: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

Cross Tee 2Usage Per Sq. Ft.

Cross Tee 3Usage Per Sq. Ft.

System Module 66! 27.5 0.20 0.36 0.18 0.18

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 30! x 30! x 1! FL ¨ 98335 SL ¨ 98333 SQ ¨ 98331

MARS 30! x 30! x 3/4! FLB ¨ 86830 SLT ¨ 86875 SQ ¨ 86815

MARS High-NRC 30! x 30! x 7/8! FLB ¨ 86400 SLT ¨ 86500 SQ ¨ 86426

PANZ Metal Panels, Solid 30! x 30! FL ¨ 212123

Channel Panels HALCYON 6! x 60! x 1! FL ¨ 98199 SL ¨ 99272 SQ ¨ 97228

MARS 6! x 60! x 3/4! FLB ¨ 86835 SLT ¨ 86543 SQ ¨ 86507

MARS High-NRC 6! x 60! x 7/8! FLB ¨ 86333 SLT ¨ 86443 SQ ¨ 86145

PANZ Metal Panels, Solid 6! x 60! FL ¨ 258036 SL ¨ 257972 SQ ¨ 257586

Panz Metal Panels, Perf C116 6! x 60! FL ¨ 259228 SL ¨ 259010 SQ ¨ 259009

Panz Metal Panels, Perf C116D 6! x 60! FL ¨ 259353 SL ¨ 259344 SQ ¨ 259308

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24

Cross Tee 1 2 ¨ DXT524

Cross Tee 2 1 ¨ DXT524

Cross Tee 3 2 ¨ DXT3022

IDENTITEE DXI Main Tee ¨ DXI24

Cross Tee 1 2 ¨ DXI524

Cross Tee 2 1 ¨ DXI524

Cross Tee 3 2 ¨ DXI3022

DONN DX Main Tee ¨ DX/DXL24 ¨ DX/DXL24

Cross Tee 1 2 ¨ DX524 2 ¨ DX524

Cross Tee 2 1 ¨ DX524 1 ¨ DX524

Cross Tee 3 2 ¨ DX3016 2 ¨ DX3016

Order Information 5" Ceiling Module 6! ChannelSystem 642 30! x 30! Infill Panel

Step 3. Select Corresponding Grid for Selected Panels

LOGIX Integrated Ceiling Systems Systems Guide 129

Step 1. Select Panels Step 2. Select Edge for Panels

Page 132: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

130 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

24" x 48" Infill Panel

4" Channel Panel 4" Channel Panel

Cross Tee 1

Main TeeCross Tee 2

Module Layout

24"

24"

24"

48"4" 4"

52"Channel Module

72"

Ceilin

g M

odul

e

4in.

cha

nnel

4in.

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

4! 6"(72!)

4"- 4!(52!)

HALCYON 24! x 48! x 1! FL DXT, DXI

SL DX

SQ DX

MARS 24! x 48! x 3/4! FLB DXT, DXI

SLT DX

SQ DX

MARS High-NRC 24! x 48! x 7/8! FLB DXT, DXI

SLT DX

SQ DX

PANZ Metal Panels, Solid 24! x 48! FL DXT, DXI

Off-Module Channel Spacing 5" Ceiling Module 4! ChannelSystem 859 24! x 48! Infill Panel

Page 133: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

Cross Tee 2Usage Per Sq. Ft.

System Module 52! 26 0.17 .46 0.31

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 24! x 48! x 1! FL ¨ 98245 SL ¨ 98243 SQ ¨ 98241

MARS 24! x 48! x 3/4! FLB ¨ 88985 SLT ¨ 88785 SQ ¨ 88185

MARS High-NRC 24! x 48! x 7/8! FLB ¨ 89500 SLT ¨ 89600 SQ ¨ 86300

PANZ Metal Panels, Solid 24! x 48! FL ¨ 212164

Channel Panels HALCYON 4! x 72! x 1! FL ¨ 97462 SL ¨ 97432 SQ ¨ 97404

MARS 4! x 72! x 3/4! FLB ¨ 86584 SLT ¨ 86565 SQ ¨ 86537

MARS High-NRC 4! x 72! x 7/8! FLB ¨ 86473 SLT ¨ 86467 SQ ¨ 86405

PANZ Metal Panels, Solid 4! x 72! FL ¨ 202652

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24SP103

Cross Tee 1 2 ¨ DXT424

Cross Tee 2 1 ¨ DXT424

IDENTITEE DXI Main Tee ¨ DXI24SP103

Cross Tee 1 2 ¨ DXI424

Cross Tee 2 1 ¨ DXI424

DONN DX Main Tee ¨ DX24SP103 ¨ DX24SP103

Cross Tee 1 2 ¨ DX422 2 ¨ DX422

Cross Tee 2 2 ¨ DX422 2 ¨ DX422

Order Information 5" Ceiling Module 4! ChannelSystem 859 24! x 48! Infill Panel

Step 3. Select Corresponding Grid for Selected Panels

LOGIX Integrated Ceiling Systems Systems Guide 131

Step 1. Select Panels Step 2. Select Edge for Panels

Page 134: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

132 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

24" x 48" Infill Panel

6" Channel Panel 6" Channel Panel

Cross Tee 1

Main TeeCross Tee 2

Module Layout

24"

24"

24"

48"6" 6"

54"Channel Module

72"

Ceilin

g M

odul

e

6in.

cha

nnel

6in.

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

6! 6"(72!)

4"- 6!(54!)

HALCYON 24! x 48! x 1! FL DXT, DXI

SL DX

SQ DX

MARS 24! x 48 x 3/4! FLB DXT, DXI

SLT DX

SQ DX

MARS High-NRC 24! x 48! x 7/8! FLB DXT, DXI

SLT DX

SQ DX

PANZ Metal Panels, Solid 24! x 48! FL DXT, DXI

Off-Module Channel Spacing 6" Ceiling Module 6! ChannelSystem 824 24! x 48! Infill Panel

Page 135: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

Cross Tee 2Usage Per Sq. Ft.

System Module 54! 27 0.17 0.30 0.30

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 24! x 48! x 1! FL ¨ 98245 SL ¨ 98243 SQ ¨ 98241

MARS 24! x 48! x 3/4! FLB ¨ 88985 SLT ¨ 88785 SQ ¨ 88185

MARS High-NRC 24! x 48! x 7/8! FLB ¨ 89500 SLT ¨ 89600 SQ ¨ 86300

PANZ Metal Panels, Solid 24! x 48! FL ¨ 212164

Channel Panels HALCYON 6! x 72! x 1! FL ¨ 97574 SL ¨ 97433 SQ ¨ 97405

MARS 6! x 72! x 3/4! FLB ¨ 86567 SLT ¨ 86566 SQ ¨ 86538

MARS High-NRC 6! x 72! x 7/8! FLB ¨ 86474 SLT ¨ 86468 SQ ¨ 86406

PANZ Metal Panels, Solid 6! x 72! FL ¨ 202653

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24

Cross Tee 1 2 ¨ DXT424

Cross Tee 2 2 ¨ DXT424

IDENTITEE DXI Main Tee ¨ DXI24

Cross Tee 1 2 ¨ DXI424

Cross Tee 2 2 ¨ DXI424

DONN DX Main Tee ¨ DX/DXL24 ¨ DX/DXL24

Cross Tee 1 2 ¨ DX422 2 ¨ DX422

Cross Tee 2 2 ¨ DX422 2 ¨ DX422

Order Information 6" Ceiling Module 6! ChannelSystem 824 24! x 48! Infill Panel

Step 3. Select Corresponding Grid for Selected Panels

LOGIX Integrated Ceiling Systems Systems Guide 133

Step 1. Select Panels Step 2. Select Edge for Panels

Page 136: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

134 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

24" x 24" Infill Panel

4" Channel Panel 4" Channel Panel

Cross Tee 1

Main TeeCross Tee 3

Cross Tee 2

Module Layout

24"

24"

24"

24"4" 4"24"

52"Channel Module

72"

Ceilin

g M

odul

e

4in.

cha

nnel

4in.

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

4! 6"(72!)

4"- 4!(52!)

HALCYON 24! x 24! x 1! FL DXT, DXI

SL DX

SQ DX, DXT

MARS 24! x 24! x 3/4! FLB DXT, DXI

SLT DX

SQ DX, DXT

MARS High-NRC 24! x 24! x 7/8! FLB DXT, DXI

SLT DX

SQ DX, DXT

PANZ Metal Panels, Solid 24! x 24! FL DXT, DXI

Off-Module Channel Spacing 6" Ceiling Module 4! ChannelSystem 724 24! x 24! Infill Panel

Page 137: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

Cross Tee 2Usage Per Sq. Ft.

Cross Tee 3Usage Per Sq. Ft.

System Module 52! 26 0.17 0.46 0.23 0.31

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 24! x 24! x 1! FL ¨ 98225 SL ¨ 98223 SQ ¨ 98221

MARS 24! x 24! x 3/4! FLB ¨ 86985 SLT ¨ 86785 SQ ¨ 86185

MARS High-NRC 24! x 24! x 7/8! FLB ¨ 87100 SLT ¨ 87200 SQ ¨ 86100

PANZ Metal Panels, Solid 24! x 24! FL ¨ 275616

Channel Panels HALCYON 4! x 72! x 1! FL ¨ 97462 SL ¨ 97432 SQ ¨ 97404

MARS 4! x 72! x 3/4! FLB ¨ 86584 SLT ¨ 86565 SQ ¨ 86537

MARS High-NRC 4! x 72! x 7/8! FLB ¨ 86473 SLT ¨ 86467 SQ ¨ 86405

PANZ Metal Panels, Solid 4! x 72! FL ¨ 202652

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24SP103 ¨ DXT24SP103

Cross Tee 1 2 ¨ DXT624 2 ¨ DXT624

Cross Tee 2 1 ¨ DXT624 1 ¨ DXT624

Cross Tee 3 4 ¨ DXT222 4 ¨ DXT222

IDENTITEE DXI Main Tee ¨ DXI24SP103

Cross Tee 1 2 ¨ DXI624

Cross Tee 2 1 ¨ DXI624

Cross Tee 3 4 ¨ DXI222

DONN DX Main Tee ¨ DX24SP103 ¨ DX24SP103

Cross Tee 1 2 ¨ DX624 2 ¨ DX624

Cross Tee 2 1 ¨ DX624 1 ¨ DX624

Cross Tee 3 4 ¨ DX216 4 ¨ DX216

Order Information 6" Ceiling Module 4! ChannelSystem 724 24! x 24! Infill Panel

LOGIX Integrated Ceiling Systems Systems Guide 135

Step 1. Select Panels Step 2. Select Edge for Panels

Page 138: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

136 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

24" x 24" Infill Panel

6" Channel Panel 6" Channel Panel

Cross Tee 1

Main TeeCross Tee 3

Cross Tee 2

Module Layout

24"

24"

24"

24"6" 6"24"

54"Channel Module

72"

Ceilin

g M

odul

e

6in.

cha

nnel

6in.

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

6! 6"(72!)

4"- 6!(54!)

HALCYON 24! x 24! x 1! FL DXT, DXI

SL DX

SQ DX, DXT

MARS 24! x 24! x 3/4! FLB DXT, DXI

SLT DX

SQ DX, DXT

MARS High-NRC 24! x 24! x 7/8! FLB DXT, DXI

SLT DX

SQ DX, DXT

PANZ Metal Panels, Solid 24! x 24! FL DXT, DXI

Off-Module Channel Spacing 6" Ceiling Module 6! ChannelSystem 292 24! x 24! Infill Panel

Page 139: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

Cross Tee 2Usage Per Sq. Ft.

Cross Tee 3Usage Per Sq. Ft.

System Module 54! 27 0.17 0.44 0.22 0.30

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 24! x 24! x 1! FL ¨ 98225 SL ¨ 98223 SQ ¨ 98221

MARS 24! x 24! x 3/4! FLB ¨ 86985 SLT ¨ 86785 SQ ¨ 86185

MARS High-NRC 24! x 24! x 7/8! FLB ¨ 87100 SLT ¨ 87200 SQ ¨ 86100

PANZ Metal Panels, Solid 24! x 24! FL ¨ 275616

Channel Panels HALCYON 6! x 72! x 1! FL ¨ 97574 SL ¨ 97433 SQ ¨ 97405

MARS 6! x 72! x 3/4! FLB ¨ 86567 SLT ¨ 86566 SQ ¨ 86538

MARS High-NRC 6! x 72! x 7/8! FLB ¨ 86474 SLT ¨ 86468 SQ ¨ 86406

PANZ Metal Panels, Solid 6! x 72! FL ¨ 202653

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24 ¨ DXT24

Cross Tee 1 2 ¨ DXT624 2 ¨ DXT624

Cross Tee 2 1 ¨ DXT624 1 ¨ DXT624

Cross Tee 3 4 ¨ DXT222 4 ¨ DXT222

IDENTITEE DXI Main Tee ¨ DXI24

Cross Tee 1 2 ¨ DXI624

Cross Tee 2 1 ¨ DXI624

Cross Tee 3 4 ¨ DXI222

DONN DX Main Tee ¨ DX/DXL24 ¨ DX/DXL24

Cross Tee 1 2 ¨ DX624 2 ¨ DX624

Cross Tee 2 1 ¨ DX624 1 ¨ DX624

Cross Tee 3 4 ¨ DX216 4 ¨ DX216

Order Information 6" Ceiling Module 6! ChannelSystem 292 24! x 24! Infill Panel

Step 3. Select Corresponding Grid for Selected Panels

LOGIX Integrated Ceiling Systems Systems Guide 137

Step 1. Select Panels Step 2. Select Edge for Panels

Page 140: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

138 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

24" x 72" Infill Panel

4" Channel Panel 4" Channel Panel

Cross Tee 1

Main Tee

Cross Tee 2

Module Layout

24"4" 4"24"

52"Channel Module

72"

Ceilin

g M

odul

e

4in.

cha

nnel

4in.

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

4! 6"(72!)

4"- 4!(52!)

HALCYON 24! x 72! x 1! FL DXT, DXI

SL DX

SQ DX

MARS 24! x 72! x 3/4! FLB DXT, DXI

SLT DX

SQ DX

MARS High-NRC 24! x 72! x 7/8! FLB DXT, DXI

SLT DX

SQ DX

PANZ Metal Panels, Solid 24! x 72! FL DXT, DXI

Off-Module Channel Spacing 6" Ceiling Module 4! ChannelSystem 562 24! x 72! Infill Panel

Page 141: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

Cross Tee 2Usage Per Sq. Ft.

System Module 52! 26 0.17 0.46 0.23

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 24! x 72! x 1! FL ¨ 98348 SL ¨ 99268 SQ ¨ 99234

MARS 24! x 72! x 3/4! FLB ¨ 88996 SLT ¨ 86166 SQ ¨ 86223

MARS High-NRC 24! x 72! x 7/8! FLB ¨ 89670 SLT ¨ 89660 SQ ¨ 86360

PANZ Metal Panels, Solid 24! x 72! FL ¨ 212192

Channel Panels HALCYON 4! x 72! x 1! FL ¨ 97462 SL ¨ 97432 SQ ¨ 97404

MARS 4! x 72! x 3/4! FLB ¨ 86584 SLT ¨ 86565 SQ ¨ 86537

MARS High-NRC 4! x 72! x 7/8! FLB ¨ 86473 SLT ¨ 86467 SQ ¨ 86405

PANZ Metal Panels, Solid 4! x 72! FL ¨ 202652

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24SP103

Cross Tee 1 2 ¨ DXT624

Cross Tee 2 1 ¨ DXT624

IDENTITEE DXI Main Tee ¨ DXI24SP103

Cross Tee 1 2 ¨ DXI624

Cross Tee 2 1 ¨ DXI624

DONN DX Main Tee ¨ DX24SP103 ¨ DX24SP103

Cross Tee 1 2 ¨ DX624 2 ¨ DX624

Cross Tee 2 1 ¨ DX624 1 ¨ DX624

Order Information 6" Ceiling Module 4! ChannelSystem 562 24! x 72! Infill Panel

LOGIX Integrated Ceiling Systems Systems Guide 139

Step 1. Select Panels Step 2. Select Edge for Panels

Page 142: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

140 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

24" x 72" Infill Panel

6" Channel Panel 6" Channel Panel

Cross Tee 1

Main Tee

Cross Tee 2

Module Layout

24"6" 6"24"

54"Channel Module

72"

Ceilin

g M

odul

e

6in.

cha

nnel

6in.

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

6! 6"(72!)

4"- 6!(54!)

HALCYON 24! x 72! x 1! FL DXT, DXI

SL DX

SQ DX

MARS 24! x 72! x 3/4! FLB DXT, DXI

SLT DX

SQ DX

MARS High-NRC 24! x 72! x 7/8! FLB DXT, DXI

SLT DX

SQ DX

PANZ Metal Panels, Solid 24! x 72! FL DXT, DXI

Off-Module Channel Spacing 4" Ceiling Module 6! ChannelSystem 643 24! x 72! Infill Panel

Page 143: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength Sq. Ft. Main Tee

Usage Per Sq. Ft.Cross Tee 1Usage Per Sq. Ft.

Cross Tee 2Usage Per Sq. Ft.

System Module 54! 27 0.17 0.44 0.22

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 24! x 72! x 1! FL ¨ 98348 SL ¨ 99268 SQ ¨ 99234

MARS 24! x 72! x 3/4! FLB ¨ 88996 SLT ¨ 86166 SQ ¨ 86223

MARS High-NRC 24! x 72! x 7/8! FLB ¨ 89670 SLT ¨ 89660 SQ ¨ 86360

PANZ Metal Panels, Solid 24! x 72! FL ¨ 212192

Channel Panels HALCYON 6! x 72! x 1! FL ¨ 97574 SL ¨ 97433 SQ ¨ 97405

MARS 6! x 72! x 3/4! FLB ¨ 86567 SLT ¨ 86566 SQ ¨ 86538

MARS High-NRC 6! x 72! x 7/8! FLB ¨ 86474 SLT ¨ 86468 SQ ¨ 86406

PANZ Metal Panels, Solid 6! x 72! FL ¨ 202653

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24

Cross Tee 1 2 ¨ DXT624

Cross Tee 2 1 ¨ DXT624

IDENTITEE DXI Main Tee ¨ DXI24

Cross Tee 1 2 ¨ DXI624

Cross Tee 2 1 ¨ DXI624

DONN DX Main Tee ¨ DX/DXL24 ¨ DX/DXL24

Cross Tee 1 2 ¨ DX624 2 ¨ DX624

Cross Tee 2 1 ¨ DX624 1 ¨ DX624

Order Information 4" Ceiling Module 6! ChannelSystem 643 24! x 72! Infill Panel

Step 3. Select Corresponding Grid for Selected Panels

LOGIX Integrated Ceiling Systems Systems Guide 141

Step 1. Select Panels Step 2. Select Edge for Panels

Page 144: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

142 Systems Guide LOGIX Integrated Ceiling Systems

Metric Systems

100mm Channels

Overview

Channel Width

Ceiling Module

On-Center Channel Spacing

Infill Panels PANZ Metal Option System Page

InfillPanel

ChannelPanel

1000mm Ceiling Module

100mm 1000mm 1500mm 1400mm x 500mm • • 132 146-147

100mm 1000mm 1500mm 1400mm x 1000mm • 116 148-149

1200mm Ceiling Module

100mm 1200mm 1200mm 550mm x 600mm • • 121 150-151

100mm 1200mm 1200mm 1100mm x 600mm • • 134 152-153

100mm 1200mm 1200mm 1100mm x 1200mm • 105 154-155

100mm 1200mm 1300mm 1200mm x 600mm • • 112 156-157

100mm 1200mm 1300mm 1200mm x 1200mm • 108 158-159

100mm 1200mm 1900mm 1800mm x 300mm • • 141 160-161

100mm 1200mm 1900mm 1800mm x 600mm • • 139 162-163

Page 145: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

LOGIX Integrated Ceiling Systems Systems Guide 143

Metric Systems

100mm Channels

Overview

Channel Width

Ceiling Module

On-Center Channel Spacing

Infill Panels PANZ Metal Option System Page

InfillPanel

ChannelPanel

1500mm Ceiling Module

100mm 1500mm 1500mm 700mm x 750mm • • 124 164-165

100mm 1500mm 1500mm 1400mm x 750mm • • 110 166-167

100mm 1500mm 1500mm 1400mm x 500mm • • 102 168-169

100mm 1500mm 1500mm 1400mm x 1500mm • 129 170-171

Page 146: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

144 Systems Guide LOGIX Integrated Ceiling Systems

Metric Systems

150mm Channels

Overview

Channel Width

Ceiling Module

On-Center Channel Spacing

Infill Panels PANZ Metal, Solid System Page

InfillPanel

ChannelPanel

1000mm Ceiling Module

150mm 1000mm 1500mm 675mm x 500mm • • 136 172-173

150mm 1000mm 1500mm 1350mm x 500mm • 122 174-175

150mm 1000mm 1500mm 1350mm x 1000mm • 107 176-177

1200mm Ceiling Module

150mm 1200mm 1200mm 525mm x 600mm • 113 178-179

150mm 1200mm 1200mm 1050mm x 600mm • 109 180-181

150mm 12000mm 1200mm 1050mm x 1200mm • 101 182-183

150mm 12000mm 1350mm 600mm x 600mm • • 127 184-185

150mm 12000mm 1350mm 1200mm x 600mm • • 130 186-187

150mm 12000mm 1350mm 1200mm x 1200mm • 106 188-189

150mm 12000mm 1950mm 1800mm x 300mm • • 120 190-191

150mm 12000mm 1950mm 1800mm x 600mm • • 137 192-193

Page 147: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

LOGIX Integrated Ceiling Systems Systems Guide 145

Metric Systems

150mm Channels

Channel Width

Ceiling Module

On-Center Channel Spacing

Infill Panels PANZ Metal, Solid System Page

InfillPanel

ChannelPanel

1500mm Ceiling Module

150mm 1500mm 1500mm 1350mm x 500mm • 114 194-195

150mm 1500mm 1500mm 1350mm x 1500mm 145 196-197

150mm 1500mm 1500mm 675mm x 750mm 143 198-199

150mm 1500mm 1500mm 1350mm x 750mm • 104 200-201

Page 148: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

146 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

1400 mm x 500 mm Infill Panel

100 mm Channel Panel 100 mm Channel Panel

Main Tee

Cross Tee 1

Cross Tee 2

Module Layout

1400

500

500

100 100

1500 mmChannel Module

1000

mm

Ceilin

g M

odul

e

100

mm

cha

nnel

100

mm

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

100mm 1000mm 1500mm HALCYON 14000mm x 500mm FL DXT, DXI, DXF

SL DX

SQ DX

MARS 14000mm x 500mm FLB DXT, DXI, DXF

SLT DX

SQ DX

MARS High-NRC 14000mm x 500mm FLB DXT, DXI, DXF

SLT DX

SQ DX

PANZ Metal Panels, Solid 14000mm x 500mm FL DXT, DXI

Metric Systems 1000mm Ceiling Module 100mm ChannelSystem 132 1400mm x 500mm Infill Panel

Page 149: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 1400mm x 500mm FL ¨ ME97464 SL ¨ ME97437 SQ ¨ ME97408

MARS 1400mm x 500mm FLB ¨ ME86571 SLT ¨ ME86548 SQ ¨ ME86520

MARS High-NRC 1400mm x 500mm FLB ¨ ME86480 SLT ¨ ME86448 SQ ¨ ME86411

PANZ Metal Panels, Solid 1400mm x 500mm FL ¨ ME909964

Channel Panels HALCYON 100mm x 1000mm FL ¨ ME97538 SL ¨ ME97509 SQ ¨ ME97480

PANZ Metal Panels, Solid 100mm x 1000mm FL ¨ ME99946

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ MEDXT24SP205

Cross Tee 1 2 ¨ MEDXT1000

Cross Tee 2 1 ¨ MEDXT1000

Cross Tee 3 2 ¨ MEDXT700

IDENTITEE DXI Main Tee ¨ MEDXI24SP205

Cross Tee 1 2 ¨ MEDXI1000

Cross Tee 2 1 ¨ MEDXI1000

Cross Tee 3 2 ¨ MEDXI700

DONN DX Main Tee 1 ¨ MEDX24SP205 ¨ MEDX24SP205

Cross Tee 1 2 ¨ MEDX1000 2 ¨ MEDX1000

Cross Tee 2 1 ¨ MEDX1000 1 ¨ MEDX1000

Cross Tee 3 2 ¨ MEDX700 2 ¨ MEDX700

Order Information 1000mm Ceiling Module 100mm ChannelSystem 132 1400mm x 500mm Infill Panel

Suspension System EstimatorLength m2 Main Tee

Usage Per m2Cross Tee 1Usage Per m2

Cross Tee 2Usage Per m2

Cross Tee 3Usage Per m2

System Module 1500mm 1.500 1.000 1.333 0.667 0.933

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

LOGIX Integrated Ceiling Systems Systems Guide 147

Step 1. Select Panels Step 2. Select Edge for Panels

Page 150: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

148 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

1400 mm x 1000 mm Infill Panel

100 mm Channel Panel 100 mm Channel Panel

Main Tee

Cross Tee 1

Module Layout

1400100 100

1500 mmChannel Module

1000

mm

Ceilin

g M

odul

e

100

mm

cha

nnel

100

mm

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

100mm 1000mm 1500mm HALCYON 1400mm x 1000mm FL DXT, DXI, DXF

SL DX

SQ DX

Metric Systems 1000mm Ceiling Module 100mm ChannelSystem 116 1400mm x 1000mm Infill Panel

Page 151: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength m2 Main Tee

Usage Per m2Cross Tee 1Usage Per m2

Cross Tee 2Usage Per m2

System Module 1500mm 1.500 1.000 1.333 0.933

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 1400mm x 1000mm FL ¨ ME97559 SL ¨ ME97530 SQ ¨ ME97502

Channel Panels HALCYON 100mm x 1000mm FL ¨ ME97538 SL ¨ ME97509 SQ ¨ ME97480

PANZ Metal Panels, Solid 100mm x 1000mm FL ¨ ME909946

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ MEDXT24SP205

Cross Tee 1 2 ¨ MEDXT1000

Cross Tee 2 1 ¨ MEDXT1400

IDENTITEE DXI Main Tee ¨ MEDXI24SP205

Cross Tee 1 2 ¨ MEDXI1000

Cross Tee 2 1 ¨ MEDXI1400

DONN DX Main Tee ¨ MEDX24SP205 ¨ MEDX24SP205

Cross Tee 1 2 ¨ MEDX1000 2 ¨ MEDX1000

Cross Tee 2 1 ¨ MEDX1400 1 ¨ MEDX1400

Order Information 1000mm Ceiling Module 100mm ChannelSystem 116 1400mm x 1000mm Infill Panel

Step 1. Select Panels Step 2. Select Edge for Panels

LOGIX Integrated Ceiling Systems Systems Guide 149

Page 152: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

150 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

550 mm x 600 mm Infill Panel

100 mm Channel Panel 100 mm Channel Panel

Cross Tee 3 Main Tee

Cross Tee 1

Cross Tee 2

Module Layout

600

600

550100 100550

1200 mmChannel Module

1200

mm

Ceilin

g M

odul

e

100

mm

cha

nnel

100

mm

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

100mm 1200mm 1200mm HALCYON 600mm x 550mm FL DXT, DXI, DXF

SL DX

SQ DX, DXT

MARS 600mm x 550mm FLB DXT, DXI, DXF

SLT DX

SQ DX, DXT

MARS High-NRC 600mm x 550mm FLB DXT, DXI, DXF

SLT DX

SQ DX, DXT

Metric Systems 1200mm Ceiling Module 100mm ChannelSystem 121 600mm x 550mm Infill Panel

Page 153: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

LOGIX Integrated Ceiling Systems Systems Guide 151

Order Information 1200mm Ceiling Module 100mm ChannelSystem 121 550mm x 600mm Infill Panel

Step 1. Select Panels Step 2. Select Edge for Panels

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 550mm x 600mm FL ¨ ME97468 SL ¨ ME97440 SQ ¨ ME97413

MARS 550mm x 600mm FLB ¨ ME86574 SLT ¨ ME86552 SQ ¨ ME86524

MARS High-NRC 550mm x 600mm FLB ¨ ME86485 SLT ¨ ME86453 SQ ¨ ME86416

PANZ Metal Panels, Solid 550mm x 600mm FL ¨ ME909965

Channel Panels HALCYON 100mm x 1200mm FL ¨ ME97460 SL ¨ ME97430 SQ ¨ ME97402

MARS 100mm x 1200mm FLB ¨ ME86568 SLT ¨ ME86540 SQ ¨ ME86514

MARS High-NRC 100mm x 1200mm FLB ¨ ME86475 SLT ¨ ME86440 SQ ¨ ME86402

PANZ Metal Panels, Solid 100mm x 1200mm FL ¨ ME909947

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee 1 ¨ MEDXT24SP201 1 ¨ MEDXT24SP201

Cross Tee 1 2 ¨ MEDXT1200 2 ¨ MEDXT1200

Cross Tee 2 1 ¨ MEDXT1200 1 ¨ MEDXT1200

Cross Tee 3 2 ¨ MEDXT550 2 ¨ MEDXT550

IDENTITEE DXI Main Tee 1 ¨ MEDXI24SP201

Cross Tee 1 2 ¨ MEDXI1200

Cross Tee 2 1 ¨ MEDXI1200

Cross Tee 3 2 ¨ MEDXI550

DONN DX Main Tee 1 ¨ MEDX24SP201 1 ¨ MEDX24SP201

Cross Tee 1 2 ¨ MEDX1200 2 ¨ MEDX1200

Cross Tee 2 1 ¨ MEDX1200 1 ¨ MEDX1200

Cross Tee 3 2 ¨ MEDX550 2 ¨ MEDX550

Suspension System EstimatorLength m2 Main Tee

Usage Per m2Cross Tee 1Usage Per m2

Cross Tee 2Usage Per m2

Cross Tee 3Usage Per m2

System Module 1200mm 1.440 0.833 1.667 0.833 0.764

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Page 154: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

152 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

1100 mm x 600 mm Infill Panel

100 mm Channel Panel 100 mm Channel Panel

Cross Tee 2 Main Tee

Cross Tee 1

Module Layout

600

600

100 1001100

1200 mmChannel Module

1200

mm

Ceilin

g M

odul

e

100

mm

cha

nnel

100

mm

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

100mm 1200mm 1200mm HALCYON 1100mm x 600mm FL DXT, DXI, DXF

SL DX

SQ DX

MARS 1100mm x 600mm FLB DXT, DXI, DXF

SLT DX

SQ DX

MARS High-NRC 1100mm x 600mm FLB DXT, DXI, DXF

SLT DX

SQ DX

PANZ Metal Panels, Solid 1100mm x 600mm FL DXT, DXI

Metric Systems 1200mm Ceiling Module 100mm ChannelSystem 134 1100mm x 600mm Infill Panel

Page 155: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength m2 Main Tee

Usage Per m2Cross Tee 1Usage Per m2

Cross Tee 2Usage Per m2

System Module 1200mm 1.440 0.833 1.667 0.764

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 1100mm x 600mm FL ¨ ME97470 SL ¨ ME97444 SQ ¨ ME97416

MARS 1100mm x 600mm FLB ¨ ME86578 SLT ¨ ME86556 SQ ¨ ME86528

MARS High-NRC 1100mm x 600mm FLB ¨ ME86489 SLT ¨ ME86457 SQ ¨ ME86420

PANZ Metal Panels, Solid 1100mm x 600mm FL ¨ ME909969

Channel Panels HALCYON 100mm x 1200mm FL ¨ ME97460 SL ¨ ME97430 SQ ¨ ME97402

MARS 100mm x 1200mm FLB ¨ ME86568 SLT ¨ ME86540 SQ ¨ ME86514

MARS High-NRC 100mm x 1200mm FLB ¨ ME86475 SLT ¨ ME86440 SQ ¨ ME86402

PANZ Metal Panels, Solid 100mm x 1200mm FL ¨ ME909947

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ MEDXT24SP201

Cross Tee 1 2 ¨ MEDXT1200

Cross Tee 2 1 ¨ MEDXT1100

IDENTITEE DXI Main Tee ¨ MEDXI24SP201

Cross Tee 1 2 ¨ MEDXI1200

Cross Tee 2 1 ¨ MEDXI1100

DONN DX Main Tee ¨ MEDX24SP201 ¨ MEDX24SP201

Cross Tee 1 2 ¨ MEDX1200 2 ¨ MEDX1200

Cross Tee 2 1 ¨ MEDX1100 1 ¨ MEDX1100

Order Information 1200mm Ceiling Module 100mm ChannelSystem 134 11000mm x 600mm Infill Panel

LOGIX Integrated Ceiling Systems Systems Guide 153

Step 1. Select Panels Step 2. Select Edge for Panels

Page 156: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

154 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

1100 mm x 1200 mm Infill Panel

100 mm Channel Panel 100 mm Channel Panel

Main Tee

Cross Tee 1

Module Layout

100 1001100

1200 mmChannel Module

1200

mm

Ceilin

g M

odul

e

100

mm

cha

nnel

100

mm

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

110mm 1200mm 1200mm HALCYON 1100mm x 1200mm FL DXT, DXI, DXF

SL DX

SQ DX

Metric Systems 1200mm Ceiling Module 100mm ChannelSystem 105 1100mm x 1200mm Infill Panel

Page 157: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength m2 Main Tee

Usage Per m2Cross Tee 1Usage Per m2

System Module 1200mm 1.440 0.833 1.667

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Step 2. Select Edge for PanelsStep 1. Select Panels

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 1100mm x 1200mm FL ¨ ME97562 SL ¨ ME97533 SQ ¨ ME97505

Channel Panels HALCYON 100mm x 1200mm FL ¨ ME97460 SL ¨ ME97430 SQ ¨ ME97402

PANZ Metal Panels, Solid 100mm x 1200mm FL ¨ ME909947

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ MEDXT24SP201

Cross Tee 1 2 ¨ MEDXT1200

IDENTITEE DXI Main Tee ¨ MEDXI24SP201

Cross Tee 1 2 ¨ MEDXI1200

DONN DX Main Tee ¨ MEDX24SP201 ¨ MEDX24SP201

Cross Tee 1 2 ¨ MEDX1200 2 ¨ MEDX1200

Order Information 1200mm Ceiling Module 100mm ChannelSystem 105 1100mm x 1200mm Infill Panel

LOGIX Integrated Ceiling Systems Systems Guide 155

Page 158: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

156 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

1200 mm x 600 mm Infill Panel

100 mm Channel Panel100 mm Channel Panel

Main Tee

Cross Tee 1

Cross Tee 2

Module Layout

600

600

1200100 100

1300 mmChannel Module

1200

mm

Ceilin

g M

odul

e

100

mm

cha

nnel

100

mm

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

100mm 1200mm 1300mm HALCYON 1200mm x 600mm FL DXT, DXI, DXF

SL DX

SQ DX

MARS 1200mm x 600mm FLB DXT, DXI, DXF

SLT DX

SQ DX

MARS High-NRC 1200mm x 600mm FLB DXT, DXI, DXF

SLT DX

SQ DX

PANZ Metal Panels, Solid 1200mm x 600mm FL DXT, DXI

Metric Systems 1200mm Ceiling Module 100mm ChannelSystem 112 1200mm x 600mm Infill Panel

Page 159: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength m2 Main Tee

Usage Per m2Cross Tee 1Usage Per m2

Cross Tee 2Usage Per m2

System Module 1300mm 1.560 0.833 1.538 0.769

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 1200mm x 600mm FL ¨ ME98245 SL ¨ ME98243 SQ ¨ ME98241

MARS 1200mm x 600mm FLB ¨ ME88985 SLT ¨ ME88785 SQ ¨ ME88185

MARS High-NRC 1200mm x 600mm FLB ¨ ME89500 SLT ¨ ME89600 SQ ¨ ME86300

PANZ Metal Panels, Solid 1200mm x 600mm FL ¨ ME909974

Channel Panels HALCYON 100mm x 1200mm FL ¨ ME97460 SL ¨ ME97430 SQ ¨ ME97402

MARS 100mm x 1200mm FLB ¨ ME86568 SLT ¨ ME86540 SQ ¨ ME86514

MARS High-NRC 100mm x 1200mm FLB ¨ ME86475 SLT ¨ ME86440 SQ ¨ ME86402

PANZ Metal Panels, Solid 100mm x 1200mm FL ¨ ME909947

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ MEDXT24SP203

Cross Tee 1 2 ¨ MEDXT1200

Cross Tee 2 1 ¨ MEDXT1200

IDENTITEE DXI Main Tee ¨ MEDXI24SP203

Cross Tee 1 2 ¨ MEDXI1200

Cross Tee 2 1 ¨ MEDXI1200

DONN DX Main Tee ¨ MEDX24SP203 ¨ MEDX24SP203

Cross Tee 1 2 ¨ MEDX1200 2 ¨ MEDX1200

Cross Tee 2 1 ¨ MEDX1200 1 ¨ MEDX1200

Order Information 1200mm Ceiling Module 100mm ChannelSystem 112 1200mm x 600mm Infill Panel

LOGIX Integrated Ceiling Systems Systems Guide 157

Step 1. Select Panels Step 2. Select Edge for Panels

Page 160: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

158 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

1200 mm x 1200 mm Infill Panel

100 mm Channel Panel100 mm Channel Panel

Main Tee

Cross Tee 1

Module Layout

1200100 100

1300 mmChannel Module

1200

mm

Ceilin

g M

odul

e

100

mm

cha

nnel

100

mm

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

100mm 1200mm 1300mm HALCYON 1200mm x 1200mm FL DXT, DXI, DXF

SL DX

SQ DX

Metric Systems 1200mm Ceiling Module 100mm ChannelSystem 108 1200mm x 1200mm Infill Panel

Page 161: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

LOGIX Integrated Ceiling Systems Systems Guide 159

Order Information 1200mm Ceiling Module 100mm ChannelSystem 108 1200mm x 1200mm Infill Panel

Step 2. Select Edge for PanelsStep 1. Select Panels

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 1200mm x 1200mm FL ¨ ME98445 SL ¨ ME98443 SQ ¨ ME98441

Channel Panels HALCYON 100mm x 1200mm FL ¨ ME97460 SL ¨ ME97430 SQ ¨ ME97402

PANZ Metal Panels, Solid 100mm x 1200mm FL ¨ ME909947

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ MEDXT24SP203

Cross Tee 1 2 ¨ MEDXT1200

IDENTITEE DXI Main Tee ¨ MEDXI24SP203

Cross Tee 1 2 ¨ MEDXI1200

DONN DX Main Tee ¨ MEDX24SP203 ¨ MEDX24SP203

Cross Tee 1 2 ¨ MEDX1200 2 ¨ MEDX1200

Suspension System EstimatorLength m2 Main Tee

Usage Per m2Cross Tee 1Usage Per m2

System Module 1300mm 1.560 0.833 1.538

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Page 162: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

160 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

1800 mm x 300 mm Infill Panel

100 mm Channel Panel100 mm Channel Panel

Main Tee

Cross Tee 1

Cross Tee 2

Module Layout

300

300

300

300

1800100 100

1900 mmChannel Module

1200

mm

Ceilin

g M

odul

e

100

mm

cha

nnel

100

mm

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

100mm 1200mm 1900mm HALCYON 1800mm x 300mm FL DXT, DXI, DXF

SL DX

SQ DX

MARS 1800mm x 300mm FLB DXT, DXI, DXF

SLT DX

SQ DX

MARS High-NRC 1800mm x 300mm FLB DXT, DXI, DXF

SLT DX

SQ DX

PANZ Metal Panels, Solid 1800mm x 300mm FL DXT, DXI

Metric Systems 1200mm Ceiling Module 100mm ChannelSystem 141 1800mm x 300mm Infill Panel

Page 163: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength m2 Main Tee

Usage Per m2Cross Tee 1Usage Per m2

Cross Tee 2Usage Per m2

System Module 1900mm 2.280 0.833 1.053 2.500

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Step 2. Select Edge for PanelsStep 1. Select Panels

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 300mm x 1800mm FL ¨ ME97574 SL ¨ ME97433 SQ ¨ ME97405

MARS 300mm x 1800mm FLB ¨ ME86570 SLT ¨ ME86546 SQ ¨ ME86518

MARS High-NRC 300mm x 1800mm FLB ¨ ME86478 SLT ¨ ME86446 SQ ¨ ME86409

PANZ Metal Panels, Solid 300mm x 1800mm FL ¨ ME909956

Channel Panels HALCYON 100mm x 1200mm FL ¨ ME97460 SL ¨ ME97430 SQ ¨ ME97402

MARS 100mm x 1200mm FLB ¨ ME86568 SLT ¨ ME86540 SQ ¨ ME86514

MARS High-NRC 100mm x 1200mm FLB ¨ ME86475 SLT ¨ ME86440 SQ ¨ ME86402

PANZ Metal Panels, Solid 100mm x 1200mm FL ¨ ME909947

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT(Use with PANZ)

Main Tee ¨ MEDXT24SP203

Cross Tee 1 2 ¨ MEDXT1200

Cross Tee 2 3 ¨ MEDXT1900

IDENTITEE DXI Main Tee ¨ MEDXI24SP203

Cross Tee 1 2 ¨ MEDXI1200

Cross Tee 2 3 ¨ MEDXI1900

DONN DX Main Tee ¨ MEDX24SP203 ¨ MEDX24SP203

Cross Tee 1 2 ¨ MEDX1200 2 ¨ MEDX1200

Cross Tee 2 3 ¨ MEDX1900 3 ¨ MEDX1900

Order Information 1200mm Ceiling Module 100mm ChannelSystem 141 1800mm x 300mm Infill Panel

LOGIX Integrated Ceiling Systems Systems Guide 161

Page 164: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

162 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

1800 mm x 600 mm Infill Panel

100 mm Channel Panel100 mm Channel Panel

Cross Tee 2 Main Tee

Cross Tee 1

Module Layout

600

600

1800100 100

1900 mmChannel Module

1200

mm

Ceilin

g M

odul

e

100

mm

cha

nnel

100

mm

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

100mm 1200mm 1900mm HALCYON 1800mm x 600mm FL DXT, DXI, DXF

SL DX

SQ DX

MARS 1800mm x 600mm FLB DXT, DXI, DXF

SLT DX

SQ DX

MARS High-NRC 1800mm x 600mm FLB DXT, DXI, DXF

SLT DX

SQ DX

Metric Systems 1200mm Ceiling Module 100mm ChannelSystem 139 1800mm x 600mm Infill Panel

Page 165: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength m2 Main Tee

Usage Per m2Cross Tee 1Usage Per m2

Cross Tee 2Usage Per m2

System Module 1900mm 2.280 0.833 1.053 0.833

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Order Information 1200mm Ceiling Module 100mm ChannelSystem 139 1800mm x 600mm Infill Panel

Step 2. Select Edge for PanelsStep 1. Select Panels

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 600mm x 1800mm FL ¨ ME97553 SL ¨ ME97445 SQ ¨ ME99234

MARS 600mm x 1800mm FLB ¨ ME88996 SLT ¨ ME86166 SQ ¨ ME86223

MARS High-NRC 600mm x 1800mm FLB ¨ ME89670 SLT ¨ ME89660 SQ ¨ ME86360

PANZ Metal Panels, Solid 300mm x 1800mm FL ¨ ME909956

Channel Panels HALCYON 100mm x 1200mm FL ¨ ME97460 SL ¨ ME97430 SQ ¨ ME97402

MARS 100mm x 1200mm FLB ¨ ME86568 SLT ¨ ME86540 SQ ¨ ME86514

MARS High-NRC 100mm x 1200mm FLB ¨ ME86475 SLT ¨ ME86440 SQ ¨ ME86402

PANZ Metal Panels, Solid 100mm x 1200mm FL ¨ ME909947

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ MEDXT24SP203

Cross Tee 1 2 ¨ MEDXT1200

Cross Tee 2 1 ¨ MEDXT1900

IDENTITEE DXI Main Tee ¨ MEDXI24SP203

Cross Tee 1 2 ¨ MEDXI1200

Cross Tee 2 1 ¨ MEDXI1900

DONN DX Main Tee ¨ MEDX24SP203 ¨ MEDX24SP203

Cross Tee 1 2 ¨ MEDX1200 2 ¨ MEDX1200

Cross Tee 2 1 ¨ MEDX1900 1 ¨ MEDX1900

LOGIX Integrated Ceiling Systems Systems Guide 163

Page 166: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

164 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

700 mm x 750 mm Infill Panel

100 mm Channel Panel100 mm Channel Panel

Main Tee

Cross Tee 1

Cross Tee 3

Cross Tee 2

Module Layout

700 700

750

750

100 100

1500 mmChannel Module

1500

mm

Ceilin

g M

odul

e

100

mm

cha

nnel

100

mm

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

100mm 1500mm 1500mm HALCYON 700mm x 750mm FL DXT, DXI, DXF

SL DX

SQ DX

MARS 700mm x 750mm FLB DXT, DXI, DXF

SLT DX

SQ DX

MARS High-NRC 700mm x 750mm FLB DXT, DXI, DXF

SLT DX

SQ DX

Metric Systems 1500mm Ceiling Module 100mm ChannelSystem 124 700mm x 750mm Infill Panel

Page 167: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength m2 Main Tee

Usage Per m2Cross Tee 1Usage Per m2

Cross Tee 2Usage Per m2

System Module 1500mm 2.250 0.667 1.333 1.244

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 700mm x 750mm FL ¨ ME97335 SL ¨ ME97449 SQ ¨ ME97419

MARS 700mm x 750mm FLB ¨ ME86834 SLT ¨ ME86559 SQ ¨ ME86532

MARS High-NRC 700mm x 750mm FLB ¨ ME86492 SLT ¨ ME86459 SQ ¨ ME86423

PANZ Metal Panels, Solid 700mm x 750mm FL ¨ ME909971

Channel Panels HALCYON 100mm x 1500mm FL ¨ ME97461 SL ¨ ME97431 SQ ¨ ME97403

MARS 100mm x 1500mm FLB ¨ ME86569 SLT ¨ ME86541 SQ ¨ ME86515

MARS High-NRC 100mm x 1500mm FLB ¨ ME86476 SLT ¨ ME86441 SQ ¨ ME86403

PANZ Metal Panels, Solid 100mm x 1500mm FL ¨ ME909949

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT(Use with PANZ)

Main Tee ¨ MEDXT24SP205

Cross Tee 1 2 ¨ MEDXT1500

Cross Tee 2 2 ¨ MEDXT1400

IDENTITEE DXI Main Tee ¨ MEDXI24SP205

Cross Tee 1 2 ¨ MEDXI1500

Cross Tee 2 2 ¨ MEDXI1400

DONN DX Main Tee ¨ MEDX24SP205 ¨ MEDX24SP205

Cross Tee 1 2 ¨ MEDX1500 2 ¨ MEDX1500

Cross Tee 2 2 ¨ MEDX1400 2 ¨ MEDX1400

Order Information 1500mm Ceiling Module 100mm ChannelSystem 124 700mm x 750mm Infill Panel

LOGIX Integrated Ceiling Systems Systems Guide 165

Step 1. Select Panels Step 2. Select Edge for Panels

Page 168: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

166 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

1400 mm x 750 mm Infill Panel

100 mm Channel Panel 100 mm Channel Panel

Main Tee

Cross Tee 1

Cross Tee 2

Module Layout

1400

750

750

100 100

1500 mmChannel Module

1500

mm

Ceilin

g M

odul

e

100

mm

cha

nnel

100

mm

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

100mm 1500mm 1500mm HALCYON 1400mm x 750mm FL DXT, DXI, DXF

SL DX

SQ DX

MARS 1400mm x 750mm FLB DXT, DXI, DXF

SLT DX

SQ DX

MARS High-NRC 1400mm x 750mm FLB DXT, DXI, DXF

SLT DX

SQ DX

PANZ Metal Panels, Solid 1400mm x 750mm FL DXT, DXI

Metric Systems 1500mm Ceiling Module 100mm ChannelSystem 110 1400mm x 750mm Infill Panel

Page 169: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

LOGIX Integrated Ceiling Systems Systems Guide 167

Order Information 1500mm Ceiling Module 100mm ChannelSystem 110 1400mm x 750mm Infill Panel

Step 1. Select Panels Step 2. Select Edge for Panels

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 1400mm x 750mm FL ¨ ME97473 SL ¨ ME98453 SQ ¨ ME97423

MARS 1400mm x 750mm FLB ¨ ME86583 SLT ¨ ME86563 SQ ¨ ME86535

MARS High-NRC 1400mm x 750mm FLB ¨ ME86496 SLT ¨ ME86465 SQ ¨ ME86428

PANZ Metal Panels, Solid 1400mm x 750mm FL ¨ ME909973

Channel Panels HALCYON 100mm x 1500mm FL ¨ ME97461 SL ¨ ME97431 SQ ¨ ME97403

MARS 100mm x 1500mm FLB ¨ ME86569 SLT ¨ ME86541 SQ ¨ ME86515

MARS High-NRC 100mm x 1500mm FLB ¨ ME86476 SLT ¨ ME86441 SQ ¨ ME86403

PANZ Metal Panels, Solid 100mm x 1500mm FL ¨ ME99949

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ DXT24SP205

Cross Tee 1 2 ¨ DXT1500

Cross Tee 2 1 ¨ DXT1500

Cross Tee 3 2 ¨ DXT700

IDENTITEE DXI Main Tee ¨ DXI24SP205

Cross Tee 1 2 ¨ DXI1500

Cross Tee 2 1 ¨ DXI1500

Cross Tee 3 2 ¨ DXI700

DONN DX Main Tee ¨ DX24SP205 ¨ DX24SP205

Cross Tee 1 2 ¨ DX1500 2 ¨ DX1500

Cross Tee 2 1 ¨ DX1500 1 ¨ DX1500

Cross Tee 3 2 ¨ DX700 2 ¨ DX700

Suspension System EstimatorLength m2 Main Tee

Usage Per m2Cross Tee 1Usage Per m2

Cross Tee 2Usage Per m2

Cross Tee 3Usage Per m2

System Module 1500mm 2.250 0.667 1.333 0.667 0.622

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Page 170: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

168 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

1400 mm x 500 mm Infill Panel

100 mm Channel Panel 100 mm Channel Panel

Main Tee

Cross Tee 1

Cross Tee 2

Module Layout

1400

500

500

500

100 100

1500 mmChannel Module

1500

mm

Ceilin

g M

odul

e

100

mm

cha

nnel

100

mm

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

100mm 1500mm 1500mm HALCYON 1400mm x 500mm FL DXT, DXI, DXF

SL DX

SQ DX

MARS 1400mm x 500mm FLB DXT, DXI, DXF

SLT DX

SQ DX

MARS High-NRC 1400mm x 500mm FLB DXT, DXI, DXF

SLT DX

SQ DX

PANZ Metal Panels, Solid 1400mm x 500mm FL DXT, DXI

Metric Systems 1500mm Ceiling Module 100mm ChannelSystem 102 1400mm x 500mm Infill Panel

Page 171: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

LOGIX Integrated Ceiling Systems Systems Guide 169

Order Information 1500mm Ceiling Module 100mm ChannelSystem 102 1400mm x 500mm Infill Panel

1400

500

500

500

100 100

1500 mmChannel Module

1500

mm

Ceilin

g M

odul

e

100

mm

cha

nnel

100

mm

cha

nnel

Step 2. Select Edge for PanelsStep 1. Select Panels

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 1400mm x 500mm FL ¨ ME97464 SL ¨ ME97437 SQ ¨ ME97408

MARS 1400mm x 500mm FLB ¨ ME86571 SLT ¨ ME86548 SQ ¨ ME86520

MARS High-NRC 1400mm x 500mm FLB ¨ ME86480 SLT ¨ ME86448 SQ ¨ ME86411

PANZ Metal Panels, Solid 300mm x 1800mm FL ¨ ME909956

Channel Panels HALCYON 100mm x 1500mm FL ¨ ME97461 SL ¨ ME97431 SQ ¨ ME97403

MARS 100mm x 1500mm FLB ¨ ME86569 SLT ¨ ME86541 SQ ¨ ME86515

MARS High-NRC 100mm x 1500mm FLB ¨ ME86476 SLT ¨ ME86441 SQ ¨ ME86403

PANZ Metal Panels, Solid 100mm x 1500mm FL ¨ ME909949

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ MEDXT24SP205

Cross Tee 1 2 ¨ MEDXT1000

IDENTITEE DXI Main Tee ¨ MEDXI24SP205

Cross Tee 1 2 ¨ MEDXI1000

DONN DX Main Tee ¨ MEDX24SP205 ¨ MEDX24SP205

Cross Tee 1 2 ¨ MEDX1000 2 ¨ MEDX1000

Suspension System EstimatorLength m2 Main Tee

Usage Per m2Cross Tee 1Usage Per m2

System Module 1500mm 1.500 1.000 1.333

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Page 172: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

170 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

1400 mm x 1500 mm Infill Panel

100 mm Channel Panel 100 mm Channel Panel

Main Tee

Cross Tee 1

Module Layout

1400100 100

1500 mmChannel Module

1500

mm

Ceilin

g M

odul

e

100

mm

cha

nnel

100

mm

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

10mm 1500mm 1500mm HALCYON 1400mm x 1500mm FL DXT, DXI, DXF

SL DX

SQ DX

Metric Systems 1500mm Ceiling Module 100mm ChannelSystem 129 1400mm x 1500mm Infill Panel

Page 173: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength m2 Main Tee

Usage Per m2Cross Tee 1Usage Per m2

Cross Tee 2Usage Per m2

System Module 1500mm 2.250 0.667 1.333 0.622

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 1400mm x 1500mm FL ¨ ME99229 SL ¨ ME97537 SQ ¨ ME97567

Channel Panels HALCYON 100mm x 1500mm FL ¨ ME97461 SL ¨ ME97431 SQ ¨ ME97403

PANZ Metal Panels, Solid 100mm x 1500mm FL ¨ ME909949

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ MEDXT24SP205

Cross Tee 1 2 ¨ MEDXT1500

Cross Tee 2 1 ¨ MEDXT1400

IDENTITEE DXI Main Tee ¨ MEDXI24SP205

Cross Tee 1 2 ¨ MEDXI1500

Cross Tee 2 1 ¨ MEDXI1400

DONN DX Main Tee ¨ MEDX24SP205 ¨ MEDX24SP205

Cross Tee 1 2 ¨ MEDX1500 2 ¨ MEDX1500

Cross Tee 2 1 ¨ MEDX1400 1 ¨ MEDX1400

Order Information 1500mm Ceiling Module 100mm Channel

System 129 1400mm x 1500mm Infill Panel

LOGIX Integrated Ceiling Systems Systems Guide 171

Step 1. Select Panels Step 2. Select Edge for Panels

Page 174: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

172 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

675 mm x 500 mm Infill Panel

150 mm Channel Panel 150 mm Channel Panel

Main Tee

Cross Tee 1

Cross Tee 3

Cross Tee 2

Module Layout

675150 150675

500

500

1500 mmChannel Module

1000

mm

Ceilin

g M

odul

e

150

mm

cha

nnel

150

mm

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

150mm 1000mm 1500mm HALCYON 675mm x 500mm FL DXT, DXI, DXF

SL DX

SQ DX

MARS 675mm x 500mm FLB DXT, DXI, DXF

SLT DX

SQ DX

MARS High-NRC 675mm x 500mm FLB DXT, DXI, DXF

SLT DX

SQ DX

Metric Systems 1000mm Ceiling Module 150mm ChannelSystem 136 675mm x 500mm Infill Panel

Page 175: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength m2 Main Tee

Usage Per m2Cross Tee 1Usage Per m2

Cross Tee 2Usage Per m2

Cross Tee 3Usage Per m2

System Module 1500mm 1.500 1.000 1.333 0.667 0.900

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 675mm x 500mm FL ¨ ME97544 SL ¨ ME97515 SQ ¨ ME97486

MARS 675mm x 500mm FLB ¨ ME86648 SLT ¨ ME86625 SQ ¨ ME86599

MARS High-NRC 675mm x 500mm FLB ¨ ME86069 SLT ¨ ME86044 SQ ¨ ME86015

PANZ Metal Panels, Solid 675mm x 500mm FL ¨ ME909960

Channel Panels HALCYON 150mm x 1000mm FL ¨ ME98198 SL ¨ ME99271 SQ ¨ ME97227

PANZ Metal Panels, Solid 150mm x 1000mm FL ¨ ME909953

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ MEDXT24SP206

Cross Tee 1 2 ¨ MEDXT1000

Cross Tee 2 1 ¨ MEDXT1000

Cross Tee 3 2 ¨ MEDXT675

IDENTITEE DXI Main Tee ¨ MEDXI24SP206

Cross Tee 1 2 ¨ MEDXI1000

Cross Tee 2 1 ¨ MEDXI1000

Cross Tee 3 2 ¨ MEDXI675

DONN DX Main Tee ¨ MEDX24SP206 ¨ MEDX24SP206

Cross Tee 1 2 ¨ MEDX1000 2 ¨ MEDX1000

Cross Tee 2 1 ¨ MEDX1000 1 ¨ MEDX1000

Cross Tee 3 2 ¨ MEDXI675 2 ¨ MEDXI675

Order Information 1000mm Ceiling Module 150mm ChannelSystem 136 675mm x 500mm Infill Panel

LOGIX Integrated Ceiling Systems Systems Guide 173

Step 1. Select Panels Step 2. Select Edge for Panels

Page 176: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

174 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

1350 mm x 500 mm Infill Panel

150 mm Channel Panel 150 mm Channel Panel

Main Tee

Cross Tee 1

Cross Tee 2

Module Layout

1350150 150

500

500

1500 mmChannel Module

1000

mm

Ceilin

g M

odul

e

150

mm

cha

nnel

150

mm

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

150mm 1000mm 1500mm HALCYON 1350mm x 500mm FL DXT, DXI, DXF

SL DX

SQ DX

MARS 1350mm x 500mm FLB DXT, DXI, DXF

SLT DX

SQ DX

MARS High-NRC 1350mm x 500mm FLB DXT, DXI, DXF

SLT DX

SQ DX

Metric Systems 1000mm Ceiling Module 150mm ChannelSystem 122 1350mm x 500mm Infill Panel

Page 177: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength m2 Main Tee

Usage Per m2Cross Tee 1Usage Per m2

Cross Tee 2Usage Per m2

System Module 1500mm 1.500 1.000 1.333 0.900

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Step 3. Select Corresponding Grid for Selected Panels

Order Information 1000mm Ceiling Module 150mm ChannelSystem 122 1350mm x 500mm Infill Panel

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 1350mm x 500mm FL ¨ ME98360 SL ¨ ME97436 SQ ¨ ME97407

MARS 1350mm x 500mm FLB ¨ ME88845 SLT ¨ ME86547 SQ ¨ ME86519

MARS High-NRC 1350mm x 500mm FLB ¨ ME86479 SLT ¨ ME86447 SQ ¨ ME86410

Channel Panels HALCYON 150mm x 1000mm FL ¨ ME98198 SL ¨ ME99271 SQ ¨ ME97227

PANZ Metal Panels, Solid 150mm x 1000mm FL ¨ ME909953

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ MEDXT24SP206

Cross Tee 1 2 ¨ MEDXT1000

Cross Tee 2 1 ¨ MEDXT1350

IDENTITEE DXI Main Tee ¨ MEDXI24SP206

Cross Tee 1 2 ¨ MEDXI1000

Cross Tee 2 1 ¨ MEDXI1350

DONN DX Main Tee ¨ MEDX24SP206 ¨ MEDX24SP206

Cross Tee 1 2 ¨ MEDX1000 2 ¨ MEDX1000

Cross Tee 2 1 ¨ MEDX1350 1 ¨ MEDX1350

LOGIX Integrated Ceiling Systems Systems Guide 175

Step 1. Select Panels Step 2. Select Edge for Panels

Page 178: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

176 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

1350 mm x 1000 mm Infill Panel

150 mm Channel Panel 150 mm Channel Panel

Main Tee

Cross Tee 1

Module Layout

1350150 150

1500 mmChannel Module

1000

mm

Ceilin

g M

odul

e

150

mm

cha

nnel

150

mm

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

150mm 1000mm 1500mm HALCYON 1350mm x 1000mm FL DXT, DXI, DXF

SL DX

SQ DX

Metric Systems 1000mm Ceiling Module 150mm ChannelSystem 107 1350mm x 1000mm Infill Panel

Page 179: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength m2 Main Tee

Usage Per m2Cross Tee 1Usage Per m2

System Module 1500mm 1.500 1.000 1.333

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 1350mm x 1000mm FL ¨ ME97558 SL ¨ ME97529 SQ ¨ ME97501

Channel Panels HALCYON 150mm x 1000mm FL ¨ ME97541 SL ¨ ME97512 SQ ¨ ME97483

PANZ Metal Panels, Solid 150mm x 1000mm FL ¨ ME909953

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ MEDXT24SP206

Cross Tee 1 2 ¨ MEDXT1000

IDENTITEE DXI Main Tee ¨ MEDXI24SP206

Cross Tee 1 2 ¨ MEDXI1000

DONN DX Main Tee ¨ MEDX24SP206 ¨ MEDX24SP206

Cross Tee 1 2 ¨ MEDX1000 2 ¨ MEDX1000

Order Information 1000mm Ceiling Module 150mm ChannelSystem 107 1350mm x 1000mm Infill Panel

LOGIX Integrated Ceiling Systems Systems Guide 177

Step 1. Select Panels Step 2. Select Edge for Panels

Page 180: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

178 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

525 mm x 600 mm Infill Panel

150 mm Channel Panel 150 mm Channel Panel

Cross Tee 3 Main Tee

Cross Tee 1

Cross Tee 2

Module Layout

150 150

600

600

525 525

1200 mmChannel Module

1200

mm

Ceilin

g M

odul

e

150

mm

cha

nnel

150

mm

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

150mm 1200mm 1200mm HALCYON 525mm x 600mm FL DXT, DXI, DXF

SL DX

SQ DX, DXT

MARS 525mm x 600mm FLB DXT, DXI, DXF

SLT DX

SQ DX, DXT

MARS High-NRC 525mm x 600mm FLB DXT, DXI, DXF

SLT DX

SQ DX, DXT

Metric Systems 1200mm Ceiling Module 150mm ChannelSystem 113 525mm x 600mm Infill Panel

Page 181: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength m2 Main Tee

Usage Per m2Cross Tee 1Usage Per m2

Cross Tee 2Usage Per m2

Cross Tee 3Usage Per m2

System Module 1200mm 1.440 0.833 1.667 0.833 0.729

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 525mm x 600mm FL ¨ ME98195 SL ¨ ME98220 SQ ¨ ME97411

MARS 525mm x 600mm FLB ¨ ME88840 SLT ¨ ME86550 SQ ¨ ME86522

MARS High-NRC 525mm x 600mm FLB ¨ ME86483 SLT ¨ ME86451 SQ ¨ ME86414

Channel Panels HALCYON 150mm x 1200mm FL ¨ ME97572 SL ¨ ME97493 SQ ¨ ME97479

MARS 150mm x 1200mm FLB ¨ ME88887 SLT ¨ ME86542 SQ ¨ ME86325

MARS High-NRC 150mm x 1200mm FLB ¨ ME86331 SLT ¨ ME86442 SQ ¨ ME86404

PANZ Metal Panels, Solid 150mm x 1200mm FL ¨ ME909954

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ MEDXT24SP204 ¨ MEDXT24SP204

Cross Tee 1 2 ¨ MEDXT1200 2 ¨ MEDXT1200

Cross Tee 2 1 ¨ MEDXT1200 1 ¨ MEDXT1200

Cross Tee 3 2 ¨ MEDXT525 2 ¨ MEDXT525

IDENTITEE DXI Main Tee ¨ MEDXI24SP204

Cross Tee 1 2 ¨ MEDXI1200

Cross Tee 2 1 ¨ MEDXI1200

Cross Tee 3 2 ¨ MEDXI525

DONN DX Main Tee ¨ MEDX24SP204 ¨ MEDX24SP204

Cross Tee 1 2 ¨ MEDX1200 2 ¨ MEDX1200

Cross Tee 2 1 ¨ MEDX1200 1 ¨ MEDX1200

Cross Tee 3 2 ¨ MEDX525 2 ¨ MEDX525

Order Information 1200mm Ceiling Module 150mm ChannelSystem 113 525mm x 600mm Infill Panel

LOGIX Integrated Ceiling Systems Systems Guide 179

Step 1. Select Panels Step 2. Select Edge for Panels

Page 182: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

180 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

1050 mm x 600 mm Infill Panel

150 mm Channel Panel 150 mm Channel Panel

Cross Tee 2 Main Tee

Cross Tee 1

Module Layout

150 150

600

600

1050

1200 mmChannel Module

1200

mm

Ceilin

g M

odul

e

150

mm

cha

nnel

150

mm

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

150mm 1200mm 1200mm HALCYON 1050mm x 600mm FL DXT, DXI, DXF

SL DX

SQ DX

Metric Systems 1200mm Ceiling Module 150mm ChannelSystem 109 1050mm x 600mm Infill Panel

Page 183: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength m2 Main Tee

Usage Per m2Cross Tee 1Usage Per m2

Cross Tee 2Usage Per m2

System Module 1200mm 1.440 0.833 1.667 0.729

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 1050mm x 600mm FL ¨ ME97560 SL ¨ ME97531 SQ ¨ ME97503

Channel Panels HALCYON 150mm x 1200mm FL ¨ ME97572 SL ¨ ME97493 SQ ¨ ME97479

PANZ Metal Panels, Solid 150mm x 1200mm FL ¨ ME909954

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ MEDXT24SP204

Cross Tee 1 2 ¨ MEDXT1200

Cross Tee 2 1 ¨ MEDXT1050

IDENTITEE DXI Main Tee ¨ MEDXI24SP204

Cross Tee 1 2 ¨ MEDXI1200

Cross Tee 2 1 ¨ MEDXI1050

DONN DX Main Tee ¨ MEDX24SP204 ¨ MEDX24SP204

Cross Tee 1 2 ¨ MEDX1200 2 ¨ MEDX1200

Cross Tee 2 1 ¨ MEDX1050 1 ¨ MEDX1050

Order Information 1200mm Ceiling Module 150mm ChannelSystem 109 1050mm x 600mm Infill Panel

LOGIX Integrated Ceiling Systems Systems Guide 181

Step 1. Select Panels Step 2. Select Edge for Panels

Page 184: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

182 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

1050 mm x 1200 mm Infill Panel

150 mm Channel Panel 150 mm Channel Panel

Main Tee

Cross Tee 1

Module Layout

150 1501050

1200 mmChannel Module

1200

mm

Ceilin

g M

odul

e

150

mm

cha

nnel

150

mm

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

150mm 1200mm 1200mm HALCYON 1050mm x 1200mm FL DXT, DXI, DXF

SL DX

SQ DX

Metric Systems 1200 mm Ceiling Module 150mm ChannelSystem 101 1050mm x 1200mm Infill Panel

Page 185: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength m2 Main Tee

Usage Per m2Cross Tee 1Usage Per m2

System Module 1200mm 1.440 0.833 1.667

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Step 3. Select Corresponding Grid for Selected Panels

Order Information 1200mm Ceiling Module 150mm ChannelSystem 101 1050mm x 1200mm Infill Panel

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 1050mm x 1200mm FL ¨ ME97561 SL ¨ ME97532 SQ ¨ ME97504

Channel Panels HALCYON 150mm x 1200mm FL ¨ ME97572 SL ¨ ME97493 SQ ¨ ME97479

PANZ Metal Panels, Solid 150mm x 1200mm FL ¨ ME909954

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ MEDXT24SP204

Cross Tee 1 2 ¨ MEDXT1200

IDENTITEE DXI Main Tee ¨ MEDXI24SP204

Cross Tee 1 2 ¨ MEDXI1200

DONN DX Main Tee ¨ MEDX24SP204 ¨ MEDX24SP204

Cross Tee 1 2 ¨ MEDX1200 2 ¨ MEDX1200

LOGIX Integrated Ceiling Systems Systems Guide 183

Step 1. Select Panels Step 2. Select Edge for Panels

Page 186: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

184 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

600 mm x 600 mm Infill Panel

150 mm Channel Panel 150 mm Channel Panel

`

Main Tee

Cross Tee 1

Cross Tee 3

Cross Tee 2

Module Layout

600

600

600 600150 150

1350 mmChannel Module

1200

mm

Ceilin

g M

odul

e

150

mm

cha

nnel

150

mm

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

150mm 1200mm 1350mm HALCYON 600mm x 600mm FL DXT, DXI, DXF

SL DX

SQ DX, DXT

MARS 600mm x 600mm FLB DXT, DXI, DXF

SLT DX

SQ DX, DXT

MARS High-NRC 600mm x 600mm FLB DXT, DXI, DXF

SLT DX

SQ DX, DXT

PANZ Metal Panels, Solid 600mm x 600mm FL DXT, DXI

Metric Systems 1200mm Ceiling Module 150mm ChannelSystem 127 600mm x 600mm Infill Panel

Page 187: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength m2 Main Tee

Usage Per m2Cross Tee 1Usage Per m2

Cross Tee 2Usage Per m2

Cross Tee 3Usage Per m2

System Module 1350mm 1.620 0.833 1.481 0.741 0.741

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 600mm x 600mm FL ¨ ME98225 SL ¨ ME98223 SQ ¨ ME98221

MARS 600mm x 600mm FLB ¨ ME86985 SLT ¨ ME86785 SQ ¨ ME86185

MARS High-NRC 600mm x 600mm FLB ¨ ME87100 SLT ¨ ME87200 SQ ¨ ME86100

PANZ Metal Panels, Solid 600mm x 600mm FL ¨ ME909975

Channel Panels HALCYON 150mm x 1200mm FL ¨ ME97572 SL ¨ ME97493 SQ ¨ ME97479

MARS 150mm x 1200mm FLB ¨ ME88887 SLT ¨ ME86542 SQ ¨ ME86325

MARS High-NRC 150mm x 1200mm FLB ¨ ME86331 SLT ¨ ME86442 SQ ¨ ME86404

PANZ Metal Panels, Solid 150mm x 1200mm FL ¨ ME909954

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ MEDXT3600 ¨ MEDXT3600

Cross Tee 1 2 ¨ MEDXT1200 2 ¨ MEDXT1200

Cross Tee 2 1 ¨ MEDXT1200 1 ¨ MEDXT1200

Cross Tee 3 2 ¨ MEDXT600 2 ¨ MEDXT600

IDENTITEE DXI Main Tee ¨ MEDXI3600

Cross Tee 1 2 ¨ MEDXI1200

Cross Tee 2 1 ¨ MEDXI1200

Cross Tee 3 2 ¨ MEDXI600

DONN DX Main Tee ¨ MEDX3600 ¨ MEDX3600

Cross Tee 1 2 ¨ MEDX1200 2 ¨ MEDX1200

Cross Tee 2 1 ¨ MEDX1200 1 ¨ MEDX1200

Cross Tee 3 2 ¨ MEDX600 2 ¨ MEDX600

Order Information 1200mm Ceiling Module 150mm ChannelSystem 127 600mm x 600mm Infill Panel

LOGIX Integrated Ceiling Systems Systems Guide 185

Step 1. Select Panels Step 2. Select Edge for Panels

Page 188: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

186 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

1200 mm x 600 mm Infill Panel

150 mm Channel Panel 150 mm Channel Panel

Main Tee

Cross Tee 1

Cross Tee 2

Module Layout

600

600

1200150 150

1350 mmChannel Module

1200

mm

Ceilin

g M

odul

e

150

mm

cha

nnel

150

mm

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

150mm 1200mm 1350mm HALCYON 1200mm x 600mm FL DXT, DXI, DXF

SL DX

SQ DX

MARS 1200mm x 600mm FLB DXT, DXI, DXF

SLT DX

SQ DX

MARS High-NRC 1200mm x 600mm FLB DXT, DXI, DXF

SLT DX

SQ DX

PANZ Metal Panels, Solid 1200mm x 600mm FL DXT, DXI

Metric Systems 1200mm Ceiling Module 150mm ChannelSystem 130 1200mm x 600mm Infill Panel

Page 189: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength m2 Main Tee

Usage Per m2Cross Tee 1Usage Per m2

Cross Tee 2Usage Per m2

System Module 1350mm 1.620 0.833 1.481 0.741

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 1200mm x 600mm FL ¨ ME98245 SL ¨ ME98243 SQ ¨ ME98241

MARS 1200mm x 600mm FLB ¨ ME88985 SLT ¨ ME88785 SQ ¨ ME88185

MARS High-NRC 1200mm x 600mm FLB ¨ ME89500 SLT ¨ ME89600 SQ ¨ ME86300

PANZ Metal Panels, Solid 1200mm x 600mm FL ¨ ME909974

Channel Panels HALCYON 150mm x 1200mm FL ¨ ME97572 SL ¨ ME97493 SQ ¨ ME97479

MARS 150mm x 1200mm FLB ¨ ME88887 SLT ¨ ME86542 SQ ¨ ME86325

MARS High-NRC 150mm x 1200mm FLB ¨ ME86331 SLT ¨ ME86442 SQ ¨ ME86404

PANZ Metal Panels, Solid 150mm x 1200mm FL ¨ ME909954

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT(Use with PANZ)

Main Tee ¨ MEDXT3600

Cross Tee 1 2 ¨ MEDXT1200

Cross Tee 2 1 ¨ MEDXT1200

IDENTITEE DXI Main Tee ¨ MEDXI3600

Cross Tee 1 2 ¨ MEDXI1200

Cross Tee 2 1 ¨ MEDXI1200

DONN DX Main Tee ¨ MEDX3600 ¨ MEDX3600

Cross Tee 1 2 ¨ MEDX1200 2 ¨ MEDX1200

Cross Tee 2 1 ¨ MEDX1200 1 ¨ MEDX1200

Order Information 1200mm Ceiling Module 150mm ChannelSystem 130 1200mm x 600mm Infill Panel

LOGIX Integrated Ceiling Systems Systems Guide 187

Step 1. Select Panels Step 2. Select Edge for Panels

Page 190: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

188 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

1200 mm x 1200 mm Infill Panel

150 mm Channel Panel 150 mm Channel Panel

Main Tee

Cross Tee 1

Module Layout

1200150 150

1350 mmChannel Module

1200

mm

Ceilin

g M

odul

e

150

mm

cha

nnel

150

mm

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

150mm 1200mm 1350mm HALCYON 1200mm x 1200mm FL DXT, DXI, DXF

SL DX

SQ DX

Metric Systems 1200mm Ceiling Module 150mm ChannelSystem 106 1200mm x 1200mm Infill Panel

Page 191: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength m2 Main Tee

Usage Per m2Cross Tee 1Usage Per m2

System Module 1350mm 1.620 0.833 1.481

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Step 3. Select Corresponding Grid for Selected Panels

Order Information 1200mm Ceiling Module 150mm ChannelSystem 106 1200mm x 1200mm Infill Panel

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 1200mm x 1200mm FL ¨ ME98445 SL ¨ ME98443 SQ ¨ ME98441

Channel Panels HALCYON 150mm x 1200mm FL ¨ ME97572 SL ¨ ME97493 SQ ¨ ME97479

PANZ Metal Panels, Solid 150mm x 1200mm FL ¨ ME909954

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ MEDXT3600

Cross Tee 1 2 ¨ MEDXT1200

IDENTITEE DXI Main Tee ¨ MEDXI3600

Cross Tee 1 2 ¨ MEDXI1200

DONN DX Main Tee ¨ MEDX3600 ¨ MEDX3600

Cross Tee 1 2 ¨ MEDX1200 2 ¨ MEDX1200

LOGIX Integrated Ceiling Systems Systems Guide 189

Step 1. Select Panels Step 2. Select Edge for Panels

Page 192: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

190 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

1800 mm x 300 mm Infill Panel

150 mm Channel Panel 150 mm Channel Panel

Main Tee

Cross Tee 1

Cross Tee 2

Module Layout

300

300

300

300

1800150 150

1950 mmChannel Module

1200

mm

Ceilin

g M

odul

e

150

mm

cha

nnel

150

mm

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

150mm 1200mm 1950mm HALCYON 1800mm x 300mm FL DXT, DXI, DXF

SL DX

SQ DX

MARS 1800mm x 300mm FLB DXT, DXI, DXF

SLT DX

SQ DX

MARS High-NRC 1800mm x 300mm FLB DXT, DXI, DXF

SLT DX

SQ DX

PANZ Metal Panels, Solid 1800mm x 300mm FL DXT, DXI

Metric Systems 1200mm Ceiling Module 150mm ChannelSystem 120 1800mm x 300mm Infill Panel

Page 193: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength m2 Main Tee

Usage Per m2Cross Tee 1Usage Per m2

Cross Tee 2Usage Per m2

System Module 1950mm 2.340 0.833 0.513 2.308

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 1800mm x 300mm FL ¨ ME97574 SL ¨ ME97433 SQ ¨ ME97405

MARS 1800mm x 300mm FLB ¨ ME86570 SLT ¨ ME86546 SQ ¨ ME86518

MARS High-NRC 1800mm x 300mm FLB ¨ ME86478 SLT ¨ ME86446 SQ ¨ ME86409

PANZ Metal Panels, Solid 1800mm x 300mm FL ¨ ME909956

Channel Panels HALCYON 150mm x 1200mm FL ¨ ME97572 SL ¨ ME97493 SQ ¨ ME97479

MARS 150mm x 1200mm FLB ¨ ME88887 SLT ¨ ME86542 SQ ¨ ME86325

MARS High-NRC 150mm x 1200mm FLB ¨ ME86331 SLT ¨ ME86442 SQ ¨ ME86404

PANZ Metal Panels, Solid 150mm x 1200mm FL ¨ ME909954

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ MEDXT3600

Cross Tee 1 1 ¨ MEDXT1200

Cross Tee 2 3 ¨ MEDXT1800

IDENTITEE DXI Main Tee ¨ MEDXI3600

Cross Tee 1 1 ¨ MEDXI1200

Cross Tee 2 3 ¨ MEDXI1800

DONN DX Main Tee ¨ MEDX3600 ¨ MEDX3600

Cross Tee 1 1 ¨ MEDX1200 1 ¨ MEDX1200

Cross Tee 2 3 ¨ MEDX1800 3 ¨ MEDX1800

Order Information 1200mm Ceiling Module 150mm ChannelSystem 120 1800mm x 300mm Infill Panel

LOGIX Integrated Ceiling Systems Systems Guide 191

Step 1. Select Panels Step 2. Select Edge for Panels

Page 194: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

192 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

1800 mm x 600 mm Infill Panel

150 mm Channel Panel 150 mm Channel Panel

Main Tee

Cross Tee 1

Cross Tee 2

Module Layout

600

600

1800150 150

1950 mmChannel Module

1200

mm

Ceilin

g M

odul

e

150

mm

cha

nnel

150

mm

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

150mm 1200mm 1950mm HALCYON 1800mm x 600mm FL DXT, DXI, DXF

SL DX

SQ DX

MARS 1800mm x 600mm FLB DXT, DXI, DXF

SLT DX

SQ DX

MARS High-NRC 1800mm x 600mm FLB DXT, DXI, DXF

SLT DX

SQ DX

PANZ Metal Panels, Solid 1800mm x 600mm FL DXT, DXI

Metric Systems 1200mm Ceiling Module 150mm ChannelSystem 137 1800mm x 600mm Infill Panel

Page 195: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength m2 Main Tee

Usage Per m2Cross Tee 1Usage Per m2

Cross Tee 2Usage Per m2

System Module 1950mm 2.340 0.833 1.026 1.538

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Order Information 1200mm Ceiling Module 150mm ChannelSystem 137 1800mm x 600mm Infill Panel

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 1800mm x 600mm FL ¨ ME97553 SL ¨ ME97445 SQ ¨ ME99234

MARS 1800mm x 600mm FLB ¨ ME88996 SLT ¨ ME86166 SQ ¨ ME86223

MARS High-NRC 1800mm x 600mm FLB ¨ ME89670 SLT ¨ ME89660 SQ ¨ ME86360

PANZ Metal Panels, Solid 1800mm x 600mm FL ¨ ME909970

Channel Panels HALCYON 150mm x 1200mm FL ¨ ME97572 SL ¨ ME97493 SQ ¨ ME97479

MARS 150mm x 1200mm FLB ¨ ME88887 SLT ¨ ME86542 SQ ¨ ME86325

MARS High-NRC 150mm x 1200mm FLB ¨ ME86331 SLT ¨ ME86442 SQ ¨ ME86404

PANZ Metal Panels, Solid 150mm x 1200mm FL ¨ ME90954

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ MEDXT3600

Cross Tee 1 2 ¨ MEDXT1200

Cross Tee 2 2 ¨ MEDXT1800

IDENTITEE DXI Main Tee ¨ MEDXI3600

Cross Tee 1 2 ¨ MEDXI1200

Cross Tee 2 2 ¨ MEDXI1800

DONN DX Main Tee ¨ MEDX3600 ¨ MEDX3600

Cross Tee 1 2 ¨ MEDX1200 2 ¨ MEDX1200

Cross Tee 2 2 ¨ MEDX1800 2 ¨ MEDX1800

LOGIX Integrated Ceiling Systems Systems Guide 193

Step 1. Select Panels Step 2. Select Edge for Panels

Page 196: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

194 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

1350 mm x 500 mm Infill Panel

150 mm Channel Panel 150 mm Channel Panel

Main Tee

Cross Tee 1

Cross Tee 2

Module Layout

500

500

500

1350150 150

1500 mmChannel Module

1500

mm

Ceilin

g M

odul

e

150

mm

cha

nnel

150

mm

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

150mm 1500mm 1500mm HALCYON 1350mm x 500mm FL DXT, DXI, DXF

SL DX

SQ DX

MARS 1350mm x 500mm FLB DXT, DXI, DXF

SLT DX

SQ DX

MARS High-NRC 1350mm x 500mm FLB DXT, DXI, DXF

SLT DX

SQ DX

Metric Systems 1500mm Ceiling Module 150mm ChannelSystem 114 1350mm x 500mm Infill Panel

Page 197: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength m2 Main Tee

Usage Per m2Cross Tee 1Usage Per m2

Cross Tee 2Usage Per m2

System Module 1500mm 1.500 1.000 2.000 1.800

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 1350mm x 500mm FL ¨ ME98360 SL ¨ ME97436 SQ ¨ ME97407

MARS 1350mm x 500mm FLB ¨ ME88845 SLT ¨ ME86547 SQ ¨ ME86519

MARS High-NRC 1350mm x 500mm FLB ¨ ME86479 SLT ¨ ME86447 SQ ¨ ME86410

PANZ Metal Panels, Solid 1350mm x 500mm FL ¨ ME909963

Channel Panels HALCYON 150mm x 1500mm FL ¨ ME97573 SL ¨ ME97570 SQ ¨ ME97490

MARS 150mm x 1500mm FLB ¨ ME86835 SLT ¨ ME86543 SQ ¨ ME86507

MARS High-NRC 150mm x 1500mm FLB ¨ ME86333 SLT ¨ ME86443 SQ ¨ ME86145

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ MEDXT24SP206

Cross Tee 1 2 ¨ MEDXT1500

Cross Tee 2 2 ¨ MEDXT1350

IDENTITEE DXI Main Tee ¨ MEDXI24SP206

Cross Tee 1 2 ¨ MEDXI1500

Cross Tee 2 2 ¨ MEDXI1350

DONN DX Main Tee ¨ MEDX24SP206 ¨ MEDX24SP206

Cross Tee 1 2 ¨ MEDX1500 2 ¨ MEDX1500

Cross Tee 2 2 ¨ MEDX1350 2 ¨ MEDX1350

Order Information 1500mm Ceiling Module 150mm ChannelSystem 114 1350mm x 500mm Infill Panel

LOGIX Integrated Ceiling Systems Systems Guide 195

Step 1. Select Panels Step 2. Select Edge for Panels

Page 198: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

196 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

1350 mm x 1500 mm Infill Panel

150 mm Channel Panel 150 mm Channel Panel

Main Tee

Cross Tee 1

Module Layout

150 1501350

1500 mmChannel Module

1500

mm

Ceilin

g M

odul

e

150

mm

cha

nnel

150

mm

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

150mm 1500mm 1500mm HALCYON 1350mm x 1500mm FL DXT, DXI, DXF

SL DX

SQ DX

Metric Systems 1500mm Ceiling Module 150mm ChannelSystem 145 1350mm x 1500mm Infill Panel

Page 199: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength m2 Main Tee

Usage Per m2Cross Tee 1Usage Per m2

System Module 1500mm 2.250 0.667 1.333

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Step 3. Select Corresponding Grid for Selected Panels

Order Information 1500mm Ceiling Module 150mm ChannelSystem 145 1350mm x 1500mm Infill Panel

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 1350mm x 1500mm FL ¨ ME97565 SL ¨ ME97536 SQ ¨ ME97507

Channel Panels HALCYON 150mm x 1500mm FL ¨ ME97573 SL ¨ ME97570 SQ ¨ ME97490

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ MEDXT24SP206

Cross Tee 1 2 ¨ MEDXT1500

IDENTITEE DXI Main Tee ¨ MEDXI24SP206

Cross Tee 1 2 ¨ MEDXI1500

DONN DX Main Tee 1 ¨ MEDX24SP206 ¨ MEDX24SP206

Cross Tee 1 2 ¨ MEDX1500 2 ¨ MEDX1500

LOGIX Integrated Ceiling Systems Systems Guide 197

Step 1. Select Panels Step 2. Select Edge for Panels

Page 200: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

198 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

675 mm x 750 mm Infill Panel

150 mm Channel Panel 150 mm Channel Panel

Main Tee

Cross Tee 1

Cross Tee 3

Cross Tee 2

Module Layout

675150 150675

750

750

1500 mmChannel Module

1500

mm

Ceilin

g M

odul

e

150

mm

cha

nnel

150

mm

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

150mm 1500mm 1500mm HALCYON 675mm x 750mm FL DXT, DXI, DXF

SL DX

SQ DX

MARS 675mm x 750mm FLB DXT, DXI, DXF

SLT DX

SQ DX

MARS High-NRC 675mm x 750mm FLB DXT, DXI, DXF

SLT DX

SQ DX

Metric Systems 1500mm Ceiling Module 150mm ChannelSystem 143 675mm x 750mm Infill Panel

Page 201: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength m2 Main Tee

Usage Per m2Cross Tee 1Usage Per m2

Cross Tee 2Usage Per m2

Cross Tee 3Usage Per m2

System Module 1500mm 1.500 1.000 2.000 1.000 0.900

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Step 3. Select Corresponding Grid for Selected Panels

Order Information 1500mm Ceiling Module 150mm ChannelSystem 143 675mm x 750mm Infill Panel

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 675mm x 750mm FL ¨ ME98333 SL ¨ ME97447 SQ ¨ ME97417

MARS 675mm x 750mm FLB ¨ ME86850 SLT ¨ ME86557 SQ ¨ ME86530

MARS High-NRC 675mm x 750mm FLB ¨ ME86490 SLT ¨ ME86458 SQ ¨ ME86421

Channel Panels HALCYON 150mm x 1500mm FL ¨ ME97573 SL ¨ ME97570 SQ ¨ ME97490

MARS 150mm x 1500mm FLB ¨ ME86835 SLT ¨ ME86543 SQ ¨ ME86507

MARS High-NRC 150mm x 1500mm FLB ¨ ME86333 SLT ¨ ME86443 SQ ¨ ME86145

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ MEDXT24SP206

Cross Tee 1 2 ¨ MEDXT1500

Cross Tee 2 1 ¨ MEDXT1500

Cross Tee 3 2 ¨ MEDXT675

IDENTITEE DXI Main Tee ¨ MEDXI24SP206

Cross Tee 1 2 ¨ MEDXI1500

Cross Tee 2 1 ¨ MEDXI1500

Cross Tee 3 2 ¨ MEDXI675

DONN DX Main Tee ¨ MEDX24SP206 ¨ MEDX24SP206

Cross Tee 1 2 ¨ MEDX1500 2 ¨ MEDX1500

Cross Tee 2 1 ¨ MEDX1500 1 ¨ MEDX1500

Cross Tee 3 2 ¨ MEDX675 2 ¨ MEDX675

LOGIX Integrated Ceiling Systems Systems Guide 199

Step 1. Select Panels Step 2. Select Edge for Panels

Page 202: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

200 Systems Guide LOGIX Integrated Ceiling Systems

Panel Layout Suspension System Layout

1350 mm x 750 mm Infill Panel

150 mm Channel Panel 150 mm Channel Panel

Main Tee

Cross Tee 1

Cross Tee 2

Module Layout

1350150 150

750

750

1500 mmChannel Module

1500

mm

Ceilin

g M

odul

e

150

mm

cha

nnel

150

mm

cha

nnel

SelectorChannel Width Ceiling Module On-Center

Channel SpacingInfill Panels Panel

EdgeSuspension System

150mm 1500mm 1500mm HALCYON 1350mm x 750mm FL DXT, DXI, DXF

SL DX

SQ DX

MARS 1350mm x 750mm FLB DXT, DXI, DXF

SLT DX

SQ DX

MARS High-NRC 1350mm x 750mm FLB DXT, DXI, DXF

SLT DX

SQ DX

PANZ Metal Panels, Solid 1350mm x 750mm FL DXT, DXI

Metric Systems 1500mm Ceiling Module 150mm ChannelSystem 104 1350mm x 750mm Infill Panel

Page 203: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Suspension System EstimatorLength m2 Main Tee

Usage Per m2Cross Tee 1Usage Per m2

Cross Tee 2Usage Per m2

System Module 1500mm 2.250 0.667 1.333 0.600

Note: Multiply the ceiling area (SF) by the Usage Factor (UF). This calculation will determine lineal footage of suspension system components required. Please refer to the front of this catalogue or IC592 for stabilizer bar usage.

Step 3. Select Corresponding Grid for Selected Panels

FL/FLB SL/SLT SQ

Edge Item No. Edge Item No. Edge Item No.

Infill Panels HALCYON 1350mm x 750mm FL ¨ ME98359 SL ¨ ME98337 SQ ¨ ME97422

MARS 1350mm x 750mm FLB ¨ ME86831 SLT ¨ ME88686 SQ ¨ ME86503

MARS High-NRC 1350mm x 750mm FLB ¨ ME86501 SLT ¨ ME86464 SQ ¨ ME86427

PANZ Metal Panels, Solid 1350mm x 750mm FL ¨ ME909972

Channel Panels HALCYON 150mm x 1500mm FL ¨ ME97573 SL ¨ ME97570 SQ ¨ ME97490

MARS 150mm x 1500mm FLB ¨ ME86835 SLT ¨ ME86543 SQ ¨ ME86507

MARS High-NRC 150mm x 1500mm FLB ¨ ME86333 SLT ¨ ME86443 SQ ¨ ME86145

Qty Item No. Qty Item No. Qty Item No.

Suspension Systems

CENTRICITEE DXT Main Tee ¨ MEDXT24SP206

Cross Tee 1 2 ¨ MEDXT1500

Cross Tee 2 1 ¨ MEDXT1350

IDENTITEE DXI Main Tee ¨ MEDXI24SP206

Cross Tee 1 2 ¨ MEDXI1500

Cross Tee 2 1 ¨ MEDXI1350

DONN DX Main Tee ¨ MEDX24SP206 ¨ MEDX24SP206

Cross Tee 1 2 ¨ MEDX1500 2 ¨ MEDX1500

Cross Tee 2 1 ¨ MEDX1350 1 ¨ MEDX1350

Order Information 1500mm Ceiling Module 150mm ChannelSystem 104 1350mm x 750mm Infill Panel

LOGIX Integrated Ceiling Systems Systems Guide 201

Step 1. Select Panels Step 2. Select Edge for Panels

Page 204: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

Notes

202 Systems Guide LOGIX Integrated Ceiling Systems

Page 205: USG Logix™ Integrated Systems (English) - IS268 · PDF fileYoke The USG Logix Yoke is an optional suspension system installation accessory that facilitates the spacing and suspension

PRODUCT INFORMATIONSee usg.com for the most up-to-date product information.

INSTALLATIONMust be installed in compliance with ASTM C636, ASTM E580, CISCA and standard industry practices, within all applicable code requirements. Alternative assemblies and installation methods may be utilized when approved by the Authority Having Jurisdiction. USG recommends checking with the Authority Having Jurisdiction prior to designing and installing a suspended ceiling system.

CODE COMPLIANCEThe information presented is correct to the best of our knowledge at the date of issuance. Because codes continue to evolve, check with a local official prior to designing and install-ing a ceiling system. Other restrictions and exemptions may apply. This is only intended as a quick installation reference.

ICC EVALUATION SERVICE, INC., REPORT COMPLIANCESuspension systems manufactured by USG Interiors, Inc., have been reviewed and are approved by listing in ICC-Evaluation Service Report ESR-1222. Evaluation Reports are sub-ject to reexamination, revision and possible cancellation. Please refer to usgdesignstudio.com or usg.com for current reports.

L.A. RESEARCH REPORT ComplianceDonn brand suspension systems manufactured by USG Interiors, Inc., have been reviewed and are approved by listing in the following L.A. Research Report number: 25764.

NOTICEWe shall not be liable for incidental and consequential damages, directly or indirectly sustained, nor for any loss caused by applica-tion of these goods not in accordance with current printed instructions or for other than the intended use. Our liability is expressly limited to replacement of defective goods. Any claim shall be deemed waived unless made in writing to us within thirty (30) days from date it was or reasonably should have been discovered.

SAFETY FIRST! Follow good safety/industrial hygiene practices during installation. Wear appropriate personal protective equipment. Read MSDS and literature before specification and installation.

IS268/rev 10-14© 2014, USG Corporation or its affiliates. All rights reserved. The trademarks CENTRICITEE, DX, DXL, DONN, DXI, FINELINE, HALCYON, IDENTITEE, LOGIX, MARS, USG, IT’S YOUR WORLD BUILD IT, THE USG LOGO and related marks are trademarks of USG Interiors, LLC or a related company. GE Lighting Solutions, LLC is a subsidiary of the General Electric Company. The GE brand logo, Lumination are trademarks of the General Electric Company. © 2012 GE Lighting Solutions, LLC.

WEBSITESusg.comseismicceilings.comsustainableceilings.comusgdesignstudio.com

TECHNICAL SERVICE800 USG.4YOU (800 874.4968)

CUSTOMER SERVICE800 950.3839