FY2016-17 Updated February 26, 2016 USER GUIDE SPED Finance Statewide Field Test 1

Upload: others

Post on 12-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

FY2016-17

Updated February 26, 2016

USER GUIDE SPED Finance Statewide Field Test

1

Page 2: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

June 1 Application

2

The June 1 deadline is for the Title VIB application (both School-Age and Preschool) and State Preschool.

The new June 1 Application includes any educational facility receiving Title VI, Part B funds, section 611 and/or section 619 and State Preschool.

This includes: School Districts Charter Districts State Institutions Educational Cooperatives

Page 3: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

June 1 deadline is for Title VIB, Federal and State Preschool

3

The June 1, 2016 Application is for the FY2016-17 Title VIB (section 611 School Age and section 619 Federal Preschool) and State Preschool.

The Application is based on the FY2015-16 Preliminary amount, since FY2016-17 allocations have not yet been announced.

June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op will scan,

then upload the application forms into the SPED folder(s) posted on Indistar/ACSIP before the June 1 deadline.

After the upload is complete, districts hit the SPED Submit button under the Submit Forms Tab.

SPED Finance reads for accuracy and communicates to districts by email concerning corrections.

Districts address corrections within a 48 hr. period, so as not to disrupt flow of funds. Corrections are emailed to SPED Finance.

Application approval must be completed before funds are disbursed.

Page 4: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

SPED Finance Timeline

4

DEADLINE DATE REQUIRED FORMS DOCUMENTATION

JUNE 1, 2016 APPLICATION PARTS I & II

UPLOADED AND SUBMITTED IN INDISTAR/ACSIP

• VIB Budget Narrative • Federal & State Preschool

Budget Narratives (if applicable)

• VIB Request for bus/construction forms

• Application signature sheets • PSPS form (if applicable) • CEIS form (if applicable) • MOE Intent

• Review/Approval form from SPED Finance

OCT 1, 2016 FIRST AMENDMENT

• Request and Report forms • AFR MOE data in MYSPED

• COGNOS budget report

SPRING 2017 AMENDMENT • Request forms • Amend APSCN for final

allocation amounts

• COGNOS budget report

END OF YEAR 2016-17 • Request/Report forms • Amend APSCN for closing of

year

• COGNOS budget/AFR reports

Page 5: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

Spring School Board Meetings

5

The June 1 deadline will require a spring School Board meeting for approval of the application and signature on forms.

Page 6: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

Locating and Downloading forms

April/May Preparation

6

Page 7: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

April/May Preparation Locate the SPED June Application forms Part I & Part II in

Indistar/ACSIP: Part I & Part II Forms should be downloaded and

saved to a computer for completion.

7

http://indistar.org/

Page 8: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

Log-In with assigned DISTRICT password

8

Please use the DISTRICT password only. DO NOT use a school building password.

Federal Programs and School Improvement have been using Indistar/ACSIP. Each district has a Process Manager with the district password.

Page 9: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

My Dashboard Locate the COMPLETE FORMS TAB on the My Dashboard page. Scroll down to locate

the SPED June 1 Application forms. Click on the forms (both Part I & II) and Save to File on a district computer.

9

Page 10: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

Completing Part I-Word Document Forms

April/May Preparation

10

Page 11: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

June 1 Application Forms Available in Indistar/ACSIP

The June 1, 2016 Application is posted in two parts on Indistar/ACSIP under the COMPLETE FORMS tab. Both Part I and Part II must be completed, scanned, uploaded and submitted before the June 1 deadline. Preschool accounts also have a Part I and Part II.

Part I documents are Word Documents and do not calculate. Part II documents are in Excel format with multiple tabs. Both parts should be completed, saved on a district computer, then scanned together into one document and uploaded into Indistar/ACSIP.

11

Page 12: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

April/May Preparation Since FY2016-17 allocations will not be available for the June 1 application, FY2015-16 Preliminary Allocation amounts will be used for all June 1 application forms, both Part I and Part II, both school-age and preschool. Locate the FY2015-16 Preliminary Regular Allocation amount for VIB School Age, Federal and State preschool (see next slide) announced by Commissioner’s Memo.

12

Page 13: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

2015-16 Preliminary Amounts For the FY2015-16 Preliminary Regular Allocation amount only please refer to the following:

FIN-16-011: School Age Preliminary 2015-16 Allocations

FIN-16-009: Federal Preschool Preliminary 2015-16 Allocations

FIN-16-010: State Preschool Preliminary 2015-16 Allocations

13

Page 14: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

2015-16 Allocation amount only For the June 1 application VIB total, use the FY2015-16

Preliminary Regular Allocation amount only. Do not use Carryover or Additional Reserve amounts. Only

the Preliminary Regular Allocation amount. This means that the amount on the June application will be

smaller/less than the October 1 budget. Districts should adjust budget accordingly.

14

Page 15: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

June 1, Application Part 1 Word Documents

Part I Application Documents include: Statement of Intent, Assurances, Lobbying Certification Private School Proportionate Share form CEIS form Maintenance of Effort Eligibility Requirement District Contact information

All documents above should be completed, scanned

and uploaded into Indistar/ACSIP .

See slide 40 for naming the scanned file before uploading.

15

Page 16: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

Required forms: Statement of Intent and Assurances

16

Presenter
Presentation Notes
These forms should look familiar.
Page 17: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

Required form: Certification Regarding Lobbying

Certification Regarding Lobbying is required for Federal Funds.

It is recommended that the Superintendent signature is used.

17

Page 18: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

Additional Preschool form for Educational Cooperatives

Cooperatives need each participating district Superintendent’s signature on the required form for Preschool services.

18

Page 19: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

Application no longer mailed

19

Since the June Application pages are uploaded electronically, there is no longer a need to mail original forms to SPED Finance.

Page 20: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

PSPS (School Age Only)

20

Page 21: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

PSPS Step 3 For Step 3 on the PSPS form use the FY2015-16 Preliminary Regular Allocation amount only please refer to the following Commissioner’s Memo:

FIN-16-011: School Age Preliminary 2015-16 Allocations

21

Page 22: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

CEIS Form (School Age Only)

22

Page 23: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

CEIS Instructions The CEIS form is 2 pages. If a district is not participating,

check NO on question #2. If participating in Required or Voluntary CEIS, the district

must complete the entire CEIS application. If changes to the CEIS program are made after the June

application, an updated application should be emailed to SPED Finance with changes written into the application.

Budget changes are simply amended in APSCN.

23

Page 24: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

CEIS Amount Refer to the following

link for the FY2015-16 CEIS amount to use on the June 1 Application.

24

https://arksped.k12.ar.us/FundingAndFinance/SchoolAge.html

Page 25: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

MOE Promise/Intent School Age Only

Districts complete page 11 as a promise to meet Maintenance of Effort and an intent to spend at least the amount spent in the last completed year ( FY2014/15 AFR).

Choose one MOE test to complete, showing how the district intends to meet Maintenance of Effort for FY2016-17.

25

Page 26: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

MOE Instructions If choosing Local Plus State as

the test to complete for MOE, use the FY2014-15 State/Local AFR expenditure amount available in COGNOS and enter into line # 2.

Districts received the FY2014/15 AFR reports with the Review and Approval. The FY2014/15 AFR Checklist in MYSPED should also have the correct amount for the FY14/15 AFR.

The projected amount for FY2016-17 must be equal to or more than the amount in line 2.

Districts may enter the same amount as the FY2014-15 State/Local AFR or enter an amount that is more.

26

Page 27: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

Contact Information sheet Please consider summer

contact information. This will be critical for SPED Finance to contact district staff for corrections.

Remember the turn-around target for corrections is 48 hours or 2 working days.

27

Page 28: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

Completing Part II Excel Forms

28

April/May Preparation

Page 29: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

June 1 Application Part II Excel Documents

Part II contains the EXCEL documents of the application and are available in Indistar/ACSIP under the COMPLETE FORMS tab. Part II has 7 Tabs. Tab 1: Instructions/Guidance Tab 2: School Age VIB Budget Narrative Tab 3: Preschool VIB Budget Narrative Tab 4: State Preschool Budget Narrative Tab 5: Request to Purchase a Bus Tab 6: Request for Construction/Renovation Tab 7: Request to Purchase Equipment

Part II Excel documents must be saved to a computer and uploaded in the appropriate

SPED Finance Folder (School-Age or Preschool).

29

Page 30: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

Tab 1: Guidance

30

Page 31: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

Tab 2: School Age VIB Budget Narrative

31

Page 32: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

Tab 3: Federal Preschool Budget Narrative

32

Page 33: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

Tab 4: State Preschool Budget Narrative

33

Page 34: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

Tab 5: Request for Bus Purchase Before purchasing a bus,

districts must submit a signed Request form along with bus specifications.

SPED Finance will forward the Request with bus specifications to the Transportation Unit for approval.

The bus estimate must be in the budget before approval can be given.

34

Page 35: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

Tab 6: Request for Construction/Renovation

Construction/Renovation also needs a preapproved Request form.

If the project is $20,000 or more, specifications will need to be provided and SPED Finance will forward the Request with specifications to the Facilities Unit for approval.

All construction/renovation must be in the budget before approval can be given.

Function codes 4710 and 4720 should be used with object code range 64000.

35

Page 36: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

Tab 7: Request for Equipment Equipment must be

preapproved before purchasing.

The equipment amount must be included in the budget before approval can be given.

The Request forms are available on Indistar/ACSIP and MYSPED.

36

Page 37: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

Sample: Budget Narrative A Drop Down list of district names is at the top of each Budget Narrative

Form for districts to utilize. All function codes must be explained in the Title VIB School Age/

Preschool and State Preschool Budget Narrative(s). For salaries, include name(s) of staff, FTE, and position title. For contracts, list the name of company and service(s) provided. For supplies, list examples. This is particularly important for large purchases. For equipment, be specific as to the item to be purchased, estimated cost and

location. For Construction, list a brief general description and also complete the Request

for Construction form. For purchasing a bus, state in narrative, function 2790/object 67000 and

complete the Request to Purchase Bus form.

37

Page 38: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

Sample: Budget Narrative

38

Page 39: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

Name the scanned file: School Age: SPED16-17

Preschool/Early Childhood: EC SPED16-17

Ready to Scan and Upload

39

Page 40: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

Scan all completed documents together in one file: Parts I & II

Scan all completed documents into one School Age file and one Preschool file using the file names below. School Age: SPED16-17 Preschool/Early Childhood: EC SPED16-17

40

Page 41: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

Upload Guide http://indistar.org/

41

Page 42: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

Log-In with assigned district password

42

Please use the district log-in and password only. DO NOT use a school building password or the Test site password.

Federal Programs and School Improvement have been using Indistar/ACSIP. Each district has a designated Process Manager with the district password.

Page 43: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

My Dashboard

43

After logging in with the assigned district log-in/district password, the My Dashboard page shows several tabs and the Document Upload icon. Click on Document Upload.

Page 44: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

Locate the SPED folders for uploading the scanned documents

44

Page 45: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

Document Upload Instructions available on the Upload Page

45

Page 46: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

Submit the application When the file has been uploaded, go to the Submit Forms Tab on the Dashboard page,

scroll down and hit the SPED Submit button.

The Submit button sends SPED Finance an email notification that a file has been uploaded by the district.

46

Page 47: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

Upload/Submit When a district has uploaded and submitted Parts I and II of the

June application, SPED Finance will review submissions and email the district if corrections are needed.

SPED Finance will review applications in June.

Districts will address corrections and email completed corrections to SPED Finance within 48 hours or 2 working days.

Applications must be approved before funds are released for the FY2016-17 fiscal year.

47

Page 48: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

FY2016-17

OCTOBER 1 AMENDMENT

48

Page 49: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

October 1 Amendment

49

The October 1 deadline looks much the same as years’ past.

FY2016-17 Allocation, Additional Reserve and Carryover will be announced by Commissioner’s Memo on the ADE website.

SPED Finance will continue to pull the FY2015-16 AFR and the FY2016-17 Budget October 1 reports on State/Local, VIB, Medicaid and ARMAC, as well as Federal and State Preschool accounts.

http://www.arkansased.gov/

Page 50: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

October 1 amendment SPED Finance will review

State/Local, VIB, Medicaid and ARMAC, as well as, Preschool budgets.

FY2016-17 Request forms are due for Equipment purchases and FY2015-16 Report of Equipment Purchased forms are still required.

The FY2015/16 AFR Maintenance of Effort data is due October 1 in MYSPED.

There is no longer a

required Budget Checklist.

50

Page 51: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

October 1 amendment to the June Application Budget

The Private School Proportionate Share (PSPS) will

need to reflect the FY2016-17 allocation and any PSPS unspent carryover from FY2015-16.

The CEIS amount will be based on the FY2016-17 allowable percentage (if applicable).

51

Page 52: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

October 1 amendment to the June Application Budget

FY15-16 Report of Equipment Purchased forms are

needed by October 1, 2016. Please make sure these match the COGNOS AFR Reports.

FY16-17 Request to Purchase Equipment/Bus/Construction forms are due before October 1. Follow the instructions on each form.

52

Page 53: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

Maintenance of Effort

53

SPED Finance will send reminders for Maintenance of Effort in the spring and summer. There is no longer a Budget Checklist submitted to state and SPED Finance no longer checks MOE exceptions on the budget side.

Districts should check

their MOE status before closing out the year.

Districts are encouraged to utilize the IDEA Part B Fiscal Accountability Procedures Manual (pages 46-47) when considering exceptions.

SPED Finance will continue

to check MOE and exceptions on the AFR after the closing of the year during the October 1 pull.

Page 54: USER GUIDE SPED Finance Statewide Field Test · June forms, Part I & II, are available on the Indistar/ACSIP website. When forms are completed by the district/co-op, the district/co-op

Reminders and Announcements SPED Finance will post

reminders and announcements on the MYSPED log-in page and on the Indistar/ACSIP Bulletin Board. Please make this a part of your weekly regiment to check for notices.

SPED Finance can be contacted at 501-682-4223.

54