HIE-ISOLDE. User facilities Building 507. 3rd HIE ISOLDE Physics Coordination Group meeting CERN, 3 September 2012. Erwin Siesling. User Facilities. Increasing the surface of the Solid State Lab in building B.115 by 120m2: - PowerPoint PPT PresentationTRANSCRIPT
User facilities
Building 507
3rd HIE ISOLDE Physics Coordination Group meeting
CERN, 3 September 2012
HIE-ISOLDE
Erwin Siesling
Hie Isolde 3rd HIE PCG, 3 Sept 2012 Erwin Siesling 2
1. Increasing the surface of the Solid State Lab in building B.115 by 120m2:
For RP safety reasons all solid state activities will be moved from B.275 to B.115This will suppress the existing workshop in B.115 and courtyard between B.115 and B.601
2. Replace the existing building 507 by a new building / modular cabins:Ground floor (only accessible from within the surveyed area):
- Labs and workshopFirst floor (accessible from outside the surveyed area):
- Data Acquisition rooms- Meeting room/Visitors Center- (Kitchen?)
Design study:Eliseo Perez-Duenas GS/SE
User Facilities
Hie Isolde 3rd HIE PCG, 3 Sept 2012 Erwin Siesling 3
Cost studies new B 507
Use of modular cabins instead of a full concrete building
Phase 1: estimate 120kChf 160kChf- dismounting the present building 30kChf- construction permit- adapting the concrete foundation 130kChf
Phase 2: estimate 500kChf 520kChf- (non-standard) modular cabins, interconnected and on 2 floors - total surface 420 m2 435 m2
- not taken in account electrical installations, CV, Labo’s, etc.
Advantages: - lower costs- fast construction- flexible work floor
Hie Isolde 3rd HIE PCG, 3 Sept 2012 Erwin Siesling 4
Present situation (ground floor Jura side):
Control room
User Facilities
Hie Isolde 3rd HIE PCG, 3 Sept 2012 Erwin Siesling 5
Solid State Lab 115
1. Increasing the surface of the Solid State Lab in B.115:
Control room
Hie Isolde 3rd HIE PCG, 3 Sept 2012 Erwin Siesling 6
Replace building 507
2. Replacing the existing building 507 by a new building - Ground floor (only accessible from within the surveyed area):
Hie Isolde 3rd HIE PCG, 3 Sept 2012 Erwin Siesling 7
2. Replacing the existing building 507 by a new building - First floor (accessible from outside the surveyed area):
Replace building 507
Hie Isolde 3rd HIE PCG, 3 Sept 2012 Erwin Siesling 8
New building 508
Hie Isolde 3rd HIE PCG, 3 Sept 2012 Erwin Siesling 9
Situation
Hie Isolde 3rd HIE PCG, 3 Sept 2012 Erwin Siesling 10
Cabins on 2 floors
Hie Isolde 3rd HIE PCG, 3 Sept 2012 Erwin Siesling 11
First draft
Hie Isolde 3rd HIE PCG, 3 Sept 2012 Erwin Siesling 12
Corrected – for discussion
Controlled access
Free access Controlled area