Helping Facilities improve the customer satisfaction by seeking improvements that include hands on training for facilities team members.TRANSCRIPT
Building Depth in Facilities
Chris Barron
Facilities Manager Faith Baptist Church Youngsville, NC
Discussing the opportunities within our teams to improve the overall function of
facilities work.
Today’s Training Plan
• Discuss a Process for Evaluating Facilities– Assessment, Quantify, Adopt, Implement,
Control
• Diagram your current Facilities Ministries– List current status, possible opportunities for
improvement / training and begin plan to change
• Leave with list of possible improvements– Begin the plan to improve facilities depth
Assessment
• What are my teams doing today?– Spiritually – is it consistent with mission/vision– Physically – can it be quantified / measured
• List them– Contracts, job descriptions / title, teams, etc.– What are you “not” doing?
• What could we be doing differently?– Gaps, cross training, insource vs outsource
Assessment Examples
• Landscaper – 6 acres, $15K, $10K OoS work, contract with no detail.
• Pest Control Spraying / watering plants• Thermostats cost most Electrically• Pastors asking Volunteers to serve in
kitchen untrained• Largest financial liability for church• What requires the most rework
Quantify
• Focus on Mission / Ministry Goals– Member involvement – Cross Functional Teams– Employee satisfaction / Opportunity for
advancement
• Look for measurable outcomes– Reduce sick time / reduce turn over rate– Improve work order completion time / improve
customer satisfaction– Reduce cost
Quantifiable Examples
• Cost of internalizing the landscaper -storage shed, tools/equip, training, drivers license just to go get the gas
• Cost of current carpet cleaning company• Employee Efficiency (WO completion) -
Tool cart and radios • Energy Usage Reduced -Weekly
Thermostat check, lockable thermostats
Adopt
• Change requires “Pre – Work”– Write Training / Write Procedures / Write
Contracts, get them reviewed / approved– Create Maps, checklist, calendar, schedule
• Sale the future change– Prepare others for coming changes– Budget – Create incentive
Adoption Examples
• Wedding Coordinator– Reduce time the FM has to manage events
• Carpet Extractions– Equipment on hand always ready to use– Reduce cost of contractor– Improve quality of carpet overall
• Electrical Demand Reduction– Improve Thermostat Settings– HVAC start times / reduce cost
Hands on Training
• Ensure a part of Job Description• Classroom (reading policies, etc.)• Observe (watch others)• Simulate (supervised )• Perform (on your own, checked behind)• Make Performance the new Norm• Be able to Train others / replacement
Implement • Hire / Change Job Description
– Employee Reviews / Goals / cross train
• Train– Schedule / conduct training– Follow-up / Ensure training working– Make the change the new normal– Tie to rewards / Allow team members to train
• Negotiate– Look at all contracts and service level
agreements
Implementation Examples
• PM schedules / new CMMS• Training – Vehicle Policy Improvement• Maps - Landscaping on campus – write
PMs to match landscaping map• Contract Re-negotiate / Implement Service
Level Agreements with measurements• Procedure for Wedding Coordinator /
Kitchen Director Training
Initial PM Planning
• Map• Inventory• Investigate• Count• Inspect
PM Code
Example
Code DescriptionW2-F W2-F Thermostat HVAC AdjustW3-G W3-G Mow, Trim, BlowW4-TP W4-TP Garbage Pick-UpW5-F W5-F Recycle Material RunM1-G M1-G Weeding / Weed KillM2-TP M2-TP Cardboard Pick-UpM3-V M3-V Inspect All Vehicles / Trailers / Plan (update) SA1-VM4-F M4-F Flush floor drainsM5-F M5-F Elevator Fire TestM6-F M6-F First Aid Kit Inventory / RestockM7-F M7-F Fire Extinguishers / Ansul System InspectionQ1-F Q1-F Pest / Insect Inspection / SprayQ2-F Q2-F HVAC AHU's - Inspect, Filter change, Clean coil as necessaryQ3-TP Q3-TP Elevator Test (Schindler)Q4-F Q4-F Exit SignsQ5-F Q5-F Emergency Lighting Test (for Lithonia ELM4)Q6-F Q6-F Paper Shredder MaintenanceQ7-C Q7-C Dry Erasers - CleaningSA1-C SA1-C Extract KT 1st Floor Carpets not NurserySA1-F SA1-F HVAC Semi-AnnuallySA1-G SA1-G Lawn Re-Seed, Aerate, FertilizerSA1-K SA1-K Ice Maker Inspect / CleanSA1-V SA1-V Vehicle / Trailer Oil Change / InspectSA2-C SA2-C Extract Nursery Carpets 3135,3145SA2-K SA2-K Griddle Inspection/CleanSA3-F SA3-F Inspect Storage AreasSA3-G SA3-G Check for any safety/broken issues regarding children's playgrounds.SA3-K SA3-K Convection Oven Inspect / CleanSA4-K SA4-K Coffee Systems De-Lime/Clean
PMP Example
Manual PM Binder Example
Control
• Is it still working?• Did the outcome we hoped for happen?• Survey, Interview, buy-in, loose ends• Sale the change • Remember the People / Mission / Vision
Controlling Examples
• Electrical Utility Data – tied to Demand charge and Usage Data affected by Degree Days, and Thermostat Programming.
• Annual Contract Review• Employee Performance Reviews• Large industries might us Loss Time
What’s on your worksheet?
• Real Depth in Facilities is in people• Leadership and Controls you implement
including your example guide those people and affect attitudes
• Remember Jesus Example – spend time, have fellowships, write cards, love and set the example.