11 Successful Implementation & Improved Operation
Usability Project Presentation and Device Replacement Demonstration
Jack van der HorstRegional Technology Manager
ABB Pte Ltd
On behalf ofFieldbus Foundation TM
22 Successful Implementation & Improved Operation
IntroductionIntroduction“5-minute” Introduction to the Fieldbus Foundation & FOUNDATION™ technologyTest and Registration Program OverviewWhat’s new in ITK Profile 6System Interoperability with Host Profile RegistrationDemonstration
33 Successful Implementation & Improved Operation
Fieldbus Foundation
IP development Promote
Digital
Interoperable
Vendor neutral
Automation focused
500 members/affiliates
44 Successful Implementation & Improved Operation
By the Numbers
700+
10
6,000
1,000,000+
registered products
registered hosts
control systems
devices in service
55 Successful Implementation & Improved Operation
Digital Technology
PV = 392.8mb
IS interface I/O cardField JB + marshalling
PV = 392.8mbGOOD
PV = 393.1mb
PV = 392.8mbGOOD
Fieldbus
4-20mA
66 Successful Implementation & Improved Operation
FOUNDATION Fieldbus DifferentiatorsFOUNDATION Fieldbus DifferentiatorsScalable, Automation InfrastructureFunction Block Based ArchitectureMulti drop, Multi-variableReduced FootprintIntegrated Data Quality from sensing to actuationControl in the Field offers Single Loop IntegrityHigh Performance, Interrupt Driven AlertsIsochronous CommunicationDevice Level Time StampingApproved for use in Safety Instrumented SystemsRigorous Test and Registration Program
77 Successful Implementation & Improved Operation
Registration Program3rd Party compliance testing executed by the Fieldbus Foundation– Field Devices– Fieldbus Power Suppliers/Conditioners– Couplers– Cable– Hosts
First registered product 1998Interoperability Test Kit (ITK) is only one of many tools used for product registration
88 Successful Implementation & Improved Operation
ITK Test Lab Station
99 Successful Implementation & Improved Operation
ITK 6 Test System Interface
1010 Successful Implementation & Improved Operation
Key Feature EnhancementsSelection Configuration Commissioning Maintenance Replacement
Error Free Download
Field Diagnostic
Specification
Host Profile Test and Registration
Device Replacement Guideline and Specifications
Device Level Methods and Views
1111 Successful Implementation & Improved Operation
CommissioningCommissioningUser Experience– Download offline configuration results in errors– Multiple downloads typically resolve errors, but this
increases overall commissioning time
Analysis– Devices apply checks to maintain consistency during
download– Device expects a specific order for parameter
download– Some parameters should not be written during an
automated download
1212 Successful Implementation & Improved Operation
ITK 6 Profile Improves Commissioning“no_download” lists inform host which parameters should not be part of an automated download– Described in EDD– e.g. calibration parameters– e.g. vendor specific behavioral parameters
Deferral of inter-parameter checks– Disables consistency checks during automated
download– Once completed, device re-evaluates configuration – Reduces errors due to parameter order mismatch
New parameter BLOCK_ERR_DESC_n– Provides more detail to the configuration block error
1313 Successful Implementation & Improved Operation
MaintenanceUser Experience– Maintenance is a costly activity– Digital networks can provide information overload– Diagnostic data is represented in different forms,
making integration difficult
Analysis– Condition based monitoring can improve maintenance
management– A common structured approach across networks is
necessary to bring the right information to the right person in context.
1414 Successful Implementation & Improved Operation
Types of Maintenance Activities
• Performed on a healthy asset.Unnecessary maintenance
• Performed after the asset has failed.Reactive maintenance
• Performed on a regular schedulePreventive maintenance
• Schedule based on basis of failure rate and drift statistics.
Predictive maintenance
• Schedule based on built-in asset diagnostics.Proactive maintenance
• Combination of proactive maintenance along with special events (e.g. shutdown)
Opportunity based maintenance
Source: Rong Gul, Shell Global Solution, Diagnostics from Safety Devices using FOUNDATION™ Fieldbus.
1515 Successful Implementation & Improved Operation
NAMUR NE107: Self-Monitoring and Diagnosis of Field Devices
Diagnosis results must be reliable
Diagnosis results must always be viewed in the context of the application.
Internal diagnosis must be categorized into 4 standard “status signals”
Configuration must be free, as reactions will depend on the user's requirements
Detailed information can be read out by the device specialist
1616 Successful Implementation & Improved Operation
Role Based Diagnostics
1
Asset ManagementMaintenance Station
Process ControlEngineering Station
HSE Control Network
H1 Process Network
Plant operators
Plant maintenance engineering
1717 Successful Implementation & Improved Operation
ITK 6 Field Diagnostic Alerts Improve Maintenance
Additional supporting parameters– Enable/Disable of diagnostic detection– Enable/Disable Simulation– Configure Priority– Configure Alert Suppression (Detect, but not alert)– Recommended Actions
Parameter Name NE107 Status SignalFD_FAIL_ALM FailureFD_OFFSPEC_ALM Out of SpecificationFD_MAINT_ALM Maintenance RequiredFD_CHECK_ALM Function Check
* Parameter names will have localized text labels. e.g. “Failure Alarm”
1818 Successful Implementation & Improved Operation
Device ReplacementUser Experience– Delivered/Replacement devices are sometimes newer
than the device used during initial configuration– Replacing devices is semi-automated
Analysis– Enhanced specifications for hosts and devices
supports automated device replacement
1919 Successful Implementation & Improved Operation
ITK 6 Improves Device ReplacementITK 6 Improves Device ReplacementFieldbus Foundation published an application note for suppliers to define rules for ‘Like’ device replacementNew parameter COMPATIBILITY_REV declare compatibility rulesEnables systems to use an updated device that was commissioned with a prior version device versionSimplify the 2 a.m. device replacement scenario
2020 Successful Implementation & Improved Operation
Device Setup and MaintenanceUser Experience– Data presentation and methods (procedures) are
restricted to blocks– Users may need interact with more than one block,
especially with complex/modular devices
Analysis– Extend EDDL technology to include device level
menus and methods– Also referred as “X-Block”
2121 Successful Implementation & Improved Operation
ITK 6 Profile Support new EDDL featuresIntegration technology for device setup and maintenance
2222 Successful Implementation & Improved Operation
EDDLIntegrating Data from Multiple Blocks
2323 Successful Implementation & Improved Operation
EDDLIntegrating Parameter Multiple Views
2424 Successful Implementation & Improved Operation
EDDLMode Control Across Multiple Blocks
2525 Successful Implementation & Improved Operation
EDDLMethods Across Blocks
2626 Successful Implementation & Improved Operation
Host Profile Registration
Operations
Maintenance
Engineering
Note: Illustrations are examples only.
Class 61 – Integrated Host
Class 63/64 – Bench Host
Class 62 – Visitor Host
2727 Successful Implementation & Improved Operation
Host Profile Specification - Key FeaturesDefines five profiles
– Integrated Host– Bench Host (for use with on-process devices)– Bench Host (for use with non-commissioned devices)– Visitor Host– FOUNDATION for Safety Instrumented Functions Integrated Host
For each profile, features are marked– (M)andatory - required for system interoperability– (O)ptional - useful, but not essential– (P)rohibited - to prevent interoperability issues
Staged Implementation– Two stage profile (6Xa, 6Xb) provides time for systems to become compliant
2828 Successful Implementation & Improved Operation
Host Profile Features
2929 Successful Implementation & Improved Operation
Host Registration2008 2009 2010 2011 2012
1H 2H 1H 2H 1H 2H 1H 2H 1H 2H
Host InteroperabilitySupport Test
(HIST) 1.x
Valid through Dec 2008
Host 6Xb Profile Test/Registration
Host 6Xa Profile Test/Registration
Valid through June 2010
10 RegisteredHosts
3030 Successful Implementation & Improved Operation
SummarySummaryITK 6 incorporates 618 new test case scripts– 35% increase from ITK 5
All new device registrations must meet ITK 6 Profile after September 2011New features improve configuration, commissioning, maintenance and replacement experiencesReduce complexity while increasing interoperability and productivityHost testing assures features are consistent across systems
3131 Successful Implementation & Improved Operation
Where To Get More InformationWhere To Get More InformationWebsite: fieldbus.orgEmail: [email protected] Forums: forums.fieldbus.orgBlog: foundationfieldbus.blogspot.comTwitter: twitter.com/FOUNDATIONField LinkedIn: linkedin.com/company/fieldbus-foundationLinkedIn Discussion Group: Fieldbus FoundationYouTube: youtube.com/user/FieldbusFoundation
3232 Successful Implementation & Improved Operation
DEMONSTRATION?
How you know there is a problemWhat action to take
3333 Successful Implementation & Improved Operation
HOW YOU KNOW THERE IS A PROBLEM ?
3434 Successful Implementation & Improved Operation
CHECK WHERE THE DEVICE IS INSTALLED
3535 Successful Implementation & Improved Operation
CHECK THE DEVICE HEALTH
3636 Successful Implementation & Improved Operation
REPLACE DEVICE AND SCAN THE BUS
3737 Successful Implementation & Improved Operation
CHECK ADVISOR
3838 Successful Implementation & Improved Operation
USE AUTO ASSIGN
3939 Successful Implementation & Improved Operation
ASSIGNMENT COMPLETED
4040 Successful Implementation & Improved Operation
ADVISOR SUGGEST DOWNLOAD ( PARAMETERS)
4141 Successful Implementation & Improved Operation
PERFORM FULL DOWNLOAD TO DEVICEALL PARAMETERS ARE SEND TO DEVICE FROM DATABASE
4242 Successful Implementation & Improved Operation
USED BLOCKS ARE IN AUTO DIRECTLY AFTER DOWNLOAD
4343 Successful Implementation & Improved Operation
VALUE IS AVAILABLE IS FF BUILDER
4444 Successful Implementation & Improved Operation
VALUE IS AVAILABLE IS DCS
4545 Successful Implementation & Improved Operation
QUESTIONS?