us army corps of engineers building strong ® savannah district overview presentation

26
US Army Corps of Engineers BUILDING STRONG® Savannah District Overview Presentation

Upload: conrad-moody

Post on 18-Jan-2016

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: US Army Corps of Engineers BUILDING STRONG ® Savannah District Overview Presentation

US Army Corps of Engineers

BUILDING STRONG®

Savannah District

Overview Presentation

Page 2: US Army Corps of Engineers BUILDING STRONG ® Savannah District Overview Presentation

BUILDING STRONG®

Savannah District Mission

2

Provides facilities for Soldiers, Airmen and families

Enables free-flow of commerce

Conserves and protects the region’s water and natural resources

Enhances family recreation

Building Strong for America!

Page 3: US Army Corps of Engineers BUILDING STRONG ® Savannah District Overview Presentation

BUILDING STRONG®3

Our Greatest Asset: Our People

Diverse

Approximately 700

Multi-disciplined

Engineers, architects, project managers, park

rangers, hydrologists, and many other

specialists

Customer focused

Organization

Page 4: US Army Corps of Engineers BUILDING STRONG ® Savannah District Overview Presentation

BUILDING STRONG®

At a Quick Glance— the Savannah District

Has served the nation since 1829 Supports 7 Army and 4 Air Force installations in 2 states 149 military projects at $842 million under contract Deployed 200+ personnel for combat support since 2001 Maintains two deep water ports Operates 3 major dams for hydropower, flood risk management,

recreation, water quality/supply, downstream navigation, and fish and wildlife protection

Hosts 15+ million annual visitors to 3 major reservoirs Regulates and protects aquatic resources in Georgia Executes the Homeowners Assistance Program for DoD

4

Page 5: US Army Corps of Engineers BUILDING STRONG ® Savannah District Overview Presentation

BUILDING STRONG®5

Page 6: US Army Corps of Engineers BUILDING STRONG ® Savannah District Overview Presentation

BUILDING STRONG®

SAS Workload Trends

6

Dollars in 000

FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15 fy16 fy170

500,000

1,000,000

1,500,000

2,000,000

2,500,000

Military Workload

CIVIL Workload

Page 7: US Army Corps of Engineers BUILDING STRONG ® Savannah District Overview Presentation

BUILDING STRONG®

Military $544M

Civil Works $218M

Environmental $52M

Real Estate $62.6M

Regulatory

$5.9M

FY16 Savannah District Programs Workload

Total: $882.5 million

7

Page 8: US Army Corps of Engineers BUILDING STRONG ® Savannah District Overview Presentation

BUILDING STRONG®

SAS Military Program Trends

00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20

MILCON 186 315 374 333 372 490 372 984 1418 2094 1216 848 398 171 164 277 258 152 170 18 135

O&M 70 68 108 99 131 195 222 129 363 317 196 199 171 202 274 155 150 150 150 150 150

250

750

1,250

1,750

2,250

2,750

89%93%100%100%100%

100%97%

95%

95%

97%

100%

97%

90%86% 57%100%

Fiscal Year

$M

Label identifies % of MILCON CMR projects executed. (CCG – MP03 Metric)

8

Page 9: US Army Corps of Engineers BUILDING STRONG ® Savannah District Overview Presentation

BUILDING STRONG®

SAS Civil Works Program Trends

00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20

O&M 80 52 49 47 47 46 55 50 46 53 51 66 53 48 62 73 56 69 69 69 69Cons 16 13 21 24 30 30 37 38 37 13 8 10 25 20 31 169 96 77 53 63 50Inv 4 2 5 10 3 4 4 4 3 2 4 2 9 7 0 1 0.6 0.6 0.5 0.5 0.5

0

50

100

150

200

250

300

$M

Fiscal Year

Page 10: US Army Corps of Engineers BUILDING STRONG ® Savannah District Overview Presentation

BUILDING STRONG®

Reimbursable Program Trends

00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19Total 39 37 37 36 39 44 32 45 37 48 75 74 64 41 36 75 37 37 35 35

0

10

20

30

40

50

60

70

80

$M

Fiscal Year

10

Page 11: US Army Corps of Engineers BUILDING STRONG ® Savannah District Overview Presentation

BUILDING STRONG®

Savannah Harbor Expansion Project

NAVIGATION FEATURES

Entrance Channel Dredging

Inner Harbor Dredging

Kings Island Turning Basin

Disposal Area 14A Dike Raising

After Dredging Dike Raising

USCG Navigation Aids

MITIGATION FEATURES

Environmental Monitoring

Dissolved Oxygen Injection System

CSS Georgia Recovery

Raw Water Storage Impoundment

Striped Bass Stocking Payment

Fish Passage

1S Marsh Restoration

McCoy’s Cut Area Work

Sediment Basin Area WorkSHEP: $706M Value

Page 12: US Army Corps of Engineers BUILDING STRONG ® Savannah District Overview Presentation

BUILDING STRONG®

o Entrance Channel deepening began Sept. 10 by Great Lakes Dredge and Docks; 3 yr construction window

o Dissolved Oxygen Injection System awarded July 31 to CDM Smith

o Water Storage Impoundment contract advertized Aug. 25

12

SHEP Status

Page 13: US Army Corps of Engineers BUILDING STRONG ® Savannah District Overview Presentation

BUILDING STRONG®

o Deepen 5 feet: from -42 to -47 feet

o Lengthen channel 7 miles: from 33 to 40 miles

o$174 M annual net benefits

oCost $706 M

oBCR: 5.5 to 1

oEnvironmental Mitigation approved by:

USACE DOIEPA DOC

13

SHEP Overview

Page 14: US Army Corps of Engineers BUILDING STRONG ® Savannah District Overview Presentation

BUILDING STRONG®

Supports Army and Air Force installations in GA and NC

Provides support to more than one-fifth of the Army

149 military projects at $842 million under contract

Builds state-of-the-art facilities to support Soldiers, Airmen, and their

families

Barracks

Dining Facilities

Training Areas and Ranges

Command and Control Buildings

Administrative Buildings

Operational Facilities

Community Service Facilities

Medical Treatment Facilities

Roads and Bridges

Military Construction

14

Page 15: US Army Corps of Engineers BUILDING STRONG ® Savannah District Overview Presentation

BUILDING STRONG®

Military Construction

15

Marshall Hall at Fort Bragg

AIT Barracks at Fort Benning

Community Hospital at Fort Stewart

New Hospital Complex at Fort Benning

Page 16: US Army Corps of Engineers BUILDING STRONG ® Savannah District Overview Presentation

BUILDING STRONG®

Ft. Gordon Road to Growth

16

TBUP Barracks at Fort Gordon TBUP COF at Fort Gordon

TBUP BN HQ at Fort Gordon TBUP DFAC at Fort Gordon

Page 17: US Army Corps of Engineers BUILDING STRONG ® Savannah District Overview Presentation

BUILDING STRONG®

Small Business Trends

18

03 04 05 06 07 08 09 10 11 12 13 14 15 16

SB 219 193 346 267 313 463 584 356 598 288 298 288 204 278

50

150

250

350

450

550

650

Fiscal Year

$M

Page 18: US Army Corps of Engineers BUILDING STRONG ® Savannah District Overview Presentation

BUILDING STRONG®

SAS Regional Environmental Acquisition Tool (REAT)

Scope: Military Munitions Response Program

Acquisition Strategy: 8(a) Program set-aside

Contract Capacity is $48M over 5 years, Multiple Award Task Order Contract (MATOC) with 4 contractors

Advertisement: 1st Quarter FY 16

19

Military Installation Support

Formerly Used Defense Sites

(FUDS)

New/Existing Interagency

Customers

Page 19: US Army Corps of Engineers BUILDING STRONG ® Savannah District Overview Presentation

BUILDING STRONG®

SAS Regional Environmental Acquisition Tool (REAT)

Scope: Environmental Consulting Services

Acquisition Strategy: 8(a) Program set-aside

Contract Capacity is $50M over 5 years, Multiple Award Task Order Contract (MATOC) with 4 contractors

Advertisement: 2nd Quarter FY 16

20

Military Installation Support

Formerly Used Defense Sites

(FUDS)

New/Existing Interagency

Customers

Page 20: US Army Corps of Engineers BUILDING STRONG ® Savannah District Overview Presentation

BUILDING STRONG®

Contract Opportunities: IDIQ A/E CONTRACTS

PROPONENT ORGANIZATION

CONTRACT CAPACITY BUSINESS STANDARD SCOPE ADVERTISE

Construction Division Construction Management

Services2 @ $15M Each UR

QA inspection and reporting, review of contract documents and shop drawings, review of NAS schedules and QC plans, and investigation and reporting of construction contractor claims. POP 5 years.

4th Qtr FY15

Construction Division Construction Management

Services2 @ $8M Each SB

QA inspection and reporting, review of contract documents and shop drawings, review of NAS schedules and QC plans, and investigation and reporting of construction contractor claims. POP 5 years.

4th Qtr FY15

Civil Work Programs Civil Works

Design $20M UR

Hydrology and Hydraulic studies, water quality and environmental modeling and monitoring, preparation of reports, studies, master planning, project planning, design criteria, preparation of drawings and specifications, commissioning, cost estimates, and other general A-E services for multi-disciplined projects. POP 5 years.

1st Qtr FY16

Engineering Division General Design $14M SB

Preparation of reports, studies, master planning, project planning, design criteria, preparation of drawings and specifications, commissioning, cost estimates, and other general A-E services for multi-disciplined projects. POP 5 years.

3rd Qtr FY16

Engineering DivisionSurveying and Mapping (except Geophysical)

Services$8M Each

SB

Aerial mapping, orthorectified digital aerial photography, topographic surveying and mapping; generation of triangulated irregular networks (TIN) and digital elevation models (DEMS); property and boundary surveys; preparation of drawings, maps and plats; and performance of records and drawing (plat) research necessary to locate property lines and monuments in the field. POP 5 years.

1st Qtr FY17

Engineering Division General Design $20M Each UR

Preparation of reports, studies, master planning, project planning, design criteria, preparation of drawings and specifications, commissioning, cost estimates, and other general A-E services for multi-disciplined projects. POP 5 years.

4th Qtr FY18

21

Page 21: US Army Corps of Engineers BUILDING STRONG ® Savannah District Overview Presentation

BUILDING STRONG®

Contract Opportunities: IDIQ

22

REIMBURSABLE MILITARY PROGRAM

PROPONENT ORGANIZATION

CONTRACT CAPACITY BUSINESS STANDARD

SCOPE ADVERTISE

Military Programs TBUP MATOC $245M SB

Design/Build General Construction for Barracks RenovationNAICS Code: 236220Pool 3-5 Contractors

POP 5 YearsArea of Coverage SAD

1st Qtr FY16

Military Programs Sources Sought TBD Multiple New Acquisition Plan Development 4th Qtr FY15

Military Programs Fort Stewart SATOC $50M SB

Design/Build General ConstructionNAICS Code: 236220

POP 5 YearsArea of Coverage SAD

1st Qtr FY16

Military Programs Maneuver Center SATOC

$95M 8(a)

Design/Build General ConstructionNAICS Code: 236220

POP 5 YearsArea of Coverage SAD

1st Qtr FY16

Page 22: US Army Corps of Engineers BUILDING STRONG ® Savannah District Overview Presentation

BUILDING STRONG®

Contract Opportunities: IDIQ SERVICES

PROPONENT ORGANIZATION

CONTRACT CAPACITY BUSINESS STANDARD

SCOPE ADVERTISE

Environmental Programs

Military Munitions Response MATOC

$48M 8(a)

Ordnance Investigation /CleanupUp to 4 Contractors in pool

POP 5 YearsNAICS 562910

1st Qtr FY16

Environmental Programs

Military Munitions Response MATOC

$48M 8(a)

Ordnance Investigation /CleanupUp to 4 Contractors in pool

POP 5 YearsNAICS 562910

1st Qtr FY16

Operations Division

Hydro Power SATOC$9.5M

UR

Investigation of failures, repairs and/or replacement of generator components

(3MVA and larger).POP 5 Years

NAICS 237130

4th Qtr FY15

Environmental Programs

Environmental Consulting Services

(ECS) MATOC$50M 8(a)

Environmental compliance support and full range of environmental

consulting services.Up to 4 Contractors in pool

POP 5 YearsNAICS 541620

2nd Qtr FY16

23

Page 23: US Army Corps of Engineers BUILDING STRONG ® Savannah District Overview Presentation

BUILDING STRONG®

Contract Opportunities: Standalone

CIVIL WORKS PROGRAM

PROPONENT ORGANIZATION

CONTRACTANTICIPATED

AWARD AMOUNT

BUSINESS STANDARD

SCOPE ADVERTISE

Civil Works Programs

SHEP Raw Water Storage

Impoundment$30M UR

General Construction , Earthwork, Utility Infrastructure

NAICS 2379904th Qtr FY15

Civil Works Programs

SHEP 14A Disposal Area Dike Raising

$8M SBGeneral Construction , Earthwork

NAICS 237990 3rd Qtr FY16

Civil Works Programs

SHEP Sediment Basin Area Work

$60M URHeavy Marine Construction, Earthwork

NAICS 237990 4th Qtr FY16

Civil Works Program

Savannah Harbor 13A Dike Raising

$13M SB

General Construction , EarthworkNAICS 237990

3rd Qtr FY16

24

Page 24: US Army Corps of Engineers BUILDING STRONG ® Savannah District Overview Presentation

BUILDING STRONG®

Contract Opportunities: Standalone

CIVIL WORKS PROGRAM

PROPONENT ORGANIZATION

CONTRACTANTICIPATED

AWARD AMOUNT

BUSINESS STANDARD

SCOPE ADVERTISE

OperationsDivision

SH & BH Entrance Channel

Maintenance Dredging

$8M URMaintenance Dredging

NAICS 2379901st Qtr FY16

OperationsDivision

SH & BH Inner Harbor

Maintenance Dredging

$20MUR

Maintenance DredgingNAICS 237990 1st Qtr FY16

25

Page 25: US Army Corps of Engineers BUILDING STRONG ® Savannah District Overview Presentation

BUILDING STRONG®

Savannah District Contact Information

Leila Hollis, Chief, Small Business [email protected] (912) 652-5340

Paige Brosch, Chief, Contracting [email protected] (912) 652-6177

Thomas Woodie, Chief, Reimbursable Programs & Project Management [email protected] (912) 652-5792

Mackie McIntosh, Chief, Civil Works Programs & Project Management [email protected] (912) 652-5320 Tim Corley, Chief, Military Programs & Project Management [email protected] (912) 652-5420

26

Page 26: US Army Corps of Engineers BUILDING STRONG ® Savannah District Overview Presentation

BUILDING STRONG®27

Savannah District on the Web

www.sas.usace.army.mil

http://twitter.com/SavannahCorps

https://www.facebook.com/SavannahCorps

WEB: