u.s. army corps of engineers savannah harbor expansion project savannah harbor expansion project
TRANSCRIPT
U.S. Army Corpsof Engineers
Savannah HarborSavannah HarborExpansion ProjectExpansion ProjectSavannah HarborSavannah HarborExpansion ProjectExpansion Project
U.S. Army Corpsof Engineers
CARGO GROWTHCARGO GROWTH
NEED FOR THE PROJECTNEED FOR THE PROJECT
DESCRIPTION OF THE PROJECTDESCRIPTION OF THE PROJECT
SEDIMENT VOLUMESSEDIMENT VOLUMES
PLACEMENT AREASPLACEMENT AREAS
CARGO GROWTHCARGO GROWTH
NEED FOR THE PROJECTNEED FOR THE PROJECT
DESCRIPTION OF THE PROJECTDESCRIPTION OF THE PROJECT
SEDIMENT VOLUMESSEDIMENT VOLUMES
PLACEMENT AREASPLACEMENT AREAS
Savannah Harbor Expansion
U.S. Army Corpsof Engineers
SEDIMENT VOLUMESSEDIMENT VOLUMES
PLACEMENT AREASPLACEMENT AREAS
EQUIPMENT LIMITATIONSEQUIPMENT LIMITATIONS
STUDY SCHEDULESTUDY SCHEDULE
CONSTRUCTION SCHEDULECONSTRUCTION SCHEDULE
SEDIMENT VOLUMESSEDIMENT VOLUMES
PLACEMENT AREASPLACEMENT AREAS
EQUIPMENT LIMITATIONSEQUIPMENT LIMITATIONS
STUDY SCHEDULESTUDY SCHEDULE
CONSTRUCTION SCHEDULECONSTRUCTION SCHEDULE
Savannah Harbor Expansion
U.S. Army Corpsof Engineers CARGO GROWTHCARGO GROWTHCARGO GROWTHCARGO GROWTH
Savannah Harbor Expansion
Georgia Ports Authority Total Tonnage16-year History
91 92 93 94 95 96 97 98 99 00 01 02 03 04 05FY
18
9
0
13
41
6,4
28
,75
5
1,8
19
,55
2
13
,29
6,3
36
15
,31
0,0
37
Mil
lio
ns
of
To
ns
7.3% FY04 over FY03
11.7% FY05 over FY04
15.% FY03 over FY02
Between the 5 yearsFY02 through FY06, GPA’s total tonnage grew by 52%.
Source: GPA Marketing
20
,22
2,5
15
22
9.9% FY06 over FY05
06
U.S. Army Corpsof Engineers CARGO GROWTHCARGO GROWTHCARGO GROWTHCARGO GROWTH
Savannah Harbor Expansion
91 92 93 94 95 96 97 98 99 00 01 02 03 04FY
1000
500
1500
0
750
1750
1250
05
Source: GPA Marketing (In Thousands of TEU’s)
1,5
72
,73
4
4.5% FY04 over FY03
12% FY05 over FY04
31.5% FY03 over FY02
1,7
61
,10
2
1,1
45
,01
6Between the 5 yearsFY02 through FY06, Savannah’s throughput has grown by 78%.
Port of Savannah Container Throughput 16-year History
In T
ho
us
an
ds
of
TE
Us
2,0
41
,78
9
06
15.9% FY06 over FY05
2000
2250
1,5
05
,37
9
USWC Labor Unrest
U.S. Army Corpsof Engineers
NEED FOR THE PROJECTNEED FOR THE PROJECTNEED FOR THE PROJECTNEED FOR THE PROJECT
Savannah Harbor Expansion
Forecast Capacity
Staying Ahead of the Growth Curve
Fiscal Year 2006 Throughput
2.04 million TEUs
Current Annual Throughput Capacity
2.62 million TEUs
Future Annual Throughput Capacity 5.07 million TEUs (by 2018)
1
1.5
2
2.5
3
3.5
4
4.5
In M
illi
on
s o
f T
EU
s
05 07 08 10 11 12FY 04 06 09 13 14 15
5.07 5
16 17 18
5.5
Actual
U.S. Army Corpsof Engineers
DESCRIPTION OF THE PROJECTDESCRIPTION OF THE PROJECT
Deepen 2 to 6 feet (from 42-feet)Deepen 2 to 6 feet (from 42-feet) Inner harbor – 20 milesInner harbor – 20 miles Entrance channel – 6 milesEntrance channel – 6 miles
Deepen & widen one turning basinDeepen & widen one turning basin Construct a passing areaConstruct a passing area Construct four bend widenersConstruct four bend wideners Nearshore placement of bar channel sedimentsNearshore placement of bar channel sediments MitigationMitigation
modify tidal creeksmodify tidal creeks dissolved oxygen improvement systemdissolved oxygen improvement system
DESCRIPTION OF THE PROJECTDESCRIPTION OF THE PROJECT
Deepen 2 to 6 feet (from 42-feet)Deepen 2 to 6 feet (from 42-feet) Inner harbor – 20 milesInner harbor – 20 miles Entrance channel – 6 milesEntrance channel – 6 miles
Deepen & widen one turning basinDeepen & widen one turning basin Construct a passing areaConstruct a passing area Construct four bend widenersConstruct four bend wideners Nearshore placement of bar channel sedimentsNearshore placement of bar channel sediments MitigationMitigation
modify tidal creeksmodify tidal creeks dissolved oxygen improvement systemdissolved oxygen improvement system
Savannah Harbor Expansion
U.S. Army Corpsof Engineers
SEDIMENT VOLUMESSEDIMENT VOLUMESSEDIMENT VOLUMESSEDIMENT VOLUMES
ENTRANCE CHANNEL INNER HARBOR
2-Foot Deepening 7 MCY 3 MCY
6-Foot Deepening 17 MCY 10 MCY
Savannah Harbor Expansion
U.S. Army Corpsof Engineers
PLACEMENT AREASPLACEMENT AREAS
Inner Harbor – existing CDFsInner Harbor – existing CDFs
Entrance Channel – open waterEntrance Channel – open water
PLACEMENT AREASPLACEMENT AREAS
Inner Harbor – existing CDFsInner Harbor – existing CDFs
Entrance Channel – open waterEntrance Channel – open water
Savannah Harbor Expansion
U.S. Army Corpsof Engineers
InnerHarbor
U.S. Army Corpsof Engineers
NearshoreSediment Placement
U.S. Army Corpsof Engineers
EQUIPMENT LIMITATIONSEQUIPMENT LIMITATIONS
Inner Harbor – existing CDFsInner Harbor – existing CDFs Long pumping distancesLong pumping distances Controls on depthControls on depth
Entrance Channel – open waterEntrance Channel – open water Shallow water at placement sitesShallow water at placement sites Window for hopper dredgesWindow for hopper dredges
EQUIPMENT LIMITATIONSEQUIPMENT LIMITATIONS
Inner Harbor – existing CDFsInner Harbor – existing CDFs Long pumping distancesLong pumping distances Controls on depthControls on depth
Entrance Channel – open waterEntrance Channel – open water Shallow water at placement sitesShallow water at placement sites Window for hopper dredgesWindow for hopper dredges
Savannah Harbor Expansion
U.S. Army Corpsof Engineers
STUDY SCHEDULESTUDY SCHEDULE
Draft GRR & EIS – Oct 07Draft GRR & EIS – Oct 07
Final GRR & EIS – Mar 08Final GRR & EIS – Mar 08
Agency approvals –Agency approvals – Apr 08Apr 08
ROD signed –ROD signed – Apr 08
STUDY SCHEDULESTUDY SCHEDULE
Draft GRR & EIS – Oct 07Draft GRR & EIS – Oct 07
Final GRR & EIS – Mar 08Final GRR & EIS – Mar 08
Agency approvals –Agency approvals – Apr 08Apr 08
ROD signed –ROD signed – Apr 08
Savannah Harbor Expansion
U.S. Army Corpsof Engineers
CONSTRUCTION SCHEDULECONSTRUCTION SCHEDULE
Sign PCA – late FY08Sign PCA – late FY08
Construction contractsConstruction contracts Entrance channel – FY09 (3 years)Entrance channel – FY09 (3 years) Inner harbor – FY10/11 (two)Inner harbor – FY10/11 (two) Mitigation – FY10/11Mitigation – FY10/11 Dissolved oxygen system – FY10/11Dissolved oxygen system – FY10/11 Dike raising – FY12Dike raising – FY12
CONSTRUCTION SCHEDULECONSTRUCTION SCHEDULE
Sign PCA – late FY08Sign PCA – late FY08
Construction contractsConstruction contracts Entrance channel – FY09 (3 years)Entrance channel – FY09 (3 years) Inner harbor – FY10/11 (two)Inner harbor – FY10/11 (two) Mitigation – FY10/11Mitigation – FY10/11 Dissolved oxygen system – FY10/11Dissolved oxygen system – FY10/11 Dike raising – FY12Dike raising – FY12
Savannah Harbor Expansion
U.S. Army Corpsof Engineers
QUESTIONS ?QUESTIONS ?QUESTIONS ?QUESTIONS ?