urvey at optimal quality whether it is road or river,...
TRANSCRIPT
~ 1 ~
Com
pa
ny P
rofile
urvey at optimal quality whether it is Road or river, Rail or
Canal, Mines or Plant we are ahead of others. Deserve the
best position in view of employees and client not by paper
but by successful completion of commitments to client. Drive
innovative processes and systems, aided by technology to provide
overall clarity in both survey systems and construction Systems
including maintenance of plant.
S
OOUURR VVIISSIIOONN
~ 2 ~
Com
pa
ny P
rofile
recision Survey Consultancy a journey to find the new horizon in the
system of survey since 2004. A few employees and with a few
instruments. After 4 years it is going to become a milestone in the
way of survey, whether it is the Road or River, Rail or Canal, Mines or Plants
with the 60 family members and utilization of modern technologies. As the
Quality of work is mature day by day, affects the growing list of prideful
clients.
Our group is committed to delivering specialized services, intelligent
solutions and logical approaches to effectively assist employer /client in the
areas of operational compliance and services reliability as well as support the
optimal use of investment across their project.
The combined team consists of building services Engineers , Company
Directors, Facilities Managers and Construction Project Managers.
The group can expand and contract to meet customer and project demands via
our own internal establishment of dedicated staff.
P
OOVVEERRVVIIEEWW
~ 3 ~
Com
pa
ny P
rofile
Precision Survey Consultancy operates multiple types of survey successfully such as:
LAND SURVEY.
TOPOGRAPHY SURVEY
HYDROGRAPHIC SURVEY
TRANSMISSION LINE
ROAD SURVEY
RAIL SURVEY
ENGINEER SURVEY
SURFACE AND VOLUME MEASUREMENT AND DETAIL DESIGN
MINING PROJECT
WATER SUPPLY AND SEWERAGE PROJECTS
CONSTITUTION WORK AND BUILDING
CANAL SURVEY
SSEERRVVIICCEESS
~ 4 ~
Com
pa
ny P
rofile
A sufficient numbers of effective engineers with other dedicated staffs as along with
modern machineries and updated soft ware:
Man Power:
Sl. No. Particulars Quantity
1) Civil Engineer 04Nos.
2) Surveyor 20Nos.
3) Asst. Surveyor 25Nos.
4) Survey Boy 25Nos.
5) Accountant 02Nos.
6) Purchaser 02Nos.
7) Office Assistance 02Nos.
8) Sales Officer 02Nos.
9) Auto CAD Draftsman 03Nos.
Machineries:
Sl. No. Particulars Quantity
1) Total Station 30 Nos.
2) Digital Thedolite 08 Nos.
3) Auto Level 65 Nos.
4) Digital Level 02 Nos.
5) Hand GPS 08 Nos.
6) Water Current Meter 01 No.
7) DGPS & RTK 02 Nos.
8) ECO – Sounder 01 No.
OOUURR RREESSOOUURRCCEESS
~ 5 ~
Com
pa
ny P
rofile
Soft Ware: 1) Auto CAD Civil 3D – 2010, 2011 & 2012
2) Land Development Desktop
3) C-Soft Wiseimage Pro ver12.x (AutoCAD & Window version)
4) E – Survey CAD
5) Civil Design
~ 7 ~
Com
pa
ny P
rofile
Others Clients:
Jain Infra Projects
Orissa Stevedores Ltd.
Ahluwalia Group Coal Mines Association
Makino Modern India Concast Godavari Group
Haldia Steel
Balaji Road System Ltd
MSPL Limited
~ 8 ~
Com
pa
ny P
rofile
*Topographical Survey:
Sl. No.
Description of Work Location Principal Client Year of
Starting Pattern of
Work Remarks
1 Survey work in CMERI Colony Campus
Durgapur Central Mechanical
Engineering Research Institute (CMERI)
2013 Topographical
Survey On Going
2 Total Station Survey of Alipore Zoo
Alipore Zoological Garden 2013 Topographical
Survey On Going
3
Preparation of survey drawings for Pilot Project under RAY in Siliguri MC, Darjeeling District in West Bengal
Siliguri IL&FS Infrastructure
Development Corporation LTd
2013 Topographical
Survey On Going
4
Topographical Survey Drawing by using Automatic Total Station (ATS) & Auto Level for Campus of High Court, Calcutta and its surrounding area.
Culcutta Public Works Department
2013 Topographical
Survey Completed
5
Topographical Survey work at 75 acre Sabujdweep island on the river Hooghly near Balagarh in Hooghly District
Hooghly Knight Frank 2013 Topographical
Survey On Going
6 Topographical Survey Work in CMERI Campus, Durgapur
Durgapur Central Mechanical
Engineering Research Institute (CMERI)
2012 Topographical
Survey Completed
7 Survey Work at Diamond Harbour Road Area
Kolkata Kolkata Environmental
Improvement Project (KEIP)
2012 Topographical
Survey Completed
8
Topographical Survey works of HRT for Suntaley H.E. Project, East Sikkim
Sikkim
Govt. of India Central Water Commission
Sikkim Investigation Division
2012 Topographical
Survey Completed
9 Topographical Survey for 100 acres land at Kalyani
Kalyani
West Bengal Electronics Industry
Development Corporation Limited
(WEBEL)
2012 Topographical
Survey Completed
10
Topographical Survey of the site for proposed shifting of the South 24 Parganas District Headquartert at Baruipur
Baruipur
Bengal Urban Infrastructure
Development Limited (BUIDL)
2012 Topographical
Survey Completed
~ 9 ~
Com
pa
ny P
rofile
Sl. No.
Description of Work Location Principal Client Year of
Starting Pattern of
Work Remarks
11
Preparation of Topographical Survey plan of Hajrat Data Mahabub Oli (RA) Shaah Mazar Sharif Premises at Patharchapuri,Suri in the district of Birbhum using Total Station & installation / Construction of RCC control pillar along property line of the premises in connection with its development for
providing brtter amenities to the pilgrims.
Birbhum West Bengal Minorities
Development & Finance Corporation
2012 Topographical
Survey Completed
12
Topographical Surveys in Connection with Basis Services For Urban Poor (BSUP) Projects under RAY Scheme with a view to interalia identify the beneficiaries and their housing and infrastructure requirments.
Baruipur
Bengal Urban Infrastructure
Development Private Limited (BUIDPL)
2012 Topographical
Survey Completed
13
Survey work in operational area in connection with New Hangars adjacent to Air India Steel Hanger at NSCBI Airport,Kolkata
Kolkata Airports Authority of
India (AAI) 2012
Topographical Survey
Completed
14
Survey of total Land using Total Station and Installation/Construction of RCC Permanent Pillars along the boundary of the land for Proposed ESI Hospital at Haldia
Haldia ENGINEERING
PROJECTS (INDIA) LTD.
2012 Topographical
Survey Completed
15
Topographical Survey work at proposed Industrial Prak of HCCI of 1000 acres at Jagatballavpur
Jagatballavpur Bengal HCCI
Infrastructure Ltd 2011
Topographical Survey
Completed
16
Topographical Survey for Preparation of Comprehensive Pollution Abatement Scheme for Howrah Municipal
Corporation
Howrah Infrastructure Professionals
Enterprises (P) Ltd
2011 Topographical
Survey Completed
17 Topographical Survey at Behala Site, Kolkata
Kolkata Jain Infrastructure
Limited. 2011
Topographical Survey
Completed
18
Strengthening of main runway 19L-01R at NSCBI Airport, Kolkata
Kolkata Airports Authority of
India (AAI) 2011
Topographical Survey
Completed
19
Topographical Survey at Naginimora, Village Lower Tiru, Dist. - Mon, Nagaland
Nagaland Black Glod Excavators
(P) Ltd. 2011
Topographical Survey
Completed
~ 10 ~
Com
pa
ny P
rofile
Sl. No.
Description of Work Location Principal Client Year of
Starting Pattern of
Work Remarks
20 Topography Survey of Land at Jangipara, Dist. Hooghly
Jangipara Howrah Mills Co Ltd. 2011 Topographical
Survey Completed
21 Surveying work at site, Baidyabati,Kolkata
Kolkata SMS Infrastructure
Limited. 2011
Topographical Survey
Completed
22
Basic Services for the Urban Poor in Five numbers Urban Local Bodies in Kolkata Metropolitan Area under JNNURM
Kolkata IL&FS Infrastructure
Development Corporation LTd
2011 Topographical
Survey Completed
23
Completion of Topographical
Survey of Siliguri Municipal Corporation Area(Part) and adjoining Area details of GAP Work of Siliguri Municipal Corporation
Siliguri Infrastructure Professionals
Enterprises (P) Ltd
2011 Topographical
Survey Completed
24
Complete Contour Survey for identified area adjoining to IT Township at Uttarpara
Uttarpara, Howrah
IL&FS Infrastructure Development
Corporation LTd
2010 Topographical
Survey Completed
25
Preparation of RL contour map of entire VMH premises at an interval of 10 M.
Kolkata Victoria Memorial Hall 2010 Topographical
Survey Completed
26
Topographical Survry of Proposed Road Connecting J.L. Nehru Road
Durgapur SPS Mani
Infrastructure Pvt. Ltd. 2010
Topographical Survey
Completed
27
Topographical Road Survey works in different location under HDRP with Howrah District
Howrah Howrah Improvement
Trust (HIT) 2010
Topographical Survey
Completed
28
Topographical Survey of Canal Adjacent to ther Boundary of IQ City Project at Sovapur, Durgapur
Durgapur SPS Mani
Infrastructure Pvt. Ltd. 2010
Topographical Survey
Completed
29
Topographical Survey
Showing Existing Infrastructure Features.
Garia IL&FS Infrastructure
Development Corporation LTd
2010 Topographical
Survey Completed
30
Detailed Topographical Survey for Sewerage Project at Baruipur Municipal Area under JNNURM
Baruipur IL&FS Infrastructure
Development Corporation LTd
2009 Topographical
Survey Completed
31
Topographical Survey of 21
Wards of Ranigunj Municipality Area covering
24.99 Sq.Km., for preparation of Detaild Project report of Raniganj Drainage Project under JNNURM Scheme.
Raniganj
Bengal Urban
Infrastructure Development Private
Limited (BUIDPL)
2009 Topographical
Survey Completed
32
Detail Topographical Survey work for Nalanda Class Room Complex at IIT, Kharagpur, B-Block
Kharagpur Simplex Infrastructures
Limited 2009
Topographical Survey
Completed
~ 11 ~
Com
pa
ny P
rofile
Sl. No.
Description of Work Location Principal Client Year of
Starting Pattern of
Work Remarks
33
Survey & Demarcation of Land area of Martin Railway with Howrah District
Howrah Howrah Zilla Parishad 2007 Topographical
Survey Completed
34
Topographical and Contour Survey for Drainage and Under Ground Sewerage system within DMC under JNNURM Project
Durgapur Durgapur Municipal Corporation (DMC)
2007 Topographical
Survey Completed
35
Topographical Survey work for Surface water scheme for added area of HMC
Howrah Kolkata Metropolitan Water & Sanitation
Authority (KMW&SA)
2007 Topographical
Survey Completed
36
Topographical Survey and Contour for Drainage Plan for Raturia Angadpur area.
Raturia Angadpur
Asansol Durgapur Development Authority
(ADDA)
2007 Topographical
Survey Completed
37 Topographical Survey of our plant at Kandra Site
Kandra Adhunik Alloys &
Power Ltd. 2006
Topographical Survey
Completed
~ 12 ~
Com
pa
ny P
rofile
* Hydrographic Survey Record:- Sl. No.
Description of Work Location Principal Client Year of
Starting Pattern of Work Remarks
1
Conducting Survey work for improvement of Entrence Channel of Minor Fishing Harbour at Harwood point.
Kakdwip. South 24
Pgs.
WEST BENGAL FISHERIES
CORPORATION LTD.
2013 Hydrographical
Survey On Going
2 Hydrographic Survey at different location within West Bengal
Howrah Howrah Irrigation
Division (HID) 2012
Hydrographical Survey
On Going
3 Hydrographic Survey of RANGANADI Reservoir
Arunachal Pradesh
North Eastern Electric Power Corporation
Limited (NEEPCO)
2013 Hydrographical
Survey Completed
4
Cross Section Survey for River Senger and Korondia Nala at Kanpur
Kanpur DHI (India) Water
& Environment Pvt. Ltd.
2012 Hydrographical
Survey Completed
5
Conducting Bathymetric survey within within the area LTC jetty and passenger jetty at lot no 8 up to the deepest point towards mod river along with the shore line at Hardwood Point,Kakdwip.South 24 Pargananas
Kakdwip
WEST BENGAL FISHERIES
CORPORATION LTD.
2012 Hydrographical
Survey On Going
6
Bathymetric Survey within area outfall of Dubda Canal where it is falling at Bay of Bengal
Kakdwip
WEST BENGAL FISHERIES
CORPORATION LTD.
2012 Hydrographical
Survey Completed
7
Hydrographic survey at Kalyani Ganga river (Hooghly river) and Budge Budge Ganga (Hooghly
river) and provision of Hydrological data
Kolkata SECON PRIVATE
LIMITED. 2012
Hydrographical
Survey Completed
8
Cross Section Survey Project for Vansadhara River Project from Gunupur to Kashinagar
Orissa DHI (India) Water
& Environment Pvt. Ltd.
2011 Hydrographical
Survey Completed
9
Survey work for assessing Scour at River bed by Echo sounding
method of Main Bridge Piers of SVB Project.
Kolkata
Second Vivekananda
Bridge Tollway Companhy Private
Ltd
2011 Hydrographical
Survey Completed
10 Hydrographic Survey at Mandermani River Site
Purba Medinipur
Dredging & Desiltation Co. Pvt.
Ltd.
2010 Hydrographical
Survey Completed
11
Survey works for our Canal rehabilitation works at Churial Main Canal, Package - 8 (In between Ch: 6400 to Ch: 14695)
Mahestala, Kolkata
Dredging & Desiltation Co. Pvt.
Ltd.
2008 Hydrographical
Survey Completed
~ 13 ~
Com
pa
ny P
rofile
* Road Survey:-
Sl. No.
Description of Work Location Principal Client Year of
Starting Pattern of
Work Remarks
1
Preparation of Detailed Project Report (DPR) of roads under 250+New Connectivity in respect of normal PMGSY road works in different Blocks in the District of Bankura.
Bankura WBSRDA 2013 Road
Survey & DPR
On Going
2
Topographical, hydraulic and Land Acquisition survey for a stretch of NH-
117 (from Ch.1.000 Km. to Ch. 5.500
Km) Kona Expressway
Kolkata PWD
(NH SURVEY DIV. NO - II)
2012 Road
Survey On Going
3
Topographical, hydraulic and Land Acquisition survey for a stretch of NH-31C (from Ch.224.500 Km. to Ch. 226.500 Km), around the existing bridge over river Gadadhar at Alipurduar, in the district of Jalpaiguri,W.B
Alipurduar PWD
(NH SURVEY DIV. NO - II)
2012 Road
Survey On Going
4
Topographical, hydraulic and Land Acquisition survey for preparation of Land Schedule, Land Acquisition Cost Estimate along with L.A.Drawing as per the format prescribed by the MORT&H regarding Improvement of the length of NH-80, Falling in the district of Murshidabad W.B.
Murshidabad PWD
(NH SURVEY DIV. NO - II)
2012 Road
Survey On Going
5 Topographical Survey of Rural Road under PMGSY Scheme of Govt of India.
Malda
IL&FS Infrastructure Development
Corporation LTd
2012 Road
Survey Completed
6 Topographical Survey of Rural Road under PMGSY Scheme of Govt of India.
Siliguri & Paschim
Midnapur
IL&FS Infrastructure Development
Corporation LTd
2012 Road
Survey Completed
7 Gantak Road Project Sikkim Brahmaputra Infrastructure
Ltd.
2011 Road
Survey Completed
8
Topographical Survey for the stretch of Farraka to Raiganj Section Ch+295.00 Kms to 398.00 Kms. For NH-34 Project
in all respect in the state of West Bengal.
NH-34 Hindustan
Construction Co Ltd (HCC)
2010 Road
Survey Completed
9
Topographical Survey along identified road corridors in Durgapur City for development of a Bus Rapid Transit System in Asansol Urban Area under JNNURM.
Durgapur
Bengal Urban Infrastructure Development
Private Limited (BUIDPL)
2009 Road
Survey Completed
~ 14 ~
Com
pa
ny P
rofile
Sl. No.
Description of Work Location Principal Client Year of
Starting Pattern of
Work Remarks
10
Proposed Trafffic Easing / Management Measures for de-congestion of Benachetty Nachan Road from Bhiringi More (on NH-2) to Prantika in Durgapur and enhancing of urban mobility within Durgapur City in Asansol Urban Area under JNNURM
Durgapur
Bengal Urban Infrastructure Development
Private Limited (BUIDPL)
2009 Road
Survey Completed
11 Survey & Demarcation of Land area of Martin Railway with Howrah District
Howrah Howrah Zilla
Parishad 2009
Road Survey
Completed
12
Traffic Easing / Management Measures
for de-congestion of OLD G.T. Road and enhancing of Urban mobility within Asansol City in Asansol Urban Area in Asansol Urban Area under JNNURM
Asansol
Bengal Urban Infrastructure Development
Private Limited (BUIDPL)
2009 Road
Survey Completed
13
Proposed widening of EM Bypass from Ultadanga to Kamal Gazi for development of a Bus Rapid Transit System (BRTS) under JNNURM Scheme
Kolkata
Bengal Urban Infrastructure Development
Private Limited (BUIDPL)
2008 Road
Survey Completed
14
Proposed Elevated road on Budge Budge Trunk Road from Zhinjira Bazar
to Batanagar More in South 24 Parganas District in KMA area of PPP Basis
Budge Budge
Bengal Urban Infrastructure
Development Private Limited
(BUIDPL)
2008 Road
Survey Completed
~ 15 ~
Com
pa
ny P
rofile
* Engineering Consultancy Survey: Sl. No.
Description of Work Location Principal Client Year of
Starting Pattern of
Work Remarks
1 Ratle Hydro Eletric Power Project Kistwar, Jammu
& Kashmir Larsen &
Toubro Limited 2013
Engineering Survey
On Going
2
Topographical Survey work using Total Station Theodolite along with necessary Skilled/ Unskilled personnel, Tools & Plants & Machinery all complete for providing PHE Services at Action
Area - II of New Town Kolkata Project.
Kolkata
Govt. of W.B. North 24 Pgns. W/S Division -
II, P.H.E.D.
2013 Engineering Consultancy
Survey On Going
3 Koradi Thermal Power Station Nagpur Larsen &
Toubro Limited 2012
Engineering Survey
On Going
4 Deployment of survey CHP Phase 2,Sagardighi site.
Sagardighi,WB McNally Bharat
Engineering Compaly Ltd.
2012 Engineering
Survey On Going
5
Deployment of survey team with necessary machinary & tools at pltcm-BOKARO
Jharkand,Bokaro McNally Bharat
Engineering Compaly Ltd.
2012 Engineering
Survey On Going
6 3X660 MW Power Project , Talwandi Saboo,
Saboo Larsen &
Toubro Limited 2012
Engineering Survey
On Going
7 GIS Power Station Kolkata Larsen &
Toubro Limited 2012
Engineering Survey
On Going
8
Topographical Survey work using
Total Station Theodolite along with necessary Skilled/ Unskilled personnel, Tools & Plants & Machinery all complete for providing PHE Services at Action Area - II of New Town Kolkata Project.
Kolkata
Govt. of W.B. North 24 Pgns. W/S Division -
II, P.H.E.D.
2012 Engineering Consultancy
Survey Completed
9
LE110063-IDCT & CHIMNEY FOR 2X600 MW VISA POWER AT RANIGARH
Raigarh Larsen &
Toubro Limited 2011
Engineering Survey
On Going
10 Rajpura Thermal Power Rajpura Larsen &
Toubro Limited 2011
Engineering Survey
On Going
11 INDIAN OIL, CORPORATION LTD.
Paradeep Refinery Paradeep
Larsen & Toubro Limited
2011 Engineering
Survey On Going
12
Survey work at site on hire basis to check the co-ordinate points, levels and make layouts for areas like CW and ACW water line, BTG, lay down areas, Fabrication yards and other necessary required areas.
LANCO always
inspiring 2011
Engineering Survey
Completed
13 Deployment of Survey Team with machinery .
Durgapur Jain
Infraproject Limited.
2011 Engineering
Survey Completed
~ 16 ~
Com
pa
ny P
rofile
Sl. No.
Description of Work Location Principal Client Year of
Starting Pattern of
Work Remarks
14 Survey Work at Box drain & different pipe line stretches
Kolkata Jain
Infraproject Limited.
2011 Engineering
Survey Completed
15
Topographical Survey work using Total Station Theodolite along with necessary Skilled/ Unskilled personnel, Tools & Plants & Machinery all complete for providing PHE Services at Action Area - II of New Town Kolkata Project.
Kolkata
Govt. of W.B.North 24
Pgns.W/S Division -II,
P.H.E.D.
2011 Engineering Consultancy
Survey Completed
16 Topography Survey at Coke Oven
JSL Stainless LTd.
2011 Engineering Consultancy
Survey Completed
17 Jaypee Nigrie Super Thermal Power Plant
Singrauli Larsen &
Toubro Limited 2010
Engineering Survey
On Going
18 Survey at 2x700MW Rajpura Thermal Power Project ,
Patiala, Punjab Larsen &
Toubro Limited 2010
Engineering Consultancy
Survey Completed
19
Survey Works for 6X150 MW structural steel works and chimney works at Mahan Singrauli,MP
MP Larsen &
Toubro Limited 2010
Engineering Survey
Completed
20
Topographical Survey work using Total Station Theodolite along with necessary Skilled/ Unskilled personnel, Tools & Plants & Machinery all complete for providing PHE Services at Action Area - II of New Town Kolkata Project.
WB
Govt. of W.B. North 24 Pgns. W/S Division -
II, P.H.E.D.
2010 Engineering Consultancy
Survey Completed
21
Erection work for construction of 400KV D/C Tower Packages - A3 under Transmission system associated with pallatana GBPP and Bangaigaon TPS in North Eastern Region
IVRCL Infrastructures & Project Ltd.
2010 Engineering
Survey Completed
22
Deployment of survey Team with Machinaries & Tools on monthly rental basis at 2X700 MW rajpura Thermal Power Project,
Rajpura, Dist Patiala, Punjab
Punjab Larsen &
Toubro Limited 2010
Engineering Survey
Completed
23
Construction of Integrated Passenger Terminal Building at NSCBI Airport,Kolkata
Kolkata ITD-ITD CEM
JV. 2010
Engineering Survey
Completed
24
Geodetic and precision survey for construction of Phase - II facilities and other areas of Coke Oven Battery No.4 complex of Visakhapatnam Steel Plant.
Andrapradesh Rashtiya Ispat Nigam Limited
2010 Engineering Consultancy
Survey Completed
~ 17 ~
Com
pa
ny P
rofile
Sl. No.
Description of Work Location Principal Client Year of
Starting Pattern of
Work Remarks
25
Survey work for installing ROW pillars along ROW line of SVB Project
Kolkata
Second Vivekananda
Bridge Tollway Companhy Private Ltd
2010 Engineering Consultancy
Survey Completed
26
Survey Work for 6X150 MW structural steel work and chimney work at Mahan Singrauli, MP
MP Larsen &
Toubro Limited 2010
Engineering Consultancy
Survey Completed
27 Survey work for DHAMRA Rail
link Project Larsen &
Toubro Limited 2009
Engineering
Survey Completed
28
Construction of Integrated Passenger Terminal Building at NSCBI Airport,Kolkata
Kolkata ITD-ITD CEM
JV. 2009
Engineering Survey
Completed
29 Survey work at COBP Project at Orissa
Orissa JSL Limited. 2009 Engineering
Survey Completed
30 Survey team with total station for SMS area.
Jajpur, Orissa JINDAL
STAINLESS 2009
Engineering Survey
Completed
31
Survey at Nalanda Class Room
Complex at IIT Kharagpur.B-Block .
Kharagpur,WB Simplex
Infrastructures Limited.
2009 Engineering
Survey Completed
32
Topographical Survey work using Total Station Theodolite along with necessary Skilled/ Unskilled personnel, Tools & Plants & Machinery all complete for providing PHE Services at Action Area - II of New Town Kolkata Project.
New Town Kolkata
Govt. of W.B. North 24 Pgns. W/S Division -
II, P.H.E.D.
2009 Engineering Consultancy
Survey Completed
33
Topographical Survey work using Total Station Theodolite along with necessary Skilled/ Unskilled personnel, Tools & Plants & Machinery all complete for providing PHE Services at Action Area - II of New Town Kolkata Project.
New Town Kolkata
Govt. of W.B. North 24 Pgns. W/S Division -
II, P.H.E.D.
2008 Engineering Consultancy
Survey Completed
34
Topographical Survey work using Total Station Theodolite along
with necessary Skilled/ Unskilled personnel, Tools & Plants & Machinery all complete for providing PHE Services at Action Area - II of New Town Kolkata Project.
New Town Kolkata
Govt. of W.B. North 24 Pgns. W/S Division -
II, P.H.E.D.
2007 Engineering Consultancy
Survey Completed
35
Survey work for Second Vivekananda Bridge Project site at Dakhineshwar - Kolkata
Kolkata Larsen &
Toubro Limited 2005
Engineering Consultancy
Survey Completed
~ 18 ~
Com
pa
ny P
rofile
Sl. No.
Description of Work Location Principal Client Year of
Starting Pattern of
Work Remarks
36
Construction of Integrated Passenger Terminal Building at NSCBI Airport,Kolkata
Kolkata ITD-ITD CEM
JV. 2004
Engineering Consultancy
Survey Completed
37 Survey Work at Kol Dam Project in Himachal Pradesh
Himachal Pradesh
Col Mines Associated
Traders
2004 Engineering Consultancy
Survey Completed
38
Survey at SAIL Durgapur Steel Plant for the Project of Debottlenecking of RAW Material Handling Plant
Durgapur Tecpro Systems
Limited.
Engineering Consultancy
Survey Completed
* Pipe Line Survey: Sl. No.
Description of Work Location Principal Client Year of
Starting Pattern of
Work Remarks
1
GPS survey work by RTK instrument for our pipe line job of 8000.00mts. Approx from GOKULPUR to HIJLI station at KHARAGPUR division Sourh Eastern Railway
Kahragpur McNally Bharat
engineering Company Limited.
2013 Pipe Line Survey
On Going
2
Route alignment suggestion best possible route from Chandil Dam to Ranchi
Ranchi HINDALCO
Industries Limited 2012
Pipe Line Survey
Completed
3
Pipeline Route Survey for 8.625" ODX28Km., IOCL ATF - Kolkata Pipeline work from Mourigram
Terminal to AFS Gouripur
Kolkata Harisons Industries
2011 Pipe Line Survey
Completed
4
Reconnaissance and pipeline route survey work for the section from Dankuni Coal Complex to Receiving terminal (NH2/NH6 Junction).
Howrah Greater Calcutta
Gas Supply Corporation Ltd.
2007 Pipe Line Survey
Completed
~ 19 ~
Com
pa
ny P
rofile
* Mining Survey: Sl. No.
Description of Work Location Principal Client Year of
Starting Pattern of
Work Remarks
1
Preparation of plans for Oting coal Mine of Black Gold Excavators Pvt.Ltd
Nagaland Black Gold Excavators
Pvt.Ltd
2012 Mining Survey
Completed
2 Contour / Grid Survey at Sharda OC Mine, Sohagpur area SECL
MP Cuprum Bagrodia
Limited 2010
Mining Survey
Completed
3 Topographical Survey work Nagaland Tirucoal Project 2008 Mining Survey
Completed
4
Topographical Survey of about 3.83 Sq.Km. (383 Hectors) in respect of Dumri Coal Block, Dist. - Hazaribagh, Jharkhand State.
Jharkhand Mahacol Trexim Private Limited
2008 Mining Survey
Completed
5 Topographical Survey of Tiru Area (Upper and Lower) in Nagaland
Nagaland NCP Oting (JV) 2007 Mining Survey
Completed
* Railway Survey:
Sl. No.
Description of Work Location Principal Client Year of
Starting Pattern of
Work Remarks
1
Topographical Survey in connecting with preparation of Feasibility Report for JSPL.
GUA Balaji Rail Road Systems Limited
(BARSYL)
2012 Railway Survey
Completed
2
Execution of Survey Work for our joka BBD Bag Metro Railway Project Site.
Kolkata McNally Bharat
Engineering Company Limited
2012 Metro
Railway Survey
Completed
3 Survey of platforms in between Bandel-Katwa Station
Katwa Mesa Narula-
GCC(JV) (MNG)
2011 Railway Survey
Completed
4
Traversing & Traversing Calculation from Phoolbagan to Central Metro Station (Total Legnth of 6Km. Approx) including Drawing Submission for
KMRC:UG2
Kolkata ITD - ITD
Cementation India Limited
2010 Railway Survey
Completed
5
Detailed survey with the help of Total Station between Tamluk (Junction cabin) and Rajgoda Railway Station in Kharagpur Division of South Eastern Railway for a Total length of 13.5Km.
Tamluk KEC International
Limited 2010
Railway Survey
Completed
~ 20 ~
Com
pa
ny P
rofile
Sl. No.
Description of Work Location Principal Client Year of
Starting Pattern of
Work Remarks
6
Topographical Survey for preparing Engineering Plan of the proposed Private siding of M/s Raigarh Coal Benification Pvt. Ltd. near Robertson Railway Station, S.E.C. Railway
Raigarh, Chattrishgar
MBB Consultancy Services Pvt. Ltd.
2009 Railway Survey
Completed
7 Detailed Survey at Patratu by Total Station
Balaji Rail Road Systems Limited
2009 Railway Survey
Completed
8 Railway siding Survey Balaghat,MP Sova Ispat Limited 2008 Railway Survey
Completed
9 Detail Survey of Railway Siding by total Station at Gamharia site
Tatanagar, Jharkand
Balaji Rail Road Systems Limited
2008 Railway Survey
Completed
10
Detailed Survey for Chattibariatu & Kerandari Coal Mines Railway siding project of NTPC Ltd.
Dehri On Sone,Bihar
Balaji Rail Road Systems Limited
2008 Railway Survey
Completed
11
Layout Survey and taking x-section of a pvt. Railwar siding taking off from Tapsi-Barbani line of Asansol Division of ER by Total Station.
Asansol Balaji Rail Road Systems Limited
2008 Railway Survey
Completed
12 Detailed Survey at GUA Railway station yard by Total Station
GUA Balaji Rail Road Systems Limited
2008 Railway Survey
Completed
13
Detailed Survey at ACC, Madhukunda Plant by Total Station
Madhukunda Balaji Rail Road Systems Limited
2008 Railway Survey
Completed
14 Detailed Survey at Borojamda Site Borojamda Balaji Rail Road Systems Limited
2007 Railway Survey
Completed
15 Deatiled Survey at Barada Railway
Yard by Total Station Barada
Balaji Rail Road
Systems Limited 2007
Railway
Survey Completed
16 Deatiled Survey at Bolani Railway Yard by Total Station
Bolani Balaji Rail Road Systems Limited
2007 Railway Survey
Completed
17 Railway siding by Total Station Purulia,WB Haldia Steels Ltd. 2006 Railway Survey
Completed
18
Layout of Proposed Railway Track from take off point to Buffer end of Shri Ramrupai Balaji Steel Ltd. At Banskopa Durgapur
Durgapur Jai Balaji Group 2006 Railway Survey
Completed
~ 21 ~
Com
pa
ny P
rofile
* HT Line Project:
Sl. No.
Description of Work Location Area/
Length Principal Client
Year of Starting
Pattern of Work
Remarks
1
Detail Survey of existing 132kv D/C Transmission Line of DVC from Kalipahari to BALCO including submission of Route Alignment Drawing,Profile Drawing & Tower Scheduling.
Durgapur 6.5 km. DPSC Limited. 2013 Transmission Line Survey
On Going
2 Route Alignment Survey Ranchi 20.863
km.
Hindalco Industries
Limited
2012 Transmission Line Survey
Completed
3
Survey and soil investigation for 400kV D/C transmission line for 2x660MW STPP at Banka ,Bihar
Bihar 29 km L&T
Construction 2012
Transmission Line Survey
Completed
4
400 KV D/C Tower Packages-A3 under Transmission System associated with Pallatana GBPP and Bongaigaon TPS in North Eastern Region.
Bonga 15 km IVRCL
Infrastructures & Projects Ltd.
2010 Transmission Line Survey
Completed
* GPS Survey: Sl. No.
Description of Work Location Principal Client Year of
Starting Pattern of
Work Remarks
1 20 nos of DGPS points fixing. Nagaland Zymax Technologies 2012 DGPS Survey
Completed
2 DGPS Control Point survry work Salt Lake (Kolkata)
Consulting Engineering Services
(INDIA) Private Limited
2012 GPS Survey Completed
3 DGPS Point Process Howrah Geosmart Technology 2011 DGPS Survey
Completed
4
GPS Point & Control Point fixing at entire area of Kolkata Metro Railway Project (East - West)
between subhas sarovar and Central Station Based for KMRC:UG2
Kolkata ITD - ITD Cementation
India Limited 2010 GPS Survey Completed
5 GPS Survey of Slum in Uttarpara - Kotrang Municipality Area
Uttarpara IL&FS Infrastructure
Development Corporation LTd
2006 GPS Survey Completed
6 Gps Survey of Slum in Kalyani Municipality area
Kalyani IL&FS Infrastructure
Development Corporation LTd
2006 GPS Survey Completed
~ 22 ~
Com
pa
ny P
rofile
Others Completed Project List:
1) Development of HINDALCO Factory at Muri.
2) Kandra Steel Plant Development.
3) Kol Dam Project in Himachal Pradesh.
4) Chakdah-Bongan Road Project.
5) South City at Kolkata.
6) Railway siding development at Dadhapara Station.
7) Railway siding development at Rupond Station.
8) D.S.P. Township Road development Project.
9) Tata Iron mines at Noamundi.
10) Monarchak Transmission Line Survey.
11) Railway siding development of ESL MINING LTD at Barbil.
12) DRDO Project at Nayagaon, Assam
13) NTPC 225 Flood Control Project at Farakka.
14) Existing Railway line development for HINDALCO at Hirakundh.
15) NEPAZE Steel Plant Development.
16) LAFARGE Cement Plant Development at Bhatapara.
17) OCL Railway siding development at Bayree.
18) HCL Railway siding development at Ghatsila.
19) Railway siding development at Durgapur.
20) BCCL out Sourcing Project at Dhanbad.
21) Railway siding development at Sri Ramrupai Balaji Steel Plant .
22) Railway siding development at Dadhapara Station.
23) Canal survey at chilka and RatnaJira river at Puri (Phase -I).
24) Rail Survey at different Private siding in CKP division under South Eastern Railway.
25) Proposed Water Treatment Plant survey at Nagpur, Jharsuguda, Koderma, Maithon, Bhuj,
Mejia for L&T.
26) Survey for proposed railway siding for NTPC at Hazaribag under BARSYL.
27) Plant survey of material handling system for Birla Cement at Durgapur.
28) Survey for fabrication and Batching plant of airport authority at Netaji Subhas Chandra
Bose Internationa Airport (NSCBIA), Kolkata under ITD Cementation Ltd.
29) Completion Bally Water Line Project.
30) Completion Topography survey for Kolkata Metro Railway from Central to Howrah
Maidan.
~ 23 ~
Com
pa
ny P
rofile
31) Topography survey of two stations one is SEALDAH & another one is Central Metro
Station under ITD.
32) Pillar Installation at metro related area under ITD.
33) Survey for new airport complex and runway at Netaji Subhas Chandra Bose International
Airport in Kolkata under ITD CEM JV.
34) Survey of canal at chilka and survey of Ratnajira River at Puri (Phase-II).
35) Survey at Thermal Power Plant of L&T Ltd. at Nagpur, Jharsuguda, Koderma, Maithon,
Bhuj, Mejia site.
36) Canal Survey at Mandermuni in Digha.
37) BRTS Road survey at Durgapur under BUIDL.
38) Detail Topography layout survey under HINDALCO Industries Limited.
39) Topographical survey at Bhadrakh Site under Larsen & Toubro.
40) Survey Project within Zone Command area including preparation data base and drawing
under Surface Water Based Water Supply Scheme in the arsenic affected areas of S outh 24
Parganas District.
41) Collecting Horizontal Reference Point from i) cut & cover (subhas sarobar); ii) Phool Bagan;
iii) cross over; iv) Sealdah; v) Central station under ITD - ITD CEM JOINT VENTUE.
42) Survey work under L&T at Rajmundrai Site.
43) Details survey at EM-Bypass relevant area
44) Rail survey work at Shantipur under Mesa Narula JV.
45) Kachrapara Municipality survey.
46) Sewerage Network survey work for the Kanchrapara, Kalyani, Champdani, Rishra,
Nabadeep, Krishnanagar municipalities under National Ganga River Basin Authority
(NGRBA).
47) Survey work at Barbil, Jharkhand under Global Industries.