upper mississippi river 9-foot navigation system st. paul district 13 locks and dams

11
US Army Corps of Engineers BUILDING STRONG ® U.S. Army Corps of Engineers St. Paul District Channels & Harbors Project Presentation for 2012 WEDA Midwest Chapter By Steve Tapp April 27 th , 2012

Upload: eman

Post on 05-Jan-2016

32 views

Category:

Documents


0 download

DESCRIPTION

U.S. Army Corps of Engineers St. Paul District Channels & Harbors Project Presentation for 2012 WEDA Midwest Chapter By Steve Tapp April 27 th , 2012. Upper Mississippi River 9-Foot Navigation System St. Paul District 13 Locks and Dams 284 Miles of 9-Foot Channel Mississippi River - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Upper Mississippi River 9-Foot Navigation System St. Paul District 13 Locks and Dams

US Army Corps of Engineers

BUILDING STRONG®

U.S. Army Corps of EngineersSt. Paul DistrictChannels & Harbors Project

Presentation for2012 WEDA Midwest Chapter

BySteve Tapp

April 27th, 2012

Page 2: Upper Mississippi River 9-Foot Navigation System St. Paul District 13 Locks and Dams

BUILDING STRONG®17 April 2009 2

Upper Mississippi River9-Foot Navigation System

St. Paul District

• 13 Locks and Dams• 284 Miles of 9-Foot Channel

• Mississippi River • Minnesota River • St. Croix River • Black River

• 11 Shallow Draft Recreation Harbors • 3 Shallow Draft Commercial Harbors

Page 3: Upper Mississippi River 9-Foot Navigation System St. Paul District 13 Locks and Dams

BUILDING STRONG®

• Average 850,000 CY/YR

• Season is May-November

• Government & Contract Dredges Used

St. Paul District Dredging

3

Page 4: Upper Mississippi River 9-Foot Navigation System St. Paul District 13 Locks and Dams

BUILDING STRONG®

Government Equipment

Dredge GOETZ

• Replaced THOMPSON in

2005

• 20-inch cutterhead pipeline

dredge

St. Paul District Dredging

4

Page 5: Upper Mississippi River 9-Foot Navigation System St. Paul District 13 Locks and Dams

BUILDING STRONG®

Government Equipment

Dredge DUBUQUE

• 12 inch cutterhead pipeline dredge

Excavators

&

Cranes

St. Paul District Dredging

5

Page 6: Upper Mississippi River 9-Foot Navigation System St. Paul District 13 Locks and Dams

BUILDING STRONG®

Contract Equipment

Hydraulic

• Mostly site excavations

• Some channel dredging

Mechanical

• Mostly channel dredging

• 3 year contract with LS Marine in 2011

St. Paul District Dredging

6

Page 7: Upper Mississippi River 9-Foot Navigation System St. Paul District 13 Locks and Dams

BUILDING STRONG®

2011 Dredging Summary

Total Dredged = 1,478,989 CY Jobs = 54

62% Government 38% Contract

Contractor: LS Marine

Dredging Season 2011:April 27th – November 16th

(Last year May 24th – October 13th)

Dredge GOETZ

St. Paul District Dredging

7

Page 8: Upper Mississippi River 9-Foot Navigation System St. Paul District 13 Locks and Dams

BUILDING STRONG®

2013: Pool 2 Channel Modification?500,000 CY

2014: Lost Island Site Unloading (Pool 5)750,000 CY

2015: McMillan Island Site Unloading (Pool 10)200,000 CY

2016: Lower Pool 2 Multiple Site Unloading1,000,000 CY

Upcoming Dredging Jobs

8

Page 9: Upper Mississippi River 9-Foot Navigation System St. Paul District 13 Locks and Dams

BUILDING STRONG®

Capoli Slough

9

Environmental Management ProgramProtect 10 IslandsConstruct 9 New IslandsQty Estimates

250K CY Sand Fill 35K CY Fines 30K CY Rock

Award Late 2011

Page 10: Upper Mississippi River 9-Foot Navigation System St. Paul District 13 Locks and Dams

BUILDING STRONG®

Pool 2 Channel Study

Complete Plan in 2012 Award Contract in 2013 Remove .5 Mile of

Channel ? Reduce Dredging Improve Safety

10

Page 11: Upper Mississippi River 9-Foot Navigation System St. Paul District 13 Locks and Dams

BUILDING STRONG®11

Thanks!Thanks!