Update from BMD - W/C Sunday 22 January 2017 Southport-Burleigh Road upgrade (northern section) Due to the Australia Day holiday next Thursday, next week BMD will be working: at night on Sunday, Monday and Tuesday. during the day at Benowa Canal Bridge and other minor works every day except Thursday. Details about night works next week are below – see zone map attached for locations. Night works will then resume on Sunday, 29 January. Night works that week will include the installation of electrical cable down the centre median of the Smith Street Motorway and laying of asphalt over Benowa Canal Bridge. See the notifications attached for further information. Night works – Nightly next Sunday to Tuesday – 6pm to 6am Location Work Main impacts Zone one – High Street and Ferry Road (North Street to Lawson Street) Shared pathway finishing works near the Nind and High Streets intersection. Installation of electrical conduits at the Nerang and High Streets intersection. Changed traffic conditions including lane closures and reduced speed limits. Noise from construction vehicles and machinery including vacuum trucks, when required. Noisy ‘high impacting’ works such as concrete cutting will be done before 11pm, when possible. The use of flashing roof lights and reversing alarms on construction vehicles for safety. When working on or near the shared pathway, pedestrian will be directed around the works. Zone two - High Street and Ferry Road (Lawson Street to Charlton Street) Installation of electrical conduits at the Queen Street and Ferry Road intersection. Anti-slip road treatment on Ferry Road between Egerton and Charlton Streets. Zones 3, 4 and 5 – Ferry Road and Bundall Road (Charlton Street to Vespa Crescent) Completion of kerb concrete works and construction of traffic islands: o Between Winchester Street and Benowa Road o Near the Cotlew Street intersection. o Near the Drury Ave intersection. o At The Arts Centre entry/exit. Zones 4 and 5 – Ferry Road and Bundall Road (from Yacht Street to Vespa Crescent) Defects finishing works.*

Upload: others

Post on 11-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Update from BMD - W/C Sunday 22 January 2017 …...2017/01/22  · Update from BMD - W/C Sunday 22 January 2017 Southport-Burleigh Road upgrade (northern section) Due to the Australia

Update from BMD - W/C Sunday 22 January 2017

Southport-Burleigh Road upgrade (northern section) Due to the Australia Day holiday next Thursday, next week BMD will be working:

at night on Sunday, Monday and Tuesday.

during the day at Benowa Canal Bridge and other minor works every day except Thursday.

Details about night works next week are below – see zone map attached for locations.

Night works will then resume on Sunday, 29 January. Night works that week will include the installation

of electrical cable down the centre median of the Smith Street Motorway and laying of asphalt over

Benowa Canal Bridge. See the notifications attached for further information.

Night works – Nightly next Sunday to Tuesday – 6pm to 6am

Location Work Main impacts

Zone one – High Street and Ferry Road (North Street to Lawson Street)

Shared pathway finishing

works near the Nind and

High Streets intersection.

Installation of electrical

conduits at the Nerang and

High Streets intersection.

Changed traffic

conditions including lane

closures and reduced

speed limits.

Noise from construction

vehicles and machinery

including vacuum trucks,

when required.

Noisy ‘high impacting’

works such as concrete

cutting will be done

before 11pm, when

possible.

The use of flashing roof

lights and reversing alarms

on construction vehicles

for safety.

When working on or near

the shared pathway,

pedestrian will be directed

around the works.

Zone two - High Street and Ferry Road (Lawson Street to Charlton Street)

Installation of electrical

conduits at the Queen

Street and Ferry Road

intersection.

Anti-slip road treatment on

Ferry Road between

Egerton and Charlton

Streets.

Zones 3, 4 and 5 – Ferry Road and Bundall Road (Charlton Street to Vespa Crescent)

Completion of kerb

concrete works and

construction of traffic

islands:

o Between Winchester

Street and Benowa Road

o Near the Cotlew Street

intersection.

o Near the Drury Ave

intersection.

o At The Arts Centre

entry/exit.

Zones 4 and 5 – Ferry Road and Bundall Road (from Yacht Street to Vespa Crescent)

Defects finishing works.*

Page 2: Update from BMD - W/C Sunday 22 January 2017 …...2017/01/22  · Update from BMD - W/C Sunday 22 January 2017 Southport-Burleigh Road upgrade (northern section) Due to the Australia

All zones Signage installation.

Intersection upgrade works

including traffic signal

upgrades and tactile

installation at most

intersections along the

project alignment.

*Defects works are works done at the end of most construction projects where small areas are rectified

to ensure they comply with the design.

DID YOU KNOW? The orange construction bollards are still in place in many sections in the northern part of Southport-Burleigh Road as upgrade works are still ongoing. The main works to be completed include the intersection upgrades, the final layer of asphalt and completion of the two bridge widenings. Once all works are completed in the remaining sections, the new third lane will open to traffic and the bollards will be removed.

SAFETY TIP: If you’re riding your bicycle along the new shared pathway, please be mindful and

courteous when you approach pedestrians. Ring your bell to signal your approach and slow down as

you pass.

Enjoy your weekend and have a great Australia Day next Thursday!

Community and Stakeholder Team BMD Constructions | Southport-Burleigh Road Upgrade Northern section (North Street to Vespa Crescent) Ph: 1800 227 561 (Option 1) Email: [email protected] Web: www.tmr.qld.gov.au/projects

Page 3: Update from BMD - W/C Sunday 22 January 2017 …...2017/01/22  · Update from BMD - W/C Sunday 22 January 2017 Southport-Burleigh Road upgrade (northern section) Due to the Australia

Transport and Main Roads (TMR) is upgrading an 8-kilometre section of Southport-Burleigh Road (High Street, Ferry Road, Bundall Road and Bermuda Street).

As a part of this upgrade, new electrical cable will be installed in the centre median of the Smith Street Motorway and a small section of North Street between High Street and Hospital Boulevard, Southport. This work will be carried out by TMR’s contractor – BMD Constructions – as part of their Southport-Burleigh Road northern section upgrade. It will occur at night from Sunday 29 January and is expected to take up to one week to complete. What to expect

Changed traffic conditions at night on the Smith Street Motorway and North Street between High Street and Hospital Boulevard (just before Parklands Drive). Sections of the lanes closest to the centre median on both sides of the road will be closed and a reduced speed limit will be in place. To avoid delays, motorists should seek alternative routes, when possible.

Some noise from construction vehicles and machinery although these works are not expected to be overly noisy.

Access to surrounding homes, businesses and facilities will be maintained at all times.

Work hours To keep traffic flowing and for the safety of everyone involved, works that require lane closures can generally only occur at night when traffic flows are at their lowest. These works will occur at night Sunday to Thursday from 8pm to 5am. The project thanks the community for their patience and understanding during these important upgrade works. BMD’s Southport-Burleigh Road northern section upgrade works are on target to be complete in early-mid 2017.

Cable installation night work – Smith Street Motorway – From Sunday 29 January 2017

Southport–Burleigh Road network improvement program

Northern section (North Street to Vespa Crescent) January 2017

Stay up-to-date

To receive our regular construction updates via email or SMS, please register your details.

Phone: 1800 227 561* – select option 1

Email: [email protected]

For general project information visit the Department of Transport and Main Roads website and search for Southport-Burleigh Road.

Web: www.tmr.qld.gov.au/projectswww.tmr.q

*Standard call charges may apply.

Page 4: Update from BMD - W/C Sunday 22 January 2017 …...2017/01/22  · Update from BMD - W/C Sunday 22 January 2017 Southport-Burleigh Road upgrade (northern section) Due to the Australia

Work is continuing at Benowa Canal Bridge on Bundall Road, as part of Transport and Main Road’s northern upgrade of Southport-Burleigh Road (High Street, Ferry Road and Bundall Road).

On Sunday 29 January from 6pm, asphalt will be installed across Benowa Canal Bridge on the northbound (One 50 Public House/ Corporate Centre) side of the bridge.

Traffic changes

During these works, temporary traffic changes will be in place on Bundall Road between Karp Court and Slatyer Avenue.

From 6pm, a single lane closure will be in place on Bundall Road.

From 7pm, both traffic lanes on the northbound carriageway will be closed.

During this time, one lane in each direction (northbound and southbound) will be provided on the southbound (Rowing Club) side of Bundall Road. See map on reverse.

What to expect

Changed traffic conditions including reduced speed limits.

Noise from construction vehicles and machinery including profiling and asphalt trucks.

Access to Holden Place businesses will be maintained, although points of access will change. Traffic controllers and police will be in place to direct motorists.

Pedestrian access will continue to be provided on the southbound side of the bridge. Please walk around the works via the traffic signals at Karp Court and Slatyer Avenue/Thomas Drive.

Work hours

As lane closures are required, to keep local traffic moving and for the safety of everyone involved, these works can only occur at night when traffic flows are at their lowest. These night works will occur from 6pm to 6am. BMD’s upgrade works in the northern section of Southport-Burleigh Road are on target to be complete in early-mid 2017. The project thanks local businesses and residents for their patience and understanding during these important upgrade works.

Night bridge works – Benowa Canal Bridge – Sunday 29 January

Southport–Burleigh Road network improvement program Northern section (North Street to Vespa Crescent) January 2017

Stay up-to-date

To receive our regular construction updates via email or SMS, please register your details.

Phone: 1800 227 561* – select option 1

Email: [email protected]

For general project information visit the Department of Transport and Main Roads website and search for Southport–Burleigh Road.

Web: www.tmr.qld.gov.au/projectswww.tmr.q

*Standard call charges may apply.

Page 5: Update from BMD - W/C Sunday 22 January 2017 …...2017/01/22  · Update from BMD - W/C Sunday 22 January 2017 Southport-Burleigh Road upgrade (northern section) Due to the Australia

Changed traffic conditions Sunday 29 January – Bundall Road, Bundall

Page 6: Update from BMD - W/C Sunday 22 January 2017 …...2017/01/22  · Update from BMD - W/C Sunday 22 January 2017 Southport-Burleigh Road upgrade (northern section) Due to the Australia

Main B

eachSouthport

Bundall Road

High StreetFerry Road

Gold Coast Highway

Smith Street

Johnston Street

Geo

rge

Stre

etQueen Street

Walton Street

Minnie Street

Charlton StreetBrolga Avenue

Slatyer AvenueThomas Drive

Crombie Avenue

Vespa Crescent

Cotlew Street

Winchester Street

North Stre

et

Nind StreetRailway Street

Nerang Street

Lawson Street

Benowa Road

Bundall

Yacht Street

Shaw Street

Zone 1 North street to Lawson Street

Zone 2 Lawson Street to Charlton Street

Zone 3 Charlton Street to Yacht Street

Zone 4 Yacht Street to Thomas Drive

Zone 5 Thomas Drive to Vespa Crescent

Legend