UNOFFICIAL 2017 SPLOST Transportation Improvement Program
Citizens Project Selection Committee Minutes
January 9, 2017
Members Present: Uday Parikh, Sherry Ferguson, Chris Ford, Steven Douches, Laurie McClain, Joy Monroe, Charles McDaniel, Chad Lockhart, Alan Kaplan, Davida Baker, Sohum Mehta Alternates Present: Piper Keairnes, Sal Pirzad, Greg Cantrell, Raymond Rodden, Darryl Franklin, Debra Pennington, Art Sheldon, Kenny King, Erik Provitt, Patricia Gabilondo Alternates Absent: Darryl Franklin, Mark Williams County Staff: Alan Chapman, Lewis Cooksey, David Tucker, Edgardo Aponte, Chuck Bailey, Vince Edwards, John Ray, Amanda Reed, Joanna Rouse, Mark Stonecypher, Jody Woodall
I. Welcome and Introductions
Mr. Alan Kaplan called the meeting to order at 6:35pm.
II. Approval of Agenda {Action: Approved. Motion: Ferguson Second: McClain Vote 9-0; Ferguson – Yes; Douches – Yes; McClain – Yes; Pennington – Yes; McDaniel – Yes; King – Yes; Kaplan – Yes; Gabilondo – Yes; Mehta - Yes }
III. Approval of Minutes – December 12, 2016
Approval of Minutes – December 12, 2016 {Action: Approved. Motion: Douches Second: Ferguson Vote 9-0; Ferguson – Yes; Douches – Yes; McClain – Yes; Pennington – Yes; McDaniel – Yes; King – Yes; Kaplan – Yes; Gabilondo – Yes; Mehta - Yes }
IV. Public Comment Public comment was received.
V. Old Business
A. Approval of Project Category – School Safety
Mr. Alan Chapman presented the School Safety category and allocation. {Action: Approval of School Safety allocation – Approved. Motion: Baker Second: McClain Vote 11-0; Parikh – Yes; Ferguson – Yes; Ford – Yes; Douches – Yes; Franklin – Yes; Monroe – Yes; McDaniel – Yes; Lockhart – Yes; Kaplan – Yes; Baker – Yes; Mehta - Yes }
VI. New Business
A. Presentation of Project Category – Bridges Mr. Jody Woodall presented information regarding the Bridges, Culverts and Transportation Drainage category.
B. Next Meeting Dates
Discussion was held. VII. Public Comment
No public comment was received.
VIII. Adjourn Meeting was adjourned at 8:07pm.
TRANSPORTATIONDEPARTMENT
CPSC MeetingJanuary 9, 2017
Agenda• Welcome and Opening Remarks• Approval of Agenda• Approval of Minutes• Public Comment• Old Business
• Vote on previous category – School Safety• New Business
• Presentation of Bridges, Culverts, and Transportation Drainage Project Category
• Discussion of Future Meeting Schedule• Public Comment• Adjourn
School Safety
Gwin Oaks Elementary School
School Safety
Graves Road from Graves Lane to McDonough Drive
School Safety
Breckinridge Boulevard at Centerview Drive
School Safety
SR 124 / Braselton Highway at South Pucketts Mill Road
School Safety
Sycamore Road from Richland Creek Trail to Sycamore Elementary School
CPSC Recommendations
Request approval of School Safety project list
Bridges, Culvertsand Transportation Drainage
Projects identified by:• Structural Adequacy / Functionally Obsolete• Safety• Capacity / Congestion Upgrades• Transportation Drainage• Bridge Rehabilitation• Connectivity
Bridges, Culvertsand Transportation Drainage
Glossary of Terms• Structurally Deficient - In poor condition or have sub-standard
strength• Structurally Deficient does not mean bridges are unsafe or are
likely to collapse• Functionally Obsolete - Designed to older standards / do not
meet current standards
Bridges, Culvertsand Transportation Drainage
Glossary of Terms• Posted Loads – The Federal Bridge Gross Weight
Formula is a mathematical formula in use in the United States by truck drivers and Department of Transportation (DOT) officials to determine the appropriate maximum gross weight for a commercial motor vehicle (CMV) based on axle number and spacing. The formula is necessary to prevent heavy vehicles from damaging roads and bridges. CMVs are most often tractor-trailers or buses, but the formula is of most interest to truck drivers due to the heavy loads their vehicles often carry.
Structural Adequacy / Functionally ObsoleteRecommended Replacements
Harbins Road at Apalachee River
• Bridge Posted for weight restrictions
• Bridge location is at the Gwinnett County/Barrow County line
• Potential for Gwinnett and Barrow to partner with Georgia DOT
Structural Adequacy / Functionally ObsoleteRecommended Projects
Harbins Road at Apalachee River
Lakeview Road at Big Haynes Creek
• Concrete spalling of bridge deck
• Paint peeling and cracking on beams
• Erosion at abutment
Structural Adequacy / Functionally ObsoleteRecommended Projects
Structural Adequacy / Functionally ObsoleteRecommended Projects
Lakeview Road at Big Haynes Creek
Old Norcross Road at Bromolow Creek Tributary
• Minimal shoulders, no guardrail, railings and end treatments
• Channel eroded
• Bridge sitting on rock abutments
Structural Adequacy / Functionally ObsoleteRecommended Projects
Old Norcross Road at Bromolow Creek Tributary
Structural Adequacy / Functionally ObsoleteRecommended Projects
Suwanee Creek Road at Bennett Creek
• Deck condition fair
• Some scour occurring
• Concrete beams have exposed steel
Structural Adequacy / Functionally ObsoleteRecommended Projects
Structural Adequacy / Functionally ObsoleteRecommended Projects
Suwanee Creek Road at Bennett Creek
Safety Improvements
Center Way at I-85 Pedestrian Fencing
Capacity / Congestion Upgrades
SR 316 / University Parkway
Capacity / Congestion Upgrades
SR 316 / University Parkway at Harbins Road
Capacity / Congestion Upgrades
SR 316 / University Parkway at Harbins Road
Capacity / Congestion Upgrades
SR 316 / University Parkway at US 29 / SR 8 / Winder Highway
Capacity / Congestion Upgrades
* Cost estimate based on preliminary engineering documents** Cost estimate based on planning level concepts
SR 316 /University Parkway Corridor Improvements – Georgia DOT / Gwinnett County Partnership Agreement
SR 316 at Hi-Hope / Progress Center **
SR 316 at Hurricane
Trail **
SR 316 at US 29 **
SR 316 at HarbinsRoad *
Total
Gwinnett County $4 million $60 million $64 millionGeorgia DOT $75 million $40 million $57 million $172 million
Total $75 million $40 million $61 million $60 million $236 million
Transportation Drainage
• Roadway crossings and parallel pipe systems
• Replacements due to condition of structure
• Replacements due to capacity of structure to carry appropriate stormwater volume
Transportation Drainage
Condition
Transportation Drainage
Capacity
Bridge Rehabilitation
Bridge Rehabilitation
Connectivity
Planning Efforts at Major Crossings (I-85 and SR 316)
Connectivity
Planning Efforts at Major Crossings (I-85 and SR 316)
Connectivity
Planning Efforts at Major Crossings (I-85 and SR 316)
Connectivity
US 29 / SR 8 / Winder Highway to Old Auburn Road – new bridge
Next Steps
• Provide any questions or concerns to GCDOT by January 18, 2017
• Request approval of Bridges, Culverts and Transportation Drainage category on January 24, 2017
• Present Road Safety & Alignment category on January 24, 2017
CPSC Meeting Schedule
February 2017 Meeting (Feb 13,14 or 16)• Committee vote on Road Safety and Alignment• Presentation on Intersections
TRANSPORTATIONDEPARTMENT
Public Comment